List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 1 2007 Aedas Ltd Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate Section G Tai Po Town Lot BD 2/9141/01 (P) Jan 04 IL7076, IL7077, IL971, IL970 Proposed Hotel Development at 31E - 39 Wyndham 31E, 31F, 33-39 , 2 2007 AGC Design Ltd SARP, IL970RP, BD3/2058/94 PT IV Jul 04 Street, Central Central, IL970SBSS1 RP Extension to the Church of Jesus Christ of Latter Day Tseung Kwan O Lot 45, Area II, Po Lam 3 2007 Aedas Ltd Tseung Kwan O Lot 45 BD 9106/04 31 Oct 2006 Saints at Tseung Kwan O Lane 4 2007 P & T Architects & Engineers Ltd Residential Development At 2 Lok Kwai Path Shatin, 2 Lok Kwai Path, Shatin, N.T. STTL 526 BD 9067/02 Jan 06 / May 06 5 2007 Leung King Partners Ltd Villa Rosa Residents 82 Peak Road, Hong Kong RBL 742 BD 2014/98 Aug 00 6 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tuen Mun Area 4C, TMTL 384 King Fung Path, Tuen Mun, N.T. Lot No. 384, Area 4C BD 6/9260/97H (P) Aug 02 Service Apartment Building at Nos. 116-122, Yeung Uk 116-122 Yeung Uk Road, , 7 2007 MLA Architects (HK) Ltd TWTL 407 9325/93 28 Aug 06 Road (H-Cube) N.T. 18A , , 8 2007 Simon Kwan Architect & Associates Ltd Anglers' Bay Residential Development 214, DD387 BD 9022/01 19 Oct 04 / 22 Dec 04 Tsuen Wan 9 2007 CYS Associates (HK) Ltd Residential Re-development at Nam Wai Nam Wai, Sai Kung 999 in DD214 9194/05 Nov 07 12 - 16 10 2007 Aedas Ltd Landmark East IL3087 2/2060/74 28 Nov 06 Central Hong Kong Community College Development at West 11 2007 Architecture Design & Research Group Ltd J/O Hoi Ting Road and Hoi Wang Road KIL 11176 BD 2/4050/05 15 June 07 Provision of Tunnel Ventilation System For Beacon Hill 2/7977/03 (TWVB) 12 2007 Ove Arup & Partner (HK) Ltd Beacon Hill, Kowloon Hill N/A, KCRC Vested Land O. P Obtained July 07 Tunnel (P) Comprehensive Development at Lot No 11127, 8 Fuk No 201 Road and Fuk Lee Phase 1 OP - 12/2002 ; 13 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd KIL No 11127 BD 2-3/4024/99 Lee Street, Kowloon Street, Kowloon Phase 2 OP - 07/2003 Shek Kip Mei Estate, Mei Ying House & Housing Authority Vesting HD(ICU) BI 2/KL48 14 2007 Hong Kong Housing Authority Shek Kip Mei Redevelopment Phase 1 May 06 Mei Yue House Order No. 32 RR/01 15 2007 Ronald Lu & Partners (HK) Ltd Choi Hung Park and Ride Development Road, Kowloon NKIL 6179 BD 2/7182/95 Dec 05 Hong Kong Jockey Club Shatin Race course Parade 16 2007 Aedas Ltd Shatin STTL 13 2/9091/03 Nov 04 Ring Redevelopment 17 2007 Eddie Chan Architects Limited Phase II, Floral Villas 18 Tso Wo Road, Tso Wo Hang, Sai Lot No. 314 in D. D. 252 BD 2/9188/04 18 July 2007, 4 May 2007 Redevelopment of Marymount Primary School and 336-338 Tai Hang Road and 123 Blue 18 2007 Simon Kwan Architect & Associates Ltd IL 8549 and IL 8499 BD 3075/02(P) 21 Jul 06 Improvement of Marymount Secondary School Pool Road School Improvement Programme Ph2 P5 Group 8: 19 2007 Leigh & Orange Ltd 18 Aberdeen Main Road, Hong Kong AIL 174 BD 2/2038/96H (P) Jan 04 (OP), Oct 03 (PC) Extension to P17II Pui Tak Canossian Primary School 5 Science Park West Avenue, Hong Kong 20 2007 Architectural Services Department Science Park at Pak Shek Kok Phase IC - Building 9 TPTL 171 ASD 51/6440 Y Jun 04 Science Park, Pak Shek Kok Redevelopment of Teaching Building Chung Chi The Chinese , 21 2007 Leigh & Orange Ltd STTL 437 BD 4/9327/94(P) 31 Aug 00 College Phase V Shatin, NT STTL 437 18 Fuk Lo Tsun Road, Kowloon City, 22 2007 Associated Architects Ltd Proposed Development of Composite Building 2724SA 2/4002/98 Sep 02 Kowloon Level 1 to 2A Festival Walk, Tat Chee 23 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works to Cinemas, Festival Walk NKIL 6181 2-3/4055/93/15 Dec 06 Avenue, Yau Yat Tseng, NKIL 6181, School Improvement Programme (Final Phase) for Government Land (THK- 20 Nov 04 (Phase 1) and 24 2007 AGC Design Ltd 19 , , Hong Kong Fortrees Hill Methodist School 1220) 11 Sep 04 (Phase 2) 25 2007 Wong & Ouyang (HK) Ltd Residential Redevelopment 35 Deep Water Bay Road, Hong Kong RBL 536 & Ext BD 2/3002/00 Mar 03 26 2007 David S.K. Au & Associates Ltd Proposed Printing Factory Industrial Estate, Tseung Kwan O TKOTL 39, S.S.1, S.H. N.T. BD 2/9252/96(P) Around Oct 07 MTRCL Cable Car Theme Lot No. 238 in D. D. Ngong BD 2/9905/03 (NPTV) 27 2007 Aedas Ltd Ngong Ping Road, Lantau May 06 Village Ping (P) 28 2007 Hong Kong Housing Department Aldrich Bay Phase 5, Market Complex Aldrich Bay Road, , Hong HK11NR N.A. Aug 07 Proposed Commercial Redevelopment of New Port KIL 1301 S.ASS 12 R.P., 29 2007 AGC Design Ltd 23-29 Jordan Road, Kowloon BD 4033/99 Oct 03 Theatre at 23-29 Jordan Road, Kowloon SASS II R.P., SA10R.P. and 30 2007 Aedas Ltd The Luxe Manor (A&A) 39 Kimberley Road, Tsim Sha Tsui KIL 7466, 7460, 7424, 6843 BD SM 4174/79 6 Jun 07 31 2007 Aedas Ltd Wanchai Chapel 118 Gloucester Road, Wanchai IL8909 BD 2/3028/00 Oct 04 / Mar 05 Residential Development At Ngau Tam Mei, Phase 2, 32 2007 MLA Architects (HK) Ltd Ngau Tam Mei, N.T. 2094 in D.D. 105, Yuen Long BD 9192/00 8 Dec 04 Yuen Long 33 2007 Andrew Lee King Fun & Associates Architects Ltd 100 QRC 100 Queen's Road Central IL 23 R.P. BD 2057/01 Sep 06 / Oct 06 34 2007 Spence Robinson LT Ltd Hotel Development at 46-48 Anchor Street 46-48 Anchor Street, Tai Kok Tsui KIL 6374 4/4028/01 Mar 2005 ASD Ref: 35 2007 Aedas Ltd , Watersports Centre Stanley Main Beach, Tam Tam Wan -- 302154181SSH3251 28 Sep 04 M151520 School Improvement Programme, Final Phase Self- 36 2007 Arthur C.S. Kwok Architects & Associates Ltd 18 La Salle Road, Kowloon NKIL 1127 R.P. BD 3025/02(P) 30 May 05 Delivery Mode (S290 - La Salle College) The Proposed Campus Redevelopment for China 37 2007 DesignVision Architects Ltd 4 & 5 Devon Road, Kowloon Tong NKIL 894 2/4026/98 Dec 00 Graduate School of Theology Adjoining No. 14 South Bay Road, 38 2007 P & T Architects & Engineers Ltd Residential Development at RBL 1142 South Bay Road R.B.L. 1142 31 Dec 02 , Hong Kong SIP Final Phase (Package 4) - Group 5 S285 - Jockey 39 2007 Ronald Lu & Partners (HK) Ltd Lok King Street, Fo Tan, Shatin Shatin Town Lot 324 BD 2/3130/01(P) Oct 05 Club TI-I College J/O Man Lok Street, Man Yue Street, 40 2007 K & W Architects Limited A&A Works on Godown Extension at Gemstar Tower H.H.I.L. No. 545 BD 2/4062/98 24 Jul 06 (OP) Hung Hom Road 41 2007 Chung Wah Nan Architects Ltd Sandwich Class Housing Project, Sunshine Grove Area 14J, Tak Yi Street, Shatin STTL 430 BD 2/9203/95H(P) May 1998 ASD School Improvement Programme Phase IV, 42 2007 Leigh & Orange Ltd 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 4/3086/01(P) 6 Jan 05 Package 2, Group 6, Good Shepherd Primary School List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Proposed House Development at RBL 1133, South Bay 43 2007 Ma & Fong & Associates Ltd RBL 1133, South Bay Road, Repulse Bay RBL 1133 BD 2/3038/97 Apr 00 Road, Repulse Bay 2 Wah Lok Path, Wah Fu, Pokfulam, OP: 23 July 2007 ; PC: 44 2007 CYS Associates (HK) Ltd Proposed Extension I.L. 8542 BD 2/2004/05 Hong Kong Anticipate by Mid Aug 07 3 Dai Kwai Street, Tai Po Industrical Tai Po Town Lot No. 1 45 2007 EC Projects Ltd Fibre Optic Factory BD 2/9132/00 Mar 02 Estate Section A, Sub-section 3&3A - Renovation of T.W.T.L. 326, Tsuen Tsuen Wan Plaza, 4-30 Tai Pa Street, 46 2007 Aedas Ltd T.W.T.L. 3262 BD 2-3/9113/87/9 Oct 06 Wan Tsuen Wan, N.T. The Hong Kong Polytechnic University, 47 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Phase VII, Development, The HK Poly U K.I.L. 9853 R.P. & Extension BD 2/4004/02 Sep 05 Hung Hom, Kowloon School Improvement Programme, Package 1, Group 3 - 48 2007 WCWP International Ltd Ventris Road, Happy Valley, Hong Kong IL 8491 & Ext. BD 2/3032/02(P) 26 Sep 05 St. Paul's Secondary School I.L. 2808s.A, S.B & I.L. 49 2007 Aedas Ltd Tai Yau Arcade Renovation 181 , Wanchai, Hong Kong BD 2-3/1133/80/3 24 Nov 06 2809s. A, s.B Lot No 1 & The Extension 50 2007 Integrated Design Associates Ltd Hong Kong Business Aviation Centre Hangar Two 12 South Perimeter Road, BD 2/9049/06(9) 12 Jul 07 Thereto (L832) Ho & Partners Architects Engineers & Development Proposed Private Residential Development at No. 1 51 2007 No. 1 Barker Road, The Peak, Hong Kong R.B.L. No. 810 BD 2/2051/97 OP: 30 Sep 05 Consultants Ltd Barker Road I.L. 3032 S.B., S.C.R.P. & I.L. 1553 R.P. & I.L. 1553 S.A., 52 2007 Lu Tang Lai Architects Ltd The Morrison 28 Yat Sin Street R.P. of Extension To I.L. BD 2/3025/04 Aug 07 1553 R.P. and S.A. of Extension to I.L. 1553 R.P. 18-24 King's Road, 7-9 Lau Sin Street and I.L. No. 5379 R.P. and 53 2007 Casa Design International Ltd 18-24 King's Road Hotel Development BD 6/3006/97H Mar 05 15 Tin Hau Temple Raod, North Point Extension 54 2007 Ronald Lu & Partners (HK) Ltd Monte Residential Development Area 108, Ma On Shan, Shatin, N.T. STTL 446 BD 2/9068/96 Mar 00 55 2007 Wong & Ouyang (HK) Ltd 625 King's Road 625 King's Road, Hong Kong IL 7550 OP: 2 Apr 98 56 2007 Planning Services International (Asia) Ltd Jockey Club Shek Mun Rowing Centre Area 51E, Shatin, N.T. STT 996 9055/00 Dec 02 57 2007 LWK & Partners (HK) Ltd Private Residential Development of Composite Building Hau Man Street, Ho Man Tin KIL No. 11122 BD 3/4030/00 Aug 03 2004 (June 17) - Phase 1 ; Residence Bel-air, Island South, Hong 58 2007 Wong Tung & Partners Ltd Residential Deve Bel-Air R1 I.L. 8969 BD 2/2042/99/ST8 2004 (December 10) - Kong Phase 2 59 2007 Wong Tung & Partners Ltd Queen Street Redevelopment - (URA Project H1) Sheung Wan, Hong Kong - Site A I.L. 8897 BD 2019/95H 5 Feb 03 V.O. no 84 (Plan No. SIP Final Phase - Package Four S297 Lok Sin Tong Ko STM6154A) Land Status: Practical Completion: 25 60 2007 Ronald Lu & Partners (HK) Ltd Area 2A, Lung Hang Estate, Shatin Hsiao Lin Secondary School School is Vesting on Housing Jan 06 Authority Land 6 Jul 04 (OP) ; 31 Oct 04 61 2007 Wong & Ouyang (HK) Ltd Urban Renewal Authority Project K2 8 Argyle Street, Mongkok, Kowloon KIL 11099 BD 2-3/4231/93 (PC) 2008 Olympic Equestrian Venue at Hong Kong Sports 62 2007 Ronald Lu & Partners (HK) Ltd Institute, Shatin, N.T. - Main Stabling Complex & 25 Yuen Wo Road, Shatin, N.T. GLA ST-301 & STTL 13 Jul 07 Veterinary Stables 33 Ka Wai Man Road, Kennedy Town, 63 2007 D. Heung & Associates Architects & Engineers Ltd Mount Davis 33 I.L. 8873 BD 2/2038/97H(P) May 06 Hong Kong Proposed Residential Redevelopment at 43-45, Beacon 64 2007 Wong Tung & Partners Ltd 43-45 Beacon Hill Road NKIL 4763 BD 2/4024/04 15 Sep 07 Hill Road 65 2007 Chau Ku & Leung Architects & Engineers Ltd 707-R-HK 57 Plantation Road R.B.L. 151 2098/94 19 Jul 01 T.M.T.L. 416 Area 10A, Tuen 66 2007 Chung Wah Nan Architects Ltd Proposed Composite Development J/O Tuen Mun Road & Yuk Hong Street BD 2/9345/97 16 Jun 00 Mun, N.T. 67 2007 Wong Tung & Partners Ltd Mega Box (Phase II) 28 Wang Chiu Road, Kowloon Bay, N.K.I.L 5927 BD 2-3/4042/02 27 Apr 07 (Phase II O.P.) 68 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Parc Palais 18 Wylie Road, Kings Park Kowloon Inland Lot No. BD 2/4038/00 Feb 04 Development At TWTL 395, Area 40 Route Twisk, TWTL 395, Area 40, Route Twisk, Tsuen 69 2007 MLA Architects (HK) Ltd TWTL 395 2/9006/01 18 Oct 04 Tsuen Wan, N.T. Wan Outward Bound School Ah Kung Wan, Tai 70 2007 Planning Services International (Asia) Ltd Outdoor Training of Outward Bound School STT No. SX627 at D.D. 252 BD 2/9018/02(1) (P) 30 Aug 05 Mong Tsai, Sai Kung 71 2007 Ronald Lu & Partners (HK) Ltd No. 1 Ho Man Tin Hill Road No. 1 Ho Man Tin Hill Road, Kowloon K.I.L. 2411 4008/93 5 Nov 02 ; 25 Mar 03 Bel-Air on the Peak (Area RIVB), Stages BD 1/2042/99/ST10- 72 2007 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RIVB) IL 8969 s.B 29 May 07 10-12, Cyberport, Hong Kong 12(B) 73 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd St. Philips Church Tin Shui Wai 16 2/9257/97 2000 Residential Development at Sham Tseng - Ocean No. 8 Sham Tsz Street, Sham Tseng, 74 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Lot 265 in DD390 BD 9184/96 Dec 00 Pointe Tsuen Wan, N.T. 75 2007 A & T Design Ltd The Apex (Phase 1) 29-51 Wo Yip Hop Road, Kwai Chung 467 BD 2/9026/01 (Pt: IV) (Phase 1) 10 Jul 07 ; Nov I.L. 29s.G, I.L. 457s.A, s.F, Main Contract Work's For Caroline Centre, 2-38 Yun Caroline Centre, 2-38 Yun Ping Road & s.H, s.O, s.CR.P.S.DR.P, 76 2007 Aedas Ltd 2-3/3062/88 23 Oct 03 Ping Road, Causeway Bay 61-67 Jardine's Crescent, Causeway Bay S.E.R.P, S.GR.P., I.L. 461s.CSS.1, s.CSS.2, Phase 1: 26 Jun 06 ; 77 2007 Aedas Ltd Kowloon Hotel Renovation Works 19-21 , TST, Kowloon K.I.L. 10737 BD 2-3/4030/82 Phase 2: 31 Aug 06 78 2007 Andrew Lee King Fun & Associates Architects Ltd 633 King's Road, North Point 633 King's Road, North Point I.L. 7860 BD 2/3004/04 30 May 07 BD 2-3/4157/89/9, 11, 79 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works at Pioneer Center 750 Nathan Road, Kowloon K.I.L. 2111 Apr 05 13 List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) East Wing & West Wing, Hau Tak Addition and Alteration Works at Hau Tak Shopping HD(ICU)E 3/026(N) 80 2007 Aedas Ltd Shopping Centre, Hau Tak Estate, TKOTL No. 99 Anticipated, Nov 07 Centre (Phase 3) AA(5)-D Tseung Kwan O, 81 2007 Aedas Ltd Kerry Cargo Centre & Public Vehicle Park 55 Wing Hei Road KCTL 455 Kwai Chung, N.T. BD 2/9155/96 May 99 82 2007 MLA Architects (HK) Ltd Proposed Hotel on I.L. 4852, I.L. 4853 & I.L. 4854 202, 204 & 206 Queen's Road Central I.L.s 4852, 4853, 4854 BD 2/2017/03 27 Sep 06 83 2007 Aedas Ltd Good Shepherd Street, Homantin, Kowloon Good Shepherd Street, Homantin, K.I.L. 11091 BD 4040/97 Aug 00 84 2007 Wong Tung & Partners Ltd Aegean Coast So Kwan Wat, Tuen Mun Tuen Mun Town Lot No. 374 BD 2/9025/97H Sep 02 85 2007 P & T Architects & Engineers Ltd St. Mary's Canossian School - Proposed Extention 162 , Kowloon KIL 9550 BD 4054 Aug 03 86 2007 Wong & Ouyang (HK) Ltd , Phase 2 Nga Ying Chau Street, Tsing Yi, N.T. TYTL 129 BD 2/9123, 95H (Pt. Mar 99 ; Jul 99 87 2007 P & T Architects & Engineers Ltd VTC - Teaching Block Extension Shing Tai Road, Chai Wan, Hong Kong CWIL 151 2/3089/02 (P) 13 Sep 04 88 2007 P & T Architects & Engineers Ltd Residential Redevelopment of Branksome Tower II 3A Tregunter Path, Hong Kong IL 8393 BD 2-3/2288/71/2 Apr 04 Residential Development At 10, 12, 16 & 18 Pollock's 10, 12, 16 & 18 Pollock's Path, Hong R.B.L. 513 R.P & R.B.L. 540 OP: 28 May 07 ; PC: 30 89 2007 P & T Architects & Engineers Ltd BD /2030/02 Path, Hong Kong Kong SEC Jul 07 90 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development at Ma Tau Kok 383 K.M.L. 102 R.P. BD 2/4006/02 Nov 06 91 2007 KLS International Architects & Planners Company Limited Proposed Office Building 111 King Lam Street, Kowloon NKIL 4761 BD 2/4141/92 Feb 07 92 2007 Leung King Partners Ltd Residential Redevelopment at 377 377 Prince Edward Road, Kowloon K.I.L. 4234 S.A. 4003/99 11 Mar 04 / 30 Jun 04 93 2007 Aedas Ltd DHL Central Asia Hub Expansion 6 South Perimeter Road, Chek Lap Kok Lot No. 1 & Extension thereto BD 2/9151/05 Aug 07 HD(ICU) 94 2007 Leigh & Orange Ltd Redevelopment of Estate Phase 6 On Tin Estate, On Tin Street, Lam Tin KL29NR Dec 04 B02/KL29NR/06 Proposed Residential Development at Area 36, Sheung Area 36 Sheung Shui, NT, 18 Ching Hiu 95 2007 Lu Tang Lai Architects Ltd FSSIL 189, NT BD 2/9138/97H Apr 05 Shui, NT (Royal Green) (Phase 1 only) Road 96 2007 P & T Architects & Engineers Ltd Enterprise Square III 39 Wang Chiu Road, Kowloon Bay, N.K.I.L 5877 13 May 04 97 2007 Ronald Lu & Partners (HK) Ltd Imperial Villa Phase 1 Ping Chuk Lane, Ping Shan, N.T. 2052 in D.D. 121 2/9111/01 28 Oct 03 N.K.I.Ls. 1177 s.AR.P & R.P. 464-474 Castle Peak Road, 98 2007 Chau Ku & Leung Architects & Engineers Ltd Proposed Residential Development & s.As.s. 1 & 1176 s.A.R.P. & BD 3/4031/04 Anticipated in Aug 07 Wan, Kowloon s.A.s.s. 1 & 1175 s.B & R.P. 99 2007 Wong & Ouyang (HK) Ltd Sheung Shui Slaughterhouse 15 Chuk Wan Street, Sheung Shui Area 2B, Sheung Shui, N.T. Not Applicable Jul 99 OP/PC 100 2007 DesignVision Architects Ltd Shatin Assembly of God Church 10-12 Man Lai Road, Tai Wai, Shatin D.D. 179 Lot 773 BD 2/9178/94 6 Mar 99 (OP) ; Aug 98 101 2007 Wong & Ouyang (HK) Ltd Gateway II K.M.L. 11s.B & s.D BD 2/4040/92 29 Oct 99 102 2007 DCM Studios Ltd Tai Yip Building 141 Thomson Road, Wanchai, Hong Kong IL 2802 BD 2-3/3016/98 May 02 103 2007 Aedas Ltd 11 (Chater House) 11 Chater Road ML 287, 288 BD 2/2014/96 20 Jun 02 104 2007 P & T Architects & Engineers Ltd Canadian International School, Phase II 36 Road, Aberdeen Lot AIL 417 Sep 02 Ho & Partners Architects Engineers & Development Proposed Residential Development at , 105 2007 8 Shung Shun Street, Yau Tong, Kowloon YTIL 21 BD 2/4022/00 30 Aug 06 Consultants Ltd Kowloon 106 2007 AGC Design Ltd Development Package One Tung Chung Town Lot 2 TCTL 2 BD 4/7302/94(P) Pt. II 21 Nov 05 107 2007 Design Consultants Limited West Annex 250 Victoria Road, Hong Kong I.L. 8839 BD 2/2036/01 (P) OP: 31 Aug 03 108 2007 Wong & Ouyang (HK) Ltd Pok Oi Hospital Redevelopment and Expansion Pok Oi Hospital, Au Tan, Yuen Long, N.T. Lot No. 1630 in DD115 BD 2/9164/00 Apr 06 109 2007 Robert Wee Architects Ltd Proposed Commercial Building 116-120 Castle Peak Road D.D. 120 Lots 3647, 3651, BD 2-3/9095/02 Apr 06 BD 2/9905/03 (NPT) 110 2007 Aedas Ltd Tung Chung Cable Car - Ngong Ping Road, Lantau N/A 17 May 06 (P) Alteration and Addition to Hong Kong International Hong Kong International Airport BD104 issued on 111 2007 Aedas Ltd Airport Passenger Terminal Building - East Hall Passenger Terminal Building - East Hall No. 1 & extension thereof BD 2/9810/01(P) 01/08/2003 Extension Extension, Chek Lap Kok ASD Reprovision Stanley Market & Public Toilet & 112 2007 Aedas Ltd Stanley Main Street, Stanley / / (ASD Project) OP: Exempted ; PC: 04/99 Football Beach Alteration and Addition Works to Existing Giant Panda Ocean Park, Road, RBL 1020 R.P. & Ext. 113 2007 Aedas Ltd BD 2/3014/98(P) BA 14 (Jun 07) Habitat Hong Kong Thereto 114 2007 CYS Associates (HK) Ltd Vision Court Residential Dev. 286 Prince Edward Road West KIL 2097 s.E.R.P. Aug 01 115 2007 Ma & Fong & Associates Ltd Commercial / Office Bldg at 674-682 Nathan Road 674-682 Nathan Road, Kowloon TBA TBA July 1997 ; May 1997 Proposed Hotel Development at KIL 11103 Hung Hom KIL 11103, (12 Hung Lok 116 2007 A & T Design Ltd KIL 11103, KLN BD 2/4049/01 22 Dec 05 ; 1 May 06 Bay, Kowloon Road) Proposed Alteration & Addition Works of a residential 117 2007 KLS International Architects & Planners Company Limited 8 Road R.B.K. 845 BD 2-3/3015/95 Dec 04 development Proposed Development at Reclamation Street and 589-601 Reclamation Street, Mongkok, Kowloon Inland Lot No. 118 2007 Andrew Lee King Fun & Associates Architects Ltd 2/4020/04 Aug 07 Arran Street Kowloon 11173 Proposed Kwong On Bank Headquarters 137-141 Queen's Road & 1-13 Gilmans 119 2007 WCWP International Ltd 4810-4819 2060/95 22 Jul 99 Redevelopment Bazzar, Central, Hong Kong 120 2007 LWK & Partners (HK) Ltd Res Dev at Sham Mong Road 8 Sham Mong Road, Kowloon NKIL 6338 BD 2/4033/00 15 Dec 03 (OP) 29 June 05 / (PC) 29 Bel-Air Rise, Resident Bel-Air, Island 121 2007 Wong Tung & Partners Ltd Cyberport Residential Development - R2 IL8969 BD 2/2042/99/ST9 Jun 05 - Section 1 ; (PC) South, Hong Kong 30 Sep 05 Section 2 122 2007 Urbanage International Ltd TWGHs S.C. GAW Memorial CollegeTsing Sum Street, Town Centre, Tsing Yi GLA-TW/82 2/3020/03(P) Jul 05 123 2007 LWK & Partners (HK) Ltd Residential Development at 56 Peak Road, Hong Kong 56 Peak Road, Hong Kong Lot 718 BD 2/2014/00 Apr 03 Proposed Residential Development at 23 Tai Hang 124 2007 Hsin Yieh Architects & Engineers Ltd 23 Tai Hang Drive, I.L. 8972, Hong Kong I.L. 8972 BD 2/3034/00 OP: Nov 06 ; PC: Mid 07 Drive, I.L. 8972 125 2007 Wong Tung & Partners Ltd Les Saisons I.L. 843 (Shau Kei Wan) 2/3042/98 31 Oct 01 126 2007 Wong Tung & Partners Ltd Cyberport Development Telegraph Bay, I.L. 8969 BD 2/2042/99/ST4 Dec 02 127 2007 Wong Tung & Partners Ltd Proposed Service Apartment Development 1 Tsing Yi Road Tsing Yi Town Lot No. 140 BD 2/9165/98 Mar 04 Junction of Norfolk Road and To Fuk 128 2007 Percy Thomas Partnership (HK) Ltd Private at Norfolk Road NKIL 6244 2/4047/03(P) Oct 06 Road, Kowloon Tong 129 2007 Rocco Design Architects Ltd Redevelopment of Man Yee Building 60-68 Des Voeux Road, Central M.L. 14 BD 1/2065/94 OP: Nov 99 ; CP: Dec 99 List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Proposed Commercial Development at 323-337 323-327 and 304-312 Jaffe OP: 15 May 00 ; PC: 9 130 2007 Rocco Design Architects Ltd ML 439 & 440 BD 2/3098/93 Lockhart Road and 304-312 Jaffe Road, Hong Kong Road, Hong Kong Aug 00 131 2007 Leigh & Orange Ltd Hong Kong Science Park Ph. 2, Area A1, Building 10 & TPTL 182 BD 2/9083/03 Mar 2007 132 2007 P & T Architects & Engineers Ltd Shopping Centre Improvement Works Siu Sai Wan Estate, Siu Sai Wan, Hong Apr 02 OP on 3 Jun 04 ; PC on 133 2007 Wong & Ouyang (HK) Ltd Community Centre 1 Greig Road, , Hong Kong I.L. 8397 s.J. BD 2/3043/02 31 May 04 Ho & Partners Architects Engineers & Development 134 2007 Residential Redevelopment 7 Sing Woo Crescent, Happy Valley I.L. 6395 2/3037/98 Mar 01 Consultants Ltd NKILs. 2770 R.P. & Ext. 2785 135 2007 Wong & Ouyang (HK) Ltd Redevelopment of Golden Theatre 94 Yen Chow Street, Kowloon BLD(B) 2/4099/91 Dec 93 s.B & Ext. 136 2007 JADL Design Ltd Proposed Residential Development 78 Mount Kellett Road 548 BD 2/2008/04 21 Aug 06 Residential Development at S.I.L. 845 Yiu Hing Road, S.I.L. 845 Yiu Hing Road, Shaukeiwan, 137 2007 LWK & Partners (HK) Ltd I.L. 845 BD 2/3010/00 OP: Feb 03 Shaukeiwan, Hong Kong Hong Kong S.S.1 & R.P. of S.D. I.L. 2836 501-517 Jaffe Road, Causeway Bay, 138 2007 AGC Design Ltd Proposed Reconstruction of President Theatre & S.S.1 & R.P. of S.L. of M.L. BD 2/3034/99 OP: 14 Mar 03 Hong Kong 52 & Ext. Thereto 139 2007 Wong Tung & Partners Ltd Queen Street Redevelopment - (URA Project H1) - Site Queen Street, Sheung Wan, Hong Kong 2/2019/95 16 Aug 02 OP: 29 May 06 ; PC: 27 140 2007 Design 2 (HK) Ltd CLP Power Substation at On Sum Street On Sum Street, Shatin, N.T. STTL NO. 545 BD/2-4/9026/04(P) Mar 06 23 Sep 05 ; 22 Sep 05 School Improvement Program - Final Phase (Package Pok Oi Hospital Chan Kai Memorial ASD 303/92301/CAA 141 2007 Ronald Lu & Partners (HK) Ltd (Main Section) ; 3 Sep 04 4) College, Lung Hang Estate, Shatin, N.T. K04 (Section A) ; 11 Jan 06 18 Farm Road, Ma Tau Wai, Kowloon, 142 2007 Ronald Lu & Partners (HK) Ltd Residential & Retails Development at 18 Farm Road KIL 11145 2/4060/00 Jul 04 Hong Kong 143 2007 Woods Bagot Asia Ltd Alteration & Additional Works to TST Centre 66 , Tsim Sha Tsui East, KIL 10477 2-3/4198/77/12 May 06 144 2007 Thomas Chow Architects Ltd SIP - Final Phase (S270) of DBS Campus 131 Argyle Street BD 2/3019/03 (P) Jun 05 Residential Development, 250 , 145 2007 Andrew Lee King Fun & Associates Architects Ltd 250 Shau Kei Wan Road, Hong Kong Shau Kei Wan Lot 4 31 Dec 03 Hong Kong Alterations & Additions to 24/F, 25/F, 26/F And Roof of Prince's Building, 10 Chater Road, 146 2007 Aedas Ltd IL 2181 BD 2-3/2567/61/49 Sep 07 Prince's Building Central, Hong Kong 147 2007 P & T Architects & Engineers Ltd Residential Redevelopment at RBL 809 23 Big Wave Bay Road, , Hong RBL 809 Nil 10 Dec 03 (OP) 148 2007 Andrew Lee King Fun & Associates Architects Ltd Proposed New Residential Building 18-30 Bedford Road, Tai Kok Tsui KIL 11157 BD 1/4063/00 Sep 07 (Expected) 149 2007 LWK & Partners (HK) Ltd Extension of Ancestral Worship Halls at Po Fook Shan Po Fook Shan, Sha Tin Town Lot No. 311 STTL 311 BD 2/9110/00 11 Sep 06 150 2007 Sherman Kung & Associates Architects Ltd Extension to HKEAA San Po Kong Sub-Office 17 Tseuk Luk Street, San Po Kong NKIL 5774 ASD PB SW Mar 02 The Hong Kong Polytechnic University Phase VI The Hong Kong Polytechnic University, OP 09/00 ; PC(1) - 10/00 ; 151 2007 Wong Tung & Partners Ltd KIL 9853 R.P. and Extension BD 4014/97(P) Development Hung Hom, Hong Kong PC(2) 08/01 152 2007 Hong Kong Housing Authority HOS Development At Shatin Area 14B, Phase 4 Yuen Chau Kok, Shatin STTL 462 Jul 01 24-26 Kimberley Road, 55-61 Carnarvon 153 2007 RDL Asia Ltd Proposed Service Apartment KIL 11147 BD 4/4064/96 OP: 28 Oct 04 Road and 38-40 Kimberley Street, TST 154 2007 RDL Asia Ltd Tian Jin Building Hotel Redevelopment 167 West, Hong Kong ML 344 R.P & 364 R.P. H.K. 2/2033/97H Aug 07 155 2007 LWK & Partners (HK) Ltd 117 Repulse Bay Road 117 Repulse Bay Road RBL 168 S.A. S.S.I. BD 2/3092/97 Nov 03 IL47AsARP, IL47AsBRP, IL47AsCRP, IL47ARP, IL47BsCRP, IL47BRP, IL47AsBss2, IL47AsD, IL47BsD, IL47BsBRP, IL47BsARP, IL47CsARP, IL47CsAss1RP, IL47CRP, IL47DRP, IL47DsARP, IL47sBRP, IL47sAss1, 156 2007 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East IL47sCss1 & Extension BD 3019/01 Feb 07 Thereto, IL47sCss2sA, IL47sCss2RP, IL47sCss3sA, IL47sCss3RP, IL47sCss4, IL47sCss5 & Extension Thereto, IL47sCss6sRP, IL47sCss6sA, IL47sCss7RP, IL47sCRP, IL47sBss1, IL47sARP, IL47sP, IL47RP, IL47sP, IL47RP Hong Kong International Airport, Chek Lap CLK Lot No. 1 R.P. and The BD 2/9062/03 (5) (P) ; 157 2007 Aedas Ltd Skyplaza Development (South Office Tower) 23 May 07 Kok Ext. Thereto FP 43/0004/99 (E) 158 2007 Wong Tung & Partners Ltd Development, Phase II KIL 11090, Tai Kok Tsui, Kowloon KIL 11090 Feb 01 School Improvement Programme - Final Phase St. 159 2007 WCWP International Ltd 50 Mount Davis Road, Hong Kong IL 7388 2/3097/01 Feb 05 Clare's Girls' School 160 2007 WDA Architects Ltd Caritas Wu Cheng Chung Sec. School 2 Northcote Close, Pokfulam, Hong Kong Southern GLA-HK 907 N/A Jul 06 Addition & Alteration Works at 5-7 Austin Road, Tsim 161 2008 Spence Robinson Ltd Nos 5-7 Austin Road, Kowloon 8668 R.P. & 8113 BD 2-3/4113/73 April 2008 Sha Tsui I.L. 7076, I.L. 7077, I.L. 971, Proposed Hotel Development at 31E - 39 Wyndham 162 2008 AGC Design Ltd 31E, 31F, 33-39 Wyndham Street, Central I.L. 970S.A.R.P., I.L. BD 3/2058/94 Pt. IV. July 2004 Street, Central 970R.P., I.L. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) "" Residential and Commercial Area 55b, Tseung Kwan O, Sai Kung, 163 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd TKOTL Lot No. 75 BD 3/7227/02 January 2006 Development at Area 55b, Tseung Kwan O N.T. Job No. NMW 1598, Proposed Open Niches at Cape 26 October 2007 (OP) / 164 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Road, Chai Wan IL 7715 BD 3003/06(P) Collinson Chinese Permanent Cemetery, Chai Wan October 2007 (PC) 165 2008 Andrew Lee King Fun & Associates Architects Ltd Residential Development at 220-222 Tai Kok Tsui Road 220-222 Tai Kok Tsui Road KIL 11159 30 September 2008 ASD 166 2008 Lu Tang Lai Architects Ltd Yuen Long Area 13, Two Primary Schools Area 13, Yuen Long, New Territories Area 13 55/92050/CWO/011- August 2008 06/BP 167 2008 LWK & Partners (HK) Ltd Residential Development at 116 Pokfulam Road 116 Pokfulam Road, Hong Kong RBL 174 BD 2007/86 August 2001 The RP. Of Chek Lap Kok September 2008 / 168 2008 Aedas Ltd Skycity Marriott Hotel - Phase 1 1 Sky City Road East BD 9094/06 No. 1 & The Extension November 2008 Proposed Domestic Building at No. 244 Aberdeen Main 169 2008 LWK & Partners (HK) Ltd No. 244 Aberdeen Main Road, Hong Kong A.I.L. 287 & Ext. BD 2052/96 October 2000 Road, Hong Kong Section 3A - Sectional ASD Completion: 19 August Area 86 Heng On Estate, Ma On Shan, 170 2008 Ronald Lu & Partners (HK) Ltd SIP Final Phase (Package 4) - Chinese YMCA College -- 053/6487/ALL318/C2 2004 / Section 3 (Annex) - New Territories 5/001 Completion: 25 November 2004 International Christian Quality Music Secondary & Po Kong Village Road, Diamond Hill, 27 August 2004 / End 171 2008 Hsin Yieh Architects & Engineers Ltd NKIL 6358 BD 4040/01 Primary School Kowloon August 2004 Development at Kowloon Bay, Enterprise Square 5 29 Dec 2006 / 15 Jan 172 2008 Wong Tung & Partners Ltd 38 Wang Chiu Road, Kowloon Bay NKIL 5927 BD2 /4042/02 Phase 1 (Mega Box) 2007 83 Castle Peak Road, Kwu Tung, New 173 2008 CYS Associates (HK) Ltd Golf Park View 2574 in D.D. 92 BD 9183/00 June 2004 Territories Provision of Additional Lifts at Block S of United J/O 130 Hip Wo Street & Sau Mau Ping 19 July 2007 / 31 July 174 2008 Perry Thomas Partnership (HK) Ltd NKIL 6014 BD 2/4009/04(P) Christian Hospital Street 2007 Area 13, , SKH Wei Lun Primary School, SIP-Final Phase Self- Area 13, Discovery Bay, , Lantau Island, N.T., On the 175 2008 Chung Wah Nan Architects Ltd BD 3057/02(P) 17 March 2005 delivery Mode New Territories remaining Portion of Lot No. 385 in D.D. 352 176 2008 Alliance Architects Ltd Redevelopment of Tsing Yi Logistic Centre -- Tsing Yi STTL No. 3622 BD 2/9139/07 November 2008 17 February 2004 (OP) / 177 2008 Wong & Ouyang (HK) Ltd Langham Place Hotel 555 , Mongkok, Kowloon KIL 11099 (K2-Site B) BD 2/4231/93 28 February 2005 (PC) The Hong Kong Community College (Hung Hom Bay 8 Hung Lok Road, Hung Hom Bay, 178 2008 Architecture Design & Research Group Ltd KIL 11163 BD 4026/04 10 July 2007 Campus) Kowloon The RP of Chek Lap Kok, Lot 12 South Perimeter Road, Chek Lap Kok, 179 2008 Integrated Design Associates Ltd Hong Kong Business Aviation Centre Hangar Two No. 1 & the Extension BD 2/9049/06(P) July 2007 NT Thereto (L104) 180 2008 Thomas Chow Architects Ltd Sports & Dormitory Complex at the Diocesan Boy's 131 Argyle Street, Kowloon KIL 6737 BD 2/4050 19 December 2007 Tower 20 Phase 3 of the Kowloon Station Development LAR Kowloon Station Development-Site F BD 2/7219/00(F) Pt. 181 2008 Wong & Ouyang (HK) Ltd KIL 11080 28 June 2007 (OP) Site F (Tower 20) VIII Proposed Redevelopment at J/O Fu Hing Street & San Fu Hing Street & San Hong Street, 182 2008 LWK & Partners (HK) Ltd DD91 Lot 3597s RP BD 2/9215/95 08 September 2003 Hong Street, Sheung Shui, NT Sheung Shui, NT 30 February 2007 (OP) / 183 2008 WMKY Ltd Proposed Residential Building 120 Pokfulam Road, Hong Kong RBL 422 & Ext BD 2/2045/94 30 October 2007 (PC) 184 2008 Leigh & Orange Ltd School Improvement Programme - Phase IV, Package 288-290 , Kowloon NKIL 4456 BD 3004/02(P) 26 July 2004 23 April 2005 (OP) / 24 185 2008 Ronald Lu & Partners (HK) Ltd The Giverney Man Kei To, Pak Sha Wan, Sai Kung, NT Lot No. 1184 in DD217 BD 9121/01 May 2005 (PC) 10 Lo Ping Road, The Hong Kong Institute 186 2008 Aedas Ltd Proposed HKIEd Jockey Club Primary School TPTL 147 August 2002 of Education, Tai Po, New Territories QBML 1RP, sQ, sR, ss1, , 979 King's Road, Quarry 187 2008 Wong & Ouyang (HK) Ltd Lincoln House sRRP, sS, sTss1, sTss2, BD 2/3017/94 September 1998 Bay sTRP, sU & sW 24 Dec 07 (Phase 1) / 29 188 2008 CYS Associates (HK) Ltd Tung Chung Station Development Package 2, Phase 4 TCTL 4 BD 7337/96(LR) Jan 08 (Phase 2) Chek Lap Kok Lot No. 1 and 11 April 2003 (OP) / 31 189 2008 Design 2 (HK) Ltd Mid-field Screening Facilities AAHK, 1 Chong Yip Road, HKIA BD 2/9815/02 extension thereto March 2003 (PC) 190 2008 Chung Wah Nan Architects Ltd Senior Staff Centre 23 Nam Shan Chuen Road NKIL 5953 BD 2/4028/94(P) 20 December 1995 Sec A KTIL No. 752, Sec B 191 2008 Andrew Lee King Fun & Associates Architects Ltd Proposed Hotel Development (Newton Place Hotel) 163 Wai Yip Street, Kwun Tong KTIL No. 752 & RP KTIL No. BD 2/4074/94 January 2007 752 192 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development at Ma Tau Kok 383 To Kwa Wan Road KML 102 RP BD 2/4006/02 November 2006 SIP (Final Phase Self Delivery Mode) Po Leung Kuk 12-20 On Yin Street, Chai Wan Kwok, 26 April 2005 (OP) / 03 193 2008 Ronald Lu & Partners (HK) Ltd TWTL 283 BD 3024/02(P) Lee Shing Pik College Tsuen Wan, NT September 2005 (PC) 194 2008 Spence Robinson LT Ltd Hotel Development at 46-48 Anchor Street 46-48 Anchor Street, Tai Kok Tsui, KIL 6374 BD 4/4028/01 March 2005 Residential Development at S.A. of I.L. 1680 No. 118- 118-122 Tung Lo Wan Road, Causeway 195 2008 CYS Associates (HK) Ltd SA of IL1680 BD 3008/05 May 2008 122 Tung Lo Wan Road, Hong Kong Bay, Hong Kong Hong Kong Community College Development at West 196 2008 Architecture Design & Research Group Ltd 9 Hoi Ting Road, West Kowloon KIL 11176 BD 2/4050/05 28 March 2008 Kowloon Redevelopment of Craigengower Cricket Club (Phase 14 October 2003 (OP) / 4 197 2008 P & T Architects & Engineers Ltd 188 Wong Nai Chung Road, Happy Valley IL 8881 BD 2/3070/01 (Ph.1) 1) December 2003 (PC) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 12 June 2008 (OP) / 198 2008 Wong Tung & Partners Ltd Teaching Hotel, The Chinese University of HK The Chinese University of Hong Kong STTL 437 & Ext thereto BD 2/9003/02 August 2008 (PC) 199 2008 Hong Kong Housing Authority Choi Wan Road Site 1 Phase Choi Wan Road, Kowloon Bay GLA-NK-730 KE05 NR-05 (HD) June 2008 200 2008 Ronald Lu & Partners (HK) Ltd Tai Kok Tsui Municipal Services Complex 63 Fu Tsuen Street, Tai Kok Tsui, June 2005 QBIL 15 s.D, QBML 1 s.Css.5, s.Css6, QBML 2s.G 201 2008 Wong & Ouyang (HK) Ltd 18 Westlands Road, Quarry Bay & Ext, s.F & Ext, BD 2/3031/01 17 March 2008 s.Hss.6s.BRP & Ext s.HRP & Ext and QBML 2 RP & Ext. 202 2008 WCWP International Ltd SIP Final Phase Package 1, St. Paul's Convent School 140 Leighton Road, Causeway Bay IL 1018 BD 2/3083/01 (P) 25 June 2005 203 2008 Andrew Lee King Fun & Associates Architects Ltd Composite Building at 3 Kwong Wa Street, Kowloon 3 Kwong Wa Street, Kowloon SKIL 1157 BD 2/4020/99H (Pt. 26 June 2003 204 2008 Ronald Lu & Partners (HK) Ltd Quarantine 'B' Stables Sha Tin Racecourse, New Territories STTL 13 BD 9189/05(2)(P) 22 April 2008 A&A Works at Nexxus Building, 41 Connaught Road 205 2008 Aedas Ltd 41 Connaught Road Central, Hong Kong ML 382 BD 2-3/2333/59/3 November 2008 Central M.L. 382 4-30 Tai Pa Street, Tsuen Wan, New 206 2008 Aedas Ltd Renovation of Tsuen Wan Plaza (Phase 2) TWTL 326 October 2008 Territories RP of Lot 385 in DD 352 & 27 April 2007 (OP) / July 207 2008 Simon Kwan Architect & Associates Ltd Proposed Community Hall & Integrated Services Centre Discovery Bay North BD 2/9166/99 Ext 2007 (PC) Residential Development in Lot 1739 in DD122 Castle 131 Castle Peak Road, Ping Shan, Yuen 208 2008 Ronald Lu & Partners (HK) Ltd 1739 in DD122 BD 9075/01 23 December 2005 Peak Road, Yuen Long, New Territories Long, New Territories 209 2008 Design Consultants Limited HKU Space Community College 28 Wang Hoi Road, Kowloon Bay NKIL 6429 BD 4018/04 September 2006 358-364 Un Chau Street, Sham Shui Po, 210 2008 Andrew Lee King Fun & Associates Architects Ltd Southern Lodge, Residential Development NKIL 2866 s.F & RP BD 4005/04 6 March 2008 Kowloon 211 2008 Spence Robinson Ltd Proposed Golf Club Development Chuen Lung, Tsuen Wan TWTL 389 BD 2/9139/05 September 2008 Residential Development at Chuk Kok, Sai Kung (The April 2005 (OP) / March 212 2008 Spence Robinson LT Ltd Chuk Kok, Sai Kung Lot No. 14 in DD 231 BD 6/9007/01 Cove) 2005 (PC) 3 November 2004 (OP) / 213 2008 Rocco Design Architects Ltd Office Building at Tsing Yi Town Lot 139 99 Cheung Fai Road, Tsing Yi TYTL 139 BD 7362/02 15 February 2005 (PC) 214 2008 Architecture Design & Research Group Ltd New Annex Block To Wah Yan College (Kowloon) 56 Waterloo Road, Kowloon KIL 6059 BD/3012/02(P) 24 January 2005 URA H9, Wan Chai Road / Tai Yuen Street Wanchai Road / Tai Yuen Street, 215 2008 Simon Kwan Architect & Associates Ltd IL 8953 BD 2/3035/99 16 June 2005 Redevelopment (Site B) Wanchai, Hong Kong 216 2008 Steve Leung Architects Proposed Office Building at 9 Chong Yip Street 9 Chong Yip Street, Kwun Tong, Kowloon KTIL 444 March 2004 Proposed Development at URA K11 - Hanoi Road Site 217 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd K11 Hanoi Road, Tsim Sha Tsui, Kowloon KIL 11188 BD 3/4031/00 Before November 2008 (KIL 11188), Kowloon 218 2008 Steve Leung Architects Win Plaza 9 Sheung Hei Street, San Po Kong, NKIL 6237 SA, SB & BP BD 2/4083 March 2008 (OP) Proposed Alterations and Additions Works at the IL669 & IL30sCRP & sA & 219 2008 Aedas Ltd 11 , Central, Hong Kong BD 2-3/1192/79/3 13 January 2006 Ruttonjee Centre IL644sA (Lau Fau Shan) Tin Shui Wai Fire Station cum 220 2008 Architectural Services Department 101 Tin Shui Road, Tin Shui Wai GLA-TSW-63 5570D 24 January 2003 Ambulance Depot in Area 112, Tin Shui Wai Proposed Centre For Chinese Archaeology And Art, September 2007 221 2008 Simon Kwan Architect & Associates Ltd Sha Tin STTL 437 RP & the Ext thereto STTL 437 BD 2/9073/01 The Chinese University of Hong Kong (NT57/2007 (OP)) Residential Development at Lot No. 4783 in DD104, Lot No. 4783 in DD 104, Ngan Tam Mei 222 2008 MLA Architects (HK) Ltd Lot No. 4783 BD 2/9034/05 31 March 2008 Ngan Tam Mei Road, Yuen Long Road 223 2008 P & T Architects & Engineers Ltd VTC - Chai Wan Teaching Block Extension Shing Tai Road, Chai Wan, Hong Kong CWIL 151 BD 2/3089/02(P) 13 September 2004 224 2008 MLA Architects (HK) Ltd Residential Development at Kwun Lung Lau 20 Lung Wah Street, Kennedy Town IL 8041 BD 6/2010/99H(P) December 2007 P381 - Completion on May 08 / P382 - Completion on A&A Works at Hong Kong International Airport Terminal 225 2008 Benoy Ltd Chek Lap Kok Lot No. 1 RP & the thereto Nov 08 / P386 - 1 Completion on Jul 08 / P387 - Completion on Nov Residential Development at 50A, B & C, Tai Hang 226 2008 Simon Kwan Architect & Associates Ltd 50A, B & C, Tai Hang Road, Hong Kong IL 8973 BD 3010/99 28 June 2005 Road, Hong Kong QBIL 4sBss.1SA & ss.1RP, 227 2008 A & T Design Ltd Proposed Development at No. 880-886 King's Road 880-886 King's Road BD 2/3013/04 13 August 2007 QBIL 4sbss. 2 & SBRP 228 2008 DCM Studios Ltd Tai Yip Building 141 Thomson Road, Wanchai IL 2802 BD 2-3/3016/98 May 2002 Hong Kong Science Park Phase 2, Pak BD 2/9083/03(2) (Pt 229 2008 Leigh & Orange Ltd Area C, Hong Kong Science Park Phase 2 TPTL 182 June 2007 Shek Kok, Tai Po, New Territories III) Level 1-2A, Festival Walk, 80 Tat Chee 230 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Alteration and Addition Works to Cinemas NKIL 6181 BD 2-3/4055/93/15 December 2006 Avenue, Kowloon Tong, Kowloon 231 2008 Wong Tung & Partners Ltd Cyberport at Telegraph Bay (C3A Office) 100 Cyberport Road, Pok Fu Lam IL 8969 BD 2/2042/99/ST6 May 2004 232 2008 A. Lead Architects Ltd Church, Kindergarten & Elderly Home Cornwall Street, Kowloon NKIL 6182 BD 2/4007/02 September 2008 Ma Fung Ling Road, Tong Yan Sun Phase 1: December 2007 / 233 2008 H.C. Wu Architect & Associates Tong Yan Sun Tsuen Phase 1 and 2 DD 122 Lot 1740 BD 2/9129/02 Tsuen, Yuen Long, New Territories Phase 2: June 2007 22 Feb 2008 (OP) / 2 Feb 234 2008 A. Lead Architects Ltd Main Block Extension, Hong Kong Baptist Hospital 222 Waterloo Road, Kowloon NKIL 5906 BD 2-3/4078/76(I)/8 08 (PC) ASD Temporary re-provisioning of Stanley Market, Stanley Stanley Main Street (Stanley Bay 51/5831/CG/UCC/001 235 2008 Aedas Ltd THK 1144 April 1999 Playground and Public Toilet Reclamation Area) , ASD 51/5732/RG/UCM/00 24 June 2002 (OP) / 8 July 236 2008 Wong & Ouyang (HK) Ltd Taikoo Primary School 1100 King's Road, Quarry Bay IL 8397 BD 2/3065/93 2002 (PC) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 237 2008 Wong Tung & Partners Ltd Cyberport Office Stage 1 Contract (C1) 100 Cyberport Road, Pok Fu Lam IL 8969 BD 2- October 2002 238 2008 Leigh & Orange Ltd HKFYG Headquarters Redevelopment 21 Pak Fuk Road, Hong Kong IL 8990 BD 3/3035 7 December 2007 (OP) Kau To Shan Residential Development (Double 52 Ma Lok Path, Kau To Shan, New 239 2008 Ronald Lu & Partners (HK) Ltd STTL 82 BD 2/9230/95 3 June 2002 (PC) Heaven) Territories Jan 2008 (OP) / April 2008 240 2008 Aedas Ltd Refurbishment to Bea Building (W Square) 314-324 , Hong Kong ML 122 RP & SD BD 2-3/3299 (PC) 241 2008 Aedas Ltd Proposed A&A Works at Trend Plaza (Cinema TMTL 282, Tuen Mun Town, New TMTL 282 BD 2-3/9001/84/10 June 2008 242 2008 Aedas Ltd Dragon View Homantin Chung Hau Street, Homantin KIL 11075 BD 2/4046/95 January 1998 74-78 Nathan Road, Tsim Sha Tsui, 10 Nov 2007 (Notification 243 2008 Y.I. & Associates Ltd A&A Works for Manson House KIL 6362 BD 2-3/4120/55/8 Kowloon of BA 14) / 29 March 2008 The Harbourside, , 1 Austin July 2003 (OP) / February 244 2008 P & T Architects & Engineers Ltd MTRC Kowloon Station Development, Package 4 KIL 11080 BD 2-3/7204/99 Road West 2004 (PC) 245 2008 Ronald Lu & Partners (HK) Ltd Proposed HKYWCA Guesthouse and Conference San Shek Wan, Lantau Island 727 in DD 332 BD 9020/04 28 August 2007 Public Transport Interchange (PTI) & Property Sha On Street, Ma On Shan, New BD 2/7947/01(P) PT 26 Nov 2004 (OP) / 17 246 2008 Ronald Lu & Partners (HK) Ltd STTL 530 Development Enabling Works At Wu Kai Sha Station Territories II Dec 2004 (PC) School Improvement Programme (SIP) Final Phase - 8 Hang Kwong Street, Ma On Shan, ASD 303/92301/CAA 247 2008 Ronald Lu & Partners (HK) Ltd Package 4 S298 - Ma On Shan St. Joseph's Secondary GLA ST-198 04 February 2005 Shatin, New Territories K04 School Proposed Printing Factory at Tseung Kwan O Industrial 7 Chun Cheong Street, Tseung Kwan O TKOTL 39, ss1, sH & Ext 248 2008 David S.K. Au & Associates Ltd BD 2/9252/96 P January 2008 Estate Industrial Estate, New Territories thereto Phase 1: 30 October 2002 249 2008 Wong & Ouyang (HK) Ltd Kowloon Station Development - Site B (Sorrento) 1 Austin Road KIL 11080 BD 2/7188/97-B / Phase 2: 16 October 250 2008 Simon Kwan Architect & Associates Ltd URA Redevelopment Project Johnston Road, Wanchai, Hong Kong IL 8997 BD 2/9032/03 August 2007 251 2008 Simon Kwan Architect & Associates Ltd Residential Development at Haung Hau Station Tseung Kwan O, Area 38b TKOTL 24 BD 2/7232/02 December 2004 252 2008 Simon Kwan Architect & Associates Ltd Regent On the Hill, Residential Development 183 Hammer Hill Road, Kowloon NKIL 6232 30 March 2000 (OP) 253 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Commercial Development 620-628 Nathan Road, Kowloon KIL 10336 2001 254 2008 Architecture Design & Research Group Ltd New Annex Block for Wah Yan College Hong Kong 281 Queen's Road East, Hong Kong IL 6935 BD 2/3063/02(P) November 2004 Redevelopment of St. Paul's Co-Educational College 255 2008 P & T Architects & Engineers Ltd 11 Nam Fung Path, Wong Chuk Hang N/A N/A End of August 2008 Primary School Ho & Partners Architects Engineers & Development Proposed Residential Development at Ma On Shan 256 2008 1 Yuk Tai Street STTL 487 BD 2/9114/04 19 November 2007 Consultants Ltd Area 77, STTL 487 Area 108, Ma On Shan, Shatin, New 257 2008 Ronald Lu & Partners (HK) Ltd Monte Vista, Residential Development STTL 446 BD 9068/96 March 2000 Territories 258 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 41C , Hong Kong IL 8870 BD 2/3006/96 September 2002 QBML 4sCSS. 1SB / QBML Proposed Commercial Residential Development at 933 4sCSS. 4SE / QBML 4sCSS. 259 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 933 King's Road, North Point BD 3008/99 August 2002 King's Road 1SARP / QBML 4sCSS 1S ASS1 / QBML 4sCSS 1RP TMTL 374, Area 55A, So Kwun Wat, Tuen 260 2008 Wong Tung & Partners Ltd TMTL 374, So Kwun Wat, Tuen Mun TMTL 374 BD 6/9025/97H September 2002 Mun Reprovision of Boarding Section of Princess Alexandar 261 2008 Arch Design Architects Ltd 9 Rehab Path, Kwun Tong, Kowloon KTIL 255 BD 2/4045/04 Residential School Residential Development at 8 Street - SIL 3sCRP, SIL 4sE, sF,sG, 262 2008 PCMH Limited 6-12A Sai Wan Ho Street, Hong Kong BD 3141/94 3 Oct 2007 Grand Garden SIL 5sAss4, ss5 & ss6 223-231 Wai Yip Street & 39 King Yip 263 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Office Twin Towers KTIL 744 BD 4047/96 December 2008 Street, Kwun Tong 1 Kiu Kiang Street (for Domestic Units), 26 June 2008 (OP) / July 264 2008 Hsin Yieh Architects & Engineers Ltd Composite Development (The Prominence) 1A Kiu Kiang Street (for G/F Shop A) & NKIL 2263, 2175 SA & RP BD 4082/05 2008 (PC) 336 Tung Chau Street (for G/F Shop B) 265 2008 Steve Leung Architects Office Development 13A Chong Yip Street, Kwun Tong KTIL 444 BD 2/4134/93 23 February 2004 (OP) Residential Development at STTL 481, Ma On Shan 266 2008 Ronald Lu & Partners (HK) Ltd 1 Po Tai Street, STTL 481, Area 77 STTL 481 BD 9135/00 September 2003 (PC) New Town Residential Development at 10, 12, 16 & 18 Pollock's 10, 12, 16 & 18 Pollock's Path, Hong 28 May 2007 (OP) / 30 267 2008 P & T Architects & Engineers Ltd RBL 513 RP & RBL 540 sec BD 2030/02 Path, Hong Kong Kong July 2007 (PC) 268 2008 P & T Architects & Engineers Ltd Proposed Industrial Redevelopment 1 Tai Yau Street, San Po Kong, Kowloon NKIL 4455 BD 2/4010/95 December 2007 269 2008 P & T Architects & Engineers Ltd A Primary School at Hiu Kwong Street, Sau Mau Ping 130 Sau Ming Road, Sau Mau Ping N/A August 2008 270 2008 Ronald Lu & Partners (HK) Ltd Proposed Student Quarters at STTL 437, CUHK The Chinese University of Hong Kong STTL 437 BD 2/9206/98(P) October 2002 School Improvement Programme Final Phase Package Lok Ha Square, Fo Tan, Sha Tin, New ASD 303/6487/AL 271 2008 Ronald Lu & Partners (HK) Ltd GLA-TST 58 24 August 2005 4 Stewards Pool Kei Primary School (P449) Territories L360/C25/001 Pinehill Village, Chung Nga Road, Nam 272 2008 Ronald Lu & Partners (HK) Ltd (01521 NT) Hong Chi Pinehill No. 2 School TPTL 34 BD 2/3101/01(P) 21 April 2005 Hang, Tai Po, New Territories ASD School Improvement Programme Phase IV, 273 2008 Leigh & Orange Ltd Kam Tsin Village, Sheung Shui DD 92 Lot 2434 BD 3017/01(P) 6 July 2004 Package II, De La Salle School Pok Oi Hospital, Au Tan, Yuen Long, New 274 2008 Wong & Ouyang (HK) Ltd Pok Oi Hospital Redevelopment and Expansion Lot No 1630 in DD 115 BD 2/9164/00 April 2006 Territories Alteration and Additions, Structural Investigation and BD 2-3/1003/82(FS) 275 2008 Y.I. & Associates Ltd Strengthening Works, Pedder Building, 12 Pedder 12 Pedder Street, Central, Hong Kong IL 2319 4 June 2008 Pt. III Street, Hong Kong Redevelopment of Au Shue Health Centre, Hong Kong 276 2008 Wong & Ouyang (HK) Ltd 330 Junction Road, Kowloon NKIL 5907 BD 2/4048/03 March 2008 Baptist Hospital 277 2008 Eddie Chan Architects Limited Proposed Composite Building 120 Stanley Main Street, Hong Kong Stanley Inland Lot No. 95 BD 2/2048/01 1 November 2007 List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Remaining Portion of Chek Tradeport Logistic Centre, Hong Kong International Logistics Centre Development at SCD, 278 2008 Aedas Ltd Lap Kok No. 1 & Extension, December 2003 Airport HKIA, Chun Yue Road, CLK, Lantau Development Lot 805 ASD Cheung Chau Sai Tai Road, Cheung 279 2008 Aedas Ltd Cheung Chau Fireboat Station STTCX 1439 55/92050/CWO/036- March 2008 Chau 06/BP 280 2008 P & T Architects & Engineers Ltd Inland Lot No. 452, New Private Independent School 19 Shun Wan Road, Aberdeen, Hong IL 452 BD 2/2007/03(P) 27 August 2007 Hostel and Amenity Building For Shue Yan College on Wai Tsui Crescent, North Point, Hong 281 2008 John Hui & Associates IL 8956 BD 3006/00 18 February 2005 Lot No. 8956, Wai Tsui Crescent, North Point, Hong Kong 12A, Dai Fat Street, Tai Po Industrial 282 2008 John Hui & Associates Rebuilding Work For Pico Factory TPIL 1sMss4 BD 2/9088/04 10 July 2006 Estate, Tai Po, New Territories Addition of Two Storeys to the Existing Kwai Chung 11 Wing Hau Street, Kwai Chung, New 283 2008 Aedas Ltd OZP No S/KC/21 ASD 010696 October 2008 Columbarium Territories 284 2008 Aedas Ltd Knutsford Steps - A&A Miramar Shopping Centre 132-134 Nathan Road, 1-23 Kimberly KIL 6454 April 2004 285 2008 Ronald Lu & Partners (HK) Ltd Residential & Retails Development at 18 Farm Road 18 Farm Road, Ma Tau Wai, Kowloon KIL 11145 BD 2/4060/00 July 2004 286 2008 Aedas Ltd Retail Design for Emperor Plaza 55 Chung On Street, Kowloon 1978 DD 449 BD 2-3/9221/8818 November 2008 287 2008 MDVISTA Ltd Oil Street Hotel 15-17 Oil Street, North Point, Hong Kong IL 7106 SA & Ext BD 2/3003/99 Pt. VI October 2008 Public Transport Interchange and Property March 2005 (OP) / April 288 2008 Ronald Lu & Partners (HK) Ltd KCRC MOS Rail, Tai Wai Station ST. MISC 124 BD 2/7960/02(P) Development above KCRC Tai Wai Station 2005 (PC) 289 2008 David S.K. Au & Associates Ltd Residential Re-development 15 Bluff Path, The Peak, Hong Kong RBL 547 SA & 560 SA BD 2029/03 5 June 2008 290 2008 P & T Architects & Engineers Ltd Canadian International School, Phase II 36 Nam Long Shan Road, Aberdeen Lot AIL 417 BD 3008/00(P) September 2002 500 Tung Chau Street, , 291 2008 Simon Kwan Architect & Associates Ltd Proposed Composite Development at NKIL 6365 NKIL 6365 BD 4082/04 July 2008 Kowloon KCRC Light Rail Division, Bus Depot, 292 2008 Spence Robinson Ltd KCRC Bus Depot Renovation August 2001 Tuen Mun Renovation Works at Raimondi College Primary 1-E, Shiu Fai Terrace, Stubbs Road, 293 2008 WCWP International Ltd IL 7936 BD 2-3/2259/63/4 August 2008 Section Wanchai, Hong Kong 294 2008 Ronald Lu & Partners (HK) Ltd Imperial Villa Phase II 1 Ping Chuk Lane, Ping Shan, Yuen Long 2051 in DD 121 BD 9162/01 November 2003 295 2008 A & T Design Ltd No. 1, Star Street 1 Start Street, Wanchai, Hong Kong March 2001 VO No 84 (Plan No. ASD SIP Final Phase - Package Four S297 Lok Sin Tong Ko STM6154A), Land Status: 296 2008 Ronald Lu & Partners (HK) Ltd Area 2A, Lung Hang Estate, Shatin 62/6487/EX5/E20/500 25 January 2006 (PC) Hsiao Lin Secondary School School is vesting on Housing (297) Authority Land Cyberport Road, Telegraph Bay, BD 2/2042/99/ST10- 297 2008 Wong & Ouyang (HK) Ltd Bel-Air On the Peak (RV) IL 8969 SB 2008 Pokfulam, Hong Kong (Stages 10-12) ST12(A) 298 2008 Chau Ku & Leung Architects & Engineers Ltd Hin Tin Public Swimming Pool, Phase II 68 Che Kung Miu Road, Sha Tin Completion 2007 April 2005 (OP) / May 299 2008 Aedas Ltd AIG Tower 1 Connaught Road Central, Hong Kong ML 275 & ML 278(SA) & (RP) BD 2004/01 2005 (PC) Hong Yip Street, Tung Tau Industrial 300 2008 K.A. Kho & Associates Architects & Consultants Ltd Proposed Factory Building YLTL 497 BD 2/9122/05 September 2007 Area, Yuen Long 301 2008 P & T Architects & Engineers Ltd Residential Development at 57 Road 57 Shouson Hill Road, Hong Kong Section A of RBL 365 BD 2/3016/97 April 2003 ASD School Improvement Programme Final Phase S361 Pui Ying College, Wo Che Estate, 9 ASD 302 2008 Ronald Lu & Partners (HK) Ltd BO103 Plan No. STM6154 31 May 2005 (Package 4) Pui Ying College Fung Shun Street, Shatin, New Territories 303/6487/EX/E20/S3 ASD School Improvement Programme Phase IV, 12 Fu Mei Street East, Wang Tau Hom, 303 2008 Leigh & Orange Ltd NKIL 4720 BD 2/3079/02(P) 28 July 2005 Package II, St. Patrick's School Kowloon Hong Kong Baptist University, School of Continuing 304 2008 Leigh & Orange Ltd 8 On Muk Street, Shek Mun, Shatin STTL 540, Area 11 BD 9107/03 July 2006 (PC) Education, Shek Mun Campus 305 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development Project at Ma On Shan Area 77, Ma On Shan STTL 481 BD 2/9251/96H (P) August 2001 20 November 2004 School Improvement Programme (Final Phase) for Government Land (THK - 306 2008 AGC Design Ltd 19 Fortress Hill, North Point, Hong Kong (Phase 1) & 11 September Fortress Hill Methodist School 1220) 2004 (Phase 2) 307 2008 AGC Design Ltd Tung Chung Station Development Package 1 Tung Chung Town Lot 2 TCTL 2 BD 4/7302/94(P) Pt. II 21 November 2005 2 December 1999 (OP) / 8 308 2008 Wong Tung & Partners Ltd Residential Development 33 Tsing King Road, Tsing Yi TYTL 132 BD 2/7162/93-T January 1999 (PC) CLK Lot No. 1 RP & the ext. 309 2008 Aedas Ltd Limousine Lounge, CLK Airport Hong Kong International Airport BD 2-3/9133/03 February 2005 thereto Alteration & Additional Works at 1/F, 2/F & 3/F, 37-39 310 2008 Spence Robinson Ltd 37-39 Ma Tau Wai Road KML 40 SeC ORP BD 2-3/4037/80/13 14 November 2006 Ma Tau Wai Road, KML 40S ORP 311 2008 Rocco Design Architects Ltd Commercial Development at NKIL 6310 J/O Sheung Yuet Road and Wang Chiu NKIL 6310 Anticipated September KIL 1993-1994, 1402 SC & 312 2008 Aedas Ltd Redevelopment of Garley Building 233-239 Nathan Road, Kowloon BD 2/4040/03 June 2007 1402 RP Redevelopment of Upper Wong Tai Sin Estate - Phase Upper Wong Tai Sin Estate, Lung Cheung 313 2008 Ronald Lu & Partners (HK) Ltd March 2000 1 Road, Kowloon 314 2008 SLHO & Associates Ltd New Residential Development at San Lau Street 2C & 2D San Lau Street, Kowloon BD 3/4163/93 28 January 2004 Proposed Alteration and Addition Works to Ching expected date of OP: 29 315 2008 David S.K. Au & Associates Ltd Tsing San Path, Tuen Mun TMTL 253 BD 2/9152/99 Chung Sin Yuen September 2008 Area 11, Pik Fung Road, Fanling (Lot No. 316 2008 Architectural Services Department New Fanling Magistracy Building DN 324 ASD 51-1377 March 2002 DN324) Ho & Partners Architects Engineers & Development 317 2008 Tsing King Road, TYTL 163 Easeful Court TYTL 163 BD 3/9042/00H 24 April 2003 Consultants Ltd List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Residential Redevelopment at RBL 647 at No. 3-5 No. 3-5 Plunkett's Road, The Peak, Hong 318 2008 P & T Architects & Engineers Ltd RBL 647 BD 2024/04 9 April 2008 Plunkett's Road, The Peak, Hong Kong Kong 319 2008 Wong Tung & Partners Ltd Hong Kong Movie City Tseung Kwan O Area 106, Sai Kung TKOTL 85 March 2005 320 2008 Cypress Consultant Ltd Residential Building at 6 Wiltshire Road, Kowloon Tong 6 Wiltshire Road, Kowloon NKIL 4028 BD 2/4025/05 February 2008 321 2008 Woods Bagot Asia Ltd Alteration & Additional Works to Tsim Sha Tsui Centre 66 Mody Road, Tsim Sha Tsui East, KIL 10477 BD 2-3/4198/77/12 May 2006 ASD (Completion inspection) 25 Reprovisioning of Kei Tsz Primary School & new LCSD 322 2008 Chau Ku & Leung Architects & Engineers Ltd Tsz Wan Shan, Wong Tai Sin, Kowloon NK 703 55/92050/CWO/017/0 September 2006 / 13 July Playground 3/BP 2006 (PC) School Improvement Programme Phase IV Package 6 323 2008 Leigh & Orange Ltd 8 Hoi Tai Street, Quarry Bay, Hong Kong IL 8570 BD 2/3007/00H August 2008 School Improvement Programme Phase IV Package 2 324 2008 Leigh & Orange Ltd 10 Tai Wan Road, Hung Hom, Kowloon HHIL 544 BD 3010/02(P) 7 October 2004 Holy Carpenter Prevocational School Light Industrial Building at No. 78 Hung To Road, Kwun No. 78 Hung To Road, Kwun Tong, 325 2008 Lu Tang Lai Architects Ltd KTIL 159 BD 2/4063/05 30 April 2008 Tong Kowloon Station Development Area 25 October 2007 (OP) / 5 326 2008 LWK & Partners (HK) Ltd Le Point - Tiu Keng Leng Station TKOTL 73B BD 7200/98 73B, Tseung Kwan O, New Territories February 2008 (PC) 27-33 & 35-37 Centre Street, Sai Ying IL 758 sB, sD, sE, sF, sG & 327 2008 Associated Architects Ltd Composite Building BD 2/2042/94 April 2002 Poon, Hong Kong sH 328 2008 Wong & Ouyang (HK) Ltd Redevelopment of Yau Tong Estate Phase 5 , Yau Tong Vesting Order 52 N/A July 2002 (PC) 329 2008 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Chan Cho Chak Primary School Jat Min Chuen, Shatin, New Territories STTL 28 BD 3/3102/01(P) October 2005 330 2008 Ronald Lu & Partners (HK) Ltd Centenary Complex Building for Alliance Bible 22 Peak Road, Cheung Chau, Hong Kong Cheung Chau Lot No. 1764 BD 2/9285/97 November 1999 Housing Authority Vesting School Improvement Programme SKH Tsang Shui Tim 13 June 2005 (PC for 331 2008 Ronald Lu & Partners (HK) Ltd Wo Che Estate, Shatin, New Territories Order No. VO103 Plan No. Secondary School (S327) Major Section) STM 6154A New Chapel for the Church of Jesus Christ of Latter- 332 2008 Aedas Ltd 15 Po Lam Lane, Tseung Kwan O TKOTL 45 N/A March 2000 Day Saints Addition & Alteration Works Sheraton Hotel & Towers 333 2008 Aedas Ltd 20 Nathan Road, Kowloon KIL 9172 November 1998 (PC) Hong Kong 30 June 2008 (OP) / 24 334 2008 Aedas Ltd Holiday Inn Golden Mile Podium Renovation (Stage B) 50 Nathan Road, Tsim Sha Tsui, Kowloon KIL 9344 BD 2-3/4350/61/12 July 2008 (PC) - 2 Phases of A&A Works 335 2008 Spence Robinson LT Ltd A&A Works for Residential Development 30 La Salle Road NKIL 3458 BD 2-3/4097/82 Early September 2008 148A, 148B, 148-160 Tung Lo Wan Road, 336 2008 A. Lead Architects Ltd Hotel Development IL 2609 RP & SA BD 2/3091/97H December 2000 Hong Kong 337 2008 Cheung Kong Yeung Architects Ltd Residential Redevelopment No. 46 Plantation Road RBL 697 BD 2001/03 15 February 2007 Ho & Partners Architects Engineers & Development HKHS Sandwich Class Housing Development in Area The Pinnacle, 8 Wan Hang Road, Tseung 338 2008 TKOTL 37 BD 2/9237/94 16 September 1998 Consultants Ltd 24, Tseung Kwan O Kwan O School Improvement Programme Final Phase Package School No S340 St. Stephen's College, 22 339 2008 RMJM (HK) Ltd RBL 432 RP & Ext BD 2/3111/01(P) 7 March 2006 2 Tung Tau Wan Road, Stanley, Hong Kong The Construction of a Special School for Severely 340 2008 P & T Architects & Engineers Ltd 17 Tin Tan Street, Tin Shui Wai N.A. N.A. May 2007 Mentally Handicapped Children in Area 32, Tin Shui Ho Sheung Heung Road, Sheung Shui, 341 2008 Kwong & Associates Ltd Relocation of Lo Wu Saddle Club STT 1408 BD 2/9115/06(P) 17 September 2007 New Territories 342 2008 RMJM (HK) Ltd CLP Substation at Tai Kok Tsui Yen Ming Road, Tai Kok Tsui KIL 11142 BD 4053/00 (TKT) 7 April 2003 343 2008 CYS Associates (HK) Ltd Vision Court Residential Dev. 286 Prince Edward Road Street KIL 2097 sE, RP BD 2/4187/91 August 2001 344 2008 Wong Tung & Partners Ltd Cineplex, Taikoo Shing 1 27 November 2000 99 Po Kong Village Road, Kwun Tong, 345 2008 Lu Tang Lai Architects Ltd The Forest Hill NKIL 6272 BD 2/4065/04 19 March 2008 Kowloon IL47AsARP, IL47AsBRP, IL47AsCRP, IL47ARP, IL47BsCRP, IL47BRP, IL47AsBss2, IL47AsD, IL47BsD, IL47BsBRP, IL47BsARP, IL47CsARP, IL47CsAss1RP, IL47CRP, IL47DRP, IL47DsARP, IL47sBRP, IL47sAss1, 346 2008 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East IL47sCss1 & Extension BD 3019/01 February 2007 Thereto, IL47sCss2sA, IL47sCss2RP, IL47sCss3sA, IL47sCss3RP, IL47sCss4, IL47sCss5 & Extension Thereto, IL47sCss6sRP, IL47sCss6sA, IL47sCss7RP, IL47sCRP, IL47sBss1, IL47sARP, IL47sP, IL47RP, IL47sP, IL47RP Tom Ip & Partners Architects, Engineers & Development Proposed Domestic Building on IL2392 - 2393 at No. 347 2008 11-13 Sand Street IL 2392, 2393 BD 2/2055/90 Jan 2001 Consultants Ltd 11-13 Sand Street, Hong Kong Outward Bound School Ah Kung Wan, Tai 348 2008 Planning Services International (Asia) Ltd Outdoor Training of Outward Bound School STT No. SX627 at D.D. 252 BD 2/9018/02(1) (P) 30 August 2005 Mong Tsai, Sai Kung List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) July 1997 (OP) / May 1997 349 2008 Ma & Fong & Associates Ltd Commercial / Office Bldg at 674-682 Nathan Road 674-682 Nathan Road, Kowloon TBA TBA (PC) ML 7sARP, ML7sAss3, ML7sBRP, L2c, IL3087, 350 2008 Aedas Ltd A&A Works at B1/F to 2/F, Podium, The Landmark The Landmark, 15 Queen's Road, Central 10 June 2008 ML3sA, ML2sB, ML2sARP, ML2RP, ML2AsBRP The Hong Kong Golf Club Proposed Golf Cart Storage 351 2008 Wilkinson & Cilley Ltd 1 Fan Kam Road, Fanling, New Territories Lot 942 in DD 94 BD 2/9141/00 November 2001 Building 352 2008 Aedas Ltd Ocean Park Redevelopment Back of House For Aviary 180 , Hong Kong RBL 1020 & Ext BD 2/2010/06 October 2008 1 Wang Yuen Street, Kowloon Bay, NKIL 353 2008 Wong & Ouyang (HK) Ltd One Kowloon, Commercial Building NKIL 6268 BD 2/4024/00 March 2007 (OP) 6268 33 Castle Peak Road, Sham Tseng, New 354 2008 Wong & Ouyang (HK) Ltd Lot No. 269 in DD 390 BD 2/9121/96 May 2002 Territories Tsing Chung Koon Road, Tuen Mun, New 355 2008 Architectural Services Department Tuen Mun Hospital Rehabilitation Block Inform No. 6603 29 June 2007 Territories 356 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Commercial & Residential Development at Tseung Tseung Kwan O Area 57, Phase 1 Tseung Kwan O Area 57 BD 2/9136/97/H 15 October 2002 19 Haven of Hope Road, Tseung Kwan O Tseung Kwan O Lot No 742 357 2008 Leigh & Orange Ltd Haven of Hope Holistic Care Centre BD 4/9079/02 August 2006 Road in SD No. 5 Major Renovation Works at Cheung Fat Shopping Cheung Fat Shopping Centre, Cheung Fat 358 2008 Aedas Ltd TYTL 172 BD 22-3/9190/06 Centre Estate, Tam Kon Shan Road, Tsing Yi NKIL 2770 RP & Ext 2785 sB 359 2008 Wong & Ouyang (HK) Ltd Redevelopment of Golden Theatre 94 Yen Chow Street, Kowloon BLD(B) 2/4099/91 December 1993 & Ext November 1999 (OP) / 360 2008 Rocco Design Architects Ltd Redevelopment of Man Yee Building 60-68 Des Voeux Road Central ML 14 BD 1/2065/94 December 1999 (PC) 661-665 King's Road, North Point, Hong 30 September 1999 (OP) / 361 2008 P & T Architects & Engineers Ltd 661-665 King's Road IL 8885 Kong 30 March 2000 (PC) 362 2008 JADL Design Ltd Alteration & Addition to Wing On Central Building 26 Des Voeux Road, Central, Hong Kong RPS 06 IL 5558 & 5559 BD 2-3/2449/61 January 2002 Rest Garden & New Service Building at Sheung Lok Sheung Lok Street Rest Garden (Site B), 363 2008 Aedas Ltd October 2006 Street Playground Kowloon City District Commercial / Service Apartment at 138 Yeung Uk 124-142 Yeung Uk Road, TWTL 406, 1 August 2005 (OP) / 364 2008 Wong Tung & Partners Ltd TWTL 406 Road, Tsuen Wan, New Territories Tsuen Wan October 2005 (PC) Proposed Transposer Station of DTTB Project At Kowloon Peak, Sai Kung on STT No SX 365 2009 David S.K. Au & Associates Ltd STT No SX 3470 BD 2/9160/06(P) 3 July 2009 Kowloon Peak 3470 Tom Ip & Partners Architects, Engineers & Development Proposed Domestic Building on IL2392 - 2393 at No. 366 2009 11-13 Sand Street IL 2392, 2393 BD 2/2055/90 Jan 2001 Consultants Ltd 11-13 Sand Street, Hong Kong QBML 1sEss2, QBML 367 2009 Wong & Ouyang (HK) Ltd Devon House - Phase 2 979 King's Road, Quarry Bay, Hong Kong BD 2/3025/00 April 2003 1sFss1, QMBL 1sF RP & ML Vocational Training Council, School of Business and 368 2009 P & T Architects & Engineers Ltd TYTL 123, Tsing Yi Road, Tsing Yi Island TYTL 123 BD 9093/02(P) Sep 2004 Information Systems 369 2009 LCK Architects Ltd Proposed New Fung Kai Primary School 19 Jockey Club Road, Sheung Shui FSST Lot No 232 BD 9181/04 10 Oct 2008 Hong Kong International Airport, Chek Lap CLK Lot No 1 RP & the Ext 370 2009 Aedas Ltd Sky Plaza - North Office Tower BD 2/9062/03(3)(P) October 2006 Kok thereto TKOTL 39 sKss 1RP, sKRP, BD 9012/07 (Phase Tentative Aug 2009 Proposed New Power Centre (Phase 1) and Dance TVB City, 77 Chun Choi Street, Tseung 371 2009 David S.K. Au & Associates Ltd sMsVss 1RP, sX and Ext 1) ; BD 9126/99 (2)/4 (Phase I) ; Tentative June Studio (Phase II) at TVB City Kwan O Industrial Estate, N.T. Thereto (Phase II) 2009 (Phase II) 372 2009 K & W Architects Limited Proposed Alteration and Addition Works Block A, 15 Wylie Path, Kowloon KIL 10658 BD 2-3/4029/82/6 5 August 2009 373 2009 Aedas Ltd Back of House for Marine Mammal Ocean Park, Headland, Hong Kong RBL 1020 BD 3/2012/06(P) 4 November 2008 Hong Kong International Airport, Chek Lap CLK Lot No 1 RP & the Ext 374 2009 Aedas Ltd Skypier 2 BD 4/9028/05(P) July 2009 Kok thereto IL 348 SCRP, SCSS 1RP, Residential Development at 38 , Mid- 375 2009 Archiplus International (HK) Ltd 38 Shelley Street SCSS 1 SSAS1, BD 2050/05 August 2008 Levels, Hong Kong SCsS1ssARP & IL 344 RP Terminal Expansion Project (Terminal 2) For Asia 10 Chun Ping Road, Hong Kong CLK Lot No 1 RP & the Ext 376 2009 Aedas Ltd BD 2-3/9011/04(s) December 2006 Airfreight Terminal International Airport, Chek Lap Kok thereto 33 Wo Yi Hop Road, Kwai Chung, New 377 2009 A & T Design Ltd The Apex Horizon (Phase II) KCTL 467 BD 2/9026/01 2 November 2007 Territories 378 2009 Steve Leung Architects Proposed Residential Development 8 College Road, Kowloon Tong, Kowloon NKIL 2494 SA & SB BD 4006/05 August 2009 305 Castle Peak Road & 7 Fat Tseung Street on NKIL 305 Castle Peak Road and 7 Fat Tseung 379 2009 Chau Ku & Leung Architects & Engineers Ltd NKIL 939 BD 2/4007/05 28 February 2008 939 Street, Cheung Sha Wan, Kowloon 380 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Summit 41C Stubbs Road, Hong Kong IL 8870 BD 2/3006/96 September 2002 Residential Development at No. 99 Peak Road, The 13 February 2003 (OP) ; 381 2009 RMJM (HK) Ltd 99, 101, 103 Peak Road, The Peak RBL No. 1147 BD 2/2039/99 Peak, Hong Kong January 2003 (PC) The Remaining Portion of 382 2009 A & T Design Ltd Princeton Tower 88 Des Voeux Road West, Hong Kong BD 2/4011/07 14 November 2003 Inland Lot No 3999-4005 Contract No: SS Shek Lei Estate, Shek Pai Street, Kwan Permanent Government Land 383 2009 Rocco Design Architects Ltd Salesian Yip Hon Millennium Primary School M312 ; Programme 31 July 2005 Chung, New Territories Allocation (GLA) KT 1141 No: 306 EP 384 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd FSSTL 126, Area 9, Fanling, New Territories (Belair 3 Ma Sik Road, Fanling, New Territories FSSTL 126 BD 2/9003/95 1998 (OP) ; 1999 (PC) 180 Wong Chuk Hang Road, Aberdeen, 385 2009 Aedas Ltd Ocean Park Astounding Asia Panda Trail RBL 1020 & Ext BD 2/2049/06(P) February 2009 Hong Kong 386 2009 K & W Architects Limited The Aegean 2 Tsing Fat Street, Tuen Mun, New TMTL No 424 BD 2/9292/98 20 December 2004 (OP) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 387 2009 Ronald Lu & Partners (HK) Ltd One Silver Sea 18 Hoi Fai Road, Kowloon KIL 11158 BD 2/4011/02 23 June 2006 388 2009 Andrew Lee King Fun & Associates Architects Ltd Proposed New Building on YTIL 38 6 Cho Yuen Street, Yau Tong, Kowloon YTIL 38 BD 2/4068/04 2 March 2009 Redevelopment of the Craigengower Cricket Club, 188 Wong Lai Chung Road, Happy Valley, October 2006 (OP) ; 389 2009 P & T Architects & Engineers Ltd IL 8881 BD 3/3001/04 Phase 2 Hong Kong December 2006 (PC) 390 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Y.I. - Private Residential Development 8B and 10 Tai Hang Road, Hong Kong IL 8886 BD 2/3038/95 December 2000 391 2009 Aedas Ltd Kowloon Station Retail Centre at Union Square Site E, 1 Austin Road West, Kowloon KIL 11080 BD 2/7224/01 4 May 2006 392 2009 Planning Services International (Asia) Ltd Kowloon Cricket Club (New Sports Building) 10 Cox's Road, Tsim Sha Tsui KIL 11052 BD 4058/98 December 2001 Alteration & Additional Works at St. James' Settlement 85 , Wanchai, Hong 393 2009 David S.K. Au & Associates Ltd HKIL 8603 BD 2/3012/06 26 March 2009 Headquarter Building Kong Yan Hing Industrial Building at Tseung Kwan O Subsection 1 of section J of Tseung Kwan 394 2009 David S.K. Au & Associates Ltd TKOTL 39 and Ext Thereto BD 9042/96(P) 19 July 1999 Industrial Estate O Happy Valley, junction of Leighton Road 14 October 2003 (OP) ; 4 395 2009 P & T Architects & Engineers Ltd Craigengower Cricket Club (Phase I) IL 8881 BD 2/3070/01 (Ph.1) And Wong Nai Chung Road December 2003 (PC) 396 2009 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Building 712 Prince Edward Road East, Kowloon NKIL 4795 sA, sB & RP BD 2/4084/05 9 January 2009 J/O 33-37 Hysan Avenue, 7-11 Yun Ping IL 29 sec DD, IL 457 sec L, IL 397 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Lee Garden (Manulife Plaza) 1998 Road and 20-24 Lan Fong Road 29 MM, IL 29L RP & IL 457 398 2009 Wong Tung & Partners Ltd Lai Sing Court 13-15 Tai Hang Road, Hong Kong IL 7903 & Ext BD 3/3048/01 November 2009 399 2009 P & T Architects & Engineers Ltd Inland Lot No. 452 New Private Independent School 19 Shum Wan Road, Aberdeen, Hong IL 452 BD 2/2007/03 27 August 2007 400 2009 Wilton Wong Architects Ltd Conversion Works at Rosaryhill School 41B Stubbs Road, Hong Kong IL 3550 RP & Ext BD 2-3/2353/62/3 October 2009 66 Leighton Road, Causeway Bay, Hong 401 2009 Ronald Lu & Partners (HK) Ltd HKU Space Po Leung Kuk Community College IL 9011 BD 2/3053/02 21 May 2008 Kong 402 2009 Andrew Lee King Fun & Associates Architects Ltd Residential Development at 220-222 Tai Kok Tsui Road 220-222 Tai Kok Tsui Road KIL 11159 BD 2/4002/00H (Pt. 6 October 2008 Construction of Permanent Public Transport Terminus Tin Yan Road, Tin Shui Wai, New 9 January 2008 (OP) ; 403 2009 HB & L Limited TSWTL 24 Area 33 BD 2/9061/02(2) at Tin Yan Road Territories February 2008 (PC) Proposed Residential Redevelopment at Nos 440-450 NKILs 2148, 2149, 2150, May 2008 (OP) ; July 2008 404 2009 Wong Pak Lam & Associates 448 Prince Edward Road West, Kowloon BD 2/4041/04 Prince Edward Road West 2151, 2152, 1432 sA and RP (PC) 405 2009 H.C. Wu Architect & Associates Proposed Residential Development at Tan Kwei Tsuen Tan Kwei Tsuen, Yuen Long, New Lot 4296 in DD 124 BD 9015/97 March 2005 (OP) Expansion and Renovation Works Eu Yan Sang (HK) Lot No 313, Subsection 2 of 406 2009 David S.K. Au & Associates Ltd Yuen Long Town BD 2-3/9039/05 30 June 2006 Ltd at Yuen Long Industrial Estate Section H Addition and Alteration Works at 5-7 Austin Road, 407 2009 Spence Robinson Ltd 5-7 Austin Road, Kowloon 8668 RP & 8113 BD 2-3/4113/73 April 2008 Tsim Sha Tsui 408 2009 Urbanage International Ltd TWGHS NKIL 5294 Chang Ming Thien College 300 Nam Cheong Street, Kowloon NKIL 5294 BD 2/3037/02(P) 15 July 2005 409 2009 KLS International Architects & Planners Company Limited Alterations and Additions at Majestic Hotel 348 Nathan Road, Kowloon KIL 6733 BD 2-3/4001 December 2006 ss1 of sF RP of sF, ss of sE 11-11A , 1-4, 7-10 West 410 2009 K & W Architects Limited No. 11 Bonham Road, Hong Kong RP of sE, RP of SB, ss4 of BD 2/2032/97 June 2004 End Terrace, Hong Kong SA, ss5 of sA & RP of IL 689 Anderson Road, Sai Kung, New 411 2009 Design Corporation Ltd Anderson Road, Sai Kung Lot No 1984 in SD2 BD 2/9186/04(Pt. III) 27 March 2009 Territories, Lot No. 1984 in SD2 412 2009 JA Design Architects Ltd Proposed Residential Development at Inland Lot No 632 King's Road, North Point, Hong Kong IL 8930 BD 3077/02 February 2006 413 2009 RMJM (HK) Ltd Jockey Club World Wide Fund for Nature Marine Life Hoi Ha Wan, Sai Kung West Country Park Lot No 448 in DD 283 May 2003 414 2009 Aedas Ltd Through-Train Primary And Secondary School Chi Shin Street, Tseung Kwan O, Area 65 ASD 14/85348 August 2006 415 2009 Aedas Ltd Alteration & Addition Works of Trend Plaza (North 2 Tuen Hop Street, Tuen Mun TMTL 282 BD 2-3/9001/84/8 June 2006 The Orchards, Residential Development at Taikoo Taikoo Valley, Greig Road, Quarry Bay, 416 2009 Wong & Ouyang (HK) Ltd IL 8397 BD 2-4/3066/95H 3 July 2003 Valley Hong Kong 417 2009 Aedas Ltd Tung Chung Cable Car Consultancy: Tung Chung 11 Tat Chung Road, Tung Chung, Lantau NIL BD 3/9905/03(TCT) May 2006 Cityplaza 2 at combined site VA & VC in 418 2009 Wong Tung & Partners Ltd Cityplaza 2 Hotel QBML 2 & Ext BD 2/3049/93 3 June 2009 Taikoo Shing, Quarry Bay, Hong Kong Phase 1 - July 2002 ; 419 2009 Wong & Ouyang (HK) Ltd Redevelopment of La Salle Primary School La Salle Road, Kowloon NKIL 5384 BD 2/4015/00(P) Phase 2 - December 2004 420 2009 WMKY Ltd A commercial Redevelopment of Tak House 5-11 Stanley Street, Central IL 4413-4416 BD 2017/04 7 April 2009 So Kwun Wat Substation, So Kwun Wat, TMTL 450, Area 55, So Kwan 421 2009 David S.K. Au & Associates Ltd So Kwun Wat 132kV Substation BD 2/9194/99 August 2003 Tuen Mun Wat, Tuen Mun BD 2/3009/05(P) - Proposed New Open Niches Across Section 24A, 25, Section 24A, 25 and 422 2009 Spence Robinson Ltd 26, 34 and 37 at Cape Collinson Chinese Permanent Chai Wan, Hong Kong IL 7715 15 December 2006 (OP) 26) ; BD 2/3019/05(P) Cemetery - Section 34 and 37 423 2009 Wong & Ouyang (HK) Ltd Kowloon Station Development Package 6, Tower 21 Union Square, 1 Austin Road West, KIL 11080 BD 2/7219/00(F) March 2007 12 Sai On Street / 20-28 ChengTu Road, 424 2009 A. Lead Architects Ltd Commercial Development at 12 Sai On Street AIL 81 RP BD 2-3/2477/70 Aberdeen, Hong Kong 425 2009 P & T Architects & Engineers Ltd Indoor Recreation Centre Community Hall cum Library Area 17, Tung Chung, Lantau Island SSP 314 September 2009 School Improvement Programme Phase IV Package 2, 426 2009 Leigh & Orange Ltd 48 Wood Road, Wanchai, Hong Kong IL 8176 BD 2-4/3030/01(P) January 2005 Group 3, P5, St. Joseph Primary School Top of Mt. Davis Path, Mt. Davis Path, 427 2009 Arch Design Architects Ltd The Extension of Ma Wui Hall, Youth Hostel HX474 BD 2019/97 15 April 2000 Hong Kong 428 2009 P & T Architects & Engineers Ltd Boardview Court at Shum Wan Road Shum Wan Road, Aberdeen IL 435 June 2000 Addition of Two Storeys to the Existing Kwai Chung 11 Wing Hau Street, Kwai Chung, New 429 2009 Aedas Ltd OZP No S/KC/21 ASD 010696 October 2008 Columbarium Territories 12A, Dai Fat Street, Tai Po Industrial 430 2009 John Hui & Associates Rebuilding Work for Pico Factory TPTL 1sMss4 BD 2/9088/04 10 July 2006 Estate, Tai Po, New Territories 431 2009 Amasia International Design Group Vertical Extension for Kiangsu Chekiang Primary 30 Ching Wah Street, North Point, Hong IL 7330 BD 2-3/3041/57 July 2004 List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Alteration & Additional Works at 1/F, 2/F & 3/F, 37-39 432 2009 Spence Robinson Ltd 37-39 Ma Tau Wai Road KML 40 SeC ORP BD 2-3/4037/80/13 14 November 2006 Ma Tau Wai Road, KML 40S ORP 433 2009 RMJM (HK) Ltd School Improvement Programme (SIP) Methodist 50 , Kowloon KIL 7068 4005/99H(P) 31 August 2004 434 2009 WCWP International Ltd 86 Victoria Road 86 Victoria Road IL 8982 BD 2/2025 18 June 2009 435 2009 Andrew Lee King Fun & Associates Architects Ltd Proposed Development at 33 Lai Chi Kok Road, Kowloon KIL 6284 BD 2/4032/05 2 October 2008 ASD A 24-classroom Primary School at Development near 436 2009 Ronald Lu & Partners (HK) Ltd 80 Choi Ha Road, Kwun Tong GLA NK 730 55/92050/CWO/002- Anticipated in August 2009 Choi Wan Road and Jordan Valley, Kwun Tong 07/BP 437 2009 Lu Tang Lai Architects Ltd Proposed Light - Industrial Development - The Pivot 52 Hung To Road, Kwun Tong, Kowloon KTIL 286 BD 2/4075/05 November 2008 Section A - 4 February 438 2009 CYS Associates (HK) Ltd Heep Yunn School - SIP 1 Farm Road, Ma Tau Wai, Kowloon KILs 6272 and 3394 & Ext BD 2/3033/02(P) 2005 ; Section B (A&A) - 21 June 2005 50A Kung Kok Shan Road, Ma On Shan, 439 2009 Eddie Chan Architects Limited New Hang Fook Camp STTL 469 & Prop STTL 1008 BD 9138/98 June 2001 New Territories 440 2009 Architecture Design & Research Group Ltd New Annex Block for Wah Yan College Hong Kong 281 Queen's Road East, Hong Kong IL 6935 BD 2/3063/02(P) November 2004 441 2009 Design 2 (HK) Ltd Extension of ancillary Facilities of Chinese Rhenish 86A Bonham Road, Hong Kong IL 1924 BD 2/2019/99 31 August 2006 442 2009 Ronald Lu & Partners (HK) Ltd Revitalization of Peak Tower 128 Peak Road, Hong Kong RBL 1104 June 2006 (PC) Residential Development at 11 Shatin Heights Road, 11 Shatin Heights Road, Tai Wai, Shatin, 443 2009 T. S. Chu Architects Ltd STTL 533 BD 9022/98 August 2004 Tai Wai, Shatin, New Territories New Territories 444 2009 Wong Tung & Partners Ltd Residential Development at 15 Ho Man Tin Hill Road 15 Ho Man Tin Hill Road, Kowloon KL 3389 RP BD 4049/00 April 2006 445 2009 Cypress Consultant Ltd Residential Building at 6 Wiltshire Road, Kowloon Tong 6 Wiltshire Road, Kowloon NKIL 4028 BD 2/4025/05 February 2008 IL 1338 sARD, IL 1386 & Ext, 2-4 Village Road, Happy Valley, Hong 446 2009 Wong & Ouyang (HK) Ltd Redevelopment of Hong Kong Sanatorium & Hospital IL 1702 & Ext, IL3284, IL BD 2/3027/03 30 April 2008 Kong 3285 and IL 7964 447 2009 Wong & Ouyang (HK) Ltd Starcrest 9 Star Street, Wanchai, Hong Kong IL 8853 BD 2/3001/94H November 1999 Tsun Wen Road & Shek Pai Tau Road, 448 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tuen Mun Area 5B Development 396 December 1998 New Territories 449 2009 Simon Kwan Architect & Associates Ltd Residential Development Phase 5 Ma Wan Island Lot 392 Ma Wan Island Lot 392 BD 9160/97H(6) June 2006 IL 905 sAss7 RP, sD, sC, sB, 450 2009 Spence Robinson Ltd Proposed Hotel Development 12-22 Davis Street, Hong Kong BD 2/2024/06 Late November 2009 sA and sAss12 18-24 King's Road, 7-9 Lau Sin Street and I.L. No. 5379 R.P. and 451 2009 Casa Design International Ltd 18-24 King's Road Hotel Development BD 6/3006/97H March 2005 15 Tin Hau Temple Raod, North Point Extension IL 1594 RP, IL 218sAss2, sAss1, SARP, sB, sC, sD, ss2, sDss1, sDRP, sE, sF, sC, sD, ss2, sDss1, sDRP, Proposed Commercial / Residential Development at 108 , 1-17 , sE, sF & RP, IL 1214 & BP, 452 2009 Simon Kwan Architect & Associates Ltd BD 2/2039/01 June 2006 108 Hollywood Road and 1-17 Bridges Street Central IL 2581 sA & RP, IL 2582 sAss1, sARP, sB&RP, IL 2583sA, IL 2584 sA & RP, IL 2585, IL 2409 sA & RP and IL 386 sA, sBss1, sBRP & RP 6D-6E Babington Path, Mid-Levels, Hong 453 2009 CYS Associates (HK) Ltd Proposed Residential Development at Babington Path IL 609C SDRP & IL 609C RP BD 2/2034/05 19 October 2009 Kong 454 2009 Aedas Ltd HIT Container Terminal 9 (North) Gatehouses Tsing Yi TYL 9 BD 2/7361/01 June 2004 A Primary and A Secondary School at Site 10, West 455 2009 P & T Architects & Engineers Ltd 1 and 3 Hoi Lai Street, Sham Shui Po GN 706 N/A July 2006 Kowloon Reclamation, Sham Shui Po 456 2009 P & T Architects & Engineers Ltd Proposed Industrial Redevelopment 1 Tai Yau Street, San Po Kong, Kowloon NKIL 4455 BD 2/4010/95 December 2007 457 2009 P & T Architects & Engineers Ltd Redevelopment of Liu Chong Hing Bank Building 24 Des Voeux Road, Central Section A of ML 62 BD 2-3/2043/01 August 2006 458 2009 P & T Architects & Engineers Ltd Canadian International School, Phase II 36 Nam Long Shan Road, Aberdeen Lot AIL 417 BD 3008/00(P) September 2002 Po Leung Kuk School Improvement Programme - Po Leung Kuk Wu Chung College, Heng 459 2009 Ronald Lu & Partners (HK) Ltd STTL 500 SF September 2005 Group 2 (S311) On Estate, Ma On Shan 460 2009 TFP Farrells Ltd 53 Mount Davis Villas 53 Mount Davis Road, Pok Fu Lam IL 7208 RP & Ext BD 3/2029/02 February 2005 The Chinese University of Hong Kong - Tung Wah BD 2/4025/02(P) and 461 2009 Urbanage International Ltd J/O Shang Tung Street and Hak Po Street KIL 9520 and KIL 9519 20 July 2005 Group of Hospitals Community College, Shan Tung BD 2/4026/02(P) QBML Sc ss4, Sc ss7, QBML 462 2009 Wong & Ouyang (HK) Ltd Oxford House, Taikoo Place Westlands Road, Quarry Bay BD 3114/94 August 1999 2 sD & Ext Proposed Alterations and Additional Works at Kowloon 463 2009 Aedas Ltd 128 Carpenter Road, Kowloon NKIL 6056 BD 2-3/4007/90/6 September 2006 (PC) City Plaza Wong Tai Sin Shopping Centre, Upper 464 2009 Archiplus International (HK) Ltd A&A Work at Wong Tai Sin Shopping Centre KIL 6438 BD 4089/06 June 2009 Wong Tai Sin Estate, , Proposed Residential Development at 105, Chuk Yeung Lot No. 270 in DD 213 & the 465 2009 Archiplus International (HK) Ltd 105 Chuk Yeung Road, Sai Kung BD 9069/04 June 2009 Road Ext ASD 302/5586/SSM 466 2009 P & T Architects & Engineers Ltd Tseung Kwan O Sports Ground 109 Po Hong Road, Tseung Kwan O GLA March 2009 336/001 467 2009 P & T Architects & Engineers Ltd St. Mary's Canossian School - Proposed Extension 162 Austin Road KIL 9550 July 2003 468 2009 P & T Architects & Engineers Ltd Canadian International School, Phase I 36 Nam Long Shan Road, Aberdeen AIL 417 BD 3/3056/95 March 1999 469 2009 P & T Architects & Engineers Ltd 79 Hoi Yuen Road 79 Hoi Yuen Road, Kwun Tong, Kowloon KTIL 692 BD 4002/06 STT 1019 in DD 35, Tai Po Kau, New 470 2009 P & T Architects & Engineers Ltd Tai Po Kau Interactive Nature Centre STT 1019 October 2000 Territories List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) KIL 9853 RP and extension 471 2009 Urbanage International Ltd Additional floor on GH Podium 11 Hong Chong Road, Hung Hom BD 2-3/4513/78/9 Mid August 2009 area 1 & 2 A Primary School at , Sham Cheung Sha Wan Road, Sham Shui Po, ASD 104/6529/SSM 472 2009 Rocco Design Architects Ltd GLA NK 692 31 July 2005 (PC) Shui Po, Kowloon Kowloon 313/C25/001 The Chinese University of Hong Kong, RP of STTL 437 & Ext 1 December 2008 (OP) ; 7 473 2009 Rocco Design Architects Ltd Teaching Complex at Western Campus, CUHK BD 2/9091/02(Pt. II) Shatin Thereto December 2008 (PC) 20 February 2009 (OP) ; 474 2009 P & T Architects & Engineers Ltd 14 Headland Road, Hong Kong 14 Headland Road, Hong Kong RBL 693 BD 2/2004/06 August 2009 (PC) 475 2009 P & T Architects & Engineers Ltd Proposed Office Development at KTIL 192 Kwun Tong 81 How Ming Street, Kwun Tong, Kowloon KTIL 192 BD 2/4112/92 November 1998 476 2009 Architecture Design & Research Group Ltd Redevelopment of Creative Kindergarten 6 Rutland Quadrant, Kowloon Tong NKIL 812 BD 4010/05 November 2006 Hong Kong Science Park Phase 2, Pak BD 2/9083/03(2) (Pt 477 2009 Leigh & Orange Ltd Area C, Hong Kong Science Park Phase 2 TPTL 182 June 2007 Shek Kok, Tai Po, New Territories III) Renovation Works at Hau Tak Shopping Centre (Phase Hau Tak Shopping Centre, Hau Tak HD (ICU) E22-3/VO 478 2009 Aedas Ltd TKOTL 99 17 January 2007 I & II) Estate, Tseung Kwan O No. 164 (AA) 7-15 Des Voeux Road, Central or Chater 479 2009 Aedas Ltd Alexandra House IL 1724, IL 1725 sARP & RP 2003 Road, Central March 2005 (Phase 5) Extension and Alterations and Additions Works at Main Lingnan University, 8 Castle Peak Road, 480 2009 Architecture Design & Research Group Ltd TMTL 376 (OP) ; January 2005 Building & Administration Building Lingnan University Tuen Mun (Phase 6) (PC) 93 San Tam Road, Ngau Tam Mei, Yuen 481 2009 Chows Architects Ltd Proposed Residential Development - Green Crest Lot No 4784 in DD 104 BD 2/9034/04 October 2006 Long, New Territories 482 2009 Design Consultants Limited Chinese International School Extension Project 1 Hau Yuen Path, , Hong IL 8743 BD 2-3/3125/88/5 18 August 2005 483 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Regence Royale 2 , Hong Kong IL 8834 and 8848 BD 2/2084/94 September 2001 Bel-Air on the Peak (Area RIII & RIVA) Cyberport, Hong Telegraph Bay, IL 8969, Pokfulam, Hong BD 2/2042/99/ST 10- 484 2009 Wong & Ouyang (HK) Ltd Section B of IL 8969 December 2005 Kong Kong 12 Proposed Residentail Development at Lot No 4781 in 1 Fairview Park Boulevard, Yuen Long, 29 May 2007 (OP) ; 29 485 2009 Chows Architects Ltd Lot No 4781 BD 9174/04 DD 104 New Territories August 2007 (PC) The RP of Chek Lap Kok Lot July 2009 (OP) ; July 2009 486 2009 Aedas Ltd Haeco Hanger 3A & 3B 80 South Perimeter Road, Hong Kong BD 2/9045/07 No 1 & The Ext Thereto (PC) Po Leung Kuk School Improvement Programme - Ma 38 Wah Ming Road, Fanling, New 487 2009 Ronald Lu & Partners (HK) Ltd Area 49B Bd 2/3074/02(P) May 2005 Kam Ming College - S309 Territories 33 Castle Peak Road, Sham Tseng, New 488 2009 Wong & Ouyang (HK) Ltd Bellagio Phase 1 Lot No. 269 in DD 390 BD 2/9121/96 May 2002 Territories KIL 1402 RP, 1402 sC, 1993, 489 2009 Aedas Ltd Redevelopment of 233-239 Nathan Road 233-239 Nathan Road BD 2/4040/03 April 2007 (PC) 1994 490 2009 Daniel Tong Chartered Architect Proposed Residential Development 217-223 Prince Edward Road West, KIL 11143 BD 2/4050/99 February 2004 491 2009 MDVISTA Ltd Harbour Grand Hong Kong 15-17 Oil Street, North Point, Hong Kong IL 7106 SA & Ext BD 2/3003/00 Pt V December 2008 (OP) International Christian Quality Music Secondary & Po Kong Village Road, Diamond Hill, 27 August 2004 (OP) ; 492 2009 Hsin Yieh Architects & Engineers Ltd NKIL 6358 BD 4040/01 Primary School Kowloon End August 2004 (PC) 493 2009 A. Lead Architects Ltd Alteration and Additional Work at 5/F and 6/F, Carpark 222 Waterloo Road, Kowloon NKIL 5906 BD 2-3/4033/83/5 March 2007 494 2009 Hong Kong Housing Department Redevelopment of Sau Mau Ping Estate Ph. 9 Sau Ming Road, Sau Mau Ping, Kowloon 14/785/9 20 April 2001 Subsection 1 of section P of 495 2009 David S.K. Au & Associates Ltd Workshop & Office for Gammon Skanska Ltd Tseung Kwan O Industrial Estate BD 2/9123/01 January 2003 TKOL 39 8 Ching Hiu Road, Ng Uk Tsuen, Sheung 496 2009 Lu Tang Lai Architects Ltd 8 Royal Green FSSTL 231 BD 2/9172/05 July 2009 Shui, New Territories Alteration and Addition Works to Concourses East and 497 2009 Leigh & Orange Ltd Tai Po Market Station KCR L/8 BD 2-3/7836/96(P) July 2009 (BA14) West Forecourt at Tai Po Market Station DD 224, Silverstand, Clearwater Bay, Sai 498 2009 Aedas Ltd Sai Kung - Proposed Private Residence Lot No. 369 September 2006 Kung Residential Redevelopment at STTL 467, Tai Po Road, Tai Po Road, Shatin Heights, Shatin, New 499 2009 P & T Architects & Engineers Ltd STTL 467 BD 9016/07 July 2009 (OP) Shatin Heights, Shatin Territories Construction of Extension Block to Pui Ling School of 13 On Lok Mun Street, On Lok Tsuen, 500 2009 Leigh & Orange Ltd FSSTL 194 BD 2/9170/06(P) 8 July 2009 Precious Blood, Fanling Fanling 501 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Deerhill Bay Tai Po TPTL 135 BD 2/9043/94 14 August 1998 99 Po Kong Village Road, Kwun Tong, 502 2009 Lu Tang Lai Architects Ltd The Forest Hill NKIL 6272 BD 2/4065/04 19 March 2008 Kowloon Redevelopment of Sau Mau Ping Phase 12 District 503 2009 Hong Kong Housing Department 20 Sau Ming Road January 2009 Open Space 504 2009 CYS Associates (HK) Ltd Vision Court Residential Dev. 286 Prince Edward Road Street KIL 2097 sE, RP BD 2/4187/91 August 2001 505 2009 Arthur C.S. Kwok Architects & Associates Ltd Proposed Office Development 100 How Ming Street KTIL 242 BD 2/4030/03 9 September 2008 506 2009 MLA Architects (HK) Ltd Proposed Commercial Development 1 Wang Kwong Road NKIL 5925 RP BD 2/4006/06 June 2009 507 2009 Wong Tung & Partners Ltd Ocean Shores (Phase 3), Tseung Kwan O Town 88 O King Road, Tseung Kwan O Lot 55 BD 2/9156/97 31 October 2003 18 Yeung Uk Road, Tsuen Wan, New 508 2009 Hsin Yieh Architects & Engineers Ltd The Dynasty TWTL 394 BD 9061/98H(P) 22 January 2009 Territories Ocean Park Redevelopment Funicular Tunnel & Ocean Park, 180 Wong Chuk Hang Road, 509 2009 Aedas Ltd RBL 1020 RP & Ext BD 2/2032/06(P) 12 June 2009 Terminals Aberdeen, Hong Kong Chek Lap Kok, Hong Kong International Chek Lok Kok Lot No. 1 & 510 2009 Aedas Ltd North Satellite Concourse BD 9080/06(P) September 2009 Airport Extension 511 2009 P & T Architects & Engineers Ltd King's Park Rise King's Park Rise, Kowloon KWL 1063 BD 2/7331/96-3 Pt. III January 2000 The Hong Kong Institute of Education, Pak Shek Kok 512 2009 P & T Architects & Engineers Ltd Tai Po, Shatin TPTL 170 BD 2/9191/98 September 2000 Sports Centre List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) As gazzetted by MTRCL, on reclaimed land between Yam 513 2009 Aedas Ltd Sunny Bay, Lantau Island 1 August 2005 (PC) O and The Penny Bay on North Lantau Island 77-79, Granville Road, Tsim Sha Tsui, 514 2009 P & T Architects & Engineers Ltd Proposed Commercial Development KIL 9601 and 10069 Bd 1/4033/96 27 April 2000 Kowloon IL 5245 RP, IL 5247 RP, IL 25 October 1996 (OP) ; 515 2009 P & T Architects & Engineers Ltd Lippp Protective Tower 231-235 Gloucester Road, Hong Kong BD 2/3006/92 5247 RP, IL 5248 RP, IL October 1997 (PC) 18 July 1997 (OP) ; 3 June 516 2009 P & T Architects & Engineers Ltd Far East Exchange Building Redevelopment 8 Wyndham Street, Hong Kong Il 2099 - 2105 BD 2/2016/94 1997 (PC) 9 Tsing Fat Lane, Tuen Mun, New 30 July 2002 (OP) ; 30 517 2009 P & T Architects & Engineers Ltd Residential Development at TMTL 371, Siu Lam TMTL 371 BD 2/9175/99H Territories September 2002 (PC) November 1999 (OP) / 518 2009 Rocco Design Architects Ltd Redevelopment of Man Yee Building 60-68 Des Voeux Road Central ML 14 BD 1/2065/94 December 1999 (PC) 519 2009 Cypress Consultant Ltd Residential Development (13 nos. houses) Hang Tau Road, Kwu Tung, Sheung Shui Lot No 2596 BD 2/9068/05 December 2008 TMTL 374, Area 55A, So Kwun Wat, Tuen 520 2009 Wong Tung & Partners Ltd TMTL 374, So Kwun Wat, Tuen Mun TMTL 374 BD 6/9025/97H September 2002 Mun Proposed Residential Redevelopment at RBL 821 & 521 2009 P & T Architects & Engineers Ltd RBL 821, Turtle Cove, Red Hill RBL 821 BD 3/3020/92 November 1998 Extension, Turtle Cove, Red Hill, Hong Kong 522 2009 K.A. Kho & Associates Architects & Consultants Ltd Student Hostel (300 Places) at Shaw Campus, CUHK The Chinese University of Hong Kong, STTL 437 BD 2/9212/97 April 2001 The Construction of A Primary School in Sham Tseng, 523 2009 P & T Architects & Engineers Ltd 37 Castle Peak Road, Sham Tseng TW 452 SS S308 - 332 EP May 2009 Tsuen Wan 1 Tsun King Road, Shatin, STTL 411, March 1997 (OP) ; June 524 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Ascot Phase 2 STTL 411 BD 2/9143/90 Pt III New Territories 1997 (PC) 525 2009 Wong & Ouyang (HK) Ltd Villa Esplanada Proposed Residential Phase 3 8 Nga Ying Chau Street, Tsing Yi TYTL 129 March 2001 526 2009 P & T Architects & Engineers Ltd Redevelopment of St. Stephen's Girls' Primary School 33 Park Road, Hong Kong GLA-HK882 March 2009 IL47AsARP, IL47AsBRP, IL47AsCRP, IL47ARP, IL47BsCRP, IL47BRP, IL47AsBss2, IL47AsD, IL47BsD, IL47BsBRP, IL47BsARP, IL47CsARP, IL47CsAss1RP, IL47CRP, IL47DRP, IL47DsARP, IL47sBRP, IL47sAss1, 527 2009 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East IL47sCss1 & Extension BD 3019/01 February 2007 Thereto, IL47sCss2sA, IL47sCss2RP, IL47sCss3sA, IL47sCss3RP, IL47sCss4, IL47sCss5 & Extension Thereto, IL47sCss6sRP, IL47sCss6sA, IL47sCss7RP, IL47sCRP, IL47sBss1, IL47sARP, IL47sP, IL47RP, IL47sP, IL47RP 528 2009 Hsin Yieh Architects & Engineers Ltd Hotel Development at KIL 4013 sD & RP, To Kwa Wan Mo Cheong Street, To Kwa Wan, Kowloon KIL 4013 RP BD 2/4068/98/2 1 June 2009 Proposed Commercial and Residential Development - 9 Tong Tak Street, Tseung Kwan O, New 529 2009 LWK & Partners (HK) Ltd TKOTL 74 BD 2/9136/97(2) 17 February 2005 Territories Commercial Redevelopment at No 23-29 Wing Fung 23-29 Wing Fung Street, Wanchai, Hong 530 2009 LWK & Partners (HK) Ltd Lot No 526 7 April 2006 Street Kong The Floridian, Redevelopment at SIL 817 of Block B, 531 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 18 Sai Wan Terrace, Quarry Bay SIL 817 BD 2/3008/89 September 1997 Sai Wan Terrace OP for Block 5: 17 July Proposed Residential Development at 11-12 Headland 11-12 Headland Road, South Bay, Hong 2009 ; OP for Block 1, 2 532 2009 LWK & Partners (HK) Ltd RLB 1163 BD 2/2030/06 Road, Hong Kong Kong and 3 is applying and target to be issued in 3 Henderson Road, Jardine's Lookout, 533 2009 Sherman Kung & Associates Architects Ltd Private Residence at Jardine's Lookout IL 7332 BD 2/3014/04 7 August 2009 Wan Chai 534 2009 AGC Design Ltd Island Lodge 180 , North Point, Hong Kong IL 7105 BD 2/3022/03 17 December 2008 (OP) Conversion of the Bethanie into the Second Campus of 535 2009 Philip Liao & Partners 139 Pokfulam Road, Hong Kong GLA-HK975 ASD PB P3-07 January 2009 the of Performing Arts Garden East Residential Development at 214-224 18 July 2008 (OP) ; 14 536 2009 Philip Liao & Partners 214-224 Queen's Road East, Hong Kong IL 427 SG, SD, SS1 & SDRP BD 3086/93 Queen's Road East November 2008 (PC) 537 2009 Gravity Partnership Ltd Proposed Hotel Development 2-12 Shelter Street IL 1149 BD 2/3009/97 (Pt. II) 23 November 2000 Proposed Church Building on NKIL 6180 at Fung Tak 21 May 1998 (OP) ; June 538 2009 P. Y. Leung & Associates Ltd Diamond Hill, Kowloon NKIL 6180 BD 2/4088/95 Road 1998 (PC) TWTL 367, Yau Kam Tau, Castle Peak 539 2009 Aedas Ltd Residential Development Yau Kam Tau TWTL 367 BD 2/9149/04 (Pt. II) 29 June 2009 Road / 2A Yau Lai Road, Tsuen Wan January 2010 (OP) ; 540 2009 K.A. Kho & Associates Architects & Consultants Ltd Private Residential Development Seung Sz Wan Lot 162 in DD 235 BD 2/9187/99 October 2009 (PC) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Site A: Kennedy Town New Praya, Site A: May 2005 (OP) ; BD 2015/99(H) (Site Kennedy Town, Hong Kong ; Site B: J/O July 2005 (PC) ; Site B: 541 2009 Ronald Lu & Partners (HK) Ltd IL 8971 A) ; BD 2022/99(H) Candogan Street, Catchick Street and November 2004 (OP) ; (Site B) Davis Street, Kennedy Town, Hong Kong January 2005 (PC) 542 2009 Ronald Lu & Partners (HK) Ltd Proposed New Club House For Ladies' Recreation Club 10 Old Peak Road, Hong Kong IL 6375 RP BD 2/2027/01 4 September 2006 10 King Fung Path, Tuen Mun, New 543 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Noble Place TMTL 263 1998 Territories 21 June 2001 (OP) ; June 544 2009 Gravity Partnership Ltd Proposed Composite Building Redevelopment 125 Wan Chai Road, Hong Kong IL 611 & IL 612 BD 2/3032/98 2001 (PC) 2004 (June 17) - Phase 1 ; Residence Bel-air, Island South, Hong 545 2009 Wong Tung & Partners Ltd Cyberport Residential Deve Bel-Air R1 I.L. 8969 BD 2/2042/99/ST8 2004 (December 10) - Kong Phase 2 Ho & Partners Architects Engineers & Development HKHS Sandwich Class Housing Development in Area The Pinnacle, 8 Wan Hang Road, Tseung 546 2009 TKOTL 37 BD 2/9237/94 16 September 1998 Consultants Ltd 24, Tseung Kwan O Kwan O Proposed Development at URA K11 - Hanoi Road Site 547 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd K11 Hanoi Road, Tsim Sha Tsui, Kowloon KIL 11188 BD 3/4031/00 (KIL 11188), Kowloon The New Headquarters for the Electrical and ASD 548 2009 Architectural Services Department Kai Cheung Road, Kowloon Bay, Kowloon November 2004 Mechanical Services Department 52/6977/ID/W79/001 The Hong Kong Polytechnic University Cultural & The Hong Kong Polytechnic University, 549 2009 P & T Architects & Engineers Ltd KIL 9853 RP & Ext BD 2/4042/94 August 1999 Professional Complex Hung Hom, Kowloon Area 11, Pik Fung Road, Fanling (Lot No. 550 2009 Architectural Services Department New Fanling Magistracy Building DN 324 ASD 51-1377 March 2002 DN324) 551 2010 Jason Yuen & Associates Ltd Proposed Multi-storey Shop / Office Building 574-576 Nathan Road, Yaumatei, KIL 2359 SB & RP BD 2/4164/81 14 Jan 1997 552 2010 Leigh & Orange Ltd St. Paul's School (Lam Tin) School No: S210 10 On Tin Street, Lam Tin, Kowloon Lot No. 5210 BF 2/3024/01(P) 10 Dec 2004 St. John the Baptist Church & Care & Attention Home Po Lam Road North, Tseung Kwan O, 553 2010 Spence Robinson Ltd TKOTL 33 BD 2/9229/98 Jan 2002 at Tseung Kwan O, Area 22 New Territories 554 2010 Ie, Siu & Chung Architects Ltd Proposed Office Development 109-111 , Hong Kong ML 156 RP & 157 RP BD 2/2082/93 22 Apr 2009 Dormitory and Facility Extension of United Christian 555 2010 Ronald Lu & Partners (HK) Ltd 2 Lee On Lane, Kwun Tong, Kowloon NK 610 -- June 2009 College (Kowloon East) 556 2010 Leigh & Orange Ltd SIP Phase IV Package 3 - Good Shepherd Primary 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 1/3086/01 (P) 6 Jan 2005 31 Grampian Road, Kowloon City, 30 June 2006 (OP) ; 31 557 2010 Aedas Ltd Residential Development at 31 Grampian Road NKIL 6332 BD 2/4014/95 Kowloon July 2006 (PC) APT Satellite Transmission Telemetry Control and Tai Po Industrial Estate, Tai Po, TPTL 13 558 2010 WCWP International Ltd TPTL13 25 Apr 1994 Monitoring Station Section E, Sub-station 1 (Phase 1) Extension to the Church of Jesus Christ of Latter Day Tseung Kwan O Lot 45, Area 11, Po Lam 559 2010 Aedas Ltd TKOTL 45 BD 6/9106/04 9 Oct 2006 Saints at Tseung Kwan O Lane School Improvement Programme (SIP) Final Phase 560 2010 Aedas Ltd 131 Argyle Street, Kowloon IL No. 6737 BD 3019/03 (P) 24 June 2005 S270 - Diocesan Boy's School 561 2010 P & T Architects & Engineers Ltd Residential Redevelopment at RBL 809 23 Big Wave Bay Road, Shek O, Hong RBL 809 BD 2041/01 10 Dec 2003 SIP Final Phase Package 1, Buddhist Wong Fung Ling 11 Eastern Hospital Road, Soo Kun Poo, 30 Dec 2005 (OP) / June 562 2010 WCWP International Ltd IL No. 8591 BD 2/3140/01 (P) College Hong Kong 2005 (PC) MTRCL Tung Chung Cable Car Ngong Ping Theme BD 2/9905/03 (NPTV) 563 2010 Aedas Ltd Ngong Ping Road, Lantau Island 238 in DD Ngong Ping May 2006 Village (P) 564 2010 Ronald Lu & Partners (HK) Ltd One Silver Sea 18 Hoi Fai Road, Kowloon KIL 11158 BD 2/4011/02 23 June 2006 Proposed Residential Development at Ching Hiu Road, Ching Hiu Road, Sheung Shui, New 565 2010 Max Yiu & Associates FSSTL No. 217 BD 9122/04 April 2007 Sheung Shui, New Territories Territories Extension works of SNCL Cheung Chuk Shan Memorial 566 2010 LD Asia - Llewelyn-Davies (HK) Ltd Sheung Hung Road, Tokwawan, Kowloon Lot No. 7526 -- May 1999 School Residential Development at No. 99 Peak Road, Hong 13 Feb 2003 (OP) ; Jan 567 2010 RMJM (HK) Ltd No. 99, 101, 103 Peak Road, Hong Kong RBL No. 1147 BD 2/2039/99 Kong 2003 (PC) Proposed Residential Development at 2 Forfar Road, 28 Jan 2010 (OP) ; Aug 568 2010 WCWP International Ltd 2 Forfar Road, Kowloon RP KIL No. 4022 BD 3/4038/05 Kowloon, RP of KIL No 4022 2010 (PC) 569 2010 Woods Bagot Asia Ltd The Apex House at the Peak 16 Mount Austin Road, The Peak, Hong RBL 913 & 640 BD 2-3/2256/69/7 12 Dec 2008 Additional and Alteration Works to Town Health 10-12 Yuen Shun Circuit, Shatin, New 570 2010 SIDE Ltd STTL 282 BD 2-3/9137/87/3 (D) August 2010 Technology Center Territories 571 2010 Daniel Tong Chartered Architect Proposed Residential Development 217-223 Prince Edward Road West, KIL 11143 BD 2/4050/99 February 2004 572 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Kingston Terrace 2 King San Path, Tuen Mun, New TMTL 384 N/A 2 August 2002 New Campus For the HK Design Institute and Area 74, Chui Ning Road, Tseung Kwan 573 2010 P & T Architects & Engineers Ltd Reprovisioning of Institute of Vocational Education Lee TKOTL 107 BD 2/9070/06 (P) 22 Feb 2010 O, New Territories Wai Lee Campus Bel-Air on the Peak (Area RIVb) Stages 10-12 BD 2/2042/99/ST 10- 29 May 2007 (OP) ; Oct 574 2010 Wong & Ouyang (HK) Ltd Telegraph Bay, Pok Fu Lam Section B of IL 8969 Cyberport Residential Development 12 (B) 2007 (PC) On Lok Mun Street, New Territories No Before at the end of Nov 575 2010 Cheung Kong Yeung Architects Ltd Proposed Industrial & Ancillary Office Redevelopment FSSTL No. 184 BD 2/9023/08 FSSTL 184 2010 HD (ICU) 576 2010 Leigh & Orange Ltd Redevelopment of Lam Tin Phase 6 On Tin Estate On Tin Estate, On Tin Street KL 29 NR Dec 2004 B02/KL29NR/06 The Church of Jesus Christ of Latter-Day Saints 118 Gloucester Road, Wanchai, Hong 577 2010 Aedas Ltd IL 8909 BD 2/3028/00 March 2005 Wanchai Chapel Kong 578 2010 AGC Design Ltd Island Lodge 180 Java Road, North Point, Hong Kong IL 7105 BD 2/3022/03 17 Dec 2008 DD 224, Silverstand, Clearwater Bay, Sai 579 2010 Aedas Ltd Sai Kung - Proposed Private Residence IL 369 BD 2/9048/04 September 2006 Kung, New Territories List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 580 2010 Wong & Ouyang (HK) Ltd Redevelopment of 35 Deep Water Bay, Hong Kong 35 Deep Water Bay, Hong Kong RBL 536 BD 3/3002/00 June 2003 581 2010 P. K. Ng & Associates (HK) Ltd Construction of New Abbot Hall at Wong Tai Sin 2 Chuk Yuen Estate, Wong Tai Sin, NKIL 5282 BD 2-3/4493/69 January 2010 2-8 Inverness Road, Kowlono City, February 2009 (OP) ; April 582 2010 LD Asia Redevelopment of Pooi To Middle School NKIL 3737 BD 2/4043/05 Kowloon 2009 (PC) A&A Cladding Works, External Wall Renovation for 583 2010 Sherman Kung & Associates Architects Ltd 41-49 Hennessy Road, Wanchai IL 2823 Sec A BD 2-3/2407/62/4 5 February 2007 Hotel New Harbour 584 2010 Hong Kong Housing Authority Tuen Mun Area 52, Phase 3 (Fu Tai Estate) Tuen Mun Area 52 HD (AR) 627 December 2000 Tom Ip & Partners Architects, Engineers & Development Proposed Domestic Building on IL2392 - 2393 at No. 585 2010 11-13 Sand Street IL 2392, 2393 BD 2/2055/90 Jan 2001 Consultants Ltd 11-13 Sand Street, Hong Kong 586 2010 Cypress Consultant Ltd Residential Building at 6 Wiltshire Road, Kowloon Tong 6 Wiltshire Road, Kowloon NKIL 4028 BD 2/4025/05 February 2008 New Infectious Disease Centre Attached to the Princess Margaret Hospital Road, Kwai ASD 587 2010 Architectural Services Department November 2006 Princess Margaret Hospital Chung 54/6867/MA/H88/M 588 2010 Hong Kong Housing Authority Tung Tau Cottage Area West 130 Junction Road, Kowloon SST No. KX 2412 April 2010 3 Yau Shin Street, Yuen Long, New 589 2010 Urbanage International Ltd TWGHs C Y Ma Memorial College GLA YL 237 BD 2/3007 August 2003 Territories 1 November 2000 (OP) ; 590 2010 Rocco Design Architects Ltd Commercial Tower Redevelopment 8 Queen's Road Central, Hong Kong IL 3274 BD 2/2024/97 13 November 2000 (PC) Proposed Dedicated Premises for the School of Hotel Anticipated OP Date by 591 2010 Rocco Design Architects Ltd 17 Science Museum Road KIL 10644 BD 4072/05 and Tourism Management End November 2010 592 2010 Steve Leung Architects Office Development at 9 Chong Yip Street, KTIL 444 9 Chong Yip Street, Kwun Tong KTIL 444 March 2004 1 Tsun King Road, Shatin, STTL 411, 593 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Ascot Phase 2 STTL 411 BD 2/9143/90 1997 New Territories Next Media Printing Workshop RP of Section J of 8 Chun Ying Street, Tseung Kwan O 594 2010 CP Architects Ltd TKOTL 39 s JR P & Ext BD 2/9274/95 9 January 1998 TKOTL 39 Industrial Estate West, Tseung Kwan O 595 2010 David S.K. Au & Associates Ltd Residential Development at 43 Beach Road 43 Beach Road, Repulse Bay RBL 1122 BD 2/2075/05 15 October 2010 Section 1: Feb 2010 ; District Open Space at Po Kong Village Road, Wong Section 2: Aug 2010 596 2010 P & T Architects & Engineers Ltd Po Kong Village Road, Wong Tai Sin GLA - NK615 Contract No. SSS315 Tai Sin (Anticipated) ; Section 3: Aug 2009 Joint-user Complex and Wholesale Fish Market in Area 101 Wu Shan Road, Tuen Mun, New September 2010 597 2010 P & T Architects & Engineers Ltd GLA - TM428 SSR314 44, Tuen Mun Territories (Anticipated) Kwai Chung Estate 5, Tai Wo Hau, Kwai 598 2010 P & T Architects & Engineers Ltd Kwai Chung Estate Phase 5 March 2005 (PC) Chung, New Territories GIC Public Carpark and Residential Development at 2 Tin Yan Road, Tin Shui Wai, New July 2010 (OP) ; Nov 2010 599 2010 MDVISTA Ltd TSWTL 24 BD 2/9061/02 TSWTL No. 24, Area 33, Tin Shui Wai, New Territories Territories (PC) 24 May 2005 (Annex, Rooftop) ; 21 Dec 2004 600 2010 WCWP International Ltd SIP for St. Clare's Girl's School 50 Mount Davis Road, Hong Kong IL 7388 BD 2/3097/1 (Conversion) ; 11 Mar 2005 (Conversion) School Improvement Programme Buddhist Tai Kwong 178 Kam Sham, Tai Po Market, New 601 2010 Leigh & Orange Ltd BD 2/3022/01(P) 21 October 2005 Middle School Territories Hong Kong University of Science & 6 March 2009 (OP) ; 7 602 2010 P & T Architects & Engineers Ltd Student Hall VII Lot No. 846 BD 2/9084/06 Technology, Clear Water Bay, Hong Kong March 2009 (PC) 603 2010 Leigh & Orange Ltd Kwun Tong Maryknoll College 100 Tsui Ping Road, Kwun Tong, Kowloon KTIL 683 BD 2/3045/01(P) 24 December 2003 604 2010 Wong Tung & Partners Ltd Cyberport Residential R2 Development Cyberport IL 8969 BD 2/2042/99/ST 9 30 June 2005 605 2010 Design 2 (HK) Ltd MHAHK Pak Tin Children's Center Cornwall Street, Sham Shui Po, Kowloon GLA-NK705 10 July 2009 606 2010 CYS Associates (HK) Ltd Proposed Residential Development 500 Nam Wai, Sai Kung, New Territories Lot No. 999 in DD 214 BD 2/9194/05 5 May 2008 IL 3087, ML2A (SEE B RP), The Landmark 5-7 Pedder Street and 12- 15 October 2006 (OP) ; 28 607 2010 Aedas Ltd The Redevelopment of Landmark East - York House ML2, ML2C, ML3, ML7RP, 16 Des Voeux Road Central November 2006 (PC) ML 7sA RP, ML7 sAss 3 Residential Development at Junction of Cornwall Street 608 2010 Wong Tung & Partners Ltd 20 Cornwall Street, Kowloon NKIL 6196 BD 4014/02 April 2006 and Tat Chee Avenue (Mount Beacon) An 18-Classroom Primary School at Tai Pak Tin Street, 99 Tai Pak Tin Street, Kwai Chung, New 609 2010 Design 2 (HK) Ltd GLA-KT1159 N/A 18 August 2009 Kwai Chung, New Territories Territories School Improvement Programme (Phase IV), Package 11 Renfrew Road, Kowloon Tong, 610 2010 Leigh & Orange Ltd 7 July 2005 2, Group 13, Maryrose School Kowloon Proposed Residential Development 43-45 Beacon Hill 611 2010 Wong Tung & Partners Ltd 43-45 Beacon Hill Road, Kowloon RP NKIL 4763 BD 2/4024/04 May 2008 Road, Kowloon Before end of November 612 2010 MAP Architecture & Planning Ltd AQUA 33 33 Consort Rise, Hong Kong IL 623 s 33RP & s 34 RP BD 2-3/2130/87/2 2010 448 Wo Yi Hop Road, Sheung Kwai 613 2010 WCWP International Ltd School Improvement Programme Ho Fung College KCTL 202 RP BD 2/3082/01 3 March 2005 Chung, New Territories Proposed Residential Development at Good Shepherd Good Shepherd Street, Homantin, 614 2010 Aedas Ltd KIL 11091 BD 4040/97 August 2000 Street, Homantin, Kowloon Kowloon 615 2010 MLA Architects (HK) Ltd Composite Development 28 Tai Po Road, Kowloon NKIL 2771 BD 2/4079/07 February 2010 The Chinese University of Hong Kong Engineering 616 2010 P & T Architects & Engineers Ltd Shatin, New Territories STTL 437 BD 3/9230/98 (P) 22 November 2003 Building Complex, Phase II 617 2010 Urbanage International Ltd TWGHs NKIL 5294, Chang Ming Thien College 300 Nam Cheong Street, Kowloon NKIL 5294 BD 2/3037/02(P) 15 July 2005 New Training Centre Annex at Hong Kong Institute of 18 Tsing Wun Road, Tuen Mun, New 618 2010 Architecture Design & Research Group Ltd TMTL 278 BD 3/9022/07 18 June 2010 Vocational Educational (Tuen Mun) Campus Territories List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Hong Kong University of Science and Technology 619 2010 Architecture Design & Research Group Ltd HKUST, Clear Water Bay, Kowloon 846 in DD277 BD 2/9036/07 September 2010 Extension to Existing Academic Building NKILS 117 sARP & sAss1 & Residential Re-development, 464-474 Castle Peak 464-474 Castle Peak Road, Cheung Sha 9 November 2007 (OP) ; 620 2010 Chau Ku & Leung Architects & Engineers Ltd 1176 RP & sARP & 1175 RP BD 4031/04 Road, Cheung Sha Wan, Kowloon Wan, Kowloon 28 December 2007 (PC) & sB Design and Construction of Residential Training Yeung Tsing Road, Area 31, Tuen Mun, ASD 201/6712/SSL 621 2010 Ronald Lu & Partners (HK) Ltd TM407 August 2006 Complex For Juveniles at Tuen Mun New Territories 399 622 2010 Ronald Lu & Partners (HK) Ltd Revitalization of Peak Tower 128 Peak Road, Hong Kong RBL 1104 April 2006 KIL 4281 sAss1, ss2, ss3 & 623 2010 Andrew Lee King Fun & Associates Architects Ltd Metro Regalia 51 Tong Mi Road, Kowloon 23 May 2006 RP & sBss1 & RP Renovation of Tuen Mun Trend Plaza (South Wing, 2 Tuen Hop Street, Tuen Mun, New 624 2010 Aedas Ltd TMTL 282 BD 2-3/9001/84/9 31 March 2010 Phase 1) Territories Alterations & Additions to 24/F, 25/F, 26/F and roof of Prince's Building, 10 Chater Road, 625 2010 Aedas Ltd IL 2181 BD 2-3/2567/61/49 September 2007 Prince's Building Central, Hong Kong Addition and Alteration for Knutsford Hotel at No. 39 626 2010 Aedas Ltd 39 Kimberley Road KIL 7466, 7430, 7424, 6843 BD 2-3/4174/79 December 2006 Kimberley Road, Kowloon 6 South Perimeter Road, Hong Kong RP of CLK No. 1 & Ext 627 2010 Aedas Ltd DHL Central Asia Hub Expansion International Airport, Chek Lap Kok, BD 2/9151/05 August 2007 Thereto Lantau Island, New Territories 628 2010 Percy Thomas Architects Ltd ESF New School at Ma On Shan Area 90B, Ma On Shan, New Territories STTL 522 BD 2/9046/01 July 2006 Proposed Residential Building at no. 18-30 Bedford 18-30 Bedford Road, Tai Kok Tsui, 629 2010 Andrew Lee King Fun & Associates Architects Ltd KIL 11157 BD 2/4063/00 January 2008 Road, Tai Kok Tsui, Kowloon Kowloon Refurbishment Works for Hong Kong College of HD(ICU) 630 2010 Architecture Design & Research Group Ltd Yiu On Estate, Ma On Shan, STTL 505 STTL 505 13 June 2010 Technology (Ma On Shan Campus) E1/019(N)AA(3)-D 631 2010 Andrew Lee King Fun & Associates Architects Ltd 100 QRC 100 Queen's Road Central, Hong Kong IL 23 RP BD 2/2057/01 15 September 2006 Extensoin to Caritas Harold H W Lee Care and 17 Kong Pui Street, Shatin, New 632 2010 Chau Ku & Leung Architects & Engineers Ltd STTL 312 BD 2/9128/08 (P) 3 September 2010 Attention Home Territories Proposed Development at Reclamation Street and 589-601 Reclamation Street, Mongkok, 633 2010 Andrew Lee King Fun & Associates Architects Ltd Lot No. 11173 BD 2/4020/04 August 2007 (OP) Arran Street Kowloon Golden Bamboo Road North, Yuen Long, NT65 2001 (OP) ; 14 634 2010 Nelson Chen Architects Ltd Fairview Park Alliance Church Lot No. 4756 in DD 104 BD 2/9021/95 New Territories November 2001 (PC) Addition & Alteration Works of The Hong Kong Cricket 16 December 2009 (OP) ; 635 2010 Wilkinson & Cilley Ltd 137 Wong Nai chung Gap Road IL 8783 BD 2/3031/05 Club Sports Annex 31 December 2009 (PC) Construction of Extension Block to Pui Ling School of 13 On Lok Mun Street, On Lok Tsuen, 636 2010 Leigh & Orange Ltd FSSTL 194 BD 2/9170/06 (P) 8 July 2009 Precious Blood, Fanling Fanling 165 , Happy Valley, Hong 637 2010 AHL Design Workshop Ltd Staff Quarter of French International School Lot No 8884 BD 2/3004/08 July 2010 Kong 638 2010 Oval Partnership Ltd Enclosure for Multi-function Hall, HKAPA 1 Gloucester Road, Wanchai, Hong Kong IL 8587 BD 2-3/1021/82/19 mid-August 2010 Hotel Development At TWIL 5 & Lot 429 in DD 399 in 353 Castle Peak Road, Tin Kau, Tsuen 639 2010 Ronald Lu & Partners (HK) Ltd TWIL 5 & Lot 429 BD 2/9131/97 October 2006 , Tsuen Wan, New Territories Wan Proposed Composite Building at 188 Fuk Wah Street, 181-185 Fuk Wing Street and 188-200A November 2008 (OP) ; 640 2010 AGC Design Ltd NKIL 6425 BD 2/4069/04 Sham Shui Po, Kowloon Fuk Wah Street, Sham Shui Po, Kowloon March 2009 (PC) A Proposed 30-classroom Primary School at DBS 641 2010 Thomas Chow Architects Ltd 131 Argyle Street, Kowloon KIL 6737 BD 2/4044/00 (P) 9 July 2004 (OP) School Campus January 2006 (OP) ; June 642 2010 Hsin Yieh Architects & Engineers Ltd Hotel Development at KIL 11110 Hung Hom Bay 8 Hung Luen Road KIL 11110 BD 2/4046/01 2006 (PC) 643 2010 BC&A Hong Kong Ltd Proposed Residential Development at South Bay Close 5-11 & 13-19 South Bay Close, Hong RBL 820 & RBL 833 BD 2/2006/02 June 2010 644 2010 Amasia International Design Group Residential Development at 18 Pokfield Road 18 Pokfield Road Lot No. 8906 BD 2/2055/95 29 September 2000 19-21 Nathan Road, Tsim Sha Tsui, Phase 1: 26 June 2006 ; 645 2010 Aedas Ltd Kowloon Hotel Renovation Works KIL 10737 BD 2-3/4030/82 Kowloon Phase 2: 31 August 2006 646 2010 Aedas Ltd Alteration & Addition to Existing Giant Panda Habitat Ocean Park, Aberdeen, Hong Kong RBL 1020 RP & Ext BD 2/3014/98 (P) June 2007 647 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 39 , Hong Kong IL 7898 sA & RP BD 2/2031/02 September 2009 Proposed 3 Storeys Shop with 1 Storey Cockloft at 32- April 2010 (OP) ; April 648 2010 A. Lead Architects Ltd 32-34 Argyle Street, Mongkok, Kowloon KIL 2855 sA & RP BD 2-4/4110/07 34 Argyle Street 2010 (PC) 11 March 2004 (OP) ; 9 649 2010 Archiplus International (HK) Ltd Proposed Residential Re-development 377 Prince Edward Road KIL 4234 sA BD 2/4003/99 June 2004 (PC) 23 October 2003 (OP) ; 27 650 2010 Archiplus International (HK) Ltd Proposed Composite Building 12 & 12A North Street, Kennedy Town IL 8962 BD 2/2004/00 November 2003 (PC) The Lingnan University New Campus Development 651 2010 Architecture Design & Research Group Ltd TMTL 376, Tuen Mun BD 2/9016/03(1) 2005 (Community College) 652 2010 T. K. Tsui & Associates Ltd Tai Po Kau, Tai Po, TPTL 180 3987 Tai Po Road, Yuen Chau Tsai TPTL 180 BD 2/9185/05 December 2009 653 2010 Aedas Ltd Renovation of Tai Yau Arcade 181 Johnson Road, Wanchai, Hong Kong IL 2808 sA, sB & IL 2809 sA, BD 2-3/1133/80/3 November 2006 654 2010 Chau Ku & Leung Architects & Engineers Ltd TWGHs Fong Shu Chuen Social Service Building 6 Po Man Street, Shaukeiwan, Hong Kong SIL 832 August 1999 655 2010 Hong Kong Housing Department Eastern Harbour Crossing Site Phase 3 9 Yau Tong Road, Kowloon N/A N/A August 2008 656 2010 Aedas Ltd Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate TPTL 13 BD 2/9141/01 (P) January 2004 657 2010 Handi Architects Ltd Residential Redevelopment at 35 Mount Kellett Road 35, 37 Mount Kellett Road, Hong Kong RBL 553 BD 2/2008/05 Pt. 11 29 April 2009 Proposed Residential Development at 33 Ka Wai Man 33 Ka Wai Man Road, Kennedy Town, 658 2010 D. Heung & Associates Architects & Engineers Ltd IL 8873 BD 2/2038/97 11 May 2006 Road, Kennedy Town, HKIL 8873 Hong Kong KIL 2232 SECA, KIL 2232 659 2010 MCAA Ltd Proposed Composite Building Development 24-28 Tung On Street BD 1/4068/06 12 February 2010 RP & KIL 84 sEss 2 RP 660 2010 Christopher Leung & Associates Ltd Proposed Residential Redevelopment at 60 Peak Road 60 Peak Road, Hong Kong RBL 310 BD 2/2013/97 30 September 2005 List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 9 January 2004 (OP) ; 9 661 2010 Christopher Leung & Associates Ltd Residential Development at 40 Peak Road 40 Peak Road RBL 784 BD 2/2037/01 January 2004 (PC) Proposed Residential Development at 20-26 Johnston 20-26 Johnston Road, Wanchai, Hong 662 2010 LWK & Partners (HK) Ltd ML 296 BD 2/3030/05 26 March 2009 Road, Wanchai, Hong Kong Kong Proposed Residential Development on IL 2132 at 12 8 June 2010 (OP) ; 30 663 2010 WMKY Ltd 12 Boardwood Road, Hong Kong IL 2132 sA, sB, sD, sE & sF BD 3/3020/05 Boardwood Road, Hong Kong June 2010 (PC) 39 Wang Chiu Road, Kowloon Bay, NKIL 664 2010 P & T Architects & Engineers Ltd Enterprise Square III NKIL 5877 sA & RP BD 4011/01 May 2004 5877 Chater House, Commercial Development at 11 Chater 665 2010 Aedas Ltd 11 Chater Road, Central ML 287 & 288 BD 2/2014/96 20 June 2002 Road, Central Tsuen Wan Plaza - Renovation of TWTL 326, Tsuen Tsuen Wan Plaza, 4-30 Tai Pa Street, 666 2010 Aedas Ltd TWTL 3262 BD 2-3/9113/87/9 October 2006 Wan Tsuen Wan, New Territories HK International Airport, Chek Lap Kok, CLK Lot 1 & RP & the ext 667 2010 Aedas Ltd SkyPlaza Development - South Office Tower BD 2/9062/03(5)(P) 23 May 2007 Lantau Island, New Territories thereto Lot No 1, Hong Kong International Airport, 668 2010 Aedas Ltd SkyPlaza (APM extension) CLK Lot 1 BD 2/9062/03(2) September 2006 Chek Lap Kok, Lantau Island, New Lok King Street, Fo Tan, Shatin, New 669 2010 Ronald Lu & Partners (HK) Ltd Jockey Club Ti-I College STTL 324 BD 3130/01 4 October 2005 Territories 28 & 33 Kwu Tung Road, Sheung Shui, DD 95 Lots 2242 sA, sB, sC, 670 2010 Ronald Lu & Partners (HK) Ltd Valais BD 2-3/9040/06 November 2009 New Territories RP & the ext thereto 8 Ping Chuk Lane, Ping Shan, Yuen Long, 671 2010 Ronald Lu & Partners (HK) Ltd Imperial Villas Phase 1 Lot No 2052 in DD 121 BD 2/9111/01 28 October 2003 New Territories 672 2010 Hong Kong Housing Authority Aldrich Bay Integrated Services Building 15 Aldrich Bay Road EHX 308 July 2007 DD 387, Sham Tseng, Tsuen Wan West, October 2004 (OP) / 673 2010 Simon Kwan Architect & Associates Ltd Anglers' Bay Lot No 214 BD 9022/01 New Territories December 2004 (PC) Po Leung Kuk School Improvement Programme - Po Leung Kuk Wu Chung College, Heng 674 2010 Ronald Lu & Partners (HK) Ltd STTL 500 SF September 2005 Group 2 (S311) On Estate, Ma On Shan 14 October 2003 (OP) ; 675 2010 Wong Tung & Partners Ltd Le Meridien Cyberport 100 Cyberport Road, Pokfulam IL 8969 RP BD 2/2042/99/ST3 April 2004 (PC) Caroline Centre, 2-38 Yun Ping Road & 676 2010 Aedas Ltd Alteration and Addition Works at the Caroline Centre IL29, IL457, IL461 BD 2-3/3062/88 23 October 2003 61-67 Jardine's Crescent, Causeway Bay Upgrading and change of use of CDW Building at 388 382-392 Castle Peak Road and 27-37 Mei 677 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 1221 sA in DD 453 BD 2-3/9184/78 2004 Castle Peak Road, Tsuen Wan, New Territories Wan Street, Tsuen Wan, New Territories Castle Peak Road, Yuen Long, New 678 2010 Planning Services International (Asia) Ltd Proposed Residential Development (Villa Sunshine) 1737 in DD 122 BD 4/9304/96 9 August 2000 Territories 33 Cameron Road, Tsim Sha Tsui, 28 October 2009 (OP) ; 24 679 2010 Integrated Design Associates Ltd Proposed Office Development KIL 8088 BD 2/4050/03 Kowloon November 2009 (PC) No. 1 & 1E La Salle Road, Kowloon Tong, 31 March 2009 (OP) ; 31 680 2010 Integrated Design Associates Ltd Proposed Residential Redevelopment NKIL 2617 BD 2/4040/05 Kowloon August 2009 (PC) Proposed Composite Development at 270 Cheung Sha 681 2010 LWK & Partners (HK) Ltd 270 Cheung Sha Wan Road, Kowloon NKIL 1068 RP BD 2/4013/06 29 November 2010 Wan Road Proposed Commercial Development at KIL 6022 RP, 100 Nathan Road, Tsim Sha Tsui, 682 2010 LWK & Partners (HK) Ltd No. 1-19A Granville Road & No. 100 Nathan Road, KIL 6022 RP BD 4021/05 April 2010 Kowloon Tsim Sha Tsui, Kowloon 683 2010 Urbanage International Ltd TWGHs S C Gaw Memorial CollegeTsing Sun Street, Town Centre, Tsing Yi GLA-TW182 BD 2/3020/03(P) July 2005 684 2010 Associated Architects Ltd The Hotel of 3 Kau U Fong, Hong Kong IL 8852 BD 2/2040/01 December 2005 (OP) International Christian Quality Music Secondary & Po Kong Village Road, Diamond Hill, 27 August 2004 (OP) ; end 685 2010 Hsin Yieh Architects & Engineers Ltd NKIL 6358 BD 4040/01 Primary School Kowloon August 2004 (PC) 6 August 2009 (OP) ; 7 686 2010 Rocco Design Architects Ltd Redevelopment of 63 Nathan Road, Kowloon 63 Nathan Road, Kowloon KIL 7425 BD 2/4072/04 November 2009 (PC) 687 2010 LWK & Partners (HK) Ltd Residential Development at Gough Hill Path, Hong 3 & 5 Gough Hill Path, The Peak, Hong RBL 1163 17 February 2006 21 June 2001 (OP) ; June 688 2010 Gravity Partnership Ltd Proposed Composite Building Redevelopment 125 Wan Chai Road, Hong Kong IL 611 & IL 662 BD 2/3032/98 2001 (PC) J/O Man Lok Street, Man Yue Street and 689 2010 K & W Architects Limited A&A works for Godown Extension at Genstar Tower HHIL 545 BD 2/4062/98 July 2006 Hung Hom Road 690 2010 LWK & Partners (HK) Ltd Residential Development at 56 Peak Road, Hong Kong 56 Peak Road, Hong Kong RBL 718 BD 2/2014/00 April 2003 691 2010 Archiplus International (HK) Ltd Proposed Additions at 82 Peak Road, RBL 742, Hong 82 Peak Road, Hong Kong RBL 742 BD 2/2014/98 June 2001 TWGHs Ko Ho Ning Memorial Primary School School Estate School No. 1, Lai Yiu Estate, Kwai 692 2010 Chung Wah Nan Architects Ltd Lai Yiu Estate BD 3009/03(P) May 2005 Improvement Programme - Final Phase Chung, New Territories 693 2010 Andrew Lee King Fun & Associates Architects Ltd Casa Bella, Residential Building 117 , Central, Hong Kong Lot No. 3026 BD 2/2077/90 12 March 2001 Proposed Residential Development at So Kwun Wat on 694 2010 Simon Kwan Architect & Associates Ltd TMTL 465, Tuen Mun TMTL 465 BD 2/9096/05 30 September 2010 Lot TMTL 465 695 2010 WMKY Ltd Proposed Commercial Building 256 Hennessy Road, Hong Kong IL 2769 sB BD 3026/04 28 November 2008 38 Tai Hong Street, Sai Wan Ho, Hong 21 June 2005 (Phase 1a, 696 2010 WCWP International Ltd "" - Composite Development IL 8955 BD 2/3002/01 Kong 1b) ; 19 August 2005 School Improvement Programme - Final Phase S319 - Rosaryhill School, 41B Stubbs Road, ASD 697 2010 WCWP International Ltd IL 3550 RP & ext 27 September 2005 Rosaryhill School (Secondary School) Rosary Hill, Wanchai, Hong Kong 303/5825/EX/E20/S3 Canadian International School of Hong Kong 36 Nam Long Shan Road, Aberdeen, 11 April 2008 (OP) ; 9 May 698 2010 P & T Architects & Engineers Ltd Aberdeen Inland Lot No. 417 BD 2/2035/04 Performing Arts Complex Hong Kong 2008 (PC) Residential Development of No. 216-224, Tung Chau 216-224, Tung Chau Street, Sham Shui 699 2010 Andrew Lee King Fun & Associates Architects Ltd Lot No. 216-224 BD 4023/98 September 2003 Street Po, Kowloon List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) The Construction of Secondary School Near Choi Wan 46 New Clear Water Bay 700 2010 Lu Tang Lai Architects Ltd Choi Wan Road, Kwun Tong ASD SST 304 11 August 2010 Road and Jordan Valley, 701 2010 Leigh & Orange Ltd SIP Phase IV Package 3 - St. Francis Xavier's College 45 Sycamore Street, Tai Kok Tsui, KIL 6421 -- March 2005 702 2010 Chung Wah Nan Architects Ltd Caritas Bianchi College of Careers 18 Chui Ling Road, Tseung Kwan O TKOTL 92 BD 2/9110/06 June 2009 Residential Development at 51 Fung Shing Street, 51 Fung Shing Street, Ngau Chi Wan, 703 2010 P & T Architects & Engineers Ltd NKIL 6350 BD 2/4064/05 September 2010 Ngau Chi Wan, NKIL 6350, Kowloon Kowloon 704 2010 Simon Kwan Architect & Associates Ltd Central District Headquarter and Division Police Station Chung Kong Road, Sheung Wan, Hong HK 629 -- September 2009 Ho & Partners Architects Engineers & Development Proposed Hotel Development at No. 35-43 Ivy Street, 705 2010 88 Tai Kok Tsui Road KIL 8050 BD 2/4055/05 22 February 2010 Consultants Ltd Tai Kok Tsui, Kowloon Junction of Waterloo Road and Norfolk 706 2010 Design Consultants Limited Australian International School Hong Kong NKIL 6315 BD 4049/99 (P) August 2001 Road, Kowloon J/O 33-37 Hysan Avenue, 7-11 Yun Ping IL 29 sec DD, IL 457 sec L, IL 707 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Lee Garden (Manulife Plaza) 1998 Road, and 20-24 Lan Fong Road 29 MM, IL 29 L RP & IL 457 708 2010 Lu Tang Lai Architects Ltd Crowne Plaza Hong Kong Causeway Bay 8 Leighton Road, Causeway Bay, Hong IL 4369-4377 8 April 2009 709 2010 Original Vision Ltd A&A works on Lot No. 236 in DD 229 684 Clearwater Bay Road, Sai Kung Lot No. 236 in DD 229 BD 2-3/9361/92/4 August 2010 Tseung Kwan O Public Transport Interchange, Hong Tseung Kwan O Town Center, Area 56, 710 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Area 56, TKOTL 72 BD 2/7196/98 28 June 2002 Kong TKOTL No. 72 13 Yuen Chau Kok Road, Shatin, New 711 2010 Cypress Consultant Ltd HKSKH Holy Spirit Church cum Residential Care Home STTL 518 BD 9084/03 February 2009 Territories 712 2010 MLA Architects (HK) Ltd Conduit 18 18 Conduit Road, Hong Kong IL 711 sA BD 2057/05 21 June 2010 Hong Kong Jockey Club Shatin Race Course Parade 713 2010 Aedas Ltd Shatin Race Course STTL 13 BD 2/9091/03 November 2004 Ring Redevelopment 714 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Parc Palais 18 Wylie Road, Kings Park, Kowloon KIL 11118 BD 2/4038/00 February 2004 (OP) Proposed Residential Development at 26 Mount Kellett 715 2010 Archiplus International (HK) Ltd 26 Mount Kellett Road, Hong Kong RBL 1119 BD 2068/05 August 2009 Road Contract No. SS Shek Lei Estate, Shek Pai Street, Kwai Certificate of Completion: 716 2010 Rocco Design Architects Ltd Salesian Yip Hon Millennium Primary School GLA-KT 1141 M312 ; Programme Chung 31 July 2005 No.: 306EP ASD ref: 717 2010 Aedas Ltd Stanley Main Beach Water Sports Centre Stanley Link Road, Stanley, Hong Kong 302/5418/SSH325/M1 28 September 2004 5/520 718 2010 Three's Architects Ltd New Café Kiosk Entrance Plaza at Kam Kam Road, Tai Po 1822 RP in DD 10 BD 3/9002/06 March 2010 (PC) 100 How Ming Street, Kwun Tong, 9 September 2008 (OP) ; 719 2010 Arthur C.S. Kwok Architects & Associates Ltd Landmark East sA & RP KTIL 242 BD 2/4030/03 Kowloon 30 September 2008 (PC) Proposed Residential Development at 117 Repulse Bay 720 2010 LWK & Partners (HK) Ltd 117 Repulse Bay Road, Hong Kong RBL 168 sAss1 BD 2/3092/97 September 2003 (OP) Road (Namely Grosvenor Place) Lantau and Airport Railway, Hong Kong Development - Northern Site Hotel Central Station Development, Northern 721 2010 Rocco Design Architects Ltd IL 8898 BD 3/7173/93-4(HT) 27 January 2005 Development Site (Hotel), Habour View Street, Central Reclamation ASD 722 2010 Rocco Design Architects Ltd Hong Kong School of Creativity 135 Junction Road, Kowloon Lot No. 577 55/92050/CWO/003- November 2007 03/BP Hotel at IL 8774, 33 Leighton Road, Causeway Bay, 133 Leighton Road, Causeway Bay, Hong 723 2010 WCWP International Ltd IL 8774 BD 2-3/3063/97/2 13 December 2005 Hong Kong - "Lanson Place Hotel" Kong Proposed Residential Development at RBL 1164, Cape 724 2010 P & T Architects & Engineers Ltd 33 Cape Road, Chung Hom Kok RBL 1164 BD 2/2013/02 11 January 2005 Road, Chung Hom Kok December 2005 (OP) ; 725 2010 Ronald Lu & Partners (HK) Ltd Choi Hung Park & Ride Development 8 Clear Water Bay Road NKIL 6179 BD 1/7182/95 December 2005 (PC) Pioneer Center at 750 Nathan Road, 726 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works at Pioneer Center KIL 2111 Kowloon (Lot No. KIL 2111) 727 2010 Simon Kwan Architect & Associates Ltd Proposed Residential Development at STTL 539 Tai Wai, Shatin, New Territories, STTL STTL 539 BD 2/9015/03 29 June 2009 YWCA Begonia Road - Re-development of YWCA 66 Begonia Road, Yau Yat Chuen, 728 2010 Design Consultants Limited NKIL 6034 BD 4075/98 November 2002 Maurine Grantham Centre Kowloon School Improvement Program Final Phase - Package 2 8 Hoi Chak Street, Quarry Bay, Hong 729 2010 RMJM (HK) Ltd IL 8570 BD 3059/02(P) March 2006 Canossa School (HK) Kong 16-22 Hampshire Road, Kowloon Tong, 730 2010 RMJM (HK) Ltd Proposed Residential Development at NKIL 4016 NKIL 4016 February 2002 Kowloon ASD 731 2010 P & T Architects & Engineers Ltd Tseung Kwan O Sports Ground 109 Po Hong Road, Tseung Kwan O GLA March 2009 302/5586/SSM336/00 732 2010 Handi Architects Ltd Proposed Renovation of Lane Crawford House 70 Queen's Road Central, Hong Kong IL 7 RP & IL 45 sA RP BD 2-3/2475/72/10 November 2006 BD 2-3/2344/60/27 ; Additional and Alteration Work for Mandarin Oriental 733 2010 DCM Studios Ltd 5 Connaught Road, Central, Hong Kong ML 369 BD 2-3/2344/60/36 ; 31 January 2007 Hotel BD 2-3/2344/60/35 Off Clearwater Bay Road, Sai Kung, New 734 2010 DCM Studios Ltd ESF Clear Water Bay School Extension DD 229, Lot 235 BD 2/9045/01(P) April 2005 Territories 5 Canton Road, Ocean Centre, Basement 735 2010 DCM Studios Ltd Redevelopment Works for Retail Flagship Store KML 11 sA BD 2-3/4070/72/19 28 February 2008 to 4/F of Block A, Tsim Sha Tsui, Kowloon 21 May 1998 (OP) ; June 736 2010 P. Y. Leung & Associates Ltd Church Building on NKIL 6180 At Fung Tak Road Diamond Hill, Kowloon NKIL 6180 BD 2/4088/95 1998 (PC) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 26 March 2009 (OP) ; 20 737 2010 Nelson Chen Architects Ltd St. Stephen's Society Expansion 50A Kung Kok Shan Road, Shatin STTL 469 BD 2/9076/06 March 2009 and 30 April 2009 (PC) Proposed Residential Development at 57 Shouson Hill 738 2010 P & T Architects & Engineers Ltd 57 Shouson Hill Road, Hong Kong Section A of RBL 365 BD DH337/72/HK 11 April 2003 Road, Hong Kong Phase VII Development, The Hong Kong Polytechnic 739 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Hung Hom, Kowloon KIL 9853 RP and ext BD 2/4004/02 September 2005 University expected to be in 740 2010 K.A. Kho & Associates Architects & Consultants Ltd Private Residential Development Sheung Sz Wan Lot 162 DD 235 BD 2/9187/99 November 2010 July 2004 (OP) ; February 741 2010 Wong & Ouyang (HK) Ltd URA Project K2 - Langham Place (Site A) 8 Argyle Street, Kowloon KIL 11099 BD 2/4231/93 2005 (PC) Proposed Commercial / Residential Redevelopment at 5 August 2005 (OP) ; 742 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 38 San Ma Tau Street, Kowloon KML 102 RP BD 4006/02(TB) KML 102, Ma Tau Kok February 2008 (PC) 743 2010 Architectural Services Department New Fanling Magistracy Building Area 11, Pik Fung Road, Fanling DN324 ASD 51/1377 March 2002 IL47AsARP, IL47AsBRP, IL47AsCRP, IL47ARP, IL47BsCRP, IL47BRP, IL47AsBss2, IL47AsD, IL47BsD, IL47BsBRP, IL47BsARP, IL47CsARP, IL47CsAss1RP, IL47CRP, IL47DRP, IL47DsARP, IL47sBRP, IL47sAss1, 744 2010 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East IL47sCss1 & Extension BD 3019/01 February 2007 Thereto, IL47sCss2sA, IL47sCss2RP, IL47sCss3sA, IL47sCss3RP, IL47sCss4, IL47sCss5 & Extension Thereto, IL47sCss6sRP, IL47sCss6sA, IL47sCss7RP, IL47sCRP, IL47sBss1, IL47sARP, IL47sP, IL47RP, IL47sP, IL47RP 745 2010 Sun Hung Kai Architects & Engineers Ltd Beacon Lodge 373 Po On Road, Sham Shui Po, Kowloon NKIL 6433 BD 2/4003/04 (Pt. II) August 2008 Anticipated end of Sept 746 2010 A. Lead Architects Ltd Monmouth Terrace Residential Project 9K Kennedy Road, Hong Kong IL 8435 BD 3013/08 2010 (OP) ; Anticipated end of Oct 2010 (PC) 747 2010 P & T Architects & Engineers Ltd Residential Development of Branksome Tower II 3 Tregunter Path, Hong Kong IL 8393 BD 2004/98 7 April 2004 Proposed VTC Training Hotel At 6/F and CCTI Responsibilities and Liabilities 748 2011 Ronald Lu & Partners (HK) Ltd Resources Centre at M/F, Pokfulam Training Centre 145 Pokfulam Road, Hong Kong AIL 420 BD 2-3/2063/90/3-4 December 2009 of the Architect when a Complex separate design consultant is 223-231 Wai Yip Street and 39 King Yip Design Effort for Public 749 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Manulife Financial Centre KTIL 744 BD 2/4047/96 2008 Street Realm Po Leung Kuk Women's Welfare Club How far can quality be Western District Fung Lee Pui Yiu Primary ASD 750 2011 Architectural Services Department A 24-classroom primary school in Area 55, Tuen Mun GLA No. TM420 July 2011 compensated when time is of School, 11 Kwun Tsing Road, So Kwun 51/6348/EA/E20/086 the essence Wat, Tuen Mun, New Territories Tree Preservation and its 751 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Parc Palais 18 Wylie Road, Kings Park, Kowloon KIL 11118 BD 2/4038/00 February 2004 (OP) challenges Learning Resources Centre, Hong Kong Institute of IVE (Shatin), 21 Yuen Wo Road, Shatin, Remaining Portion of STTL How the architect responded 752 2011 Design Consultants Limited BD 2/9148/06 (P) July 2008 Vocational Education (Sha Tin) New Territories 233 to the physical site Ocean Park Redevelopment Waterfront Entry Plaza Wong Chuk Hang Road, Hong Kong, RBL 753 2011 Aedas Ltd RBL 1020 & Ext BD 2/2069/06 December 2010 Fire Engineering Approach and Aqua City 1020 & Ext Hong Kong Science Park Phase 2- 754 2011 Simon Kwan Architect & Associates Ltd Hong Kong Science Park Phase 2-Building 20 TPTL 182 BD 2/9083/03 (3) (P) 12 May 2011 Sustainability Design Building 20 at Pak Shek Kok, Tai Po The successful negotiation 755 2011 Wong & Ouyang (HK) Ltd Langham Place, Site B 555 Shanghai Street KIL 11099 BD2/4231/93 17 February 2004 between the Architect, URA and the Client 9A-H Seymour Road and 5, 6, 6A, 7 and IL 585 RP and Ils 4626, 4627, Maximum Development 756 2011 WCWP International Ltd Seymour BD 2/2090/06 12 August 2011 7A Ying Fai Terrace, Hong Kong 4628 and 4629 Potential vs Public Interest ASD Cost Saving Exercise in view FSD Diving Training Centre in Government Dockyard at Government Dockyard at Stonecutters 757 2011 Design 2 (HK) Ltd TK 367 55/92050/CWO/023- May 2009 of the tender prices exceeding Stonecutters Island Island 06/BP the approved budget "" Residential and Commercial How to handle client's late 758 2011 Wong Tung & Partners Ltd 638 Prince Edward Road East, Kowloon NIL 6308 BD 2/4070/04 27 September 2010 Development instruction List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) The case study will extensive introduce Home Automation System, and explain how its application can achieve Proposed Residential Building on RBL 422 and 30 February 2007 (OP) ; privacy, security, comfort, 759 2011 WMKY Ltd 120 Pokfulam Road RBL 422 BD 2/2045/94 Extensions at No. 120 Pokfulam Road 11 Jan 2007 (PC) improved convenience, energy saving concept through the integration with architectural design and layout, in both active and Small site, OZP and Lease Restriction Effect on Proposed Residential Redevelopment at 62 Kennedy Development, and 760 2011 Ma & Fong & Associates Ltd 62 Kennedy Road, Hong Kong IL 2299 sARP BD 2/3065/02 30 June 2010 Road, Hong Kong Negotiation with Government Department to bring about advantegous Results Renovation of the Old Clubhouse at the Beas River Beas River Country Club, Kam Tsin Road, Meeting deadlines for the 761 2011 Ivanho Architect Ltd Lot No. 922 in DD 94 BD 2-3/9011/97 May 2009 Country Club Sheung Shui, New Territories olympics Mitigation measures to poor 762 2011 Ronald Lu & Partners (HK) Ltd HKYWCA Conference Centre and Guesthouse San Shek Wan, Lantau Lot No. 727 in DD 332 BD 2/9020/04 August 2007 performing contractor Changing of site classification 3-7 Mosque Junction, Mid-Levels, Hong IL 717 sDIL 392 sA ss3RP, IL 763 2011 Chau Lam Architects & Associates Phase II Development of Lily Court BD 2/2046/01 31 March 2004 (OP) from different easement of Kong 392 sARP, IL 717 RP service lane BD 2-3/9702/94/136, Alteration and Addition Works at Hong Kong CLK Lot No 1 RP and the ext Statutory constrains to 764 2011 Benoy Ltd Chek Lap Kok 137, 138, 142, 143, March 2010 International Airport thereto existing building 150, 151 The Architect's role and responsibility in respond to Lo Wu Station Improvement Departure Hau Queuing contractor's poor performance 765 2011 Leigh & Orange Ltd Lo Wu Station, New Territories KCRCL 12 BD 22-3/7987/05 (P) December 2007 Area and Associated Works and the challenge in the enforceability of liquidated damages Deletion of podium carpark at Cnr. Of Wai Kek and Shek Pai Street, 766 2011 Hong Kong Housing Department Redevelopment of Shek Lei Estate Phase 10 VO/10/034 HD(AR)/10/R10 30 April 2007 (OP) late stage of design leading to Shek Lei, New Territories variation in piling contract. Extension and renovation works for Eu Yang Sang (HK) Lot No. 313, Subsection No. Effective communication as 767 2011 David S.K. Au & Associates Ltd Yuen Long Industrial Estate BD 2/9039/05 June 2006 (OP) Limited 2 of Section H an aid of construction delivery ASD Progress/Programme Time 768 2011 Architectural Services Department A 30-classroom primary school in Area 55, Tuen Mun So Kwun Wat Road, Area 55, Tuen Mun GLA No. TM420 August 2011 51/6472J/EA/E20/080 Management 28 January 2010 (OP) ; Proposed Residential Development at 2 Forfar Road, Building height restriction and 769 2011 WCWP International Ltd 2 Forfar Road, Kowloon RP of KIL 4022 BD 3/4038/05 August 2010 (Anticipated Kowloon, RP of KIL No 4022 solution PC) Architect's endeavour in Firestation cum ambulance depot and police post at Long Yan Road, Penny's Bay, North 770 2011 Architectural Services Department Site No. 88/1, GLA No. IS436 ASD 51/5434F September 2004 achieving a plantinum beam Penny's Bay Lantau Lantau plus building Proposed Composite Development at Sham Mong Non-standard Tendering 771 2011 LWK & Partners (HK) Ltd Sham Mong Road, New Kowloon KIL 6338 BD 2/4033/00 December 2003 Road, New Kowloon Process How the architect used his 2 Dai Li Street, Tai Po Industrial Estate, TPTL no. 1 and ext thereto 772 2011 David S.K. Au & Associates Ltd Maxims' New Food Factory Development BD 2/9146/09 August 2011 design to overcome site Tai Po, New Territories sBss 1 constrains? Sun Yat Sen Memorial Park Swimming Pool (Section 5 Natural ventilation design in 773 2011 Architectural Services Department Connaught Road West, Hong Kong GLA - HK897 ASD 52/5966 March 2011 (PC) of Sun Yat Sen Memorial Park and Swimming Pool swimming pool venue 45 Choi Ha Road, Ngau Tau Kok, Site Constraint - Building on 774 2011 Leigh & Orange Ltd Maryknoll Secondary School NKIL 4495 BD 2/3044/02 (P) 15 March 2005 Kowloon an existing slope Public Rental Housing Development at Choi Wan Road Overcome site constraints at 775 2011 Hong Kong Housing Authority Choi Wan Road, Kwun Tong N/A 30 May 2011 (Site 2 Phase 2) design and construction Architect's solution of minimizing disturbances to an Additions and Alteration Works for Conversion of KIL 9361, 8183, 9262 and existing tenant still operating 776 2011 L. Y. Wong Associates Ltd Nos. 21, 21A, 23, 23A Prat Avenue BD 2-3/4020/86/3 November 2008 Commercial Building to Hotel 9263 for karaoke business at the captioned building throughout the entire construction stage Tom Ip & Partners Architects, Engineers & Development Second Primary School - Site 10 West Kowloon ASD Creation of favorable learning 777 2011 1 and 3 Hoi Lai Street, Sham Shui Po GN 706 July 2006 (OP) Consultants Ltd Reclamation Area, HK 102/6804/EA/9AM19 environment List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 1. How the Architect deals with existing issues of inadequate escape staircase and direct travel distance to Cheung Fat Shopping Centre, Cheung Fat make the new design 778 2011 Aedas Ltd Cheung Fat Shopping Centre Estate, Tam Kon Shan Road, Tsing Yi, TYTL 172 BD 22-3/9190/06 12 July 2008 complied with all statutory New Territories requirements. 2. Construction phasing plan would be discussed with careful consideration of renovation 779 2011 P & T Architects & Engineers Ltd Proposed Residential Development No. 57 Shouson Hill Road, Hong Kong Section A of RBL 365 BD 6/3016/97 (L/M) 11 April 2003 Land matters How Architect to deal with site Proposed Primary School on IL 8347 RP and Adjoining 1100 King's Road, Quarry Bay, Hong IL 8397 RP and Adjoining 24 June 2002 (OP) ; 8 July 780 2011 Wong & Ouyang (HK) Ltd BD 2/3065/93 constraints during design Government Land at Greig Road Kong Lots 2002 (PC) process Design opportunity and 781 2011 Tam & Philip So & Associates Ltd Alteration and Addition Works: Good Hope School 303 Clear Water Bay Road, Kowloon NKIL 3810 and NKIL 4192 BD 2/3150/01 (P) 9 August 2005 constraint The effect of changes in 782 2011 SLHO & Associates Ltd 2C and 2D San Lau Street, Kowloon 2C and 2D San Lau Street, Kowloon KILs 7584 and 4307 BD 2/4163/93 January 2004 building control on green building design and the Pinehill Village, Chung Nga Road, Nam Delay due to unforeseen site 783 2011 Ronald Lu & Partners (HK) Ltd Hong Chi Pinehill No. 2 School TPTL 34 BD 2/3101/01 (P) 21 April 2005 Hang, Tai Po, New Territories conditions ASD Dealing with ambiguility and A 30-classroom primary school at development near 78 Choi Wan Road, Jordan Valley, 784 2011 Ronald Lu & Partners (HK) Ltd GLA - NK771 55/92050/CWO/003- August 2011 (Anticipated) discrepacy in contract Choi Wan Road and Jordan Valley, Kwun Tong Kowloon 09/BP documents and drawings 7 December 2010 (OP) ; Industrial/Residential interface 785 2011 Ronald Lu & Partners (HK) Ltd Larvotto Praya Road IL 129 BD 2-3/2038/99H 31 March 2011 (PC) problems Contract administration with DD 122 Castle Peak Road, Ping Shan, 23 December 2005 (OP) ; 786 2011 Ronald Lu & Partners (HK) Ltd Residential Development at Lot No. 1739, DD 122 IL 1739 BD2/9075/01 the main contractor being the Yuen Long, New Territories May 2006 (PC) subsidiary company of the 787 2011 Aedas Ltd Alteration and Addition Work of Tsuen Wan Plaza Tsuen Wan Town Lot No. 326 TWTL 326 BD 2-3/9113/87/12 April 2009 Phasing programme April 2004 (OP) ; August EVA Design not complying 788 2011 P & T Architects & Engineers Ltd Branksome Tower II 3 Tregunter Path, Mid-Levels, Hong Kong IL 8393 BD 2004/98 2004 (PC) with regulations Coordination works at the BD 4/7302/94 (P) Pt. 789 2011 AGC Design Ltd Tung Chung Station Development Package One Tung Chung Town Lot 2 TCTL 2 21 November 2005 core interfacing between II phase 1 and 2 How Architect to facilitate project completion and 7 Chun Cheong Street, Tseung Kwan O 22 January 2008 (OP) ; 23 790 2011 David S.K. Au & Associates Ltd Proposed New Sing Tao Newspaper Printing Factory TKOTL 39, ss 1, sH and ext BD 2/9252/96 P programme within 9-month Industrial Estate, New Territories January 2008 (PC) period for foundation works, pile cap and superstructure Redevelopment of Upper Ngau Tau Kok Estate - Ngau Tau Kok Road, Kwun Tong, HD (ICU) B1 791 2011 Hong Kong Housing Department February 2009 Community participation Phases 2 and 3 Kowloon 2/KL33RR/02&03 JPN was firstly introduced during the tower construction. Late design changes to QBML 4 sCss 1RP, QBML incorporate the new codes Royal Terrace, 933 King's Road, North Point, Hong 913-919, and 929-935 King's Road, North 4sCss 1sB, QBML 4sCss were advised. Detail study on 792 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd BD 2/3008/99 H August 2002 (OP) Kong Point, Hong Kong 1sARP, QBML 4sCss 1s how architect to draft with the Ass1 and SE late design change based on the new code requirement and how the building was shaped differently. Evaluate the design consideration between an 793 2011 Wong Tung & Partners Ltd Les Saisons Tai On Street, Shau Kei Wan SIL 843 BD 2/3042/98 31 October 2001 urban podium high-rise residential project and a rural low density house project IL 897 sBss 1 SA, SBss 5 Impact on the Building Design 24-32 Ming Yuen Western Street, North 794 2011 MLA Architects (HK) Ltd Proposed Residential Redevelopment SA, SBss 5 RP, SBss 8 RP, BD 2/3005/06 2 February 2011 due to enactment of new Point, Hong Kong SBss 8 SA, SBss 9 regulations List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) The project was the second phase of the whole development. The architect had to design and co-ordinate the construction of a new GIC/Public Carpark and Residential Development at 2 Tin Yan Road, Tin Shui Wai , New July 2010 (OP) ; podium to attach the existing 795 2011 MDVISTA Ltd TSWTL 24 BD 2/9061/02 TSWTL No. 24, Area 33, Tin Shui Wai, New Territories Territories November 210 (PC) one. Concerns on aesthetic uniformity and structural stability between two phases, safety and security measures for existing occupants would be studied in the special topic. The construction of a special school for Severely 17 Tin Tan Street, Tin Shui Wai, Yuen 796 2011 P & T Architects & Engineers Ltd TSWTL 32 22 May 2007 Universal Accessibility Mentally Handicapped Children in Area 32, Tin Shui Long, New Territories How Architect struggles with 8 Waterloo Road, Yau Ma Tei, Kowloon, Conversion of Yau Ma Tei Theatre and Red Brick ASD heritage conservation and 797 2011 Architectural Services Department 334 Shanghai Street, Yau Ma Tei, TK450, KIL11100 July 2011 (Anticipated) Building into a Xiqu Activity Centre 52/6811/YMTT/HAB spatial constraints to cater for Kowloon new uses in existing buildings Place for public entertainment The Junction of Tin Fuk Road and Ping and non place for public 798 2011 Architectural Services Department Ping Shan Tin Shui Wai Leisure and Cultural Building GLA - TSW 82 ASD 54/3333 May 2011 (PC) Ha Road, Tin Shui Wai, New Territories entertainment at the same building 17 September 2009 Wing Sin House, Upper Wong Tai Sin (Domestic block and Public Rental Housing Redevelopment at Upper Wong 799 2011 Hong Kong Housing Authority Phase 3, Wong Tai Sin Road, Wong Tai Vesting Order No. 51 footbridge no. 2) and 18 Passive sustainability design Tai Sin Estate Phase 3 Sin, Kowloon December 2009 (Footbridge no. 1) 800 2011 Leigh & Orange Ltd Franciscan Centre Redevelopment 133 Waterloo Road, Kowloon NKIL 800 BD 2/4041/00 5 February 2003 Late Final Account How the Architect plays her Adjoining No. 14 South Bay Road, Proposed Residential Redevelopment at RBL 1142 30 December 2002 (OP) ; role to improve the 801 2011 P & T Architects & Engineers Ltd Repulse Bay, Hong Kong (Now named as RBL 1142 BD 2/3036/99 South Bay Road, Hong Kong 7 May 2003 (PC) development potential, in 16A South Bay Road) consideration of statutory and Town Lot No. 45 in Area 11, Tseung Kwan Special terms of lease 802 2011 Aedas Ltd Proposed New Chapel in Tseung Kwan O TKOTL 45 BD 9291/96 March 2000 O, New Territories conditions 803 2011 Leigh & Orange Ltd HKFYG Headquarters Redevelopment Project 55 Model Lane, North Point, Hong Kong IL 8960, IL 8990 BD 1/3035/01 7 December 2007 Auditorium QBIL 15 sD, QBML 1sCss5 Architect's initiative to achieve sCss6, QBML 2sG & ext, sF 18 Westland Road, Quarry Bay, Hong design excellence with 804 2011 Wong & Ouyang (HK) Ltd One Island East Office Development & ext, sF & ext, sHss6, sBRP BD 2/3031/01 17 March 2008 Kong constraints from clients and & ext, sHRP & ext and QBML practical issues 2RP & ext How did the Architect deal with the technical and Proposed redevelopment for China Graduate School of 12 Dorset Crescent, Kowloon Tong, 8 May 2008 (OP) ; 20 contractual issues in order to 805 2011 DesignVision Architects Ltd NKIL 922 & 923 BD 4062/05 Theology Kowloon October 2008 (PC) manipulate the historical porch revitalisation to the satisfaction of the Client and An in-depth study on 21 March 2007 (OP) ; 12 806 2011 Wong & Ouyang (HK) Ltd One Kowloon 1 Wang Yuen Street, Kowloon Bay NKIL 6268 BD 4024/00 rearrangement of office core April 2007 (PC) during construction period The Church of Jesus Christ of Latter-Day Saints, 118 Gloucester Road, Wanchai, Hong Architectural Feature - Church 807 2011 Aedas Ltd IL 8909 BD 2/3028/00 March 2005 Wanchai, Chapel Kong steeple and roof system Kiu Tau Wai, Ping Shan, Yuen Long, New Project Programme and 808 2011 P & T Architects & Engineers Ltd Redevelopment of Industrial Building Lot No. 432 in DD 127 BD 2/9122/07 (Pt II) February 2011 Territories Budget Residential Development at Hung Shui Kiu, Yuen Long, How architect responded to 809 2011 Wong Tung & Partners Ltd 88 Hung Yuen Road Lot No 4331 in DD 124 BD 9138/04 21 March 2011 New Territories site constraints? The affect of the client's 20, 22, 24, 26 Cape Road, Chung Hum request for early OP mid- 810 2011 ARK Associates Ltd 22 Cape Road, Chung Hum Kok, Hong Kong RBL 800 BD 2/2067/07 26 March 2010 Kok, Hong Kong construction, on procurement of contract and coordination 811 2011 Leigh & Orange Ltd Hong Kong Baptist University School of Continuing Edu 8 On Muk Street, Shek Mun STTL 540, Area 11 BD 4/9107/03 (P) July 2006 Flexibility of an Architect School Improvement Programme Phase IV Package 2 - Authorized Person Vs 812 2011 Leigh & Orange Ltd 10 Tai Wan Road, Hung Hom HHIL 544 BD 3010/02 (P) October 2004 Holy Carpenter Prevocational School Buildings Department The differences between Two Primary Schools at Eastern Harbour Crossing 23-25 Yau Tong Road, Yau Tong, 813 2011 Wong Tung & Partners Ltd SS M311 August 2005 Government and private (EHC) Site, Yau Tong Kowloon projects in the whole building The Design Coordination and Proposed Residential and Commercial Development at Project Management for Site 814 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 9 Tong Chung Street, Tseung Kwan O TKOTL 75 BD 2/7227/02 17 January 2006 Tseung Kwan O, Area 55B, TKOTL 75 Designated as Scheduled Area No. 3 Kowloon Station Development Packages 5, 6 & 7- August 2007 (OP) ; Architect's design to resolve 815 2011 Wong & Ouyang (HK) Ltd 1 Austin Road West, Kowloon KIL 11080 BD 2/7219/00 (F) Tower 20 August 2008 (PC) intricate spatial arrangement List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Architect's initiative to achieve Main Clinical Block and Trauma Centre, Prince of 30-32 Ngan Shing Street, Shatin, New 816 2011 Wong & Ouyang (HK) Ltd N/A ASD in form no: 6367 23 April 2010 design excellence in Wales Hospital Territories contractor-led design and 23 February 2007 (Phase Architect's strategy on Proposed residential redevelopment at Lot 868 of DD 1, 1) ; 24 November 2008 817 2011 Cheung Kong Yeung Architects Ltd Nga Kau Wan, Lamma Island, Hong Kong Lot 868 of DD 1 BD 2/9321/97 fulfilling lease condition and Nga Kau Wan, Lamma Island, Hong Kong (Phase 2) ; 24 December overcoming site constraints 2008 (Phase 3) Design constraint due to tight 818 2011 Andrew Lee King Fun & Associates Architects Ltd Emerald Green Ma Tin Road YLTL 515 BD 2/9088/05 30 October 2010 site condition 819 2011 Ronald Lu & Partners (HK) Ltd Ocean View Po Tai Street No. 1, Ma On Shan, Shatin Lot No. 481 BD 3/9135/00 September 2003 JPN Clause No. 1 Passenger Terminal Building - East Hall A&A to Airport Passenger Terminal Building - East Hall Fire engineering approach to 820 2011 Aedas Ltd Extension, International Airport, Lot No. 1, Chek Lap Kok Lot No. 1 BD 2/9810/01 (P) December 2003 Extensions fire safety Chek Lap Kok, Lantau Unexpected water table level Lot 2598, Kam Tsin Tsuen, Sheung Shui, after ground investigation 821 2011 AND Architect & Design Ltd Proposed Residential Redevelopment Lots 2598 Lot 2598 in DD 92 BD 2/9091/06 June 2007 New Territories resulting change in design and submission strategy Proposed Residential Development in Area 36, Sheung No. 18 Ching Hiu Road, Ng Uk Tsuen, 822 2011 Lu Tang Lai Architects Ltd FSSTL 189 BD 9138/97H August 2006 Landuse Rezoning Shui Area 36, Sheung Shui, New Territories Architect's role vs 823 2011 LWK & Partners (HK) Ltd 8 Hoi Fai Road, Kowloon KIL 11152 BD 2/4061/00 9 September 2004 (OP) procurement method 824 2011 Cheung Kong Yeung Architects Ltd Proposed Residential Redevelopment 11 Verbena Road, Kowloon Tong NKIL 4610 BD 4062/07 3 August 2009 Contract comparison How architect countered to Podium Portion (Phase 1) of Tseung Kwan O Area 56 825 2011 Wong Tung & Partners Ltd 9 Tong Yin Street TKOTL 72 BD 2/7196/98 (2) January 2011 site constraints through early Development identification and coordination Tseung Kwan O Area 106, Sai Kung, New 826 2011 Wong Tung & Partners Ltd Hong Kong Movie City, Tseung Kwan O TKOTL 85 BD 2/9156/01 March 2005 Acoustic Design Issue Territories (A&A Works) Proposed Restaurant at Level 4 of Pacific L4, Pacific Place 1, 88 , Hong September 2008 (OP) ; ETFE Cushion Skylight, Fire 827 2011 Wong & Ouyang (HK) Ltd IL 8571 BD 2-3/2013/85/4-5 Place Kong August 2008 (PC) Engineering, Structural Lime Habitat - Proposed residential redevelopment on IL 897 sAss 19, sAss 20 sA 31 May 2011 (OP) ; 31 828 2011 Archiplus International (HK) Ltd IL 897 sAss 19, sAss 20 sA and SBRP at No. 38 Ming 38 Ming Yuen Western Street, North Point BD 2/3017/07 Special site circumstances and SBRP August 2011 (PC) Yuen Western Street, Hong Kong Proposed Development of New Student Dormitory at St. St. Stephen's College, 22 Tung Tau Wan Time and cost control 829 2011 Cheung Kong Yeung Architects Ltd RBL 432 RP and ext BD 2/2027/09 June 2011 Stephen's College, RBL 432 RP and ext Road, Stanley, Hong Kong thoughout the project The pros and cons of the use sub section 1 of section B of 830 2011 WMKY Ltd Shiu Fai Terrace 6 Shiu Fai Terrace, Hong Kong BD 2/3032/06 January 2010 (OP) of pre-cast façade in a IL 2302 and ext residential development. How architects deal with Extension to SKH Mung Yan Primary School at King King Fung Path, Tuen Mun, New ASD 831 2011 Chows Architects Ltd GLA - TM 110 April 2010 limited site area on design Fung Path, Tuen Mun, New Territories Territories 102/7093/EA/E20/001 and construction aspects? How architect endeavour to 832 2011 Aedas Ltd Extension of St. Paul's Co-Education College 33 MacDonnell Road, Hong Kong IL 8203 BD 2033/05 Aug 2011 promote architectural excellence in his work in a 1 Road, Clear Water Tendering arrangement 833 2011 I Architects Ltd 1 Silverstrand Beach Road Lot No 315 in DD 224 BD 2/9034/06 23 September 2008 Bay comparison Study Design and construction 834 2011 Original Vision Ltd White Haze 64 Sheung Sze Wan Road Lot No 216 in DD 235 BD 9036/04 23 December 2009 issues of precast concrete Further discuss on statutory compliance issues and procedures of project with an ASD MTR 710 Re-Provisioning of Kennedy Town Swimming 2 Sai Cheung Street North, Kennedy without BD submission ; the 835 2011 TFP Farrells Ltd GLA HK 1075 14/85750/TAS/SJP/1 May 2011 Pool (Phase 1) Town role of ICC in this project; and 27 the relationship between the architect, the client, LCSD and ArchSD. East Wing and West Wing, Hau Tak Addition and Alteration Works at Hau Tak Shopping HD(ICU)E Complexity of Construction 836 2011 Aedas Ltd Shopping Centre, Hau Tak Estate, TKOTL 99 July 2011 Centre (Phase 3) 3/026(N)AA(5)-D Programme Tseung Kwan O, New Territories Six Towers and Hotel Development at Tseung Kwan O Design of the typical floor plan 837 2011 Wong Tung & Partners Ltd 9 Tong Yin Street, Tseung Kwan O TKOTL 72 BD 2/7196/98 (2) Mid August 2011 Lot 72, Area 56 response to the site context. Special comforting design for 838 2011 Architectural Services Department Reprovisioning of Diamond Hill Crematorium Po Kong Village Road, Kowloon GLA NK 665 ASD 5989 February 2009 the Crematorium Investigation of Environmental Tom Ip & Partners Architects, Engineers & Development The Construction of a 24-Classroom Primary School at J/O Texaco Road and Castle Peak Road, ASD Sustainability of Building 839 2011 GLA TW 460 December 2008 Consultants Ltd J/O Texaco Road and Castle Peak Road, Tsuen Wan Tsuen Wan, New Territories 103/6647/EA/9AN020 within The Local Context and Site Constraint September 2000 (OP) ; How Architect responds to Lee Ka Shing Tower, The Hong Kong The Hong Kong Polytechnic University, Phase VI October 2000 (PC-Phase problems through the crucial 840 2011 Wong Tung & Partners Ltd Polytechnic University, Hung Hom, KIL 9853 RP and ext BD 4017/97 (P) Development, Kowloon Inlet 1) ; August 2001 (PC- construction stages to meet Kowloon Phase 2) critical deadlines. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Construction of Swimming Pool Complex in Area 2, 5 Tat Chung Road, Tung Chung, New GLA IS 440 (Phase 1) ; ASD An unique feature: The 841 2011 Ronald Lu & Partners (HK) Ltd November 2011 (PC) Tung Chung Territories TGLA TIS 560 (Phase 2) 302/6536/RA/9AQ017 Membrane roof Determination clause in letter of intent as Architect's Man Kei To, Pak Sha Wan, Sai Kung, 23 April 2005 (OP) ; 24 842 2011 Ronald Lu & Partners (HK) Ltd The Giverny Lot No. 1184 in DD 217 BD 9121/01 solution to minimize client's New Territories May 2005 (PC) loss due to late approval of tree removal application How the Architect justify the 10 Lo Ping Road, The Hong Kong Institute 843 2011 Aedas Ltd Proposed HKIEd Jockey Club Primary School TPTL 147 BD 2/9150/00 (P) August 2002 design against building height of Education, Tai Po, New Territories restriction of schools April 2007 (OP) ; May 844 2011 Wong Tung & Partners Ltd Enterprise Square 5 - Phase II 38 Wan Chiu Road, Kowloon Bay NKIL 5927 BD 2/4042/02 New Practice Notes Studies 2007 (PC) Architect's solution to 138 Yeung Uk Road, Tsuen Wan, New August 2005 (OP) ; 845 2011 Wong Tung & Partners Ltd Commercial / Service Apartment at Yeung Uk Road TWTL 406 BD 2/9046/93 environmental concerns in an Territories October 2005 (PC) industrialised area KIL 2232 SEC A, KIL 2232 846 2011 MCAA Ltd Proposed Composite Building Development 24-28 Tung On Street BD 1/4068/06 12 February 2010 Asbestos RP & KML 84 sEss 2 RP Relationship between Building J/O Hung Lai Road and Hung Lok Road, Mid June 2007 (OP) ; 10 847 2011 Architecture Design & Research Group Ltd The Hong Kong Community College Development KIL 11163 BD 3/4026/04 design and construction Hung Hom July 2007 (PC) technologies - Pros and Cons The ways to deal with the environmental problems Redevelopment of Au Shue Hung Health Centre, Hong 330 Junction Road, Kowloon Tong, affecting the occupants of the 848 2011 Wong & Ouyang (HK) Ltd NKIL 5907 BD 2/4048/03 20 March 2008 Kong Baptist University Kowloon adjacent buildings during the demolition and construction process. Codes with implications and 849 2011 Leigh & Orange Ltd Creative Media Centre, City University of Hong Kong 18 Tat Hong Avenue Lot No 6264 BD 2/4011/04 (P) November 2010 control in planning and design aspect 311 Gloucester Road, Causeway Bay, Lot No IL 7717, IL 7718, IL Coordination 3 nos. contractor 850 2011 AGC Design Ltd Proposed Alterations and Additions Windsor House BD 2-3/3082/76/33 24 June 2011 Hong Kong 781 sA, IL782 sA & sC in different contact at same An Investigation on the precaution and safety of 851 2011 ARK Associates Ltd The Java, 98 Java Road, North Point 98 Java Road, North Point IL 3539 BD 2/3010/07 1 October 2011 building construction especially in relation to School Improvement Programme - P260 (sp) - Saviour 852 2011 Leigh & Orange Ltd 288 Tai Po Road, Kowloon, NKIL 4456 NKIL 4456 BD 3004/02 (P) 2004 Site constraint Lutheran School ASD School Improvement Programme Final Phase How Architect resolve the salt 853 2011 Llewelyn-Davies (HK) Ltd 155 Lung Cheung Road, Wang Tau Hom NKIL 5239 BD 2/3002/03 (P) 20 June 2005 S351 The Pentecostal Holiness Church Wing Kwong contaminated building works From URA to BEAM, Green 854 2011 LWK & Partners (HK) Ltd Bedford Road/ Larch Street Project 38 Larch Street, Tai Kok Tsui, Kowloon KIL 11182 March 2009 Premises to Urban Redevelopment Proposed domestic building in RBL 174, at No. 116, Construction near sensitive 855 2011 LWK & Partners (HK) Ltd 116 , Hong Kong RBL 174 BD 2/2007/86 28 August 2001 Pok Fu Lam Road, Hong Kong site Protect the natural Proposed Teaching Hotel Development - The Chinese 18 Chak Cheung Street, Shatin, New 12 June 2008 (OP) ; environment has a different 856 2011 Wong Tung & Partners Ltd STTL 437 and ext thereto BD 2/9003/02 University of Hong Kong Territories August 2008 (PC) impact in the planning and construction process. How does the contractual Unit 8, 2M, 21 Chun Yue Road, Hong relationship with contractor 857 2011 Aedas Ltd Tradeport Logistics Centre Development CLK 1 and ext BD 2/9806/01 January 2003 Kong International Airport promote the progress and quality of the project. Proposed Composite Development on 42-44 Belcher's 42-44 Belcher's Street, Kennedy Town, 858 2011 K & W Architects Limited IL 953 Sec C, Sec D BD 2/2038/04 5 January 2011 In-house Contractor System Street Hong Kong Architect's solution to the 859 2011 Andrew Lee King Fun & Associates Architects Ltd 633 King's Road 633 King's Road, North Point IL 7860 BD 3004/04 May 2007 major change of use of the building during construction Design opportunities and Addition and Alteration works of creative media 5/F, Tin Heng Estate Multi-Storey HD (ICU) E3/122(N) 860 2011 SLHO & Associates Ltd 16 January 2008 constraints in converting workshop for skyhigh creative partners Carpark, Tin Shui Wai AA(8) carpark to public facilities The project presents a challenge on highly restrictive site, with difficulties related to carrying out site works within SIP Final Phase Package 1, Ho Koon Nature Education 101 Route Twist Tso Kung Tam Park, 861 2011 WCWP International Ltd TWTL 359 BD 3/3086/02 (P) 25 August 2005 a small site. Futhermore, cum Astronomical Centre Tsuen Wan precaution measures to be provided to minimize harzards / disturbance on school operation during construction List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Construction procedure and The Satellite Remote Sensing Ground Receiving The Chinese University of Hong Kong, STTL 437 RP and the ext 862 2011 Seniorman Design Ltd BD 2/9062/06 3 December 2009 EVA of fire service due to site Station Phase II Shatin, New Territories thereto constrain The design and administrative approaches taken by the 863 2011 A & T Design Ltd 1881 Heritage 2A Canton Road, Tsim Sha Tsui, Kowloon KIL 11161 BD 2/4023 9 February 2009 architects to resolve the conflicts How did the architect deal with the difficulties encounter Proposed Redevelopment of China Graduate School of 864 2011 DesignVision Architects Ltd 4-5 Devon Road, Kowloon Tong NKIL 894 BD 2/4026/98 December 2000 for the redevelopment of old Theology at 4-5 Devon Road, Kowloon Tong site in order to satisfy the planning control requirement Chinese University of Hong Kong, Shatin, Contract Administration 865 2011 Ronald Lu & Partners (HK) Ltd Daisy Li Hall Student Quarters STTL 437 BD 9206/98 (P) 9 October 2002 New Territories Aspect SIP Final Phase - Package 4 S316, Pui Ying College at S316, Pui Ying College, Wo Che Estate, 9 VO 103, Plan No. STM ASD How the architect respond to 866 2011 Ronald Lu & Partners (HK) Ltd 1 June 2005 Sha Tin Fung Shun Street, Shatin, New Territories 6154A 303/6487/EX/E20/S3 the liquidation of contractor Architect's role in solving land 867 2011 Chau Ku & Leung Architects & Engineers Ltd Composite Redevelopment of 8-12, Baker Court 8-12 Baker Court, Hung Hom, Kowloon KIL 11181 BD 2/4004/09 July 2011 matters Impact of economical behaviour on architect's 868 2011 Wong & Ouyang (HK) Ltd Villa Esplanada Phase II 8 Nga Ying Chau Street, Tsing Yi TYTL 129 BD 2/9123/95 12 March 1999 decision and architectural design in Hong Kong QBML 1 RP, sQ, sR, ss1, BEAM Plus standards and the 979 King's Road, Taikoo Place, Island 869 2011 Wong & Ouyang (HK) Ltd Lincoln House sRRP, sS, sTss1, sTss2, BD 2/3017/94 7 September 1998 architect's role in the building East, Hong Kong sTRP, sU and sW industry today. Investigate building design measures of the PTI such as Tseung Kwan O Town Centre, Area 56, plan layout, vertical access, 870 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tseung Kwan O Public Transport Interchange TKOTL 72 BD 2/7196/98 2002 TKOTL 72 fire escape routes, structure etc, that allow the incorporation of the above Contractual resolution in Hong Kong Community College Development at West 871 2011 Architecture Design & Research Group Ltd 9 Hoi Ting Road, West Kowloon KIL 11176 BD 2/4050/05 28 March 2008 relationship with tight Kowloon construction programme How architect to help building 14 October 2003 (OP) ; 1 services systems to meet the 872 2011 WT Architects (Management) Ltd Le Meridien Cyberport 100 Cyberport Road, Pokfulam IL 8969 RP BD 2/2042/99/ST 3 April 2004 (PC) requirement of relevant departments Tree Felling and Tree Proposed Residence at 1 Pueves Road, Jardine's 1 Purves Road, Jardine's Lookout, Hong 873 2011 AGC Design Ltd IL 7193 BD 2/3019/08 December 2010 Preservation clause and its Lookout Kong implications on project QBML 1RP, sQ, sRSS1, Architectural solutions Commercial Development of Dorset House and PCCW Taikoo Place, 979 King's Road, Quarry 874 2011 Wong & Ouyang (HK) Ltd sRRP, sS, sTSS1, sTSS2, BD 3011/89 December 1994 towards multi-clients within a Tower Bay, Hong Kong SULSW twin-tower 875 2011 Wong & Ouyang (HK) Ltd Pok Oi Hospital Redevelopment and Expansion Au Tau, Yuen Long, New Territories Lot No. 1630 in DD 115 BD 2/9164/00 21 April 2006 Hospital Circulation Design Ho & Partners Architects Engineers & Development Proposed residential development at Hung Shui Kiu, PM + CM management 876 2011 Lot 2064 in DD 121 BD 2/9177/05 BD 2/9177/05 31 May 2011 Consultants Ltd Yuen Long, Lot 2064 in DD 121 system of Cheung Kong Ltd SIP - Final Phase, Package 1, S338 - St. Paul's 140 Leighton Road, Causeway Bay, Hong 877 2011 WCWP International Ltd IL 1018 BD 3/3083/01 (P) 25 June 2005 Convent School Kong How the extraordinary foundation design as a consequence affecting the whole construction 878 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Hong Kong Polytechnic University, Phase VII Hung Hom, Kowloon KIL 9853 RP and ext BD 2/4004/02 November 2004 procedures and increasing the complexity of contractual procedure in relation to the budget control for construction and the building Property Development at Tai Wai Maintenance Centre 3 February 2010 (OP) ; 6 879 2011 Hsin Yieh Architects & Engineers Ltd 1 Mei Tin Road, Tai Wai, New Territories STTL 529 BD 2/7897/99/2 Phasing and demarcation (Phase 1) / Festival City February 2010 (PC) How architect deal with site Residential Development at 21 Tung Shan Terrace 21 June 2002 (OP) ; 1 constraints not only to solve 880 2011 LWK & Partners (HK) Ltd 21 Tung Shan Terrace, Hong Kong IL 2933 BD D72/78/HK (Notting Hill) August 2002 (PC) problem but also to achieve aesthetic pursuit Adopting prefabrication 881 2011 Aedas Ltd Skycity Marriott Hotel - Phase 1 1 Skycity Road East CLK Lot No 1 RP BD 9094/06 12 August 2008 construction method Issues in relation to over 10 882 2011 Simon Kwan Architect & Associates Ltd Ma Wan Residential Development Area Phase 6 8 Pak Lai Road, Ma Wan Island MWL 392 BD 9160/97H (7) 30 June 2009 (OP) years span of RDA implementation period. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 6 Man Kuk Lane, Tseung Kwan O (TKO) ; Comparison between District open space at Tseung Kwan O Area 37 and On Lok Mun Street Playground, On Lok 883 2011 Arthur C.S. Kwok Architects & Associates Ltd SSW 318 July 2011 government and private Local open space at Fanling, Sheung Shui Areas 25 Mun Street, Fanling (FL1) ; One Fok projects. Street Playground, On Fok Street, Fanling Architect's role in the event of 884 2011 Steve Leung Architects Office Development at 9 Chong Yip Street, KTIL 444 9 Chong Yip Street, Kwun Tong KTIL 444 BD 4035/02 March 2004 a major late stage change in building use and design brief Administration procedure and construction management 885 2011 Wong & Ouyang (HK) Ltd Sheung Shui Slaughterhouse 15 Chuk Wan Street, Sheung Shui Area 2B, Sheung Shui July 1999 addressed in design and build contract. Level 5, Zone 50, Terminal 1, Hong Kong CLK Lot No 1 PR and ext Bespoke designer furniture: 886 2011 Foster + Partners Cathay Pacific Lounges BD 2-3/9702/94/180 30 July 2010 International Airport, Chek Lap Kok thereto Intellectural ownership New residential building 358-364 Un Chau Street, Sham Shui Po, 887 2011 Andrew Lee King Fun & Associates Architects Ltd Southern Lodge, Residential Development NKIL 2866 sF & RP BD 4005/04 6 March 2008 typology under new practice Kowloon notes and SBD guidelines 888 2011 P & T Architects & Engineers Ltd Kowloon Station Package 4 1 Austin Road, Kowloon KIL 11080 BD 2-3/7204/99 25 July 2003 Building defects Fire engineering process for 889 2011 The Oval Partnership Ltd 3-5 Star Street 3-5 Star Street, Wanchai, Hong Kong 2837 sCss1 and sCRP BD 2/3027/07 September 2011 (PC) realizing untypical design solution Building information management in construction End of September 2010 industry: influences on local 890 2011 KPF (Hong Kong) Ltd Kerry Centre 865 King's Road, Quarry Bay, Hong Kong IL 9021, formerly 7737, 8637 BD 2/3007/06 (OP) ; End of December practice collaborative 2010 (PC) process, future development and design profession liability Public rental housing development at Tin Shui Wai Area Carport Planning and 891 2011 Hong Kong Housing Authority Tin Shui Wai Area 103 Lot No. 103 YL 28 March 2008 103 (Phase 1) Development, Community 892 2011 P & T Architects & Engineers Ltd 3-5 Plunkett's Road, The Peak, Hong Kong, RBL 647 3-5 Plunkett's Road, The Peak Hong Kong RBL 647 BD 2024/04 April 2008 Sustainability design BD 2/9905/03 (NPT) How architect dance with 893 2011 Aedas Ltd Tung Chung Cable Car-Ngong Ping Terminal Ngong Ping Road, Lantau 17 May 2006 (P) chain Lot 507, Kwai Chung Town, Container 894 2011 Aedas Ltd Logistic Centre, Kwai Chung Town Lot No 507 BD 2/9102/08 May 2011 Lease Conditions Port Road South, Hong Kong ML 384, ML 385, ML 387, ML Architectural Consultancy Services for No. 50, 55, 57- 895 2011 Aedas Ltd 50, 55, 57-59 Connaught Road, Central 388, ML 389 RPsA, ML 390 BD 2/2023/07 22 February 2011 Leed Certificate Measure 59 Connaught Road, Central RP sB and sA Project Programme: 661-665 King's Road, North Point, Hong 30 September 1999 (OP) ; 896 2011 P & T Architects & Engineers Ltd 661-665 King's Road IL 8885 BD 3068/94 Preliminary, Construction and Kong 30 March 2000 (PC) Extension Design Adaption with Existing 897 2011 Aedas Ltd Redevelopment of St. Rose of Lima's School 4 Embankment Road, Kowloon KIL 2356, 2585 BD 4012/08(P) July 2011 (Anticipated) Trees Architectural solution in Summit, Ocean Park, 180 Wong Chuk 898 2011 Leigh & Orange Ltd Ocean Park Redevelopment - Rain Forest RBL 1020 RP and ext BD 2/2032/07 (P) 15 February 2011 dealing with special functional Hang Road, Aberdeen requirement To construct with minimal Union Hospital, 18 Fu Kin Street, Tai Wai, 899 2011 Leigh & Orange Ltd Union Hospital Extension STTL 168 BD 2-3/9094/04 March 2006 disturbance of the operating Shatin, New Territories hospital Hong Kong Jockey Club Shatin Race Course Parade 900 2011 Aedas Ltd Shatin Race Course STTL 13 BD 2/9091/03 November 2004 Ring Redevelopment Redevelopment of Upper Wong Tai Sin Estate (Phase Delay of master programme - 901 2011 Ronald Lu & Partners (HK) Ltd Upper Wong Tai Sin Estate, Kowloon September 2000 1) Its causes and implications Lok Ha Square, Fo Tan, Shatin, New ASD 303/6487/AL 902 2011 Ronald Lu & Partners (HK) Ltd Stewards Pooi Kei Primary School GLA TST 58 August 2004 Main Contractor's Liquidation Territories L360/C25/001 Lok Sin Tong Chan Cho Chak Primary School Improvement Programme Final Package - 903 2011 Ronald Lu & Partners (HK) Ltd School, Jat Min Chuen, Shatin, New STTL 28 BD 2/3102/01 (P) 30 September 2005 Project Programme and Delay Package 4 Group 5 Territories Proposed Commercial Building at J/O Sheung Yee 7 Wang Man Street and 23 Wang Tai 7 August 2008 (OP) ; 30 904 2011 WMKY Ltd NKIL 6280 BD 4/4006/01 Architectural Design Road, Wang Tai Road, Kowloon Bay Road August 2008 (PC) Lease requirement and Proposed residential and retail management at KIL 18 Farm Road, Ma Tau Wai Road, client's need - To fulfill lease 905 2011 Ronald Lu & Partners (HK) Ltd KIL 11145 BD 2/4060/00 July 2004 11145, Farm Road, Ma Tau Wai, Kowloon Kowloon requirement and balance the client's need Proposed redevelopment of quarantine "B" Stables at 22 April 2008 (Phase 1) ; 906 2011 Ronald Lu & Partners (HK) Ltd Shatin Racecourse, New Territories STTL 13 BD 2/9189/05 (2) (P) Time Constrict - Programme Sha Tin Racecourse April 2008 (Phase 2) 8 January 1999 (Blk 2-6) ; How the architect worked with 33, Tsing King Road, 7 August 1999 the Contractor to resolve 907 2011 Wong Tung & Partners Ltd Tsing Yi Station Development TYTL 132 BD 2/7162/93-T Tsing Yi, New Territories (Clubhouse) ; January many constrain during 2000 (Blk 1, 7-12) construction stage How Architect uses design to Residential Development at 363 Tai Po Road, Monte 908 2011 Christopher Leung & Associates Ltd 363 Tai Po Road, Kowloon NKIL 3512 RP & ext BD 2/4169/93 November 2001 resolve site constraints and Carton maximize development List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) ML 7sARP, ML7sAss3, A&A Works at B1/F to 2/F, Podium, The Landmark, The Landmark, 15 Queen's Road, Central, ML7sBRP, ML2c, ML3sA, Minimizing the interruption to 909 2011 Aedas Ltd BD 2-3/2216/75/51 April 2007 ; July 2008 (PC) Central, Hong Kong Hong Kong ML2sB, ML2sARP, ML2RP, the public during construction ML2AsBRP, IL 3087 Residential development on 910 2011 LWK & Partners (HK) Ltd Proposed residential development on Severn Road 8 Severn Road, Peak, Hong Kong RBL 1148 BD 2/2007/00 August 2005 sloping site The Architect's solution to Comprehensive Residential and Commercial 500 Tung Chau Street, Cheung Sha Wan, deal with the tight time frame 911 2011 Simon Kwan Architect & Associates Ltd Development at NKIL 6365, 500 Tung Chau Street, NKIL 6365 BD 4082/04 July 2008 Kowloon for meeting the anticipated Cheung Sha Wan, Kowloon date of occupation permit Land Grant / Tree Felling 912 2011 Andrew Lee King Fun & Associates Architects Ltd Po Leung Kuk Choi Kai Yau School 6 Caldecott Road, Kowloon NKIL 6440 BD 2/4052/06 (P) August 2009 Proposal 1 June 2011 (TOP) ; Sustainability design, green 913 2011 Rocco Design Architects Ltd Redevelopment of 31 Queen's Road, Central 31 Queen's Road, Central, Hong Kong IL 2316 BD 2/2059/05 October 2011 (Target OP) features and BEAM Plus How extraordinary foundation Stage 4a: July 2002 (OP) ; system affecting construction August 2002 (PC) ; Stage 914 2011 Wong & Tung International Ltd Cyberport Development Stage 4 Telegraph Bay, Pok Fu Lam, Hong Kong IL 8969 RP BD 2/2042/99/ST 4 procedures and increasing 4b: December 2002 (OP) ; complexity of contractual December 2002 (PC) procedure Comprehensive Hotel, Office, Residential and 3 Tong Tak Street, Tseung Kwan O, New Targeted to be end of Design change to meet client 915 2011 Wong Tung & Partners Ltd TKOTL 72 BD 2/7196/98 (2) Commercial Development (Phase 3) Territories September 2011 request The Lingnan University, Junction of Tuen The Lingnan University News Campus Development of 916 2011 Architecture Design & Research Group Ltd Kwai Road and Castle Peak Road, Tuen TMTL 482 BD 2/9097/08 August 2011 (OP) Acoustic window Student Hostel and Academic Block Mun, New Territories Proposed industrial building at No. 37-39 Wing Hong 37-39 Wing Hong Street and 70-72 King NKIL 2828 RP, sARP, 4 17 November 2008 (OP) ; Industrial building in 21st 917 2011 Andrew Lee King Fun & Associates Architects Ltd BD 4005/06 Street and No. 70-72 King Lam Street, Cheung Sha Lam Street sAss2 27 November 2008 (PC) Century Hong Kong How Architect response in Extension of School Block for Fanling Lutheran 270 Jockey Road, Fanling, New 918 2011 Andrew Lee King Fun & Associates Architects Ltd FSSTL 228 BD 2/9022/05 (P) 6 December 2010 case of emergency during Secondary School Territories construction period? Architect's solution against Hotel Development at 165-167 Wai Yip Street and How 919 2011 Andrew Lee King Fun & Associates Architects Ltd 163 Wai Yip Street KTIL 752 BD 2/4074/94 (Pt III) 23 January 2007 tight programme and client's Ming Street budget control How Architect response to compliance with ordinance, Proposed Industrial Building at No. 4-6 Kom Tsun requirement from the client 920 2011 Andrew Lee King Fun & Associates Architects Ltd 932 Cheung Sha Wan Road NKIL 3874 and NKIL 3951 BD 2/4030/08 14 January 2011 (OP) Street and 932 Cheung Sha Wan Road and coordination with contractors. Ethical responsibility of Architect Proposed Hotel Building at 38 Bowrington Road, 38 Bowrington Road, Wanchai, Hong January 2011 (OP) ; How Architect works to 921 2011 Andrew Lee King Fun & Associates Architects Ltd Lot No. 8263 BD 2/3023/07 Wanchai, Hong Kong Kong March 2011 (PC) overcome site constraint Precautionary work during The New Cathay Pacific HKIA Lounges (The Wing) Level 6 and 7, Zone 15 and 16, Terminal CLK Lot No. 1 RP and ext 922 2011 Foster + Partners BD 2-3/9702/94/184 June 2011 (Phase 1) phasing and interfacing (Phase 1) 1, Hong Kong International Airport thereto existing building components 923 2011 CSI Property Holdings Ltd Proposed Commercial Development 8 Hau Fook Street, Kowloon KIL 9201 RP BD 4038/06 February 2011 Project Management 26 Sung On Street, To Kwan Wan, Conflict between time and 924 2011 Andrew Lee King Fun & Associates Architects Ltd Addition of A New Annex 29 June 2010 Kowloon operation of school Architect, as a lead consultant, to co-ordinate with Development at 600 Canton Road, Yau Ma Tei, 590-600 Canton Road, Yau Ma Tei, KIL 1556 sERP, KIL sF, KIL various consultants and 925 2011 Andrew Lee King Fun & Associates Architects Ltd BD 2/4045/06 30 July 2010 Kowloon Kowloon 1556 RP, KIL 1556 sG government departments for solving contraditory lands issue before application of 926 2011 P & T Architects & Engineers Ltd Commercial Development at IL 8822 Tamar (Citic Off , Hong Kong IL 8822 BD 2/2042/95 July 1997 Short Construction Balance between characteristics of private Private Sector Participation Scheme in Area III, Tin 927 2011 P & T Architects & Engineers Ltd Tin Shui Wai Area 111, Yuen Long TSWTL 28 BD 9030/00 December 2002 residential development and Shui Wai, Yuen Long (Grandeur Terrace) public housing development in PSPS as an architect Design coordination and Hong Kong Convention and Exhibition Centre Atrium development with existing 928 2011 Wong & Ouyang (HK) Ltd 1 Expo Drive, Wanchai, Hong Kong GLA 840 March 2009 Link Expansion buildings and the concurrent operation of HKCEC Architect's approach to add 1 Lam Shing Road, Tseung Kwan O, New new elements to an existing 929 2011 WCWP International Ltd SIP Final Package 1, King Ling College TKOTL 41 BD 2/9311/93 18 October 2005 Territories building with minimal alternation and disturbance to Residential Redevelopment at 54, 56, 58 Mount Kellet Supplementary agreement 930 2011 Handi Architects Ltd 54 Mount Kellet Road, The Peak RBL 532 BD 2/2054/06 18 May 2011 Road, The Peak between client and contractor Construction at scheduled Residential Development at RBL 513 RP and RBL 540 931 2011 P & T Architects & Engineers Ltd 10 Pollock's Path, The Peak RBL 513 RP and RBL 540 sA BD 2030/02 30 July 2007 area and its diffculties in sA, 10 Pollock's Path, The Peak project management List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Cyber Port Road (Stage 10-12) (Area RV), BD 2/2042/99/ST 10- GRC Architectural Feature on 932 2011 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RV) IL 8969 sB August 2008 Cyberport, Pokfulam 12(A) Façade Comparison of considerations on design, time and budget Renovation Works at Raimondi College Primary 1-E, Shiu Fai Terrace, Stubbs Road, constraints between A&A 933 2011 WCWP International Ltd IL 7936 BD 2-3/2259/62/4 November 2009 Section Wanchai, Hong Kong work of the project and the SIP from Government will be further discussed Building performance by comparing the original Hotel at IL 8774, 133 Leighton Road, Causeway Bay, 133 Leighton Road, Causeway Bay, Hong 934 2011 WCWP International Ltd IL 8774 BD 2-3/3063/97/2 13 December 2005 intention and final outcome Hong Kong - Lanson Place Hotel Kong including statutory approach, design approach Construction of Extension Block to Pui Ling School of 13 On Lok Mun Street, On Lok Tsuen, Minimize construction period, 935 2011 Leigh & Orange Ltd FSSTL 194 BD 2/9170/06 (P) 8 July 2009 Precious Blood, Fanling Fanling including the extension days Advantages and 936 2011 Andrew Lee King Fun & Associates Architects Ltd 133 Hoi Bun Road 133 Hoi Bun Road, Kwun Tong, Kowloon KTIL 756 BD 2/4050/08 16 May 2011 disadvantages of procedures that deviate from common Accesible built-environment Mental Health Association of Hong Kong Pak Tin 937 2011 Design 2 (HK) Ltd Cornwall Street, Sham Shui Po, Kowloon GLA NK 705 10 July 2009 for children with severe metal Children's Center handicap Innovative solution to fire Development at Kowloon Bay, Enterprise Square 5 29 December 2006 (OP) ; 938 2011 Wong Tung & Partners Ltd 38 Wang Chiu Road, Kowloon Bay NKIL 5927 BD 2/4042/02 escape strategy, fire Phase 1 (Mega Box) 15 January 2007 (PC) compartment and FS system Redevelopment of Historially - 939 2011 Simon Kwan Architect & Associates Ltd URA Redevelopment at Johnston Road, IL 8997 60 Johnston Road, Wanchai, Hong Kong IL 8997 BD 2/9032/03 November 2007 Valuable Building Proposed Composite Building at Yiu Hing Road, Shau How do new regulations affect 940 2011 LWK & Partners (HK) Ltd 88 Yiu Hing Road SIL 845 BD 2/3010/00 4 February 2003 Kei Wan, SIL 845 program and design of Comparison of the 1st Phase - 15 September advantages and G/F and 1/F, 3 , Yau 941 2011 Meta 4 Design Forum Ltd Broadway Cinematheque (YMT) A&A Projects KIL 10878 BD 2-3/4092/87/8 2011 ; 2nd Phase - 31 disadvantages of running a Ma Tei October 2011 project with / without using standard form of building Several architects who are catholic members of the client's church volunteered as additional architectural consultant representing the Redevelopment of Provincial House of the Franciscan 22 February 2011 (OP) ; 942 2011 Omar Yeung Architect & Associates Ltd 104 , Kowloon KIL 2375 BD 2/4070/08 client together with providing Missionaries of Mary 25 February 2011 (PC) design input, resulting in complicated relationship between the client and the architect (OYA) and architects (Volunteered Architects) BD 2-3/4157/89/9, 11, 943 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works at Pioneer Center 750 Nathan Road, Kowloon KIL 2111 Apr 05 13 Noise control strategy, Time Proposed Residential Development at Kowloon Inland saving strategy for 944 2011 LWK & Partners (HK) Ltd Hau Man Street, Ho Man Tin, Kowloon KIL 11122 BD 4030/00 26 May 2003 Lot No. 11122, Hau Man Street, Homantin, Kowloon overlapping the building construction and slope work. The special role of the Ho & Partners Architects Engineers & Development Architect within this design 945 2011 PSPs Tsing King Road (TYTL 163) Tsing King Road, Tsing Yi TYTL 163 BD 2/9042/00H March 2003 Consultants Ltd and build structure will also be reviewed under the special Area N4b at the Remaining Difficulties encountered in 38 Siena Avenue, Discovery Bay, Hong June 2008 (OP) ; August 946 2011 Integrated Design Associates Ltd ESF Discovery Bay Private Independent School Portion of Lot 385 in DD 352 BD 2/9121/02 (P) applying environmental Kong 2008 (PC) and the ext thereto design technology Hiu Kwong Street, Sau Mau Ping, Kwun ASD 102/5815 & Land allocation between 947 2011 P & T Architects & Engineers Ltd School A (324EP) - Primary School NK 722 May 2008 Tong, Kowloon 6736/EA/9AM011 Government Bodies 11 Nam Fung Path, Wong Chuk Hang, July 2008 (PC1) ; August 948 2011 P & T Architects & Engineers Ltd St. Paul's Co-Educational College Primary School GLA-HK 1023 Programme Management Hong Kong 2008 (PC2) 949 2011 Global Atelier Ltd Kingston International School 105 Waterloo Road, Kowloon Tong, Lot No. 708 BD 2/4022/09 27 August 2010 Section 16 Submission Proposed Composite Development at 78, 78A-C Private Street Drainage 950 2011 Kwong & Associates Ltd Nos. 78, 78A-C Waterloo Road, Kowloon KIL 3903 sA, sB, sC & sE BD 2/4032 18 January 2007 Waterloo Road Improvement Work Ho & Partners Architects Engineers & Development 1 Yuk Tai Street, Ma On Shan, New Issues raised by precast faç 951 2011 Sausalito STTL 487 BD 2/9114/04 (Pt. IV) November 2007 Consultants Ltd Territories ade from design to List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Under the distinct site constraint, research on Architect and Developer's 952 2011 Wong & Tung International Ltd Proposed Service Apartment Development 1 Tsing Yi Road TYTL 140 BD 2/9165/98 March 2004 Master Planning and Building Layout helps to achieve noise barrier shielding effect for the development Influence of Economical 953 2011 Ronald Lu & Partners (HK) Ltd Residential Development at STTL 82 (Double Heaven) 52 Ma Lok Path, Kau To Shan, Shatin STTL 82 BD 2/9230/95 11 May 2002 Condition on Design and Construction Proposed Residential Development in 10-18 Wharf 10-18 Wharf Road, North Point, Hong Construction near sensitive 954 2011 LWK & Partners (HK) Ltd Lot No 7433 - 7443 BD 3017/00 July 2003 Road, North Point Kong site How the project team Residential Development at Ma Fung Ling Road, Tong Ma Fung Ling Road, Tong Yan Sun December 2007 (Phase 1) 955 2011 H. C. Wu Architect & Associates Lot 1740 in DD 122 BD 2/9129/02 organization affects the Yan Sun Tsuen, Yuen Long, New Territories Tsuen, Yuen Long, New Territories ; June 2007 (Phase 2) project as a whole Environment and Sustainable 956 2011 ARCA Ltd Reprovisioning of the Buddhist Po Kwong School Tin Sum Village, Fanling, New Territories FSSTL 40 29 May 2003 Challenge 12 June 2009 (BA14 - Alteration and Addition Works - Proposed Hotel in the Conversion of a serviced Bldg A&A) ; 19 June 2009 957 2011 Wong & Ouyang (HK) Ltd Atrium Tower Pacific Place at IL 8571 Queensway, 88 Queensway, Hong Kong IL 8571 BD 2-3/2013/85/49 apartment into a boutique (BA - 14 Acknowledge) ; Hong Kong hotel 27 August 2009 (BA14 - 21 June 2005 (Phase 1a, Government 38 Tai Hong Street, Sai Wan Ho, Hong 958 2011 WCWP International Ltd Grand Promenade - Composite Development IL 8955 BD 2/3002/01 1b) and 19 August 2005 Accommodations Design Kong (Phase 2) Process Proposed Commercial / Residential Redevelopment at 5 August 2005 (OP) ; How design change to suit the 959 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 38 San Ma Tau Street, Kowloon KML 102 RP BD 2/4006/2 KML 102 RP, Ma Tau Kok November 2006 (PC) contemporary market strategy April 2005 (OP) ; May 960 2011 Aedas Ltd AIG Tower 1 Connaught Road, Central, Hong Kong ML 275 and ML 275 sA & RP BD 2004/01 Dedication Proposal 2005 (PC) Design, Renovation and Conversion of Old Married Castle Peak Road, Butterfly Valley, Green Issue of Construction 961 2011 WCWP International Ltd Quarters and the Design of Supporting Facilities For the GLA-NK699 ALM 302 7 February 2006 Kowloon Procedures Re-Provisioning of Victoria Prison at Lai Chi Kok Construction of the New A&A Works at 19 Middle Gap Road, The Peak, Hong 19 Middle Gap Road, The Peak, Hong 1984 (OP) ; April 2011 Swimming Pool Structure and 962 2011 MAP Architecture & Planning Ltd RBL 378 BD 2/1025/82 Kong Kong (PC) Installation of Pool Equipment and Balance Tank The special topic would ASD emphasis on the influence 963 2011 Architecture Design & Research Group Ltd A-24 Classroom Primary School at Inverness Road 39 Inverness Road, Kowloon City GLA-NK680 55/92050/CWO/025- 12 May 2010 (PC) and constraint due to this 07 characteristic of ASD over different stages of the project. HKHA, informed by ArchSD that defects were found at a large extent of the Kwai Chung Estate, Kwai Chung, New 964 2011 P & T Architects & Engineers Ltd Kwai Chung Estate (Phase 7) November 2002 development shortly after Territories completion of the Defect Liability Period and dispute between the Client, Architect 15 January 2009 (Phase Feasibility Study of this Proposed Development at KIL 11124 (Namely Elestial 965 2011 LWK & Partners (HK) Ltd 80 Sheung Shing Street KIL 11124 BD 4074/04 1) ; 23 November 2009 project to fulfill current Heights) (Phase II) sustainability design Proposed Alteration and Addition Works of Nexxus ML 382 Des Voeux Road, Volumetric Calculation and 966 2011 Aedas Ltd 77 Des Voeux Road, Central BD 2-3/2333/59/3 31 December 2008 Building Central GFA Calculation How Architect control and Ho Sheung Heung Road, Sheung Shui, complete a building project 967 2011 Kwong & Associates Ltd Relocation of Lo Wu Saddle Club Short Term Tenacy No. 1408 BD 2/9115/06 (P) 28 September 2007 New Territories within very tight schedule and budget Junction of Castle Peak Road and Palm 5-10 in DD 101, Santin, Yuen Section 16 Application and 968 2011 T. S. Chu Architects Ltd Mai Po Temporary Restaurant BD 2/9041/05 July 2011 Springs Boulevard, Yuen Long Long Building on Agricultural Land How have the architect University Avenue, The Chinese August 2011 (OP - addressed different 969 2011 Gravity Partnership Ltd Proposed New 300 Student Hostel Development University of Hong Kong, Shatin, New STTL 437 RP and ext thereto BD 2/9151/06 anticipated) ; September challenges during different Territories 2011 (PC - anticipated) stages of the development? Proposed Alteration and Addition Works for Grand No to Bonus GFA and design 970 2011 Chau Ku & Leung Architects & Engineers Ltd 138 Shatin Rural Committee Road, Shatin STTL 304 BD 2-3/9268/90/10 10 July 2009 (BA14) Central Plaza at STTL 364 constraints that follow Existing Party Staircases 971 2011 RDL Asia Ltd Proposed Commercial Building 487-489 Lockhart Road IL 2836 sA ss8 and ss4 BD 3002/05 August 2008 were retained adjoining the How the Architect work with different consultants to November 2010 (OP) ; 972 2011 A. Lead Architects Ltd Monmouth Terrace Residential Project 9K Kennedy Road, Hong Kong IL 8435 BD 3013/08 overcome different site December 2010 (PC) contraints and gets an optimal solution List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 973 2012 Cheung Kong Yeung Architects Ltd Proposed Residential Development 11 Verbena Road, Kowloon Tong NKIL 4610 BD 4062/07 3 August 2009 Contract Comparison How the different roles of the Residential Development at 363 Tai Po Road, Monte Architect help to achieve a 974 2012 Christopher Leung & Associates Ltd 363 Tai Po Road NKIL 3512 RP & ext BD 2/4169/93 March 2001 Carton more economically justifiable development. Administration Process of BD submission and approval in School Improvement Work for Po On Commercial 2 Tai Pai Street, Tsuen Wan, New 975 2012 WCWP International Ltd TWTL 275 BD 3/3100/01(P) 26 August 2005 phasing, resulting the two Association Wong Siu Ching Secondary School Territories phases of issuance of TOP and OP. Public Rental Housing Development at Choi Wan Road Overcome site constraints at 976 2012 Hong Kong Housing Authority Choi Wan Road, Kwun Tong VO 233 HD (AR) 826/2 30 May 2011 (Site 2 Phase 2) design and construction With the unique location of the site, being adjacent to the Container Terminal No. 9, and the objective to deliver a Noise Screening Barrier development under the non- typical lease conditions, the site constraint became the Proposed Hotels and Service Apartment Development 977 2012 Wong Tung & Partners Ltd 1 Tsing Yi Road TYTL 140 BD 2/9165/98 March 2004 critical design parameters for in Tsing Yi this project. In the special topic, the critical issue on Architects and developer applying building modifications to building department has become the key throughout the entire design and construction Hong Kong International Airport, Chek Lap CLK Lot No. 1 RP & ext BD 2/9028/05 (P) (Pt 978 2012 Aedas Ltd Hong Kong International Airport Skypier 2 August 2009 Kok thereto III) How the Architect had 979 2012 LWK & Partners (HK) Ltd Proposed Domestic Building 244 Aberdeen Main Road, Hong Kong AIL 287 & ext BD 2/2052/96 August 2000 overcame the challenges and his solutions for implementing Design Constraints with Proposed Residential Redevelopment at RBL 693, 14 14 Headland Road, Southside, Hong February 2009 (OP) ; respect to Different 980 2012 P & T Architects & Engineers Ltd RBL 693 Headland Road, Southside, Hong Kong Kong August 2009 (PC) Dimensions of Control from Various Government Interface connections / Conversion and extension to De La Salle Secondary 981 2012 Leigh & Orange Ltd Kam Tsin Village, Sheung Shui 2434 in DD 92 BD 2/3017/01 (P) 6 July 2004 conflicts between the existing School under School Improvement Programme and new annex. To investigate how new codes and regulations, on the BD 2-3/9144/83/23 Phase 1 - 28 July 2006 contrary of being always (Phase 1 and Phase (PC) ; Phase 2 - 6 Alteration and Addition Works at Podium Levels, Tuen Tuen Mun Street, Tuen Mun, New thought of as "restricting the 982 2012 Chau Ku & Leung Architects & Engineers Ltd TMTL 209 2) ; BD 2- September 2007 (PC) ; Mun Town Plaza Territories creative mind", through the 3/9144/83/28 (Deck Deck over void - 18 Architect's interpretations and over void) December 2010 solutions, were able to turn into opportunities. Skygardens of the First pre- Sub section of FF of IL 29 983 2012 KPF (Hong Kong) Ltd Hysan Place 500 Hennessy Road, Causeway Bay BD 2/3017/04 29 March 2012 certified LEED Platinum and RP of ML 365 Building in Hong Kong. Construction of Swimming Pool Complex in Area 2, GLA IS 440 (Phase 1) ; ASD An unique feature, the 984 2012 Ronald Lu & Partners (HK) Ltd 5 Tat Chung Road, Tung Chung November 2011 (PC) Tung Chung TGLA TIS 560 (Phase 2) 302/6536/RA/9AQ017 membrane roof. Two Integrated Teachning Buildings, The Chinese The Chinese University of Hong Kong, 30 August 2012 985 2012 Andrew Lee King Fun & Associates Architects Ltd RP of STTL 437 & ext BD 2/9082/08 International Collaboration University of Hong Kong Shatin, New Territories (anticipated) Precautions to be taken for 11 Kwun Tsing Road, So Kwun Wat, Tuen ASD 986 2012 Architectural Services Department A 24-classroom primary school in Area 55, Tuen Mun GLA TM420 July 2011 (PC) projects with underground Mun, New Territories 51/6348/EA/E20/086 historical relics. How architect works to 987 2012 Andrew Lee King Fun & Associates Architects Ltd Ermald Garden Ma Tin Road, Yuen Long, YLTL 515 YLTL 515 BD 2/9088/05 30 October 2010 overcome road subsidence. Codes with implications and 988 2012 Leigh & Orange Ltd Creative Media Centre, City University of Hong Kong 18 Tat Hong Avenue Lot No 6264 BD 2/4011/04(P) November 2010 control in planning and design aspect. 1115/AA/12 (as Evaluation of Architect's assigned by 989 2012 Ronald Lu & Partners (HK) Ltd CIC Zero Carbon Building 8 Sheung Yuet Road GLA-NK 786 20 June 2012 Application of Passive and Independent Code Active Sustainable Strategies. Compliance Checker) Sustainable Design - Pro and Jockey Club World Wide Fund for Nature Marine Life 990 2012 RMJM (HK) Ltd Hoi Ha Wan, Sai Kung West Country Park Lot No 448 in DD 283 BD 2/9193/97 May 2003 Con for the development and Center design of the project. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) How the architect adapts their design to meet the client's Redevelopment of Li Shu Fan Site, Phase 1, The 991 2012 Andrew Lee King Fun & Associates Architects Ltd 5-7 Sassoon Road, Pokfulam, Hong Kong IL 7746 BD 2/2003/06 10 June 2011 requirements and to comply University of Hong Kong with various statutory requirements due to special How Architect Response in Building Extension of Fanling Lutheran Secondary 992 2012 Andrew Lee King Fun & Associates Architects Ltd 270 Jockey Club Road, Fanling FSSTL 228 BD 2/9022/05(P) 6 December 2010 case of emergency during School construction period? Hong Kong Jockey Club Shatin Race Course Parade 993 2012 Aedas Ltd Shatin Race Course STTL 13 BD 2/9091/03 November 2004 Tensile Metal Roof Ring Redevelopment Proposed Residential Development at No. 11 Conflict between sustainability 994 2012 WCWP International Ltd 11 Macdonnell Road, Hong Kong Sec P, Q and R of IL 1381 BD 2/2019/98 June 2002 Macdonnell Road and Interest. A&A works in operating high Proposed Alteration and Addition Works for Gateway I Harbour City 3-27 Canton Road, Tsim Sha 995 2012 Ronald Lu & Partners (HK) Ltd KML II Section D BD 2-3/4164/89/7 May 2012 traffic shopping mall and Harbour City, Canton Road Tsui, Kowloon office tower entrance. Relaxation of Building Height Kiu Tau Wai, Ping Shan, Yuen Long, New 996 2012 P & T Architects & Engineers Ltd Redevelopment of Industrial Building Lot No 432 in DD 127 BD 2/9122/07 (Pt II) February 2011 and Number of Storey, Land Territories Exchange etc. 997 2012 Global Atelier Kingston International School 105 Waterloo Road, Kowloon Tong, Lot No 708 BD 2/4022/09 27 August 2010 Section 16 Planning Ho & Partners Architects Engineers & Development YLTL 486, Yuen Long, New Territories - Scenic YLTL 486, 25 Town Park Road South, 998 2012 YLTL 486 BD 2/9220/93/P 30 December 1997 Scheduled Area No 2 Consultants Ltd Gardens New Territories Measures taken to fulfill Proposed Development For Hang Seng Management Hang Shin Link, Siu Lek Yuen, Shatin, 999 2012 Wong & Ouyang (HK) Ltd STTL 546 BD 2/9111/11(P) September 2012 client's requirement on the College at Hang Shin Link, Siu Lek Yuen, Shatin New Territories time of possession of the Proposed A&A Works for Island South Campus of HKU 3 Wah Lam Path, Wah Fu Estate, Hong GLA HK 1077 (Formerly IL Realization of Sustainable 1000 2012 Y. I. & Associates Ltd BD 2/3094/02(P) July 2011 Space Kong 8105) Design. The Lingnan University New Campus Development, Street hydrant issue and 1001 2012 Architecture Design & Research Group Ltd Tuen Fu Road, Tuen Mun, New Territories TMTL 410 BD 2/9125/96(P) 19 December 2007 Student Activity Centre and Spectator Stand liaison with FSD. Proposed Residential Development at Tan Kwei Tsuen, Tan Kwei Tsuen, Yuen Long, New Challenges on 1002 2012 H. C. Wu Architect & Associates Lot No 4296 in DD 124 BD 9015/97 March 2005 Yuen Long Territories Unconventional façade Proposed Residential Development at Kowloon Inland 1003 2012 LWK & Partners (HK) Ltd Hau Man Street, Ho Man Tin, Kowloon KIL 11122 BD 4030/00 26 May 2003 Frequent design change. Lot No 11122, Hau Man Street, Ho Man Tin, Kowloon Macpherson Indoor Stadium and Residential 10 Yim Po Fong Street, Mongkok, How the Architect dealt with a 1004 2012 Andrew Lee King Fun & Associates Architects Ltd KIL 11050 BD 4002/93 September 2012 Redevelopment Kowloon delayed programme. Study the implication on Architect's practice, Residential Development at 33 Lai Chi Kok Road, 1005 2012 Andrew Lee King Fun & Associates Architects Ltd 33 Lai Chi Kok Road, Kowloon KIL 6284 BD 2/4031/05 2 October 2008 (OP) construction process and Kowloon project outcome in comparison to normal 43-63 Tai Yuen Street and 242-246 Queen's Road East 43-63 Tai Yuen Street and 242-246 IL 5663-5, IL5669-73, IL5696- Acrylic panel as used in 1006 2012 Aedas Ltd BD 3/3034/08 August 2012 Wanchai Hotel Development Queen's Road East, Wanchai 9 exterior. Balance of statutory power amongst Building Ordinance, 1007 2012 Andrew Lee King Fun & Associates Architects Ltd No. 83 Sycamore Street, Kowloon No. 83 Sycamore Street, Kowloon KIL 11159 RP BD 2/4002/00H 6 October 2008 TPB and lease, and appraisal on this development regarding this issue. Implication on the Upgrading of School Facilities for China Holiness 170 Wai Wai Road, Sham Shui Po, 1008 2012 Andrew Lee King Fun & Associates Architects Ltd NKIL 3887 BD 3/4029/03 5 December 2008 development of public lane College at 170 Wai Wai Road, Sham Shui Po, Kowloon Kowloon converting to private lane 25 March 2011 submit Zoning and programmatic 38 Cheung Fat Street, So Uk Estate, 1009 2012 Wong Pun & Partners Ltd A&A Works For Buddhist Tai Hung College NKIL 5137 BD 2-3/4114/81 BA14, resubmission of sequencing of works in Sham Shui Po, Kowloon BA14 within June 2012 operating school. 1010 2012 Andrew Lee King Fun & Associates Architects Ltd Proposed Residential Development at No. 2 Oxford 2 Oxford Road, Kowloon Tong, Kowloon NKIL 4128 BD 2/4054/10 4 June 2012 Unauthorised Building Work Complicated Internal Feature Design on Podium Floors IL 2244 RP, 2245 RP and 1011 2012 Wong & Ouyang (HK) Ltd 28 Hennessy Road 28 Hennessy Road, Wanchai, Hong Kong BD 2/3004/09 10 July 2012 which requires architects' Marine Lot 23 immediate response and actions to cope with the tight 1012 2012 P & T Architects & Engineers Ltd Redevelopment of Liu Chong Hing Bank Building 24 Des Voeux Road, Central Section A of ML 62 BD 2-3/2043/01 August 2006 Façade Design - Curtain Wall How the architect resolved December 2011 (OP) ; 1013 2012 P & T Architects & Engineers Ltd Residential Development at Hoi Fai Road 10 Hoi Fai Road KIL 11146 BD 3/4061/07 construction difficulties due to July 2012 (PC) site constraints. How architects solve the Proposed extension of St. Paul's Co-Educational challenges in extension 1014 2012 Aedas Ltd 33 MacDonnell Road, Hong Kong IL 8203 BD 2/2033/05 July 2011 College project in terms of design and construction. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Compare the old and new building codes to see how they were reflected in the studied project from planning 10 King Fung Path, Tuen Mun, New 1015 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Noble Place TMTL 263 BD 6/9242/94 December 1997 of the development, to Territories architectural layout design and building envelop; and how would it be different if the project is to be executed at Site Design and surrounding 1016 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd DeerHill Bay, Hong Kong Tai Po Road, Tai Po Kau TPTL 135 BD 2/9043/94 October 1998 environment. 1017 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Summit 41C Stubbs Road, Hong Kong IL 8870 BD 2/3006/96 September 2002 Curtain wall design. Proposed Residential and Commercial Development at KIL 11127, 8 Fuk Lee Street, Tai Kok Planning and Design solution 1018 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd KIL 11127 BD 3/4024/99H December 2003 KIL 11127, Tai Kok Tsui, Kowloon Tsui, Kowloon on public open space. QBML 1sE ss2, QBML 1sF March 2001 (OP) ; April Difficulties and site matters 1019 2012 Wong & Ouyang (HK) Ltd Cambridge House 979 King's Road, Quarry Bay, Hong Kong BD 2/3025/00 RP & ML703 sN 2003 (PC) arise during construction The damage of existing The Construction of Public Rental Housing Estate at 1020 2012 Hong Kong Housing Department 160 Tsz Wan Shan Road, Wong Tai Sin VO 31 20 May 2011 stormwater drain located at Shatin Pass 7m below ground level. Redevelopment of historically 1021 2012 Simon Kwan Architect & Associates Ltd URA Redevelopment at Johnston Road, IL 8997 60 Johnston Road, Wanchai IL 8997 BD 2/9032/03 November 2007 valuable building. 39 Queen's Road Central and 19-28 Li IL 4229 to 4240, 4241 RP to 29 November 2011 (OP) ; Challenges of site constraint / 1022 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Prosperity Tower BD 2/2061/05 Yuen Street East 4243 RP 17 May 2012 (PC) congestion. 1023 2012 P & T Architects & Engineers Ltd VTC - Teaching Block Extension 30 Shing Tai Road, Chai Wan CWIL 151 BD 2/3035/07 1 February 2012 Delay in completion time. 22 December 2005 (OP) ; Construction Management 1024 2012 A & T Design Ltd Harbourview Horizon Hotel at Hung Hom Hung Hom Bay Reclamation, Kowloon KIL 11103 BD 3/4049/01 1 May 2006 (PC) Contract. Issues encountered when Proposed Development at TMTL 374, So Kwun Wat, TMTL 374, So Kwun Wat, Tuen Mun, New 1025 2012 Wong Tung & Partners Ltd TMTL 374, Area 55A BD 6/9025/97H October 2002 developing New Territories's Aegean Coast Terriotories Land. ASD - School Improvement Phase 4, HK Chinese 28 Tai Cheong Street, Sai Wan Ho, Hong 1026 2012 Leigh & Orange Ltd SIL 780 and ext BD 1/3039/01(P) March 2004 School Improvement Project. Women's Club College Kong 1027 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Regence Royale 2 Bowen Road, Hong Kong IL 8834, 8848 BD 2/2084/94 September 2001 Construction consideration. How the architect help Proposed Sports and Dormitory Complex at Diocesan technically to solve problems 1028 2012 Thomas Chow Architects Ltd 131 Argyle Street, Kowloon KIL 6737 BD 4050/04 6 December 2007 Boy's School yet to retain design intent and client budget. A special study will focus on the design and technical strategies such as plan layout, exit route, building construction and materials, sanitary fitments, plumbing 1029 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd King Wah Centre, Hong Kong 620-628 Nathan Road, Kowloon KIL 10336 BD 2/4094/93 June 2001 (OP) and drainage facility, etc for the vertical arrangement of restaurant in a high-rise building design that architect has implemented to achieve design brief and client's To justify client's claim, the IL 577 Section C to Section J, change of the R(C)7 to R(A) Residential Development of Castle Road and Seymour 2A Seymour Road, Mid-Levels West, Section L Sub-Section 1-3, 5 September 2012 (OP) ; 1030 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd BD 2/2014/03 site was viable and would not Road Hong Kong Section L Remaining Portion October 2012 (PC) cause adverse effect to the and Section M neighbourhood. ASD September 2004 Deletion of Main Contractor 1031 2012 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Yong Ko Hsiao Lin Secondary School Lung Hang Estate, Shatin, New Territories STTL 557 62/6487/EX5/E20/500 (Conversion) ; March 2005 and EOT Issue. (S297) (Annex) December 2011 (OP) ; Necessity of BIM 3D- 1032 2012 Ronald Lu & Partners (HK) Ltd OPUS Hong Kong 53 Stubbs Road, Hong Kong RLB 224 BD 2/3008/07 January 2012 (PC) Modeling in Design and Exploration of Maximizing the Proposed A&A Works at Trend Plaza (Cinema 2 Tuen Hop Street, Tuen Mun Town, New 1033 2012 Aedas Ltd TMTL 282 BD 2-3/9001/84/10 June 2008 leasing area by conversion of Conversion) Territories existing cinema. 4 November 2004 (OP) ; 1034 2012 Rocco Design Architects Ltd Office Building at Tsing Yi 99 Cheung Fai Road, Tsing Yi TYTL 139 BD 2/7362/02 Building as a noise barrier. 15 February 2005 (PC) Teaching Complex at Western Campus, The Chinese The Chinese University of Hong Kong, Temporary operation permit 1035 2012 Rocco Design Architects Ltd STTL 437 and ext thereto BD 2/9091/02 7 December 2008 University of Hong Kong Shatin, New Territories application. How the architect assess Proposed Commercial and Residential Development 1036 2012 LWK & Partners (HK) Ltd Tseung Kwan O Area 57A TKOTL 74 BD 2/9136/97H 17 February 2005 statutory constrains in Tseung Kwan O Area 57A, TKOTL 57, 66 and 74 different stages of building List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Architect's solution for St. Mary's Canossian School, Proposed Extension June 2003 (OP) ; August minimising the disturbance to 1037 2012 P & T Architects & Engineers Ltd 162 Austin Road, Tsim Sha Tsui, Kowloon KIL 9550 BD 2/4054/00/P Block 2003 (PC) existing user in a school environment. Ngong Ping Road, Lantau Island, New BD 2/9905/03 (NPT) How contract types affect a 1038 2012 Aedas Ltd Tung Chung Cable Car - Ngong Ping Terminal N/A 17 May 2006 Territories (P) project. 1039 2012 Leigh & Orange Ltd SIP Phase IV, Group 3, P5, St. Joseph's Primary 48 Wood Road, Wanchai, Hong Kong IL 8176 BD 3/3030/01(P) January 2005 Site constraints. 17 June 2004 (Phase 1) ; How architect responded to IL8969 Cyberport Residential Deve at Telegraph Bay, Residence Bel-Air, Island South, Hong 1040 2012 Wong Tung & Partners Ltd IL 8969 BD 2/2042/99/ST8 10 December 2004 floor-to-floor height change Ph. R1, Residential Bel-Air Kong (Phase 2) during construction. The Architect's response in terms of positioning of the building bulk in relation to the existing site constraints and Proposed Boutique Hotel at 21 Whitfield Road, North 21 Whitfield Road, North Point, Hong 23 September 2011 (OP) ; 1041 2012 MLA Architects (HK) Ltd IL 3309 RP & 3310 RP BD 2/3031/06 striking a balance between Point, Hong Kong Kong 30 September 2011 (PC) the client's aspiration and optimizing the design potential of site whilst meeting all statutory requirements and To discuss the advantage and Lot No. 435, Sham Wan Road, Aberdeen, disadvantage of case study 1042 2012 P & T Architects & Engineers Ltd Board View Court IL 435 BD 3004/1 29 June 2000 (OP) Hong Kong being deviated from conventional contract. How the Architect tackle with the M&E and structural issues for existing building like IL 669 & IL 30 sCRP & sA & 1043 2012 Aedas Ltd Proposed A&A Works at the Ruttonjee Centre 11 Duddell Street, Central, Hong Kong BD 2-3/1192/79/3 13 January 2006 Ruttonjee Centre while IL 644 sA installation of new M&E items and new structural arrangement in the renovation Extension & Renovation Works for Eu Yan Sang (HK) Lot No 313, Subsection 2 of Effective communication as 1044 2012 David S.K. Au & Associates Ltd Yuen Long Industrial Estate BD 2/9039/05 June 2006 Limited Section H an aid of construction The issue of project ASD Consultancy suspension and the change of The Construction of a primary school in Sham Tseng, TW452, 37 Castle Peak Road, Sham 1045 2012 P & T Architects & Engineers Ltd TW 452 Agreement No. 9 AM May 2008 project brief subsequently Tsuen Wan Tseng, Tsuen Wan 011 after the recommencement of the project. Evaluation on the inconsistency between the A 24-classroom primary school (school A) at ASD contract documents and the 80 Choi Ha Road, Jordan Valley, Kwun 1046 2012 Ronald Lu & Partners (HK) Ltd development near Choi Wan Road and Jordan Valley, GLA NK 730 55/92050/CWO/002- August 2009 drawings found in this project Tong Kwun Tong 07/BP such that a great underestimation of the quantities and cost in the 66 Leighton Road, Causeway Bay, Hong May 2008 (OP) ; June DH order of existing masonry 1047 2012 Ronald Lu & Partners (HK) Ltd HKU SPACE Po Leung Kuk Community College IL 9011 BD 3053/02 Kong 2008 (PC) wall. Investigation of possibility of 18 Wang Chiu Road, Kowloon Bay, 1048 2012 Aedas Ltd 18 Kowloon East - Po Hing Centre Redevelopment NKIL 5856 07837/E4/650 19 January 2011 providing sustainable design Kowloon in the project Implication of lease of the lot 1049 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Belair Mount 3 Ma Sik Road, Fanling, New Territories FSSTL 126, Area 9 BD 2/9003/95 1999 (ie provision of bridge) Client's requested tall roof 8 Sham Tsz Street, Sham Tseng, Tsuen 1050 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Lot 265 in DD 390 BD 2-4/9184/96(2) 2000 feature caused concerns from Wan, New Territories the BD TKOTL 55, Tseung Kwan O, 88 O King Explore the Architect's 1051 2012 Wong Tung & Partners Ltd Tseung Kwan O - TL No. 55, Ocean Shores TKOTL 55 BD 2/9156/97 31 October 2003 Road, New Territories solution in overcoming site How architect responded to 1052 2012 Wong Tung & Partners Ltd Residential Development at 15 Ho Man Tin Hill Road 15 Ho Man Tin Hill Road KIL 3389 RP BD 4049/00 April 2006 site and design constraints? Lot No. 2131 in DD 121 (Site B), Yuen How does architect 1053 2012 Wong Tung & Partners Ltd Tong Yan San Tsuen Lot No. 2131 BD 9014/04 June 2012 Long responded to confined site Exploration of the Proposed Residential Redevelopment IL 8982, Victoria 1054 2012 WCWP International Ltd 86 Victoria Road, Kennedy Town IL 8982 BD 2/2025/03 18 June 2009 (OP) environmental factors Road, Kennedy Town determining Architectural A&A Works for composite building at 53 Carnarvon Adaptive reuse VIA alteration 1055 2012 Eddie Chan Architects Ltd 53 Carnarvon Road, Tsim Sha Tsui KIL 8261 2-3/657k in 1/47/2 2 April 2011 (PC) Road, Tsim Sha Tsui and addition works. Level 7, Terminal 1, Hong Kong 1056 2012 Foster + Partners Cathay Pacific Lounges (Phase 2) CLK Lot No. 1 BD 2-3/9702/94/183 February 2012 Fire Engineering Approach. International Airport September 2012 (OP) ; 1057 2012 Foster + Partners Tai Po Luxury Residential TPTL 188 Tak Shek Kok, Tai Po, New Territories TPTL 188 BD 2/9056 GRC Prefabricated Façade December 2012 (PC) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) How does architet mediate Private Residence at 5 Moorsom Drive, Jardine's 5 Moorsom Drive, Jardine's Lookout, among different parties to 1058 2012 Barrie Ho Architecture Interiors Ltd Section O of IL 7863 BD 3/3009/04 March 2009 Lookout, Hong Kong Hong Kong resolve complaints and site issues during construction? Overcoming design and Inner Pier, HK-Macau Ferry Terminal, structural difficulties 1059 2012 Integrated Design Associates Ltd New Heliport at Hong Kong - Macau Ferry Terminal Shun Tak Centre, 200 Connaught Road, NHX-376 BD 22-3/2047/07 June 2009 encountered to suit unique Central, Hong Kong building typologies. Proposed Office Building at 712 Prince Edward Road 712 Prince Edward Road East, San Po Role of architect in this project 1060 2012 Andrew Lee King Fun & Associates Architects Ltd NKIL 4795 BD 4084/05 January 2009 East, San Po Kong Kong, Kowloon compared to common Architect solution to site Proposed Extension of Evangel Children's Home at 120 Shatin Pass Road, Wong Tai Shin, 1061 2012 D. Heung & Associates Architects & Engineers Ltd NKIL 488 BD 2/4054/90 August 2012 management, cost control NKIL 4498 Kowloon and co-ordination. 1062 2012 Wong & Ouyang (HK) Ltd HK Sanatorium & Hospital Phase 3 Redevelopment 2 Village Road, Happy Valley, Hong Kong IL 1702 & ext and IL 3284 BD 2/3027/03 April 2008 Curtain wall system. How the architect resolved the site constraint by planning Residential Development at RBL 240 Sec A, 6 Stanley solution, which comprise of a 1063 2012 Aedas Ltd 6 Stanley Beach Road RBL 240 Sec A BD 2013/07 6 August 2010 Beach Road, Stanley, Hong Kong comprehensive study on the section 16 submission of this project. Il 1337 sAss1, sAss2, sAss3, How does the architect 1064 2012 CYS Associates (HK) Ltd The Oakhill 28 Wood Road sAss4, sAss5, sAss6, sARP, BD 3013/05 30 June 2011 manage to deal with the sBss1 & sBRP revised brief initiated by Architect's strategy to meet 12 Tai Hang Tung Road, Sham Shui Po, 1065 2012 MLA Architects (HK) Ltd Concordia Lutheran School NKIL 3933 BD 4037/07 February 2011 the latest statutory and Kowloon operational requirements. Construction of Open Niches at Terrace 2, 3 and 4 of Supplementary Agreement Chinese Permanent Cemetery, Cape 1066 2012 Spence Robinson Ltd Section 35 Chinese Permanent Cemetery, Cape IL 7715 RP and ext BD 3013/09 May 2012 No. 1 between the client and Collinson Road, Hong Kong Collinson main contractor. Block 1 at Area 39, Pak Shek Kok, The Development of Centralized General Research Lab HK BEAM Plus / Sustainable 1067 2012 Andrew Lee King Fun & Associates Architects Ltd Chinese University of Hong Kong, Shatin, STTL 437 and ext thereto BD 2/9073/08(P) 18 January 2012 Complex Design New Territories Design strategies for compact 1068 2012 Ie, Siu & Chung Architects Ltd Proposed Commercial Building at KL 3951 21C , Mongkok, Kowloon KIL 3951 BD 3/4031/08 15 August 2011 sites. Elevation Design in relation to 1069 2012 Wong Tung & Partners Ltd East Cityplaza Site VC QBML & ext BD 2/3049/93 July 2009 statutory and contractual constraints. Proposed Hotel Development at 19-23 Austin Avenue, 19-23 Austin Avenue, Tsim Sha Tsui, Architect's solution in relate to 1070 2012 Andrew Lee King Fun & Associates Architects Ltd KIL 9786 BD 2/4033/07 9 August 2012 Tsim Sha Tsui, Kowloon Kowloon Site Constraint. How to cooperate with MTR 1071 2012 LWK & Partners (HK) Ltd Tiu Keng Leng Station Property Development (Site A) Area 73B, NT Site A TKOTL 73 BD 2-3/7200/98/3 February 2011 Corporation? Architect's Solution for Design Residential Redevelopment at STTL 467, Tai Po Road, Tai Po Road, Shatin Height, Shatin, New 1072 2012 P & T Architects & Engineers Ltd STTL 467 BD 9016/07 17 July 2009 Change Initiated by Client and Shatin Height, Shatin, New Territories Territories Impacts Therewith. Re-phrase the flat mix of 1073 2012 P & T Architects & Engineers Ltd Tai Kok Tsui Development Site C - Residential Hoi Fai Road, Tai Kok Tsui, Kowloon KIL 11074 BD 2/7331/96-3 4 May 2000 residential development. The Solution of How the Architect Transforms the Residential Development at Lo Fai Road, Tai Po Lot Tai Po Town, Lot 117, Lo Fai Road, Tai 1074 2012 P & T Architects & Engineers Ltd TPTL 117 BD 2/9055/96 March 1999 Lease Condition (Platform A, 117 Po, New Territories B and C into the Architectural Planning and Design). 1075 2012 P & T Architects & Engineers Ltd KIL 11074 Olympic Station Development - Site C Olympic Station Development Site C KIL 11074 BD 2/7331/96 Pt.V August 2000 Phasing and Programme To handle the negotiation between client and main KIL 2097 sGss 1 RP & sGss 1076 2012 Ie, Siu & Chung Architects Ltd Proposed Residential Redevelopment 148-148A Boundary Street, Kowloon BD 2/4058/06 10 November 2010 contractor, as the long time 1sA part the payment delay after AP issued the payment Delay of Master Programme ISF Academy Phase II 2B New West Extension Over a 1 Kong Sin Wan Road, Pokfulam, Hong Substantial completion on 1077 2012 Ronald Lu & Partners (HK) Ltd IL 8995 BD 2/2023/03(P) Criteria and Actions for EOT Carpark Kong 10 August 2011 Approval. Public Transport Interchange (PTI) & Property Property development 1078 2012 Ronald Lu & Partners (HK) Ltd Wu Kai Sha Station of Ma On Shan Rail STTL 530 BD 2-3/7947/01 26 November 2004 Development Enabling Works at Wu Kai Sha Station enabling works. The choice of construction Sheung Kung Hui Tsang Shiu Tim Secondary School HA VO103 Plan No STM method and sequence in 1079 2012 Ronald Lu & Partners (HK) Ltd Wo Che Estate, Shatin, New Territories June 2005 (S327) 6154A relation to the operation of existing school. CDA site with old lease ; Proposed Comprehensive Redevelopment of KMB procedure of section 16 and 1080 2012 Ronald Lu & Partners (HK) Ltd 1 Po Lun Street, Lai Chi Kok, Kowloon NKML 3 BD 2/4010/01 December 2006 Depot negotiation of planning conditions. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) The Redevelopment of St. Stephen's Girls Primary How to utilize the limited 1081 2012 P & T Architects & Engineers Ltd 33 Park Road, Hong Kong GLA-HK 882 March 2009 School budget and time? Influence of economical 52 Ma Lok Path, Kau To Shan, Shatin June 2002 (OP) ; 11 May 1082 2012 Ronald Lu & Partners (HK) Ltd Residential Development at STTL No. 82 STTL 82 BD 2/9230/95 condition on design and (Double Heaven) 2002 (PC) construction matter. The considerations and procedures that can gurantee the transformation from a 1083 2012 Aedas Ltd Residential Development at 350 Tai Hang Road 350 Tai Hang Road, Hong Kong IL 7350 BD 3002/06 23 March 2012 single-tenant house into a multi-tenant low-rise residential building with an additional floor, which is Site A: BD Architect solution to project 25 May 2005 (Site A) ; 5 1084 2012 Ronald Lu & Partners (HK) Ltd The Merton, Residential Redevelopment at IL 8971 Kennedy Town, Hong Kong IL 8971 2/2015/99H(P) ; Site delay and extension of time November 2004 (Site B) B: BD 2/2022/99H(P) arrangement. Tai Po Pak Shek Kok Lot 187 Residential Development Pak Shek Kok, Phase 1, Site A, Tai Po, August 2012 (OP) ; Architects' solutions to 1085 2012 Foster + Partners TPTL 187 BD 2/9055/07 (The Graces, Providence Bay, 天賦海灣) TPTL 186 September 2012 (PC) precast GRC façade design. URA K-11 Development Kowloon Inland Lot No 11188 18 Hanoi Road, URA Project at KIL Spcial difficulties and 1086 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd KIL 11188 BD 2/4031/00 February 2009 (The Masterpiece) 11188, Tsim Sha Tsui, Kowloon constraints Hang Tai Road and Yuk Tai Street, Area 1087 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development Project at Ma On Shan STTL 448 BD 2/9251/96H(P) 31 August 2001 Land lease conditions. 77, Ma On Shan Public N1235 Tuen Mun Area 5B, Tsun Wen Road, New interest/benefit/comment 1088 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tsun Wen Road DD 131 Lots 445 & 463 BD 2/9205/94(1) September 2000 Territories affect the new development project - S16 ; APP 151 & 152 Discuss the issues that were IL 150 sAss4 sAss, ss4sB, derived from the insistence of 1089 2012 Aedas Ltd Proposed New Building, Caine Road, Hong Kong 38-44 Caine Road, Hong Kong sAss4RP, sAss5, sARP & July 2012 a clean, modern spectacular sAss1RP façade. 1090 2012 Ronald Lu & Partners (HK) Ltd New Clubhouse for Ladies Recreation Club 10 Old Peak Road, Hong Kong IL 6375 RP BD 2/2027/01 4 September 2006 Club licensing issues 1. NHX-638: November Beneath Canal Road Flyover, 435 How architect responded to 1091 2012 Barrie Ho Architecture Interiors Ltd Headquarters of the Hon Kong Federation of Women 1. NHX-638 ; 2. EHX-425 BD 2/3041/08(TB) 2010 ; 2. EHX-425: Lockhard Road, Hong Kong site constraints? November 2010 24 November 2006 (OP) ; 1092 2012 Hsin Yieh Architects & Engineers Ltd 23 Tai Hang Drive 23 Tai Hang Drive IL 8972 BD 2/3034/00 Contract Administration March 2007 (PC) Hong Kong Science Park Phase 2 - 1093 2012 Simon Kwan Architect & Associates Ltd Hong Kong Science Park Phase 2 - Building 20 TPTL 182 BD 2/9083/03(3)(P) 12 May 2011 Sustainability Study Building 20 at Pak Shek Kok, Tai Po How management control of an architect solves problem 1094 2012 Hsin Yieh Architects & Engineers Ltd Industrial Redevelopment TWIL 36 and TWIL 218 Hoi Shing Road, Tsuen Wan, Hong Kong TWIL 36 & TWTL 218 BD 2/9111/03 (Pt. II) June 2012 with different constraints to fulfill client design ASD Design variation in early A Primary School at Cheung Sha Wan Road, Sham Cheung Sha Wan Road, Sham Shui Po, 104/6529/SSM313/C2 1095 2012 Rocco Design Architects Ltd GLA-NK 692 31 July 2005 construction stage caused by Shui Po, Kowloon Kowloon 5/001 Program No new planned bus lay-by. 310 EP 1096 2012 Andrew Lee King Fun & Associates Architects Ltd Residential Development 8 Cho Yuen Street, Yau Tong SA of YTIL 38 & RP of YTIL BD 2/4068/4 2 March 2009 How the project team took on challenges of project management and design criteria, and then transformed ASD 1097 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Hong Kong Government Tai Po Complex 8 Heung Sze Wui Street, Tai Po Area 1 December 2003 the project into a unique state 52/4741/RC/RCC/001 of the art of market complex building type that would best enhance the quality of life of the community as a whole. 1098 2012 Simon Kwan Architect & Associates Ltd Ma Wan Island Residential Development - Phase 5 8 Pak Lai Road, Ma Wan, New Territories MWIL 392 BD 9160/97H(6) June 2006 (OP) Modification of approved 31-35A Wellington Street, Central, Hong IL 21 sCss1, sCRP, sBRP, 1099 2012 Brighspect Limited Proposed Redevelopment at 31-35A Wellington Street BD 2/2013/05 May 2007 Building and structural layout. Kong sARP Additional one storey on top of the flat roof area of Asia 15 Dai Kwai Street, Tai Po Industrial Structure system connecting 1100 2012 Aedas Ltd TPTL 13 sGRP & ext thereto BD 2/9198/10 15 March 2012 Satellite Earth Station Estate, Tai Po, New Territories the new and the old. How the development 1101 2012 P & T Architects & Engineers Ltd Residential Redevelopment 7-9 Mount Kellett Road, The Peak RBL 729 & 732 BD 2/2038/08 February 2012 potential of a unclassified site to be determined. Proposed Hotel Development at Sha Tin Town Lot No. The difficulties arose in the J/O On Ping Street and On Lai Street, 1102 2012 P & T Architects & Engineers Ltd 347 Junction of On Lai Street and On Ping Street, STTL 347 BD 2/9042/09 June 2012 process and resolution by the Shatin, New Territories Shatin, New Territories architect. 18 Yeung Uk Road, Tsuen Wan, New Statutory Control and 1103 2012 Hsin Yieh Architects & Engineers Ltd Composite Development - Tsuen Wan Town Lot 394 TWTL 394 BD 9061/98H(P) 22 January 2009 Territories submission. How the site constraints An 18-Classroom Primary School at Tai Pak Tin Street, 99 Tai Pak Tin Street, Kwai Chung, New ASD programme no. 1104 2012 Design 2 (HK) Ltd GLA-KT 1159 18 August 2009 affected the final design of the Kwai Chung, New Territories Territories 307 EP project. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Proposed A&A Works No. 162 Nga Tsin Wai Road, A balance between an old 1105 2012 Aedas Ltd 162 Nga Tsin Wai Road, Kowloon NKIL 3537 BD 2-3/4610/61 March 2012 Kowloon building and new regulations. Positive or negative impact on , Ngong Ping Road, BD 2/9905/03 (TCT) 1106 2012 Aedas Ltd Tung Chung Cable Car Project Lot No. 238 6 April 2006 design and build contract with Lantau (P) (Pt.II) target price. BD 2-3/9051/85/2 ; The proposed alteration and addition works for ESF - 3A Lai Wo Lane, Fo Tan, Shatin, New 1107 2012 Llewelyn-Davies (HK) Ltd STTL 234 BD 2/9260/10 ; BD 2- August 2012 Shatin Junior School Territories 3/9008/99 Construction administration process and details for the Singapore International School Secondary Campus and 2 Police School Road, Aberdeen, Hong 1108 2012 WMKY Ltd AIL 386 BD 2/2056/08 August 2011 existing secondary school to Link-Bridge to Primary School Campus Kong be partly demolished, partly retained and renovated. Alterations and Additions Works to Existing University Central Campus, The Chinese University STTL 437 RP & the ext 1109 2012 Aedas Ltd BD 2/9010/09 31 May 2012 Phasing of the project. Library, The Chinese University of Hong Kong of Hong Kong, Shatin thereto Rezoning Application from 5 Redevelopment of Sawtow Christian Church, Kowloon 39 Grampian Road, Kowloon City, 13 June 2011 (OP) ; July 1110 2012 AGC Design Ltd NKIL 1587 sA BD 2/4084/06 storeys (under OZP) to 9 City Kowloon 2011 (PC) storeys. How do architects cope with tight construction programme 1 Yau Cheung Road, South West 1111 2012 Wong Tung & Partners Ltd Proposed Residential Development at KIL 11073 KIL 11073 BD 4054/07 July 2012 (Anticipated) and uncertain matters subject Kowloon to government department approval? School Improvement Programme Po Leung Kuk Lee April 2005 (OP) ; 1112 2012 Ronald Lu & Partners (HK) Ltd 12-20 On Yin Street, Tsuen Wan TWTL 283 BD 3024/02(P) Project Team Organization Shing Pik College (S308) September 2005 (PC) Special Treatment on Wet 63 Fuk Tsun Street, Tai Kok Tsui, 1113 2012 Ronald Lu & Partners (HK) Ltd Tai Kok Tsui Complex (Phase 2) N/A SSK 313 2005 Market Under the Outbreak of Kowloon H5N1 in 2003. To maximize the development 1114 2012 Ronald Lu & Partners (HK) Ltd Proposed Residential Development at Ping Shan Ping Shan, Yuen Long, New Territories Lot No 2051 BD 2/9162/01 November 2003 potential by application for modification. Comparison between the allowed GFA concession in 1998 and the current allowed 1115 2012 Wong & Ouyang (HK) Ltd Villa Esplanada, Residential Development TYTL 129, Nga Ying Chau, Tsing Yi TYTL 129 BD 2/9123/95 15 July 1999 GFA concession under the newly introduced SBD guided in year 2011. Compliance of BFA: 1116 2012 Ronald Lu & Partners (HK) Ltd SIP / PLK Mr. & Mrs. Chan Pak Keung Tsing Yi School 2 Tsing Chin Street, Tsing Yi KT 1068 BD 3071/02(P) April 2005 Constraint & Solution. Lease, deed of dedication & 1117 2012 Rocco Design Architects Ltd Redevelopment of 31 Queen's Road, Central 31 Queen's Road, Central, Hong Kong IL 2316 BD 2/2056/05 December 2011 (OP) TOP ; Application, Statutory & Contractual Implication. Junction of Sheung Yuet Road and Wang Ecological innovations in 1118 2012 Rocco Design Architects Ltd Exchange Tower (1647) NKIL 6310 BD 2/4016/05 (Pt IV) 26 September 2008 Chiu Road, Kowloon Bay commercial development. The GFA and site coverage 314-324 Hennessy Road, Wanchai, Hong January 2008 (OP) ; April calculation of such green 1119 2012 Aedas Ltd Refurbishment of BEA Building ML 122 RP & SD BD 2-3/3299 Kong 2008 (PC) features and projection over street will be discussed. ASD 1120 2012 Aedas Ltd Tseung Kwan O Primary & Secondary School Area 65, Tseung Kwan O August 2006 Time and cost management. 92/92050/CWO/008- Dedication of arcade to public 1121 2012 Aedas Ltd Alexandra House, Podium Refurbishment 7-15 Des Voeux Road, Central IL 1724 & 1725 BD 2-3/2442/72/25 November 2003 passageway. How the architect on the one hand fulfilling the design requirement as a "luxury Yau Hom Tau, Castle Peak Road, Tsuen 1122 2012 Aedas Ltd Yau Kom Tau TWTL 367 BD 2/9149/04 29 June 2009 housing", while on the other Wan hand, maximize the development potential, as the client expected. ASD How does the architect School Improvement Programme, Final Phase, Area 86, Heng On Shan, Shatin, New 1123 2012 Ronald Lu & Partners (HK) Ltd STTL 500 sA 053/6487/ALL318/C2 25 November 2004 choose a design option and Package 4 - Chinese YMCA College Territories 5/001 his solution to design brief. 1124 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Ascot (Phase 1), Hong Kong Ho Tung Lau, KCR Depot, Sha Tin STTL 411, KCRL/5 BD 2/9143/90 1995 MLP Planning How could architect design 9 Tin To Street, Tin Shui Wai, Yuen Long, with site constraining with 1125 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Hong Kong SKH St. Philip Church 2000 New Territories clients requirements and budget control. What is the architect's role Ocean Park, 180 Wong Chuk Hang Road, 1126 2012 Aedas Ltd Back of House Building for Marine Mammal RBL 1020 & ext thereto BD 3/2012/06(P) November 2008 when problems occur relating Hong Kong to the contract basis. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Determination of GFA and 1127 2012 ARCA Ltd 10 Bowen Road, Hong Kong 10 Bowen Road, Hong Kong IL 6875 BD 2/2029/01 8 February 2012 Plot ratio for the pre-war site. Lower Wong Tai Sin Estate, Lung Cheung Fire Services for Realizing 1128 2012 Archiplus International (HK) Ltd Proposed A&A works at Wong Tai Sin Shopping Centre KIL 6438 BD 22-3/4089/06 September 2010 Road, Kowloon A&A Design Solution. Study and evaluated how the 164A Prince Edward Road West, KIL 2357 sAss1 RP & KIL 1129 2012 Charles M.H. Wong Architect & Associates Ltd Proposed composited building BD 2/4081/05 28 July 2009 design was driven by Mongkok 2357 sAss1 RP & sAss 1 sB maximizing profit for client. 1130 2012 Charles M.H. Wong Architect & Associates Ltd Proposed composited Building 201-203 Castle Peak Road NKIL 2789 sBRP & sC BD 2/4083/95 16 June 2006 How finance affects program. IL 1247 sAss1 - ss3, sARP, Extension of site during 1131 2012 Andrew Lee King Fun & Associates Architects Ltd Best Western Hotel Harbour View 239-251 Queen's Road West, Hong Kong BD 2008/08 22 February 2012 IL 1247 sB, sCRP, sDRP construction. Hong Kong Polytechnic University, Phase 8 J/O and Princess 1132 2012 Architecture Design & Research Group Ltd KIL 11201 BD 1/4025/08 August 2012 (Phase 1) Phase Occupation Permit. Development Margaret Road Tong Yan San Tsuen, Yuen Long, New Lease modification from 1133 2012 Vincent Lai Architects Ltd 3-Storey Warehouse Building Lot No 2148 in DD 21 BD 2/9189/08 25 August 2011 Territories agricultural to industrial use. How architectural design Residential Building at 12-16 , Hong 1134 2012 LWK & Partners (HK) Ltd 12-16 Tai Tam Road, Hong Kong RBL 441 sA & ext RP & ext BD 3049/97 July 2000 responds to planning Kong restrictions and site The criteria and selections for 1135 2012 LWK & Partners (HK) Ltd Residential Development 71 Mount Kellett Road, Hong Kong RBL 506 BD 202 BC/97 November 2002 employing good contractors. Redevelopment of Creative Kindergarten at 6 Rutland 1136 2012 Architecture Design & Research Group Ltd 6 Rutland Quadrant, Kowloon NKIL 812 BD 2/4010/05 15 March 2007 Section 16 Application. Quadrant, Kowloon The role and responsibility of 1137 2012 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Development 38 Heung Yip Road, Hong Kong AIL 344 BD 2/2008/06 4 September 2012 architect in the management of building construction Revitalization of Lui Seng Chun as the Hong Kong Conservation Vs New 1138 2012 AGC Design Ltd 119 Lai Chi Kok Road, Mongkok, Kowloon GLA-K 424 BD 22-3/3024/09(HU) 1 March 2012 Baptist University Chinese Medicine and Healthcare Building Regulation 1139 2012 LWK & Partners (HK) Ltd Liberte (Residential Development) 833 Lai Chi Kok Road, Kowloon NKIL 6328 BD 4030/99 H 20 August 2003 Connection to the MTR The Construction of a special school for severely 28 Nam Shan Chuen Road, Tai Hang 1140 2012 P & T Architects & Engineers Ltd mentally handicapped children in Area 32, Tin Shui NKIL 5986 ASD 102/6357 22 May 2007 Universal accessibility Tung, Kowloon Wai, New Territories Focus on the biggest challenge for this kind of 1141 2012 Gravity Partnership Ltd Cathy Lodge 125 Wan Chai Road, Hong Kong IL 611 and IL 662 BD 2/3032/98 21 June 2001 redevelopment project during the demolition stage for it demands special attention How does precast 1142 2012 Gravity Partnership Ltd Proposed Hotel Development 2-12 Shelter Street IL 1149 BD 2/3009/97 (Pt 2) 23 November 2000 construction system poses positive impact on sustainable How have the Architect University Avenue, The Chinese STTL 437 RP & the ext addressed different 1143 2012 Gravity Partnership Ltd Proposed New 300 Student Hostel Development University of Hong Kong, Shatin, New BD 2/9151/06 October 2011 thereto challenges during different Territories stages of the development? Implication on the new Redevelopment of NKIL 5120 and 5121, 50-52 Lion 1144 2012 Barrie Ho Architecture Interiors Ltd 50-52 Lion Rock Road, Kowloon NKIL 5120 and 5121 BD 2/4042/06 27 April 2011 statutory requirement to the Rock Road, Kowloon same development. Residential Development at 118-122 Tung Lo Wan 118-122 Tung Lo Wan Road, Causeway 13 May 2008 (OP) ; June Incompetent Curtain Wall 1145 2012 CYS Associates (HK) Ltd Section A of IL 1680 BD 3008/05 Road Bay, Hong Kong 2008 (PC) NSC The special role of the Ho & Partners Architects Engineers & Development Tsing King Road, Tsing Yi, New 1146 2012 PSPS Tsing King Road (TYTL 163) TYTL 163 BD 2/9042/00H March 2003 Architect within this design Consultants Ltd Territories and build structure will also be The recycling aspects of a Ho & Partners Architects Engineers & Development Alteration and Addition Works at 7 Connaught Road 7 Connaught Road West and 13 New 1147 2012 ML 423 RP BD 2-3/2427/71 19 December 2011 building designed for an Consultants Ltd West and 13 New Market Street Market Street, Hong Kong earlier era. Target OP date: 13 July Management of the Fire Proposed Hotel Development at 388 Jaffe Road, 1148 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 388 Jaffe Road, Wanchai, Hong Kong ML 436 sARP BD 2/3626/6 2012 ; Target Practical Incident during the Wanchai, Hong Kong Completion: November construction period. Interface between sub- Proposed residential redevelopment at RBL 1100, 1, 3 1, 3 and 5 Gough Hill Road, The Peak, 1149 2012 P & T Architects & Engineers Ltd RBL 1100 BD 2/2025/05 29 March 2012 structure and super-structure, and 5 Gough Hill Road, The Peak, Hong Kong Hong Kong extension of time. A&A Works to G/F, M/F, 2-5/F and R/F of 54-56 Russell A project without main 1150 2012 Aedas Ltd 54-56 Russell Street, Causeway Bay IL 3590 RP and IL 3591 RP BD 2-3/3211/69/5 March 2011 Street contractor Architect's approaches: Hotel at IL 8774, 133 Leighton Road, Causeway Bay, 133 Leighton Road, Causeway Bay, Hong Striking a balance among cost 1151 2012 WCWP International Ltd IL 8774 BD 2-3/3063/97/2 13 December 2005 Hong Kong - "Lanson Place Hotel" Kong control, statutory requirement and building performance. Design and engineering of the 1152 2012 Woods Bagot Asia Ltd Commercial Building at Hoi Ping Road 1-3 Hoi Ping Road, Hong Kong IL 29 sHRP and sHss1RP BD 2/3017/06 October 2010 façade. Minimize disturbance to surroundings during 1153 2012 WCWP International Ltd SIP Final Phase - Package 1 St. Paul's Convent School 140 Leighton Road, Causeway Bay IL 1080 BD 2/3083/01(P) 25 June 2005 construction in dense and complex site. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) The avoidable consequences Providence Bay Phase 1 - Proposed Residential Pak Shek Kok Development Area, Phase July 2012 (OP) ; 1154 2012 WCWP International Ltd TPTL 186 BD 2/9172/07 of construction stage and final Development 1, Site B, Tai Po, New Territories September 2012 (PC) outcome of the project. The existing staircases are 1155 2012 RDL Asia Ltd Proposed Commercial Building 487-489 Lockhart Road IL 2836 sAss8 and ss4 BD 3002/05 August 2008 cut in half size and retained at adjoining site during 17 July 2009, 27 October 11-12 Headland Road, Repulse Bay, 1156 2012 LWK & Partners (HK) Ltd Proposed Residential Development at Headland Road RBL 1163 BD 2/2030/06 2009 and 22 October 2009 Lease modification Hong Kong (OP) ; August 2010 (PC) 1157 2012 P & T Architects & Engineers Ltd 3-5 Plunkett's Road, The Peak, Hong Kong, RBL 647 3-5 Plunkett's Road, The Peak, Hong RBL 647 BD 2024/04 April 2008 Sustainability design Construction procedure and The Satellite Remote Sensing Ground Receiving The Chinese University of Hong Kong, STTL 437 RP & the ext 1158 2012 Seniorman Design Ltd BD 2/9062/06 3 December 2009 EVA of fire service due to site Station Phase II Shatin, New Territories thereto constrain. September 2010 (OP) ; Fire engineer and implication 1159 2012 Kohn Pederson Fox (HK) Kerry Centre 865 King's Road, Quarry Bay, Hong Kong IL 9021, formerly 7737, 8637 BD 2/3007/06 December 2010 (PC) on project management. Junction of Cherry Street and Hoi Wang How architect responded to 1160 2012 Wong Tung & Partners Ltd Olympic Station Development - Site B, Phase I & III KIL 11090 BD 2/7339/97 March 2002 Road, Tai Kok Tsui the noise impact issue of the The importance of early Comprehensive Hotel, Tseung Kwan O, Area 56 3 Tong Tak Street, Tseung Kwan O, New 17 January 2012 (Phase 1161 2012 Wong Tung & Partners Ltd TKOTL 72 BD 2/7196/98(2) design co-ordination (Phase 3) Territories 3) - OP associating with the control of Designing with environmental Residential Development at AIL 451, Welfare Road, AIL 451, Welfare Road, Aberdeen, Hong 1162 2012 Wong Tung & Partners Ltd AIL 451 BD 2/2079/07 April 2012 friendly features for a Aberdeen, Hong Kong Kong residential project. The change requested by the client during the early stages Hong Kong International Airport, Chek Lap CLK Lot No. 1 RP & ext of construction whereby the 1163 2012 Aedas Ltd Sky Plaza - North Office Tower BD 2/9062/03(3)(9) October 2006 Kok thereto roof was transformed from a maintenance access zone to a public viewing deck. Olympian City II, 18 Hoi Ting Road, West 1164 2012 Aedas Ltd A&A Works of Olympian City II KIL 11090 BD 2-3/7339/97-1/8 May 2011 Construction in Phases Kowloon, Hong Kong Site arrangement and 1165 2012 Thomas Chow Architects Ltd Proposed IB Block at Diocesan Boys' School 131 Argyle Street, Kowloon KIL 6737 BD 3/4073/08 December 2011 mobilization during As gazetted by MTRCL, on Unusal Project Management land between and Practice: Special Team 1166 2012 Aedas Ltd Sunny Bay Station Lantau Island, New Territories N/A 1 August 2005 (PC) Penny Bay Reclaimation in Working together with in-team North Lantau Island professionals and specialists. 18 Chun Wang Street, Tseung Kwan O 1167 2012 David S.K. Au & Associates Ltd Proposed Pat Chun Food Factory TKOTL 39 s3sQ BD 9083/08 March 2011 Industrial Estate, New Territories Incovportion of as-built Proposed Property Development at STTL 530, Ma On 599 Sai Sha Road, Ma On Shan, New June 2009 (OP) ; 1168 2012 Ronald Lu & Partners (HK) Ltd STTL 530 BD 2/7990/05 development enabling works Shan, Shatin, New Territories Territories September 2009 (PC) and client's need. 1169 2012 Hsin Yieh Architects & Engineers Ltd Tai Wai Festival City Phase 2 1 Mei Tin Road, Tai Wai, New Territories STTL 529 BD 2/7897/99/2 November 2010 Noise Barrier. How the architect propose passageway of vehicular Stage 4a: July 2002 (OP) ; circulations to alleviate the 100 Cyberport Road, Pokfulam, Hong August 2002 (PC) ; Stage traffic impact within this virgin 1170 2012 Wong Tung & Partners Ltd Cyberport Development (Stage 4) IL 8969 RP BD 2/2042/99/ST4 Kong 4b: December 2002 (OP) ; land development, of which December 2002 (PC) also serving as Emergency Vehicular Access to fulfill the requirement of Planning 1171 2012 P & T Architects & Engineers Ltd Crocodile Centre 79 Hoi Yuen Road, Kwun Tong, Kowloon KTIL 692 BD 2/4002/06 25 September 2009 Façade design and regulation 1172 2012 P & T Architects & Engineers Ltd 1 Tai Yau Street, San Po Kong (Midas Plaza) 1 Tai Yau Street, San Po Kong, Kowloon sARP of NKIL 4455 BD 2/4010/95 28 December 2007 Special Design Constraints. An evaluation of project team 55 King Yip Street and 24 Hing Yip Street, and building procurement 1173 2012 Andrew Lee King Fun & Associates Architects Ltd King Palace Plaza KTIL 697 BD 2/4055/08 2 Feburary 2012 Kwun Tong, Kowloon deviating from common practice. Tendering programme and 1174 2012 Leigh & Orange Ltd Princess Alexandra Red Cross Residential School 8-9 Rehab Path, Kwun Tong, Kowloon NKIL 5775 and STT KX 1499 BD 3045/02(P) June 2004 project management. ASD School Improvement Programme Kei Chi ASD 402/95062/PH Mitigation of construction 1175 2012 Leigh & Orange Ltd 20 Shui Ning Road, Kwun Tong, Kowloon KTIL 507 13 September 2004 Secondary School IV/P2 noise. To study on how to manage the constraints & measures to School Improvement Programme Ling To Catholic Chun Man Court, Homantin, Kowloon, VO minimize the impact of 1176 2012 Leigh & Orange Ltd N/A N/A 9 July 2004 Primary School Phase IV Package Two 16-18 construction on the existing school operation in terms of safety, air pollution & noise Architect's role in solving URA K32, KIL 11192 Beech Street / Ivy Street / Pine 1177 2012 Chau Ku & Leung Architects & Engineers Ltd 88 Beech Street, Mongkok District KIL 11192 BD 3/4073/06 14 August 2012 (OP) street improvement work Street / Anchor Street, Tai Kok Tsui, Kowloon located outside and List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 3 Connaught Road Central, Central, Hong 30 September 2012 1178 2012 Aedas Ltd Redevelopment of 3 Connaught Road Central IL 8736 BD 2/2006/07 MTR Subway sub-contract. Kong (Expected OP date) Implementation of A&A Works at Nexxus Building, 41 Connaught Road 1179 2012 Aedas Ltd 41 Connaught Road Central ML 382 BD 2-3/2333/59/3 1 November 2008 management building contract Central with pros and cons. BD 2/2028/08(P) - TM1 ; BD August 2011 - TM1 ; 180 Wong Chuk Hang Road, Brick Hill, 2/2028/08/2(P) - TM2 November 2011 - TM2 ; 1180 2012 Leigh & Orange Ltd Thrill Mountain RBL 1020 & ext thereto Phase development. Aberdeen, Hong Kong ; BD 2/2028/08/3(P) - November 2011 (TM3) ; TM3 ; BD September 2010 (TM4) 2/2032/06/3(P) - TM4 BD 2/2059/07(P) - 1 June Contractual relations ; 180 Wong Chuk Hang Road, Brick Hill, BD 2/2059/07(P) and 2012 ; BD 2/2059/07/1(P) - statutory submissions 1181 2012 Leigh & Orange Ltd Polar Adventure, Summit, Ocean Park RBL 1020 & ext thereto Aberdeen, Hong Kong BD 2/2059/07/1(P) Phase 1: 25 August 2011 ; (licensing) ; technical Phase 2: 10 May 2012 construction (sustainability) Ho & Partners Architects Engineers & Development Proposed residential development at Hung Shui Kiu, PM & CM management 1182 2012 Hung Shui Kiu, Yuen Long YLTL 2064 in DD 121 BD 4/9177/05 31 May 2011 Consultants Ltd Yuen Long, Lot 2064 in DD 121 system IL3011-3014 RP - IL94 sCRP, IL94 sFss1, IL94 sGss6RP, IL94sGRP, 1183 2012 ARK Associates Ltd Staunton Street Residential Development 70-72 Staunton Street, Sheung Wan BD 2/2033/03 19 December 2011 Application for section 16. IL94sFRP, IL94sFRPsBRP, IL94sEss4RP, IL94sDss5RP, IL94sDss6RP, IL94sCss3RP, ML 7sARP, ML 7sAss3, ML Phasing programme - To A&A works at B/1 to 2/F (Phase 7), Podium, The The Landmark, 15 Queen's Road Central, 7sBRP, L2c, IL 3087, ML January 2008 (OP) ; July maximize the work 1184 2012 Aedas Ltd BD 2-3/2216/75/51 Landmark, 15 Queen's Road Central Hong Kong 3sA, ML 2sB, ML 2sARP, 2008 (PC) programme efficiency while ML2RP, ML2AsBRP minimize the interruption to 1185 2012 Aedas Ltd Kowloon City Plaza, A&A Works 128 Carpenter Road, Kowloon NKIL 6056 BD 2-3/4007/90/6 15 December 2006 (PC) Phasing in programme. Alteration and Addition Works to Cinemas, Festival September 2006 (OP) ; Project delay and extension of 1186 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 80 Tat Chee Avenue, Kowloon Tong NKIL 6181 BD 2-3/4055/93/15 Walk March 2007 (PC) time handling. Construction of extension block to Pui Ling School of 13 On Lok Mun Street, On Lok Tsuen, Difficulty during construction 1187 2012 Leigh & Orange Ltd FSSTL 194 BD 2/9170/06(P) 8 July 2004 Precious Blood, Fanling Fanling stage. Main Building for Hong Kong Baptist University Campus Hong Kong Baptist University, Renfrew Proposed building adjacent to 1188 2012 AGC Design Ltd NKIL 6173 BD 2/4018/08 30 April 2012 (OP) Development Road, Kowloon Tong schedule area. Ho & Partners Architects Engineers & Development 1 Yuk Tai Street, Ma On Shan, New 1189 2012 Sausalito STTL 487 BD 2/9114/04 (Pt IV) November 2007 Precast Façade Consultants Ltd Territories The role of Architect in Residential Redevelopment at 105 Chuk Yeung Road, 105 Chuk Yeung Road, Sai Kung, New construction in works without 1190 2012 Archiplus International (HK) Ltd Lot No 270 in DD 213 and ext BD 9069/04 2009 Sai Kung, New Territories Territories a Main Contract between Client and Contractor. Design and planning of New upline entrance and concourse at University 1191 2012 ARCUS Design Ltd University Station, East Rail Line KCRL 6 BD 22-3/7802/10/2(5) August 2012 construction to avoid Station disruption to train services. 18 July 2008 (OP) ; 14 GFA concession / Role of 1192 2012 WMKY Ltd Garden East Residential Development 214-224 Queen's Road East, Wanchai IL 427 sGss1 & sDRP BD 3086/93 November 2008 (PC) Design and Project Architect SILs 459, 460RP, 461 RP, 18-36 Shing On Street, Shaukeiwan, 28 June 2012 (OP) ; 30 1193 2012 AGC Design Ltd Proposed residential development at Shing On Street 462, 483RP, 499RP, BD 2/3022/07 Fire engineering. Hong Kong June 2012 (PC) 539RPsA, 540RP and 541RP IL 1161RP, IL 1162RP, IL 1163RP, ext IL 1163RP, IL 1164sBRP, IL 1164sCRP, IL 68-74 Bonham Strand West, 18-30 Des 16 April 2012 (OP) ; 28 1194 2012 AGC Design Ltd Sheung Wan Hotel 1164RP, IL 1164sAss2RP, IL BD 2071/07 Design and site discrepancy. Voeux Road West, Kowloon June 2012 (PC) 1164sARP, IL 1164sAss1RR4sA, IL 1165, IL 1166, IL 1167 How the project is granted approval by FSD as the Kowloon Station Retail Portion - Site E prescriptive provisions were 1195 2012 Aedas Ltd Kowloon Station, Union Square Phase 1 KIL 11080 BD 2/7224/01 December 2006 and Portion of Site G not used as the basis of the grant but rather the fire engineering approach. KIL 1314. sD1624, sD1314, Proposed Redevelopment at 1, 1A Liberty Avenue & 6 1, 1A Liberty Avenue, 6 Peace Avenue, Combined site and lease 1196 2012 LWK & Partners (HK) Ltd sE1624, RP1312, sAss3, BD 2/4069/95 October 1998 Peace Avenue, Kowloon Kowloon conditions. 1314sC, 1624sC The Chinese University of Hong Kong, Ma STTL 437 RP & the ext Material use, fair-face 1197 2012 Arch Design Architects Ltd An integrated teaching building BD 2/9063/09(P) 29 June 2012 Liu Shui, Shatin, New Territories thereto concrete as major finishes. 23 October 2007 (Phase The construction interface Residential Development at Tiu Keng Leng MTR Tiu Keng Leng MTR Station, Tseung 1198 2012 LWK & Partners (HK) Ltd TKOTL 73B BD 2/7200/98 2) - OP ; February 2008 - between new development Station, Site B - Le Point Kwan O, New Territories PC and existing structure. List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) IL 344RP & IL 348sCRP, How architect overcome site August 2008 (OP) ; 1199 2012 Archiplus International (HK) Ltd SOHO 38 38 Shelley Street, Central sCss1RP, sCssAs1 and BD 2/2050/05 constraint ; Implication of in- January 2008 (PC) sCss1ssARP house QS Architect's tactic in 1200 2012 A. Lead Architects Ltd A&A Works 180-182 Tai Po Road, Kowloon NKIL 2345 RP & 2345 sAss1 BD 2-3/5009/63/2 November 2011 transforming old tenement building to brand new Proposed Residential Building at 13-27 Warren Street, IL 2040 sB, sE, sD, sC, 1201 2012 Archiplus International (HK) Ltd 13-27 Warren Street, Hong Kong BD 3007/09 September 2012 Special site constraint. Hong Kong sFss1sFRP, sG and sH Role of an architect affected 1202 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Park Central, Hong Kong Tseung Kwan New Town, New Territories Area 57, Lot 576 and Lot 66 BD 2/9136/97H January 2002 by the project team structure. The importance of 1203 2013 Wong Tung & Partners Ltd , Hung Hom, Hong Kong Hung Hom Bay Reclamation, KIL 11084 KIL 11084 2001 collaboration in the success of delivering architectural 24 November 2006 (OP) ; 1204 2013 Hsin Yieh Architects & Engineers Ltd 23 Tai Hang Drive 23 Tai Hang Drive IL 8972 BD 2/3034/00 Contract Procurement March 2007 (PC) School Improvement Programme was acknowledge by Education Department, Architect's role on accomplishing the goal of SIP with cost and time efficiency would be investigated. Especially on effective budget School Extension for Kwong Yuet Tong Excel 1205 2013 Andrew Lee King Fun & Associates Architects Ltd Wah Fu Estate, 3 Wah Lam Path 8105 BD 2/3094/02(P) July 2005 control of the project (initial Foundation Primary School in Wah Fu Estate budget was 33m reducted to final cost of 25M), extended project programme, and coordination between Education Departments, client, tenderers, contractors and consultants in relation with the SIP brief would be Syntax of Contextual Vibrancy 1206 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Mody 18 18-20 Mody Road KIL 10537 BD 2/4092/97 January 2013 in An Urban Speculative Commerical Development How architect response to site 1207 2013 LWK & Partners (HK) Ltd Tiu Keng Leng Station Property Development (Site A) Area 73B, NT Site A TKOTL 73 BD 4/7200/98 February 2007 constraint? A study on the Architect's Approach and methods ASD School Improvement Programme - Buddhist Tai 178 Kam Sham, Tai PO Market, New 1208 2013 Leigh & Orange Ltd DD6 Lot No. 1639 BD 2/3022/01(P) October 2005 undertaken to minimize the Kwong Middle School Territories impact of construction works on the school's operation 1209 2013 Ronald Lu & Partners (HK) Ltd Royal View Hotel 353 Castle Peak Road, Ting Kau TWIL 5 & Lot 429 in DD 399 BD 2/9131/97 October 2006 / January Change of site classification Proposed Composite Development at 270 Cheung Sha 1210 2013 LWK & Partners (HK) Ltd 270 Cheung Sha Wan Road, Kowloon NKIL1069RP BD 2/4013/06 29 November 2010 Lane/Site Area Dispute Wan Road How the architect and the consultant team satisfy the 1211 2013 Barrie Ho Architecture Interiors Ltd Redevelopment of No.50+52 Lion Rock Road No 50+52 Lion Rock Road, Kowloon NKIL5120,5121 BD 2/4042/06 27 April 2011 (OP) client's requirements and CLP's requirement on the provision of transformer room. No 10 and 12 Mount Kellett Road, The Site Responsive Design in 1212 2013 P & T Architects & Engineers Ltd 12 Mount, Kellett Road RBL1159 BD 2/2001/07 May 2012 Peak Sloped Site Proposed Telepark For APT Satellite At Tai Po 22 Dai Kwai Street, Tai Po Industrial June 2003 (OP) ; Balance between Value of 1213 2013 WCWP International Ltd TPTL 13 S.E. BD 2/9195/00(P) Industrial Estate Estate November 2003 (PC) client and interest of Dormitory and Facility Extension of United Christian Project Delay and EOT 1214 2013 Ronald Lu & Partners (HK) Ltd 2 Lee On Lane, Kwun Tong, Kowloon GLA - NK 610 0706/AA June 2009 College (Kowloon East) Claims Construction of Fire Station -cum -Ambulance Facility at The process of 1215 2013 Architectural Services Department 5 Cheung Yip Street, Kowloon Bay GLA - NK 770 ASD 51/7279L June 2013 Cheung Yip Street, Kowloon Bay implementation of this 1216 2013 P & T Architects & Engineers Ltd VTC - Teaching Block Extension 30 Shing Tai Road, Chai Wan CWIL 151 BD 2/3035/07 1 February 2012 Delay in completion time When Problems occur during Ocean Park, 180 Wong Chuk Hang Road, construction, what is the 1217 2013 Aedas Ltd Back of House Building for Marine Mammal RBL 1020 RP & ext thereto BD 3/2012/06(P) November 2008 Hong Kong architect's role and its contractural Basis SILs 459, 460RP, 461 RP, 18-36 Shing On Street, Shaukeiwan, 28 June 2012 (OP) ; 30 Client Management During 1218 2013 AGC Design Ltd Proposed residential development at Shing On Street 462, 483RP, 499RP, BD 2/3022/07 Hong Kong June 2012 (PC) Design Process 539RPsA, 540RP and 541RP The Architect's solutions Residential redevelopment at 105 Chuk Yeung Road, 105 Chuk Yeung Road, Sai Kung, New 1219 2013 Archiplus International (HK) Ltd Lot No 270 in DD 213 and ext BD 2/9096/04 September 2009 against site constraints in site Sai Kung Territories and building design Kingston Terrace - Proposed Residential Development No.2 King San Path, Tuen Mun, New BD 2/9260/97 H (p) Discussion on Extension of 1220 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd No.384 Area 4C N.T. 2 August 2002 at Tuen Mun Town Territories (Pt. II) Time (EOT) List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Positive/Negative Impact of No.71, New Clear Water Bay Road, Kwun 1221 2013 Andrew Lee King Fun & Associates Architects Ltd Jordon Valley Park 9AQ004 March 2010 Organization & Procedure Tong that deviate from common The difficulties and architects On Muk Street, Area II, Shek Mun, Sha 1222 2013 Andrew Lee King Fun & Associates Architects Ltd Heung Yee Kuk Building STTL No.547 BD 2/9001/07 25 March 2011 solution on coordination Tin, New Territories works and construction of The Role & Responsibilty Between The Architect & Addition of A New Annex With An Indoor Swimming 1223 2013 Andrew Lee King Fun & Associates Architects Ltd 26 Sung On Street, To Kwa Wan GLA-K388 April 2009 Independent Checker Who Pool for Po Leung Kuk Ngan Po Ling College were hired under the same client (PLK) The Pros and Cons of 37A Cadogan Street, Kennedy Town, excessive nominated sub- 1224 2013 Andrew Lee King Fun & Associates Architects Ltd Cadogan IL905 SA BD 2/2052/09 September 2013 Hong Kong contractors over the course of the project The architect's role and struggle in the midst of 1225 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed Residential development at Bedford Road No.18-30 Bedford Road KIL 11157 BD 2/4063/00 October 2008 authority empowerment by project manager Development potential 1226 2013 Lu Tang Lai Architects Ltd Light Industrial Building No.52 Hung To Road, Kwun Tong KTIL 286 BD 2/4075/05 26 November 2008 (OP) between light industrial and office development Challenges faced by the architect, the architect's role among parties and their solutions to all the Joint User Complex and Wholesale Fish Market at Area 101 Wu Shan Road, Butterfly Beach, environmental guidelines, the 1227 2013 P & T Architects & Engineers Ltd GLA-TM428 SSR314 August 2010 44, Tuen Mun Tuen Mun requirements from different departments, at the same time to handle the opposition from the local residents and the Council Administration and execution J/O On Yiu Street, On Kwan Street, On 1228 2013 Leigh & Orange Ltd Project Symmetry, HSBC Data Centre STTL433 BD 2/9250/10 August 2013 of Architectural Design for Lai Street Data Centre How the site constraints An 18-Classroom Primary School at Tai Pak Tin Street, 99 Tai Pak Tin Street, Kwai Chung, New ASD programme no. 1229 2013 Design 2 (HK) Ltd GLA-KT 1159 28 August 2009 affected the final design of the Kwai Chung, New Territories Territories 307 EP project. KIL 2097 sGss 1 RP & sGss How an architect solves the 1230 2013 Ie, Siu & Chung Architects Ltd Proposed Residential Redevelopment 148-148A Boundary Street, Kowloon BD 2/4058/06 10 November 2010 1sA problem of delayed payment Sustainable Design 6 Chun Kwong Street, Tseung Kwan O, 1231 2013 Wong & Ouyang (HK) Ltd New Data Centre Development TKOTL39 BD 2/9183/10 23 January 2013 Measurement for LEED Hong Kong Certification 1232 2013 Handi Architects Ltd Residential Redevelopment at 35 Mount Kellett Road 35 Mount Kellett Road, The peak, Hong RBL553 BD 2/2008/05 April 2009 Consecutive GBP How the project would be completed with an intensive QBML 1sE ss2, QBML 1sF 29 October 2001 (OP) ; 26 construction programme by 1233 2013 Wong & Ouyang (HK) Ltd Cambridge House 979 King's Road, Quarry Bay, Hong Kong BD 3/3025/00 (Pt II) RP & ML703 sN April 2003 (PC) achieving fast construction methods and curtain wall system was adopted How architect maintain quality Cyber-port Development at Telegraph Bay, Pok Fu Lam 27 March 2002 (OP) ; control through design control 1234 2013 Wong Tung & Partners Ltd 100 Cyber Port, Pok Fu Lam, Hong Kong IL 8969 RP BD 2/2042/99/ ST1&2 (Stage 1 & 2) October 2002 (PC) and contract administration in a complex development proposed Residential Redevelopment of 468-474 Sai 468-474 North and How architect addressed to 1235 2013 Chau Ku & Leung Architects & Engineers Ltd NKIL317 BD 2/4002/09 22 October 2012 Yeung Choi Street North and 51-53 Wong Chuk Street, 51-53 Wong Chuk Street, Kowloon the site irregularities? 8 Sham Tsz Street, Sham Tseng, Tsuen Implication on building bulk 1236 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Ocean Pointe Lot 265 in DD 390 BD 2-4/9184/96(2) 2000 Wan, New Territories due to GFA concession How to prevent UBW in 1237 2013 Wong Tung & Partners Ltd Cyberport Residential R2 Development 6-18 Bel-Air Avenue, Cyberport, Pokfulam IL No. 8969 BD 2/2042/99/ST9 30 June 2005 residential units after OP How Architect respond to the BD 2/2019/95H (Site design and construction of the 1238 2013 Wong Tung & Partners Ltd Queen Street Redevelopment (Site A) Queen Street, Sheung Wan ILN 8887 5 February 2013 A) pedestrian footbridge over a public street 13 Ping Tong Street South, Tong Yan San 1239 2013 Vincent Lai Architects Ltd 3-Storey Warehouse Building D.D. 121 1300 SB RP BD 2/9189/08 25 August 2011 5/6 Minor Height Relaxation Tsuen, Yuen Long, New Territories The advantage and disadvantage of the "reuse" 1240 2013 A&B Design Consultants Ltd Alteration & Addition works of hotel conversion No 126-128 Lockhart Road, Hong Kong IL2799 BD 2-3/3063/89/5 26 April 2013 existing building instead of demolish and construct a brand new building List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Project team organization Proposed development of Po Leung Kuk Energetic Wang Yip Street, Shap Pat Heung, Yuen 1241 2013 Andrew Lee King Fun & Associates Architects Ltd STT2381 BD 2/9172/10 20 March 2013 (OP) difference Architect VS Youth Centre Long, NT Consultant role Impact of nominated sub- 1242 2013 Andrew Lee King Fun & Associates Architects Ltd 181 Hoi Bun Road 181 Hoi Bun Road, Kwun Tong KTIL173 BD 3/4066/09 30 September 2013 contract arrangement in building construction process Pak Shek Kok, Reclamation Phrase I, Site December 2012 (OP) ; 1243 2013 Foster + Partners Providence Peak TPTL 188 Residential Development TPTL 188 BD 2/9056 GRC Prefabricated Façade C, NT, Hong Kong May 2013 (PC) Building Planning / 26 August 2011 (OP); 1244 2013 C.S. Tam & Associates Godown Building on 10 Lok Yip Road 10 Lok Yip Road, On Lok Tsuen, Fanling FSSTLN 114 BD 2/9026/08 Governmental Submission & February 2011 (PC) Environment Friendly Design 1245 2013 LWK & Partners (HK) Ltd Residential Development at 146-148 Argyle Street 146-148 Argyle Street, Homantin, KIL3303 BD 2/4018/10 October 2013 (anticipated) Building Façade To study the statutory controls imposed by the Government Proposed Commercial and Residential Development 1246 2013 LWK & Partners (HK) Ltd Tseung Kwan O Area 57A TKOTL 74 BD 2/9136/97H 17 February 2005 and how do they affect the Tseung Kwan O Area 57A, TKOTL 57, 66 and 74 design of residential building in different direction Redevelopment of Block B, St Stephen's College How the architect solve the 1247 2013 Andrew Lee King Fun & Associates Architects Ltd 30-32 Wong Ma Kok Road, Hong kong RBL432 BD 2/2036/05 12 March 2008 (OP) Preparatory School site constraint in Construction of independent Revitalisation Scheme Conversion of old Police Shek Tsai Po Street, Tai O, Lantau Island, steel structure glazed pitched 1248 2013 WMKY Ltd GLA IS 534 BD 3022/09 (HU) 23 February 2012 Station into Tai O Heritage Hotel Hong Kong roof above existing historic building To study how architects react The Construction of student hall VII at Hong Kong DD227, HKUST, Clearwater Bay, Hong to unexpected events (e.g. 1249 2013 P & T Architects & Engineers Ltd 846 March 2009 University of Science & Technology Kong site conditions) to mitigate programme delay. How the architect deal with the special problems or issues found in school project 1250 2013 P & T Architects & Engineers Ltd Re-provisioning of St.Francis's Canossian School 42-44 St Franci's Street, Wan Chai IL8102 & Ext BD 3015/06 30 November 2010 for renovating an old premise and constructing a new extension at the same time in both design and construction The cause of slowness of the top down construction in the Residential Development NKIL 6350 Ngau Chi Wan 1251 2013 P & T Architects & Engineers Ltd 51 Fung Shing Street Ngau Chi Wan NKIL6350 BD 4064/05 December 2010 project and cost control Kowloon requested by client in the middle stage of the project How architect deal with the landscape and retain/compensate over 200 number of trees within the site 1252 2013 P & T Architects & Engineers Ltd The Grandville, Shatin Lok Kwai Path, Shatin STTL526 BD 3/9067/02 16 January 2006 under various constraints, such as cilents design brief, construction, site context, cost, lease condition, the statutory requirements, etc The challenges of alteration 1 Cheung Man Road, Chai Wan, Hong 1253 2013 Wong Tung & Partners Ltd French International Primary School 135 BD 2-3/3075/95H 20 December 2011 and addition works at a site Kong with historical buildings Pros and Cons of the dual identity of the client and how this project nature would influence the entire development progress. Residential Redevelopment at 48-50 Junction Road, 1254 2013 Andrew Lee King Fun & Associates Architects Ltd 48-50 Junction Road, Kowloon NKIL 2747 sA RP BD 2/4008/09 September 2013 Remedial measures and Kowloon architect solutions to compensate the project delay due to the replacement of site agent and project manager during the construction stage MTR Tunnel connection 6 August 2009 (OP); 7 1255 2013 Rocco Design Architects Ltd I Square No.63 Nathan Road KIL7425 BD 4072/04 construction & safety November 2009 (PC) supervision Measures taken to fulfill Proposed Development For Hang Seng Management Hang Shin Link, Siu Lek Yuen, Shatin, 1256 2013 Wong & Ouyang (HK) Ltd STTL 546 BD 2/9111/11(P) September 2012 client's requirement on the College at Hang Shin Link, Siu Lek Yuen, Shatin New Territories time of possession of the List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) How did the project architect Hong Kong Design Institute & HKIVE Lee Wai Lee 3 King Ling Road, Tseung Kwan O, Hong negotiate / coordinate and 1257 2013 P & T Architects & Engineers Ltd TKOTL 107 BD 2/9070/06(P) February 2010 Campus Kong what were the solutions / strategies adopted Discovery Bay North Development Phase 14, Area N1d, The remaining portion of Issues involving compliance 1258 2013 CYS Associates (HK) Ltd Amalfi 8, Amalfi Drive, Discovery Bay 2 February 2011 Lot 385 in demarcation with the Specification district No. 352 and the extensions thereto Introduction of a 9m high sky Residential development at Junction of garden, application to the 1259 2013 Wong Tung & Partners Ltd Mount Beacon Cornwall Street & Tat Chee Avenue at 20 NKIL 6196 June 2006 Town Planning Board & lease Cornwall Street, Kowloon modification would be The procedure and the difficulties encountered in the progress of dealing with 1260 2013 Lu Tang Lai Architects Ltd Light Industrial Building 78, Hung To Road, Kwun Tong KTIL 159 BD 2/4063/05 March 2008 different government department and also the consultant team of the other project in order to achieve the BA 14 submitted to An alterations and additions works at 14/F at the Lease modification of Height 1261 2013 Paliburg Development Consultant Ltd No 30-38 Sa Po Road, Kowloon City NKIL5754 BD 2-3/4342/78/16 Buildings Department on exisiting hotel Regal Oriental Hotel Restriction 19 October 2012 The Architect's approach to coordinate between different Proposed Commerical Development IL 2769 SB 256 256 Hennessy Road, Wan Chai Hong 1262 2013 WMKY Ltd 2769 (Section B) BD 2/3026/04 November 2008 parties due to the major Hennessy Road, Wan Chai Kong structural change in design after the commencement of The AP/architect's role in this project for providing the IL678 SC RP; IL678 SD ss1 September 2013 (BA13 to relevant information to the 110-118 Second Street, Sai Ying Pun, 1263 2013 JA Design Architects Ltd Altro(懿山) RP; IL678 SD RP;IL678 SD BD 2/2128/10/1 be submitted in August client in accordance to the Hong Kong ss2 RP; IL678 SD ss1 sA 2013) newly implemented Residential Properties (First- hand sales) Ordinance since Exchange of land use, 1264 2013 Lu Tang Lai Architects Ltd Proposed Residential Development in FSSTL 231 NT No. 8 Ching Hiu Road, Sheung Shui, NT FSSTLN 231 BD 2/9172/05 (Pt III) July 2009 structure of project team and building design VS statutory Residential development at 43-45 Beacon Hill Road, Exemption of the EVA 1265 2013 Wong Tung & Partners Ltd 43-45 Beacon Hill Road NKIL 4763 23 January 2007 Kowloon requirement from BPR The challenges of new Hong Kong International Airport, Chek Lap CLK Lot No. 1 RP & ext BD 2/9062/03(5)(P); 1266 2013 Aedas Ltd Skyplaza Development (South Office Tower) 23 May 2007 building works at a site within Kok thereto FP43/0004/99E airport area Explore the Architect's Role in TKOTL 55, Tseung Kwan O, 88 O King Construction Administration 1267 2013 Wong & Tung International Ltd Tseung Kwan O - TL No. 55, Ocean Shores Phase 3 TKOTL 55 BD 2/9156/97 31 October 2003 Road, New Territories where in-house contractor is engaged What are the constraints to STTL 483 Area 77, Ma On 1268 2013 Wong Tung & Partners Ltd STTL 483 Area 77 Ma On Shan (La Costa) 8 Po Tai Street, Ma On Shan February 2004 achieving a zero carbon high Shan rise building? How does architect response 1269 2013 Wong Tung & Partners Ltd Residential Development at 15 Ho Man Tin Hill Road 15 Ho Man Tin Hill Road KIL 3389 RP BD 4049/00 April 2006 to site and design The role and responsibility of 1270 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Development 38 Heung Yip Road, Hong Kong AIL 344 BD 2/2008/06 5 May 2013 (OP) architects in the management of building construction Studies on Foundation Proposed 30-classroom primary school, Diocesan Boy's 1271 2013 Thomas Chow Architects Ltd 131 Argyle Street, Kowloon KIL6737 BD 2/4069/04 9 July 2004 Systems with Suspected School Explosive remained under the 1272 2013 Thomas Chow Architects Ltd Proposed IB Block at Diocesan Boys' School 131 Argyle Street, Kowloon KIL 6737 BD 3/4073/08 December 2011 Massing Disposition Ngong Ping Road, Lantau Island, New BD 2/9905/03 (NPT) How contract types affect a 1273 2013 Aedas Ltd Tung Chung Cable Car - Ngong Ping Terminal N/A 17 May 2006 Territories (P) project. Study on the practicality of the 1274 2013 Ronald Lu & Partners (HK) Ltd Siu Sai Wan Complex 1E, Siu Sai Wan Road, Hong Kong Nil 24 November 2010 sustainable design feature Proposed Residential Building at 13-27 Warren Street, IL 2040 sB, sE, sD, sC, Constraint encountered when 1275 2013 Archiplus International (HK) Ltd 13-27 Warren Street, Hong Kong BD 3007/09 October 2012 Hong Kong sFss1sFRP, sG and sH implementing the original 1276 2013 Woods Bagot Asia Ltd Private Residential "The Apex" 16 Mount Austin Road, The Peak, Hong RBL 913 & 640 BD 2-3/2256/69/7 12 December 2008 Statutory Control (A & A Sports Centre and Community Hall in Area 101, Tin Architect's role in collapse of 1277 2013 Andrew Lee King Fun & Associates Architects Ltd Area 101, Tin Shui Wai Area 101, Tin Shui Wai ASD 9AS 045 29 May 2012 Shui Wai bamboo scaffolding in List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) BD 2/7940/01 Proposed Property Development at TMTL 447, Tuen Century Gateway's 83 Tuen Mun Heung ASD Phrasing arrangement and 1278 2013 Ronald Lu & Partners (HK) Ltd TMTL 447 September 2012 Mun, NT Sze Wui Road 14/85752/TAS/SJP/1 migration of PTI 94/02 ASD September 2004 Deletion of Main Contractor 1279 2013 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Young Ko Hsiao Lin Secondary School Lung Hang Estate, Shatin, New Territories STTL 557 62/6487/EX5/E20/500 (Conversion) ; March 2005 and EOT Issue. (S297) (Annex) Liquidation of Quantity Survey 1280 2013 Ronald Lu & Partners (HK) Ltd Po Leung Kuk Wu Chung College Heng On Estate, MA On Shan, Shatin, NT STTL 500 SF BD 4/3070/02 (P) September 2005 or before final account by ASD & corresponding actions A comparison between ASD School improvement programme - SKH Tsang Shui Tin 1281 2013 Ronald Lu & Partners (HK) Ltd Wo Che Estate Shatin, NT N/A S327 June 2005 & Private Developer project in Secondary School building process Development with interface of 1282 2013 Ronald Lu & Partners (HK) Ltd Tuen Mun Swimming Pool Complex Area 1 (San Wai Court) Tuen Mun N/A 9AQ 022 February 2012 private road Ho & Partners Architects Engineers & Development Proposed residential development at Hung Shui Kiu, PM & CM management 1283 2013 Hung Shui Kiu, Yuen Long YLTL 2064 in DD 121 BD 4/9177/05 31 May 2011 Consultants Ltd Yuen Long, Lot 2064 in DD 121 system Sustainable design measures 1284 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 39 Conduit Road, Hong Kong 39 Conduit Road, Central Hong Kong IL 7898 SA September 2009 in the project An appraisal of Gehry Tuen Mun Hospital, Tsing Chung Koon October 2012 (OP) ; Technologies' Building 1285 2013 Ronald Lu & Partners (HK) Ltd Maggie's Cancer Caring Centre at Tuen Mun Hospital GLA-TM53 N/A Road, Tuen Mun March 2013 (PC) Information Modeling (BIM) and construction Evaluate the Counter Balance Wan Chai Rd/ Tai Yuen Street Redevelopment, URA BD 2/3018/08 (HU) 10 September 2012 (OP); Strategy between New 1286 2013 Simon Kwan Architect & Associates Ltd Wan Chai Road / Tai Yuen Street IL8953 H9 (Site C) (P) 10 January 2013 (PC) Development and Preservation of historical Wan How did the Project Architect Extension of Hong Kong Ling Liang Church 6 Leighton Lane, Causeway Bay, Hong June 2011 (OP); June 1287 2013 P. Y. Leung & Associates Ltd IL7411 BD 2/3029/07 (P) overcome the restriction of Kindergarten Kong 2011 (PC) site conditions? URA Redevelopment at Larch Street & FIR Street, Tai Urban renewal resources 1288 2013 Simon Kwan Architect & Associates Ltd 1 Larch Street, Tai Kok Tsui IL 11195 BD 2/4070/06 September 2011 Kok Tsui () centre ( URRC) 338Fan Kam Road, Kwu Tung South NT Construction sequence and 1289 2013 Hsin Yieh Architects & Engineers Ltd Residential Development at DD100 1882 BD 2/9231/05 (Pt. V) April 2013 Hong Kong phasing Proposed Office Building at 712 Prince Edward Road 712 Prince Edward Road East, San Po Role of architect in this project 1290 2013 Andrew Lee King Fun & Associates Architects Ltd NKIL 4795 S.A., S.B., & R.P. BD 2/4084/05 January 2009 East, San Po Kong Kong, Kowloon compared to common School Improvement Work for Po On Commercial 2 Tai Pai Street, Tsuen Wan, New Phrasal Completion 1291 2013 WCWP International Ltd TWTL 275 BD 3/3100/01(P) 26 August 2005 Association Wong Siu Ching Secondary School Territories (OP/TOP) Issues that caused the discrepancies in interpretation 28 & 33 Kwu Tung Road, Sheung Shui, 1292 2013 Ronald Lu & Partners (HK) Ltd Valais DD95 LOT 2242 BD 2/9040/06 November 2010 and understand the method NT Hong Kong and strategy the architect used to solve the problem Section 1: February 2012, Request of Additional District Open Space at Po Kong Village Road Wong Tai 1293 2013 P & T Architects & Engineers Ltd Po Kong Village Road, Wong Tai Sin GLA - NK 615 Contract No. SSS315 Section 2: August 2010, Sprinkler system by FSD at Sin Section 3: August 2009 the very last construction HHIL 402,475, 395, 410 & 23 November 2011 (OP); 1294 2013 CYS Associates (HK) Ltd Wuhu Residence 111 Wuhu Street Hung Hom Kowloon BD 2/4104/08 Open kitechen design 459 6 December 2011 (PC) 18 Yat Yiu Avenue, Tai Po Kau, Tai Po Lease modification and 1295 2013 APA Architects Ltd L'Utopie TRTL 160 BD 2/9106/03 July 2006 NT drainage diversion Coordinating the new 1296 2013 P & T Architects & Engineers Ltd Redevelopment of Hong Kong Sports Institute C3 No.25 Yuen Wo Road, Fotan, Shatin, NT ST 301 BD 2/9177/07(1) July 2013 construction and existing life activities How the site constraints could 1297 2013 Ronald Lu & Partners (HK) Ltd MTRC Rail Che Kung Temple Shatin Town Lot no. 519 519 BD 7807/08 September 2012 impact the design and construction in different June 2013 (OP); August Building modification / design 1298 2013 LWK & Partners (HK) Ltd Argenta No.63 Seymour Road, Hong Kong IL2300 BD 2/2077/06 2013 (PC) optimisation The uniqueness of the team 1299 2013 Leigh & Orange Ltd SIP FDBWA SZETO HO Secondary School 7 Kai Tin Road, Lam Tin NKIL 5575 BD 3/3020/01 (P) May 2004 organization particularly the cilent & the architect Changes of the Buildings Area 55A, So Kwun Wat, Tuen Mun, New 1300 2013 Wong Tung & Partners Ltd Aegean Coast TMTL 374 BD 2/9025/97 2002 Regulations that affect Terriotories residential building design Elaine Field School, GLA-TP 417 Fu 1301 2013 Thomas Chow Architects Ltd Extension to Elaine Field School GLA-TP417 9AQ036 2010 Barrier Free Access Chung Lane, Tai Po, NT Architect's solution on dealing Area 18, Man Tung Road, Tung Chung, ASD302/5098/RA/LC 1302 2013 Andrew Lee King Fun & Associates Architects Ltd District Open Space in Area 18, Tung Chung GLA-IS369 March 2010 with contractor of poor Lantau SD/903 performance List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Post-completion : Defect Queen's Street redevelopment, Queen's Terrace (Site 16 August 2002 (OP); 3 1303 2013 Wong Tung & Partners Ltd No.1 Queen's Street M903 (H1) BD 2019/95H Rectification & Extension of B) September 2002 (PC) Time (EOT) claims 11 Hoi Shing Road, Tsuen Wan, Hong The feasibility of sustainable 1304 2013 Hsin Yieh Architects & Engineers Ltd Industrial Redevelopment TWIL 36 and TWIL 218 TWIL 36 & TWIL 218 BD 2/911/03 (Pt II) 22 June 2012 (OP) Kong building design ASD Environmental Protective 1305 2013 Andrew Lee King Fun & Associates Architects Ltd ASD, Sports Centre in Area 28A, Fanling 19 Pak Wo Road, Sheung Shui Sports Centre in Area 28A 55/92050/CWO/034- April 2011 Measurement + 07/BP Environmental Impact Difficulities encountered for HD (ICU) the whole school to comply 1306 2013 Andrew Lee King Fun & Associates Architects Ltd New Annex For Po Leung Kuk Tang Yuk Tsen College Wu King Estate, Tuen Mun, NT VO No. 104 August 2011 E3/148(N)AA(14) with the current regulations & architect's solution Architect's response and role Hotel Development at 86 Tai Kok Tsui Road, Tai Kok 86 Tai Kok Tsui Road, Tai Kok Tsui, 1307 2013 Archiplus International (HK) Ltd KIL No. 11208 BD 4011/08 December 2011 (OP) to the suspension of works Tsui, Kowloon Kowloon under design and build Alterations & Additions Works, Kiangsu & Chekiang No. 30 Ching Wah Street, North Point, 27 April 2005 (OP) ; 27 Architect's solution in pre- 1308 2013 Amasia International Architects Ltd IL 7330 BD 2-3/3041/57/2 Primary School Vertical Extension Hong Kong April 2005 (PC) planning stage No.1 Kwun Chui Road, So Kwan Wat, Construction of box culvert 1309 2013 Simon Kwan Architect & Associates Ltd Residential Development at So Kwan Wat (Avignon) TMTL 465 BD 2/9096/05 8 August 2011 Tuen Mun under lease condition Alterations & Addition Works at Winfield Building (Block No 1,3, 5 Ventris Road Happy Valley 29 February 2012 (CC) Building regulations VS 1310 2013 Nan Fung Design ILN 8538 BD 2-3/1091/81/2 (S) A & B) Hong Kong 28 September 2013 (PC) Design intent 1311 2013 RAD Ltd A&A Works for W Place 52 Wyndham Street, Central, Hong Kong 4093 BD 2-3/2383/71/2 July 2009 Prefrabrication 697/730RP/743/744RP/747R P/752RP/761RP/760RP/938/ Administrative and statutory ASD401/6452&6453/ 1312 2013 Lu Tang Lai Architects Ltd A Primary school in Area 31, Sheung Shui 51 Tin Ping Road, Sheung Shui, NT 939/940/941RP/959RP/962/1 November 2009 comparison - public VS EX/CAAL010 157/115/1159/4652SAssI/465 private project 2SBRP/4652SBSSI/4652SC IL3032 SB SCRP & SDRP IL Proposed development at 11.L. 1553 SA RP of No 28 Yat Sin Street, Wan Chai, Hong 1553 RP IL 1553 SA, RP of Reason, procedure and effect 1313 2013 Lu Tang Lai Architects Ltd extension to IL1553RP and SA of extension to IL 1553 BD 2-4/3025/04 September 2007 Kong extension to IL 1553 RP and on site extension RP, No 28 Yat Sin Street, Wan Chai, Hong Kong SA of extension to IL 1553 Proposed Hotel Development at 388 Jaffe Road, Managing fire accident during 1314 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 388 Jaffe Road, Wanchai, Hong Kong ML 436 sARP BD 2/3026/06 31 August 2012 Wanchai, Hong Kong construction period. In-house construction management team involved in different construction stages and how they collaborate with Residential Development at Area 85 Site A, Tseung architect struggling on design 1315 2013 Spiral Architectural Design Ltd Area 85 Site A, Tseung Kwan o, NT TKOTL 90 BD 1/9088 October 2013 Kwan O, Hong Kong procedures and making suitable sacrificial design judgement in order to meet critical deadlines and construction budget tightened Combination works of School Improvement Project Phase 4. Good Shepherd 1316 2013 Leigh & Orange Ltd 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 3086/01 (P) 6 January 2005 (OP) construction a new building, Primary School A&A work / UBW Architect's solution for St. Mary's Canossian School, Proposed Extension June 2003 (OP) ; August minimising the disturbance to 1317 2013 P & T Architects & Engineers Ltd 162 Austin Road, Tsim Sha Tsui, Kowloon KIL 9550 BD 2/4054/00/P Block 2003 (PC) existing user in a school environment. 8, Wu Kai Sha Road, Lok Wo Sha, Ma On 1318 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd , Hong Kong DD 206 2 April 2013 Substainability Development Shan, New Territories 31-35A Wellington Street, Central, Hong IL 21 sC, ss1, sC RP, sB RP, 1319 2013 Brighspect Limited Proposed Redevelopment at 31-35A Wellington Street BD 2/2013/05 May 2007 Building and structural layout Kong sA RP Architect's response on the 1320 2013 P & T Architects & Engineers Ltd In-Situ Redevelopment of Diocesan Girls' School 1 Jordan Road, Kowloon 10718 BD 2/4078/07 (P) 7 July 2011 change of design intent on usage of the podium roof Phase 1 Part 1: December 2009; Phase 1 Part 2: Construction arrangement of 1321 2013 Aedas Ltd A&A Works to Tuen Mun Trend Plaza (South Wing) 2 Tuen Hop Street, Tuen Mun, NT TMTL 282 Site B BD 2-3/9001/84/9 March 2010; Phase 2 : an operating mall December 2010 Architect's decisions in term of design / construction T.K.O.T.L.70, No. 1 Lohas Park Road, method / choice of material on 1322 2013 MLA Architects (HK) Ltd Temporary Supermarket Building TKOTL 70 BD / 7192/97/3(TB) 7 October 2011 Tseung Kwan O, NT a temporary building and possibilities after the end of building life-cycle 300 Nam Cheong Street, Sham Shui Po, Study on connection between 1323 2013 Urbanage International Ltd TWGHs Chang Ming Thien College Extension NKIL 5294 July 2005 Kowloon old and new Hong Kong University of Science and Technology Hong Kong University of Science & DD 227 LOT 846 & the Ext. 18 October 2010; How architect solve the 1324 2013 Architecture Design & Research Group Ltd BD 2/9036/07 Extension to Existing Academic Building Technology, Sai Kung thereto December 2010 issues due to existing List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Project Management Ho & Partners Architects Engineers & Development 123-127 , , KIL 1702 RP; 1703 RP; 1704 challenges with Integrated 1325 2013 Proposed hotel development BD 2/4003/09 October 2013 (OP) Consultants Ltd Hong Kong RP Client (Client being the contractor, quantative & 52-54 Wellington Street, Central, Hong 22 June 2005 (OP); 2 Environmental friendly and 1326 2013 Ie, Siu & Chung Architects Ltd Commercial Building IL 988 sE, sF. & RP, sD, ss1 BD 2/2027/00 Kong August 2005 (PC) sustainable building Use of virtual prototyping technology optimising 1327 2013 P & T Architects & Engineers Ltd Tseung Kwan O Sports Ground 109 Po Hong Road, Tseung Kwan O, NT AREA 45 March 2009 (PC) construction processes, reduced risk & project cost BD 3/3130/01 (P) ASD 1328 2013 Ronald Lu & Partners (HK) Ltd Jockey Club Ti-I College (Extension and A&A) Lok King Street, FoTan, Shatin STTL 324 4 October 2005 Delay of construction 93/6487/ALL361/c25/ 001 22 June 2010 (OP); 4 1329 2013 Ronald Lu & Partners (HK) Ltd TLTL 68 Residential Development 8 Hoi Long Path, Tsuen Wan, NT TLTL 68 BD 2/9175/06 DD & H October 2010 (PC) 1330 2013 Ronald Lu & Partners (HK) Ltd Redevelopment of Kowloon Junior School 20 Perth Street, Ho Man Tin, Kowloon KIL 10735 BD 2/4024/07 (P) July 2013 (anticipated) Sustainability achievement ASD Special School in Area 16, Tuen Mun for the Physically Fault zone of foundation 1331 2013 Ronald Lu & Partners (HK) Ltd No. 6, 8 Hang Kwai Street, Tuen Mun GLA - TTM 404 55/92050/CWO/013- December 2012 Disabled Children School discovered during piling works 09/BP Facade design in relations 1332 2013 Aedas Ltd Residential Development at 350 Tai Hang Road 350 Tai Hang Road, Hong Kong IL 7350 BD 3002/06 25 March 2012 with program & cost Discussion of treatment of One Silver Sea; Authorized Person for Hotel G/F & UG/F, 18 Hoi Fai Road, West 1333 2013 Aedas Ltd KIL 11158 BD 4011/02/3 November 2012 GFA exempted void after Development at Podium Kowloon Reclamation, Kln change of use 212 Gloucester Road, Wan Chai, Hong ML 435 SF, ML 435 RP & ML 31 December 2012 (OP); Site excavation conflict 1334 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Gloucester (Residential) Kong 436 SA SS2 1 May 2013 (PC) causing program amendment 22 November 2012 (OP) ; Proposed Student Halls VIII and IX, The Hong Kong The Hong Kong University of Science & DD 227 LOT 846 the Ext. Natural Terrain adjacent to 1335 2013 Ronald Lu & Partners (HK) Ltd BD 2/9108/08 November 2012 University of Science & Technology Technology, Sai Kung thereto the site (Substantial Completion) Incorportion of the proerty June 2009 (OP); 1336 2013 Ronald Lu & Partners (HK) Ltd Property Development at Wu Kai Sha Station 599 Sai Sha Road, Ma On Shan, NT 530 BD 2/7990/05 development enabling works September 2009 (PC) and client's needs New Lobby - Feb 2003 Arcade / shopfront - July Challenges & Strategies in Upgrading and change of Use of CDW Building at 388 No. 382-392 Castle Road & No. 27-37 Mei 2003 1337 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd DD. 453 Lot 1221 S.A. BD 2-3/9184/78/8 Addition and Alteration Works Castle Peak Road Wan Street, Tsuen Wan, N.T. Podium work - Sept 2003 for Industrial Building Covered walkway & footbridge - Sept 2005 Effects of the Temporary University Avenue, The Chinese Occupation Permit on the STTL 437 RP & the ext 1338 2013 Gravity Partnership Ltd Proposed New 300 Student Hostel Development University of Hong Kong, Shatin, New BD 2/9151/06 October 2011 project and analyze how the thereto Territories design team have addressed various problems QBML 2 & EXT., sJR.P, Solutions to overcome the Cityplaza 1, Site V-A, King's Road, Taikoo BD 2-3/3133/74/18 1339 2013 Wong Tung & Partners Ltd Cineplex, Cityplaza 1, Taikoo Shing sQss2sA, sQss7, sQR.P, 24 November 2000 difficulties with tight Shing, HK SITE V-A sRs.s1sA, SRR.P. construction program DLO disapproval of DD&H Residential & Commercial Development at No. 9 Yuk No. 9 Yuk Yat Street, To Kwa Wan, 1340 2013 LWK & Partners (HK) Ltd KIL 11196 RP BD 2/4037/05 30 October 2012 submission during the final Yat Street, KIL 11196 RP Kowloon construction stage As this scope of this project involved the erecting of a building in a location that was in a park, an application for permission in respect of plans was made to the Town Planning Board under Section The Redevelopment of Victoria Park Swimming Pool 30 April 2013 (PC for 1341 2013 P & T Architects & Engineers Ltd Victoria Park, Causeway Bay 9AS009 16 of the Town Planning Complex, Phase I Section 1) Ordinance (TPO) during the Inception stage of the project. However, such application was disapproved by the board and subsequently an application to review the Board's decision under The role of architect in project 1342 2013 LWK & Partners (HK) Ltd Residential Development 71 Mount Kellett Road, Hong Kong RBL 506 BD 202 BC/97 November 2002 quality control in different Ocean Park, 180 Wong Chuk Hang Road, 10 February 2009 (Phase 1343 2013 Aedas Ltd Ocean Park Astounding Asia Panda Trail RBL 1020 RP & ext thereto BD 2/2049/06 (P) ETFE Hong Kong 1); 22 April 2009 (Phase 181 Castle Peak RR, Hung Shui Kiu, 1344 2013 Aedas Ltd Hung Shui Kiu Meeting House 4314 IN D.D. 124 N.T. BD 2/9079/05 23 August 2012 Site Constraints Yuen Long List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) BD 2/4014/09(P) & Architect's solution to 1345 2013 Ronald Lu & Partners (HK) Ltd King George V School (KGV) 2 Tin Kwong Road, Homantin, Kowloon KIL 10736 July 2013 (anticipated) BD 2/4039/09(P) preserve & embrace existing How architect worked on STTL 437 RP & the ext 1346 2013 Andrew Lee King Fun & Associates Architects Ltd Student Hostel Site 1 Residence Lane 1, CUHK, Sha Tin BD 6/9143/09(P) June 2013 statutory issue to achieve the thereto design concept Coordination with gov. parties 1347 2013 Andrew Lee King Fun & Associates Architects Ltd Casa Bella, Residential Building 117 Caine Road, Central, HK 3026 BD 2077/90 12 March 2001 dealing with site issue to maximize development How the architects role differs 1348 2013 Andrew Lee King Fun & Associates Architects Ltd QRC 100 100 Queen's Road Central, HK HKIL 23RP August 2006 when encountering contractual difficulties 1349 2013 LWK & Partners (HK) Ltd Propsed Residential Development at 38 Repulse Bay 38 Repulse Bay Road RBL 380 BD 2/2044/06 September 2013 Construction of slope Adoption of precast façade 1350 2013 LWK & Partners (HK) Ltd Residential Development at 28 Barker Road, HK 28 Barker Road RBL 126 & Ext. BD 2/2054/07 March 2013 and stone cladding Tsuen Wan Town Lot No. January 2010 (OP); 1351 2013 Wong & Ouyang (HK) Ltd Primrose Hill 152-160 Kwok Shui Road, Tsuen Wan BD 2/9036/03 Green Building 410 February 2010 (PC) 55 King Yip Street and 24 Hing Yip Street, Lease Modification, certificate 1352 2013 Andrew Lee King Fun & Associates Architects Ltd King Palace Plaza KTIL 697 BD 2/4055/08 2 Feburary 2012 Kwun Tong, Kowloon of compliance & surrendering Architect's role in balancing School Improvement Programme Final Phase Wah Yan 1353 2013 Architecture Design & Research Group Ltd 56 Waterloo Road, Kowloon KIL 6059 BD 2/3012/02(P) August 2005 construction schedule & client College Kowloon needs Residential Development at 211-215C Prince Edward 1354 2013 LWK & Partners (HK) Ltd 211 Prince Edward Road West, Kowloon 2340 BD 2/4081/07 29 January 2013 (OP) Development potential Road West Discrepancy between Redevelopment of Departmental Quarters for Customs 9-11 Tsing Chau St., 1-3 Lee Kung Street, ASD Ref: 1355 2013 Wong & Ouyang (HK) Ltd 2 August 2013 specification and bill of and Excise Department Hung Hom, Kowloon 61JA/SST321 quantities How architect respond to 1356 2013 Andrew Lee King Fun & Associates Architects Ltd 44 Oxford Road, Kowloon Tong 44 Oxford Road, Kowloon Tong, KLN NKIL 4152 BD 2/4012/04 July 2006 variation claim? KIL 1993-1994, 1402 SC & 1357 2013 Aedas Ltd Re-development of Garley Building 233-239 Nathan Road, Kowloon BD 2/4040/03 June 2007/ April 2007 Modification 1402 RP Po Leung Kuk School Improvement Programme - Ma 1358 2013 Ronald Lu & Partners (HK) Ltd 38 Wah Ming Road, Fanling, NT AREA 49B BD 2/3074/02(P) May 2005 Extension of Time Kam Ming College Architect's solution and the 1359 2013 Freevision Ltd E-Trade Plaza 24 Lee Chung Street, Chai Wan, HK Chai Wan Inland Lot No. 13 BD 2/2024/07 31 May 2012 problem of his solution Challenges of upgrading old buildings with limited records 1360 2013 Leigh & Orange Ltd Rehabilitation of Yue Kwong Chuen Phase I 26 Aberdeen Reservoir Road, Aberdeen HKIL 260 BD 2-3/3471/62/2 October 2011 (PC) and unexpected conditions, and how to match the existing standard How the architect action towards the surrounding condition and re-designing of Improvement Works to Hau Tei Square Hawker the junction of the building 1361 2013 Spence Robinson Ltd Hau Tei Square, Tsuen Wan GLA-TW422 January 2013 Bazaar, Tsuen Wan edge and the surrounding in order to fulfill the statutory requirement and queries aroused after completion Lease with special conditions BD 2/9145/99 H(P) and requirements; Special 1362 2013 Leigh & Orange Ltd Senior Citizen Residence, Tseung Kwan O 2 Pui Shing Lane, Tseung Kwan O, NT TKOTL 68 June 2003 (PT.III) modifications made for design for elderly needs Dangerous hill slope order / ASD Sip Phase IV (Package 2) Group 4, Ning Po slope site implication to 1363 2013 Leigh & Orange Ltd 7 Kung Lok Road, Kwun Tong, KWL KTIL 685 RP & Ext. BD 2/3043/01 (P) 20 January 2004 College (S160) programme, cost & statutory aspects Adoption of Standardized 1364 2013 P & T Architects & Engineers Ltd R.B.L. 1164 Chung Hom Kok Housing 33 Cape Road, Chung Hom Kok RBL 1164 BD 2/2013/02 January 2005 (OP) Design The Chinese University of Hong Kong 1365 2013 P & T Architects & Engineers Ltd CUHK - Engineering Building Complex Phase II BD 2/9230/98 (P) 22 November 2003 Special Design Constraints Shatin STTL 437 1366 2013 P & T Architects & Engineers Ltd Crocodile Centre 79 Hoi Yuen Road, Kwun Tong, Kowloon KTIL 692 BD 2/4002/06 25 September 2009 Façade design and regulation ASD August 2011 (substantial 1367 2013 Design 2 (HK) Ltd Improvement Works for Mongkok Stadium 37 Flower Market Road, Mongkok, KLN GLA - K423 303/7116/RA/LCSD/0 Fire Engineering Assessment completion 5 ) 01 Bel-Air on the Peak (Area RIII & RIVA) Cyberport, Hong Cyberport Road, Telegraph Bay, BD 2-4/2042/99/ST 1368 2013 Wong & Ouyang (HK) Ltd IL 8969 s.B. 2 December 2005 Refuge Floor and Sky Garden Kong Pokfulam, Hong Kong 10-12 List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) IL47AsARP, IL47AsBRP, IL47AsCRP, IL47BsCRP, IL47BRP, IL47AsBss2, IL47AsD, IL47BsD, To analyze the process on the IL47BsBRP, IL47BsARP, construction of the link bridge IL47CsARP, IL47CsASS1RP, that involved a lease IL47CRP, IL47DRP, modification and/or the Three Pacific Place, One Queen's Road East, Hong IL47DsARP, 33.905m Of 13 August 2004 (Phase 1); 1369 2013 Wong & Ouyang (HK) Ltd 1 Queen's Road East, Hong Kong BD 2/3019/01 dedication of the portion of Kong Wing Fung Street West, 9 February 2007 (Phase 2) the ground level of the tower IL47sBRP, IL47sAss1, and the underground tunnel IL47sCss2sA, IL47sCss2RP, for public traffic in exchange IL47sCss3sA, IL47sCss3RP, for bonus GFA IL47sCss4, IL47sCss5 & Adjasent Government Land, IL47sCss6sRP, IL47sCss6sA, IL47sCss7RP, New Annex Block at Hong Kong Institute of Vocational Additional FS requirement 1370 2013 Architecture Design & Research Group Ltd 18 Tsing Wun Road, Tuen Mun, NT TMTL 278 BD 2/9022/07(P) June 2010; July 2010 Education Tuen Mun Campus during late construction stage The Lingnan University New Campus Development Lingnam University, 8 Castle Peak Road, 1371 2013 Architecture Design & Research Group Ltd TMTL 376 BD 2/9016/03(1)(P) 22 March 2005; May 2005 Courtyard Building (Community College), Phase 2 & 3 Tuen Mun, (Site 5), Hong King Concept of Sustainability and Pok Fu Lam Road, HK (The University of Extension of Inland Lot No. the design, construction and 1372 2013 Wong & Ouyang (HK) Ltd HKU Centennial Campus BD 2/2082/06(P) 30 December 2011 HK - Centennial Campus Phase I) 8833 management considerations for awarding the LEED Green Building Technology, and its role on statutory 1373 2013 TFP Farrells Ltd 53 Mount Davis Road; Southwest Villas 53 Mount Davis Road IL 7208 RP BD 4/2029/02 April 2004 issues such as site coverage relaxation and GFA IL 8042. IL 902, IL 4245. IL 1374 2013 Chau Ku & Leung Architects & Engineers Ltd Holiday Inn Express 77-85 Jervois St. and 16-22 Burd St., HK BD 2/2025/07 2 April 2012 Sustainability 4244 & IL 900 SA & RP I.L. 2132, s.A., s.C., s.D. & Slopes and site design, 1375 2013 WMKY Ltd 12 Broadwood Road, Hong Kong 12 Broadwood Road, Hong Kong BD 2/3020/05 8 June 2010 R.P building services & site With the unique location of the site, being adjacent to the Container Terminal No. 9, and the objective to deliver a Noise Screening Barrier development under the non- typical lease conditions, the site constraint became the Proposed Hotels and Service Apartment Development 1376 2013 Wong Tung & Partners Ltd 1 Tsing Yi Road TYTL 140 BD 2/9165/98 March 2004 critical design parameters for in Tsing Yi this project. In the special topic, the critical issue on Architects and developer applying building modifications to building department has become the key throughout the entire design and construction 1377 2013 K & W Architects Ltd The Signature 8 Chun Fai Terrace, Tai Hang Road, HK IL 3565 SEC ARP BD 2/3065/01 15 August 2011 Cost Control Measures and controls for the 7 Tsing Sum St., Town Center, Tsing Yi, 1378 2013 Urbanage International Ltd Sip for TWGHs S.C. GAW Memorial College GLA - TW182 BD 2/3020/03(P) July 2005 construction works, to be NT done while the school YLTL 313 sIss3sA & 12 Wang Lee Street, Yuen Long Industrial 1379 2013 David S.K. Au & Associates Ltd Proposed Phase 2 Development of Eu Yan Sang Extensions Thereto and BD 2/9194/09 17 January 2013 Drainage Reserve Issue Estate, Yuen Long YLTL 313 sPss1 & Hong Kong International Airport, Chek Lap Unique emphasis on 1380 2013 Aedas Ltd North Satellite Concourse Lot No. 1 Extension Thereto BD 2/9080/06(P) October 2009 (OP) Kok circultation and passenger Permit (Challenges of phase 1381 2013 P & T Architects & Engineers Ltd Canadian International School - Phase II Nam Long Shan Road, Aberdeen A.I.L. 417 3008/00(P) August 2002 OP and temporary OP) 1382 2013 P & T Architects & Engineers Ltd Proposed Residential Redevelopment at RBL 809 23 Big Wave Bay Road, Shek O, HK RBL 809 BD 2/2041/01 10 December 2003 Dual Client Party Programme management to 1383 2013 P & T Architects & Engineers Ltd St. Teresa's Hospital Refurbishment 327 Prince Edward Rd. West, KLN KIL 1594 & Ext. BD 2-3/4258/62 March 2007 accelerade construction process BD 2-3/4098/74/22, End October / Early Comprehensive Phasing / 1384 2013 Associated Architect Ltd Comprehensive Renovation of one Grand Tower 639 Nathan Road, Mong Kok, KLN KIL 10246 23, 24, 26, 27, 29, 30, November 2013 Program design for an 33 (anticipated) operating mall renovation Explore the difficulties in 1385 2013 Wong & Tung International Ltd Tseung Kwan O - TL No. 55, Ocean Shores (Phase 2) Tseung Kwan O, 8, O King Road TKOTL NO 55 September 2001 building process of multi- phase building project List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Issue of design and Proposed Alteration and Addition Works for Hok Un No. 8 Avenue Hung Hum, BD 2- 1386 2013 AGC Design Ltd KIL No 11056 8 May 2012 Construction work on existing Redevelopment (Phase III) KLN 3/4182/92H(PH.3)/5 building Function of the Architectural 1387 2013 AGC Design Ltd Cinema Conversion at Telford Garden Telford Garden, Kowloon Bay, KLN NKIL 5744 BD 2/7351/06 August 2008 (OP) Skin and its implication Resort - Disney's Hollywood Parallel Construction of 1388 2013 AGC Design Ltd Sunny Bay, Lantau Island Chok Ko Wan Lot NO.1 BD 2/9901/01 2005 Hotel Precast and Insitu concrete Rehabiliting a heritage into a Asia Society Hong Kong Centre at Former Explosives 1389 2013 AGC Design Ltd 8 Justice Drive, Admiralty, HK IL 9000 BD 2/2018/04 August 2010 cultural performance and Magazine Site IL 9000, 8 Justice Drive, Admiralty. exhibiton venue 1390 2013 Gravity Partnership Ltd Cathy Lodge No.125, Wan Chai Road, Wanchai, HK IL 661/IL 662 BD 2/3032/98 11 June 2001 Demolition Stage School Improvement Programme for Buddist Wong 11, Eastern Hospital Road, Sookunpoon, Compromise Between 1391 2013 WCWP International Ltd IL 8591 October 2004 Fung Ling College HK Interest and Constraints A notable absence of M&E T.W.I.L., 29S.A., 29S.B. RP, Proposed Industrial Building at 6-28 Chai Wan Kok engineer, how architect work 1392 2013 Andrew Lee King Fun & Associates Architects Ltd 6-28 Chai Wan Kok Street, Tsuen Wan 34S.A. SS.1 And 34S.A. SS2 BD 2/9195/10 July 2013 Street, Tsuen Wan with the nominated sub- RP contractors in the project? Construction Sequencing over 1393 2013 Aedas Ltd The Fourm at Exchange Square "LDW Block", 8 Connaught Place, HK IL 8668 BD 2/2020/09 October 2013 operating P.T.I. Leadership in Energy and Proposed A&A Works for Pacnet EAC 1 Conversion 11 Chun Kwong Street, Tseung Kwan O TKOL 39 Sub-Section 2 of 1394 2013 Studio One Design Ltd BA 2-3/9016/00(S) 10 September 2012 Environment Design (LEED) Project Industrial Estate Section 1 Accrediation BD 2/9905/03 Design and Build Targeted 1395 2013 Aedas Ltd Tung Chung Cable Car - Ngong Ping Theme Village Ngong Ping Road, Lantau Island, NT 17 May 2006 (NPTV)(P) Pt.111 Cost 1. Design brief and architect's solutions to the client's brief 2. Site Constrain and 1396 2013 A. Lead Architects Ltd 32, 34, Argyle Street Commercial Development 32, 34 Argyle Street, KLN KIL 2855 S.A. and R.P. BD 4110/07 15 April 2010 (OP) Submission matters 3. Programme and Contract Administration Innovation Tower, The School of Design Development, The Hong Kong Polytechnic University, Government Approval 1397 2013 AGC Design Ltd KIL 9853 R.P. and Ext BD 2/4057/08 July 2013 Hong Kong Polytechnic University, Hung Hum KLN Hung Hum, KLN Process and Construction IL 730 S.B. SS4 S.E. SS2, Proposed Commercial Building at 15-21 Sharp Street Architect's Role - Design and 1398 2013 Studio Raymond Chau Architecture Ltd 15-21 Sharp Street East, Hong Kong S.B. SS4 S.E. R.P., S.B. SS4 BD 2/3039/10 September 2013 East Build Contract S.B. SS1 and S.B. SS4 S.B. The Architect's solution to the major design changes due to change of selling strategies 1399 2013 Simon Kwan Architect & Associates Ltd Hill Paramount STTL 539 Tai Wai, Shatin, N.T STTL 539 BD 2/9015/03 29 June 2009 (OP) during the constrution stage would be discussed in detail in the study How an Architect should / could strive to uphold 850 Clear Water Bay Road, Clearwater architectural excellence, 1400 2013 Aedas Ltd Silverstrand D.D. 224 Lot 369 BD 2/9048/04 22 August 2006 (OP) Bay, Sai Kung, NT especially when Client's involvement may interfere with the Architect's intent 1401 2013 Leigh & Orange Ltd SIP( Phase IV), Package 2, Group 13, Maryrose School 11 Renfrew Road, KLN NKIL 5947 P 262 (SP) 7 July 2005 EOT Investigation 26 June 2006 (Phase 1) 1402 2013 Aedas Ltd Kowloon Hotel Renovation Works 19-21 Nathan Road, TST KIL 10737 BD 2-3/4030/82 Phasing Programme 31 Aug 2006 (Phase 2) Architect's Solution for New Tsuen Wan Town Lot NO. 24 December 2008 (OP) 1403 2013 Spence Robinson Ltd Proposed Golf Club Development Chuen Lung, Tsuen Wan , N.T. BD 2/9139/05 Territories Development with 389 26 September 2008 (PC) Deserted/ Enclosed Lot. Delay in Construction 1404 2014 David S.K. Au & Associates Ltd. Residential Development at 43 Beach Road 43 Beach Road, Repulse Bay RBL 1122 BD 2/2027/05 Feb 2011 Progress due to Change of Renovation and fitting out works at the Raimondi 1-E, Shiu Fai Terrace, Stubbs Road, OP: Nov 2009; PC: Dec 1405 2014 WCWP International Ltd IL 7936 BD 2-3/2259/62/4 Major construction delay College Primary Section Wanchai, Hong Kong 2009 Dennis Lau & Ng Chun Man Architects & Engineers(HK) BEAM "Platinum 1406 2014 Residences 1 Sai Wan Terrace 761 BD 2/3036/05 Dec 2013 Limited (Provisional)" rating 1407 2014 P & T Achitects & Engineers Ltd Harrow International School Castle Peak Road, Tuen Mun, NT Tuen Mun Lot No. 475 BD 2/9178/09 (P) August 2012 Future expansion planning Feb 2011 - 3 storey building for non-domestic BD 2/2032/07 (P), use Complex Design Coordination Ocean Park, 180 Wong Chuk Hang Road, BD 2/2032/07/2 (P), 1408 2014 Leigh & Orange Limited Expedition River at Summit, (Rainforest), Ocean Park R.B.L. 1020 & Ext. thereto March 2011 - Ancillary with Specialist Consultants Hong Kong R.B.L. 1020 & Ext thereto BD 2/2032/07/3 (P), Building + Transformer and Contractors BD 2/2032/07/4 (P) Room + filtration plant room Discussion on the changes in KIL 2132 RP & KIL 2132 SA 1409 2014 Chau, Ku, Leung Architects & Engineers Ltd 726 Nathan Road, Mongkok, Kowloon, HK 726 Nathan Road, Mongkok, Kowloon HK BD 2/4065/10 Feb 2014 urban condition & regulation RP affecting OP application List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Exemption of pressurized staircase and smoke 1410 2014 P & T Achitects & Engineers Ltd Hotel Development at 15-19 Luk Hop Street Kowloon 15-19 Luk Hop Street,Kowloon NKIL 6473 4043/4113 Nov 2012 extraction system in hotel which deviate from normal Technical Implication of OP(Phase 2): Apr/2007 Implementing Sectional 1411 2014 Wong Tung & Partners Ltd Enterprise Square 5 (Phrase 2) at N.K.I.L 5927 38 Wang Chiu Road, Kowloon Bay 5927 BD 2/4042/02 PC(Phase 2): May/2007 Completion during post- contract stage BD 1412 2014 Aedas Limited Tung Chung Cable Car- Ngong Ping Theme Village Ngong Ping Road, Lantau DD NP 212 2/9905/03(NPTV)(P)P May 2006 Design & build targeted cost t 3 I.L.906 s.l., s.j., s.K., s.L., Site constraints on 1413 2014 Studio One Design Limited Proposed Commercial Building No. 100 Belcher's Street, Kennedy Town BD 2-3/2333/68/10 13 Oct 2011 (OP) s.M. & R.P. planning/design/construction QBIL 15 sD, QBML 1sCss5 sCss6, !BML 2sG & ext, sF & 18 Westlands Road, Quarry Bay, Hong 1414 2014 Wong & Ouyang (HK) Ltd. One Island East ext, sF & ext, sHss6, sBRP & BD 2/3031/01 Mar 2008 Façade treatment Kong ext, sHRP & ext and QBML2RP & ext How does an architect consider balancing the cost 1415 2014 A&B Design Consultants Limited Alteration & Addition works of hotel conversion No 126-128 Lockhart Road, Hong Kong IL 2799 BD 2-3/3063/89/5 (PC) 26 Apr 2013 control and enhancing the sustainability and quality of ILs905 s.Ass. 7RP, Cost claim due to Proposed Hotel Development at No 12-22 Davis Street, 1416 2014 Spence Robinson LT Limited 18 Davis Street, Hong Kong SAss7SD, Sass 7sc, sAss BD 2/2024/06 25 Feb 2011 determination of main Kennedy Town 7sB, sAss 7sA and s Ass12 contractor How the architect solve the Kung Um Road, Lung Tin Tsuen, Yuen problem, how this problem to 1417 2014 Christopher Leung & Associates Ltd. Park Signature 4043 SA and RP in DD 120 BD 2/9089/08 OP: Jun 2014 Long, NT affect the original design and what the final design is Resolving discrepancy IL 2087 sA, sB & sC, sD Proposed Residential Development at 1,3,5,7,9&11 1-11 Jones Street and 3-11 Warren between Land Registry's & 1418 2014 P & T Achitects & Engineers Ltd RP&sE RP, sF, sG, sH, sJ, BD 2/3012/08 OP : Jan 2014 Jones Street and No. 3,5,5A,7,7A,9&11 Warren Street Street, Hong Kong Land Record and approved sK and RP GBP during OP application How the architect's role differs 1419 2014 Andrew Lee King Fun & Associates QRC 100 100 Queen's Road Central, HK HKIL 23RP BD 2057/01 August 2006 when encountering contractual difficulties School Improvement Programme for Buddhist Wong ASD Compromise between interest 1420 2014 WCWP International Ltd 11 Eastern Hospital Road, Sookunpoon IL 8591 Oct 2004 Fung Ling College 303/5825/EX/E20/S2 and constraints Ko Sing Street / Wo Fung Street, Sheung M.L 58 S.F. SS 2,3,5 and SC A responsive solution 1421 2014 MLA Architects (HK) Ltd One Pacifc Height (A.K.A Wo Fung Street) BD 2/2052/05 April 2009 Wan, Hong Kong ss1 between new and old Private Residence at No. 3 Henderson Road Jardine's No.3 Henderson Road Jardine's Lookout, 1422 2014 Sherman Kung & Associates Architects Limited I.L. 7332 BD 3014/04 September 2009 Lease Modification Lookout, Hong Kong Hong Kong IL 1262 S.A ss. 3 R.P., s.A. Study what reason make the Proposed Detached Building at Nos 1-13 Kwai Heung ss.4 R.P., s.A ss. 2R.P., s.A 1423 2014 Lu Tang Lai Architects Ltd. No. 1-13 Kwai Heung Street BD 2/2101/10 September 2014 programme delay and what Street., Hong Kong ss. 1 R.P., s. A ss.1 s.A R.P., can be done by Architect s.A ss. 1 s.B R.P. The Chinese University of Hong Kong Architects' solution to meet 1424 2014 P & T Achitects & Engineers Ltd CUHK - Engineering Building Complex Phase II STTL 437 BD 2/9230/98 (P) 22 November 2003 Shatin STTL 437 the completion date The architect's control on 1425 2014 Architectural Services Department Sai Kung Tseung Kwan O Government Complex 38 Pui Shing Road, Tseung Kwan O GLA SK 574 ASD 52/5132 May 2011 material and workmanship to the clients' satisfaction 1426 2014 K.A. Kho & Associates, Architects & Consultants Proposed Hotel Building 54-60 , Yau Ma Tei KIL 9849, 9725 & 10232 BD 2/4047/10 July 2014 Rear lane drainage works Proposed Residential Development at Hung Shui Kiu, PM & CM system compare 1427 2014 Ho & Partners Architects Hung Shui Kiu, Yuen Long Lot. 2064 IN DD 121 BD 4/9177/05 OP: 31 May 2011 Yuen Long with ordinary project running Implication of several design 1428 2014 Wong Tung & Partners Ltd No. 1 & No.3 Ede Road No.1 & No.3 Ede Road N.K.I.L. 6306 BD 2/4086/10 Apr 2014 changes for House 3 during late construction stage How the architects resolved Villa Carlton, Residential Redevelopment at N.K.I.L 1429 2014 Christopher Leung & Associates Ltd. 369 Tai Po Road N.K.I.L 4850 R.P. BD 2/4027/91 Oct 2000 planning difficulties due to site 4850 R.P. constraints Balance between client's Dennis Lau & Ng Chun Man Architects & Engineers (HK) 1430 2014 Additional Open Niches at Sections 15,16 Cape Collinson Road, Chai Wan I.L 7715 R.P BD 1-4/3003/06 2007 attempt & architects' design Limited intent Building D, Hang Shin Link, Siu Lek Yuen, BD 2/9122/11 (2) Offsets by the use of BEAM 1431 2014 Wong & Ouyang (HK) Ltd. Hang Seng Management College Site D STTL 76 August 2013 Shatin (Pt2) Plus Assessment Permit (Challenges of Phase 1432 2014 P & T Achitects & Engineers Ltd Canadian International School- Phase 2 Nam Long Shan Road, Aberdeen A.I.L. 417 3008/00 (P) August 2002 OP & TOP) No.63 Seymour Road, Mid-Level, Hong Jun 2013 (OP); Aug 2013 Building modification / Design 1433 2014 LWK & Partners (HK) Ltd. Argenta IL 2300 BD 2/2077/06 Kong (PC) optimisation List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Reflection on independent Building 15W, Hong Kong Science Park 1434 2014 Simon Kwan & Associates Building 15W TPTL 204 BD 9167/10 (P) 11 Dec 2013 (OP) Project Management Phase 3a, Pak Shek Kok, Tai Po Consultancy BD Appeal case that affect Redevelopment of Lido Complex at 28 Beach road, 1435 2014 Simon Kwan & Associates 28 Beach Road, Repulse Bay, Hong Kong IL (RBL 368 RP) BD 2/3027/98 23 Nov 2012 the occupation permit status Repulse Bay of the redeveopment How architect overcome the Residential Portion (Phase 2) at Tseung Kwan O 1436 2014 Wong Tung & Partners Ltd 9 Tong Yin Street, Tseung Kwan O TKOTL 72 BD 2/7196/98 (2) 31 Aug 2011 site constraints and respond Station Development Area 56 to the development brief ? OP: Mar 2007 Changing the central core 1437 2014 Wong & Ouyang (HK) Ltd. One Kowloon 1 Wang Yuen Street, Kowloon Bay N.K.I.L 6268 BD 2/4024/00 PC: Apr 2007 during the construction Residential Road, The Chinese University STTL No. 437 R.P. and the How Architect's Design 1438 2014 Design 2 (HK) Ltd. Lee Woo Sing Residential College BD 2/9167/06 19 Dec 2012 of HK, Shatin extention Responds to the Site Severe 4-month time delay of Pinehill Village, Chung Nga Road, construction, the Extension of 1439 2014 Ronald Lu & Partners (HK) Ltd Hong Chi Pinehill No.2 School TPTL 34 BD 2/3101/01 (P) 21 Apr 2005 Namhang, Tai Po, N.T. Time granted and the Liquidated Damages. How architect propose to 16 September 2000 (OP) cope with the constraints in 1440 2014 Amasia International Architects Ltd. 18-24 Pokfield Road, Residential Development 18-24 Pokfield Road, Sai Wan, HK I.L. 8906 BD 2/2055/95 28 September 2000 (PC) term of the complicated land form and its efficiency and Elaine Field School, GLA- TP 417, Fu 1441 2014 Thomas Chow Architects Ltd Extention to Elaine Field School GLA-TP 417 9AQ036 2010 Barrier Free Access Chung Lane, Tai Po, NT PWP No.1 contract Building design/ admin control Area 25, Tung Chung Lantau, N.T. Hong 1442 2014 Simon Kwan & Associates North Lantau Hospital, Phase 1 No: 63MMISST322, December 2012 mechanism for BO exempted Kong Inform No: 6178 ArchSD Project Change of residental unit Dennis Lau & Ng Chun Man Architects & Engineers(HK) 1443 2014 Grand Water Front, Hong Kong 38 Ma Tau Street, Ma Tau Kok, Kowloon K.M.L. 102 R.P. BD 2/4006/02 Mar 2007 design due to improvement of Limited economic enviroment Evaluation of architect's 1444 2014 Architectural Services Department Re-Provisioning of Wo Hop Shek Crematorium Kiu Tau Road, Wo Hop Shek, Fanling GLA-DN 421 ASD 51/5549 Sep 2012 actions & measures to execute the EIA process Proposed Hotel Development at 84 Hung To Road, Prescribed window RHP vs 1445 2014 Associated Architects Limited 84 Hung To Road, Kwun Tong, Kowloon KTIL 162 BD 2/4007/07 Mar 2012 Kwun Tong performance base approach Section A NKIL 6499 & 1446 2014 Wong & Ouyang (HK) Ltd. URA Kwun Tong Centre Redevelopment - Site 1 8 Yuet Wah Street & 60 Hip Wo Street BD 2/4079/09 July 2014 Phasing arrangement Remaining portion of NKIL 1447 2014 Chau, Ku, Leung Architects & Engineers Ltd Extension to Canossa Hospital No. 1, Old Peak Road IL 647A BD 2/2031/07(P) Aug 2013 Drainage connection issue Contract Arrangement - Proposed residential development for 29-31 Yuk Sau 29-31 Yuk Sau Street, 21-23 Village IL 2962 sA ss1, sC, sB & sA 1448 2014 CYS Associates (HK) Limited BD 2/3009/07 June 2014 Design and Build Contract Street, 21-23 Village Road Road, HK RP arrangement for Foundation Comparing the systems of New Territories South Animal Management Centre ASD 1449 2014 Leigh & Orange Limited To Shek Path, New Territories N/A Sept 2013 generic statutory submissions (NTSAMC) & Shatin Plant Quarantine Station (STPQS) 14/85751/TAS/SJP to independent checking units Tree preservation and tree 1450 2014 Archiplus International (HK) Ltd. Proposed Composite Development 12 & 12A North Street IL 8962 BD 2/2004/00 Aug 2003 removal process in construction stage Contract Administration - Alteration and Addition Works for Church of Jesus 1451 2014 David S.K. Au & Associates Ltd. 32 Tsing King Road, Tsing Yi, N.T. TYTL 122 BD 2/9148/09 (Pt 2) Mar 2014 lessons learn from the delay Christ of LDS Tsing Yi Meeting House in foundation works B2/F to 4/F, 99 Percival Street and 2-4 I.L.1452, I.L. 472RP, I.L.476 Phasing of works in A&A 1452 2014 A & T Design Limited Alterations and Additions Works at Lee Theatre Plaza BD 2-3/3032/91/11 November 2013 Matheson Street, Causeway Bay, Hong RP works How an architect should be dealing with issue during OP: Mar 2005 PC: Jan arising during the statutory 1453 2014 TFP Farrells Ltd 53 Mount Davis Road, Pok Fu Lam 53 Mount Davis Road, Pok Fu Lum, HK IL 7208 RP BD 4/2029/02 2005 submission, between the client and the architect, and between the contractors and The change in the phasing plan in different stage to cope German Swiss International School Peak Campus 1454 2014 P & T Achitects & Engineers Ltd 22 Guildford Road, The Peak RBLs 1069 & 1097 BD 2/2042/07 August 2014 with issues arose from Expansion statutory aspect, design aspect, site aspect, cost Construction access & works 1455 2014 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Chan Cho Chak Primary School Jat Min Chuen, Shatin, NT STTL 28 BD 2/3102/01 (P) Aug 2004 area Programme & site planning 1456 2014 P & T Achitects & Engineers Ltd St. Teresa's Hospital Refurbishment 327 Prince Edward Road West, Kowloon KIL 1594 & Ext. BD 2-3/4258/62 March 2007 management to accelerate construction process Proposed Residential Development at 10-18 Wharf How do Architect respond to 1457 2014 LWK & Partners (HK) Ltd. 18 Wharf Road, North Point , Hong Kong IL 7439-7443 BD 3017/00 PC: Feb 2003 Road, IL 7439-7443, North Point, Hong Kong urban compacted site List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Transformation of The Former Police Married Quarters How the architect get a 1458 2014 Architectural Services Department Site on Hollywood Road into a Creative Industries 35 , Central GLA-HK10 400 IO Dec 2013 balance between revitalization Landmark and preservation The effect on the changes on Sub-section 3 of Section A of design and other provisions to Marine Lot 117 and the facilitate the connection with 1459 2014 KLS International Architects & Planners Co. Ltd. A 27-Storey Composite Development in Wanchai 130-136 Johnston Rd. Wanchai, HK BD 2/3042/09 OP: April 2014 Remaining Portion of Section proposed extension at the A of Marine Lot 117 adjacent site (138-142 Johnston Road) Development with interface of 1460 2014 Ronald Lu & Partners (HK) Ltd Tuen Mun Swimming Pool Complex Area 1(San Wai Court), Tuen Mun GLA.TM 426 9AQ 022 Feb 2012 private road I.L.730 S.B SS.4 S.E SS.2, Proposed Commercial Building at 15-21 Sharp Street OP: Dec 2013 Architect's role under a 1461 2014 Studio Raymond Chau Architecture Limited 15-21 Sharp Street East, Hong Kong S.B SS.4 S.E.R.P., BD 2/3039/10 East PC: Mar 2014 design and build contract S.B SS.4 S.B SS.1 & S.B SS.4 S.B.R.P. 1462 2014 AGC Design Ltd Disney Hollywood Hotel Sunny Bay, Lantau Island Chok Ko Wan Lot 1 BD 2/9901/01 2005 Façade Construction & ASD The role of architect on how 1463 2014 WCWP International Ltd Y1022- S319 Rosaryhill School (Secondary School) 41B Stubbs Road, Rosary Hill, Hong Kong I.L 3550 & Extension September 2005 303/5825/EX/E20/S3 they deal with ASD and client Prompt response from the architect on the illegal tree 1464 2014 Archiplus International (HK) Ltd. 26 Mount Kellett Road The Peak, Hong Kong R.B.L. 1119 BD 2/2068/05 August 2009 felling, missing tree and tree compensation Elaboration of EOT claim, The remaining Portion of No. 595, Reclamation Street, Mongkok, Architect's administration and 1465 2014 Andrew Lee King Fun & Associates Architects Ltd. MOD 595 Kowloon Inland Lot No. BD 2/4020/04 August 2007 Kowloon solution (the professional role 11173 of an architect) The problems encountered by No. 12 & 16 Science Park West Avenue, Hong Kong Science Park Phase 3-Building 12 W & 16 the architect during 1466 2014 Simon Kwan & Associates Hong Kong, Science Park (Phase 3) Pak TPTL No. 204 BD 9167/10 (1)(P) March 2014 (OP) W negotiation process and the Shek Kok, Tai Po, NT final solution in different Proposed Industrial Building at 6-28 Chai Wan Kok T.W.I.L. 29sA., 29sB.R.P., Changing flat slab system 1467 2014 Andrew Lee King Fun & Associates 6-28 Cha Wan Kok Street, Tsuen Wan BD 2/9195/10 13 Aug 2013 (OP) Street, Tsuen Wan 34s.A. ss.1 and 34s.A. ss2 during construction stage Construction administration 1468 2014 Leigh & Orange Limited The Hong Kong Federation of Youth Groups Building 21 Pak Fuk Road, Hong Kong IL 8990 BD 2/3035/01 Dec 2007 process Residential Development at Sham Mong Road, New Podium design modification 1469 2014 LWK & Partners (HK) Ltd. 8 Sham Mong Road, Kowloon NKIL 6338 BD 2/4033/00 Dec 2003 Kowloon. (Aqua Marine) within a tight program Conversion of Lai Chi Kok Hospital into Jao Tsung - I 800 Castle Peak Road, Lai Chi Kok, Building Ordinance 1470 2014 P & T Achitects & Engineers Ltd LSO 901/KGS/63 22-3/3019/09 (HU) June 2013 Academy Kowloon Requirement vs Heritage Architect's solution to reduce Consultancy Proposed Radar (Terminal Doppler Weather Radar A Knoll North of Tuen Mun Road Near Government Land Allocation impacts in new development 1471 2014 Thomas Chow Architects Ltd Agreement October 2014 Station) in "Green Belt" zone Brothers Point, Tai Lam Chung, Tuen Mun GLA TM467 on Green Belt site and its 9AW029/181GK/72 neighborhood OP: 26 Aug 2011; PC : Government submission & 1472 2014 Muchtime Limited Godown Building on 10 Lok Yip Road 10 Lok Yip Road, On Lok Tsuen, Fanling FSSTLN 114 BD 2/9026/08 Feb 2011 environmental friendly design 1473 2014 LWK & Partners (HK) Ltd. Eden Gate 5-11 Ede Road, Kowloon Tong, Kln NKIL no. 6423 BD 2/4110/10 June 2014 Speed Up Program To analysis the procedures to resolve the situation involved new materials to be constructed on the existing building; maintain the operation of HSBC on the Proposed Alteration and Addition Works for Wong Tze J10 Hoi Yuen Road and How Ming Street 1474 2014 MCAA Ltd. K.T.I.L.2 BD 2-3/4147/80/2 Oct 2014 ground floor as usual and Building on K.T.I.L.2, Kowloon guarantee the construction progress rate on the other floors; design a new means of escape for existing building to fulfill the requirements of Code of Practice for Fire Hong Kong Bapist University, School of Continuing End user's based design 1475 2014 Leigh & Orange Limited 8 On Muk Street, Shek Mun, Shatin STTL 540, Area 11 BD 2/9107/03 (P) OP: 7 July 2006 Education, Shek Mun Campus approach Maximizing the development 1476 2014 LWK & Partners (HK) Ltd. URA- K30, I-home 38 Larch Street, Tai Kok Tsui KIL No, 11182 BD 2/9134/03 March 2009 potentials Interface co-ordination of the HD(ICU) BD 1477 2014 Leigh & Orange Limited Redevelopment of Lam Tin Phase 6 On Tin Estate, On Tin Street, Lam Tin KL29NR Dec 2004 link bridge between phase 4 2/KL29NR/06 and phase 6 How architect response to IL 2113 sA RP, sA ss1, IL 1478 2014 Ie, Siu & Chung Architects Ltd Proposed Commercial Building 14-18 On Lan Street, Central, HK BD 2/2014/07 Dec 2013 some unexpected situations 2114, IL 2115 & IL 2116 during construction period ? List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) The tackle of site constraints Hong Kong Convention and Exhibition Centre Atrium 1479 2014 Wong & Ouyang (HK) Ltd. 1 Expo Drive, Wanchai, Hong Kong GLA 840 BD 2-3/2050/84/7 March 2009 from planning, coordination Link Expansion and operation Examination the Impact of the Wholesale Conversion of Good Prospect Industrial No. 33-35, Wong Chuk Hang Road, Wong sustainable building design 1480 2014 Barrie Ho Architecture Interiors Ltd. AIL 155 BD 2-3/3124/76 Aug 2014 (Tentative) Building Chuk Hang, Hong Kong Guidelines to the building plan submitted beforehand How the specially designed acoustic windows being adopted in this development in response to noise matter? Detail design of proposed acoustic window system in terms of both materiality and architecturally, the resolution The Lingnan University, Junction of Tuen The Lingnan University New Campus Development of for such application to be 1481 2014 Architecture Design and Research Group Ltd. Kwai Road and Castle Peak Road, Tuen T.M.T.L 482 BD 2/9097/08 OP: Aug 2011 Student Hostel and Academic Block complied with the complex Mun, N.T prescribed window requirements, necessary government submissions and application for modifications, the order of natural ventilation design incorporated with the overall structure of typical hostel layout around the The role of architects in VTC Permanent Campus for the School of Business 1482 2014 P & T Achitects & Engineers Ltd 20A Tsing Yi Road, Tsing Yi Island TYTL 123 BD2/9093/02(P) Sept 2004 quality and time control of the and Information System at Tsing Yi fast track project Proposed Industria Redevelopment at 91-97 Bedford 91-97 Bedford Road, Tai Kok Tsui K.I.L. Nos. GBP disapproval on 1483 2014 Handi Architects Limited BD 2/4025/09 July 2013/ Sep 2013 Road Kowloon, Hong Kong 7798,7799,7800,7801 fundamental issues prior to To examine primarily at geotechnical issues of the house and how these affect 32 Plantation Road, The Peak, Hong 1484 2014 ARCA Ltd. 32 Plantation Road, The Peak, House G R.B.L. 512 BD 2-3/2307/72/4 December 2008 the architect's choice of Kong construction methods and procedures to complete the extention I.L 2179 s.C, R.P., s.B & I.L. January 2014 (OP) 1485 2014 Aedas Limited 31-37 Des Voeux Rd. Central HK 31-37 Des Voeux Rd. Central, HK BD 2/2017/10 Right of way 2180 March 2014 (PC) Junction of Fan Leng Lau Road, Wo Muk Architect's Response to Residential Development at Fanling Sheung Shui Town 1486 2014 LWK & Partners (HK) Ltd. Road, Leun Hing Street, Luen Wo Hui, F.S.S.T.L. 202 BD 2/9197/10 Tentatively Mid of July change in statutory Lot No. 202 Fanling requirement The approaches/differences ASD between public/private 1487 2014 Architectural Services Department A 30-classroom primary school in Area 55, Tuen Mun So Kwun Wat Road, Area 55, Tuen Mun GLA No. TM420 51/6472J/EA/E20/O8 19 Aug 2011 sectors that contribute to the 0 quality of architecture Impact of unclear work division between sub- 1488 2014 Andrew Lee King Fun & Associates CLP Substation at Chui Ling Road Chui Ling Road Area 72 Tiu Keng Leng TKOTL 116 BD 9011/10 (P) June 2013 (OP) consultants in affecting building construction process 4 Embankment Road & 1 Duke Street, Architects' decisions on 1489 2014 Aedas Limited Redevelopment of St. Rose of Lima's School KIL 2356, 2585 BD 2/4012/08 July 2011 Kowloon sustainability design approach OP : Jan 2010, PC : Sep 1490 2014 WCWP International Ltd The Forfar at 2 Forfar Road 157 Argyle Street, Kowloon BD 1/4038/05 KIL 4022 RP Height Restriction 2010 1. Construction phasing to facilitate smooth A&A works while keeping daily operation 1491 2014 Leigh & Orange Limited Renovation of Tai Po Market Station Tai Po Market Station KCR L/8 BD 2-3/ 7836/96/7 July 2009 unaffect 2. Reason for a way to avoid delay of construction work 1492 2014 LWK & Partners (HK) Ltd. Dunbar Place 146-148 Argyle Street, Homantin, Section A of K.I.L 3303 BD 2/4018/10 Aug 2013 Beam Plus Application The Open University of Hong Kong Chung Hau Street 81 Chung Hau Street, Ho Man Tin, Green and energy efficient 1493 2014 P & T Achitects & Engineers Ltd No. 11202 BD 3/4088/11 (P) Jan 2014 Campus Development Kowloon building design School Improvement Project Phase 4. Good Shepherd The role of an architect in 1494 2014 Leigh & Orange Limited 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 3086/01 (P) 6 January 2005 (OP) Primary School dealing with divergence New Private Indepandent School at Shum Wan Rd., HK 24/2007 (OP); 27 Aug 1495 2014 P & T Achitects & Engineers Ltd 19 Shum Wan Road, Aberdeen A.I.L. 452 BD 2/2007/03 (P) Design constraints, site. Aberdeen 2007 2 Sai Cheung Street North, Kennedy ASD Considerations and effects of 1496 2014 TFP Farrells Ltd Kennedy Town Swimming Pool, Phase I GLA HK 1075 March 2011 Town Praya, Sai Wan, HK 14/85750/TAS/SJP/1 Phasing on Project Design Architect's response to lands 1497 2014 Archiplus International (HK) Ltd. Shapo South Residential Development 1, Ying Ho Road, Yuen Long 2099 in D.D. no. 109 BD 9083/07 3 Sep 2013 department comment List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Retaining existing structure School Improvement Programme Phase IV Package 2, ASD 102/ 92301/ OP: Jul 2004 1498 2014 Leigh & Orange Limited 288-290 Tai Po Road, Kowloon NKIL 4456 that was't part of demolition Saviour Luthern School CAA G39 PC: May 2004 plan submitted to BD The Grandiose, Residential and Commercial Design issues under Dennis Lau & Ng Chun Man Architects & Engineers (HK) 9 Tong Chun Street, Tseung Kwan O, January 2006 (OP) 1499 2014 Development at Tseung Kwan O Area 558B, TKOTL 75 BD 3/7227/02 scheduled area no. 3-railway Limited Kowloon, Hong Kong June 2006 (CC) No,75 protection zone How the architect deals with the restricted lease conditions by applying a lease Residential Redevelopment at I.L. 7735 335-339 Tai 1500 2014 P & T Achitects & Engineers Ltd 335-339 Tai Hang Road, Hong Kong I.L. 7735 BD 2/3056/09 October 2013 modification to relax the Hang Road, Hong Kong constraints, archieve the original design intent, fulfill the client's brief, and satisfy the The professional relationship 123-127 Tung Choi Street, Mong Kok, KIL 1702 RP; 1703 RP; 1704 1501 2014 Ho & Partners Architects Proposed hotel development BD 2/4003/09 October 2013 (OP) of the dual roles of contractor Hong Kong RP being the Client Proposed Internet Applications Centre at S.S 3 of 22 Chun Cheong Street, Tseung Kwan O BD 2-3/9030/95 Phase 1: July 2014 (BA Subsection 3 of section D of A change of use to an existing 1502 2014 David S.K. Au & Associates Ltd. Section D of Tseung Kwan O Town Lot No. 39 and Industrial Estate - T.K.O.T.L. 39 s.D. ss3 (Phase 1), 14) Phase Tseung Kwan O Town Lot 39 building Extensions Thereto (Phase1) & (Phase 2) & thereto BD 2-3/ 9030/95/2 2: September 2014 (OP 15 May 2013 (OP); 16 Development potential, tree 1503 2014 Cypress Consultant International Ltd. 37 San Shek Wan DD329, Lantau Island 661 BD 2/9194/08 May 2013 (PC) preservation and public Re-appointment of interior The Construction of Superstructure of Block A for St. No. 2 Eastern Hospital Road, Causeway 1504 2014 P & T Achitects & Engineers Ltd IL 1018 BD 2/3025/05 Nov 2009 designer after the award of Paul's Hospital Redevelopment Bay, Hong Kong main contract Fire engineering approach to 1505 2014 Aedas Limited Proposed Logistic Center Hong Wan Road, Tsing Yi, NT 180 BD 2/9054/11 Anticipated on 30 Jul 2014 fire safety How the project architect correspond to an unexpected HD(ICU) B12/ YL 28 1506 2014 Housing Department Tin Shui Wai Area 103 (Tin Ching Estate) Tin Shui Wai Area 103 YL 28/ NR-01 June 2008 request of client without NR/ 1 &2 causing tremendous impact on the contruction programme Residential Department at No. 20-26 M.L. No. 296 Sustainable building design in 1507 2014 LWK & Partners (HK) Ltd. 20-26, Johnston Road, Wanchai, HK M.L No.296 BD 2/3030/05 26 Mar 2009 Wanchai, Hong Kong residential project Apr 2005 (OP) 1508 2014 Ronald Lu & Partners (HK) Ltd The Giverny Man Kei To, Pak Sha Wan, Sai Kung, NT Lot 1184 IN D.D. 217 BD 9121/01 Project Management May 2005 (PC) 1509 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK) NI333 A&A Works to Pioneer Centre 750, Nathan Road K.I.L. 2111 BD 2-3/4157/89 February 2006 Dedication of public passage Residential Development on R.B.L. 800 at No. 20,22, No. 20, 22, 26A, 26B, 26C, 26D, 26E, 26F 26 March 2010 (OP) Study of Design Constraint on 1510 2014 ARK Associates Limited R.B.L. 800 BD 2067/07 26A, 26B, 26C, 26D, 26E, 26F Cape Road Cape Road 3 November 2010 (PC) a sloping site Statutory obligations of AP in Annex Block and Link Bridge of Baptist University Road 36 Renfrew Road, Kowloon Tong, July 2012 1511 2014 AGC Design Ltd K.N.I.L. 6127 BD 2/4019/08 site supervision and accident Campus Development Kowloon (ref. KN21/2012(OP)) during construction 1512 2014 Leigh & Orange Limited Mary Rose School Improvement Programme 11 Renprew Road, Kowloon Tong NKIL 5947 BD 3078/02 July 2005 EOT claims & disputes Construction of a Multi Purpose Use Sand Count in Tin SIF(6) in LCS 1/HQ 1513 2014 Spence Robinson Ltd. Tin Yip Road, Tin Shui Wai GLA TYL 1375 June 2014 Drainage and rain water Shui Wai 734/09(9) 1514 2014 Z Architects Ltd. Proposed Commercial Tower at No. 459-461 Lockhart No. 459-461 Lockhart Rd I.Ls. 2833 S.B & S.C. BD 2/3015/10 Sep 2013 Flexibility of space uses Two- phase construction at 188, Wong Nai Chung Road, Happy BD 2-4/3070/01 1515 2014 P & T Achitects & Engineers Ltd The Redevelopment of Craigengower Cricket Club I.L 8881 Apr 2003 the same time maintaining Valley, Hong Kong (PH1) normal operation of the club Comparison of statutory ASD approval system between 1516 2014 Architecture Design and Research Group Ltd. A 24- Classroom Primary School at Inverness Road 39 Inverness Road, Kowloon City, KLN GLA-NK -680 55/92050/CWO/025- PC: May 2010 Buildings Department and 07 S.C.C.U of Architectural Services Department The issue affecting delay, ASD comtractor's procedure of 1517 2014 Ronald Lu & Partners (HK) Ltd Ng Yuk Secondary School Sun Chui Estate Shatin, N.T STTL 554 53/6487/ALL318/C25/ March 2005 claiming EOT, architect's 001 criteria and action etc Review on development and Proposed Residential Development at No. 56 Peak efficacy of green and 1518 2014 LWK & Partners (HK) Ltd. No. 56 Peak Road, HK RBL 718 BD 2014/00 April 2003 Road, HK innovative buildings incentives to architectural Location of the site that is fall 6 Po Man Street Shau Kei Wan, Hong 1519 2014 Chau, Ku, Leung Architects & Engineers Ltd TWGHS Fong Shu Chuen Social Service Building SIL 832 BD 3008/96 August 1999 within the MTR protection Kong area (Schedule Area 3) Q.B.M.L. 4S. CSS1 R.P., Q.B.M.L. 4S. CSS1 S.B., Role of architect in traditional Dennis Lau & Ng Chun Man Architects & Engineers (HK) 1520 2014 Royal Terrace 933 King's Road, North Point, HK Q.B.M.L. 4S.E, BD 2/3008/99 2002 contract with client''s in-house Limited Q.B.M.L. 4S. CSS1S ARP, consultants/contractors Q.B.M.L. 4S. CSS 1S.A List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Wholesale conversion of 1521 2014 T.S. Chu Architects Ltd. Wholesale Conversion for pioneer industrial building 213 Wai Yip Street, Kwun Tong, Kowloon K.T.I.L. No.294 BD 2-3/4355/10/6 August 2014 industrial building- challenges & opportunities Mixed use with three clients. (Kowloon Tong Baptist Church) Proposed Church, 1522 2014 A. Lead Architects Limited Cornwall Street, Kowloon N.K.I.L. 6182 BD 2/4007/02 November 2008 How did the architect manage Kindergarten & Home for Elderly them? ASD School Improvement Programme Phase IV Site Constraints & 1523 2014 Leigh & Orange Limited 10 On Tin Street, Lam Tin, Kowloon NKIL 5210 BD 3024/01(P) November 2004 (OP) Package 2- St Paul's School (Lam Tin) accessibility at design & "Time frame" processes and application for section 16 13 Ping Tong Street South, Tong Yan San 1524 2014 Vincent Lai Architect Ltd 3-Storeys Warehouse Building D.D. 121 1300 SB RP BD 2/9189/08 25 August 2011 under the TPO height Tsuen, Yuen Long, New Territories restriction from the gazetted outline zoning plan "Remarks" Re-development of 1-11A, San Wai Street, Hung Hom, KIL 7488, 7489, 7490, 7491, Study of F.A. Provision in 1525 2014 Aedas Limited 1-11A San Wai Street, Hung Hom BD 2/4057/09 May 2014 Kowloon - Star Ruby 7492, 7493, 7494 residential building NKIL 1694 SARP; NKIL 1694 Imbalance of project team - SA ss 1, NKIL 1694 SAss2, main contractor is a 1526 2014 Andrew Lee King Fun & Associates 188 Tai Po Road 188 Tai Po Road, Sham Shui Po, Kowloon BD 2/4002/10 (Tentative) July 2014 NKIL 1694 SA ss3, NKIL subsidiary company of the 1694 SAss4, NKIL 1694 client Commercial Development at Fan Ling, Sheung Shui, No. 48 Lung Sum Avenue, Sheung Shui, 1527 2014 Ronald Lu & Partners (HK) Ltd No. 73 BD 2/9166/09 March 2014 Oversized podium Town Lot No. 73 NT SCCU Site Audit : 6 Feb Large Volume Indoor 1528 2014 Ronald Lu & Partners (HK) Ltd Kwun Tong Swimming Pool Complex (Section1) 2 Tsui Ping Road, Kwun Tong GLA-NK 656 051 RG 2013 Swimming Pool Hall Design Redevelopment of St. Paul's Co-Educational College Carbon zero environment 1529 2014 P & T Achitects & Engineers Ltd No.11 Nam Fung Path, Wong Chuk Hang GLA- HK 1023 Aug 2008 Primary School concept adoption OP: 23 Aug 2013 Late & contradicting decisions 1530 2014 P & T Achitects & Engineers Ltd Kellett School, Kowloon Bay Campus 7 Lam Hing Street, Kowloon Bay NKIL No. 6504 BD 2/4058/10 PC: Sep-Dec, 2014 made by client at the (Sectional) construction stage Construction Method to Redevelopment of Ash Health Centre, Hong Kong 1531 2014 Wong & Ouyang (HK) Ltd. 330 Junction Road, Kowloon Tong 5907 BD 2/4048/03 March 2008 Minimize the Impacts to the Baptist Hospital Existing Building Hong Kong International Airport, Chek Lop R.P of CLK Lot 1 and The Balancing between value of 1532 2014 WCWP International Ltd DHL Central Asia Hub Project BD 3/9820/02 (P) April 2004 Kok Ext. client & interest of public Pak Shek Kok Reclamation Phase 1 Site December 2012 (OP) 1533 2014 Foster & Partners Providence Peak- TPTL 188 Residential Developemnt TPTL 188 BD 2/9056 GRC Prefabricated façade C New Territories May 2013 (PC) Costs savings to compensate 1534 2014 P & T Achitects & Engineers Ltd The Hillgrove Castle Peak Road, Area 58, Siu Lam, NT Tuen Mun Town Lot. 371 BD 3-6/9175/99H Sep 2002 for the loss in achieving a better living environment How architects satisfy client's OP: 18 Jan 2013; PC: 8 1535 2014 RDL Asia Limited 6 Shung Shun St., Yau Tong YTIL 20 BD 4041/09 request when construction is Feb 2013 started already HD (1cu) B1 How the Architect managed 1536 2014 Housing Department Construction of Un Chau Estate Phase 5 Cheung Sha Wan V.O. 55 Apr 2012 2/KL79NR/05 delays Advantages & disadvantages 1537 2014 P & T Achitects & Engineers Ltd No. 9 Shouson Hill Road No. 9-19F, Shouson Hill Road RBL 345 RP BD 2/2033/06 Jan 2012 of procedures that deviate from common practice Proposed Alterations & Additions Works at Area 15, , 8 Long Yat Road, BD 2-3/7604/95/7 (Pt. (OP) : Phase 1 12 Feb Adapting to phase 1538 2014 AGC Design Ltd DD 115 Lot 1576 Yuen Long Interchange of Tuen Mun LRT Yuen Long, NT II) 2014 construction Corresponding change of 1539 2014 P & T Achitects & Engineers Ltd Kowloon Station Package 4 Development No.1 Austin Road West Kowloon KIL 11080 BD 2/7204/99- D OP: 25 July 2003 building design in relation to regulation change Dedication Proposal to benefit ML 275 OP: Apr 2005 1540 2014 Aedas Limited AIG Tower 1 Connaugut Rd, Central, Hong Kong BD 2004/01 public and to expand ML278 (SA) and (RP) PC: May 2005 connection network in central, Proposed Composite Redevelopment at No. 38 Kwun 38 Kwun Chung Street Kowloon, Hong K.I.L.S 3240, 3241, 3242, Project execution in economic 1541 2014 Handi Architects Limited BD 2/4043/08 August 2014 Chung Street Kong 3243, 3244 & 1701 crisis Proposed Re-development at No. 23-29 Wing Fung No. 23-29 Wing Fung Street, Wan Chai, Development potential & site 1542 2014 LWK & Partners (HK) Ltd. Inland Lot 526 BD 3015/03 April 2006 Street, Wan Chai, Hong Kong HK coordination How the architect handled an unexpected ground settlement on Hong Chong Dennis Lau & Ng Chun Man Architects & Engineers(HK) Hong Kong Polytechnic University 1543 2014 The Hong Kong Polytechnic University, Phase VII KIL 9853 RP and ext BD 2/4004/02 Aug 2005 Road and Chatham Road Limited Campus Hung Hom Kowloon during phase VII substructure construction work, which resulted in 2-month halt of the 1544 2014 CYS Associates (HK) Limited One Mayfair 1 , Kowloon Tong NKIL 6374 BD 2/4003/07 OP : 28 Dec 2011; PC : 09 Tree preservation 1545 2014 Simon Kwan & Associates Tin Shui Wai Community Health Centre 3 Tin Yip Road, Tin Shui Wai GLA - TSW 62 ASD 66 mm Dec 2011 Architect in the contract Vocational Training Council Training Hotel and Chinese 6/F and M/F of Pokfulam Training Centre Phase1: March 2009 Contract Administration- 1546 2014 Ronald Lu & Partners (HK) Ltd AIL 420 BD 2-3/2063/90/3-4 Cuisine Training Institute Resources Centre Complex, 145 Pokfulam Road Phase 2: June, 2009 Interior Design Related List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) How would the architect overcome difficulty of a tight 1547 2014 Wong Tung & Partners Ltd Le Meridien Cyberport 100 Cyberport Road, Pokfulam, HK I.L. 8969 RP 2/2042/99/ST3 April 2004 completion programme within a mixed development site? Proposed Office Building at no. 10 Shing Yip Street, No. 10 Shing Yip Street, Kwun Tong, No electrical & mechanical 1548 2014 Lee King Fun & Associates Architects Limited K.T.I.L. 63 BD 2/4059/09 August 2014 Kwun Tong Kowloon engineer in this project 1549 2014 Freevision Lid. E- Trade Plaza 24 Lee Chung Street Chai Wan Inland lot no. 13 BD 2/2024/07 May 2012 Sky Garden Union Hospital, 18 Fu Kin Street, Tai Wai, Construction Phasing and 1550 2014 Leigh & Orange Limited Union Hospital Extension STTL 168 RP BD 2-3/9094/04/2 2007 Sha Tin- STTL 168 RP Sequence Incorporation of as-built 599 Sai Sha Road, Ma On Shan, New June. 2009 (OP) 1551 2014 Ronald Lu & Partners (HK) Ltd Property Development at Wu Kai Sha Station 530 BD 2/7990/05 development provisions and Territories September 2009 (PC) fulfilling client's design needs 9A-H Seymour Road and 5, 6, 6A, 7 and IL 585 RP and Ils 4626, 4627, 1552 2014 WCWP International Ltd Residential Development of 9 Seymour Road BD 2/2090/06 OP: 06/2011 PC: 03/2012 Dispute & Arbitration 7A Yig Fai Terrace 4628 and 4629 1553 2014 APA Architects Limited L'Utopie 18 Yat Yiu Avenue, Tai Po Kau, Tai Po, TRTL 160 BD 2/9106/03 Jul 2006 Lease Modification No.139 Queen's Road Central on I.Ls. 4810-4819, 1554 2014 Z Architects Ltd. 139 Queen's Road Central, HK I.Ls. 4810-4819 BD 2-3/2060/ 95 Aug 2010 Change of use Hong Kong BD 2/7219/00(F) Pt. Abortive design changes for 1555 2014 Wong & Ouyang (HK) Ltd. Tower 21, The Kowloon Station Development Austin Road West 11080 March 2007 VII architect as a consultant Relationship among saleable value, building design and Proposed Residential Development at No. 8 Ching Hiu No.8 Ching Hiu Road, Ng Uk Tsuen, 1556 2014 Lu Tang Lai Architects Ltd. NT- FSSTL 231 BD 2/9172/05 June 2009 statutory requirement, and the Road, 8 Royal Green Sheung Shui pros and cons to achieve maximum building efficiency Previous AP ceased to be 1557 2014 A. Lead Architects Limited KP Tower 93-95 King's Road, North Point I.L. 2273 Sec C.C BD 2/3005/08/2 June 2014 (Tentative) appointed I.L. 3539 SEC. A SS. 7 R.P., Proposed Residential Development at No. 98 Java I.L. 3539 S.A. S.S.7, October 2011 (OP) 1558 2014 ARK Associates Limited 98 Java Road, North Point, HK BD 2/3010/07 External Design Consultants Road S.B. S.S.1, S.S.2, S.S.3, January 2012 (PC) AR.P. OF S.B. OF I.L. 3539 Elicitation & comparison Proposed Residential Development alnwick Road, 1559 2014 Cheung Kong (Holdings) Limited 8 Alnwick Road, Kowloon NKIL 4782 BD 2/4006/07 23 Nov 2012 between the existing lease Kowloon and the new lease OP: Oct 2006; PC: Jan 1560 2014 Ronald Lu & Partners (HK) Ltd Royal View Hotel 353 Castle Peak Road, Ting Kau TWIL 5 & Lot 429 in DD 399 BD 2/9131/97 Change of Site Classification 2007 1561 2014 Ronald Lu & Partners (HK) Ltd Redevelopment of Upper Wong Tai Sin Estate-Phase 1 8 Wong Tai Sin Road KL 31 RR HD KL31-1 Sept 2000 Delay of master programme The possibility of applying Proposed Residential Redevelopment on R.B.L 310 at 1562 2014 Christopher Leung & Associates Ltd. No. 60 Peak Road, Hong Kong R.B.L 310 and Ext BD 2/2013/97 30 Sep 2005 more sustainability measures No. 60 Peak Road, Hong Kong for independent house N.K.I.L. 1105 R.P., Demolition works with Nos 79-81 Sa Po Road & Nos 33-37 N.K.I.L. 1105 S.B.R.P., Proposed Residential Development at 33 Capenter preservation of existing 1563 2014 ARK Associates Limited Carpenter Road, Kowloon City, Kowloon, N.K.I.L 1105 S.A.R.P., BD 2/4083/10 September 2014 Road common staircase of the HKSAR N.K.I.L. 1433 R.P., adjoining old building N.K.I.L. 1741 R.P. Evaluation of impact of design 17 Tin Tan Street, Tin Shui Wai, Yuen SSP308-101ET; ASD 1564 2014 P & T Achitects & Engineers Ltd Caritas Lok Kan School Area 32 Tin Shui Wai May 2007 for handicapped on design Long, New Territories consultancy and construction progress Co-ordination with Government bodies on 1565 2014 Ho & Partners Architects 8 LaSalle No. 8 La Salle Road, Homantin KIL 2098 BD 2/4056/09 July 2014 resolving encroachment of run-in/out into tree protection The struggle of architect to Dennis Lau & Ng Chun Man Architects & Engineers(HK) 8 Wu Kai Sha Road, Lok Wo Sha, Ma On 1566 2014 Double Cove- Starview (Phase 2) S.T.T.L 502- Phase 2 BD 2-4/ 9058/06 (1) July 2014 deal with two independent in- Limited Shan NT house contractors The pros & cons of employing oversea design consultant on 1567 2014 Wong Tung & Partners Ltd Enterprise Square 5 Phase 1 (Mega Box) 38 Wang Chiu Road, Kowloon Bay 5927 NKIL BD 2/4042/02 December 2006 local projects, and the influence to Hong Kong architect's design innovation Abortive work due to DLO late 1568 2014 CYS Associates (HK) Limited Proposed Residential Development No. 53 Conduit Road, HK I.L. 2138 R.P. & I.L. 2613 BD 2/2012/04 End of Oct 2014 comment Formation of 'green area' as Residential Development at S.I.L. 845 Yiu Hing Road, 1569 2014 LWK & Partners (HK) Ltd. 88 Yiu Hing Road, Shau Kei Wan S.I.L. 845 BD 3010/00 February 2003 per special conditions of the Shaukeiwan, Hong Kong consitions of sale Investigate the impact of a Proposed Residential Redevelopment of 1 Coronation I.L. 100 S.B. SS.2, shared party wall from the 1570 2014 P & T Achitects & Engineers Ltd 1 Coronation Terrace, Hong Kong BD 2/2120/10 May 2014 Terrace S.B R.P., S.E. adjoin site built over and encroached into the captioned How the architect dealt with 1 Hing Tin St. (Cnr of Tak Tin & Hing Tin 1571 2014 Simon Kwan & Associates Lam Tin Complex GLA - NK 595 52RG (Inform:7248) June 2012 (PC) disputes between the St. Lam Tin) contractor and client List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 1572 2014 A+T Design Ltd Residential Development at No. 81 Broadcast Drive No. 81 Broadcast Drive, Kowloon NKIL No. 5099 BD 2/4041/ 05 April 2011 Sun Shading Device To look at the reasons of Proposed Commercial and Residential Development developer choose project 1573 2014 LWK & Partners (HK) Ltd. Tseung Kwan O Area 57A TKOTL 74 BD 2/9136/97H 17 February 2005 Tseung Kwan O Area 57A manager instead of Architect act as team leader Difficulties encountered in No. 1 & 1E La Salle Road, Kowloon Tong, applying architect's 1574 2014 Integrated Design Associates Ltd Residential redevelopment at No. 1 & 1E Lasalle Road NKIL 2617 BD 2/4040/05 June 2009 Kowloon philosophy and environmental friendly building design Negotiation on service lane 1575 2014 Oval Partnership Ltd No. 5 Star Street 3-5 Star Street, Wan Chai, HK I.L. 2837 s.C ss 1 & s.C. R.P. BD 2/3027/07 June 2010 exemption Building massing controlled I.L. 2147 S.D SS.1, S.D R.P, under Iease, BO and OZP 1576 2014 P & T Achitects & Engineers Ltd Composite Redevelopment at IL 2147 Haven Street 32-50 Haven Street, Causeway Bay, HK S.E SS.2, S.E SS.3, S.E BD 1/3014/09 June 2014 and the differentiation of SS.4, S.E SS.5, S.E.R.P. architect's approach among new and old lease How architect overcome Proposed Alteration & Addition Works of Optimall challenges to transform an old 1577 2014 KLS International Architects & Planners Co. Ltd. 118 Chuen Lung Street, Tsuen Wan TWTL 320 BD 2-3/9096/89/5 March 2014 (BA 14) (Tsuen Wan Hoover Plaza) building to meet new design requirement No. 4 Suffolk Road, Kowloon Tong, BD Tightening of basement 1578 2014 A. Lead Architects Limited Proposed 2-storey Residential Development N.K.I.L. 842 BD 2/4005/11 April 2014 N.K.I.L. 842 area approval of low-density Estate Revitalization scheme(ERS) of Ping Shek Estate Ping Shek Estate, 2 Clear Water Bay ICU Ref: HD (ICU)E Construction of phasing 1579 2014 Leigh & Orange Limited NKIL 5182 R.P May 2014 Kowloon Road, Ngau Chi Wan, Kowloon 3/097(K) AA (18) works Dennis Lau & Ng Chun Man Architects & Engineers (HK) Apartment No. 16 Ventris Road & No. 3 Broadwood No. 16 Ventris Road & No. 3 Broadwood I.L. No. 5491 R.P & I.L. No. Pereparation works and 1580 2014 BD 2/3022/08 June 2014 Limited Road, Happy Valley, Hong Kong Road, Happy Valley, Hong Kong 5492 application for occupation No. 38 Ming Yuen Western Street, North S.A. S.S. 19, S.A. S.S. 20 May 2011 (OP) 1581 2014 Archiplus International (HK) Ltd. Proposed Residential Redevelopment BD 2/3017/07 Particular Site Constraint Point S.A, S.B.R.P August 2011 (PC) K.I.L. 7658, 7685, 7668, The role of architect in an 1582 2014 Andrew Lee King Fun & Associates 58 Boundary Street No. 58-66 Boundary Street BD 2/4003/10 October 2014 7669, 7678 S.A & RP atypical team organization Non-traditional podium design The Wings II Proposed Development at Tseung Kwan Po Yap Road, Tseung Kwan O Area 66B, Tsueng Kwan O Town Lot. 1583 2014 P & T Achitects & Engineers Ltd BD 2/9038/10 31 Mar 2014 challenge due to lease and O Area 66B TKO. TL 76 NT 76 statutory constraints Process, difficulties and solutions to balance both 1584 2014 Spiral Architectural Design Limited Redevelopment of House No. 16, Tsing Tai Road, Tuen Mun 754 in DD 379 BD 9094/12 Oct 2014 considerations at developer and lands department in Lease Modification Architect's response to deal with the issues raised by the Lands Department in 1585 2014 Ronald Lu & Partners (HK) Ltd Seascape Villa at Tsing Lung Tau 67 Castle Peak Road, Tsing Lung Tau 67 BD 2/9129/06 7 Oct 2013 particular with one matter that caused the unusual prolonged procedure to obtain an approval from the Lands Larvotto Proposed Residential Development at Alcil 1586 2014 Ronald Lu & Partners (HK) Ltd 8 Ap Lei Chau Praya Road AP.I.L. 129 BD 2-3/2038/99H/6 Dec 2010 Noise Mitigation 129, Ap Lei Chau Praya Road, Aberdeen, Hong Kong The efficiency of circulation 111 Wing Hong Street, Sham Shui Po, NKIL No. 4715, NKIL No. and internal operation design 1587 2014 Wong & Ouyang (HK) Ltd. Redevelopment of Caritas Medical Centre Phase 2 BD 4067/04 November 2013 Kowloon 5542 & EXT RP adapted in the new ambulatory and rehabilitation An 18- Classroom Primary School at Tai Pak Tin Street, ASD Pogramme Relationship between site 1588 2014 Design 2 (HK) Ltd. 99 Tai Pak Tin Street, Kwai Chung, N.T. GLA- KT 1159 August 2009 Kwai Chung, N.T. No.307EP constraints and overall design Efficiency of construction assembly problems in relation to the choices of setting out Residential Development at 15 &16 Wang Fung points, manpower, tools and 1589 2014 Hsin Yieh Architect & Associate Tai Hang Road, Wang Fung Terrace I.L 6408 SS2 BD 2/8020/07 September 2012 Terrace, Hong Kong sequences in relation to cost and time complexity in the point of view of contractors and clients Redevelopent of Provincial House of The Franciscan 104 Boundary Street, Kowloon KIL No. 22 February 2011 (OP) The role of an architect in 1590 2014 Omar Yeung Arch & Assoc. Ltd K.I.L 2375 BD 2/4070/08 Missionaries of Mary 2375 25 February 2011 (PC) project management Dennis Lau & Ng Chun Man Architects & Engineers (HK) 223-231 Wai Yip Street & 39 King Yip Design constraints & 1591 2014 Manulife Financial Centre K.T.I.L. on 744 BD 2/4047/96 December 2007 Limited Street, Kwun Tong, Hong Kong problems under lease Details on the cost and time Alteration and Additions (A&A) Work at 14/F at the June 2013 (Form BA14 1592 2014 Paliburg Development Consultant Ltd. 30-38 Sa Po Road, Kowloon City N.K.I.L. 5754 BD 2-3/4342/78/16 implication for the lease Existing Royal Oriental Hotel Acknowledgement Letter) modification Obstacle and solution 46-48 Anchor Street, Tai Kok Tsui, 23 Feb 2005 (OP); May 1593 2014 Spence Robinson LT Limited Silka West Kowloon Hotel (Dorsett) KIL 6374 BD 4/4028/01 regarding certificate of Kowloon 2006 (PC) compliance application List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Design on "Building bulk" & Podium Portion (Phase 1) of Tseung Kwan O Area 56 "Circulation" of shopping Mall 1594 2014 Wong Tung & Partners Ltd 9 Tong Yin Street, Tseung Kwan O TKOTL 72 BD 2/7196/98 (2) Jan 2011 Comprehensive Development in connection to the statutory constraints & exemption How did the Architect minimised disturbance and Alteration works of station areas and commercial 1595 2014 Leigh & Orange Limited Shatin MTR Station, Shatin, NT STTL 561 BD 22-3/7808/08/02 Nov 2013 risk to passengers during facilities at Shatin Station construction period in terms of safety & construction 1596 2014 MLA Architects (HK) Ltd Kennedy Park at Central No. 4 Kennedy Road, Mid-Levels, HK IL 1381 sA & sB RP BD 2013/08 March 2014 (OP) Exemption of E.V.A To discuss how the architect Industrial Development at 2-6 Fui Yiu Kok Street, Tsuen No. 2-6 Fui Yiu Kok Street, Tsuen Wan, balances and justifies 1597 2014 P & T Achitects & Engineers Ltd TWTL 30 and 120 BD 2/9263/10 April 2014 Wan NT between client requirement, design intention and site 1598 2014 P & T Achitects & Engineers Ltd Renovation for Hong Kong Japanese School Primary 157, Blue Pool Road, Happy Valley I.L. 8379 BD 2-3/086/87 Aug 2013 Contruction Time The application of Temporary Occupation Permit (TOP) and 42-44 Belcher's Street, Kennedy Town, 1599 2014 K & W Architects Limited Composite Development at 42-44 Belcher's Street I.L. No.953 sec C, sec D BD 2/2038/04 January 2011 the required statutory HK submissions as per building regulations Conservation and rectification of previous repair work of the MW12040171 1600 2014 ARCA Ltd. Kau Yan Church Renovation 974 High Street, Hong Kong I.L. 829 Dec 2013 (PC) antique materials, including AMO:AM89-0410 washed-granolithic façade and traditional Chinese tiles Alternative method of time Main Clinical Block & Trauma Centre, Prince of Wales 1601 2014 Wong & Ouyang (HK) Ltd. 30-32 Ngan Shing Street, ShaTin, N.T GLA ST-43 ASD 6367 April 2010 management in fast track Hospital project Residential Redevelopment at 10, 12, 16 & 18 Pollock's 10, 12. 16 & 18 Pollock's Path, Hong R.B.L. 513 R.P. and R.B.L. 1602 2014 P & T Achitects & Engineers Ltd BD 2/2030/02 May 2007 (OP) Extension of time issue Path, Hong Kong Kong 540 s.A South Lantau Road, San Shek Wan, Aug 2007 (OP); Sep 2007 Architectural solution on 1603 2014 Ronald Lu & Partners (HK) Ltd HKYWCA Conference Centre and Guesthouse Lot No. 727 in DD 332 BD 2/9020/04 Lantau (PC) E.O.T. & V.O. arrangement Residential Redevelopment at RBL No 589 and No. 1604 2014 P & T Achitects & Engineers Ltd 37 Severn Road, The Peak, Hong Kong RBL 589 & No. 590 BD 2/2049/05 Jan 2012 Sustainable design integration 590, the Peak Constructual obligation of the Architect between traditional 1605 2014 TFP Farrells Ltd C701 Sheung Wan Station 199 Des Voeux Road Central SPANS Lots C704-PM089 April 2012 building contract and MTRC projects Sheung Kok Street, Tai Wo Hau, Kwai Severe site constraints & 1606 2014 P & T Achitects & Engineers Ltd Kwai Chung Estate Phase 5 N/A N/A March 2005 (PC) Chung, NT slope maintenance issues School A: ASD School A: 145 Pratas Street, Sham Shui 55/95050/CW0/006- The role of architect played in CCC HeepWoh & SKH St. Thomas's Primary School at Po Kowloon 07/BP 1607 2014 P & T Achitects & Engineers Ltd GLA-NK 712 May 2011 noise and acoustics control in Fuk Wing Street School B: 18 TonKin Street, Shan Shui Po School B: ASD the whole building process Kowloon 55/92050/CW0/007- 07/BP How to overcome the design Adventureland Building 531 Mystic Manor & External Hong Kong Disneyland Theme Park, BD 2/9901/01 and contruction challenges of 1608 2014 Leigh & Orange Limited C.K.W. Lot No. 1 R.P January 2013 Area Development Lantau Island (531)(P) the themed faced & show ornaments in architecture Architect's role, responsibility The Hong Kong Golf Club, 1 Fan Kam The Remaining Portion of Lot and solutions to aforesaid 1609 2014 Wilkinson and Cilley Limited Additional Floor on Existing Golf Cart Storage BD 2/9021/04 May 2005 (OP) Road, Sheung Shui, New Territories No. 942 in D.D. 94 issues in order to keep the project programme in time Architect's role where an in- 1610 2014 Wong Tung & Partners Ltd Residential Development at Hung Shui Kiu, Yuen Long 88 Hung Yuen Road 4331 IN D.D 124 BD 9138/04 March 2011 house contractor is engaged Relocation of gensets and 1611 2014 Studio One Design Limited Digital Savvis Data Centre 33 Chun Choi Street, Tseung Kwan O 39 BD 2-3/9042/96 March 2014 fuel supply systems onto roof HD(ICU) E3/052 Alteration & Addition Renovation Works at Oi Man 1612 2014 CYS Associates (HK) Limited Oi Man Street, Ho Man Tin Kowloon KIL 9826 RP (K)AA(14)-D, May 2013 (BA 14) Phases Division Shopping Centre HK(ICU) The pros and cons of in- house main-contractor, how DD 122 Castle Peak Road, Ping Shan, architect to have a good 1613 2014 Ronald Lu & Partners (HK) Ltd Residential Development at Lot No. 1739 IL 1739 BD 2/9075/01 Dec 2005 Yuen Long, NT communication between client and main contractor and to maintain good relationship Mos. St. Joseph's Secondary School, All 317 Programme 1614 2014 Ronald Lu & Partners (HK) Ltd Ma On Shan St. Joseph's Secondary School GLA - ST 198 PC: 20 Dec 2004 Extension of Time Hang Kwong St., Ma On Shan, NT No. 8025 EC List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) Environmental implication on School A (324EP) - Primary School at Hiu Kwong Hiu Kwong Street and Sau Ming Road, ASD 102/5815 & 1615 2014 P & T Achitects & Engineers Ltd NK 722 May 2008 the end product and how the Street, Sau Mau Ping Sau Mau Ping, Kwun Tong, Kowloon 6736/EA/9AM011 architect overcome the issue Architect's inevitable design 1616 2014 Andrew Lee King Fun & Associates 133 Hoi Bun Road 133 Hoi Bun Road, Kwun Tong, Kowloon KTIL 756 BD 2/4050/08 16 May 2011 constraints from prescriptive control of Building 1617 2014 P & T Achitects & Engineers Ltd Grandeur Terrace 88 Tin Shui Road TSWTL 28 BD2/ 9030/ 00H (P) Dec 2002 Short Master Programme Proposed Commercial/ Service Apartment at 138, Architectural Strategies to 1618 2014 Wong Tung & Partners Ltd 138 Yeung Uk Road, Tsuen Wan, NT T.W.T.L. No. 406 Aug 2005 Yeung UK Road, Tsuen Wan, N.T tackle environmental issues Explore the difficulties in Ocean Shores (Phase 2) Residential / Retail 1619 2014 Wong Tung & Partners Ltd Tseung Kwan O, 8, O King Road TKOTL NO 55 BD 9156/97 October 2003 building process of a multi- Development at TKO-TL No 55 phase building project 1620 2014 Wong & Ouyang (HK) Ltd. Redevelopment & Expansion of Pok Oi Hospital Au Tau, Yuen Long, New Territories Lot 00 1630 in DD 115 BD 2/9164/00 Apr 2006 Circulation Efficiency Client's late decision on Proposed Printing Factory Extension at Tseung Kwan 7 Chun Cheong Street, Tseung Kwan O 1621 2014 David S.K. Au & Associates Ltd. TKOTL 39 BD 2/9227/11 January 2014 adding an extra floor during O Industrial Estates N.T (Phase 2) Industrial Estates, Tseung Kwan O, N.T. construction period Design & Construction of Residential Training Complex Yeung Tsing Road, Area 31, Tuen Mun ASD 201/6712/SSL Design Consideration of High 1622 2014 Ronald Lu & Partners (HK) Ltd TM 407 Aug, 2006 for the Juveniles at Tuen Mun, N.T. New Territories 399 Security Building Junction of Chun Ying Street and Chun Section C of Tseung Kwan O Sustainability Design 1623 2014 Rocco Design Architects Limited HKEX Next Generation Data Centre Kwong Street, Tseung Kwan O Industrial Town Lot No. 39 and BD 2/9155/0 August 2012 Conciousness for Leed Cert. Estate Extension Thereto. 1624 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Heya Green-Urban Renewal Wai Wai Road, Po On Road, Tonkin N.K.I.L. No. 6448 BD 2/4037/04 November 2013 Urban redevelopment How an architect should/ could strive to upholad 850 Clear Water Bay Road, Clearwater architectural excellence, 1625 2014 Aedas Limited Silverstrand D.D 224 Lot 369 BD 2/9048/04 OP: 22 Aug, 2006 Bay, Sai Kung, NT especially when client's involvement may interfere with the architect's intent Constraints of a design & Design- Build- Operate a District Cooling System 1626 2014 Andrew Lee King Fun & Associates 33 Shing Kai Road, Kowloon HK GLA- NK 765 EE 0/WC/31/20 July 2013 build contract for a BS (Phase 2) at Kai Tak Development dominant building Proposed Composite Development No. 44A, 44B and No. 44A, 44B and 46 Belcher's Street, 11 Mitigation of variation order in 1627 2014 LWK & Partners (HK) Ltd. 46 Belcher's Street, 11 Rock Hill Street, Kennedy Town, I.L.953 R.P BD 2004/08 March 2014 Rock Hill Street, Kennedy Town a project I.L 953 R.P. Hong Kong 1628 2014 A. Lead Architects Limited 4 Monmouth Terrace 9K Kennedy Road, Hong Kong I.L. 8435 BD 3013/08 1 Nov 2010 Reuse of existing foundation ASD The ambiguity and A 30-Classroom Primary School of Development near 78 Choi Ha Road, Kowloon Bay, Kwun 1629 2014 Ronald Lu & Partners (HK) Ltd GLA NK 771 55/92050/CWO/003- July 2011 inconsistency between Choi Wan Road and Jorden Valley, Kwun Tong Tong 009/BP contract documents and ASD School Improvement Programme Final Phase S361 Pui Ying College, Wo Che Estate, 9 ASD 1630 2014 Ronald Lu & Partners (HK) Ltd BO103 Plan No, STM6154 May 2005 Delay of master programme (Package 4) Pui Ying College Fung Shun Street, Shatin, N.T. 303/6487/EX/E20/S3 Residential Redevelopment at No. 44, 46, 48 & 50 CHK No. 44,46, 48 & 50 Chung Hom KokRd, Implications from changes in 1631 2014 LWK & Partners (HK) Ltd. R.B.L. No. 811 BD 2/2043/08 February 2014 Rd. HK building regulation Proposed Development at Lot No. K.I.L. 1124 Sheung Sheung Shing Street, Ho Man Tin, 15 Jan, 2009 (Phase 1) 1632 2014 LWK & Partners (HK) Ltd. K.I.L. 11124 BD 4076/04 Pros & Cons of CM Contract Shing Street, Ho Man Tin, Kowloon Kowloon 23 Nov, 2009 (Phase 2) 1633 2014 Hsin Yieh Architect & Associate Festival City Phase 3 1 Mei Tin Road, Tai Wai STTL 529 BD 2/7897/99/2 November 2010 OP Arrangement How does the architect Po Leung Kuk Fung Ching Memorial Primary School 1634 2014 Ronald Lu & Partners (HK) Ltd No.2 Pui Shing Road, Tseun Kwan O Area 37 Tseung Kwan O BD 4/3073/02 (P) September 2005 concern with extend of time Improvement Program (EOT) application by Special Site Constraints by 1635 2014 LWK & Partners (HK) Ltd. Proposed Residential No. 116 Pokfulam Road 116 Pokfulam Road, RBL 174, HK RBL 174 BD 2007/86 August 2001 surrounding site context Structural constraint in A&A 1636 2014 LWK & Partners (HK) Ltd. A&A Works of House 182 at 93 Repulse Bay Road 93 Repulse Bay Road, Hong Kong 1025 BD 2027/85 August 2011 development Proposed Residential Development at No. 1 Tung Shan June 2002 (OP) GFA exemption of small scale 1637 2014 LWK & Partners (HK) Ltd. No.1 Tung Shan Terrance, Hong Kong IL 2933 BD 3099/97 Terrance, Hong Kong (3523) August 2002 (PC) development Proposed Residential Development at Discovery Bay A&A Works After OP 1638 2014 CYS Associates (HK) Ltd Discovery Bay North, Lantau Island 385 BD 2/9060/06 February 2011 North, Phase 15 Issuance I.L. 1395, R.P.M.L. 281 SA, Factors in A&A works that 1639 2014 Aedas Ltd Manulife Tower A&A Works 169 Electric Rd. North Point, HK BD 2-3/3022/84/3/2 August 2012 EXT M.L 277 S.C S.F. & EXT alter end result from original The architect's method of Proposed Alteration from Industrial Building Into Data 2 Chun Yat Street, Tseung Kwan O combining the highest 1640 2014 A & B Design Consultants Limited T.K.O.T.L. 39s.F BD 2-3/9180/95/P November 2013 Centre Industrial Estate, Hong Kong security design with the statutory requirements