DSRC: Research and Application 路侧设备  Start at the End of Last Century 车载设备  Objective  Establish the V2I/V2V Platform

Total Page:16

File Type:pdf, Size:1020Kb

DSRC: Research and Application 路侧设备  Start at the End of Last Century 车载设备  Objective  Establish the V2I/V2V Platform Development of CITS and Automated driving in China National ITS Center 2016/03/09 Contents 1 Overview of development status 2 CITS major projects 3 Standardization 4 Testing 1. Overview of development status Intelligent Vehicle Intelligent Infrastructure V2X communication platform 1.1 Intelligent Vehicle Made in China 2025 Aiming at intelligent connected vehicle(ICV): 2020: Master Intelligent Driver Assistance Technologies 2025: Master Automatic Driving Technologies Research for Academic Since 1990’s, some teams from colleges have engaged in IV Since 2008, a major project " Visual and Auditory Information Cognitive Computing" has been funded continuously by NSFC • 65 Cultivation Programs, 26 Key Programs, 4 Integration Programs • Annual “Intelligent Vehicle Future Challenge” promoting and facilitating the innovation and development of IVs. Now,many colleges and universities teams: • HNU, TSHU, XAJU, SHJU, • NJUT, NUDT, AMT, CAS, • BJIT, WHU, TJU, BJUU Beijing-Tianjin Expressway Autonomous Driving First Official Open Test by MTU • NSFC,NDRC ,Third-party testing agency R&D by auto industry FAW Group and NUDT for driverless car on highway Great Wall Automobile Co., Ltd. and MTU for autonomous vehicle on urban road and off-road BYD Automobile Co., Ltd. and BJIT for driverless car on urban road SAIC and MTU for driverless car on highway and urban road Yutong Automobile Co., Ltd. and Academician Li Deyi’s team for driverless bus Google, Baidu, Ali, LeTV for driverless car or intelligent connected car 1.2 Intelligent Highway Road-Vehicle Cooperative system Research and testbed--- Beijing-Tianjin Expressway 主线交通VMS流调节 诱导 网站 高 发CENTE布中心 速 IPV6 网 R 推Digital送式信 Radio息广播 公 路 信 Portal手机信 Terminal息服务 息 服 务 走 廊 可变VMS情报 板 车载On终端-board信息 服务 Terminal Information Technology Infrastructure (ITI) New Generation T-GIS Service System High-precision and real-time cloud service Refined Surveying, adapt to vector, remote sensing, 3D data types Transportation Key Management and Certificate Authority, TKCA Instantaneity, reliability, lightweight, low cost digital certificate format, with comprehensive key management mechanism and rapid certificate process CA for C-ITS ID Cards for Certificate of 交通运输行业密码应用 vehicle and driver, access 安全认证、网络信任、 control , fast transaction, 安全管理、运营监管。 etc. Important control system for highway monitoring, 公路 水运 运输服务 安全质量 内部办公 重要工 重要工 重要工 重要信 重要信 重要信 重要信 重要信 tolling, traffic control, 业控制 业控制 业控制 息系统 息系统 息系统 息系统 息系统 vehicle dispatch, logistics, 系统 系统 系统 etc. 海事&救捞 民航 铁路 邮政 公 交 路 通 公 公 水 运 路 路 路 输 水 水 建 经 路 路 设 济 安 交 与 运 全 通 运 行 公 畅 输 监 收 公 国 公 交 物 公 水 交 出 路 公 出 协 通 市 测 费 公 农 治 公 路 港 航 航 航 水 际 路 通 流 运 路 路 通 行 交 交 租 同 与 场 预 公 路 村 超 路 桥 口 道 务 运 路 道 客 运 公 政 建 建 地 信 通 智 车 办 应 信 警 路 养 公 信 路 梁 综 综 船 枢 运 路 运 行 共 管 设 设 理 息 量 能 管 公 急 用 与 运 护 路 息 政 隧 合 合 舶 纽 政 运 联 动 信 理 项 项 信 服 调 化 理 自 处 信 决 营 管 管 管 管 道 管 管 管 管 管 输 网 态 息 信 目 目 息 务 查 管 信 动 置 息 策 管 理 理 理 理 管 理 理 理 理 理 管 售 监 服 息 管 管 基 系 管 理 息 化 系 服 分 理 系 系 系 系 理 系 系 系 系 系 理 票 管 务 系 理 理 础 统 理 系 系 系 统 务 析 系 统 统 统 统 系 统 统 统 统 统 系 系 系 系 统 系 系 平 系 统 统 统 系 系 统 统 统 统 统 统 统 统 台 统 统 统 1.3 V2I/V2V Communication (1)DSRC: research and application 路侧设备 Start at the end of last century 车载设备 Objective Establish the V2I/V2V platform Milestones GB/T20851-2007 Series Standards for ETC-DSRC GB/T31024-2014 Series Standards for CITS-DSRC peak rate:155Mbps comm radias:1.5Km Command channel and data channel …… Befitting for safety application Extended application of DSRC Terminal Bluetooth: Portable Mobile Terminal Establish the connection between on-board device and the Mobile Internet, realize on-line payment and other services OEM: On-board Entertainment System and Control System Form connection between the CAN bus with outside Application in parking lot RSU DSRC Bluetooth OEM OBU 首都机场停车场 Information collection-based on DSRC terminal DSRC terminal transaction accounts more than 35% of total transaction on JingCheng Highway, 120 Out 6th Ring Road which gives more encourage of using DSRC to 115 represent the traffic state. 110 ) 105 km/h 100 95 平均速度( 90 真实值 ETC ETC+DSRC 85 Receiver 80 Gantry Road Side 6:00:00 8:24:00 10:48:00 13:12:00 15:36:00 LTE-V: Mobile communication for V2X R&I of LTE-V orientation for V2V application requirements. LTE-V: In ITS industry alliance –standards “General technical requirements of wireless communication technology based on LTE Internet of Vehicles” Key performance optimization: time delay- ultra low High speed Wifi Broadcast 5G 1.4 Prospect for C-ITS and auto dring Infrastructure innovation providing safe environment for IV – High precision Dynamic Digital Map – Cyber Security – BeiDou – Communciation Vehicle will be more and more intelligent driven by market and compatible with road Wireless COMM is important for C-ITS, and V2X is the key tech for closing the gap between in-vehicle sensors and cellular technology Next step task Technology development policy Standardization Field test Road test--Demo and Pilot Project Market based + Government support Intergovernmental cooperation:MOT, MIIT MPS Full chain cooperation among government, manufactory, university, research institute, and implantation entity, Third party test platforms 2. C-ITS major projects (1) New transport Control and Operation Network Function •Interactive transport services •Intelligent driving •Dynamic adjust system parameters and management mode •Integrated system of EV and ITS •Integrated system of infrastructure and vehicle Support by new technology •Cyber-Physical System •Big Date •Cloud Computing •M2M •V2V, V2I, V2X •… … (2) Study on policy of Vehicle-Infrastructure Cooperative technology Overall goals Technology policy-driven, preliminary research-supporting, promoting road passenger transportation, large freight vehicles, dangerous goods transport vehicles and other crucial commercial vehicle demonstration program as the starting point, clear the path of Vehicle-Infrastructure Cooperative Systems technology Main Research Contents Construction planning of Vehicle-Infrastructure Cooperative Systems Commercial vehicle demonstration project program( open, closed Test – Verification technology ) The relevant policy and standard advice Ministry Development Project •2016-2019 Function •Safety warning •Safety information service •Driving assistant •ECO-Driving •Fleet management Team Leader •RIOH 3. Standardization work Vehicle-Infrastructure Cooperative /Intelligent network standardization planning Scope Category General Definitions, terminology, data structure The basic standards of classification Generic /Basic Lightweight security authentication technology Information security Trusted network system Privacy protection V-X communication Road information Communication network along the road Intelligent road infrastructure high-accuracy GIS Adaptability of facilities along the road Intelligent vehicle fusion of electric vehicle and intelligent vehicle Application Cooperative application system Reliability and robustness of application system Test Traffic engineering standard adaptability A Multi-layer and cross-field Standard System National/ industrial Standards (ITS, vehicles, telematics, etc.) Organization standards (Industry alliance or others) Company Standards (Self-enact, Open self-declaration, etc.) Government National ITS Standard leading Committee Standard system Market ITS Industry leading Alliance Existing crucial standard CITS-DSRC (Communication GB/T31024.1-2014 Cooperative ITS DSRC Part1:General technical requirements GB/T31024.2-2014 Cooperative ITS DSRC Part2: Medium Access Control Layer and Physical Layer Vehicle safety assistant GB/T20608-2006 Intelligent transportation system-Full speed range adaptive cruise control system(FSRA)-test procedure GB/T26773-2011 Intelligent transportation system-lane departure warning system- Performance requirements and test methods GB20100504-T-469 Vehicle reversing safety assistant system-Performance requirements and test procedures GB20100505-T-469 Vehicle lane change decision support system- Performance requirements and test procedures GB20100506-T-469 Vehicle front collision warning system-Performance requirements and test procedures GB/T20130072-T- Intelligent transportation system-lane departure warning system- 469 Performance requirements and test methods 20111693-T0469 Intelligent transportation-Data security service Information 20130077-T-469 Transportation-Digital certificate format Security 20130080-T-469 Information security standard,100.104.6 Alliance or industry standards C-ITS(V2X and data security) Cooperative ITS DSRC Part3: Network Layer and Application Layer Cooperative ITS DSRC Part4:Equipment Application CITS- Date structure C-ITS: System framework model C-ITS:Participants information interaction interface specification C–ITS: The vehicle terminal front loading technical requirement C–ITS: Information security general requirement CITS-DSRC-Automotive application service test requirements DSRC-Wireless interconnection vehicle unit-Internet distribution General technical requirements of wireless communication technology based on LTE Internet of Vehicles Vehicular dedicated short range communication equipment-factory installed OBU Intelligent dring and safety control Road operating vehicle-Vehicular gateway-Communication capability and technical requirements Intelligent transportation system-Full speed adaptive cruise control system- performance requirement Intelligent transportation system-Vehicle forward collision mitigation system- Operating performance Intelligent transportation system-Forward vehicle collision mitigation system- Performance requirements and test procedures Intelligent transportation system-Parking assist system-Performance requirements and test procedures Intelligent transportation system-Signal information and early warning system of the cooperative intersection-Performance requirements and test procedures Intelligent driving road test method---For highway Intelligent driving classification High precision navigation data model and exchange format for intelligent driving 4.
Recommended publications
  • Spatiotemporal Patterns of Carbon Emissions and Taxi Travel Using GPS Data in Beijing
    energies Article Spatiotemporal Patterns of Carbon Emissions and Taxi Travel Using GPS Data in Beijing Jinlei Zhang 1, Feng Chen 1,2, Zijia Wang 1,* ID , Rui Wang 1 and Shunwei Shi 1 1 School of Civil and Architectural Engineering, Beijing Jiaotong University, No.3 Shangyuancun, Haidian District, Beijing 100044, China; [email protected] (J.Z.); [email protected] (F.C.); [email protected] (R.W.); [email protected] (S.S.) 2 Beijing Engineering and Technology Research Center of Rail Transit Line Safety and Disaster Prevention, No.3 Shangyuancun, Haidian District, Beijing 100044, China * Correspondence: [email protected]; Tel.: +86-010-5168-8070 Received: 21 December 2017; Accepted: 19 February 2018; Published: 27 February 2018 Abstract: Taxis are significant contributors to carbon dioxide emissions due to their frequent usage, yet current research into taxi carbon emissions is insufficient. Emerging data sources and big data–mining techniques enable analysis of carbon emissions, which contributes to their reduction and the promotion of low-carbon societies. This study uses taxi GPS data to reconstruct taxi trajectories in Beijing. We then use the carbon emission calculation model based on a taxi fuel consumption algorithm and the carbon dioxide emission factor to calculate emissions and apply a visualization method called kernel density analysis to obtain the dynamic spatiotemporal distribution of carbon emissions. Total carbon emissions show substantial temporal variations during the day, with maximum values from 10:00–11:00 (57.53 t), which is seven times the minimum value of 7.43 t (from 03:00–04:00). Carbon emissions per kilometer at the network level are steady throughout the day (0.2 kg/km).
    [Show full text]
  • Glorious Property Holdings Limited 囱 盛 地 產 控 股 有 限
    非供於美國公佈 香港交易及結算所有限公司及香港聯合交易所有限公司對本公告的內容概不負責,對其準確性或 完整性亦不發表任何聲明,並明確表示,概不就因本公告全部或任何部份內容而產生或因依賴該 等內容而引致的任何損失承擔任何責任。 本公告並不構成在美國提呈證券出售的要約。在並無登記或不獲豁免登記下,證券不一定可在美 國提呈發售或出售。在美國進行的任何公開發售證券,將以可向本公司索取的發售章程進行,發 售通函將載有本公司及管理層的詳細資料以及財務報表。本公司不擬在美國註冊任何部分的票據。 Glorious Property Holdings Limited 囱盛地產控股有限公司 (於開曼群島註冊成立的有限公司) (股份代號:845) 建議的優先票據發行 本公司擬進行建議的票據發行。有關這次建議的票據發行,本公司將向若干機 構投資者提供有關本集團的最新企業及財務信息,包括已更新風險因素、本公 司業務的及本集團承辦項目的概況、管理層就財務狀況及經營業績的討論與分 析、近期發展、關聯方交易及債務資料,該等資料之前尚未公開過。該等最新 信息摘要隨附於本公告並在向機構投資者發放的相若時間,可於本公司網址 www.gloriousphl.com.cn瀏覽。 – 1 – 建議的票據發行的完成須受市況及投資者反應規限。建議的票據的定價,包括 總本金金額、發售價及息率將由唯一賬簿管理人及唯一牽頭經辦人渣打銀行透 過使用入標定價的方式釐定。在落實最終票據條款後,渣打銀行及本公司等將 訂立購買協議。倘票據予以發行,本公司現擬使用票據收益對新增及現有項目 提供資金(包括建造費用及土地成本)及供作一般公司用途。本公司或會因應變 動中的市況及情況調整上述計劃,並因此可能重新分配建議的票據發行的收益。 本公司已申請票據於新加坡交易所上市。票據是否獲納入新加坡交易所並不視 為本公司或票據價值之指標。本公司將不會尋求票據於香港上市。 由於於本公告日期尚未就建議的票據發行訂立具約束力的協議,故建議的票據 發行不一定會落實。投資者及本公司股東於買賣本公司證券時,務須審慎行事。 倘購買協議獲予訂立,本公司將就建議的票據發行作進一步公告。 建議的票據發行 緒言 本公司擬進行建議的票據發行。有關這次建議的票據發行,本公司將向若干機構 投資者提供有關本集團的最新企業及財務信息,包括已更新風險因素、本公司業 務及本集團承辦項目的概況、管理層就財務狀況及經營業績的討論與分析、近期 發展、關聯方交易及債務資料,該等資料之前尚未公開過。該等最新信息摘要隨 附於本公告並在向機構投資者發放的相若時間,可於本公司網址 www.gloriousphl.com.cn瀏覽。 – 2 – 建議的票據發行的完成須受市況及投資者反應規限。建議的票據的定價,包括總 本金金額、發售價及息率將由唯一賬簿管理人及唯一牽頭經辦人渣打銀行透過使 用入標定價的方式釐定。除非根據票據的條款予以提前贖回,票據(倘獲發行)將 具有一次性還款。於本公告日期,尚未釐定建議的票據發行的款額、條款及條件。 在落實最終票據條款後,渣打銀行及本公司等將訂立購買協議,據此,渣打銀行 將為票據的初步買方。倘購買協議獲予簽署,本公司將就建議的票據發行作進一 步公告。 建議的票據發行將僅供渣打銀行以要約形式於美國境外遵照證券法項下的S規例 發售。概無票據將於香港公開發售,及概無票據將配售予本公司的任何關連人士。 進行建議的票據發行的原因 本集團是專注在中國主要經濟城市發展及銷售優質物業的最大的房地產發展商之 一。於二零一零年六月三十日,本集團在全中國11個主要城市,包括3個直轄市 (上海、天津及北京)、5個省會城市(合肥、瀋陽、哈爾濱、南京及長春)及3個位 於長三角主要區域的經濟城市(無錫、蘇州及南通)有多個項目處於已開發或正在
    [Show full text]
  • Underground Space As a Connector
    ARCHITECTURE DEPARTMENT CHINESE UNIVERSITY OF HONG KONG MASTER OF ARCHITECTURE PROGRAMME 2010-2011 DESIGN REPORT NEW MOBILITY HUB IN BEIJING UNDERGROUND SPACE AS A CONNECTOR SHEKWai Ling, Sophy May 2011 \ r 00 Thesis Statement 01 Background Study 02 Site Analysis 03 Underground Space 04 Design Strategy & Development i Thesis Statement The fast urbanization and urban sprawl in Beijing causes problematic conditions in many areas of city. The south-east area is a representative case for this development. To cope with the problem of increased traffic congestion and emission in Beijing, the government has planned to expand the subway system to cover most parts of the city and aiming at a 1km node-to-node walking distance within the 3rd ring road area by 2020, in order to encourage citizens to use public transport rather than automobiles and develop a more sustainable life- style. In addition to the subway system, the government has planned underground networks as an alternative way to ease ground traffic congestion and land use tensions in downtown areas. Along with the Beijing Government's emphasis on the subway system and underground space development, a new subway station will be built in Nanmofang in the east part of the capital bringing new opportunities to this area, south of the extending CBD. This thesis attempts to connect an increasingly fragmented urban fabric through the introduction of an underground space network. The underground space network provides a large flexibility to link different destinations directly by the all weather pedestrian connections and helps to reconnect Beijing's urban blocks divided by the large street grid for vehicular traffic.
    [Show full text]
  • The Systematic Evolution of Beijing: a Human Ecology Perspective
    Research Article Int J Environ Sci Nat Res Volume 23 Issue 4 - March 2020 Copyright © All rights are reserved by Lachang Lyu DOI: 10.19080/IJESNR.2020.23.556121 The Systematic Evolution of Beijing: A Human Ecology Perspective Lachang Lyu1* and Richard Greene2 1College of Resource, Environment and Tourism, Capital Normal University, China 2College of Geospatial Information Science and Technology, Capital Normal University, China Submission: Published: rd *Corresponding February author: 17, 2020; March 04, 2020 Lachang Lyu, College of Resource Environment and Tourism, Capital Normal University, No. 105 West 3 Ring Road North, Haidian District, Beijing, 10004, China Abstract Megacity sprawl is an international phenomenon and Chinese megacities have been especially exposed to rapid sprawl since reform and the opening-up policy in the year of 1978. As the political, cultural, and international communication center of China, Beijing has witnessed a morphological transition that demonstrates typical aspects of this megacity sprawl. Though the morphological changes have been investigated by a number of scholars, emerging changes and new high resolution multi temporal global urban land data allow for a more systematic investigation that results in an evolutionary model that uncovers the urban form dynamics of megacity sprawl. In this paper, we examine the Beijing morphological evolutionary process and the geographic direction of intra-urban sprawl with the use of a new global urban land database obvious periodic sequences ranging from compact to a more loosely-shaped form but also triangular in some cases and rectangular in other cases that utilized an extensive number of LANDSAT images for five-year periods from 1980-2015.
    [Show full text]
  • Biographical Details of Directors and Senior Management
    Biographical Details of Directors and Senior Management DIRECTORS Executive Directors WANG Guang Hao, aged 64, was appointed Chairman, Executive Director and General Manager of the Company in June 1997. He is also the Chairman and General Manager of Tsinlien Group Company Limited (‘‘Tsinlien’’). He graduated from Tianjin Mechanical Engineering Institute in 1962 and is a senior engineer. Before joining Tsinlien in May 1996, he was the vice general manager of Petrochemical Machinery and Industrial Company, the deputy commissioner of the Tianjin Mechanic and Industrial Bureau, the commissioner of Tianjin Technology Supervision Bureau, the deputy director of Tianjin Foreign Economic Trade Commission and the director of the foreign investment office of the Tianjin Municipal People’s Government. ZHOU Si Chun, aged 52, was appointed Vice Chairman, Executive Director and Deputy Managing Director of the Company in April 2000. He was also the Vice Chairman of Tsinlien. He graduated from Faculty of Chinese of Tianjin Normal College in 1977 and was a postgraduate in the Faculty in Law in 1999. He worked in the organisations of the Tianjin Municipal People’s Government during the years 1983 to now. He formerly served as chief of the Economics Bureau, deputy director of General Office and vice general secretariat of the Tianjin Municipal People’s Government. YU Ru Min, aged 54, was appointed Vice Chairman and Executive Director of the Company in November 1997. He graduated from Shanghai Haiyun College in 1975 and obtained a Master degree in international transport engineering management. He was appointed the assistant to the head of the Tianjin Port Authority from March 1986 to October 1988.
    [Show full text]
  • Travel Demand Management Options in Beijing May
    TravelTravel Demand Demand Management Management Options Options in in Beijing Beijing RapidRapid urbanization urbanization and and motorization motorization combined combined with with high high population population density density have have led led to to serious serious congestion congestion andand air air quality quality problems problems in inthe the People’s People’s Republic Republic of of China China capital capital of of Beijing. Beijing. While While Beijing Beijing accounts accounts for for less less thanthan 2% 2% of of the the population, population, more more than than 10% 10% of of the the country’s country’s vehicles vehicles ply ply the the city’s city’s roads. roads. This This study study is ispart part of of thethe Asian Asian Development Development Bank’s Bank’s initiative initiative to to support support greener greener and and more more sustainable sustainable transport transport systems systems that that are are convenientconvenient and and lessen lessen carbon carbon dioxide dioxide emissions. emissions. Read Read how how congestion congestion charging, charging, vehicle vehicle ownership ownership quotas, quotas, andand progressive progressive parking parking reforms reforms can can improve improve Beijing’s Beijing’s approach approach to to travel travel demand demand management. management. AboutAbout the the Asian Asian Development Development Bank Bank ADB’sADB’s vision vision is isan an Asia Asia and and Pacific Pacific region region free free of ofpoverty. poverty. Its Its missionmission is isto tohelp help its its developing developing membermember countriescountries reduce reduce poverty poverty and and improve improve the the quality quality of of life life of of their their people.
    [Show full text]
  • Beijing Urban Construction Design & Development Group Co., Limited
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. Beijing Urban Construction Design & Development Group Co., Limited 北京城建設計發展集團股份有限公司 (A joint stock company incorporated in the People’s Republic of China with limited liability) (Stock Code: 1599) VOLUNTARY ANNOUNCEMENT BID WINNING FOR MAJOR PROJECTS IN THE FIRST QUARTER OF 2020 This announcement is published by Beijing Urban Construction Design & Development Group Co., Limited (the “Company”) as a voluntary announcement. For the three months ended 31 March 2020, the Company won the bid for major projects in the survey, design and consultancy segment with a total amount of approximately RMB1,006.4 million. Particulars of the above major projects are set out as follows: Winning bid amount of the No. Project name Company Note (RMB0’000) 1 Preliminary Design Scheme Project for 74.8 Intelligent Rail Transit System in Zhuzhou of Zhuzhou Transportation Bureau (株洲市交通 運輸局株洲市智能軌道交通系統初步設計方 案項目) 2 Feasibility Study Report Preparation Project 2,393 for Shijiazhuang Urban Rail Transit Line 4 and Line 6 Phase I Project (石家莊市城市軌 道交通4號線和6號線一期工程可行性研究報 告編製項目) 1 Winning bid amount of the No. Project name Company Note (RMB0’000) 3 General Contracting for the Design of 97,641.19 Won the bid together with Chongqing Rail Transit Line 15 and Line 4 consortium comprising West Extension Section (重慶軌道交通交通15 China Railway Siyuan 號線、4號線西延伸段設計總承包) Survey and Design Group Co., Ltd., China Railway Liuyuan Group Co., Ltd.
    [Show full text]
  • Replace This with the Actual Title Using
    CHARACTERIZING ON-ROAD VEHICULAR EMISSIONS AND THEIR IMPACTS ON NEAR-ROADWAY AIR POLLUTION A Dissertation Presented to the Faculty of the Graduate School of Cornell University In Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy by Xing Wang August 2011 © 2011 Xing Wang CHARACTERIZING ON-ROAD VEHICULAR EMISSIONS AND THEIR IMPACTS ON NEAR-ROADWAY AIR POLLUTION Xing Wang, Ph. D. Cornell University 2011 Traffic emission is a major source of urban air pollution. Vehicle is a significant contributor of carbon monoxide (CO), nitrogen oxides (NOx), black carbon (BC) and ultrafine particle (UFP) on-road and near-roadways. People living and working near roadways are facing health risks due to the exposure of elevated pollutant concentration. In order to develop cost-efficient strategies to mitigate near-road air pollution for protecting public health and promoting sustainable growth, it is imperative to characterize on-road traffic emission and its impacts on near-road air quality. On-road chasing method was used in this study to investigate on-road vehicle emissions. This is the first application of this method in China. The method was developed and improved during a four-year field campaign and is an efficient approach to characterize emissions of a large number of on-road vehicles. Fleet average and individual emission factors (EF) are derived and reported. The large sample size significantly expands the database of real world Chinese vehicle emissions. Some of the results are reported for the first time in China: BC and UFP number EF of vehicles by type; EF of buses linked with emission standard; EF distribution based on large sample size; contribution of “heavy emitter” to entire on- road emission; spatial variance of UFP number concentration at on-road, roadside and ambient environments.
    [Show full text]
  • Driver's Ability to Assess Their Driving Quality While Using An
    ICTCT Extra Workshop, Beijing Proceedings Roadside safety evaluation by analyzing the roadside structures of Jingjintang expressway in China Jiang bi Hu, De Hui Li & Xiao Ming Liu Transportation Research Center Beijing University of Technology 100, Ping Le Yuan, Chaoyang District, Beijing 100022 Beijing, P.R.China Phone: +86-10-67396181-221 Fax: +86-10-67391509 E-mail: [email protected], [email protected], [email protected] ABSTRACT This paper discusses a common expressway roadside safety problem in China through a typical example, Jingjintang expressway and introduces some effective roadside structure by analyzing of the typical historical accident record during 2002~2004. The severity of the expressway problem has called great concern on the road safety. A high proportion of fatal crashes occurred on roadside in expressway during the past few years in China. Some design components included horizontal alignment, vertical alignment, superelevation, hydraulic design and sight distance to name some of the most common freeway design elements. These elements have been revised and refined over the years through experience and research. However, Roadside safety design and maintenance still don’t become a discussed aspect of highway design and maintenance until now. Meanwhile, problems like volume over load, too many crash accidents exist on almost all the expressways, especially the roadside accidents account for a large scale of the total accidents. The paper presents the practical crash investigative results about the roadside accidents. Combining with the design criteria of other countries, the paper puts forgive concept, analyzes the expressway design factors which influence the roadside safety and evaluates the current Chinese design specification on slope, barrier, drainage, shoulder and curb.
    [Show full text]
  • Olympics Memo and Contingency Plan
    OLYMPICS MEMO AND CONTINGENCY PLAN Vol.4, Jun. 2008 For external distribution Index Facts Of Beijing Olympics Impact By Olympics DHL Global Forwarding Contingency Plan DHL Exel Supply Chain Contingency Plan Q&A Page 2 Facts of Beijing Olympics Olympics, Aug 8 - Aug 24 Description Details Opening / Closing Aug 8 / Aug 24 Beijing Football: Shanghai, Shenyang, Qinhuangdao, Tianjin Locations Sailing: Qingdao Equestrian: Hong Kong Sport / Events 28 / 302 Gold Medals 302 Athletes 10708 Competition Venues 31 in Beijing / 6 outside Beijing Olympics Village officially opens July 27 Page 3 Facts of Beijing Paralympics Paralympics, Sep 6 - Sep 17. Description Details Opening / Closing Sep 6 / Sep 17 Locations Beijing, Qingdao, HongKong Sport / Events 20 / 471 Gold Medals 471 Athletes 4000 Competition Venue 1 in Beijing, 1 in Qingdao, 1 in HongKong Paralympics Village officially Aug 30 opens Official regulations on Paralympics to be published. The regulations and impact of Paralympics can be referred to those of Olympics Page 4 Index Facts Of Beijing Olympics Impact By Olympics DHL Global Forwarding Contingency Plan DHL Exel Supply Chain Contingency Plan Q&A Page 5 Traffic Control (1/2) • Emission Standard Regulation in Beijing – From Jul 1 to Sep 20, all registered cars need to pass an inspection where a green or yellow label will be given as a result. Cars should meet the emissions standards to get a green label. – From Jul 1 to Sep 20, cars with yellow labels will strictly be prohibited running in Beijing. – From Jul 1 to Sep 20, no entry permission for non-local diesel cars that can’t meet Euro III norm and gasoline cars that can’t meet Euro II.
    [Show full text]
  • 2017 Annual Results Guorui Properties Limited (2329.HK)
    2017 Annual Results Guorui Properties Limited (2329.HK) March 2018 1 Performance Highlights CONTENTS 2 Financial Summary 3 Development plan 4 Appendixes 01 Performance Highlights 1.1 Sales increased by 34% YoY, hitting a record high Total contracted sales: approx. RMB14.9 bn, up by 34% Regional distribution: Beijing-Tianjin-Hebei: 42%, South China: 24%, Yangtze River Delta: 7%, JVs: 19% Total GFA sold: approx. 920k sqm, down by14%; ASP: RMB16,000/sqm, rose by 56% YoY Locked-in contracted sales: approx. RMB9.4 bn, up 135% Contracted sales amount Distribution Average selling price (RMB mn) (By city) (RMB/sqm) CAGR:34% 2017 2016 2017 2016 14,877 32% 32,800 11,099 29,100 19,800 19% 6,569 15,600 6,206 14,700 9,900 14,000 10% 10% 14,500 8,900 8% 6,800 6% 5% 11,600 4% 3% 2% 1% 17% 38% 15% 9% 6% 5% 6% 4% 2014 2015 2016 2017 4 1.2 Land replenishment over 800k sqm in 2017 Total land bank: 8.5 mn sqm, average land cost: RMB4,700/sqm Acquired 6 projects in 4 cities. Total GFA added 810k sqm at total consideration of RMB9.9 bn. Average land cost: RMB12,000/sqm Saleable resources generated from the 6 projects: RMB30 bn. Land bank analysis Shenyang Beijing As % of total GFA As % of total land cost Yongqing Tier 1 22% 65% Tier 2 and hot spots 53% 23% Xi'an Zhengzhou Tier 3 &4 25% 12% Suzhou Island Chongming Primary land development and urban redevelopment Total planed GFA Acc.
    [Show full text]
  • Interim Report 2018
    Contents Financial Highlights / 2 Five Years Financial Summary / 3 Corporate Profile / 4 Location Maps of Projects / 6 Management Discussion and Analysis / 15 Report on Review on Interim Financial Information / 43 Unaudited Interim Financial Information Interim Condensed Consolidated Income Statement / 44 Interim Condensed Consolidated Statement of Comprehensive Income / 45 Interim Condensed Consolidated Balance Sheet / 46 Interim Condensed Consolidated Statement of Cash Flows / 48 Interim Condensed Consolidated Statement of Changes in Equity / 49 Notes to the Interim Condensed Consolidated Financial Information / 51 Other Information / 76 Corporate and Investor Relations Information / 80 2 Yuexiu Transport Infrastructure Limited | Interim Report 2018 FINANCIAL HIGHLIGHTS RESULTS HIGHLIGHTS FOR THE FIRST HALF OF 2018 Income from operations Gross Prot Gross Margin* RMB 1,371 million RMB 998 million percentage point 72.8% ▲ ▲ ▲ percentage 14.2% 17.7% 2.2 point Operating Prot Prot before income tax Prot attributable to shareholders of RMB 915 million RMB 925 million the Company RMB 462 million ▲19.7% ▲27.7% ▲21.7% Earnings per share Total Assets Net assets per share RMB 0.2764 RMB 23.44 billion RMB 5.80 ▲21.7% ▼2.0% ▲1.6% * Gross margin = Gross profit / Income from operations FIVE YEARS FINANCIAL SUMMARY INCOME STATEMENT for six months ended 30 June (RMB million) 2018 2017 2016 2015 2014 Income from operations 1,371 1,200 1,234 932 877 Profit attributable to shareholders of the Company 462 380 350 321 291 Earnings per share RMB0.2764 RMB0.2272
    [Show full text]