To: Members of the Sandwell Local Access Forum

Total Page:16

File Type:pdf, Size:1020Kb

To: Members of the Sandwell Local Access Forum Agenda Item 7 Sandwell Local Access Forum 12th April 2005 Discussion of Local Access Forum’s Response to Sandwell’s Rights of Way Improvement Plan Consultation As part of the consultation on Sandwell’s Rights of Way Improvement Plan, Dene Stevens, member representing Community Health on the Local Access Forum, has submitted the following comments for consideration. To: Members of the Sandwell Local Access Forum March 2005 Dear Colleagues on Sandwell LAF, Sandwell Rights of Way Improvement Plan consultation 2005 I have overlaid the Sandwell Walking Strategy Leisure Route Network and the planned local cycle network onto the map provided as part of the ROWIP consultation. Using this analysis, and adding my own local knowledge of certain other initiatives, I have compiled the following list of suggested improvements. I propose these for consideration at the next Local Access Forum meeting, and support by the LAF where there is agreement. In particular I would be interested to know which suggestions fellow LAF members would most endorse, and which they would consider most problematic. Note that my analysis emphasizes longer distance routes and important links in these. I am aware that there are also many shorter, isolated sections of Right of Way (or potential RoW) that are equally important and provide valuable access to local shops, schools, bus stops and other destinations. Yours sincerely, Dene Stevens Walking & Cycling for Health Development Worker Sandwell Primary Care Trusts 0121 – 500 1660 ; [email protected] and Community Health spokesperson on the LAF ID Grid Improvement Forms part of Description, suggestions, Suggested square (i) or new the following comments priority proposal (p) plans level (A high, B medium, C low) 1. A7 P+I River Tame Create new foot & cycle link A Way from IKEA to Pleck Park (surface, sign and light) 2. A8 P (part) +I Safer routes Formalise and improve foot & A (and to stations; cycle accesses to Bescot B8) safer routes to Station, from St. Paul’s Road, schools; River Pemberton Crescent, Tame Tame Way Avenue and eastwards along the River Tame (ultimately to New Walsall Road); (surface, sign and light, CCTV, wheeling ramps on bridges). Links to item 3 below. 3. A8 P+I Safer routes Formalise and improve link B to schools across recreation ground to St Paul’s Road (surface and sign) 4. A10 P National cycle Formally recognise NCN Route C network 5 link from Cherry Tree Avenue to Bell Lane (no improvements needed) 5. B5 P+I Walking There is a useful loop formed by B (also strategy the Walsall Canal, Bradley C3, C4 leisure Branch (to Irving Road), path to & C5) network; Turton Road, existing RoW link Health walks; to Wednesbury Oak Road, local cycle across to and along pathway network behind Tipton Sports Centre and back to the stub off the Walsall Canal by Charlotte Road (surface, sign and light). 6. B7 I Walking The RoW from Pound Road to B strategy Red House Avenue is a leisure valuable traffic-free foot and network; cycle crossing of the railway health walks line. It is sometimes used by health walks starting in Brunswick Park. Re-surface, sign and light. 7. B7 I Local cycle Link from Oxford Street to Price B network; Road. Re-surface, sign and walking light. strategy leisure network H:\Committee\WPWIN61\CTTEE\Sandwell Local Access Forum\02 - Reports\2005\02 - 12 April 05\07 - Discussion of LAF Response to ROWIP Consultation.DOC ID Grid Improvement Forms part of Description, suggestions, Suggested square (i) or new the following comments priority proposal (p) plans level (A high, B medium, C low) 8. B9 P+I River Tame Surface and sign path along B Way whole of River Tame through this square. 9. B9 P Local cycle Formally recognise as RoW B (and network; River “white path” between M6 and B10) Tame Way; Tame Bridge Estate, from New access to bus Walsall Road, to meet link from stops Pimpernel Drive to River Tame. 10. B10 P+I Walking Surface and sign link from B (and strategy Pimpernel Drive to River Tame. C10) leisure network; River Tame Way 11. B10 P+I Walking Sign post link from Brooklands C (and Strategy to Biddleston Bridge. B11) Leisure network 12. B11 P+I National Cycle Formalise, surface, sign post, A Network; light and CCTV link from Walking Brackendale Drive over Hill strategy Farm Bridge to Dartmouth leisure School and Wilderness Lane, network; safer with branch up to Birmingham routes to Road following route of Beacon school; Way. Beacon Way 13. C5 I Local cycle Charlotte Road to Bannister B network Road link. Sign and light, re- surface if necessary. 14. C6 P+I River Tame Create riverside path along B (and Way (& River Tame. C7, Walking D5, Strategy D6) leisure network N of Hydes Road in C7); safer routes Bto school 15. C7 P+I Local cycle Formalise, re-surface, widen, B network sign post and light cycle link from Woden Road South (opposite Chestnut Road) to Hampshire Road, via College and canal. H:\Committee\WPWIN61\CTTEE\Sandwell Local Access Forum\02 - Reports\2005\02 - 12 April 05\07 - Discussion of LAF Response to ROWIP Consultation.DOC ID Grid Improvement Forms part of Description, suggestions, Suggested square (i) or new the following comments priority proposal (p) plans level (A high, B medium, C low) 16. C8 P+I Local cycle Formalise and complete the re- B (and network, surfacing of the off-road link D8) Walking from Ryddings Lane to Gordon Strategy Avenue. leisure network, safer routes to school 17. C8 P+I Local cycle Complete the surfacing, B (and network formalise, sign post and D8) consider lighting the link from Beverley Road to item 16 of this table. 18. C10 I River Tame Surface, sign post and consider B Way; Walking lighting the RoW along the Strategy Tame from the Tame Valley Leisure Canal/M6 underpass to Ray Hall network Lane. 19. C10 P+I Walking Formalise, surface and sign C (and Strategy post the link from the River C11) Leisure Tame (just north of M6) to Network Biddleston Bridge (over Rushall Canal). 20. C10 P+I Walking Resurface, clear and re-sign B Strategy post the path from Rushall Leisure Junction to Ray Hall Lane, Network; alongside the M6. Beacon Way 21. C10 P National Cycle Complete the formalisation of C Network RoW status of the whole link from Ray Hall Lane to the Tame Valley Canal of NCN Route 5. 22. C11 P+I Walking Formalise and sign post the C Strategy path from the Rushall Canal to leisure Wilderness Lane, parallel to and network just north of the M6. 23. C11 P+I WSLN; canal Formalise, resurface and sign B access post the link from Pear Tree Road to Chatsworth Avenue, over the Tame Valley Canal. 24. C11 P+I WSLN; safer Formalise, re-surface, sign post A (and routes to and light the off-road link from C12) schools Longleat up to Red House and (Dartmouth) Hill Lane. H:\Committee\WPWIN61\CTTEE\Sandwell Local Access Forum\02 - Reports\2005\02 - 12 April 05\07 - Discussion of LAF Response to ROWIP Consultation.DOC ID Grid Improvement Forms part of Description, suggestions, Suggested square (i) or new the following comments priority proposal (p) plans level (A high, B medium, C low) 25. C13 P+I WSLN; Provide good access from B potential Whitecrest into Holly Wood, strategic cycle then on via Handsworth Drive link under the M6 and into Walsall borough. 26. D3 P+I WSLN; local Formalise, re-surface, sign post B (and cycle network and consider lighting the D4, Princes End path to link Brick E3) Kiln Street to the Bradley loop (Item 5 of this list). 27. D4 P+I Local cycle Formalise, re-surface, sign post B (and network and light the link from Powis D5) Avenue to Bridge Road. 28. D5 P+I Local cycle Formalise and sign post the link B network; canal from Bagnall Street to Eagle access Lane and assess for any other necessary improvements. 29. D8 P+I Local cycle Formalise and sign post the C network; path alongside Gordon Avenue. WSLN 30. D8 P+I Local cycle Formalise, re-surface, sign post B (and network; and consider lighting the link E8, WSLN from Leicester Place to the E7) Ridgeacre Canal. 31. D9 P+I Safer cycle Formalise and maintain Water B route from Lane from Pennyhill Lane to Charlemont Newton Road, improve access towards from the south end up to Sandwell Newton Road footway. Hospital area 32. D10 I WSLN Sign post link from Ray Hall C Lane to Pear Tree Close. 33. D10 P+I National Cycle Formalise the path along the B (and Network; Tame from Newton Road to D11, WSLN; River Forge Mill Farm, and resurface E10) Tame Way the stretch alongside Forge Mill Lake. 34. D10 P+I WSLN Formalise and signpost the C (and network of paths in the WSLN in E10) the area bounded by Forge Lane, Newton Road, the River Tame and the railway. H:\Committee\WPWIN61\CTTEE\Sandwell Local Access Forum\02 - Reports\2005\02 - 12 April 05\07 - Discussion of LAF Response to ROWIP Consultation.DOC ID Grid Improvement Forms part of Description, suggestions, Suggested square (i) or new the following comments priority proposal (p) plans level (A high, B medium, C low) 35. D11 P+I WSLN Formalise and signpost the B network of paths in the WSLN in the area bounded by Tanhouse Avenue, the railway line and the River Tame. Consider surfacing. 36. D11 P+I Local cycle Formalise and maintain Green B link alternative Lane bridge over Tame Valley to Newton Canal.
Recommended publications
  • PDF995, Job 6
    The Wildlife Trust for Birmingham and the Black Country _____________________________________________________________ The Endless Village Revisited Technical Background December 2005 Protecting Wildlife for the Future The Endless Village Revisited Technical Background 2005 The Wildlife Trust for Birmingham and the Black Country gratefully acknowledges support from English Nature, Dudley MBC, Sandwell MBC, Walsall MBC and Wolverhampton City Council. This Report was compiled by: Dr Ellen Pisolkar MSc IEEM The Endless Village Revisited Technical Background 2005 The Endless Village Revisited Technical Background 2005 Contents Page 1. INTRODUCTION 1 2. EXECUTIVE SUMMARY 2 3. SITES 4 3.1 Introduction 4 3.2 Birmingham 3.2.1 Edgbaston Reservoir 5 3.2.2 Moseley Bog 11 3.2.3 Queslett Quarry 17 3.2.4 Spaghetti Junction 22 3.2.5 Swanshurst Park 26 3.3 Dudley 3.3.1 Castle Hill 30 3.3.2 Doulton’s Claypit/Saltwells Wood 34 3.3.3 Fens Pools 44 3.4 Sandwell 3.4.1 Darby’s Hill Rd and Darby’s Hill Quarry 50 3.4.2 Sandwell Valley 54 3.4.3 Sheepwash Urban Park 63 3.5 Walsall 3.5.1 Moorcroft Wood 71 3.5.2 Reedswood Park 76 3.5 3 Rough Wood 81 3.6 Wolverhampton 3.6.1 Northycote Farm 85 3.6.2 Smestow Valley LNR (Valley Park) 90 3.6.3 West Park 97 4. HABITATS 101 The Endless Village Revisited Technical Background 2005 4.1 Introduction 101 4.2 Heathland 103 4.3 Canals 105 4.4 Rivers and Streams 110 4.5 Waterbodies 115 4.6 Grassland 119 4.7 Woodland 123 5.
    [Show full text]
  • Contacts: T Becoming More Active
    KEY National Cycle Route Existing cycle routes and safer routes to school On road cycle facilities rrss and bus lanes AA SSttaa Canal towpath Cycle stands Pedestrian area Walsall Walk On Health Walks Local Programme Town Centre Map Groups TO BROWNHILLS A454 TO ALDRIDGE & A34 TO BLOXWICH/ A461 TO BROWNHILLS CANNOCK TO ALDRIDGE Active Sustainable Travel TO Da & LICHFIELD Gr y WALSALL Str REEDSWOOD een ee t COLLEGE L an POLICE ARBORETUM e STATION And Road Safety Walking is Not sure where to start? Joining a group LAW LEATHER MUSEUM COURTS treet Littleton S one of the best is a great way of discovering new routes A4148 The A*STARS programme looks at promoting Wi llen A4148 TO h sustainable travel on the school journey and during and improving your skills and fitness with al st St t l C e y af t e BIRMINGHAM/ cle We Rout e ford n ee Str e La tr ld M6 J7 & J9 the school day. It also develops opportunities for e St and easiest ways of S the help of more experienced people. TO WILLENHALL u fie Bl on re rt Lich et training and new initiatives, such as walking bus he Here are a few useful contacts: t becoming more active. Supermarket Ha schemes. After a successful pilot, the programme is Supermarket now being rolled-out across all Walsall schools d CIVIC Walking regularly can: CTC Walsall Member Group a BATHS Ro CENTRE Pilot project achievements (2010-2012): n to LIBRARY Wol er verhampton POST (Cyclists’ Touring Club) Street Hath In OFFICE to • Help weight loss A454 TO WILLENHALL/ wn 3% increase in walking and cycling levels in R WOLVERHAMPTON M6 J10 WALSALL CANAL ART ow Contact: 01543 377145 BASIN GALLERY COUNCIL A*STARS schools, compared to an overall Walsall THE • Ease back pain Butlers HOUSE [email protected] Passage CROSSING t average of 1.8% e e r Pa t S rk l www.chasecycling.co.uk l • Reduce the risks of heart disease St re Br ha i s 3.7% reduction in single car use.
    [Show full text]
  • 7.9 Impacts on Water Resources 22/10/2014
    7.9 Impacts on Water Resources 22/10/2014 Midland Metro 7.9 Impacts on Water Resources 7.9.1 Introduction This section of the ES describes the potential for impacts on water resources to occur during the construction of the scheme. This includes impacts associated with both surface and ground water. Where appropriate, mitigation measures have been developed in order to minimise the potential impact of the scheme. 7.9.2 Assessment Methodology The assessment of impacts on surface and groundwaters has been undertaken based upon existing sources of information. The following sources of information were utilised: water quality data available on the Environment Agency’s website ([16]); Groundwater Vulnerability Map, Sheet 22 (South Staffordshire & East Shropshire); relevant European Community (EC) legislation; Local Environment Agency Plan (LEAP) West Midlands – Tame ([17]) ; Sandwell UDP ([18]); Dudley UDP ([19]); planning policies and Environment Agency (EA) objectives with regard to groundwater; and designated sites of nature conservation importance (local, national and international designations). 7.9.3 Assessment Criteria Local Planning Context The Sandwell UDP states in Policy PC12 that: “in conjunction with the Environment Agency, the Council will oppose development which is likely to lead to a significantly adverse impact on groundwater resources, both in terms of protecting their quality and/or ability to use the resource”. Further, the Plan states that the Council will resist development that poses an unacceptable threat to the quality of surface and groundwaters (Policy PC9), and will ensure that adequate pollution control measures are incorporated into new developments, to reduce the risk of water pollution. Policy EP2 of the First Deposit Dudley UDP that: “proposals will not be permitted where development would harm the water quality or quantity in underground aquifers.
    [Show full text]
  • Display PDF in Separate
    NRA Severn-Trent 36 TAME CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT JANUARY 1996 v NRA N at ion a I Rivers Authority Sc v e rn - Trcn t R eg io n Your views We want your views, comments, ideas and criticisms This is the basis for consultation between the NRA and all those with interests in the catchment. Please consider:- o The Vision for the Catchment. o The issues and options identified in the report. o Alternative options for resolving identified issues. o Raising additional issues not identified in the report. o Raising anything else you feel is important. All comments received will be treated as public information unless you explicitly state otherwise in your response. Following the consultation period all comments received will be considered in preparing the next phase, the Action Plan. This Consultation Report will not be rewritten as part of the Action Plan process. We intend that the Plan should influence the policies and action of developers, planning authorities and other as well as assisting in the day to day management of the Catchment. A letter outlining the issues was sent to local authorities, national organisations, other representative bodies and representatives of the NRA Statutory Committees in the summer of 1995. All the comments have been incorporated into this document where possible. A list of organisations that were contacted is given in Appendix 1. We are grateful for the useful suggestions received. Comments on the Consultation Report should be sent to: Tony Stanley National Rivers Authority Upper Trent Area Sentinel House 9 Wellington Crescent Fradley Park Lichfield Staffs WS13 8RR All contributions should be made in writing by: 31 March 1996 If you or your organisation need further information or further copies of this Report, please contact Jonathan Jenkin at the above address or by telephone on (01543) 444141 Ext 4086.
    [Show full text]
  • Wyrley & Essington Canal, Brownhills to Chasewater
    Wyrley & Essington Canal, Brownhills to Chasewater Easy Trail: Please be aware that the grading of this trail was set according to normal water levels and conditions. Weather and water level/conditions can change the nature of trail within a short space of time so please ensure you check both of these before heading out. Route Summary Distance: Can be variable, full one way distance is 3 A gentle paddle to Chasewater Park, an opportunity to miles but it is intended to be a two way trip maybe with stop for a picnic and take in the picturesque countryside. a picnic at Chasewater. Approximate Time: 1-2 Hours This trail uses the Anglesey branch of the Wyrley & The time has been estimated based on you travelling 3 – 5mph Essington canal. The canal was built in 1798 as a culvert (a leisurely pace using a recreational type of boat). to supply water from Norton Pool canal feeder reservoir Type of Trail: Out and Back (later known Chasewater) to the Wyrley & Essington Canal. In 1850 it was made navigable to tap into traffic Waterways Travelled: Wyrley & Essington Canal from local coal mines. Coal was loaded into boats at (Anglesey branch) Anglesey Wharf until 1967 and the remains of the loading Type of Water: Urban and rural canal chutes can still be seen. Above Anglesey Basin is the stone faced dam for Chasewater that is a country park Portages and Locks: None and where there is a sailing, water skiing & power Nearest Town: Walsall boating centre. Boating activity is limited to club use and Start and finish: Brownhills Canoe Centre, Silver there is no canoeing for safety reasons.
    [Show full text]
  • BCN Moorings Leaflet
    FACILITIES GENERAL INFORMATION WATER POINTS he Birmingham Canal Navigations (BCN) is a 100 mile network of narrow Sherborne Wharf (Birmingham) [0121 456 6163] T canals situated at the very heart of the Midlands waterway system. There is, Farmers Bridge Top Lock (Birmingham & Fazeley) Holliday Wharf (just south of Gas Street Basin) arguably, no other inland waterways complex in the world which provides such Tividale Aqueduct (Netherton Tunnel Branch) vivid, sometimes breathtaking, contrasts. It would be difficult to imagine a canal Tividale Aqueduct (Old Main Line) landscape containing more features of interest to such a wide variety of users. Wolverhampton Top Lock Wolverhampton Lock No.15 BW Sneyd Yard (Wyrley & Essington) Unfortunately, the BCN harbours a serious burden – its image. To the uninitiated the Anglesey Bridge Marina (Anglesey Branch) [01543 454994] Longwood Junction (by Boat Club) BCN is still perceived as grimy and unpleasant, but this is simply not true. Perry Barr Top Lock Admittedly, some parts do pass through industrialised areas – but remember – that is Walsall Top Lock the reason they were built in the first place! There are many others which remain Parkhead Junction (next to pump house) Aldridge Marina (Daw End Branch) [01922 53397] amazingly rural and completely unspoilt. Nowhere is this more apparent than the Hawne Basin (Dudley No.2) delightful areas of the Northern BCN, providing many miles of tranquil, trouble-free Malthouse Stables, Tipton (Old Main Line) cruising. Cuckoo Wharf (Aston Locks) Canal Transport Services (Cannock Extension) [01543 374370] Grove Colliery Basin (Cannock Extension) Fortunately British Waterways, in conjunction with local canal societies and Black Country Museum Coronation Gardens, Tipton (Old Main Line) councils, has done much in recent years to enhance the waterside, to improve NEW – Windmill End (Dudley No.2) [next to new visitor centre].
    [Show full text]
  • BCN Leaflet Amendments
    “FINDING YOUR WAY “FINDING YOUR WAY “FINDING YOUR WAY AROUND THE BCN” AROUND THE BCN” AROUND THE BCN” Additions and Amendments Additions and Amendments Additions and Amendments MOORINGS INFORMATION: MOORINGS INFORMATION: MOORINGS INFORMATION: There are now suitable moorings at: There are now suitable mooorings at: There are now suitable mooorings at: • Black Cock Bridge (Daw End Branch) • Black Cock Bridge (Daw End Branch) • Black Cock Bridge (Daw End Branch) • Walsall Town Wharf • Walsall Town Wharf • Walsall Town Wharf • BW, Ocker Hill (Walsall Canal) • BW, Ocker Hill (Walsall Canal) • BW, Ocker Hill (Walsall Canal) PUBS: PUBS: PUBS: Add the following to the list: Add the following to the list: Add the following to the list: • “Tap & Spile” (Gas St Basin) • “Tap & Spile” (Gas St Basin) • “Tap & Spile” (Gas St Basin) • “The Victoria”, Tipton (Old Main Line) • “The Victoria”, Tipton (Old Main Line) • “The Victoria”, Tipton (Old Main Line) • “Church Tavern, Perry Barr (Tame Valley Canal) • “Church Tavern, Perry Barr (Tame Valley Canal) • “Church Tavern, Perry Barr (Tame Valley Canal) • “The Dilke” (west of Longwood, Daw End Branch) • “The Dilke” (west of Longwood, Daw End Branch) • “The Dilke” (west of Longwood, Daw End Branch) • “The Black Cock” (Daw End Branch) • “The Black Cock” (Daw End Branch) • “The Black Cock” (Daw End Branch) • “The Nickleodeon” (Wednesfield Jn, W&E Canal) • “The Nickleodeon” (Wednesfield Jn, W&E Canal) • “The Nickleodeon” (Wednesfield Jn, W&E Canal) • “The United Kingdom” (Wednesfield, W&E Canal) • “The United
    [Show full text]
  • Daw End Branch & Rushall Canals and Ryecroft Railway Junction An
    Walsall Walkabout #2 (North East) Daw End Branch & Rushall Canals and Ryecroft Railway Junction An RCHS West Midlands Group Walk Saturday 9th September 2017 Overview Walsall Walkabout #2, - a (perhaps surprisingly) mostly rural walk - starts at Bell Bridge (Walstead Road) on the Rushall Canal: Bus #51 or X51 from Walsall Bus Station stand A/B to Walstead Road Bell Inn. The Wyrley & Essington Canal was incorporated in 1792 to connect Wolverhampton with Wyrley Bank and adjacent collieries. In fact, before the canal was completed the line up to Wyrley became a branch with the main line continuing to Birchills (north Walsall). Subsequently, the main line was extended from a junction less than half a mile north of Birchills basin to join the Coventry Canal at Huddlesford Junction which is to the east of Lichfield. There were a number of branches notably in the area around Wyrley and to the south of Cannock. The main line of the canal was opened in stages (from west to east) between 1794 and 1797. Despite the proximity of the Wyrley & Essington Canal and the BCN, and pressure from local businessmen, the two canals had no connections (apart from Horseleyfields Junction at the Wolverhampton end) until the two canal companies merged in 1840. Three such canals were completed between 1841 and 1847. The first (the Walsall Locks Branch) made the half-mile connection between the W&E at Birchills Wharf and the Walsall Canal close to its terminus at Walsall Wharf - this canal was included in our Walsall Walkabout #1 in 2016. The Rushall Canal, completed in 1847, was #3 in the sequence.
    [Show full text]
  • Dudley and Sandwell MG
    H V N A O E U gg M I E 334 O L R L H R L S O N A NL L G A D U R N D I A I A V EE N School R U H E R N O 310 N T 637 T A R 26 27 R I L V E N C G CUMB ERLA B L H A D D E O S Green Priestfield M A Heath G 4 S DE A E E 64 R L O Walsall Campus R D H R T 39 34A K E DARLASTON LV LAK H 637 45 E O W D R E V C L 26A 27A D E A C R E L 63 N . O 23.26A.34 334 74 A A R T G S 4H S N 34 H of University of I R S 77 G 23 O W U W O 334 57 R SLATER’S E 63 R O 23 L LA. 401E S N 255 N 530 R 303 S RD E D N Y B 74 Y O A A O R R E O . A B H 4M Wolverhampton T T D L IX H A D P D 79 H T IC 256 34 R OUG LANGLF EY ROAD B V E G T E P A X U N R C . A D S Wolverhampton College S 34.37.310 T L N 637 R O E E OW . S R LL N A S A T.
    [Show full text]
  • Canal Restrictions by Boat Size
    Aire & Calder Navigation The main line is 34.0 miles (54.4 km) long and has 11 locks. The Wakefield Branch is 7.5 miles (12 km) long and has 4 locks. The navigable river Aire to Haddlesey is 6.5 miles (10.4 km) long and has 2 locks. The maximum boat size that can navigate the full main line is length: 200' 2" (61.0 metres) - Castleford Lock beam: 18' 1" (5.5 metres) - Leeds Lock height: 11' 10" (3.6 metres) - Heck Road Bridge draught: 8' 9" (2.68 metres) - cill of Leeds Lock The maximum boat size that can navigate the Wakefield Branch is length: 141' 0" (42.9 metres) beam: 18' 3" (5.55 metres) - Broadreach Lock height: 11' 10" (3.6 metres) draught: 8' 10" (2.7 metres) - cill of Broadreach Lock Ashby Canal The maximum size of boat that can navigate the Ashby Canal is length: There are no locks to limit length beam: 8' 2" (2.49 metres) - Safety Gate near Marston Junction height: 8' 8" (2.64 metres) - Bridge 15a draught: 4' 7" (1.39 metres) Ashton Canal The maximum boat length that can navigate the Ashton Canal is length: 74' 0" (22.5 metres) - Lock 2 beam: 7' 3" (2.2 metres) - Lock 4 height: 6' 5" (1.95 metres) - Bridge 21 (Lumb Lane) draught: 3' 7" (1.1 metres) - cill of Lock 9 Avon Navigation The maximum size of boat that navigate throughout the Avon Navigation is length: 70' (21.3 metres) beam: 12' 6" (3.8 metres) height: 10' (3.0 metres) draught: 4' 0" (1.2 metres) - reduces to 3' 0" or less towards Alveston Weir Basingstoke Canal The maximum size of boat that can navigate the Basingstoke Canal is length: 72' (21.9 metres) beam: 13'
    [Show full text]
  • BCN Safe Moorings Guide
    MOORING PLACES ON THE BCN WEDENSBURY OAK LOOP WALSALL CANAL BIRMINGHAM CITY CENTRE C&RT Workshop basin. Mooring has been permitted, by prior Walsall Locks Top Lock, off side K There are many excellent visitor moorings arrangement – particularly in association with their open days. Walsall Town Arm secure off side before town basin. Barclaycard Arena, National Sealife Centre & Oozells Street loop. Check with the workshop. Walsall Town Basin Between the Worcester Bar and Holliday Street Bridge. TAME VALLEY CANAL Willingsworth Hall Bridge (adjacent to Patent Shaft site). Cambrian Wharf and Gas Street basin visitor moorings. Between Lock No.11 & No.12 adjacent to park and container base. Ocker Hill moorings (just inside arm) K PUBS: Many to choose from, but the “Prince of Wales” (beside Good stretch between M6 and Lock No.7. Top of Ryders Green Locks. (off side) the ICC, on Cambridge Street) is a boaters' favourite. Perry Barr Top Lock. PUBS: "New Navigation" (Walsall Top Lock); BIRMINGHAM & FAZELEY PUBS: "Boars Head" on College Road above "Eight Locks" (Ryders Green Top Lock). Farmers Bridge top lock & Cambrian Wharf. Perry Barr Lock No.11. DUDLEY NO.1 CANAL Aston Business Park (offside between Locks 8 & 9 DAW END BRANCH & RUSHALL Black Country Museum end of Dudley Tunnel K on Aston flight). P K Longwood Boat Club towpath side Parkhead end of the Dudley Tunnel Cuckoo Wharf – at the bottom of Aston flight near Salford or on club moorings by arrangement. Some quiet spots between Parkhead and Woodside Bridge. Junction. Outside the “Manor Arms” Waterfront (Merry Hill) – moorings on hotel side of basin.
    [Show full text]
  • Bradley Canal Map in Acrobat
    Cruising Map of the Bradley Canal including Moorcroft Junction Bradley Locks Former and Proposed Routes Route 38M9 Map IssueIssue 117 50 Notes 1. The information is believed to be correct at the time of publication but changes are frequently made on the waterways and you should check before relying on this information. 2. We do not update the maps for short term changes such as winter lock closures for maintenance. 3. The information is provides “as is” and the Information Provider excludes all representations, warranties, obligations, and liabilities in relation to the Information to the maximum extent permitted by law. The Information Provider is not liable for any errors or omissions in the Information and shall not be liable for any loss, injury or damage of any kind caused by its use. BBRADLRADL 0011 FFootbridgeootbridge BBilstonilston BBridgeridge BBRADLRADL 0011 BBCNCN MMainain LLineine BBCNCN WWalsallalsall CCanalanal This is the September 2021 edition of the map. CCatchemsatchems CCornerorner BBridgeridge See www.waterwayroutes.co.uk/updates for updating BBarnesarnes MMeadoweadow BBridgeridge to the latest monthly issue at a free or discounted price. Contains OS data © Crown copyright and database right. JJibbetibbet LLaneane BBridgeridge All other work © Waterway Routes. MMillfieldsillfields BBridgeridge HHeathfieldseathfields BBridgeridge oorr BBaggot’saggot’s BBridgeridge Licensed for personal use only. Business licences on request. 17.6K 10.9M 3L 0B 4.5H BBCNCN 1100 BBCNCN 1100 SSpringpring VValeale RRailwayailway BBridgeridge
    [Show full text]