Sites for Dtm Round 5 - Nepal
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
3702-NEP: Disaster Resilience of Schools Project and Title: DRSP/CLPIU/076/77-Kavre-02 Contract No
Invitation for Bids Date: 24 September 2019 Loan No. 3702-NEP: Disaster Resilience of Schools Project and Title: DRSP/CLPIU/076/77-Kavre-02 Contract No. Construction of School Buildings, Toilet and Water Supply Facilities and Title: including Site Development Works in Nine (9) Schools of Kavrepalanchok District Deadline for Submission of 8 November 2019, 12:00 hours Nepal Standard Time (NST) Bids: 1. The Government of Nepal has received a financing from the Asian Development Bank (ADB) toward the cost of Disaster Resilience of Schools Project (DRSP). Part of this financing will be used for payments under the contract named above. Bidding is open to bidders from eligible source countries of ADB. 2. The Central Level Project Implementation Unit (Education), National Reconstruction Authority (NRA) (the “Employer”) invites sealed bids from eligible bidders or joint ventures for the Construction of School Buildings, Toilet and Water Supply Facilities including Site Development Works in Nine (9) Schools of Kavrepalanchok District. Construction period is 18 months after contract signing date. 3. Only eligible bidders with the following key qualifications should participate in the bidding: Key Qualification Minimum Description of works Minimum Lot work to be bid as SINGLE PACKAGE Average Annual S.N. Identification experience, (Construction of following school building Turnover (Last (ID) No. size and complex) three (3) years). nature. • Bhaleswor Mavi, Malpi, Panauti Municipality-8 • Dedithumka Mavi, Mandan Deupur Municipality-9 • Gyaneswori Mavi, Padalichaur, Anaikot-1 • Himalaya Mavi, Pipalbot, Rosh RM-6 At least one (1) • Laxmi Narayan Mavi, Narayantar, Roshi RM-2 DRSP/CLPIU/0 USD 7.00 Million project of Saraswati Mavi, Bhugdeu, Bethanchok RM-6 1 76/77-Kavre -02 • worth USD • Sarbamangala Mavi, Aglekot, Panchkhal Municipality-3 2.52 Million. -
Public Policy for Social and Solidarity Economy a Case Study from Nepal
Public Policy for Social and Solidarity Economy A Case Study from Nepal Submitted By: Ripu M. Kunwar, Ram P. Acharya, Geeta Khadka, Bishnu H. Poudyal, Sita Shahi, Suman Dhakal, Sunil Pariyar and Bhola Bhattarai Practical Solution Consultancy Nepal Pvt. Ltd (PSPL) Min Bhawan, Kathmandu, Ph: 00977 1 4620373, Email: [email protected] www.psplnepal.org in association with Federation for Community Forestry Users Nepal (FECOFUN), Kathmandu Dalit Alliance for Natural Resources (DANAR), Kathmandu National Forum for Advocacy, Nepal (NAFAN), Kathmandu Submitted to: Center for International Studies and Cooperation (CECI) & UNITERRA, Kathmandu, Nepal February 2013 Public Policy for Social and Solidarity Economy: A Case Study from Nepal TABLE OF CONTENTS ACRONYMS & ABBREVIATIONS .................................................................................................................................... 4 ACKNOWLEDGEMENTS ..................................................................................................................................................... 6 EXECUTIVE SUMMARY ..................................................................................................................................................... 7 CHAPTER 1. INTRODUCTION .......................................................................................................................................... 10 1.1 BACKGROUND ........................................................................................................................................ -
Proceedings of International Conference on Climate Change Innovation and Resilience for Sustainable Livelihood 12-14 January 2015 Kathmandu, Nepal
Proceedings of International Conference on Climate Change Innovation and Resilience for Sustainable Livelihood 12-14 January 2015 Kathmandu, Nepal Organizers: The Small Earth Nepal (SEN) City University of New York (CUNY), USA Colorado State University (CSU), USA Department of Hydrology and Meteorology (DHM), Government of Nepal Nepal Academy of Science and Technology (NAST), Nepal Agriculture and Forestry University (AFU), Nepal Nepal Agricultural Research Council (NARC), Nepal Editors: Dr. Soni Pradhananga, University of Rhode Island, USA Jeeban Panthi, The Small Earth Nepal, Nepal Dilli Bhattarai, The Small Earth Nepal Executive Summary Climate change is one of the most crucial environmental, social, and economic issues the world is facing today. Some impacts such as increasing heat stress, more intense floods, prolonged droughts, and rising sea levels have now become inevitable. Climatic extremes are becoming more frequent; wet periods are becoming wetter and dry periods are becoming dryer. People are able to describe the impacts faced by climate change but not the meaning of „climate change‟. The impacts are most severe for the poor countries. It is high time to plan and implement adaptive measures to minimize the adverse impacts due to climate change, and it is important to explore innovative ideas and practices in building resilience for sustainable development and livelihood, particularly in rural areas of developing countries which are highly vulnerable to climate change. Climate innovation and technologies involve basic science and engineering as well as information dissemination, capacity building, and community organizing. In this context an International Conference on Climate Change Innovation and resilience for Sustainable Livelihood was held in Kathmandu, Nepal from 12-14 January 2015. -
MCSP Annual Report
MCSP Annual Report FY 2018 October 1, 2017– September 30, 2018 Submission Date: November 6th, 2018 Cooperative Agreement No. AID-OAA-A-14-00028 Activity Start Date and End Date: October 2016 – April 2019 Activity Manager: Pavani Ram AOR: Nahed Matta Submitted by: Adhish Dhungana, Manager- Maternal & Child Survival Program Save the Children| Airport Gate Area, Shambhu Marg Kathmandu, Nepal GPO Box: 3394 Telephone: +977-1-4468130/4464803 Email: [email protected] This document was produced for review by the United States Agency for International Development (USAID). Acronyms BEmONC Basic Emergency Obstetric and Neonatal Care CHD Child Health Division CMA Community Medical Assistant CRS Contraceptive Retail Sales CSD Curative Service Division DDA Department of Drug Administration DHO District Health Office DoHS Department of Health Services DIP Detail Implementation Plan ENAP Every Newborn Action Plan FB IMNCI Facility Based Integrated Management of Neonatal and Childhood Illness FHD Family Health Division GoN Government of Nepal IMNCI Integrated Management of Neonatal and Childhood Illness MCSP Maternal and Child Survival Program M&E Monitoring and Evaluation MEL Monitoring, Evaluation, and Learning MNH Maternal and Newborn Health MNHI Maternal and Newborn Health Integration MoHP Ministry of Health and Population NCDA Nepal Chemist and Druggist Association NHRC Nepal Health Research Council NYI Newborns and Young Infants PI Principle Investigator PSBI Possible Severe Bacterial Infection PSD Partner for Social Development Nepal SBA Skilled Birth Attendant SCI Save the Children International SDG Sustainable Development Goal SNL Saving the Newborn Lives TAG Technical Advisory Group ToR Terms of Reference USAID United States Agency for International Development WHO World Health Organization WIRB Western Institutional Review Board Contents Acronyms 2 FINANCIAL INFORMATION Error! Bookmark not defined. -
Tables Table 1.3.2 Typical Geological Sections
Tables Table 1.3.2 Typical Geological Sections - T 1 - Table 2.3.3 Actual ID No. List of Municipal Wards and VDC Sr. No. ID-No. District Name Sr. No. ID-No. District Name Sr. No. ID-No. District Name 1 11011 Kathmandu Kathmandu Ward No.1 73 10191 Kathmandu Gagalphedi 145 20131 Lalitpur Harisiddhi 2 11021 Kathmandu Kathmandu Ward No.2 74 10201 Kathmandu Gokarneshwar 146 20141 Lalitpur Imadol 3 11031 Kathmandu Kathmandu Ward No.3 75 10211 Kathmandu Goldhunga 147 20151 Lalitpur Jharuwarasi 4 11041 Kathmandu Kathmandu Ward No.4 76 10221 Kathmandu Gongabu 148 20161 Lalitpur Khokana 5 11051 Kathmandu Kathmandu Ward No.5 77 10231 Kathmandu Gothatar 149 20171 Lalitpur Lamatar 6 11061 Kathmandu Kathmandu Ward No.6 78 10241 Kathmandu Ichankhu Narayan 150 20181 Lalitpur Lele 7 11071 Kathmandu Kathmandu Ward No.7 79 10251 Kathmandu Indrayani 151 20191 Lalitpur Lubhu 8 11081 Kathmandu Kathmandu Ward No.8 80 10261 Kathmandu Jhor Mahakal 152 20201 Lalitpur Nallu 9 11091 Kathmandu Kathmandu Ward No.9 81 10271 Kathmandu Jitpurphedi 153 20211 Lalitpur Sainbu 10 11101 Kathmandu Kathmandu Ward No.10 82 10281 Kathmandu Jorpati 154 20221 Lalitpur Siddhipur 11 11111 Kathmandu Kathmandu Ward No.11 83 10291 Kathmandu Kabresthali 155 20231 Lalitpur Sunakothi 12 11121 Kathmandu Kathmandu Ward No.12 84 10301 Kathmandu Kapan 156 20241 Lalitpur Thaiba 13 11131 Kathmandu Kathmandu Ward No.13 85 10311 Kathmandu Khadka Bhadrakali 157 20251 Lalitpur Thecho 14 11141 Kathmandu Kathmandu Ward No.14 86 10321 Kathmandu Lapsephedi 158 20261 Lalitpur Tikathali 15 11151 Kathmandu -
District Profile - Kavrepalanchok (As of 10 May 2017) HRRP
District Profile - Kavrepalanchok (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 381,9371 75 VDCs and 5 municipalities Damage Status - Private Structures Type of housing walls Kavrepalanchok National Mud-bonded bricks/stone 82% 41% Cement-bonded bricks/stone 14% 29% Damage Grade (3-5) 77,963 Other 4% 30% Damage Grade (1-2) 20,056 % of households who own 91% 85% Total 98,0192 their housing unit (Census 2011)1 NEWS & UPDATES 1. A total of 1,900 beneficiaries as per District Technical Office (DTO/DLPIU) have received the Second Tranche in Kavre. 114 beneficiaries within the total were supported by Partner Organizations. 2. Lack of proper orientations to the government officials and limited coordination between DLPIU engineers and POs technical staffs are the major reconstruction issues raised in the district. A joint workshop with all the district authorities, local government authorities and technical persons was agreed upon as a probable solution in HRRP Coordination Meeting dated April 12, 2017. HRRP - Kavrepalanchok HRRP © PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) ADRA NA 2,110 ARSOW -
Food Insecurity and Undernutrition in Nepal
SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014. -
Map of Dolakha District Show Ing Proposed Vdcs for Survey
Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking -
Kathmandu - Bhaktapur 0 0 0 0 5 5
85°22'0"E 85°24'0"E 85°26'0"E 85°28'0"E 85°30'0"E 340000 342500 345000 347500 350000 352500 GLIDE number: N/A Activation ID: EMSN012 Product N.: Reference - A2 NEPAL, v2 Kathmandu - Bhaktapur 0 0 0 0 5 5 7 7 Reference map 7 7 0 0 3 3 2014 - Detail 25k Sheet A2 Production Date: 18/07/2014 N " A1 !Gonggabu A2 A3 0 ' 8 !Jorpati 4 E N ° E " ! 7 Kathmandu E 0 ' 2 E E 8 4 ! ° Kirtipur Madh!yapur ! 7 Bhaktapur 2 B1 B2 0 ú 0 0 Budanilkantha 0 ! B 0 0 5 5 7 7 0 di n 0 3 Na Sundarijal 3 0 5 10 km /" ati um ! hn B Bis ! B ! B ú Cartographic Information 1:25000 Full color A1, high resolution (300 dpi) ! B ! B n ChapaliBhadrakali Meters ú nn n 0 10000 20000 30000 40000 50000 n n Grid: WGS 1984 UTM Zone 45N map coordinate system ! B ! B Tick Marks: WGS 84 geographical coordinate system n n ú ú n n WX Legend n n n n ! B Hydrography Transportation Urban Areas n ! B ! River Line (500>=m) Crossing Point (<500m) B d n Built Up Area a ú o ú R Intermittent Bridge Point Agricultural ! n in B ! B ! ! ú B a B ú n Perennial WX M ! Culvert Commercial r ú n B ú ta õö u River Area (>=1Ha) XY lf Ford Educational o n ! G n B n n Intermittent Crossing Line (>=500m) Industrial n ú Perennial Bridge 0 0 Institutional N n 0 n 0 " n ú 5 5 0 Reservoir Point (<1Ha) 2 2 Culvert ' Medical 7 7 6 ú 0 0 õö 4 3 3 E N Reservoir Point ° Ford E " Military 7 E 0 ' 2 E Reservoir Area (>=1Ha) 4 ú n Baluwa E 6 Ï Tunnel Point (<500m) Other 4 ! B IC ° ! B Intermittent ! B n n n 7 TunnelLine (>=500m) ú n 2 Recreational/Sports n Perennial n n Airfield Point (<1Ha) Religious ú n Ditch -
Healing the Wounds of the Most Excluded Sections of Nepali Society
This booklet compiles journalistic narrative profiles of ten victims of political conflict Stories from Nepal’s Transitional Justice Process that took place in Nepal between 1996 and 2006. These victims represent one Healing the Wounds of the most excluded sections of Nepali society. In addition, as a victims’ booklet, Healing the this publication includes factual and actionable, “utility” information for those seeking support or help. Wounds l Media Foundation With Facts, Context & Utility Information Healing the Wounds Stories from Nepal’s Transitional Justice Process Media Foundation Kathmandu This booklet compiles journalistic narrative profiles of ten victims of political conflict that took place in Nepal between 1996 and 2006. These victims represent one of the most excluded sections of Nepali society. In addition, as a victims’ booklet, this publication includes factual and actionable, “utility” information for those seeking support or help. Coordinators Punita Rimal Prabhat Kiran Koirala 2011 Shanti Marga, Bhatbhateni 40, PO Box: 9824, Kathmandu, Nepal Phone: 977-1-441-5137 Email: [email protected] Web: http://www.media-foundation.org/ © 2011 Media Foundation Cover photo: Ekal Silwal (Santa Bahadur Magar of Devendrapur, Chitwan, helping his disabled wife and conflict victim Durga Maya, 55, in March 2011. Book design and printing: Creative Press Pvt .Ltd. First published, May 2011 Provided that the text is credited correctly, content from this booklet can be used freely for personal, non-commercial purposes. ISBN 978-9937-2-33528-0 This booklet has been supported by UN Peace Building Fund through UN Peace Fund Nepal and OHCHR Nepal. The views and opinions expressed in this booklet are of the authors and do not necessarily reflect those of Media Foundation or OHCHR-Nepal. -
Thangmi Time for a True Population Census: the Case of the Miscounted
‘imfl’i” (CITIZEN) Voi.I4No.4 Aug.OO-Qct.OO 0 g,q/* (CITIZEN) VoLII,Na4 Aug.OO-OcI.OO C in fact nearly double the official the months of Kartik and one another. The number of Time for a True Population Census: figure. Phagun 2054, by Mr. Meghraj Thangmi houses in each village. Simi Rishmi Thami. editor and and the breakdown of men. The Case of the Miscounted Thangmi Disparity in Figures publisher of Dolakhareng women and children, is - Mark Turin According to the 1991 (pages 38-44). (See Fig.l) common knowledge to all who (Mark Turin is a linguistic the Thangmi (Nep. Thami) workers involved in the census, the total Thangmi live n the area. According to the anthropologist and has been population of Nepal and of demanding process of statistical population is 19.103 (1999, As can be seen from the above figures then, there are working on the Thangmi Northeast India I would support recording. Having said this, the page 52) and there are 14.440 above figures. there is a great almost three times more language since 1996. He was these criticisms. disparity between the total people who spoke Thangmi as disparity between the official Thangmi people living the trained in Social Thangmi population a mother tongue (1999, page statistics and those provided by eastern districts of Nepal than Anthropology at the figure provided by the 22). Ofequal interest, however. thej ournal Dolakhareng. Some the official census suggests. University of government and the is the official breakdown of the of this difference may ofcourse Cambridge, UK, and more realistic figures Thangmi population by district. -
WASH Cluster Nepal 4W - May 12Th 2015
WASH Cluster Nepal 4W - May 12th 2015 Please find following the analysis of the 4W data – May 12th Introduction (Round 2) This is the second round of the 4W analysis. As this is the second round and still early in the emergency response, many agencies are still planning their interventions and caseloads, hence much of the data is understandably incomplete. In the coming week/s we will receive far more comprehensive partner data and will be able to show realistic gaps. In addition, we are receiving better affected population data and there are many ongoing assessments, the results of which will help us to understand both the response data and the affected population data and enable us to deliver a far more profound analysis of the WASH response. Please assist us as we have a lot of information gaps in the data provided so far and hence the maps are not yet providing a true picture of the response. We would like to quickly move to VDC mapping including planned/reached beneficiaries. Since the first round of reporting, agencies have provided substantially more VDC‐level data – as of today, of 740 WASH activities identified, 546 of these (74%) are matched to an identified VDC ‐ this is a big improvement from last week (which had VDC data for 192 of 445 activities, or 43%) The Highlights ・ 47 Organisations – number of organisations that reported in Round 1 and/or Round 2 of the WASH 4W ・ 206 VDCs – where WASH interventions taking place/planned (in 15 districts) 4W – WASH May 12th 2015 Water0B Spread of water activities ‐ targeted Temporary