View PDF in Full Window

Total Page:16

File Type:pdf, Size:1020Kb

View PDF in Full Window Item 6 (a) Glasgow and Clyde Valley City Deal 20th October 2015 Cabinet Report by Director of Programme Management Office Contact: Mandy MacDonald 0141 287 8503 Programme Management Office Evaluation Inverclyde Council Strategic Business Cases Purpose of Report: Inverclyde Council, as a Member Authority, has submitted the following Strategic Business Cases for consideration by Glasgow and Clyde Valley City Deal Cabinet:- Strategic Business Case – Inverkip Strategic Business Case – Ocean Terminal Both Business Cases were considered by the Chief Executives’ Group on 7th October when it was agreed to submit them to Cabinet for approval. Recommendations : It is proposed that the Cabinet agrees (1) to invite Inverclyde to proceed to develop the projects to the next stage of development through the preparation of Outline Business Cases, subject to them developing aspects of the Business Case to meet in full the business case criteria going forward; (2) to note that Inverclyde Council will continue to take cognisance of the emerging outcomes of the SAF and the detail of the Programme Business Case; and (3) to approve the funding required for each project as follows:- (a) Inverkip - £260,000 for design fees; and (b) Ocean Terminal - £800,000 for design fees. 1. Purpose : 1.1 Inverclyde, as a Member Authority, has submitted Strategic Business Cases for the following projects for consideration by Glasgow and Clyde Valley City Deal Cabinet:- Strategic Business Case – Inverkip Strategic Business Case – Ocean Terminal. These Business Cases were considered by the Chief Executives’ Group on 7th October 2015 when it was agreed that they should be submitted to Cabinet for approval 2. Background: 2.1 The Executive Summary for each project is attached as Appendices 1 and 2. These describe the strategic need for the projects, the options which have been considered to address the area’s development constraints and the outline of proposed solutions. 3 Programme Management Office Assessment 3.1 The projects have been reviewed against the business case criteria outlined within the Assurance Framework which aims to provide a level of technical checking, and to identify areas where further analysis or planning is required to develop the project to the next level of detail. These technical checks will be discussed with Inverclyde Council and will form the basis of development work going forward. 3.2 The Strategic Business Cases have also been assessed for “strategic fit” against the objectives of the City Deal. The projects are aligned with these objectives and the project outputs can be more fully defined at the Outline Business Case stage. 3.4 The Programme Business Case is in development in parallel with our appraisal of these projects. The outcomes of the SAF and Programme Business case process will further inform the development of these project business cases as they are developed to Outline Business Cases. 3.5 The SAF exercise is complete and the recommendations from this analysis will continue to be developed within the Programme Business Case. 3.6 Finance These Strategic Business Cases seek approval for monies to allow the projects to progress to the next stage of the business case process. The projects are seeking approval for City Deal funding of £260,000 to fund eligible expenditure for Inverkip and £800,000 for Ocean Terminal. 3.7 Legal The Member Authority should ensure close liaison and co-operation with the Legal and Procurement Support Group, and the Legal Sub Group in particular, to ensure that all outstanding legal issues are recognised and addressed appropriately at a Project and Programme level. 4 Recommendations 4.1 It is proposed that the Cabinet agrees (1) to invite Inverclyde to proceed to develop the projects to the next stage of development through the preparation of Outline Business Cases, subject to them developing aspects of the Business Case to meet in full the business case criteria going forward; (2) to note that Inverclyde Council will continue to take cognisance of the emerging outcomes of the SAF and the detail of the Programme Business Case; and (3) to approve the funding required for each project as follows:- (a) Inverkip - £260,000 for design fees; and (b) Ocean Terminal - £800,000 for design fees. APPENDIX 1 INVERCLYDE: Inverkip 1.0 Executive Summary Inverkip is an infrastructure and development project that addresses the restricted network and junction capacity on the A78 trunk road at four locations in and around Inverkip. It will release investment and secure the development of a Major Area of Change site identified within the Local Development Plan whilst also securing access and safety improvements benefiting the strategic network and transport and access at Wemyss Bay and Inverkip. Development of the former Inverkip Power Station site is currently constrained by significant cost abnormalities that impact adversely on the viability of development. The site will not achieve planning consent unless, to the satisfaction of Transport Scotland, the existing A78 roads infrastructure at and specifically the four highlighted existing junctions and merge/diverge slip roads are improved. The City Deal infrastructure project will act as a catalyst, through a developer agreement, for the current owner to remove the existing power station floor slab, make a feature of the existing Clyde jetty and build out the mixed use site over a fixed gestation period. This strategic business case seeks approval to incur design fees of £260,000 which will be incurred on the current and next financial year. 1.1 Strategic need for the project Inverclyde Council and its economic development partners within the Single Operating Plan are focused on delivering investment and development in the area that addresses: Economic disadvantage and inclusive growth within communities (National Regeneration Strategy 2011 / Inverclyde Single Operating Agreement 2014) Sustainable Economic Investment with strong focus on SME’s (Inverclyde Economic Regeneration Strategy (2014-2017) Regenerating Key Economic Sites and Communities (Inverclyde Economic Regeneration Strategy (2014-2017) Inverkip is identified as a Major Area of Change (LDP). Inverclyde Council has been seeking to facilitate investment at Inverkip through active economic engagement and positive land-use planning. These include: Mixed Use Development Zoning in the Local Plan 2006 Promotion of Major Area of Change in Local Development Plan 2014. Supporting and facilitating a Development Masterplan for brownfield land Developing clear partnership delivery arrangements with Riverside Inverclyde (Ri) Facilitating private/public sector dialogue on infrastructure and investment with: Transport Scotland / Major Landowners / Service and Utility Providers / Communities The Inverclyde Economic Development and Regeneration Single Operating Plan (2014-2017) identifies the areas strategic challenges and opportunities with specific reference to: Improving Economic Infrastructure (Section 3.5) focusing on: Developing key sites within the A8 Corridor and associated with the Clyde waterfront Increasing Inverclyde’s capacity to diversify the business base Regenerating Disadvantaged Areas (Section 3.6) focusing on: An area based, partnership approach to regeneration Addressing Population Decline (section 3.7) De-population is a major economic issue with a need to stabilise population Inverclyde Council has secured, through positive engagement, a masterplan to promote a high quality mixed use development and secure positive investment in a major brownfield site capable of securing significant regeneration benefits. 1.2 Options shortlisted The options appraisal outlined below sets out a range of potential options which have been identified and considered in developing the preferred option based on a Detailed Transportation Assessment (Atkins) and discussions with Transport Scotland / Transportation Services within Inverclyde Council. Options include: Do Nothing Retain existing arrangements with no further capacity or junction improvements and look to future Local Development Plan or alternative finance measures Transport Scotland / TIF / Infrastructure Fund to fund Traffic Signalised Junction with Speed Controls Promote a new traffic Signalised Junction together with associated A78 Speed Controls and/or other speed reducing measures on the Trunk Road New Roundabout Junction and Junction Improvement Preferred Option Promote a new roundabout Junction to Brueacre and Main Street with all associated traffic management measures together with pedestrian and cycle facilities to support enhancement for all transport modes and improve accessibility Re-align A78 & Create new Roundabout Promote wider upgrading including dual entry roundabouts to secure additional long term capacity and access. 1.3 Proposed solution The preferred option allows for four improvements involving new Roundabout Junction and Junction Improvement that meet all stakeholder needs and are capable of securing DRMB design standards and meeting approval of Transport Scotland. 1.4 Forecast cost Inverkip will be implemented and delivered by Inverclyde Council in partnership with wider stakeholders under a standard NEC Contract suitable for transport infrastructure work contracts. Inverclyde Council has the in-house expertise to project manage transportation projects of this scale and complexity and will appoint, with partners, a Design Team through competitive tender. The broad breakdown of capital costs are as follows: Inverkip North £900,000
Recommended publications
  • Identification of Pressures and Impacts Arising Frm Strategic Development
    Report for Scottish Environment Protection Agency/ Neil Deasley Planning and European Affairs Manager Scottish Natural Heritage Scottish Environment Protection Agency Erskine Court The Castle Business Park Identification of Pressures and Impacts Stirling FK9 4TR Arising From Strategic Development Proposed in National Planning Policy Main Contributors and Development Plans Andrew Smith John Pomfret Geoff Bodley Neil Thurston Final Report Anna Cohen Paul Salmon March 2004 Kate Grimsditch Entec UK Limited Issued by ……………………………………………… Andrew Smith Approved by ……………………………………………… John Pomfret Entec UK Limited 6/7 Newton Terrace Glasgow G3 7PJ Scotland Tel: +44 (0) 141 222 1200 Fax: +44 (0) 141 222 1210 Certificate No. FS 13881 Certificate No. EMS 69090 09330 h:\common\environmental current projects\09330 - sepa strategic planning study\c000\final report.doc In accordance with an environmentally responsible approach, this document is printed on recycled paper produced from 100% post-consumer waste or TCF (totally chlorine free) paper COMMISSIONED REPORT Summary Report No: Contractor : Entec UK Ltd BACKGROUND The work was commissioned jointly by SEPA and SNH. The project sought to identify potential pressures and impacts on Scottish Water bodies as a consequence of land use proposals within the current suite of Scottish development Plans and other published strategy documents. The report forms part of the background information being collected by SEPA for the River Basin Characterisation Report in relation to the Water Framework Directive. The project will assist SNH’s environmental audit work by providing an overview of trends in strategic development across Scotland. MAIN FINDINGS Development plans post 1998 were reviewed to ensure up-to-date and relevant information.
    [Show full text]
  • 03B Inverkip Power Station
    Agenda Item 3(b) No. Report To: The Planning Board Date: 2 nd November 2011 Report By: Head of Regeneration and Planning Report No: 09/0175/IC Plan 11/11 Major Application Development Contact David Ashman Contact No: 01475 712416 Officer: Subject: Mixed use "Urban Village" development including residential, business, community use and small scale retail at Inverkip Power Station SITE DESCRIPTION Inverkip Power Station and its grounds extend to 43 hectares in a prominent coastal location between Inverkip and Wemyss Bay. The power station is sited on an expanse of generally level ground directly fronting the coast and with a backdrop of tree cover including the western parts of the Wemyss Plantation (protected by a Tree Preservation Order). Culverted sections of the Brueacre Burn run through the site. Beyond the plantation are the northern reaches of Wemyss Bay and the A78 trunk road. Access to the site is from the Brueacre Interchange. PROPOSAL Planning permission in principle is sought for a comprehensive redevelopment of the site with the intended creation of a mixed use village. A development framework sets out general principles and guidelines for building aimed at creating a village reflective of others along the coast, characterised by a mix of house types and development densities and with a population level that sustains a variety of local facilities. Site analysis and early community consultation identified a number of key elements central to the successful redevelopment of the site which are summarised as: Securing a mixed use
    [Show full text]
  • Examination Report 2014
    Directorate for Planning and Environmental Appeals Telephone: 01324 696455 Fax: 01324 696444 E-mail: [email protected] Ron Gimby Regeneration and Planning Service Inverclyde Council Municipal Buildings Clyde Square Greenock PA15 1LY Our ref: LDP-350-1 11 June 2014 Dear Ron Gimby INVERCLYDE LOCAL DEVELOPMENT PLAN THE TOWN AND COUNTRY PLANNING (DEVELOPMENT PLANNING) (SCOTLAND) REGULATIONS 2008 SUBMISSION OF THE REPORT OF THE EXAMINATION We refer to our appointment by the Scottish Ministers to conduct the examination of the above plan. Having satisfied ourselves that the authority’s consultation and engagement exercises conformed with their participation statement, our examination of the plan commenced on 01 January 2014. We have completed the examination, and now submit our report, enclosing one bound and one unbound copy. Before carrying out the examination into the issues raised in representations we carried out an assessment of the council’s conformity with its participation statement under Section 19(4) of the Town and Country Planning (Scotland) Act 1997 (as amended). We concluded that the council’s actions with regard to consultation and involvement of the public at large as respects the proposed plan had conformed with its statement. In our examination we considered the 27 issues arising from over 300 unresolved representations, which were identified by the authority. In each case we have taken account of the summaries of the representations and the responses, as prepared by the authority, the representations themselves and responses to further information requests. We have set out our conclusions and recommendations in relation to each issue in our report.
    [Show full text]
  • Contract in Brief Challenge Inverkip Power Station Was an Oil-Fired Power Station in Inverclyde, on the West Coast of Scotland
    Contract in Brief Challenge Inverkip power station was an oil-fired power station in Inverclyde, on the west coast of Scotland. Built in the 1970's, it was rarely used due to soaring oil Location: prices. Inverkip, Inverclyde The site to be decommissioned was the cable run from the former Inverkip Former Inverkip Power Station Power station, Inverclyde to the live 400kv Inverkip switching station. The Power Station had been demolished to slab level by Brown and Mason, leaving Client: the redundant 400kv oil filled cables that run from the former power station up Brown And Mason to the 400 KV switching station. There were three circuits, three cables per circuit identified as copper cores, paper insulated and aluminium sheathed. ( Scottish Power Asset) There were approximately 49 control cables that follow the same route. The 400kv cables are oil filled and oil had been partially removed from the lower Contract Start: Section (from power station to railway line). The upper section was still full of oil. This was a liability for Scottish Power. The cable route was through 27 January 2014 woodland, cable tunnels, ducting under Network rail, railway line and through Duration: farmland. 16 weeks Gilmerton Land Services (GLS) Solution Services Provided: Once as laid drawings had been received, GLS performed a full site survey to establish a proposed scope of works. As a result we were able to offer a lump Site survey sum credit of £126,500.00 to Brown and Mason to allow for work to Vegetation Removal commence at no risk or cost to the client.
    [Show full text]
  • The Special Landscape Qualities of the Loch Lomond and the Trossachs National Park
    COMMISSIONED REPORT Commissioned Report No. 376 The Special Landscape Qualities of the Loch Lomond and The Trossachs National Park (iBids and Project no 648) Produced in partnership with The Loch Lomond and the Trossachs National Park Authority For further information on this report please contact: Dr James Fenton Scottish Natural Heritage Great Glen House INVERNESS IV3 8NW Telephone: 01463-725 000 E-mail: [email protected] This report should be quoted as: Scottish Natural Heritage and Loch Lomond and The Trossachs National Park Authority (2010). The special landscape qualities of the Loch Lomond and The Trossachs National Park. Scottish Natural Heritage Commissioned Report, No.376 (iBids and Project no 648). This report, or any part of it, should not be reproduced without the permission of Scottish Natural Heritage. This permission will not be withheld unreasonably. © Scottish Natural Heritage 2010 COMMISSIONED REPORT Summary The Special Landscape Qualities of the Loch Lomond and The Trossachs National Park Commissioned Report No. 376 (iBids and Project no 648) Contractor: SNH project staff Year of publication: 2010 Background In 2007/8 Scottish Natural Heritage used a standard method to determine the special qualities of Scotland’s National Scenic Areas. In 2009, in partnership with the National Park Authorities, this work was extended to determine the special qualities of the two National Parks, including the National Scenic Areas within them. The result of the work for the Loch Lomond and the Trossachs National Park is reported here. Main findings • The park is large and diverse with significantly different landscape characteristics in different areas. Hence as well as listing the landscape qualities which are generic across the park, the qualities for the four landscape areas of Argyll Forest, Loch Lomond, Breadalbane and the Trossachs are also given.
    [Show full text]
  • Torness Monthly Report June 2014
    Torness monthly report June 2014 Introduction We are keen to hear the views of our local communities. We recognise that good communication is a two way process and we welcome your feedback and comments. Safety • The station had no lost time incidents (LTIs) during the reporting period and has had 1991 LTI free days up to 30 June, that’s more than 5 years. • The station had no emergency services call outs during June • There was one first aid injury at the station in June • The station had no environmental events during June and has gone 1232 days without an environmental event (more than 3 years) Station output Reactor 1 and 2 were operational for the month of June. As previously communicated reactor one was shut down due to an issue with the electrical system within our conventional plant on 1 July. Our engineers are progressing through testing routines and it will be returned to power as soon as testing is satisfactorily completed. Reactor 2 planned maintenance work started on Wednesday, 2 July to repair a turbine governor valve. The valve controls the flow of steam into the turbine and is part of the conventional, non- nuclear, side of the power station. Reactor 2 will be returned to power after this work has been finished. Four flasks containing spent fuel were safely transported to Sellafield for reprocessing during the period. Station news Golden service award for Willie There aren’t many people who can say they’ve been with a company for 50 years, but Willie Clarkson is one of them! When 15 year old Willie started out as an apprentice at Kincardine power station on 6 July 1964, he could never have imagined what the future had in store.
    [Show full text]
  • The Scottish Economy Industrial Performance
    The Scottish Economy Industrial Performance the CBI survey. Responses are elicited not only from manufacturing but also construction, distribution and financial institutions. The results from the new SBS are therefore capable of a greater degree of disaggregation than those from the CBI. Over the last quarter there has been a fall in nominal interest rates and a strengthening of sterling. As at mid- April interest rates had fallen by one percentage point from their levels in February. This fall and the expectation of further reductions in interest rates, which have now materialised, will have influenced the replies of respondents to both the SBS and CBI surveys. Whilst the trade weighted exchange rate rose by about three percent over the last quarter it is unlikely that this will as yet have had any significant impact on export orders. It is likely that the outlook of respondents in this respect is still very much influenced by last year's sharp depreciation of sterling. BUSINESS SURVEY It was observed in the February Commentary that there appeared to be some indication of a recovery in economic activity. The With the Inauguration of the quarterly latest findings of both the SBS and CBI Scottish Business Survey (SBS) in October Surveys provide further evidence to this 1984 there are now two regular up-to-date effect. Moreover, the expansion of indicators of trends in the Scottish activity which is now taking place would industrial sector. The combination of appear to be broadly based and even those the new survey and the long-standing CBI sectors which had consistently lagged in Industrial Trends Survey provides a performance are now reporting an overall comprehensive assessment of trends in improvement in their business prospects.
    [Show full text]
  • Index to the House of Commons Parliamentary
    VOLUME 537 SIXTH SERIES INDEX TO THE HOUSE OF COMMONS PARLIAMENTARY DEBATES (HANSARD) SESSION 2010–12 5th December—20th December 2011 £00·00 © Parliamentary Copyright House of Commons 2011 Applications for reproduction should be made in writing to the Copyright Unit, Her Majesty’s Stationery Office, St Clements House, 2-16 Colegate, Norwich, NR3 1BQ Fax 01603 723000 e-mail: [email protected] Her Majesty’s Stationery Office is independent of and separate from the company now trading as The Stationery Office Ltd., which is responsible for printing and publishing House publications. INDEX TO THE PARLIAMENTARY DEBATES OFFICIAL REPORT SIXTH SERIES VOLUME 537 SESSION 2010–12 5th December—20th December 2011 SCOPE The index is derived from the headings that appear in Hansard. The index includes entries covering the names of all Members contributing to the Parliamentary business recorded in Hansard, including Divisions. REFERENCES • References in the indexes are to columns rather than pages. • There are separate sequences in Hansard for the material taken on the floor of the House, Westminster Hall sittings, written statements, written questions, ministerial corrections and petitions • References consisting of a number by itself indicate material taken on the floor of the House. • References ending in ‘wh’ indicate Westminster Hall sittings. • References ending in ‘ws’ indicate written statements. • References ending in ‘w’ indicate written questions. • References ending in ‘p’ indicate written petitions. • References ending in ‘mc’ indicate ministerial corrections. • References under all headings except the names of Members contributing to Parliamentary business and the titles of legislation are listed in one numerical sequence irrespective of whether the material is taken on the floor of the House, is discussed at a Westminster Hall sitting, is a written statement or is a written question.
    [Show full text]
  • Corporate Social Responsibility Annual Review for 2009 Corporate Social Responsibility Annual Review for 2009 TABLE of CONTENTS
    Corporate Social Responsibility Annual Review for 2009 Corporate Social Responsibility Annual Review for 2009 TABLE OF CONTENTS 1. Welcome 5. Sense of About this Report Our Year in Summary – Highlights of 2009 Belonging & Trust Performance Highlights Our People About Us Our Communities Our Strategy Key Statistic 2. Corporate Ethics & 6. Safety & Reliability Responsibility Governance & Management Occupational Health Governance Health and Safety Standards How We Manage CSR Accidents & Injuries Stakeholder Engagement Safety Programmes Benchmarking and Recognition Plant Reliability & Energy Security Energy Security 3. Economic Results Key Financial Results 2009 Investment and Pricing Customer Bills 7. Customer Focus Customer Profile Ofgem Energy Supply Probe Pricing and Product Innovation 4. Respect for the Sales and Marketing Customer Information Environment Customer Service Environmental Policy Help for Vulnerable Customers Climate Change Acidification & Air Quality Resource Use and Waste Water 8. Assurance & Biodiversity Environmental Management Information Sites and Infrastructure Welcome A Message From Ann Loughrey, Head of Corporate Social Responsibility Welcome to our Corporate Social Responsibility Annual Review for 2009. The year was a challenging one as the UK suffered the effects of the economic recession – but despite this, we made huge progress in a number of areas. One of the most exciting developments was our progress towards making Carbon Capture and Storage (CCS) a realistic option in the fight against global climate change. This technology could have the potential to capture around 90% of the CO2 produced from burning coal to produce electricity and transport it by pipeline for long-term geological storage under the North Sea. During the year Longannet Power Station became the first major power station in the UK to capture CO2 from its flue gases, signalling a major step forward in this clean coal technology.
    [Show full text]
  • Item 9(A) 11Th October 2017
    Item 9(a) 11th October 2017 Glasgow City Region City Deal Cabinet Report by Director of Regional Economic Growth Contact: Kevin Rush Tel: 0141 287-4613 PMO Evaluation: Inverclyde Council – Outline Business Case Inverkip Purpose of Report: To report on the PMO evaluation of Inverclyde Council’s Outline Business Case for Inverkip. The Business Case has been considered by the Chief Executives’ Group who agreed that it should be submitted to Cabinet for approval. Recommendations: It is proposed that the Cabinet: 1. agree that Inverclyde Council be invited to develop a Full Business Case; 2. note the Executive Summary at Appendix 1 and the Project Risk Register in Appendix 2; and 3. note that no funding is requested at this stage. 1 Purpose 1.1 To inform the Cabinet of the results of the PMO evaluation of Inverclyde Council’s Outline Business Case September 2017 for the Inverkip project. The Business Case has been considered by the Chief Executives’ Group who agreed that it should be submitted to Cabinet for approval. 2 Review 2.1 The submission of this business case for appraisal is considered as confirmation that Inverclyde Council approves the inclusion of this business case as part of the City Deal programme as stated in the current Glasgow and Clyde Valley City Deal Assurance Framework (10 March 2015) in section 4.1.1. 2.2 The project has been reviewed against the business case criteria outlined within Assurance Framework dated March 2015. 2.3 The Cabinet approved Inverclyde’s Strategic Business Case in October 2015 with a funding allocation of £260,000.
    [Show full text]
  • Inverkip (Scottish Power/Transport Scotland)
    AGENDA ITEM NO: 12 Report To: Environment & Regeneration Date: 2 May 2019 Committee Report By: Corporate Director Report No: E+R/19/05/06/SA/SJ Environment, Regeneration & Resources Contact Officer: Scott Allan Contact No: 01475 712764 Subject: Glasgow City Deal – Inverkip (Scottish Power/Transport Scotland) 1.0 PURPOSE 1.1 The purpose of this report is to update Members on the revised access arrangements and road improvements on the A78 in respect of the Inverkip former Power Station City Deal Project. 2.0 SUMMARY 2.1 At this Committee on 25 October 2018 a report was presented which advised the Committee that following progression of detailed designs into roads improvements on the A78, Transport Scotland as the trunk road authority supported a revised scheme which involved the installation of traffic signals at the north entrance to Inverkip on the A78 and the creation of a 3-arm roundabout on the A78 just north of Brueacre junction. It was reported that this situation had arisen despite Transport Scotland’s involvement in the Planning Permission in Principle for the development of the former power station site and their agreement to a different solution. 2.2 The revised proposals as developed to feasibility study stage between Iberdrola and Transport Scotland remained within the funding envelope of £3.25 million available within City Deal. 2.3 The Committee in considering the revised roads improvements requested that the Leader of the Council along with the Leader of Minority Groups write to the Cabinet Secretary for Transport, Infrastructure & Connectivity seeking a meeting. 2.4 The Cabinet Secretary initially did not respond to the offer of a meeting but subsequently a meeting has been agreed for Wednesday 8 May 2019.
    [Show full text]
  • The Meteorology and Climatology of Air Pollution in West Central Scotland
    THE METEOROLOGY AND CLIMATOLOGY OF AIR POLLUTION IN WEST CENTRAL SCOTLAND A Thesis presented for the Degree of Doctor of Philosophy of the University of Glasgow by JOHN C. ýWEENEY Department of Geography, University of Glasgow, Glasgow. 1980 TO MY PARENTS -1- PREFACE In recent decades the, age old problem of air pollution has assumed a new importance as evidence has become available concerning its adverse effects both on a local and global scale. Awareness of these effects has been most marked in densely populated industrialised countries where the juxtaposition of people and their employment makes 'living with air pollutiona necessaryi though unwelcome reality. In most of these areas some form of written or unwritten guidelines have evolved which express a consensus com- promise between the adverse effects of air pollution on the one hand and the material prosperity accompanying industrial- isation on the other. Increasingly, internationally es- tablished criteria are being utilised as a basis for managing air quality within a region, and for assessing the impact of planned new sources within it. Such an approach implies that the effect of a new or existing source is readily quantifiable in terms of its impact on ground level concentrations. This is not the case and was demonstrated by previous workers with reference to the changing industrial landscape of West Central Scotland. Environmental impact analyses in relation to proposed new high level sources in the Clyde Estuary were seen to be in- conclusive. This was attributed to a gap in knowledge con- cerning the interaction of topographical and meteorological influences on pollution dispersal within the region.
    [Show full text]