PROTECTING CRITICAL INFRASTRUCTURE: RESILIENCY LOGAN AIRPORT PLANNING AND INVESTMENTS IN PART II

The Massport Experience MARITIME

November 1, 2019

WORCESTER AIRPORT

Property of Port Authority

Michael Meyran, Acting Port Director HANSCOM AIRPORT Massachusetts Port Authority Introduction

. Massport is an independent authority governed by a board of directors, appointed by the state’s governor . Massport owns three lines of business:

Aviation Maritime Real Estate

• Logan Airport • Conley Terminal • • Flynn Cruiseport Boston • East Boston • Worcester Airport • Seafood Landlord • Charlestown • Boston Autoport

SUSTAINABLE 2 Massport’s Resiliency Timeline

2018/2019 2013 Jan 2018: Expanded the Storm Logan selected by water Pollution & Prevention FAA to participate Sept. 2015 Program (SWPPP) to in Sustainability Conducted Flood incorporate resiliency best Master Plan Pilot Operations Plan Tabletop 2014 Nov. 2014 practices Program. Began Exercise; Completed Released: March 2018: First “real-life” developing Test deployment of April 2016 Disaster and Floodproofing emergency deployment of Sustainability temporary flood barriers Released Logan Infrastructure Design Guideline flood barriers at Maritime Management Plan at critical Massport Annual Resiliency properties in preparation for for Logan facilities Sustainability Planning Report Nor’easter (DIRP) Study June 2018: Developed Resiliency Web App June 2018: Conducted test August 2017-Incorporated deployment of temporary Aug. 2014 April 2015 Early 2014 Oct.-Nov. 2015 resiliency evaluations into the flood barriers at one Logan Launched Revised Modified Released Flood safety unit’s Annual Chemical Airport critical asset resiliency Floodproofing Design Department of Operations Plans for Storage Inventory Assessments Oct 2018: Completed Logan portal on Guide; Homeland Logan and Maritime Sept-Oct 2017: Conducted a series storm water flood risk study. public Released Logan Security Hazard Facilities of workshops with key Aug 2019: First major update website Sustainability Identification and stakeholders to review and to aviation and maritime flood Management Plan Risk Assessment improve Flood Operations Plans operations plans Highlights and (THIRA) Model for Logan and Maritime facilities Technical Reports

SUSTAINABLE 3 Disaster Infrastructure Resiliency Plan

Goals of the project: – Understand Massport’s vulnerability to climate impacts – Develop short-term and long-term resiliency strategies

Project approach:

1- Climate projections 2- Vulnerability and risk assessment 3- Adaptation planning & design

Adaptation strategies Consequence of impact

Probability of occurrence

SUSTAINABLE 4 Risk-Based Prioritization of Assets

Probability of Determined based on Inundation Model results Flooding Flooded in more storm scenarios  higher probability, higher priority

Criticality Score X Occupancy Category

Based on role in Based on ASCE/SEI 24-05 disaster Standard for Flood Resistant Consequence preparedness, Design and Construction of Flooding response, recovery Higher consequence  higher priority

Further distinguish among assets with Depth of same Probability and Consequence Flooding Higher depth  higher priority

SUSTAINABLE 5 Flood Scenario Elevations – Fish Pier East

CAT. 2 HURRICANE CAT. 3 HURRICANE (HAT) (MHHW) EST. FLOOD EL. = 17.5’ FLOOD EL. = 19.7’

GROUND FLOOR EL. = 10.0’ SUSTAINABLE 6 Flood Barriers

SUSTAINABLE 7 Elevated Platforms

Generator Combo Unit Elevated Platform at CTDFC State Police Generator

SUSTAINABLE 8 Annual Training/Test Temporary Flood Barriers

• Temporary Flood Barriers deployed May 2019 • Logan Airport – 4 facilities • Conley Terminal - 2 facilities • Fish Pier – 3 Facilities • Initially deployed in September 2015 Access Stairs

SUSTAINABLE 9 Implemented Operational Plans and Guidelines

Flood Operations Plans: • Specific to Logan and Maritime sites • Identifies detailed actions, timelines and responsible parties • Created through collaborative process with MPA stakeholders • Tabletop exercise to engage functions

Flood-proofing Design Guide: • Design Flood Elevations for construction – Different heights for new & existing facilities • Floodproofing Strategies – Wet & dry floodproofing • Performance standards

Test deployment of temporary flood barriers Electrical Telecom Building at Logan Conley Terminal test deployment SUSTAINABLE 10 Flooding Actions and Timelines

SUSTAINABLE 11 Application

1.Facilitate management oversight of flooding or heavy precipitation events impacting Massport infrastructure

2.Inform decision-making during a flood event where Massport flood operations plans may or have been activated;

3.Enable real-time field updates via mobile devices of: i. flood water encroachment ii. barrier and resource deployments iii. equipment status or activity milestones iv. site inspections

SUSTAINABLE 12