Supplementary DPR Documents
Total Page:16
File Type:pdf, Size:1020Kb
DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Mewat (HARYANA) (AS PER SUPLEMENTRY DPR) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 B Electrification of UE villages 10 9 B(I) Block-wise coverage of villages 11 10 B(II) Villagewise/Habitation wise coverage 12 11 B(III) Existing Habitation Wise Infrastructure 12 12 B(IV) Village Wise/Habitation Proposed Works 12 13 B(V) Existing REDB Infrastructure 12 14 B(VI) Block-Wise Substation 13 15 B(VII) Feederwise DTs 14 16 C Feeder Segregation 16 17 D Connecting unconnected RHHs 17 18 D(I) Block-wise coverage of villages 18 19 D(II) Villagewise/Habitation wise coverage 19 20 D(III) Existing Habitation Wise Infrastructure 19 21 D(IV) Village Wise/Habitation Proposed Works 19 22 D(V) Existing REDB Infrastructure 19 23 D(VI) Block-Wise Substation 20 24 D(VII) Feederwise DTs 21 25 E Metering 23 26 E(I) DTR Metering 24 27 E(II) Consumer Metering 40 28 E(III) Shifting of Meters 42 29 E(IV) Feeder Metering 43 30 F System Strengthening and Augmentation 44 31 F(I) Block-Wise Substation 45 32 F(II) EHV Substation Feeding the District 46 33 F(III) Districtwise Details of Existing 11 KV or 22 KV Lines 51 34 G SAGY 53 35 G(I) Block-wise coverage of villages 54 36 G(II) Villagewise/Habitation wise coverage 55 37 G(III) Existing Habitation Wise Infrastructure 55 38 G(IV) Village Wise/Habitation Proposed Works 55 Section -A Basic Details of District State : HARYANA District : Mewat Page 1 of 54 28/12/2015 (AS PER SUPLEMENTRY DPR) A(V) Basic Details of District for Supplementry DPR State : HARYANA District : Mewat Name of Project Implementing Agency Dakshin Haryana Bijli Vitran Nigam Limited Name of DISCOM Dakshin Haryana Bijli Vitran Nigam Limited Name of State HARYANA Name of District Mewat Total Population of district 1086711 Total Geographical Area(SqKm) 1859.61 Percentage of Hilly area 5.2 Total Block in the district 6 Total Urban Town in the district 0 Total Urban Population in the district 123172 Population Of Urban Area 123172 Total Census Revenue Villages in the district 443 Total Habitations in the district 0 Total Rural Population in the district 963539 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 147662 187693 0.04 201250 215786 Rural HH in the district 132979 158308 0.02 169742 182003 Urban HH in the district 14683 29385 0.02 31508 33783 Total Energised HH in the district 80870 96271 0.02 103228 110684 Urban HH electrified in the district 13601 16192 0.02 17362 18616 Rural HH electrified in the district 67266 80079 0.02 85863 92065 Balance Un-electrified Rural HH 65713 78229 0 83879 89938 Page 2 of 54 28/12/2015 (AS PER SUPLEMENTRY DPR) A(V) Basic Details of District for Supplementry DPR State : HARYANA District : Mewat Balance Un-electrified Urban HH 1082 13193 0 14146 15167 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 0 0 0 0 0 0 0 0 0 0 11th 0 0 0 0 0 0 0 0 0 0 12th 0 0 0 0 0 0 0 0 0 0 Page 3 of 54 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Mewat S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) E.Metering LT Metering(Consumer Metering) 1 Ferozepur Jhirka Installation of New Meters(1-Ph Domestic and Commercial Nos. 16 0.0212 0.3392 Meters) Installation of New Meters(3-Ph Agriculture Meters) Nos. 6 0.0476 0.2856 Installation of New Meters(3-Ph Domestic and Commercial Nos. 7 0.0476 0.3332 Meters) Installation of New Meters(3-Ph Water Works Meters) Nos. 7 0.0476 0.3332 Replacement of Defective Meters(1-Ph Domestic and Nos. 8 0.0131 0.1048 Commercial Meters) Replacement of Defective Meters(3-Ph Agriculture Meters) Nos. 8 0.0285 0.228 Replacement of Defective Meters(3-Ph Domestic and Nos. 8 0.0285 0.228 Commercial Meters) Replacement of Defective Meters(3-Ph Water Works Meters) Nos. 3 0.0285 0.0855 Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 7 0.0212 0.1484 Commercial Meters) Replacement of Electro-Mechanical Meters(3-Ph Domestic and Nos. 7 0.0476 0.3332 Commercial Meters) 2 Nagina Installation of New Meters(1-Ph Domestic and Commercial Nos. 7 0.0212 0.1484 Meters) Installation of New Meters(3-Ph Agriculture Meters) Nos. 6 0.0476 0.2856 Installation of New Meters(3-Ph Domestic and Commercial Nos. 3 0.0476 0.1428 Meters) Installation of New Meters(3-Ph Water Works Meters) Nos. 5 0.0476 0.238 Replacement of Defective Meters(1-Ph Domestic and Nos. 6 0.0131 0.0786 Commercial Meters) Replacement of Defective Meters(3-Ph Agriculture Meters) Nos. 7 0.0285 0.1995 Page 4 of 54 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Mewat S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) Replacement of Defective Meters(3-Ph Domestic and Nos. 7 0.0285 0.1995 Commercial Meters) Replacement of Defective Meters(3-Ph Water Works Meters) Nos. 4 0.0285 0.114 Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 7 0.0212 0.1484 Commercial Meters) Replacement of Electro-Mechanical Meters(3-Ph Domestic and Nos. 3 0.0476 0.1428 Commercial Meters) 3 Nuh Installation of New Meters(1-Ph Domestic and Commercial Nos. 7 0.0212 0.1484 Meters) Installation of New Meters(3-Ph Agriculture Meters) Nos. 7 0.0476 0.3332 Installation of New Meters(3-Ph Domestic and Commercial Nos. 5 0.0476 0.238 Meters) Installation of New Meters(3-Ph Water Works Meters) Nos. 5 0.0476 0.238 Replacement of Defective Meters(1-Ph Domestic and Nos. 2 0.0131 0.0262 Commercial Meters) Replacement of Defective Meters(3-Ph Agriculture Meters) Nos. 9 0.0285 0.2565 Replacement of Defective Meters(3-Ph Domestic and Nos. 8 0.0285 0.228 Commercial Meters) Replacement of Defective Meters(3-Ph Water Works Meters) Nos. 7 0.0285 0.1995 Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 9 0.0212 0.1908 Commercial Meters) Replacement of Electro-Mechanical Meters(3-Ph Domestic and Nos. 3 0.0476 0.1428 Commercial Meters) 4 Punahana Installation of New Meters(1-Ph Domestic and Commercial Nos. 8 0.0212 0.1696 Meters) Installation of New Meters(3-Ph Agriculture Meters) Nos. 7 0.0476 0.3332 Installation of New Meters(3-Ph Domestic and Commercial Nos. 7 0.0476 0.3332 Meters) Installation of New Meters(3-Ph Water Works Meters) Nos. 5 0.0476 0.238 Page 5 of 54 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Mewat S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) Replacement of Defective Meters(1-Ph Domestic and Nos. 7 0.0131 0.0917 Commercial Meters) Replacement of Defective Meters(3-Ph Agriculture Meters) Nos. 3 0.0285 0.0855 Replacement of Defective Meters(3-Ph Domestic and Nos. 4 0.0285 0.114 Commercial Meters) Replacement of Defective Meters(3-Ph Water Works Meters) Nos. 4 0.0285 0.114 Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 6 0.0212 0.1272 Commercial Meters) Replacement of Electro-Mechanical Meters(3-Ph Domestic and Nos. 6 0.0476 0.2856 Commercial Meters) 5 Taoru Installation of New Meters(1-Ph Domestic and Commercial Nos. 3 0.0212 0.0636 Meters) Installation of New Meters(3-Ph Agriculture Meters) Nos. 8 0.0476 0.3808 Installation of New Meters(3-Ph Domestic and Commercial Nos. 5 0.0476 0.238 Meters) Installation of New Meters(3-Ph Water Works Meters) Nos. 4 0.0476 0.1904 Replacement of Defective Meters(1-Ph Domestic and Nos. 7 0.0131 0.0917 Commercial Meters) Replacement of Defective Meters(3-Ph Agriculture Meters) Nos. 6 0.0285 0.171 Replacement of Defective Meters(3-Ph Domestic and Nos. 5 0.0285 0.1425 Commercial Meters) Replacement of Defective Meters(3-Ph Water Works Meters) Nos. 7 0.0285 0.1995 Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 8 0.0212 0.1696 Commercial Meters) Sub-Total (LT Metering(Consumer Metering)) 304 9.6572 LT Metering(Shifting of Meter) 6 Ferozepur Jhirka Total Requirement of shifting of meters outside(1-Ph Domestic Nos. 8 0.0064 0.0512 and Commercial Meters) Page 6 of 54 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Mewat S.No.