Pakistan's Water Economy

Total Page:16

File Type:pdf, Size:1020Kb

Pakistan's Water Economy PakistanPakistan ’’ss WaterWater Economy:Economy: RunningRunning DryDry The World Bank October 2005 Written by John Briscoe, Usman Qamar, Manuel Contijoch, Pervaiz Amir, and Don Blackmore CCCooonnnttteeennntttsss Overview and Executive Summary..................................................................................4 I: Preface ........................................................................................................................ 20 II. The Challenges and Achievements of the Past: ....................................................... 23 The challenges .................................................................................................................................................23 The response – public infrastructure...........................................................................................................27 The response – private infrastructure..........................................................................................................32 The response – institutions ...........................................................................................................................36 III. The Challenges of the Present and the Necessary Responses ............................... 42 Adjusting to the needs of a changing Pakistan...........................................................................................42 Preparing for climate change ........................................................................................................................45 Adapting to scarcity: An imminent “water gap”........................................................................................48 Getting more product per drop: The “performance gap” ......................................................................50 Narrowing the “trust gap”.............................................................................................................................56 Maintaining the resource base -- groundwater...........................................................................................59 Maintaining the resource base – salinity management .............................................................................65 Reversing large scale environmental degradation ......................................................................................70 Living with floods...........................................................................................................................................75 Renewing existing infrastructure: Addressing the “maintenance gap” ..................................................78 Investing in priority new infrastructure.......................................................................................................80 IV: What needs to be done............................................................................................. 89 Principles for a modern institutional structure..................................................................... 89 Instruments........................................................................................................................... 90 Unbundling and Competition................................................................................................................................91 Regulation.................................................................................................................................................................93 Water entitlements...................................................................................................................................................95 Transparency............................................................................................................................................................99 Knowledge..............................................................................................................................................................100 Financing ................................................................................................................................................................101 What this means for Federal and Provincial Governments .................................................103 V: Principled pragmatism and “rules for reformers” ...................................................106 Rule # 1: Water is different.......................................................................................................................................106 Rule # 2: Initiate reform where there is a powerful need and demonstrated demand for change..................107 Rule #3: Involve those affected, and address their concerns with understandable information.....................108 Rule #4: Reform is dialectic not mechanical...........................................................................................................109 Rule # 5: It’s implementation, stupid.......................................................................................................................109 Rule #6: Develop a sequenced, prioritized list of reforms ...................................................................................109 Rule #7: Be patient and persistent............................................................................................................................110 Rule #8: Pick the low-hanging fruit first – nothing succeeds like success..........................................................110 Rule #9: Keep your eye on the ball – don’t allow the best to become the enemy of the good.......................110 Rule #10: There are no silver bullets .......................................................................................................................111 Rule #11: Don’t throw the baby out with the bathwater......................................................................................111 Rule #12: Reforms must provide returns for the politicians who are willing to make changes ......................111 VI: The Evolving Role of the World Bank...................................................................113 What the Bank has done in the past ..........................................................................................................113 Water Resources and Irrigation ...........................................................................................................................113 Hydropower ...........................................................................................................................................................125 Water Supply and Sanitation................................................................................................................................126 The Bank’s new Water Strategy..................................................................................................................128 An indicative World Bank water investment program for 2006-2010: ................................................129 The four pillars:......................................................................................................................................................129 The investment projects: ......................................................................................................................................133 Evolving priorities and the indicative Bank water investment program........................................................135 Pakistan Water Strategy page 2 of 140 Endnotes .......................................................................................................................136 Pakistan Water Strategy page 3 of 140 OOOVVVEEERRRVVVIIIEEEWWW AAANNNDDD EEEXXXEEECCCUUUTTTIIIVVVEEE SSSUUUMMMMMMAAARRRYYY Pakistan is one of the world’s most arid countries, with an average rainfall of under 240 mm a year. The population and the economy are heavily dependent on an annual influx into the Indus river system (including the Indus, Chenab, Jhelum, Ravi, Beas and Sutlej rivers) of about 180 billion cubic meters of water, most derived from snow- melt in the Himalayas, and most emanating from neighboring countries. Throughout history people have adapted to the low and poorly distributed rainfall by either living along river banks or by careful husbanding and management of local water resources. One of the greatest of human civilizations – the Indus Valley civilization (Harrapa and Mohenjo Daro) – flourished along the banks of the Indus. This precarious, low-level balance between man and water was decisively shifted with the advent of large-scale irrigation technology Figure S1: Pakistan from space in the 19th century. The Indus irrigation system became the largest contiguous irrigation system in the world. A shown in Figure S1, the desert literally bloomed, with irrigated agriculture providing the platform for the development of the modern economy of Pakistan. This hydraulic economy has faced and surmounted three massive challenges in the last half century. The first challenge arose because the lines of Partition Indus Afghanistan Jhelum severed the irrigated heartland of Punjab from the life- China Chenab giving waters of the Ravi, Beas and Sutlej rivers. In an Ravi unprecedented triumph of water diplomacy, Pakistani Beas engineers, together with their Indian counterparts and Sutlej the World Bank, negotiated the Indus Waters Treaty, Pakistan giving Pakistan rights in perpetuity to the waters of the Nepal
Recommended publications
  • Kurram Tangi Dam Consultants
    Satpara Dam Project Initial Environmental Examination CHAPTER - 1 INTRODUCTION 1.1 BACKGROUND The Satpara dam multipurpose project with an installed capacity of 13.2 MW is proposed, in Northern Areas, 6 km south of Skardu city. It is located 16 km north of Deosai planes and about 3 km downstream of Satpara village. It is a natural lake formed by the glaciers having a surface area of 689 Acres. The dam has a dead storage of 38,500 acre-ft and live storage of 54,122 acre-ft. The project will generate 4.86 MW electricity from with one powerhouse and 13.2 MW with two powerhouses. The project will irrigate about 4,600 acres of land on right side of Satpara nullah and 10,400 acres of land on left side of Skardu city. The land on left side of the nullah is spread up to Hoto village just upstream of Ayub Bridge. To deliver power from the proposed powerhouse new transmission lines and improvement of existing transmission system will be required. Northern Areas of Pakistan is a land locked area with a population of 1.20 million(Census report 1998). At present more than 50% of the population (This figure is less for rural areas.) has access to electricity in their homes and many of those experience frequent load shedding, blackouts on daily basis through out the year. Economic growth in the country has severely been affected inadequate supply of power. Present domestic demand is increasing by a rate of 6 % per annum. The power demand of WAPDA system is forecast to increase at an annual average compound growth rate of 5.2 percent and 6.7 percent in case of low growth scenario and normal growth scenario respectively.
    [Show full text]
  • Ecological Impbalances in the Coastal Areas of Pakistan and Karachi
    Ecological imbalances in the coastal areas of Pakistan and Karachi Harbour Item Type article Authors Beg, Mirza Arshad Ali Download date 25/09/2021 20:29:18 Link to Item http://hdl.handle.net/1834/33251 Pakistan Journal of Marine Sciences, VoL4(2), 159-174, 1995. REVIEW ARTICLE ECOLOGICAL IMBALANCES IN THE COASTAL AREAS OF PAKISTAN AND KARACID HARBOUR Mirza Arshad Ali Beg 136-C, Rafahe Aam Housing Society, Malir Halt, Karachi-75210. ABSTRACT: The marine environment of Pakistan has been described in the context of three main regions : the Indus delta and its creek system, the Karachi coastal region, and the Balochistan coast The creeks, contrary to concerns, do receive adequate discharges of freshwater. On site observations indicate that freshwater continues flowing into them during the lean water periods and dilutes the seawater there. A major factor for the loss of mangrove forests. as well as ecological disturbances in the Indus delta is loss of the silt load resulting in erosion of its mudflats. The ecological disturbance has been aggravated by allowing camels to browse the mangroves. The tree branches and trunks, having been denuded of leaves are felled for firewood. Evidence is presented to show that while indiscriminate removal of its mangrove trees is responsible for the loss oflarge tracts of mangrove forests, overharvesting of fisheries resources has depleted the river of some valuable fishes that were available from the delta area. Municipal and industrial effluents discharged into the Lyari and Malir rivers and responsible for land-based pollution at the Karachi coast and the harbour. The following are the three major areas receiving land-based pollution and whose environmental conditions have been examined in detail: (l) the Manora channel, located on the estuar}r of the Lyari river and serving as the main harbour, has vast areas forming its western and eastern backwaters characterized by mud flats and mangroves.
    [Show full text]
  • Transport and Communications
    Chapter 14 TRANSPORT AND COMMUNICATIONS A well functioning Transport and communication I. TRANSPORT system is a critical pre-requisite for a country’s i. Road Transport development. Investment in the infrastructure directly affects economic growth through many Road transport is the backbone of Pakistan’s changes such as allowing producers to find the transport system, accounting for 90 percent of best markets for their goods, reducing national passenger traffic and 96 percent of freight transportation time and cost and generating movement. Over the past ten years, road traffic – employment opportunity. In addition, efficient both passenger and freight – has grown much transport and communication systems also have faster than the country’s economic growth. The network effects and allow adoption of latest 10,849 km long National Highway and Motorway production techniques such as just-in time network contributes 4.2 percent of the total road manufacturing. network. They carry 90 percent of Pakistan’s total traffic. Infrastructure development has been a priority area for Pakistan as evidenced by a number of Pakistan, with about 156 million people, has a projects completed or in progress. Major reasonably developed transport system. However, infrastructure projects completed during the last when compared with other developed and seven years include: Islamabad-Lahore Motorway developing countries, the road density of Pakistan (M-2), Makran Costal Highway, Nauttal-Sibi is low. This fact is documented in Fig-14.1. A section including Sibi Bypass, Dera Allah Yar- commonly used indicator for development of the Nauttal Section, Khajuri-Bewata Section N-70, road system is road density (total length of road / Kohat Tunnel and Access Roads, Mansehar-Naran total area), which is often used as an index of Section, Karachi Northern Bypass, Qazi Ahmed & prosperity, economic activity and development.
    [Show full text]
  • Revisiting the Constraints to Pakistan's
    86257 Public Disclosure Authorized Public Disclosure Authorized Revisiting the Constraints to Pakistan’s Growth José Lopez-Calix and Irum Touqeer Public Disclosure Authorized Policy Paper Series on Pakistan PK 20/12 June 2013 Public Disclosure Authorized _______________________________________________ These papers are a product of the South Asia Poverty Reduction and Economic Management Unit. They are part of a larger effort by the World Bank to provide open access to its research and make a contribution to development policy discussions in Pakistan and around the world. Policy Working Papers are also posted on the Web at http://econ.worldbank.org. The author may be contacted [email protected] and [email protected]. Revisiting the Constraints to Pakistan’s Growth Abstract This paper revisits the identification of the binding constraints to investment and growth in Pakistan by rigorously applying the growth diagnostic framework. It has a central finding: Pakistan’s economy faces two major groups of constraints—emerging and structural. The emerging constraints include infrastructure (energy) deficit, high macro-fiscal risks, and inadequate international financing (high country risks and low FDI inflows). The structural binding constraints that persistently affect prospects of sustainable growth in Pakistan are low access to domestic finance, high anti-export bias, bad taxation system, micro risks (bad governance, excess business regulations, and poor civil service) and slow productive diversification. The papers carry the names of the authors and should be cited accordingly. The findings, interpretations, and conclusions expressed in this paper are entirely those of the authors. They do not necessarily represent the views of the International Bank for Reconstruction and Development/World Bank and its affiliated organizations, or those of the Executive Directors of the World Bank or the governments they represent.
    [Show full text]
  • Newsletter Oct-Dec 2011
    T h e P a k i s t a n W e t l a n d s P r o g r a m m e Vol. 5 No. 51 w w w . p a k i s t a n w e t l a n d s . o r g Oct-Dec.2011 “Nothing Slips By” Articles in this Edition: Comparative analysis of biogas plants and its ecological and social impacts in Soon Valley Also Lurking Inside: Programme Updates Public Events Trainings Intern’s Corner Production Staff: Pakistan Wet Notes is compiled and edited by Nasir Iqbal Malik, Programme updates Coordinator, National Awareness-raising and “Controlling Illegal Wildlife ports and exit points in Pakistan. Illegal wildlife trade is not only causing huge loss Communications, PWP, Trade in Pakistan” of revenue to national exchequer but also Irfan Raza, Naila Azhar disturbing the ecosystem in the country Communication Assistant, leading to climatic change, various Graphic Design by deadly diseases and socio-economic Basharat Hussain. problems, said Pakistan Science Foundation (PSF) Chairman Dr. Manzoor Soomro. Dr Ghulam Akbar from WWF Unless specifically credited, all Pakistan emphasized on the urgent need photographs have been taken to control illegal trade of wildlife that has by members of the PWP Team endangered many species. It involves live and may be used, with proper animals and plants or a diverse range of Pakistan Wetlands Programme WWF acknowledgment, for any bona products needed or prized by Pakistan and PMNH arranged a 2-days fide conservation purpose. humans—including skins, medicinal training workshop titled “Controlling ingredients, tourist curios, timber, fish and Illegal Wildlife Trade” on Nov 23rd, 2011 at other food products, he added.
    [Show full text]
  • Role of Pakistan Studies in Promoting Political Awareness at Secondary Level in Pakistan
    Bulletin of Education and Research December 2017, Vol. 39, No. 3 pp. 57-74 Role of Pakistan Studies in Promoting Political Awareness at Secondary Level in Pakistan Muhammad Muzaffar*, Muhammad Arshad Javaid** and Fariha Sohail*** _______________________________________________________________ Abstract This study was designed to determine the role of Pakistan studies in promoting political awareness among the secondary level students in Pakistan. The study was delimited to three divisions of the Punjab province. A sample of 480 students was taken from the High and Higher Secondary Schools of Faisalabad, Multan and Rawalpindi Divisions. The tools of research adopted in this study were content analysis of the curriculum of Pakistan Studies and a test regarding the basic political knowledge. The collected data were analyzed by using the descriptive as well as inferential statistics. The content analyses showed a little inclusion of the text on the basic political knowledge and the test results confirmed the lower level of political awareness among the students. The integration of the basic political information in the books of Pakistan studies at secondary level was recommended in this study. Keywords: Politics, political awareness, students, secondary school certificate, education, pakistan * Assistant Professor, Department of Political Science and International Relations, Government College University, Faisalabad. Email: [email protected] ** Lecturer University of Education Lahore, DG Khan Campus. *** Ph. D Scholar Department of Education, Government College University, Faisalabad. Role of Pakistan Studies in Promoting Political Awareness at SL in Pakistan 58 Introduction Pakistan is a country with a great multitude of population. “Even though the literacy rate is low, however the educational administration is constantly improving because of the concerted efforts on the part of successive governments.
    [Show full text]
  • Basic Design Study Report on the Project for Rehabilitation of Gates of Taunsa Barrage in Islamic Republic of Pakistan
    No. BASIC DESIGN STUDY REPORT ON THE PROJECT FOR REHABILITATION OF GATES OF TAUNSA BARRAGE IN ISLAMIC REPUBLIC OF PAKISTAN DECEMBER 2004 JAPAN INTERNATIONAL COOPERATION AGENCY SANYU CONSULTANTS INC. YACHIYO ENGINEERING CO.,LTD GM JR 04-238 Intake at right bank Upstream Weir Gate Under Sluice gate at Right bank Intake at left bank Downstream Under Sluice gate PERSPECTIVE at Left bank THE PROJECT FOR REHABILITATION OF GATES OF TAUNSA BARRAGE IN ISLAMIC REPUBLIC OF PAKISTAN Summary Economy of Islamic Republic of Pakistan (Population 149,030 thousand, GNP 470 USD per Capita, in 2003) has been largely dependent on the agricultural sector with such dominant indexes of about 1/4 of GDP, about 1/2 of working population, etc. However, the agriculture sector is now in a very difficult and sensitive situation being subjected to problematic weather conditions affecting the area. The GDP of the country in 2000/01 came down due to severe drought that occurred in the country. Situation changed in 2003/2004 because the country’s GDP was 6.4 percent higher than the government objective figures of 5.3 percent due mainly to the favorable conditions of the manufacturing sector, as well as the recovery of the agricultural sector. However, economy of the country is still on the decline due to problems of debt repayment, and other medium and long-term problems such as delay of adequate privatization, stagnation of agricultural productivity, sluggish growth of export industry, etc. Major problems in the fields of irrigation and drainage are summarized in the issues of: a) shortage of water resources in accordance with population increase, b) lowering of irrigation efficiencies caused by the deterioration of provided irrigation systems, c) facility damages due to water-logging and salt, water contamination, lowering of ground-water table, flood, and; d) shortages of operation and maintenance (O&M) costs due to low recovery of water-charges, etc.
    [Show full text]
  • Environmental Problems of the Marine and Coastal Area of Pakistan: National Report
    -Ç L^ q- UNITED NATIONS ENVIRONMENT PROGRAMME Environmental problems of the marine and coastal area of Pakistan: National Report UNEP Regional Seal Reports and Studies No. 77 PREFACE The Regional Seas Pragra~eMS initiated by UMEP in 1974. Since then the Governing Council of UNEP has repeatedly endorsed a regional approach to the control of marine pollution and the ma-t of marine ad coastal resources ad has requested the develqmmt of re#ioml action plans. The Regional Seas Progr- at present includes ten mimyand has over 120 coastal States à participating in it. It is amceival as an action-oriented pmgr- havim cmcera not only fw the consqmces bt also for the causes of tnvirommtal dtgradation and -ssing a msiveapproach to cantrollbg envimtal -1- thmqb the mamgaent of mrine and coastal areas. Each regional action plan is formulated according to the needs of the region as perceived by the Govemnents concerned. It is designed to link assessment of the quality of the marine enviroment and the causes of its deterioration with activities for the ma-t and development of the marine and coastal enviroment. The action plans promote the parallel developmmt of regional legal agreemnts and of actioworimted pmgr- activitiesg- In Hay 1982 the UNEP Governing Council adopted decision 10/20 requesting the Executive Director of UNEP "to enter into consultations with the concerned States of the South Asia Co-operative Envirof~entProgran~e (SACEP) to ascertain their views regarding the conduct of a regional seas programe in the South Asian Seasm. In response to that request the Executive Director appointed a high level consultant to undertake a mission to the coastal States of SACW in October/November 1982 and February 1983.
    [Show full text]
  • The Geographic, Geological and Oceanographic Setting of the Indus River
    16 The Geographic, Geological and Oceanographic Setting of the Indus River Asif Inam1, Peter D. Clift2, Liviu Giosan3, Ali Rashid Tabrez1, Muhammad Tahir4, Muhammad Moazam Rabbani1 and Muhammad Danish1 1National Institute of Oceanography, ST. 47 Clifton Block 1, Karachi, Pakistan 2School of Geosciences, University of Aberdeen, Aberdeen AB24 3UE, UK 3Geology and Geophysics, Woods Hole Oceanographic Institution, Woods Hole, MA 02543, USA 4Fugro Geodetic Limited, 28-B, KDA Scheme #1, Karachi 75350, Pakistan 16.1 INTRODUCTION glaciers (Tarar, 1982). The Indus, Jhelum and Chenab Rivers are the major sources of water for the Indus Basin The 3000 km long Indus is one of the world’s larger rivers Irrigation System (IBIS). that has exerted a long lasting fascination on scholars Seasonal and annual river fl ows both are highly variable since Alexander the Great’s expedition in the region in (Ahmad, 1993; Asianics, 2000). Annual peak fl ow occurs 325 BC. The discovery of an early advanced civilization between June and late September, during the southwest in the Indus Valley (Meadows and Meadows, 1999 and monsoon. The high fl ows of the summer monsoon are references therein) further increased this interest in the augmented by snowmelt in the north that also conveys a history of the river. Its source lies in Tibet, close to sacred large volume of sediment from the mountains. Mount Kailas and part of its upper course runs through The 970 000 km2 drainage basin of the Indus ranks the India, but its channel and drainage basin are mostly in twelfth largest in the world. Its 30 000 km2 delta ranks Pakiistan.
    [Show full text]
  • Privatization of PTCL and Its Positive and Negative Impacts on Economy
    International Journal of Scientific & Engineering Research Volume 9, Issue 10, October-2018 1473 ISSN 2229-5518 Privatization of PTCL and Its Positive and Negative Impacts on Economy and Society of Pakistan Tariq Naseer Sulehria Department of Telecommunication, Institute of Communication Technologies Islamabad. Abstract In this research work positive& negative impacts of Privatization of PTCL on economy and society of Pakistan are analyzed. Privatization process of PTCL started in early 90 and completed in 2006. Objectives behind the Privatization of PTCL were the improvement in economy of the country with the reduction in loans, stability in GDP and currency and improvement in performance of company with the increase in Profit and revenue of the company. It has found that privatization of PTCL has more negative impacts as compare to positive impacts on economy & society of Pakistan. Analysis shown that set objectives have not achieved, targets were not met, and expectations were not fulfilled with the privatization of PTCL. It was a profit earning company and was contributing a huge amount (billions of profit per year) to national treasury. It had provided an honorable employment to the big number of nationals of country. It was constructing a part of National assets. Such profit earning organizations may not have privatized. If there were some pitfalls, they should be removed rather than throwing away of such profiting & valuable National asset. However such sick units be identified which have gone in loss, have lost their integrity and no chances of their improvement/revival. These units be privatized with certain SOPs & transparency. Keywords. IJSER PTCL, Privatization, Positive & Negative impacts, Impacts on loans, GDP and currency, Performance of company, economy of country Introduction Policy was finalized in 2000.
    [Show full text]
  • Research Article an Analysis of Environmental Law in Pakistan-Policy and Conditions of Implementation
    Research Journal of Applied Sciences, Engineering and Technology 8(5): 644-653, 2014 DOI:10.19026/rjaset.8.1017 ISSN: 2040-7459; e-ISSN: 2040-7467 © 2014 Maxwell Scientific Publication Corp. Submitted: May 04, 2014 Accepted: May 25, 2014 Published: August 05, 2014 Research Article An Analysis of Environmental Law in Pakistan-policy and Conditions of Implementation 1Muhammad Tayyab Sohail, 1Huang Delin, 2Muhammad Afnan Talib, 1Xie Xiaoqing and 2Malik Muhammad Akhtar 1School of Public Administration, 2School of Environmental Science, China University of Geosciences, Wuhan 388 Lumo Lu, Wuhan 430074, Hubei Province, PRC 430074, China Abstract: We have human-environment relations inseparable since the creation of mankind. Being a developing country, Pakistan is striving to make developments in all the respective fields which alleviate our hot raising socio- economic issues. But beside the infrastructural and economic growth our environment is also getting polluted leaving behind several drastic and severe environmental crises and one of the adverse repercussions is environmental pollution. The extreme effects of environmental pollution cannot be neglected and through proper and genuine laws and policies implementations we can cope up such issues. This study reveals the history of environmental laws and policies and their implementations in Pakistan. Pakistan has a wide range of laws related to environment but the practice shows there is some problem which hinders to achieve the desired targets. This study mainly includes two main factors of pollution; water pollution and air pollution and their effects on population of Pakistan. Air pollution is top of the list for environmental protection agencies all over the world and same in Pakistan which is acting as a destructive bump for the economic growth of Pakistan.
    [Show full text]
  • Economic Growth, Exports and Imports in Pakistan: Granger Causality Analysis
    ECONOMIC GROWTH, EXPORTS AND IMPORTS IN PAKISTAN: GRANGER CAUSALITY ANALYSIS Majeed A. Hussain, American University in the Emirates, UAE-Dubai Pakistan’s economy has been in a turbulent phase during the last two decades. Prior to 9/11, the Pakistani economy was in its worst condition ever. The country was going to default on its debt and was about to be declared a pariah state. The significant economic gains the country has achieved since 2002, which the government takes credit for, were a result of the impact of international post 9/11 developments. During Musharraf’s era, the economic situation only appeared to be improving, because of favorable terms granted to Pakistan in the light of 9/11. These consisted of export incentives, such as greater market access to the EU, debt rescheduling, and one-time incentives, such as US grants and Saudi investments. This paper is to examine the Granger Causality between economic growth (GDP), exports and imports in Pakistan over the period 1976-2011. Granger causality and co-integration tests were employed in the empirical analysis, using Augmented Dickey Fuller (ADF) and Phillip Perron (PP) tests. The variables proved to be integrated of the order I (1) at first difference. The Johansen and Juselius Cointegration test was used to determine the presence or otherwise of a cointegration vector in the variables. Both Trace and Max-Eigen values indicated no cointegration at 5% level of significance, indicating that the variables do not have a long-run relationship. To determine the causality between the variables at least in the short run, the Granger causality test was carried out.
    [Show full text]