Expression of Interest for Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Bridges

Total Page:16

File Type:pdf, Size:1020Kb

Expression of Interest for Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Bridges Government of Nepal Ministry Of Physical Infrastructre and Transport Department of Roads Bridge Branch As per Notice No: 1/ 071/72 Expression of Interest for Consulting Services For Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Bridges I Introduction The Department of Roads (DOR) invites Expression of Interest (EOI) from domestic consulting Firm(s) for short listing to carry out Feasibility Study, Detailed Engineering Survey, Soil Investigation, Detailed Design and Design Review of Bridges. The proposed list of bridges and packaging information is given in Appendix II. In their covering letter the applying firms must indicate the package numbers for which they intend to submit Proposal (RFP). II Criteria for Short listing The eligibility and qualifying criteria are provided in Appendix I. The Request for Proposal (RFP) shall be provided only to the short listed Consulting Firms as and when required. The RFP for the said works shall be provided only for the packages which the firms have indicated in their covering letter. III Joint Venture Consulting Firms can form a Joint Venture (JV) with maximum three partners, but a firm is not eligible to submit more than one EOI either as a single firm or as a member of a JV. Failing this the EOI of such firm(s) shall be rejected. The EOI must clearly mention the name of the leading firm. IV Information about the Consulting Firms The Consulting Firm(s) are required to complete the forms prescribed below. In case of a JV these forms are to be completed individually for each partner, in a sequential manner. 1) Financial Capacity Annual turnover of the last five years. (The Financial Capacity will be assessed by the values of the Best 3 years within last 5 years.) Fiscal year Turnover (NRs) EOI for Feasibility Study, Detailed Engineering Survey & Design of bridges-56 packages (071/72) [1] Notes: A. The above information must be supported by the auditor's reports. The applicants are advised to indicate the best three years of turnovers. The values of the turnover of previous years will be adjusted according to the National Urban Consumer Price Indices. B. The firm and/or JV shall have to submit Tax Clearance Certificate of fiscal year 069/70 duly attested by Notary Public. Submission of non attested Audit Report shall not be considered for EOI evaluation. 2) General Experience of the Firm in civil engineering works during the last 5 years with contract amount more than Rs. 0.5 million. S. Name of the Project Name of the client Contract Amount Year of No (Consulting services) of Consulting Completion Services (excluding VAT) 1 2 3 … The above information must be supported by works completion certificates with clearly indicated contract amount and date. 3) Work Experience in Detailed Engineering Survey and Design of Motorable Bridges during the last 5 years S. Name of the Project Name of the client Year of No (Consulting services) Completion 1 2 3 …. The above information must be supported by works completion certificates with clear completion date. 4) Office Equipment and Facilities List office space, Drilling equipment, Lab facilities, Survey equipment and Vehicles available with and owned by the firm(s). S. No Office space/Equipment/Facilities Quantities Specifications/Remarks 1 2 3 … … Notes: • Lab equipment should include equipment for assessing soil/Rock parameters • Office space in square meters. EOI for Feasibility Study, Detailed Engineering Survey & Design of bridges-56 packages (071/72) [2] • Only Total Station or other Electronic Theodolites are considered for evaluation • Only 4WD Utility vehicles are considered for evaluation • Ownership evidences are mandatory for drilling equipment, survey equipment and vehicles. 5) Manpower Resources Resource persons and supporting staff working with the consulting firm S.N. Resource person / Required administrative / support staff minimum Name(s) of the persons General Experience Permanent On call 1 Bridge / Structural Engineers 10 years 2 Geotechnical Engineers 5 years 3 Hydrologists 5 years 4 Senior Surveyor / Geodetic 5 years engineers 5 Civil engineers 3 years 6 Managerial / Administrative N/A staff 7 Supporting staff N/A Notes: • Provide bio-data of only the technical resource persons. The bio-data shall be signed in blue indelible ink by the respective personnel declaring the correctness of the information. 6) Adherence to Code of Ethics and Anti Corruption Policy Provide the firms' commitment on Code of Ethics and Anti Corruption and their mechanism to monitor the adherence to these policies. ----------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------- EOI for Feasibility Study, Detailed Engineering Survey & Design of bridges-56 packages (071/72) [3] Appendix - I ELIGIBILITY AND QUALIFING CRITERIA Eligibility Criteria: a. The firm must be registered in appropriate government office b. The firm must be registered in Value Added Tax (VAT) office c. Must submit evidence of Tax clearance for up to the last fiscal year (2069/70) d. Must commit to adhere to the code of ethics and anti-corruption policy e. JV agreement in case of Firms in JV Qualifying Criteria: a. Firm's Capacity - 50 Points • Financial Capacity – 15 points • Resource personnel – 20 points • Office equipment and facilities – 15 points b. Experience - 50 Points • General Experience of the Firm in Civil Engineering works - 15 Points • Detailed Engineering Survey & Design of motorable bridges - 35 Points Notes: 1- A successful firm or JV shall secure minimum 60% of the total points and 50% in individual criteria a and b above. 2- The same firm shall not be allowed to submit EOI individually and in JV for same package. Every JV shall be unique. (" Example 1: EOI for Firm A and Firm A JV Firm B"- not allowed) ("Example 2: EOI for Firm A J.V. with Firm B an Firm B JV with Firm C"- not allowed) EOI for Feasibility Study, Detailed Engineering Survey & Design of bridges-56 packages (071/72) [4] 17 Appendix- II Contract No. BB-159-DSD-071/72-01 S. N. District Name of Bridge Name of Road 1 Panchthar Hewa Khola Bridge Memmeng-2 Machhebung-Pabung-5 2 Panchthar Damor Limbuni Bridge Taplejung Jodne 3 Panchthar Ri Gewa Khola Bridge Sidin 2 and Parabung Jodne 4 Ilam Puwa Kholama Bridge Sankhe Junga VDC Milgolai 5 Ilam Lakhandehi Bridge Pattharkot VDC Wada no. Jiyajor Hirapur 6 Ilam Phuljor Khola Bridge Ishwarpur 9 Rampur bat Jabdi Jodne 7 Ilam Phakphok Kholama Pakki Bridge EkatappaVDC batPhuetapa VDC Simanam 8 Ilam Mai Khola Bridge Hansapukari Sarupakha Irautar Road 9 Ilam Sanonete Bhimale Bridge 10 Ilam Daanawari 6 Kulo Diya Khola Pakki Bridge Contract No. BB-159-DSD-071/72-02 District Name of Bridge Name of Road 1 Ilam Chyame Khola Bridge Garkhe 2 Jhapa Baniyani Kholama Pakki Bridge Dudamari Kunjibari Road 3 Jhapa Dhagra Khola Bridge Dangibari 7 Kumaltol Naksal bahudangi-Shantinagar-BudhbareSagak Jodne Sadak, 4 Jhapa Dama Khola Pakki Bridge Budhaware 1 Naksalbanda-Bahundangi-Shantinagar-Budhbare-Jaypur- 5 Jhapa Hadiya Kholama Bridge Khudunabari-Road, Budhbare 9 Sitapuri-Jivanchowk-Devichown-Ratanchown-Gauradah 6 JJhapahapa BhBhutlungutlung KhKholamaolama BriBridgedge Sadakma Gauriya Kholama Bridge, Culvert 7 Jhapa Construction Gaurahdah, Schoolchaun, Dillibandh Chilahara Road ChandragadhiWada no. 3 and wada no. 4 Jodne Parijat Chowk 8 Jhapa Kajwe batBhadrapur Municipality Road 9 Jhapa Dhyangri Kholama Bridge Kerkha-Gurungtol-Ratancaun-Gaurdah Sadakma Jhapa Surung Khola Bridge Shantinagar 7 Contract No. BB-159-DSD-071/72-03 District Name of Bridge Name of Road 1 Jhapa Biring Khola Bridge Jaypur Sisne khanda 2 Jhapa Sanu Kamal Khola Bridge Baigundhara Panchgachi 3 Jhapa Kamal Kholama Bridge Topgachhi Dharampur Mangalbare 4 Jhapa Biring Khola Bridge Ghailadubba Bazzar batChampapur Sadak Khandama 5 Jhapa Bhusuki Khola Bridge Shahid Netramarga Garamani 6 Jhapa Bhalu Khola Bridge Maidhar Dekhi Chillaagadhdham 7 Jhapa Mechi River 40 Km. Tatabandha Stop Chowk Dekhi Shramik tol Jodne 8 Jhapa Road Shanti Arjun 7 and 1 Jodne 9 Jhapa Shanishchare Hundai Jaypur Jane Road 10 Jhapa Ratuwa Kholama Pakki Bridge Damak 1 and Lakhanpur 1 ma Parne EOI for Feasibility Study, Detailed Engineering Survey Design of Bridges‐56 packages (071/72) 17 Contract No. BB-159-DSD-071/72-04 District Name of Bridge Name of Road 1 Jhapa Sano Mai Kholama Pakki Bridge Taghan Dubba 9 ko Kankai Pathma Parne 2 Jhapa Kamal Khola Bridge Lakhanpur-Campus-Mangalbare-Shivganj Road 3 Jhapa Kamal Khola Bridge Lakhanpu -Topgachhi Dharampur Road 4 Jhapa Bridge Dharampur 5 dekhi 4 Jodne Bridge 5 Jhapa Basilal Khola Bridge Chandargadhi 8 Saraswatimarga 6 Jhapa Sano raising Bridge Bahundangi wada no. 6 Piltimare Ratuwa khola Bridge 7 Jhapa (Jhapa/Ilam) Chulachuli/Damak 8 Morang Lohandra Khola Bridge Majhare 8 and 9 Jodne 9 Morang Pakki Bridge Motipur VDC wada no. 2,3 Siswani badahara 6 bat Gherawani Limbu tolChatara Nahara 10 Morang Chatara Nahar Bridge Bridge Contract No. BB-159-DSD-071/72-05 District Name of Bridge Name of Road 1 Morang Singhiya Kholama Bridge Biratnagarko Chakrapath Antargat Sindhiya kholama Bridge 2 Morang Chatara Nahar Mathi Bridge Shiswani Badahara 6 and Gherawani
Recommended publications
  • Code Under Name Girls Boys Total Girls Boys Total 010290001
    P|D|LL|S G8 G10 Code Under Name Girls Boys Total Girls Boys Total 010290001 Maiwakhola Gaunpalika Patidanda Ma Vi 15 22 37 25 17 42 010360002 Meringden Gaunpalika Singha Devi Adharbhut Vidyalaya 8 2 10 0 0 0 010370001 Mikwakhola Gaunpalika Sanwa Ma V 27 26 53 50 19 69 010160009 Phaktanglung Rural Municipality Saraswati Chyaribook Ma V 28 10 38 33 22 55 010060001 Phungling Nagarpalika Siddhakali Ma V 11 14 25 23 8 31 010320004 Phungling Nagarpalika Bhanu Jana Ma V 88 77 165 120 130 250 010320012 Phungling Nagarpalika Birendra Ma V 19 18 37 18 30 48 010020003 Sidingba Gaunpalika Angepa Adharbhut Vidyalaya 5 6 11 0 0 0 030410009 Deumai Nagarpalika Janta Adharbhut Vidyalaya 19 13 32 0 0 0 030100003 Phakphokthum Gaunpalika Janaki Ma V 13 5 18 23 9 32 030230002 Phakphokthum Gaunpalika Singhadevi Adharbhut Vidyalaya 7 7 14 0 0 0 030230004 Phakphokthum Gaunpalika Jalpa Ma V 17 25 42 25 23 48 030330008 Phakphokthum Gaunpalika Khambang Ma V 5 4 9 1 2 3 030030001 Ilam Municipality Amar Secondary School 26 14 40 62 48 110 030030005 Ilam Municipality Barbote Basic School 9 9 18 0 0 0 030030011 Ilam Municipality Shree Saptamai Gurukul Sanskrit Vidyashram Secondary School 0 17 17 1 12 13 030130001 Ilam Municipality Purna Smarak Secondary School 16 15 31 22 20 42 030150001 Ilam Municipality Adarsha Secondary School 50 60 110 57 41 98 030460003 Ilam Municipality Bal Kanya Ma V 30 20 50 23 17 40 030460006 Ilam Municipality Maheshwor Adharbhut Vidyalaya 12 15 27 0 0 0 030070014 Mai Nagarpalika Kankai Ma V 50 44 94 99 67 166 030190004 Maijogmai Gaunpalika
    [Show full text]
  • Forests and Watershed Profile of Local Level (744) Structure of Nepal
    Forests and Watershed Profile of Local Level (744) Structure of Nepal Volumes: Volume I : Forest & Watershed Profile of Province 1 Volume II : Forest & Watershed Profile of Province 2 Volume III : Forest & Watershed Profile of Province 3 Volume IV : Forest & Watershed Profile of Province 4 Volume V : Forest & Watershed Profile of Province 5 Volume VI : Forest & Watershed Profile of Province 6 Volume VII : Forest & Watershed Profile of Province 7 Government of Nepal Ministry of Forests and Soil Conservation Department of Forest Research and Survey Kathmandu July 2017 © Department of Forest Research and Survey, 2017 Any reproduction of this publication in full or in part should mention the title and credit DFRS. Citation: DFRS, 2017. Forests and Watershed Profile of Local Level (744) Structure of Nepal. Department of Forest Research and Survey (DFRS). Kathmandu, Nepal Prepared by: Coordinator : Dr. Deepak Kumar Kharal, DG, DFRS Member : Dr. Prem Poudel, Under-secretary, DSCWM Member : Rabindra Maharjan, Under-secretary, DoF Member : Shiva Khanal, Under-secretary, DFRS Member : Raj Kumar Rimal, AFO, DoF Member Secretary : Amul Kumar Acharya, ARO, DFRS Published by: Department of Forest Research and Survey P. O. Box 3339, Babarmahal Kathmandu, Nepal Tel: 977-1-4233510 Fax: 977-1-4220159 Email: [email protected] Web: www.dfrs.gov.np Cover map: Front cover: Map of Forest Cover of Nepal FOREWORD Forest of Nepal has been a long standing key natural resource supporting nation's economy in many ways. Forests resources have significant contribution to ecosystem balance and livelihood of large portion of population in Nepal. Sustainable management of forest resources is essential to support overall development goals.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Landslide Inventory, Characterization and Engineering Design for Mitigation Works of Chure Area in Ten Districts
    LANDSLIDE INVENTORY, CHARACTERIZATION AND ENGINEERING DESIGN FOR MITIGATION WORKS OF CHURE AREA IN TEN DISTRICTS Submitted to: Submitted by: Government of Nepal Central Department of Environmental President Chure-Tarai Madhesh Science Conservation Development Board Tribhuvan University, Kirtipur Kathmandu September, 2016 © September 2016 President Chure-Tarai Madhesh Conservation Development Board and Central Department of Environmental Science, Tribhuvan University Citation: TU-CDES (2016). Landslide Inventory Characterization and Engineering Design for Mitigation Works of Chure Area in Ten Districts. Central Department of Environmental Science, Tribhuvan University and Government of Nepal, President Chure-Tarai Madhesh Conservation Development Board, Kathmandu. Project Steering Committee Chair Dr. Annapurna Das, Secretary , PCTMCDB/GoN Prof. Dr. Madan Koirala, Professor, TU-CDES Member Prof. Dr. Kedar Rijal, Head of Department, TU-CDES Member Prof. Dr. Rejina Maskey, Project Team Leader, TU-CDES Member Dr. Prem Paudel, Under Secretary, PCTMCDB/GoN Member Dr. Subodh Dhakal, Project Coordinator, TU-CDES Member Mr. Gehendra Keshari Upadhya, Joint Secretary , PCTMCDB/GoN Member Mr. Pashupati Koirala, Under- Secretary, PCTMCDB/GoN Project Team Team Leader Prof. Dr. Rejina Maskey Project Co-ordinator Dr. Subodh Dhakal Geo-Technical Engineer Dr. Ram Chandra Tiwari GIS Expert Mr. Ajay Bhakta Mathema Geologist Mr. Suman Panday Assistant Geologist Mr. Niraj Bal Tamang Assistant GIS Analyst Mr. Padam Bahadur Budha Assistant GIS Analyst Ms. Shanta Banstola Social Surveyor Mr. Kumod Lekhak Field Assistant Mr. Nabin Nepali Review Technical Reviewer: Dr. Ranjan Kumar Dahal English Reviewer: Dr. Dinesh Raj Bhuju ii ACKNOWLEDGEMENTS Hazards like earthquake, landslide, soil erosion and sedimentation all shape the landscape and relief of the Himalaya. Land degradation of the Chure area of Nepal is primarily contributed by different types of landslides and mass wasting phenomena.
    [Show full text]
  • Map of Dolakha District Show Ing Proposed Vdcs for Survey
    Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking
    [Show full text]
  • A Local Response to Water Scarcity Dug Well Recharging in Saurashtra, Gujarat
    RETHINKING THE MOSAIC RETHINKINGRETHINKING THETHE MOSAICMOSAIC Investigations into Local Water Management Themes from Collaborative Research n Institute of Development Studies, Jaipur n Institute for Social and Environmental Transition, Boulder n Madras Institute of Development Studies, Chennai n Nepal Water Conservation Foundation, Kathmandu n Vikram Sarabhai Centre for Development Interaction, Ahmedabad Edited by Marcus Moench, Elisabeth Caspari and Ajaya Dixit Contributing Authors Paul Appasamy, Sashikant Chopde, Ajaya Dixit, Dipak Gyawali, S. Janakarajan, M. Dinesh Kumar, R. M. Mathur, Marcus Moench, Anjal Prakash, M. S. Rathore, Velayutham Saravanan and Srinivas Mudrakartha RETHINKING THE MOSAIC Investigations into Local Water Management Themes from Collaborative Research n Institute of Development Studies, Jaipur n Institute for Social and Environmental Transition, Boulder n Madras Institute of Development Studies, Chennai n Nepal Water Conservation Foundation, Kathmandu n Vikram Sarabhai Centre for Development Interaction, Ahmedabad Edited by Marcus Moench, Elisabeth Caspari and Ajaya Dixit 1999 1 © Copyright, 1999 Institute of Development Studies (IDS) Institute for Social and Environmental Transition (ISET) Madras Institute of Development Studies (MIDS) Nepal Water Conservation Foundation (NWCF) Vikram Sarabhai Centre for Development Interaction (VIKSAT) No part of this publication may be reproduced nor copied in any form without written permission. Supported by International Development Research Centre (IDRC) Ottawa, Canada and The Ford Foundation, New Delhi, India First Edition: 1000 December, 1999. Price Nepal and India Rs 1000 Foreign US$ 30 Other SAARC countries US$ 25. (Postage charges additional) Published by: Nepal Water Conservation Foundation, Kathmandu, and the Institute for Social and Environmental Transition, Boulder, Colorado, U.S.A. DESIGN AND TYPESETTING GraphicFORMAT, PO Box 38, Naxal, Nepal.
    [Show full text]
  • VBST Short List
    1 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10002 2632 SUMAN BHATTARAI KATHMANDU KATHMANDU M.N.P. KEDAR PRASAD BHATTARAI 136880 10003 28733 KABIN PRAJAPATI BHAKTAPUR BHAKTAPUR N.P. SITA RAM PRAJAPATI 136882 10008 271060/7240/5583 SUDESH MANANDHAR KATHMANDU KATHMANDU M.N.P. SHREE KRISHNA MANANDHAR 136890 10011 9135 SAMERRR NAKARMI KATHMANDU KATHMANDU M.N.P. BASANTA KUMAR NAKARMI 136943 10014 407/11592 NANI MAYA BASNET DOLAKHA BHIMESWOR N.P. SHREE YAGA BAHADUR BASNET136951 10015 62032/450 USHA ADHIJARI KAVRE PANCHKHAL BHOLA NATH ADHIKARI 136952 10017 411001/71853 MANASH THAPA GULMI TAMGHAS KASHER BAHADUR THAPA 136954 10018 44874 RAJ KUMAR LAMICHHANE PARBAT TILAHAR KRISHNA BAHADUR LAMICHHANE136957 10021 711034/173 KESHAB RAJ BHATTA BAJHANG BANJH JANAK LAL BHATTA 136964 10023 1581 MANDEEP SHRESTHA SIRAHA SIRAHA N.P. KUMAR MAN SHRESTHA 136969 2 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10024 283027/3 SHREE KRISHNA GHARTI LALITPUR GODAWARI DURGA BAHADUR GHARTI 136971 10025 60-01-71-00189 CHANDRA KAMI JUMLA PATARASI JAYA LAL KAMI 136974 10026 151086/205 PRABIN YADAV DHANUSHA MARCHAIJHITAKAIYA JAYA NARAYAN YADAV 136976 10030 1012/81328 SABINA NAGARKOTI KATHMANDU DAANCHHI HARI KRISHNA NAGARKOTI 136984 10032 1039/16713 BIRENDRA PRASAD GUPTABARA KARAIYA SAMBHU SHA KANU 136988 10033 28-01-71-05846 SURESH JOSHI LALITPUR LALITPUR U.M.N.P. RAJU JOSHI 136990 10034 331071/6889 BIJAYA PRASAD YADAV BARA RAUWAHI RAM YAKWAL PRASAD YADAV 136993 10036 071024/932 DIPENDRA BHUJEL DHANKUTA TANKHUWA LOCHAN BAHADUR BHUJEL 136996 10037 28-01-067-01720 SABIN K.C.
    [Show full text]
  • Strengthening the Role of Civil Society and Women in Democracy And
    HARIYO BAN PROGRAM Monitoring and Evaluation Plan 25 November 2011 – 25 August 2016 (Cooperative Agreement No: AID-367-A-11-00003) Submitted to: UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT NEPAL MISSION Maharajgunj, Kathmandu, Nepal Submitted by: WWF in partnership with CARE, FECOFUN and NTNC P.O. Box 7660, Baluwatar, Kathmandu, Nepal First approved on April 18, 2013 Updated and approved on January 5, 2015 Updated and approved on July 31, 2015 Updated and approved on August 31, 2015 Updated and approved on January 19, 2016 January 19, 2016 Ms. Judy Oglethorpe Chief of Party, Hariyo Ban Program WWF Nepal Baluwatar, Kathmandu Subject: Approval for revised M&E Plan for the Hariyo Ban Program Reference: Cooperative Agreement # 367-A-11-00003 Dear Judy, This letter is in response to the updated Monitoring and Evaluation Plan (M&E Plan) for the Hariyo Program that you submitted to me on January 14, 2016. I would like to thank WWF and all consortium partners (CARE, NTNC, and FECOFUN) for submitting the updated M&E Plan. The revised M&E Plan is consistent with the approved Annual Work Plan and the Program Description of the Cooperative Agreement (CA). This updated M&E has added/revised/updated targets to systematically align additional earthquake recovery funding added into the award through 8th modification of Hariyo Ban award to WWF to address very unexpected and burning issues, primarily in four Hariyo Ban program districts (Gorkha, Dhading, Rasuwa and Nuwakot) and partly in other districts, due to recent earthquake and associated climatic/environmental challenges. This updated M&E Plan, including its added/revised/updated indicators and targets, will have very good programmatic meaning for the program’s overall performance monitoring process in the future.
    [Show full text]
  • Introduction
    CHAPTER I INTRODUCTION 1.1 Background Local Non-Government Organizations (NGOs) are one of the important institutions for local development. They are playing significant role directly and indirectly in the development of local communities since long time back. These organizations work as catalyst for pooling resources both human and natural in a collective manner in order to fulfill local needs of local communities. The process of local development cannot accelerate without giving due attention to the viable local organizations. Rural development concerns basically with improving quality of life of the rural people. This implies the involvement of rural poor in the development process and requires participation of local people in decision-making process and implementation of decisions. The productivity and self-reliance of rural region can only be increased when the mobilization of local energies and use of local resources are made. It requires the organization of local people (United Nations Development Program [UNDP], 1979). In essence, rural development is a strategy designed to improve the economic and social life of the rural poor. It involves the flow of benefits of development to the poorest among those who seek a livelihood in rural areas. The poorest group may include small/peasant farmers, tenants and landless people (World Bank, 1975). In this regard, rural development is basically concerned with improving quality of life of the mass of the subsistence population residing in rural areas and making the process of their development self sustaining and self reliance (Lele, 1975). This goal, however, cannot be achieved without mobilizing the local resources, involving local people in overall development processes and institutionalizing the local people’s organizations.
    [Show full text]
  • New Ethnomedicinal Claims from Magar Community of Palpa District, Nepal
    Indian Journal of Traditional Knowledge Vol. 17 (3), July 2018, pp. 499-511 New ethnomedicinal claims from Magar community of Palpa district, Nepal Anant Gopal Singh 1,3 , Akhilesh Kumar 2, Divya Darshan Tewari 3 & Kumar Avinash Bharati 4* 1Department of Botany, Tribhuvan University, Butwal Multiple Campus, Butwal-284 403, Nepal; 2Department of Botany, Dayalbagh Educational Institute (Deemed University), Agra-282 005, Uttar Pradesh, India; 3Department of Botany, M. L. K. Post Graduate College, Balrampur-271 202, Uttar Pradesh, India; 4Central National Herbarium, Botanical Survey of India, Howrah- 711 103, West Bengal, India E-mail: [email protected] Received 20 February 2018, revised 14 March 2018 The aim of present study was to identify medicinal plant species used for the management of healthcare problems prevalent among the Magar tribal community of Palpa district, Nepal. Data about medicinal uses of plants were collected by questionnaire, personal interview and group discussion with pre-identified informants. The present study includes a total of 171 new ethnomedicinal claims for 70 plant species from Nepal. Magar tribes used these species in the treatment of 104 different ailments of human being. Use Value (UV), Fidelity level (FL), Relative Frequency of Citation (RFC) and Factor of Informants Consensus (Fic) were used for identification of the popularity level, efficiency medicinal importance of the plants among the community. In the study area, the informants' consensus about usages of medicinal plants ranges from 0.4 to 0.76 with an average value of 0.7. Only 8.6 % of the ethnomedicines are from cultivation and rest 91.4 % from wild resources.
    [Show full text]
  • Notice Fifth Lot for All PMT Upto 2075.10.13 Selected & Alternate 2Nd Quintile
    मत / / गतेको "गोरखाप दैनक "मा काशत सुचना अनुसार ावधक श ालयहमा डलोमा तहमा भनाx भएर वगत (चार पटक ) मा परयोजनाले सुचना काशन गदाx तो"कएको #यादभ$ आवेदन दताx गराउन छु टेका व(याथ*हले छा$वि-तृ आवेदन (Scholarship Application) फाराम परयोजनाको वेवसाइट www.event.gov.np बाट डाउनलोड गर2 भरेर श ालयले मा3णत गर2 प"रयोजना स%चवालय , वु'नगरमा मत /( /() काया* य समयभ दताx गराउनुहोला । सो5ह सुचना अनुसार डलोमा तहमा बाँक8 रहेका 99 कोटामा छा$वि-तमाृ छनोट गन: योजनका लाग पुवx काशन भएको पएमट2 यो;यता<म अनुसारको =>?@ जनाको नामावल2 । नोट : आवेदन फाराम प"रयोजनाका पुवx सुचनाह1 अनुसार दताx ग"रसकेका 2व3याथ5ह1ले भनु x नपन6 । Selected candidates for Diploma Ward Token VDC/Municipa PMT SN. SLC Reg No Name District Numb Father Mother Village No lity Score er 1 34871 7416018187 SRIJANA KUMARI MAHATO Siraha RamnagarMirchaiya 7 BINDESHWAR MAHATO SUDI RAM DULARI DEVI BAN KARYALAYA CHOWK884.5 2 28644 7259004015 DANSINGH ROKAYA Humla ShreeNagar 5 Barkhe Rokaya Gorikala Parki Rokaya Village 899 3 28719 7059004006 BANDANA PHADERA Humla ShreeNagar 4 Netra Phadera Pushi Phadera Phadera Gaun 905 4 32936 7224003027 JEEWAN KUMAR NEUPANE Rasuwa Dhaibung 4 Khem Raj Neupane Chet Kumari Neupane Katunje 907.5 5 32696 7063022017 KAMAL ROKAYA Jumla Lihi(Rara) 6 MAN BAHADUR ROKAYA MANMA ROKAYA LIHI 910 6 32817 7124013003 Ghyu Jyalmo Tamang Rasuwa Gatlang 8 Kawa Tamang Dawa Chamo Tamang Gre 910.5 7 29380 6562005014 Dipak Kumar Shahi Kalikot Jubika 6 Harsa Bahadur Shahi Padma Shahi Jubitha 911.7 8 30311 7372001067 DEEPA PARIYAR Doti Dipayal Silgadhi N.P.5 DILIP PARIYAR NIRMALA PARIYAR SILGADI 915.5
    [Show full text]
  • Sindhuli - Operational Presence Map [As of 14 July 2015]
    NEPAL: Sindhuli - Operational Presence Map [as of 14 July 2015] Partners working in Sindhuli22 Kusheshwar Dumja Jhangajholi Ratmata Puranojhangajholi 1-5 6-10 11-15 16-20 21-35 Shanteshwari Rampur Netrakali Sitalpati Bastipur Hariharpurgadhi Tamajor Majhuwa Amale Bhimeshwar No. of implementing partners Kapilakot Jalkanyachapauli Baseshwar Pipalmadi Bhadrakali Ratanchur by cluster Mahendrajhyadi Bhuvaneshwari Gwaltar Mahadevsthan Bitijor Bagaincha Dandiguranse Tinkanya WASH Kalpabrikshya Kamalami Municipality Dudhbhanjyang Khangsang 11 Sumnampokhari Swalpathana Tosarangkhola Kyaneshwar Ranichuri Balajor Kholagaun Ratnawati Shelter and NFI 9 Bhimsthan Bahuntilpung Mahadevdanda Jarayotar Beldhari Lampantar Health 7 Tribhuvan Ambote Jinakhu Hatpate Arunthakur Ranibas Kakur Thakur Protection 3 Sirthauli Nipane Harsahi Dudhauli Mahendra Ladabhir Education 1 Tandi Nutrition 1 IMPLEMENTING PARTNERS BY CLUSTER Education Health Nutrition 1 partners 7 partners 1 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Protection Shelter and NFI WASH 3 partners 9 partners 11 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Want to find out the latest 3W products and other info on Nepal Earthquake response? visit the Humanitarian Response website at http:www.humanitarianresponse.info/en/op erations/nepal Note: Implementing partner represent the organization on the ground, send feedback to in the affected district doing operational work, such as [email protected] distributing
    [Show full text]