Plan of Study, Salinas and Carmel Rivers Basin Study

Total Page:16

File Type:pdf, Size:1020Kb

Plan of Study, Salinas and Carmel Rivers Basin Study EXHB Plan of Study Salinas and Carmel Rivers Basin Study January 2017 Bureau of Reclamation Mid-Pacific Region Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Table of Contents Table of Contents Page Chapter 1 – Introduction ................................................................................................................ 1 1.1 Purpose of the Basin Study .......................................................................................... 1 1.2 Basins Study Goals and Objectives ............................................................................. 1 1.3 Description of the Basin Study Area ........................................................................... 2 1.3.1 The Salinas River ................................................................................................ 4 1.3.2 The Carmel River ................................................................................................ 8 1.3.3 Monterey Peninsula Watershed .......................................................................... 10 Chapter 2 – Study Description ..................................................................................................... 13 2.1 Project Background ...................................................................................................... 13 2.2 Problems, Needs, and Opportunities ............................................................................ 15 2.2.1 Water Shortages .................................................................................................. 15 2.2.2 Basin Study Area Supplies and Demands ........................................................... 16 2.2.3 Instream Flows .................................................................................................... 20 2.2.4 Groundwater ....................................................................................................... 22 2.3 Previous Work and Available Data.............................................................................. 23 2.3.1 Hydrology Models .............................................................................................. 24 2.3.2 Select Studies Which Support the Basin Study .................................................. 25 Chapter 3 – Study Approach and Management ........................................................................... 28 3.1 Basin Study Management Structure............................................................................. 28 3.2 Roles and Responsibilities of the Study Management Teams and Groups ................. 29 U.S. Bureau of Reclamation ........................................................................................ 29 U.S Geological Survey.................................................................................................. 30 Executive Team ............................................................................................................ 31 Study Team ................................................................................................................... 31 Technical Working Group ............................................................................................ 31 Technical Sufficiency Review Team(s) ........................................................................ 32 3.3 Change Management Plan ........................................................................................... 32 3.4 Risk Management Plan ................................................................................................ 33 3.5 Technical Sufficiency Review Plan ............................................................................. 34 Chapter 4 – Basin Study Work Plan ............................................................................................ 36 Salinas and Carmel Rivers Basin Study | iii Table of Contents 4.1 Basin Study Requirements ........................................................................................... 36 4.2 Summary Work Plan .................................................................................................... 37 Task 1: Develop Study Metrics .................................................................................... 37 Task 2: Characterize Climate Change and Sea Level Rise .......................................... 38 Task 3: Develop Study Scenarios ................................................................................ 38 Task 4: Develop Modeling Tools and Inputs ............................................................... 38 Task 5: Evaluate Water Supplies, Demands, and Operations (No Action) ................. 39 Task 6: Develop Adaptation and Mitigation Strategies ............................................... 39 Task 7: Evaluate Adaptation and Mitigation Strategies .............................................. 39 Task 8: Prepare Basin Study Report ............................................................................ 40 4.3 Detailed Work Plan ...................................................................................................... 40 Task 1: Develop Study Metrics .................................................................................... 40 Task 2: Characterize Climate Change and Sea Level Rise .......................................... 43 Task 3: Develop Study Scenarios ................................................................................ 47 Task 4: Develop Modeling Tools and Inputs ............................................................... 51 Task 5: Evaluate Water Supplies, Demands, and Operations (No Action) ................. 59 Task 6: Develop Adaptation and Mitigation Strategies ............................................... 61 Task 7: Evaluate Adaptation and Mitigation Strategies .............................................. 63 Task 8: Prepare Basin Study Summary Report............................................................ 65 Chapter 5 – Communications and Outreach Plan ........................................................................ 68 5.1 Goal and Objectives of the Communications and Outreach Plan ................................ 68 5.2 Approach ...................................................................................................................... 69 5.3 Study Audiences .......................................................................................................... 69 Reclamation and Basin Study Partners ......................................................................... 69 Technical Experts.......................................................................................................... 70 Key Stakeholders .......................................................................................................... 70 General Public ............................................................................................................... 70 5.4 Outreach Activities ...................................................................................................... 70 Executive Team Meetings............................................................................................. 71 Study Team Meetings ................................................................................................... 71 Technical Working Group Meetings ............................................................................ 71 Technical Sufficiency Review ...................................................................................... 71 Stakeholder and General Public Meetings .................................................................... 71 Public Outreach and Information Meetings .................................................................. 71 Coordination Meetings with Related Efforts ................................................................ 72 Additional Meetings with Interested Stakeholders ....................................................... 73 Study Information and Updates .................................................................................... 73 Study Website ............................................................................................................... 73 iv | Salinas and Carmel Rivers Basin Study Table of Contents Outreach Materials ........................................................................................................ 73 Stakeholder Mailing List/Study Updates ...................................................................... 73 Designated Point-of-Contact ......................................................................................... 74 Review of Draft Study Documents ............................................................................... 74 Appendix A – Basin Study – Agency and Partner Tasking Table ............................................... 76 Appendix B – Table of Major Study Tasks, Budgets w/Projected Timelines84 List of Tables Table X. Salinas and Carmel Basin Supply, Demands and Unmet Demand by Sub-Basins ............................................................................................................................. 18 Table X. Existing
Recommended publications
  • Technical Report
    2350 Mission College Blvd., Suite 525 Santa Clara, CA 95054 650-852-2800 Storm Water Resource Plan For the Greater Salinas Area Final February 10, 2017 Prepared for Monterey Regional Water Pollution Control Agency 5 Harris Court, Building D Monterey, CA 93940 K/J Project No. 1668019*00 Table of Contents List of Tables ................................................................................................................................ iii List of Figures............................................................................................................................... iii List of Appendices ........................................................................................................................ iv List of Acronyms ........................................................................................................................... iv Section 1: Introduction and SWRP Objectives .............................................. 6 1.1 Plan Development .................................................................................. 6 1.1 SWRP Plan Objectives........................................................................... 8 1.1.1 GMC IRWM Plan Objectives ..................................................... 11 1.1.1.1 Basin Plan Goals Relevant to Storm Water ............ 11 1.1.2 Greater Salinas Area SWRP Objectives ................................... 11 1.1.2.1 Water Quality Objective .......................................... 12 1.1.2.2 Water Supply Objective .........................................
    [Show full text]
  • Monterey County
    Steelhead/rainbow trout resources of Monterey County Salinas River The Salinas River consists of more than 75 stream miles and drains a watershed of about 4,780 square miles. The river flows northwest from headwaters on the north side of Garcia Mountain to its mouth near the town of Marina. A stone and concrete dam is located about 8.5 miles downstream from the Salinas Dam. It is approximately 14 feet high and is considered a total passage barrier (Hill pers. comm.). The dam forming Santa Margarita Lake is located at stream mile 154 and was constructed in 1941. The Salinas Dam is operated under an agreement requiring that a “live stream” be maintained in the Salinas River from the dam continuously to the confluence of the Salinas and Nacimiento rivers. When a “live stream” cannot be maintained, operators are to release the amount of the reservoir inflow. At times, there is insufficient inflow to ensure a “live stream” to the Nacimiento River (Biskner and Gallagher 1995). In addition, two of the three largest tributaries of the Salinas River have large water storage projects. Releases are made from both the San Antonio and Nacimiento reservoirs that contribute to flows in the Salinas River. Operations are described in an appendix to a 2001 EIR: “ During periods when…natural flow in the Salinas River reaches the north end of the valley, releases are cut back to minimum levels to maximize storage. Minimum releases of 25 cfs are required by agreement with CDFG and flows generally range from 25-25[sic] cfs during the minimum release phase of operations.
    [Show full text]
  • Application to Appropriate Water in Division of Water Rights California") P.O
    TYPE OR PRINT IN BLACK INK California Environmental Protection Agency (For instructions, see booklet: "How to File an State Water Resources Control Board Application to Appropriate Water in Division of Water Rights California") P.O. Box 2000, Sacramento, CA 95812-2000 Tel: (916) 341-5300 Fax: (916) 341-5400 APPLICATION NO www. waterboards. ca.gov/waterrights APPLICATION TO APPROPRIATE WATER 1. APPLICANT/AGENT APPLICANT ASSIGNED AGENT (if any) Name Shandon-San Juan Water District Michael Preszler Mailing Address P.O. Box 150 169 Parkshore Drive, Suite 110 City, State & Zip Shandon, CA 93461 Folsom, CA 95630 Telephone (805) 451-0841 (916) 542-7895 Fax E-mail [email protected] [email protected] 2. OWNERSHIP INFORMATION (Please check type of ownership.) Sole Owner _ Limited Liability Company (LLC) _General Partnership* „ Limited Partnership* Business Trust _ Husband/Wife Co-Ownership _ Corporation Joint Venture x Other California Water District *Please identify the names, addresses and phone numbers of all partners. 3. PROJECT DESCRIPTION (Provide a detailed description of your project, including, but not limited to, type of construction activity, area to be graded or excavated, and how the water will be used.) Add additional pages if needed and check box below and label as an attachment. This project is being undertaken by the Shandon-San Juan Water District. The purpose of the project is to augment groundwater supplies in the Paso Robles Area Subbasin (the "Subbasin") by transporting unappropriated water in Lake Nacimiento through the existing Nacimiento Water Project Pipeline (the "Pipeline") to the Subbasin. Water would be delivered to the Subbasin by direct recharge in groundwater recharge facilities that will be constructed, owned and operated by Applicant.
    [Show full text]
  • 20020906 Water Issues
    The Californian September 6, 2002 Section: Local Page: 3C Water Issues Divide Residents of Two Counties POLLY KENNEDY SPECIAL TO THE CALIFORNIAN There's a storm brewing in South Monterey County, but this one doesn't contain any water. Actually, a great part of it is about a lack of water. I have learned a couple of valuable lessons over the past decade: don't believe everything you hear, and there are always two sides to every story. These lessons were certainly proven true after a week-long vacation to Oak Shores at Lake Nacimiento with a family from Pacific Grove, which has become somewhat of a summer tradition. We paid for this home probably seven months ago, and it was at the end of July when, much to our chagrin, we heard (they in P.G. and we in King City) that the lake was dried up. I can tell you first-hand this rumor is false. The lake, according to a year-round resident Leslie of Oak Shores, hasn't been dry since the drought of 1990. She told us rumors have been escalating for years, because the lake is - and always has been - an agricultural reservoir and water is let out. The residents of Monterey County, she said, will vote on this issue in November. The lake is filled by rainwater only, and Monterey County uses the water to help keep the saltwater from intruding into the Salinas Valley. Adding to the problem is the lack of rain this past year. A year ago, 16 inches of the precious stuff was measured at Lake Nacimiento.
    [Show full text]
  • Forever Green Water Conservation Patch
    California is in the middle of a very serious drought and it is up to us, as stewards of our land, to make every effort to conserve water and help educate others to do the same! This patch program has been designed to educate the participants about water conservation, exploring your water footprint, how water is treated, water runoff, and to save money reducing unnecessary water usage. You will explore and investigate your local water district through printed materials and links found within this patch program. Learn how to test your local water source and compare results. Visit locally suggested water sources, water bodies, creeks, and beaches to gain a better understanding of your watershed. With guided instructions you’ll learn how to reach out to communities and help spread the word about water conservation. By reducing wasteful water practices you’ll save money on your water bill. Within this patch program, you’ll learn which county has a water rebate program for customers being proactive about water conservation. 1. Get to know your H2O! 1. Discover: Investigate your local water district online & through printed materials [Attachment A] • Santa Cruz Municipal Utilities Office (SCMU) o Santa Cruz County Water District Home Page o Santa Cruz County Water District Map • San Benito County Water District o San Benito County Water District Home Page o San Benito County Water District Map • Monterey Peninsula Water Management District o Monterey County Water Home Page o Monterey County Water District Map • San Luis Obispo County Water Resources o San Luis Obispo County Water Home Page o San Luis Obispo County Water District Map • Santa Barbara Public Works o Santa Barbara County Water District Home Page o Santa Barbara County Water District Map • Ventura Water o Ventura County Water District Home Page o Ventura County Water District Map 2.
    [Show full text]
  • May 2018 NEWSLETTER
    May 2018 NEWSLETTER NRWMAC’S PETITIONS of these uses as carrying any more or any less The Monterey County Water Resources weight than any other use. Yet it is now, and Agency (MCWRA) is releasing water from Lake always has been, the recreational component Nacimiento at an unprecedented rate. To that sufers due to MCWRA’s mismanagement. understand just how much water is being sent Although NRWMAC has been fghting to down the river, follow this link to the stream maintain the lake level at g48 feet above mean gauge monitor maintained by the United sea level (MSL), MCWRA is determined to States Geological Survey (USGS) at the base of lower it to g30 feet MSL, at which level lake the dam at Lake Nacimiento Reservoir: activity is adversely impacted. As a The full USGS website link - consequence, NRWMAC has retained a water https://waterdata.usgs.gov/ca/nwis/uv/t rights attorney to ejamine any and all legal site_no=11149400&PARAmeter_cd=00065,00 options to pursue against MCWRA, including 060 an immediate cessation of the massive and ( Alternate: https://tinyurl.com/yanggojj ) unreasonable water releases. NRWMAC is setting up a GoFundMe page to help fnance The data presented on the USGS website is attorney fees and will shortly announce when generally more reliable than that which and how donations can be made. MCWRA publishes on their website: http://www.co.monterey.ca.us/home/showdo RANGERS AND THE LAKE cumenttid=22189 With the water levels dropping it is more important than ever to bring Park Rangers back On April 26, 2018, NRWMAC served MCWRA to the lake in numbers sufficient to maintain with a petition, signed by 6,000 plus citiiens, center-line buoys and mark shallow water demanding the release be curtailed.
    [Show full text]
  • San Antonio and Nacimiento Rivers Watershed Management Plan
    San Antonio and Nacimiento Rivers Watershed Management Plan October 2008 Prepared by the Nacitone Watersheds Steering Committee and Central Coast Salmon Enhancement, Inc. Prepared for the Monterey County Water Resources Agency and the State Water Resources Control Board Funding for this project has been provided in full or in part through an agreement with the State Water Resources Control Board. The contents of this document do not necessarily reflect the views and policies of the State Water Resources Control Board, nor does mention of trade names or commercial products constitute endorsement or recommendations for use. (This page intentionally left blank) 2 Acknowledgements Facilitation of the Nacitone Watersheds Planning Process was managed by Traci Roberts of the Monterey County Farm Bureau. Stephnie Wald of Central Coast Salmon Enhancement prepared the watershed management plan with grateful assistance of Nicole Smith, Elise Torres, and Sarah Paddack. The preparation of the management plan was guided by Steering Committee Co-chairs Duane Wolgomott and Phil Humphrey. Ken Ekelund of the Monterey County Water Resources Agency managed the SWRCB grant that funded the Nacitone Watersheds Management Plan. Each member of the Steering Committee also contributed valuable information and assistance and is acknowledged below. Ann Beckett, Lockwood resident Marilyn Breland, Heritage Ranch resident Bill Capps, Nacimiento Regional Water Management Advisory Committee Terry Chavis, Heritage Ranch resident Ken Ekelund, Program Manager, Monterey County
    [Show full text]
  • Interlake Tunnel and Spillway Modification Projects
    Interlake Tunnel and Spillway Modification Projects April 16,2015 Pre‐proposal Meeting 1 Agenda • Welcome / Introductions • Pre‐proposal meeting instructions • Project Information – Tunnel Project Introduction – Spillway Modification Introduction – Reservoir simulation modeling results – Project schedule – Capital cost budget 2 Agenda (cont.) • RFP Requirements • Selection Criteria • Sample Contract Agreement – Compensation and payments • RFP 10531 Preliminary Engineering Scope of Work • RFP 10532 Environmental Compliance Scope of Work • Exhibit B –Technical References • Questions and Answers 3 Introductions Project Owner Program Management EPC Consultants, Inc Conceptual Engineering 4 PROJECT BACKGROUND, DESCRIPTION AND FUNCTION 5 Bob Antle • Project champion • Representing agriculture in Salinas Valley • Desired tunnel to be built: As fast As cheap As soon as possible • Sought alternative means to conventional public project process. Project team is honoring Bob’s legacy. 6 Existing Surface Water Supply for Salinas Valley properties 2 reservoirs, Salinas River, and Salinas River Diversion Facility Description Average SRDF Annual Amounts Salinas (AFY) San Antonio River Average annual 200,000 controlled release from reservoirs Nacimiento (baseline) Less ‐40,000 Evapotranspiration & Conveyance losses SRDF deliveries ‐6,000 Ground water 154,000 recharge Provides flood control, minimum flows, and conservation releases 7 Tunnel has 37 year history from 1978 8 1991 Analysis 9 1991 tunnel studies 10 Reservoirs Features San Antonio Max Capacity
    [Show full text]
  • Salinas River Corridor Trail Master Plan
    Salinas River Trail Northern San Luis Obispo County Salinas River Corridor Anza Trail Conceptual Master Plan - February 2014 Prepared by: In association with: Prepared for: Table of Contents 1. Introduction and Summary 3. Design Standards and Guidelines 1.1 Master Plan Purpose ....................................1-1 3.1 Design Guidelines and Regulations ..........3-1 1.2 Salinas River Trail Background....................1-3 3.2 Transportation Facilities vs Recreational 1.3 Vision, Goals and Objectives .......................1-3 Trails .................................................................3-1 1.4 Public Input ...................................................1-8 3.2.1 Transportation Facilities .................................3-1 1.4.1 Public Workshop #1 .........................................1-8 3.2.2 Recreational Trails and Paths ........................3-3 1.4.2 Public Workshop #2 .........................................1-8 3.2.3 Facility Type Selection .....................................3-3 1.4.3 Public Workshop #3 .........................................1-8 3.3 Federal Standards and Guidelines ............3-3 1.4.4 Public Review Document ..............................1-8 3.3.1 American Association of State Highway and 1.4.5 Stakeholder Interviews ...................................1-8 Transportation Ocials (AASHTO) .............3-3 1.4.6 Online Survey .....................................................1-9 3.3.2 Architectural and Transportation Barrier Com- pliance Board (Access Board) .......................3-5
    [Show full text]
  • Nacimiento Water Project Watershed Sanitary Survey Five Year Update ‐ 2015
    Nacimiento Water Project – San Luis Obispo County Watershed Sanitary Survey Update 2015 Nacimiento Water Project Watershed Sanitary Survey Five Year Update ‐ 2015 Prepared By: San Luis Obispo County Department of Public Works Utilities Department Water Quality Laboratory Nacimiento Water Project – San Luis Obispo County Watershed Sanitary Survey Update 2015 Contents WATERSHED SANITARY SURVEY CHECKLIST ............................................................................... i ABBREVIATIONS ......................................................................................................................... ii 1 SUMMARY of INITIAL WATERSHED SANITARY SURVEY .................................................... 1 1.1 Recommendations from Initial Watershed Sanitary Survey ..................................... 2 1.2 Status of Recommendations ..................................................................................... 0 2 WATERSHED and WATER SUPPLY DELIVERY ..................................................................... 1 2.1 Reservoir Description ................................................................................................ 1 2.2 Watershed Security ................................................................................................... 1 2.3 Project Facilities ........................................................................................................ 2 2.4 Water Delivery Entitlement ...................................................................................... 5 2.5 Inspection
    [Show full text]
  • January 2020 NEWSLETTER NRWMAC VS MONTEREY COUNTY Habitat
    Current Lake Level – 762 ft ( 60% ) Current Daily Release – 60 cfs January 2020 NEWSLETTER NRWMAC VS MONTEREY COUNTY habitat. However, NRWMAC's 6500 constituents also have rights to the use of this water, and for It has been one year since the Nacimiento over 25 years NRWMAC has fought, and Regional Water Management Advisory continues to fight, to ensure that these rights Committee ("NRWMAC") filed its lawsuit against are recognized and honored.2 the County of Monterey, and other agencies in that county, each of which has some In the current litigation, NRWMAC has been responsibility for managing Lake Nacimiento. Or 1 involved in a lengthy and continuing negotiation rather, mismanaging it. The lawsuit alleges that process with Monterey County over what the the various agencies named as defendants (for lake level should be. (To allow for settlement the sake of brevity, all are referred to herein as discussions to proceed while keeping litigation "Monterey County") have, among other things, costs to a minimum, the parties agreed to stay failed their obligations to operate the lake in the court action.) Although the specific details of such manner as to provide sufficient water the talks are shielded by a confidentiality levels for recreation. When the level becomes agreement, in general terms they concern the too low, docks and launch ramps become level at which the lake should be maintained unusable and navigational hazards emerge from from April through Labor Day each year. under water. This happens entirely too often in NRWMAC asserts that the water in the lake the peak summer months, causing harm, must be maintained during these months at 750 financial and otherwise, to the community of feet above mean sea level (msl), with residents, businesses and lake enthusiasts who adjustments made for drought years.
    [Show full text]
  • By William E. Templin and Randall C. Schluter Sacramento, California 1990
    A WATER-RESOURCES DATA-NETWORK EVALUATION FOR MONTEREY COUNTY, CALIFORNIA, PHASE 3: NORTHERN SALINAS RIVER DRAINAGE BASIN By William E. Templin and Randall C. Schluter U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 89-4123 Prepared in cooperation with the MONTEREY COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT CM iH I CO O o Sacramento, California 1990 DEPARTMENT OF THE INTERIOR MANUEL LUJAN, JR., Secretary U.S. GEOLOGICAL SURVEY Dallas L. Peck, Director For additional information write to: Copies of this report may be purchased from: District Chief U.S. Geological Survey U.S. Geological Survey Books and Open-File Reports Section Federal Building, Room W-2234 Box 25425 2800 Cottage Way Building 810, Federal Center Sacramento, CA 95825 Denver, CO 80225 CONTENTS Page Abstract .................................................................. 1 Introduction .............................................................. 2 Purpose, scope, and objectives ....................................... 2 Approach ............................................................. 6 Location of study area ............................................... 6 Limitations .......................................................... 7 Acknowledgments ...................................................... 7 Well-numbering system ................................................ 8 Climate ................................................................... 9 Land use .................................................................. 10 Water use ................................................................
    [Show full text]