Exploiting the Potential of Quality Bus Corridor's

Total Page:16

File Type:pdf, Size:1020Kb

Exploiting the Potential of Quality Bus Corridor's Exploiting the Potential of Quality Bus Corridor’s Paddy Doherty Manager Business Development Dublin Bus Dublin Bus Overview Manage and Operate bus network Population of Dublin 1.1 million Dublin Bus Fleet 1082 buses (mainly double deck) Dublin Bus Staff 3434 Revenue / €179m / Expenditure €240 m Farebox ratio 75% The Dublin Suburban Rail Network Transport 21 •Recently launched During the study Requires the bus network to be reviewed in the light of the proposal •Sets challenging target dates for implementation of rail schemes •The main capacity enhancing schemes are later in the programme Longer Term PT Proposals Timeframe 5 to 10+ years •Metro • Extended light rail lines • Rail upgrade into and through the city centre • Extended rail spurs, multiple track lines • Park and Ride • Integration of bus/ rail metro and light rail modes ……..but the bus will be the primary PT solution for at least until 2011. Percentage change in the population of Electoral Divisions within Dublin, 1996-2002 What is a Quality Bus Corridor… Quality Bus Corridors have 6 key Attributes Unambiguous & Direct Alignment ¾Main roads, direct High Frequency ¾Bus operating every 10 min or less Improved Speeds ¾Bus Priority, bus lanes, bus only turns … High Specification Fleet ¾Investment in buses, on board technology Roadside Infrastructure ¾Shelters, information…. Staff Training ¾Customer focused training…. QBC’s are for more than buses! Cyclists Pedestrians Taxi’s, Emergency Vehicles Suburban buses / coaches Junction Redesign Traffic Calming Footpath Upgrades Loading bays….community shops Dublin Bus is the biggest provider of public transport Dublin Morning Peak (7-10) Car/Public Transport Modal Split 2005 Dublin Morning Peak (7-10) Public Transport Modal Split 2005 Car Rail/Luas 44% Public 30% Transport 56% Total Bus 70% Dublin Bus carries over 70% of Public Transport customers into Dublin each morning Dublin Bus Customer Growth 1998 to 2005 148 1998 1999 s n 143 *2000 2001 llio i 2002 M 2003 138 2004 2005 133 Millio n s 2000 adjusted for industrial disputes Year 2005 estimated The Success of QBC’s #1 More people travel to the city by bus than by car Changing Bus/Car ratio on 9 QBC Corridors 2004 57% Bus in 2004 1997 41% Bus in 1997 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 Persons travelling inbound in morning peak Bus / Car Divide @ Canal Cordon Inbound AM Peak (7-10) 1997 v 2004 Total Persons +5,600 (8%) The Success of QBC’s #2 More people travel over Leeson St Bridge by bus than by car Changing Bus/Car ratio on Stillorgan Corridor QBC 2004 53% Bus in 2004 1997 20% Bus in 1997 0 2000 4000 6000 8000 10000 12000 Persons travelling inbound in the Morning Peak Bus / Car Divide @ Leeson Street Inbound AM Peak (7-10) 1997 v 2004 Total Persons +1,800 (22%) The Success of QBC’s #3 Three examples where Bus Journey Times are faster than car 50 Car Bus 40 es 30 nut i 20 M 10 0 Lucan - Bachelors Foxrock-Leeson St Malahide Rd - Walk Amiens St Trunk QBC Section The Success of QBC’s #4 Facts More commuters come to Dublin City by QBC than by car every morning The largest QBCs each carry 8 - 10 million customers a year – same as Luas. Bus customers travel faster than car on the majority of QBCs Morning peak customers using QBC’s has risen by almost 50% The average time between buses on a QBC is 2 mins Population growth 2002 to 2011 (Source DKM Consultants) +17,000 +22,000 +14,000 +21,000 +18,000 +12,000 +16,000 +7,000 +3,000 QBCs can deliver further customer benefits by 2008 How QBC’s can deliver more benefits to customers – More frequent services – Improved journey speeds – 15 million additional customer in 3 years – Serve new residential and industrial areas • North Fringe (Baldoyle), Adamstown, Stepaside, Ongar – Increased integration to Rail and Luas Actions to Double the QBC Network • Introduce 5 new QBCs to the city centre bringing the total radial QBCs to 14 • Introduce 6 new orbital QBCs linking suburban communities like Tallaght, Lucan and Swords directly • Improve bus priorities, bus speeds and bus supply on existing 9 QBCs • Improve movement of buses through the city centre for the benefit of the 58 million bus customers Significant benefits can be achieved by improved QBC design Additional buses give increased frequency on all QBCs Continuous bus lane priority Bus Priority approaching M50 junctions Bus only access roads Traffic light priority Bus only turns City Centre bus priority and access to Luas priority Improved interchange to bus, rail Real Time Passenger Information and luas at bus stops Full accessibility for all customers Modern bus shelters Park n Ride can complement QBC’s • PnR sites should be along trunk QBC sections • Distance to city – 6/7 km • Good access & egress for buses and cars to PnR site • Existing bus resources should be used • Suggested areas Santry Navan Rd(M50) Clondalkin Foxhunter (Lucan) Tallaght (Spawell) N11 (Cherrywood) • PnR should be managed as a single system City Centre Issues • The city centre is a major origin and destination for bus customers – 58 million Dublin Bus customers pass the front of Trinity p.a. • Cross City Bus Priority Routes are Needed – ‘Light Rail’ type priorities needed – More direct bus alignments – Additional bus priority • Port Tunnel 2006 – Opportunity when Port Tunnel opens to give buses more priority • Metro and Light/Rail Projects – Alignment and construction of other transport schemes must be carefully chosen and managed City Centre QBC Connections Blanchardstown QBC Improvements The following improvements will take place by 2008 28 more buses will serve Blanchardstown Buses will operate every 60 seconds on the trunk sections Bus speeds will increase to 18 kph Customer could save up to 35 minutes on a QBC journey 2.3 million more customers will be carried (+24%) More bus customers than car drivers and occupants will travel into the city Capital Cost – Blanchardstown QBC 2005 - 2008 Buses €9.6m QBC Infrastructure & €18.4m Bus Priority Customer €2m Information Total €30m Summary QBC Proposals The following improvements will take place by 2008 170 additional buses will operate on QBC’s Buses will operate on average every 2 minutes on QBC’s Bus speeds will increase to an average of 18 kph 37 million more customers will travel on QBC buses (59% of all Dublin Bus customers) 64% of those travelling into Dublin will choose to do so by QBC Total Dublin Bus Projected Customer Numbers ** Most customers will travel by QBC from 2008 onwards 200 150 100 63% 50 59% QBC 41% QBC QBC 0 2005 2008 2011 Examples of annual QBC customers in 2008 12 10 8 2005 6 2008 4 2 0 Swords Lucan Malahide Tallaght Stillorgan Blanch Luas Capital Investment Buses and Customer Information To 2008 Extra buses €83m Maintenance facilities €60m Information & SBD €42m Total €185m Notes 1: Capital cost for replacement buses of €30m p.a. not included 2: QBN Office funding for priority schemes currently allocated separately Subvention Implementing the full proposal will have the following implication on annual subvention – Additional Subvention of €17m required – Proposal will result in wider savings in the context of the environment, quality of life and time The case for bus Investment This Presentation has demonstrated that investment in buses has the following benefits • Short lead times • Flexible service • Carry large numbers (similar to LRT) • Less disruption (utilities/ traffic and business) • Realise transfer from private transport (cars) • Proven value for money Questions ?.
Recommended publications
  • Conditions of Carriage of Passengers and Their Luggage
    Conditions of Carriage of Passengers and their Luggage June 2004 Until Further Notice Conditions TEXT 30-6-04 5:49 PM Page 1 CONTENTS CHAPTER 1 SECTION A PAGE CONDITIONS OF CARRIAGE OF PASSENGERS 1 Tickets are issued subject to conditions, byelaws and regulations 5 2 Refusal of access 5 3 Tickets not transferable 5 4Periods of validity of tickets 5 5 Available route of tickets 6 6 Through tickets and inter-available tickets 6 7 Change of train/station 6 8 Break of journey 7 9 Group travel 7 10 Using tickets from any other stations 7 11 Re-booking at intermediate stations 7 12 Production of tickets 7 13 Passengers entering wrong trains 8 14Children 8 15 Kid + Family tickets 8 16 Fraudulent use of authorisation documents 8 17 Torn, mutilated, lost or stolen unused tickets 9 18 Travelling in superior class of carriage 9 19 Accommodation in trains 9 20 Timetable and train services 10 21 Closing of entrances to and exits from stations and platforms 10 22 Purchase of tickets - change 10 23 Validation of tickets 10 24Refunds 11 25 Free travel scheme for holders of free travel cards 11 1 Conditions TEXT 30-6-04 5:49 PM Page 2 SECTION B CONDITIONS OF ISSUE OF TICKETS FOR INTERNAL TRAVEL ON THE DUBLIN SUBURBAN RAIL SECTION 26 Conditions Of Issue Of Tickets For Internal Travel 12 27 Single tickets 12 28 Ordinary return tickets 12 29 All other tickets 12 30 Validation of tickets 12 31 Children (other than school children) 12 32 Children (travelling to and from school only) 12 33 Schoolchild 5 Day tickets (travelling to and from school only) 13 34Scholar
    [Show full text]
  • Buses As Rapid Transit
    BBuusseess aass RRaappiidd TTrraannssiitt A transport revolution in waiting WWeellccoommee ttoo BBRRTT--UUKK RT is a high profile rapid transit mode that CONTACT BRT-UK combines the speed, image and permanence of The principal officers of BRT-UK are: light rail with the cost and flexibility of bus. BRT-UK Chair: Dr Bob Tebb Bseeks to raise the profile of, and develop a centre b of excellence in, bus rapid transit. b Deputy Chair: George Hazel BRT-UK does not seek to promote bus-based rapid transit b Secretary: Mark Curran above all other modes. BRT-UK seeks to enhance b Treasurer: Alex MacAulay understanding of bus rapid transit and what it can do, and b Membership: Dundas & Wilson allow a fair and informed comparison against other modes. External promotion: George Hazel BRT-UK is dedicated to the sharing of information about b evolving bus-based rubber-tyred rapid transit technology. b Website: Alan Brett For more information please contact us at [email protected]. b Conference organisation: Bob Menzies ABOUT BRT-UK BRT-UK MEMBERSHIP Membership of BRT-UK has been set at £250 for 2007/08. Objectives of the association Membership runs from 1st April-31st March. Membership is payable by cheque, to BRT-UK. Applications for membership The objectives of BRT-UK are: should be sent to BRT-UK, c/o Dundas & Wilson, 5th Floor, b To establish and promote good practice in the delivery Northwest Wing, Bush House, Aldwych, London, WC2B 4EZ. of BRT; For queries regarding membership please e-mail b To seek to establish/collate data on all aspects of BRT
    [Show full text]
  • Annex 2.1 Review of Planning and Policy Documents
    DART+ West Iarnród Éireann Option Selection Report Volume 2: Technical Report MAY-MDC-GEN-ROUT-RP-Y-0001 April 2021 Option Selection Report Volume 4: Annex 2.1 Review of Planning and Policy Documents Table of contents 1. Review of Planning and Policy Documents ................................................................................. 4 1.1 Policy Context ................................................................................................................... 4 1.2 EU Policy ........................................................................................................................... 5 1.3 National Policy .................................................................................................................. 5 1.4 Regional Policy ............................................................................................................... 12 1.5 Local Policy ..................................................................................................................... 16 MAY-MDC-GEN-ROUT-RP-Y-0002 Annex 2.1 i Option Selection Report Volume 4: Annex 2.1 Review of Planning and Policy Documents Glossary Abbreviation Meaning BRT Bus Rapid Transit CIÉ Córas Iompair Éireann CRR Commission for Railway Regulation DART Dublin Area Rapid Transit (IÉ’s Electrified Network) DCDP Dublin City Development Plan DTTAS Department of Transport, Tourism and Sport DU DART Underground EMRA Eastern and Midland Regional Assembly GDA Greater Dublin Area GHG Greenhouse gas GSWR Great Southern & Western Railway IÉ /
    [Show full text]
  • 89 Merrion Grove Blackrock, Co
    89 Merrion Grove Blackrock, Co. Dublin 89 Merrion Grove Blackrock, Co. Dublin �Two-bedroom own door duplex �2 balconies �South-facing aspect �Approx 70 sq m / 753.5 sq ft �Light filled interior �High ceilings in living space �Quiet leafy setting �Ample communal parking For Sale By Private Treaty Savills are thrilled to present this 2 bed duplex to the market. This stunning bright two-bedroom duplex is situated on the grounds of the well-known Radisson Blu Hotel which is conveniently located just off the N11 / Stillorgan road. This quiet, leafy residential enclave is tucked away with a beautiful manicured, mature gardens. Number 89 is a bright and spacious two-bedroom duplex apartment which benefits from a stunning outlook over the beautiful communal gardens. The accommodation is laid out over two levels boasting excellent proportions throughout and measures to approx. 70sq m / 753sq ft. The accommodation comprises a spacious entrance hall with hot press and storage press, a double bedroom with door to the larger balcony, the second bedroom as well as a main bathroom completes the accommodation on this level. Upstairs is the heart of this home where there is a large living/dining room with high ceilings, a Velux window and doors leading to a second balcony. This room is ideal for entertaining and relaxing. Off this lies the kitchen/ breakfast room which has a lovely outlook. The balconies are connected by spiral steps. Merrion Grove is a highly sought-after upmarket development situated within easy reach of Mount Merrion, Stillorgan, Blackrock and Foxrock and boasts a plentiful supply of recreational amenities in the immediate area.
    [Show full text]
  • An Bord Pleanála Inspector's Report
    An Bord Pleanála Inspector’s Report Reference No: NA 0001. Proposed Development: Dunboyne (M3) Commuter Rail. Location: Clonsilla, Co. Dublin to Pace, Co. Meath. Applicants: Coras Iompair Eireann (CIE). Planning Authorities: 1. Fingal County Council. 2. Meath County Council. Application Type: Railway Order under section 37 of the Transport (Railway Infrastructure) Act, 2001 as amended by section 49 of the Planning and Development (Strategic Infrastructure) Act, 2006. Observers: There are 31 observers and they are listed overleaf. Dates of Site Inspection: 21st and 30th November 2007. Inspector: David Dunne. NA 0001. An Bord Pleanála Page 1 of 1 List of Observers. 1. Richard B. Leahy, Liverpool. 2. James Reeves, 8a Elton Drive, Dunboyne. 3. Thomas & Maud Potterton, Rathcormick, Ballivor. 4. James & Adrienne McGrath, 9 Elton Drive, Dunboyne. 5. John Connaughton Ltd. 6. Millfarm Residents Association. 7. Hilltown Partnership. 8. SIAC Construction Ltd. 9. Menolly Group. 10. Virginia Kerr. 11. Rail Users Ireland. 12. McGarrell Reilly. 13. Sean Boylan, Castlefarm, Dunboyne. 14. Ian Pringle, Barnhill. 15. Tony Murray & Michael Degan, Lucan. 16. Mrs Betty Larkin, Station Road, Dunboyne. 17. DTO. 18. Manor Park Homebuilders. 19. Gerty Gregan, Lands at Bennettstown, Dunboyne. 20. Michael Mc Loughlin, 11 Riverwood Heath, Castleknock. 21. NRA. 22. Barina Construction Ltd. 23. An Taisce. 24. Gerard & Moira McGrath, Stirling Bridge. 25. Meath Local Authorities. 26. Castelthorn Construction. 27. Colm Moore. 28. Fingal County Council. 29. Dept. Environment, Heritage & Local Government. 30. Waterways Ireland. 31. Tom Maher (Note: Observation received 13/12/07 during oral hearing). NA 0001. An Bord Pleanála Page 2 of 2 TABLE OF CONTENTS Section 1.
    [Show full text]
  • The Role of Marketing in Quality Bus Corridor Promotion
    Proceedings of the Institution of Civil Engineers Municipal Engineer 157 March 2004 Issue ME1 Pages 61–66 Paper 13555 Received 03/11/2003 Accepted 09/02/2004 Keywords: Tom Rye Marcus Enoch marketing & public relations/ Reader in Transport Studies, Lecturer in Transport Studies, transport management/transport School of the Built Environment, Transport Research Civil and Building Engineering, planning Institute, Napier University, Edinburgh, UK Loughborough University, UK The role of marketing in quality bus corridor promotion T. Rye and M. Enoch Quality bus corridors (QBCs) are being implemented in of public transport services or journeys. These might include towns and cities throughout the British Isles in order to improving the product by simplifying the route network, improve the image of the bus and to boost patronage, with providing better information, conducting market research, or a view to meeting local and national transport policy targeting specific user groups with promotions.) objectives such as reduced reliance on the private car. QBC initiatives commonly consist of bus priority To achieve the above aims, the paper first defines the range of measures, improved vehicles, enhanced waiting improvements that can be implemented to grow the bus market. environments, better information and, sometimes, It then defines QBCs and marketing, before moving on to enhanced service frequencies. The purpose of this paper is consider three empirical examples. Two of these are from to examine the importance of the marketing of the QBC Scotland—Stagecoach’s Kick Start experiment in Perth, and concept to the achievement of its objectives: are Lothian Buses and its use of Greenways in Edinburgh.
    [Show full text]
  • Mobility Management Plan
    MOBILITY MANAGEMENT PLAN . PROPOSED RESIDENTIAL DEVELOPMENT, EGLINTON ROAD, DONNYBROOK, DUBLIN 4 The Donnybrook Partnership Project No. R487 26th March 2020 MOBILITY MANAGEMENT PLAN PROPOSED RESIDENTIAL DEVELOPMENT, ELINTON ROAD, DONNYBROOK, DUBLIN 4 The Donnybrook Partnership Project No. R487 26th March 2020 MOBILITY MANAGEMENT PLAN PROPOSED RESIDENTIAL, DEVELOPMENT, EGLINTON ROAD, DONNYBROOK, DUBLIN 4 NOTICE This document has been produced by O’Connor Sutton Cronin & Associates for its client, The Donnybrook Partnership. It may not be used for any purpose other than that specified by any other person without the written permission of the authors. DOCUMENT CONTROL & HISTORY OCSC Job No.: Project Code Originator Zone Volume Level Type File Type Role Number Status Suitability / Code Revision R487 R487 OCSC XX XX RP C 0006 A1 C02 Rev. Status Authors Checked Authorised Issue Date C02 A1 J. Tai P. Raggett M. McGrath 26.03.2020 C01 A1 J. Tai P. Raggett M. McGrath 24.03.2020 P04 S3 J. Tai P. Raggett M. McGrath 23.03.2020 P03 S3 J. Tai P. Raggett M. McGrath 06.03.2020 P02 S3 J. Tai P. Raggett M. McGrath 10.02.2020 P01 S3 J. Tai P. Raggett M. McGrath 06.02.2020 INDEX PAGE 1. INTRODUCTION .................................................................... 1 2. CONTENT OF THE TRAVEL PLAN ............................................ 3 3. EXISTING PUBLIC TRANSPORT, CYCLE & PEDESTRIAN FACILITIES ........................................................................... 4 BUS .................................................................................
    [Show full text]
  • Economic and Social Infrastructure Programme.Pdf
    5 Economic & Social Infrastructure Programme Economic & Social Infrastructure Sub-Programme: National Roads and Public Transport Measure: National Roads Measure: Public Transport Measure: National Public Transport Services Sub-Programme: Environmental Infrastructure Measure: Waste Water Measure: Water Supply Measure: Management and Rehabilitation of Infrastructure Measure: Infrastructure Support for Expanded Economic Activity Measure: Coastal Protection Sub-Programme: Sustainable Energy Measure: Energy Conservation Measure: Alternative/Renewable Energy Sub-Programme: Housing Measure: Local Authority Housing Measure: Provision of Housing by Voluntary Sector Measure: Access to Affordable Housing for Lower Income Households Measure: Improvements to Existing Housing Measure: Accommodation for Groups with Special Needs Sub-Programme: Health Facilities Measure: Acute Hospitals Measure: Non-Acute/Continuing Care The Cohesion Fund Guide to Funding 5 Economic and Social Infrastructure Operational Programme The key objectives of this Programme, which accounts for 46% of NDP expenditure, are: I to increase the capacity of Ireland’s economic infrastructure, thereby supporting continued growth and competitiveness I to enhance the potential of all parts of the country to participate in continuing economic and social development I to contribute to the protection and improvement of the environment I to improve overall quality of life The Programme comprises six Sub-Programmes: I National Roads: investment in major national roads projects I Public Transport:
    [Show full text]
  • Statement of Strategy 2018 - 2020
    Statement of Strategy 2018 - 2020 CONTENTS Commissioner’s Statement 2 About the CRR 3 CRR Mandate 5 Legislative Context 7 Current Legislation 7 Fourth Railway Package 8 Cooperation With National and International Bodies 8 EU Cooperation at Agency and Commission Level 8 Brexit 6 Railway System in Ireland 9 Operational Profile 9 Asset Profile 9 Planned Asset Development 10 Safety Performance Indicators 10 New and Emerging Risks 11 Economic Regulation Analysis 11 Consultation 12 Mission 13 Vision 13 Strategic Priorities 14 The CRR is grateful to Neil Dinnen and Transdev for permission to use their copyright images. CONTENTS 1 Commission for Railway Regulation | Statement of Strategy 2018 - 2020 COMMISSIONER’S STATEMENT I am pleased to introduce the Commission’s Statement of Strategy 2018 – 2020 This is the fifth statement of strategy prepared by the Commission under the Railway Safety Act 2005 It has been developed with the participation of staff and in consultation with stakeholders In developing this Strategy, the Commission recognises that the regulation of the rail sector continues to develop both at national and European level This Strategy has been prepared against the background that is challenging in the context of key legislative and policy developments These include the implementation of the 4th European Railway Package, the Government’s National Development Plan 2018 – 2027 and Brexit In addition, it is expected that the time frame for this Strategy will be a period of continued economic growth and recovery bringing with it increased
    [Show full text]
  • Transportation Assessment Report for Proposed Apartment Development
    Transportation Assessment Report (incl. Preliminary Travel Plan, DMURS Statement of Consistency & Independent Stage 1 Road Safety/Quality Audit) for Proposed Apartment Development At Former Europa Garage Site, Newtown Avenue, Blackrock, Co. Dublin. SUBMISSION ISSUE 1st Floor, Apollo Building, Dundrum Road, Dundrum, Dublin 14 Tel/fax: +353 1 292 1941, E-mail: [email protected], Web: www.nrb.ie Registered in Ireland No. 491679 Contents Page Section Description 2 -- Executive Summary 4 1.0 Introduction Existing Conditions, Development Proposals & Car 7 2.0 Parking 15 3.0 Traffic - Trip Generation Assignment and Distribution 16 4.0 Traffic Impact - Traffic Capacity Analysis Issues Raised by DLRCC Roads/Transportation Section in 19 5.0 Response to Pre-App Submission 23 6.0 Conclusions Appendices...... A Proposed Development – Layout & Access B Raw Traffic Survey Data C TRICS Trip Generation Output D Traffic Surveys, Trip Distribution & Network Traffic Flow Diagrams E PiCADY Junction Capacity Model Output - Proposed Site Access F Independent Stage 1 Road Safety Audit including Quality Audit G Preliminary Mobility Management Plan (Travel Plan) H DMURS Statement of Consistency I Letter of Confirmation from Go-Car TA - Blackrock Apartments 19-079/ER Nov 2020 Page 1 of 23 EXECUTIVE SUMMARY NRB Consulting Engineers Ltd were appointed to address the Traffic & Transportation issues associated with a planning application for a Residential Apartment Development at Newtown Avenue, Blackrock, Co. Dublin. The proposed development consists of 101 private residential apartments, with secure off-street parking areas for bicycles & cars, along with bins storage and all associated site works. In terms of vehicles, the site is to be accessed by way of a simple priority access located on Newtown Avenue, replacing the established access gateway serving the site, providing for a well designed, safe and appropriate form of access.
    [Show full text]
  • Transport Strategy for the Greater Dublin Area 2016 - 2035
    Draft Transport Strategy for the Greater Dublin Area 2016 - 2035 20 35 ii National Transport Authority Draft Transport Strategy for the Greater Dublin Area National Transport Authority 1 Draft Transport Strategy for the Greater Dublin Area Contents Strategy Purpose 3 1. Introduction and Context 5 1.1 Rationale for the Strategy 5 1.2 Legislative Requirements 9 1.3 Consultation 12 2. Policy Overview 14 2.1 Introduction 14 2.2 Primary Policy 15 2.3 Transport and Planning Policy 15 2.4 Other Sectors 16 2.5 Summary 17 3. Transport in the Greater Dublin Area 19 3.1 Introduction 19 3.2 Current Transport Supply 21 3.3 Regional Patterns and Trends 23 3.4 Patterns and Trends by Area 32 3.5 Transport Shortcomings 43 3.6 Considerations for the Strategy 43 4. Development of the Strategy 46 4.1 Appraisal for Options Common to all Corridors 46 4.2 Options Appraisal by Corridor 48 4.3 Options Appraisal for Local Movement 52 4.4 SEA Alternatives Assessment 52 5. The 2035 Transport Network 55 5.1 Introduction 55 5.2 Heavy Rail Infrastructure 55 5.3 Light Rail Infrastructure 60 5.4 Combined Rail Network 63 2 National Transport Authority Draft Transport Strategy for the Greater Dublin Area 5.5 Bus Infrastructure 64 5.6 Cycling Infrastructure 71 5.7 Walking 73 5.8 Road Network 74 5.9 Demand Management 77 5.10 Park and Ride 78 5.11 Parking Supply 79 6. Transport Services and Integration 81 6.1 Bus Services 81 6.2 Bus stops and Bus Shelters 82 6.3 Rail Services 82 6.4 Fares 83 6.5 Passenger Information Systems 83 6.6 Optimising Interchange and transport facilities 83 6.7 Accessibility 84 6.8 Small Public Service Vehicles (Taxis, Hackneys and Limousines) 84 6.9 Local Transport Services 85 6.10 Environmental 85 7.
    [Show full text]
  • Annual Report 2005 1
    Annual Report 2005 1 Annual Report 2005 © Department of Transport Department of Transport Transport House, Kildare Street, Dublin 2, Ireland Tel 01-6707444 Fax 01-6709633 Email: [email protected] Website: http://www.transport.ie Copies of this report may be downloaded from www.transport.ie in pdf format. The Department may be contacted from any part of the country for the price of a local call by dialling 1890-443311 An Roinn Iompair Teach Iompair, Sráid Chill Dara, Baile Átha Claith 2, Éire Tel 01-6707444 Fax 01- 6709633 Rphoist: [email protected] Láithair Eangach: http://www.transport.ie Is féidir teangmhail a dhéanamh leis an Roinn ó aon pháirt den tír le haghaidh praghas glaoch áitiúil má dhiailionn tú 1890-443311 Annual Report 2005 Statement of the Minister It is my pleasure to introduce my 3 Department’s Annual Report for 2005 which reports on progress against our ambitious commitments and objectives set down in our most recent Statement of Strategy 2005-2007. Significant progress on implementing the Agreed Pass, Sligo Inner Relief Road, South Programme for Government has been made by Eastern Motorway section of M50. the Department in the course of 2005. The commencement of work on 15 other In 2005 my Department was given an projects including Dundalk/border on the extraordinary opportunity by Government: To M1, Arklow/Gorey Bypass on the N11 and prepare a plan to transform this country’s the Monaghan By Pass on the N2; transport network within a ten-year financial Major public transport developments framework. The opportunity was great, the including completion of the DART upgrade challenge immense but we met that challenge with project (extended platforms for 8 car trains, the launch, on 1 November, 2005 of the Transport accessibility improvements), entry into 21 project.
    [Show full text]