Existing Infrastructure & Services Chapter 6
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
PNG: Sustainable Highlands Highway Investment Program (Tranche 2) Volume 2: Goroka to Kagamuga Section
Resettlement Plan Project Number: 48444-005 Document Stage: Draft January 2020 PNG: Sustainable Highlands Highway Investment Program (Tranche 2) Volume 2: Goroka to Kagamuga Section Prepared by the Department of Works (Government of Papua New Guinea) for the Asian Development Bank CURRENCY EQUIVALENTS Kina = PNG Kina (K) (BPNG Mid-Rate, 30 Sep 2019) K1.00 = $02.940 $1.00 = K3.4013 WEIGHTS AND MEASURES ha = hectare km = kilometer km2 = square kilometer m = meter m2 = square meter mm = millimeter NOTES (i) In this report “$” refers to US dollars. (ii) This Resettlement Plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. (iii) In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS ABBREVIATIONS i GLOSSARY ii EXECUTIVE SUMMARY iv I. PROJECT DESCRIPTION 1 A. Background 1 B. Tranche 2 Scope of Works 2 C. Section 2 Scope and Impacts 4 D. Alternative Analysis 6 II. SCOPE OF LAND ACQUISITION AND RESETTLEMENT. 6 III. SOCIOECONOMIC INFORMATION AND PROFILE 10 A. Demographic Information 10 B. Impacts of Land and Assets Acquisition of Affected Persons 11 C. Project Impacts on Poor, Different Ethnic Groups, and Other Vulnerable Groups 12 D. Gender and Resettlement Impacts 12 E. Geography 13 F. Population 15 G. -
SEIS Volume I
Morobe Consolidated Goldfields Limited Morobe Gold and Silver Project Socio-Economic Impact Study ► Volume I Introduction, analysis of social and political risks, recommendations Volume II Area study and social mapping Volume III Working Papers March 2001 proof corrections 9 May 2001 document format remediated in Word 2007, 22 August 2010 Author With the assistance of John Burton Peter Bennett, MCG In 2001: Morobe Consolidated Goldfields Ngawae Mitio, MCG In 2010: Australian National University Lengeto Giam, MCG Wayang Kawa, MCG Susy Bonnell, Subada Consulting Jennifer Krimbu, MCG Boina Yaya, MCG EXECUTIVE SUMMARY · This study characterises the stakeholder environment in the hinterland of the Morobe Gold and Silver Project. Its key objectives are to identify areas of risk in the inter- stakeholder relationships and to provide the means of ensuring equity in the distribution of mine-related benefits. · On present design, the project will be a small to medium sized operation, compared with the larger contemporary mining and petroleum operations in Papua New Guinea. Partly as a consideration of the project‘s size, this report deals only in passing with the project‘s macroeconomic contributions to Papua New Guinea, useful though they may be, instead looking much more closely at its effects within the District it is situated in, one of 89 in the country. · This emphasis is also helpful in focussing on the key social and political risks of the project at a time in the development of Papua New Guinea when contemporary political process has seen renewed efforts to de-centralise many of the planning and implementation functions of government to District level. -
Papua New Guinea
PAPUA NEW GUINEA EMERGENCY PREPAREDNESS OPERATIONAL LOGISTICS CONTINGENCY PLAN PART 2 –EXISTING RESPONSE CAPACITY & OVERVIEW OF LOGISTICS SITUATION GLOBAL LOGISTICS CLUSTER – WFP FEBRUARY – MARCH 2011 1 | P a g e A. Summary A. SUMMARY 2 B. EXISTING RESPONSE CAPACITIES 4 C. LOGISTICS ACTORS 6 A. THE LOGISTICS COORDINATION GROUP 6 B. PAPUA NEW GUINEAN ACTORS 6 AT NATIONAL LEVEL 6 AT PROVINCIAL LEVEL 9 C. INTERNATIONAL COORDINATION BODIES 10 DMT 10 THE INTERNATIONAL DEVELOPMENT COUNCIL 10 D. OVERVIEW OF LOGISTICS INFRASTRUCTURE, SERVICES & STOCKS 11 A. LOGISTICS INFRASTRUCTURES OF PNG 11 PORTS 11 AIRPORTS 14 ROADS 15 WATERWAYS 17 STORAGE 18 MILLING CAPACITIES 19 B. LOGISTICS SERVICES OF PNG 20 GENERAL CONSIDERATIONS 20 FUEL SUPPLY 20 TRANSPORTERS 21 HEAVY HANDLING AND POWER EQUIPMENT 21 POWER SUPPLY 21 TELECOMS 22 LOCAL SUPPLIES MARKETS 22 C. CUSTOMS CLEARANCE 23 IMPORT CLEARANCE PROCEDURES 23 TAX EXEMPTION PROCESS 24 THE IMPORTING PROCESS FOR EXEMPTIONS 25 D. REGULATORY DEPARTMENTS 26 CASA 26 DEPARTMENT OF HEALTH 26 NATIONAL INFORMATION AND COMMUNICATIONS TECHNOLOGY AUTHORITY (NICTA) 27 2 | P a g e MARITIME AUTHORITIES 28 1. NATIONAL MARITIME SAFETY AUTHORITY 28 2. TECHNICAL DEPARTMENTS DEPENDING FROM THE NATIONAL PORT CORPORATION LTD 30 E. PNG GLOBAL LOGISTICS CONCEPT OF OPERATIONS 34 A. CHALLENGES AND SOLUTIONS PROPOSED 34 MAJOR PROBLEMS/BOTTLENECKS IDENTIFIED: 34 SOLUTIONS PROPOSED 34 B. EXISTING OPERATIONAL CORRIDORS IN PNG 35 MAIN ENTRY POINTS: 35 SECONDARY ENTRY POINTS: 35 EXISTING CORRIDORS: 36 LOGISTICS HUBS: 39 C. STORAGE: 41 CURRENT SITUATION: 41 PROPOSED LONG TERM SOLUTION 41 DURING EMERGENCIES 41 D. DELIVERIES: 41 3 | P a g e B. Existing response capacities Here under is an updated list of the main response capacities currently present in the country. -
Isoptera) in New Guinea 55 Doi: 10.3897/Zookeys.148.1826 Research Article Launched to Accelerate Biodiversity Research
A peer-reviewed open-access journal ZooKeys 148: 55–103Revision (2011) of the termite family Rhinotermitidae (Isoptera) in New Guinea 55 doi: 10.3897/zookeys.148.1826 RESEARCH ARTICLE www.zookeys.org Launched to accelerate biodiversity research Revision of the termite family Rhinotermitidae (Isoptera) in New Guinea Thomas Bourguignon1,2,†, Yves Roisin1,‡ 1 Evolutionary Biology and Ecology, CP 160/12, Université Libre de Bruxelles (ULB), Avenue F.D. Roosevelt 50, B-1050 Brussels, Belgium 2 Present address: Graduate School of Environmental Science, Hokkaido Uni- versity, Sapporo 060–0810, Japan † urn:lsid:zoobank.org:author:E269AB62-AC42-4CE9-8E8B-198459078781 ‡ urn:lsid:zoobank.org:author:73DD15F4-6D52-43CD-8E1A-08AB8DDB15FC Corresponding author: Yves Roisin ([email protected]) Academic editor: M. Engel | Received 19 July 2011 | Accepted 28 September 2011 | Published 21 November 2011 urn:lsid:zoobank.org:pub:27B381D6-96F5-482D-B82C-2DFA98DA6814 Citation: Bourguignon T, Roisin Y (2011) Revision of the termite family Rhinotermitidae (Isoptera) in New Guinea. In: Engel MS (Ed) Contributions Celebrating Kumar Krishna. ZooKeys 148: 55–103. doi: 10.3897/zookeys.148.1826 Abstract Recently, we completed a revision of the Termitidae from New Guinea and neighboring islands, record- ing a total of 45 species. Here, we revise a second family, the Rhinotermitidae, to progress towards a full picture of the termite diversity in New Guinea. Altogether, 6 genera and 15 species are recorded, among which two species, Coptotermes gambrinus and Parrhinotermes barbatus, are new to science. The genus Heterotermes is reported from New Guinea for the first time, with two species restricted to the southern part of the island. -
E. Mei-Li Roberts Phd Thesis
Translating Identities: ‘Being a missionary’ in Papua New Guinea Submitted by: E. Mei-Li Roberts For the degree of: PhD (Social Anthropology) Date of submission: March 13, 2006 Abstract Many studies of missionaries have taken an historical perspective, looking particularly at missionaries’ role in colonialism. However, missionaries are still very much part of contemporary Papua New Guinea (PNG), with a significant number of expatriate missionary groups working in PNG. This thesis is a study of a present day mission in PNG, SIL International, formerly known as the Summer Institute of Linguistics (SIL). It examines the way in which the mission community is constructed and the boundaries and divisions within the community itself. It attempts to challenge some of the stereotypes of missionaries and show that there are different views of what it is to ‘be a missionary’ even within the missionary community itself. I focus particularly on what it means to ‘be a missionary’ and the ambiguities and ambivalences between the ideals and realities of mission work. The focus of the study was on SIL members themselves and their identities as missionaries rather than the effect of their missionising on others. This is examined through a number of different themes. Debates about the fence surrounding the mission station highlighted the way in which it created both a physical and a symbolic boundary between those living inside the fence and the people living outside of it. Related to this were debates regarding the mission station, Ukarumpa and how SIL members should ‘communicate the gospel’. SIL’s main goal is Bible translation and the thesis explores the challenges and problems of translation, both the practical aspects of Bible translation and translating between cultures. -
16. Communication, Logistics and Inter-Agency Partnerships in the Eastern Highlands Provincial Electorate
16. Communication, Logistics and Inter-Agency Partnerships in the Eastern Highlands Provincial Electorate Michael Unage With the introduction of limited preferential voting (LPV), and the late legislative change to voting procedures in November 2006, many predicted that the 2007 general election would be a failure. Nonetheless, there was general satisfaction with the election outcome, with election-related violence in the Highlands down significantly from 2002 levels. Among factors contributing to electoral success, communications, logistics and inter-agency partnership were critical. This paper examines issues of communications, logistics and inter- agency partnership in the Eastern Highlands provincial electorate. Background Eastern Highlands is one of the 19 provincial electorates in the country. It shares borders with Morobe, Madang, Simbu and Gulf provinces. Eastern Highlands has eight open electorates—Daulo, Goroka, Unggai-Bena, Lufa, Henganofi, Okapa, Kainantu and Obura-Wonenara (Figure 16.1). At the 2000 census, Eastern Highlands had a population of 432,972. In 2007 the total number of votes polled in the provincial electorate was 354,495. There are 24 local-level governments (LLGs) in the province: two urban LLGs (Goroka Urban and Kainantu Urban) and 22 rural LLGs. Population is concentrated in the flat lands around Kainantu and Goroka, reflecting the gravitation of people towards the urban areas. Goroka town was established in 1939 and became the major administrative and commercial centre of the province. The province has rich temperate valleys and ridges, which attracted the attention of early gold prospectors such as Mick Dwyer and Mick Leahy and now support a thriving arabica coffee industry. Coffee, ‘the money that grows on trees’, is the lifeblood of Eastern Highlands Province. -
Consultation Document
Leaving behind a better future Porgera Joint Venture Porgera Mine Closure Consultation Document December 2002 Leaving behind a better future Porgera Mine Closure Consultation Document December 2002 CR 257_44_v3 NSR Environmental Consultants Pty Ltd NSR Environmental Consultants Pty Ltd Porgera Joint Venture Unisearch Limited 124 Camberwell Road P.O. Box 484 UNSW, Rupert Myers Building Hawthorn East, Victoria 3123 Mt Hagen Gate 14, Barker Street Australia Papua New Guinea Sydney, NSW 2052 Australia Tel: 61 3 9882 3555 Tel: 675 547 8200 Tel: 61 2 9385 5555 Fax: 61 3 9882 3533 Fax: 675 547 9579 Fax: 61 2 9385 6524 Published by © Porgera Joint Venture 2002 Acknowledgements: Chapter 1 Porgera Joint Venture NSR Environmental Consultants Pty Ltd Chapter 2 Porgera Joint Venture NSR Environmental Consultants Pty Ltd Chapter 3 Porgera Joint Venture Unisearch Limited Dr. Glenn Banks, with Richard Jackson, Susanne Bonnell, Gary Simpson Contents Contents 1. Introduction 1 1.1 Background 1 1.2 Proposed Process for Closure Planning and Sustainability 2 1.3 Partnerships for Sustainability 3 1.4 Stakeholders in Closure Planning and Sustainability 3 1.5 PJV’s Vision and Objectives for Mine Closure 3 1.6 Corporate Requirements 5 1.7 Regulatory Requirements and Agreements 5 1.8 Impact of Premature Closure 5 1.9 Structure of this Document 5 2. Biophysical Considerations 7 2.1 Introduction 7 2.2 Biophysical Setting 7 2.3 Biophysical Closure Issues 10 2.3.1 Public Safety and Human Health 10 2.3.2 Environmental Impacts 11 2.3.3 End Land Use and Lease Relinquishment 14 2.3.4 Small-scale Mining 17 2.4 Biophysical Components 19 2.4.1 Underground Mine and Open Pit Mine 19 2.4.2 Low-grade Ore Stockpiles 21 2.4.3 Waste Rock Dumps 22 2.4.4 Minesite Infrastructure 25 2.4.5 Satellite Infrastructure 27 3. -
Landscaping New Opportunities for Digital Agriculture in Papua New Guinea
Landscaping New Opportunities for Digital Agriculture in Papua New Guinea COPYRIGHT © 2019 GSM ASSOCIATION GSMA AgriTech Programme The GSMA represents the interests of mobile GSMA AgriTech programme works towards operators worldwide, uniting more than 750 equitable and sustainable food chains that empower operators with almost 400 companies in the farmers and strengthen local economies. We broader mobile ecosystem, including handset and bring together and support the mobile industry, device makers, software companies, equipment agricultural sector stakeholders, innovators and providers and internet companies, as well as investors in the AgriTech space to launch, improve organisations in adjacent industry sectors. The and scale impactful and commercially viable digital GSMA also produces the industry-leading MWC solutions for farmers in the developing world. events held annually in Barcelona, Los Angeles and Shanghai, as well as the Mobile 360 Series of For more information about GSMA AgriTech regional conferences. Programme visit our website at: www.gsma.com/ mobilefordevelopment/agritech For more information, please visit the GSMA Follow us on twitter @GSMAm4d corporate website at www.gsma.com Authors: Follow the GSMA on Twitter: @GSMA Panos Loukos, Senior Insights Manager, GSMA Mobile for Development Leslie Arathoon, Telecommunications Consultant, Emerging Markets Guy Zibi, Telecommunications Consultant, Emerging Markets This publication is the output of a project funded by Australia’s Department of Foreign Affairs and Trade (DFAT), for the benefit of developing countries. The views expressed are not necessarily those of DFAT. LANDSCAPING NEW OPPORTUNITIES FOR DIGITAL AGRICULTURE IN PAPUA NEW GUINEA Contents 1. EXECUTIVE SUMMARY 4 2. INTRODUCTION 6 3. AGRICULTURE IN PAPUA NEW GUINEA 8 4. -
Women and Politics in Presence: Case of Papua New Guinea A
Women and Politics in Presence: Case of Papua New Guinea A thesis presented to the faculty of the College of Arts and Sciences of Ohio University In partial fulfillment of the requirements for the degree Master of Arts Mary Fairio August 2014 © 2014 Mary Fairio. All Rights Reserved. 2 This thesis titled Women and Politics in Presence: Case of Papua New Guinea by MARY FAIRIO has been approved for the Department of Political Science and the College of Arts and Sciences by Julie White Associate Professor of Political Science Robert Frank Dean, College of Arts and Sciences 3 Abstract FAIRIO MARY, M.A., August 2014, Political Science Women and Politics in Presence: Case of Papua New Guinea Director ofThesis: Julie White One area that presents challenge for democracy is women representation, an important dimension for gender equality. However, there are major variations among countries. Papua New Guinea is one of the countries with the lowest number of female representatives in parliament. Two questions are asked in regard to the representation of women. First, why is it difficult for women to be elected in Papua New Guinea? And second, how do we explain where women were able to challenge others to be elected? Formal institution such as the electoral system is just one way to discuss gender equality. There are other areas of gender inequality that interact with the formal system relating to social, cultural, and economic factors. An analysis of these factors shows that even improving formal institutions to increase the number of women in political participation, gender inequality is still a challenge within and outside the legislative office. -
Salamaua Falls
Cambridge University Press 978-0-521-89681-8 - The Battle for Wau: New Guinea’s Frontline 1942-1943 Phillip Bradley Excerpt More information CHAPTER 1 Salamaua Falls The town of Wau, at the head of the Bulolo Valley in what is now Papua New Guinea, had its foundation in gold. It was in the early 1920s that the first gold was found in the Bulolo Valley, with the first miner’s right issued in December 1923. As the goldfields developed, the coastal town of Salamaua became their key supply port. Salamaua lies some 50 kilometres to the northeast of Wau and almost 40 kilometres directly south of Lae across the Huon Gulf. The old town is on the isthmus of a peninsula that juts out into the Solomon Sea like an accusing finger, pointed to the northeast. On 21 October 1925 the first cargo boat, the MV Marsina, called at its port. As the news spread, more people came to Salamaua to head up into the mountains for the promise of riches at Wau. Both towns grew, though that growth would always be limited by the strenuous eight-day trek from the coast up to Wau. An air route was sorely needed. In 1927 a former Australian officer from the First World War, Cecil Levien, brought 250 native labourers to Lae and constructed a landing ground there. Ray Parer, who had been narrowly beaten by Sir Ross and Keith Smith as the first to fly from England to Australia, flew the first aeroplane, a De Havilland DH-4, from Rabaul to Lae. -
Bulletin of the World Health Organization
Policy & practice Transforming the health information system using mobile and geographic information technologies, Papua New Guinea Alexander Rosewell,a Phil Shearman,b Sundar Ramamurthyb & Rob Akersc Abstract In the context of declining economic growth, now exacerbated by the coronavirus disease 2019 pandemic, Papua New Guinea is increasing the efficiency of its health systems to overcome difficulties in reaching global health and development targets. Before 2015, the national health information system was fragmented, underfunded, of limited utility and accessed infrequently by health authorities. We built an electronic system that integrated mobile technologies and geographic information system data sets of every house, village and health facility in the country. We piloted the system in 184 health facilities across five provinces between 2015 and 2016. By the end of 2020, the system’s mobile tablets were rolled out to 473 facilities in 13 provinces, while the online platform was available in health authorities of all 22 provinces, including church health services. Fractured data siloes of legacy health programmes have been integrated and a platform for civil registration systems established. We discuss how mobile technologies and geographic information systems have transformed health information systems in Papua New Guinea over the past 6 years by increasing the timeliness, completeness, quality, accessibility, flexibility, acceptability and utility of national health data. To achieve this transformation, we highlight the importance of considering the benefits of mobile tools and using rich geographic information systems data sets for health workers in primary care in addition to the needs of public health authorities. Introduction lot of mobile device technologies and geographic information systems in the capture and reporting of health data. -
IEE: Papua New Guinea: Lae Port Development Project
Initial Environmental Examination October 2011 PNG: Lae Port Development Project – Additional Works Prepared by Independent Public Business Corporation for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 20 October 2011) Currency unit – kina (K) K1.00 = $0.454 $1.00 = K2.202 ABBREVIATIONS ADB – Asian Development Bank BOD – biological oxygen demand CSC Construction Supervision Consultant CSD cutter suction dredger DO – dissolved oxygen DEC Department of Environment and Conservation DMP Drainage Management Plan DOE Director of Environment EIA – Environmental Impact Assessment EIA 2009 EIA approved in principle 2009 by DOE EIS Environmental Impact Statement EMP – environmental management plan ESA – Environmental and Safety Agent (Contractors) PMU – Environmental and Social Circle Division (in PMU) ESO – Environmental and Safety Officer (in PMU) ESS – Environmental and Safety Specialist (in CSC) GOP – Government of Papua New Guinea HIV – human immunodeficiency virus IEE – Initial Environmental Examination IES – International Environmental and Safety Specialist (in CSC) IPBC Independent Public Business Corporation IR Inception Report NES – National Environmental and Safety Specialist (in CSC) NGO – non-governmental organization LPDP – Lae Port Development Project MMP – Materials Management Plan MOE Minister of Environment MRA Mineral Resources Authority PMU – Project Implementation Unit (IPBC) PNGPCL PNG Ports Corporation Limited PPE – Personal Protective Equipment REA – rapid environmental assessment RP – Resettlement Plan Spoil Unusable peaty or clay dredged material SPS – ADB‟s Safeguard Policy Statement (2009) SR – sensitive receiver TA – Technical Assistance TOR – Terms of Reference TSP – total suspended particulate TSS – total suspended solids TOR – terms of reference TTMP – temporary Drainage management plan i WEIGHTS AND MEASURES dB(A) – Decibel (A-weighted) masl – Meters above sea level km – kilometer km/h – kilometer per hour m – meter m3 – cubic meter NOTES (i) The fiscal year (FY) of the Government of Papua New Guinea ends on 31 December.