April 22, 2019 60% Design Community Meeting

High School Site 80-H-SW-4

Please sign in on your mobile device: http://communitymeeting.ocps.net/

1 High School Site 80-H-SW-4 Meeting Agenda April 22, 2019, 6:00 PM

• Welcome – School Board Member: Pam Gould • Introductions – Lauren Roth/ Facilities Communications • Project Update – David Torbert, AIA, NCARB • Questions and Answers • Adjournment

2 Site Location DR. PHILLIPS HS

Parkside

Hilton Sand Grand Vacations Lake

ORANGE COUNTY CONVENTION CENTER BEACHLINE

FREEDOM HS Dr. Phillips Community SEAWORLD SITE 80 Park NEW HIGH SCHOOL Villas of ROAD VINELAND APOPKA S. Grand Cypress Jewish Community WINTER GARDEN VINELAND ROAD GARDEN VINELAND WINTER Center Lake north Willis 441 ROAD STATE New Lake Connector Ruby

Road S. JOHN YOUNGPARKWAY (By County)

3 Site Aerial

Dr. Phillips Sand Lake Community Park

FENTON ROAD

Jewish Community Center High School Site 80-H-W-4 (+/-50 Acres) S. APOPKA VINELAND ROAD VINELAND APOPKA S.

New Connector Road (By County)

Park Soleil Lake Willis

north Lake Ruby

4 Site Plan

Baseball Retention Softball Practice Practice Field Field Stadium Track Tennis Basketball & Field

Shadehouse & Greenhouse

Service Field House Future Expansion Fencing

Bike Racks Cafeteria 3-Story Academics Bus Loop & Staff Parking Courtyard Student

Bus DropBus Parking Admin. Auditorium Music Media Gym FRONT DOOR Parent Drop Visitor Retention Parking

Full Median Student Stations = 2,776 Daryl Carter Parkway north Opening 0’ 200’ Parking = 777 spaces Car Stacking = up to 300 cars Directional Left On-site Bus Stacking = 60 buses Turn Lane

5 Project Basis – OCPS Prototype High School OCPS PROTOTYPE HIGH SCHOOLS Oak Ridge High School Evans High School West Orange High School Freedom High School Olympia High School

Oak Ridge High School

6 Project Basis – OCPS Prototype High School UPGRADES INCLUDED PROTOTYPE Oak Ridge High School Educational • 21st Century Collaborative Learning Hubs

Technology • Interactive Touchscreen Smart TV’s • WiFi access points throughout

Energy Efficiency • LED lighting campus wide (interior, exterior, site and athletic fields) • High efficiency chillers and variable pumping scheme • Low flow plumbing fixtures • Commissioning of MEP systems • ASHRAE 90.1 compliance for lighting and power metering

Security • Full security access control and cameras for the school • 2-way emergency radio system • Voice evacuation fire alarm system • Permanent generator and life safety lighting 7 Building Program Students: 2,776 Buildings: +/-350,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms Science Labs • MEDIA CENTER • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling CAFETERIA

12 Building Program Students: 2,776 Buildings: +/-350,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms Science Labs • COMPUTER LAB • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling SCIENCE LAB

13 Building Program Students: 2,776 Buildings: +/-350,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms Science Labs • AUDITORIUM • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling GYMNASIUM

14 Site Program Site: +/-50 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions • Practice Fields GREENHOUSE • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts

Cars and Buses Student and Faculty parking (+/-777 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) STADIUM/TRACK & FIELD

15 Site Program Site: +/-50 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions • Practice Fields BASEBALL • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts

Cars and Buses Student and Faculty parking (+/-777 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) SOFTBALL

16 Site Program Site: +/-50 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions • Practice Fields TENNIS • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts

Cars and Buses Student and Faculty parking (+/-777 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) OUTDOOR BASKETBALL

17 Additional Features Safety & Security SECURE ENTRY POINT • Secure Courtyard Design • Single Secure Entry Point • Security System & Cameras • Card Reader Entrance Controls

Educational Technology CLASSROOM TECHNOLOGY • 70” Touch Screen “Smart” Monitors • Audio Enhancement • WiFi Connectivity

Audio Enhancement System 70” Touchscreen

Wireless Access Point

18 Sustainability Building Site • 10% more energy efficient than ASHRAE • Native/low water plants – reduce water 90.1 standard consumption • High Efficiency Chillers (15% energy • Low Impact Design (LID) stormwater design reduction) • Light colored roof to reduce heat gain and improves energy performance • Energy Efficient LED Lighting • Energy Star rated equipment • Water saving toilets, faucets, and fixtures • All classrooms have daylighting • Over 75% of ALL spaces have daylighting • Thermal efficient windows/glazing

19 Planned Schedule

November April April August 2018 2020 2022 2022

Design, Permitting, Bidding New Campus Construction (24 Months) Move-In