Alasek 31 Jan 08 Utk Edaran
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Micare Panel Gp List (Aso) for (October 2020) No
MICARE PANEL GP LIST (ASO) FOR (OCTOBER 2020) NO. STATE TOWN CLINIC ID CLINIC NAME ADDRESS TEL OPERATING HOURS REGION : CENTRAL 1 KUALA LUMPUR JALAN SULTAN EWIKCDK KLINIK CHIN (DATARAN KEWANGAN DARUL GROUND FLOOR, DATARAN KEWANGAN DARUL TAKAFUL, NO. 4, 03-22736349 (MON-FRI): 7.45AM-4.30PM (SAT-SUN & PH): CLOSED SULAIMAN TAKAFUL) JALAN SULTAN SULAIMAN, 50000 KUALA LUMPUR 2 KUALA LUMPUR JALAN TUN TAN EWGKIMED KLINIK INTER-MED (JALAN TUN TAN SIEW SIN, KL) NO. 43, JALAN TUN TAN SIEW SIN, 50050 KUALA LUMPUR 03-20722087 (MON-FRI): 8.00AM-8.30PM (SAT): 8.30AM-7.00PM (SUN/PH): 9.00AM-1.00PM SIEW SIN 3 KUALA LUMPUR WISMA MARAN EWGKPMP KLINIK PEMBANGUNAN (WISMA MARAN) 4TH FLOOR, WISMA MARAN, NO. 28, MEDAN PASAR, 50050 KUALA 03-20222988 (MON-FRI): 9.00AM-5.00PM (SAT-SUN & PH): CLOSED LUMPUR 4 KUALA LUMPUR MEDAN PASAR EWGCDWM DRS. TONG, LEOW, CHIAM & PARTNERS (CHONG SUITE 7.02, 7TH FLOOR WISMA MARAN, NO. 28, MEDAN PASAR, 03-20721408 (MON-FRI): 8.30AM-1.00PM / 2.00PM-4.45PM (SAT): 8.30PM-12.45PM (SUN & PH): DISPENSARY)(WISMA MARAN) 50050 KUALA LUMPUR CLOSED 5 KUALA LUMPUR MEDAN PASAR EWGMAAPG KLINIK MEDICAL ASSOCIATES (LEBUH AMPANG) NO. 22, 3RD FLOOR, MEDAN PASAR, 50050 KUALA LUMPUR 03-20703585 (MON-FRI): 8.30AM-5.00PM (SAT-SUN & PH): CLOSED 6 KUALA LUMPUR MEDAN PASAR EWGKYONGA KLINIK YONG (MEDAN PASAR) 2ND FLOOR, WISMA MARAN, NO. 28, MEDAN PASAR, 50050 KUALA 03-20720808 (MON-FRI): 9.00AM-1.00PM / 2.00PM-5.00PM (SAT): 9.00AM-1.00PM (SUN & PH): LUMPUR CLOSED 7 KUALA LUMPUR JALAN TUN PERAK EWPISRP POLIKLINIK SRI PRIMA (JALAN TUN PERAK) NO. -
Debottlenecking Biomass Supply Chain Resources Deficiency Via
2155 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 70, 2018 The Italian Association of Chemical Engineering Online at www.aidic.it/cet Guest Editors: Timothy G. Walmsley, Petar S. Varbanov, Rongxin Su, Jiří J. Klemeš Copyright © 2018, AIDIC Servizi S.r.l. ISBN 978-88-95608-67-9; ISSN 2283-9216 DOI: 10.3303/CET1870360 Debottlenecking Biomass Supply Chain Resources Deficiency via Element Targeting Approach a, b c b Chun Hsion Lim *, Bing Shen How , Wendy P. Q. Ng , Wei Dong Leong , Sue Lin Ngan b, Hon Loong Lamb a Universiti Tunku Abdul Rahman, Sungai Long Campus, Jalan Sungai Long, Bandar Sungai Long, Cheras, 43000 Kajang, Selangor, Malaysia b University of Nottingham Malaysia Campus, Jalan Broga, 43500 Semenyih, Selangor, Malaysia c Curtin University Malaysia, CDT 250, 98009 Miri, Sarawak, Malaysia [email protected] Biomass has been one of the focus in research and development of renewable resources for energy, chemicals and downstream products. Despite many success of biomass conversion technologies such as pyrolysis, gasification, fermentation, and combustion, implementation of such technologies in industrial scale is often very challenging. The major limitations within the system include unique properties of each biomass species, unique regional nature of biomass system, complex supply chain and logistic distribution. Nonetheless, the demand for renewable energy and its products are favourable, increasing the need for more sustainable and green pr ocesses. However, most of the current biomass technology being implemented is only designed in relatively small scale due to limitation of local biomass resources. Availability of biomass resources has been one of the main constraint for mass production of biomass product. -
Report-Off Lighting Design (Page 1)
REPORT how to design a good lighting system, A TECHNICAL one can save costs with better comfort giving a better quality of life, better PRESENTATION ON performance and productivity. The Question and Answer session “OFFICE LIGHTING was lively and active, with questions on how the new standard compares to DESIGN” the British Standards currently in use, and requests for more elaboration on design in terms of spot and average Reported by: Ir. Mah Soo, Electrical Engineering Technical Division luminance. The speaker fielded the questions to the satisfaction of the participants. technical presentation on “Office The Speaker then touched on the The Chairman concluded the A Lighting Design” was elements of quality and quantity of successfully organised by the IEM lighting with special focus on office presentation with a summary of the Electrical Engineering Technical lighting design with illustrations on highlights of the presentation and Division on Friday, 12 December 2003 task area, direct and reflected glare, invited the participants to show their at 5:30p.m. at IEM Conference Room colour aspects and the maintenance appreciation to the Speaker in the A, Bangunan Ingenieur, Petaling Jaya. factor. usual manner. He then presented a The presentation attracted 75 He concluded that the new token of appreciation to the Speaker. participants. The speaker was Mr. EN12464-1 needs to be studied for The session concluded with a note of Marius Wouters, who is the Senior harmonisation with the European thanks to all the members of the Application Specialist, Indoor Lighting standards. The aim of lighting design organising committee, the Speaker at Philips Lighting Design And is directed to the human aspects such and Philips Malaysia, and most of all to Application Centre (Lidac). -
No. Nama Premis Alamat Premis No. Tel. Pejabat Alamat Email Pejabat Nama Preseptor Tahun Tamat Pengesahan Preseptor 1 Nutrilife
Senarai Premis Bagi Latihan Provisional PRP Secara Liberalisasi- Jadual Kedua, Akta Pendaftaran Ahli Farmasi 1951 [Second Schedule, ROPA 1951] Farmasi Komuniti Tahun tamat Alamat Email No. Nama Premis Alamat Premis No. Tel. Pejabat Nama Preseptor pengesahan Pejabat Preseptor Perlis Nutrilife Pharmacy No.9, Jalan Raja Syed Alwi, [email protected] 1 Sdn Bhd (Georgetown 04-9705628 Yeow Shin Yi 2024 01000 Kangar, Perlis om Pharmacy) Kedah No. 915, Jalan Sultan Poly Pharmacy Sdn mandykhoo1962 2 Badlishah, 04-7311310 Ng Lai Yan 2022 Bhd @hotmail.com 05000 Alor Setar, Kedah No. 64, Pusat Perniagaan Kota Farmasi Kota Jaya - Jaya, Jalan Kota Sarang faridjamaludin@g Mohd Farid Bin 3 04-7693002 2022 Alor Setar Semut, 06800, Alor Setar, mail.com Jamaludin Kedah No.5-A, Bangunan Al-Ikhwan, Sinar Farmasi (Farmasi Pusat Perniagaan Putra, [email protected] Jamaluddin Bin 4 04-4918100 2022 Sinar) Kelang Lama Kulim 09000 m.my Awang Kulim, Kedah Mega Kulim Pharmacy 14A, Bangunan Pknk, Jalan megakulim@gmai 5 Sdn. Bhd -Bangunan Tunku Abidah, 09000 Kulim 04-4907993 Lim Soo Tian 2022 l.com Pknk Kedah Mega Kulim Pharmacy 165 & 166, Jalan Tunku Putra, megakulim@gmai Murni Hayati Binti 6 Sdn. Bhd. -Jalan Tunku 04-4903118 2022 09000 Kulim Kedah l.com Man Putra Mega Kulim Pharmacy No.20, Jalan Ibrahim, 08000 megakulim@gmai Noraidah Binti 7 Sdn. Bhd. -Jalan 04-4254027 2022 Sungai Petani, Kedah l.com Saad Ibrahim 12, 13 & 14,Jalan Selasih, Mega Kulim Pharmacy Ong Tok Heong 2022 Taman 8 Sdn. Bhd. -Taman 04-4918169 megakulim@gmai Leong Meng Fai 2022 Semarak,09000,Kulim,Kulim,K Semarak l.com Koo Cheau Ling 2026 edah. -
Ampang Point Branch Temporarily Closed Bandar Sri Damansara
NOTICE : REVISED OPERATING HOURS AS AT 12 JULY 2021 Updated as at 9.45am 12 July 2021 Updates are highlighted in yellow. Our Customer Contact Centre has been operating on a reduced capacity since 26 January 2021, in order to ensure the health and safety of our employees and to comply with the SOP on social distancing. You may reach us at [email protected] offsite ATMs and Cheque Deposit for Machinesassistance. (SSTs) within the MCO areas will be operational from 6.00am to 10.00pm. SSTs within branches will operate as stated below. Branch Operating Hours Branch Operating Hours SST Operating Hours SST Operating Hours RHB BANK - KLANG VALLEY NORTH REGION Notes From To From To Ampang Point Branch Temporarily closed Bandar Sri Damansara Branch 9.15am 2.00pm 8.00am 8.00pm Dataran Wangsa Melawati Branch Temporarily closed 8.00am 8.00pm Jalan Pasar Branch 9.15am 2.00pm 8.00am 8.00pm Kepong Branch 9.15am 2.00pm 8.00am 8.00pm Kuala Lumpur Main Branch 9.15am 2.00pm 8.00am 8.00pm Kota Damansara Branch 9.15am 2.00pm 8.00am 8.00pm Pandan Indah Branch 9.15am 2.00pm 8.00am 8.00pm Rawang Branch 9.15am 2.00pm 8.00am 8.00pm Setapak Branch 9.15am 2.00pm 8.00am 8.00pm Pasar Borong Selayang Branch 9.15am 2.00pm 8.00am 8.00pm Bandar Baru Sg Buloh Branch Temporarily closed Jinjang Utara Branch 9.15am 2.00pm 8.00am 8.00pm Jalan Bukit Bintang Branch 9.15am 2.00pm 8.00am 8.00pm Plaza OSK Branch 9.15am 2.00pm 8.00am 8.00pm Jalan Raja Laut Branch 9.15am 2.00pm 8.00am 8.00pm Cawangan Utama Kuala Lumpur 9.15am 2.00pm 8.00am 8.00pm KLCC Branch 9.30am 2.00pm -
Growing Connecting
AMMB Holdings Berhad GROWING 199101012723 (223035-V) TRUST CONNECTING PEOPLE AMMB Holdings Berhad 199101012723 (223035-V) (Incorporated in Malaysia) 22nd Floor, Bangunan AmBank Group No. 55, Jalan Raja Chulan, 50200 Kuala Lumpur, Malaysia Tel: 603-2036 2633 Fax: 603-2032 1914 ambankgroup.com INTEGRATED REPORT 2020 AMMB Holdings Berhad 199101012723 (223035-V) INTEGRATED REPORT 2020 We want to deliver the best banking experience possible for our customers. Which is why we are committed to building trusted relationships that last. With more than 40 years of expertise and over three million customers across Malaysia, we aim to connect our customers to better opportunities and help them achieve their financial goals. We help people buy new homes, grow their business, save, invest, receive better education and make plans for the future. As a bank for all Malaysians, we will continue to grow and progress with our customers, our people and the nation. About Our Report AMMB Holdings Berhad’s Integrated Report (AmBank Group Integrated Report 2020) is our principal report and is supplemented by supporting online disclosures for our stakeholders. These disclosures include condensed financial statements for our quarterly and yearly performance. AmBank Group Integrated Report 2020 Integrated Report Governance and Financial Reports CONTENT CONTENT Provides a comprehensive overview of AmBank Group’s performance, including Provides detailed reporting of Corporate Governance Statements, as well as Financial milestones and achievements for the 2020 financial -
Rm 35 (Zone 1)
Caj Penghantaran adalah termasuk kos petrol & tol. Kawasan penghantaran adalah untuk Lembah Klang sahaja. NO Postcodes Kawasan Kos Penghantaran 1 47100 Bandar Puteri/ Taman Puchong Hartamas/ Puchong 2 47120 Aman Putra/ Bandar Bukit Puchong 2 3 47130 D'Island Residence/ Taman Perindustrian Putra/ Puchong 4 47150 Bandar Metro Puchong/ Bistari Residensi/ Puchong 5 47160 Taman Indah Sri Puchong/ Taman Metro Puchong 6 47170 Bandar Puchong Jaya/ IOI 7 47180 Bandar Kinrara/ Puchong RM 35 8 47190 Taman Kandan Baru/ Taman Kinrara/ Puchong 9 47500 Bandar Sunway/ Subang Jaya (ZONE 1) 10 47600 Taman Perindustrian UEP/ USJ Sentral/ Subang Jaya 11 47610 Subang Jaya - USJ 5 - 8 12 47620 Subang Jaya - USJ 9 - 11 13 47630 Taman Indah Subang UEP/ Subang Jaya 14 40400 Jalan Ampang/ Shah Alam 15 40460 Bukit Kemuning/ Shah Alam 16 47650 Universiti Teknologi Mara (UiTM) Shah Alam 17 57000 Bandar Baru Seri Petaling, Bukit Jalil 18 58200 Bukit Indah 19 57100 Jalan Besar Salak Selatan, Jalan Sungai Besi 20 58100 Fairview Mansion, Bukit Pisang 21 59200 Bandar Mid - Valley 22 58000 Bedford Bussiness Park 23 50470 Jalan Stesen Sentral 5, Jalan Travers 24 50460 Bukit Petaling, Jalan Lapangan Terbang Lama 25 55200 Jalan Chan Sow Lin, Jalan Hang Tuah 26 50150 Jalan Changkat Stadium, Jalan Maharajalela 27 50000 Jalan Balai Polis, Jalan Petaling RM 15 28 50050 Balai Seni Lukis Negara, Central Square 29 50100 Bangunan Mara, Jalan Dang Wangi (ZONE 3) 30 50250 Jalan P. Ramlee, Menara KL 31 50200 Cangkat Bukit Bintang, Persiaran Raja Chulan 32 50450 Bangunan Angkasa Raya, -
Coconut Water Vinegar Ameliorates Recovery of Acetaminophen Induced
Mohamad et al. BMC Complementary and Alternative Medicine (2018) 18:195 https://doi.org/10.1186/s12906-018-2199-4 RESEARCH ARTICLE Open Access Coconut water vinegar ameliorates recovery of acetaminophen induced liver damage in mice Nurul Elyani Mohamad1, Swee Keong Yeap2, Boon-Kee Beh3,4, Huynh Ky5, Kian Lam Lim6, Wan Yong Ho7, Shaiful Adzni Sharifuddin4, Kamariah Long4* and Noorjahan Banu Alitheen1,3* Abstract Background: Coconut water has been commonly consumed as a beverage for its multiple health benefits while vinegar has been used as common seasoning and a traditional Chinese medicine. The present study investigates the potential of coconut water vinegar in promoting recovery on acetaminophen induced liver damage. Methods: Mice were injected with 250 mg/kg body weight acetaminophen for 7 days and were treated with distilled water (untreated), Silybin (positive control) and coconut water vinegar (0.08 mL/kg and 2 mL/kg body weight). Level of oxidation stress and inflammation among treated and untreated mice were compared. Results: Untreated mice oral administrated with acetaminophen were observed with elevation of serum liver profiles, liver histological changes, high level of cytochrome P450 2E1, reduced level of liver antioxidant and increased level of inflammatory related markers indicating liver damage. On the other hand, acetaminophen challenged mice treated with 14 days of coconut water vinegar were recorded with reduction of serum liver profiles, improved liver histology, restored liver antioxidant, reduction of liver inflammation and decreased level of liver cytochrome P450 2E1 in dosage dependent level. Conclusion: Coconut water vinegar has helped to attenuate acetaminophen-induced liver damage by restoring antioxidant activity and suppression of inflammation. -
Klang River Basin Environmental Improvement and Flood Mitigation Project
Completion Report Project Number: 26009 Loan Number: 1500 December 2007 Malaysia: Klang River Basin Environmental Improvement and Flood Mitigation Project CURRENCY EQUIVALENTS Currency Unit – ringgit (RM) At Appraisal At Project Completion 6 November 1996 31 August 2007 RM1.00 = $0.3962 $0.2899 $1.00 = RM2.5239 RM3.4494 ABBREVIATIONS ADB – Asian Development Bank AFS – audited financial statement ARI – average recurrence interval DID – Department of Irrigation and Drainage DOE – Department of Environment EA – executing agency EIRR – economic internal rate of return ha – hectare IRBM – integrated river basin management KBMC – Klang Basin Management Council km – kilometer MASMA – Urban Stormwater Management Manual for Malaysia (or Manual Saliran Mesra Alam Malaysia) MOA – Ministry of Agriculture MNRE – Ministry of Natural Resources and Environment MTR – midterm review MWSS – Malaysia Wetland Sanctuary, Selangor OPP3 – Malaysia Third Outline Perspective Plan O&M – operation and maintenance PAM – project administration memorandum PCR – project completion review PELAWI II Strategic Plan for Klang River Basin PPTA – project preparatory technical assistance SMART – storm water management and road tunnel TA – technical assistance NOTE In this report, "$" refers to US dollars. Vice President C. Lawrence Greenwood, Jr., Operations Group 2 Director General A. Thapan, Southeast Asia Department Director U. Malik, Agriculture, Environment and Natural Resources Division, Southeast Asia Department Team leader M. Nasimul Islam, Environmental Engineer, Southeast Asia Department Team members N. Calma, Associate Project Analyst, Southeast Asia Department H. Refareal-Nacario, Senior Operations Assistant, Southeast Asia Department CONTENTS Page BASIC DATA i MAP I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Project Outputs 2 C. -
The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in the Klang Valley and Kuala Lumpur, Malaysia
JOURNAL OF SOCIAL TRANSFORMATION AND REGIONAL DEVELOPMENT VOL. 2 NO. 2 (2020) 1-10 © Universiti Tun Hussein Onn Malaysia Publisher’s Office Journal of Social Transformation JSTARD and Regional Journal homepage: http://publisher.uthm.edu.my/ojs/index.php/jstard Development e-ISSN : 2682-9142 The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in The Klang Valley and Kuala Lumpur, Malaysia Mohd Sahrul Syukri Yahya1*, Edie Ezwan Mohd Safian1, Burhaida Burhan1 1Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, MALAYSIA *Corresponding Author DOI: https://doi.org/10.30880/jstard.2020.02.02.001 Received 20 July 2020; Accepted 30 October 2020; Available online 30 December 2020 Abstract: The development and distribution pattern of the railway network has significantly increased in urban public transport with the current situation to move fast towards the fourth industrial revolution (4IR). In Malaysia, the problem issues are related to traffic congestion and many user cars on the roadway in daily lives. One alternative mode of using a rail network is commuter, LRT, Monorail, MRT and ETS. Therefore, the Geographic Information System (GIS) technology is then used to map and produce the railway networks history and developments in urban public transportation (UPT). The goal of this research is to identify the heatmap trends of the Klang Valley railway stations which included Kuala Lumpur as urban public transport sectors. It was based on the OSM image layer from the year 1990 to 2019 and studied the growth of railway networks through a polyline pattern analysis. -
Economic Performance and Prospects
(FRQRPLF 3HUIRUPDQFHDQG 3URVSHFWV Chapter 3.indd 47 9/30/11 4:42:27 AM 48 Chapter 3.indd 48 9/30/11 4:42:27 AM Economic Performance and Prospects Overview by the Government such as tax incentives and liberalisation measures to attract investment, Economy continues to expand particularly in the oil and gas as well as services sectors. Public expenditure is envisaged to remain he Malaysian economy continued to expand supportive of economic activities with expansion Tdespite the more challenging external in capital spending by the Non-Financial Public environment. Real Gross Domestic Product Enterprises (NFPEs). (GDP) registered a growth of 4.4% during the first half of 2011. The moderation was On the supply side, all sectors are expected due to slowing exports following the weaker- to post positive growth, except mining due than-expected United States (US) economic to lower production of crude oil. In tandem performance, deepening euro sovereign debt with robust private consumption, the services crisis, global supply chain disruptions resulting sector is envisaged to grow strongly led by from earthquake and tsunami in Japan as well the wholesale and retail trade, finance and as rising global inflation. The moderation was insurance, real estate and business services as also partly attributed to the high-base effect well as communication sub-sectors. Despite the as GDP grew at a strong pace of 9.5% during contraction in output of electrical and electronics Economic Performance and the same period in 2010. However, the growth (E&E) and transport equipment in the first half momentum is expected to pick up in the second of 2011, the manufacturing sector is expected to half of the year on the back of resilient private record positive growth supported by strong output Prospects consumption and strong private investment. -
Senarai Permohonan Lesen Premis Perniagaan Dan Perindustrian Majlis Perbandaran Kajang Bil 06/2013
SENARAI PERMOHONAN LESEN PREMIS PERNIAGAAN DAN PERINDUSTRIAN MAJLIS PERBANDARAN KAJANG BIL 06/2013 Tarikh : 29hb. Mac,2013 Hari : Jumaat Masa : 9.30 pagi Tempat : Bilik Mesyuarat Cempaka Putih 1, Tingkat 7 Menara Majlis Perbandaran Kajang BIL NAMA PEMOHON KEPUTUSAN 1 MPKJ/CL/1/123/2013 Tolak ID PLATFORM NG AH KOW JAS : Tolak NO. 58, JALAN SENTOSA 3, TAMAN SENTOSA, SG. JELOK, 43000 KAJANG, SELANGOR. 2 MPKJ/CL/1/124/2013 Lulus WAI AUTO CAR SERVICES SIOW CHEE WEINO. 1, JALAN RESTU 1, TAMAN RESTU OFF JALAN SEMENYIH, 43000 KAJANG, SELANGOR. 3 MPKJ/CL/1/127/2013 Lulus PHONE ON TRADING ANG CHEE SIONG NO. 31, JALAN BESAR, PEKAN KAJANG, 43000 KAJANG, SELANGOR. BIL NAMA PEMOHON KEPUTUSAN 4 MPKJ/CL/1/128/2013 Lulus TLK POWDER CONTING SDN. BHD. NGAN YOON THIAM JAS : PAT NO. 1, JLN. BA/3, KAW. PERUSAHAAN BKT. ANGKAT, SG. CHUA, 43000 KAJANG, SELANGOR. 5 MPKJ/CL/1/129/2013 Lulus bersyarat RAMAL PETS ENT. - Kemukakan kelulusan WAN MOHAMEDZAKHIR BIN ANAS pelan bangunan LOT. 369-B, BATU 13 ½, JLN. CHERAS, 43000 KAJANG, SELANGOR. 6 MPKJ/CL/1/130/2013 Lulus bersyarat K.L AQUATIC SDN. BHD. - Tukar syarat nyata CHA LEE LI kegunaan bangunan NO. 125, JALAN REKO, TAMAN DESA SEROJA, 43000 KAJANG, SELANGOR. BIL NAMA PEMOHON KEPUTUSAN 7 MPKJ/CL/1/131/2013 Lulus SARIZ ENTERPRISE NORISHAH BT HAMZAH NO. 2, KEDAI PLB, KAMPUNG BAHAGIA BANGI, 43000 KAJANG, SELANGOR. 8 MPKJ/CL/1/133/2013 Lulus bersyarat HARUS SETIA ENTERPRISE - Kemukakan MOHD NAZAM PAWANCHIK kelulusan NO. 12, JALAN SG. KANTAN, 43000 KAJANG, SELANGOR. i) pelan bangunan ii) kebenaran merancang - Perlu sediakan cerobong asap dan perangkap minyak 9 MPKJ/CL/1/134/2013 Lulus bersyarat MEENACHY MEALS - Kemukakan THIAGARAJAN A/L BALAN kelulusan pelan 221, JALAN KAJANG JAYA 7, TAMAN KAJANG JAYA, 43000 ubahsuai dalaman KAJANG, SELANGOR.