1. Introduction 5. Next Steps 1.1 Report Background 5.1 Timetable for Delivery 1.2 The Prince’s Regeneration Trust 1.3 Project Background Appendices 1.4 Planning Context Appendix A: Masterplanning Workshop Agenda 1.5 Masterplanning Process Principles Appendix B: Second Stakeholder Session Attendee List 1.6 Masterplanning Process Structure Appendix C: Scoping Day Outputs
2. Scoping Day, 11 December 2014 2.1 Scoping Day
3. Masterplanning Workshop, 11-12 February 2015 3.1 Stakeholder Session 3.2 Design Session 3.3 Public Meeting
4. Brymbo Heritage Area Masterplan: Considerations and Proposals 4.1 Movement and Transportation 4.2 A New ‘Heart’ for Brymbo 4.3 The Wider Site 4.4 Phasing & Vision 4.5 Accommodation Schedule 4.6 Community Feedback Page 2 Executive Summary
This report summarises the results of collaborative day masterplanning workshop which took place on planning events run by The Prince’s Regeneration 11-12 February 2015. Trust (PRT) on behalf of Brymbo Heritage Group (BHG), to determine a route forward for the During the first day of the masterplanning workshop a regeneration of the Brymbo Heritage Area near large number of community and local level Wrexham, North Wales and develop an outline spatial stakeholders worked in groups to consider five key masterplan for the site. themes: • Traffic and transport BHG’s vision is to turn the Heritage Area, which • Housing and community facilities / village centre consists of an ancient fossilised forest, partial remains • Heritage / visitor / education site of the eighteenth century Brymbo Ironworks and • Spatial requirements adjacent areas of brownfield land, into a vibrant, • Phasing / delivery / site ownership issues. heritage-led mixed use visitor destination and community/enterprise hub. The Heritage Area is part Groups were encouraged to express their ideas and of a wider Brymbo Steelworks site, currently owned by proposals through drawings, diagrams and Brymbo Development Ltd (BDL), who have their own photographs, to help explain and visualise the masterplan for the area. emerging masterplan.
The first collaborative planning event was held in These thoughts were then taken to the second day by December 2014, and involved a wide range of a design team, consisting of representatives from PRT, community, local authority-level, and national 5th Studio Architects, and WSP, who worked alongside stakeholders. It included a review of BHG’s vision and representatives from BHG and BDL to integrate and a SWOT analysis of the site. develop the ideas generated by stakeholders and produce an outline masterplan. The results of this exercise were then taken to a two-
Page 3 The proposals were split into two distinct phases: furnace. The vision also proposes changes to some elements of the BDL masterplan, including a hotel / • Phase 1 would see a temporary structure placed YHA located in front of the amphitheater (fronting over the fossil forest to secure the site against onto Heritage Way), to provide guest weather damage, and allow for geological accommodation and a source of revenue income for archaeological activities to be undertaken. BHG, and shops with flats above on the opposite side of Heritage Way, to respond to BDL’s The Machine Shop would be restored to create a requirement for residential use on the site. Two welcome / entry point for the site, a gift shop, café, major public spaces are also proposed – one in front heritage interpretation area, rentable commercial of the machine room, creating an entrance to the space, and a craft / heritage skills training area, to BHG site, and a smaller square within it. contribute to revenue generation for BHG. A proposed perimeter fence was discussed, to allow While the design team was working on producing the BHG to retain control of the site. The other buildings outline masterplan, members of BHG, along with Laura on the Ironworks site would be allocated to Norris from PRT, discussed next steps for the project meanwhile uses, and a lift has been considered to and produced a timeline for the implementation of the run up the charging wall, allowing for greater visitor masterplan. access. The results of the design session and the proposed • Phase 2 would see the creation of a visitor centre next steps were presented at a public meeting at the for the fossil forest, and a high-level walkway end of the masterplanning workshop. created through the excavated fossilised trees. The remainder of the Ironworks site would be Since the February workshop, plans for the site have developed, with a range of uses being considered been discussed and built upon by BHG. The results of for the foundry buildings. Garden terraces are these discussions have been collated into a separate proposed for the higher parts of the site above the document, “Brymbo’s Heritage Renaissance: Preparing blast furnace and charging wall, with the creation of for Phase 1”. an amphitheater on the terraces to the right of the
Page 4 1. Introduction
Page 5 1.1 Report Background
In the Spring of 2014, BHG applied for mentoring support through the BRICK (Building Resources, In collaboration with BHG, PRT developed and Investment and Community Knowledge) programme facilitated a series of collaborative planning events run by PRT. The group requested assistance related to aimed at developing an outline masterplan for the their efforts to restore the Brymbo Heritage Area into Brymbo Heritage Area. a vibrant, heritage-led, mixed use visitor destination and community/enterprise hub. A Scoping Day was held on 11 December 2014, and was led by Biljana Savic, BRICK Programme Director, BRICK is a training and mentoring programme funded and Edward Holland, Senior Projects Advisor, both by the Heritage Lottery Fund (HLF) and a number of from PRT. Culture and regeneration consultant Lia corporate sponsors. The key aim of BRICK is to build Ghilardi provided pro bono advice during the day. the capacity of community groups with heritage-led regeneration projects, to assist them in securing A further two day Masterplanning Workshop was then funding from private sources and successfully held on 11 and 12 February 2015, with the PRT team delivering their projects. consisting of Biljana Savic, Laura Norris, Deputy Operations Director, and Alex Hatt, Assistant Projects BHG’s application for BRICK mentoring support was Adviser. The design team also included Oliver Smith approved in September 2014. The assistance focused and Kieran Perkins from 5th Studio Architects on three key areas: (providing pro bono design assistance) and Andrew • advising on an appropriate legal structure for BHG Cameron from WSP, who acted as transport • advising on potential sources of funding consultant. • assisting with putting together a masterplan for the site and identifying a way forward for BHG to This report begins by introducing the project, PRT and achieve their project vision. BHG, as well as the local planning context. It then gives an overview of the collaborative planning events and the resulting outline masterplan, including recommendations for its delivery. Page 6 1.2 The Prince’s Regeneration Trust
PRT was founded by HRH The Prince of Wales in 1996. It has dual charitable objects, covering heritage and regeneration – it works to ensure that important buildings at risk of demolition or decay are preserved, regenerated and re-used, for the benefit of the communities they are located in. PRT works in areas of economic and social deprivation in which its impact can be more greatly felt.
PRT delivers its diverse project work in three ways: 1. Supporting community groups to undertake heritage-led regeneration projects by advising and guiding them through the project development and delivery phases 2. Working with developers, local authorities, government bodies and other organisations to provide expert advice and undertake work on a consultancy basis 3. Acting as a principal by acquiring historic buildings and delivering regeneration projects itself.
In addition PRT shares the learning gained on over 90 projects through its education programme BRICK, publications, networking events and digital media.
Page 7 1.3 Project Background
A vision for Brymbo’s built and natural heritage was first put together in 2005. In 2012, that vision was the subject of a detailed feasibility study, which considered the scope for the area to become a vibrant, heritage- led, mixed use destination. The results of the study were received favorably by BHG. Along with emergency stabilisation work and a programme of community engagement, the progressing of a masterplan was one of the report’s key recommendations.
The Brymbo Heritage Area contains: • Fossilised forest, trapped between two coal seams, c. 280-320 million years old, 5% of which taken out, most remaining in situ • Brymbo Ironworks (1790s–1890s), incl blast furnace, foundry, casting house, pattern shop and charging wall • Blast Colliery (1840s–1890s), incl winding house, lamp room, railyard, retaining wall and pit head • Brymbo Steelworks (1920s–1960s), incl winch room and slope, rail workings, coke chute, machine shop • Open space, incl area within Ironworks ‘courtyard’, ecology area by Blast Colliery, Wonderbank spoil heap and ‘Valley Slopes’ facing Lodge.
Page 8 The Heritage Area accounts for a little over a fifth of the land area that was once occupied by Brymbo Steelworks. The Steelworks closed in 1990, and were largely demolished during the decade that followed. By 2004 only the buildings that are still in existence today remained, whilst the rest of the site was heavily reworked and reclaimed to produce a two tier plateau ready for regeneration by its land owner, BDL.
By 2006, plans for 600 houses at the southern end of the Steelworks site had been agreed, with most completed before the financial crash of 2008/9. BDL is now progressing with plans for more homes extending northwards, as well as a new primary school, supermarket, retirement community, health centre and other employment uses. These plans are at a masterplanning stage, with only a few full permissions in place.
The Brymbo Heritage Area, which is located at the northwestern edge of the Steelworks site, has always been seen as a key component of the wider masterplan, having the potential to attract higher value businesses and housing, and provide a stimulus for investment in high quality public realm and facilities.
Page 9 There has been a strong community will to see the site brought back into use ever since the Steelworks closed. Initially the focus was on the provision of replacement jobs. With the changing global economy trends and declining investment in manufacturing, the employment expectations related to the Heritage Area changed too – proposals for the site are now expected to include a small number of quality jobs serving a mix of (non- manufacturing) uses on and around the Heritage Area.
Wrexham County Borough Council (WCBC) has supported the notion of the Heritage Area regeneration over many years, incorporating it as a significant element in its tourism and regeneration strategies. The Council has provided practical support to help BHG develop and test its vision, and guidance on the interim preservation of the heritage assets on the site, as well as used its planning authority powers to secure a capital levy to provide match funding for Phase 1.
The Heritage Area is still in the ownership of BDL. Heads of Terms are being developed to agree the conditions under which the ownership of the area will pass to BHG, a principle condition being the securing of capital funding to achieve the aims of Phase 1 described later in this report.
Page 10 1.4 Planning Context
The Brymbo Heritage Area forms part of a wider site already subject to a masterplan produced by the landowner, BDL, in 1994. Pertinent points relating to the BHG masterplan are: • Development of the BDL masterplan has begun from the southern end housing development (marked in blue on the plan to the right). • The proposed primary school site (marked in purple) was positioned in the centre of the masterplan, as it was assumed that primary schools in both Brymbo village (to the north of the masterplan site) and Tanyfron (to the south), would close. However, Wrexham Council is now planning to keep Tanyfron Primary open, allowing for the potential of the new school site to be moved closer to Brymbo, where the demand would be greater. • The proposed retail development (to the north of the school site on the masterplan) has been stalled by the current economic climate; however, the catchment area does not have a large supermarket, and the new housing to the south of the masterplan site will only increase demand. • The BDL Masterplan shows a residential block fronting the BHG site; this proposal was subsequently abandoned, but BDL are keen to see an equivalent amount of residential use within their plans. Page 11 The proposed masterplan for the Brymbo Heritage The draft LDP outlines twelve suggested objectives Area must also be viewed within the context of WCBC that will direct the vision for the area; these are shown planning policy. WCBC is in the process of preparing a overleaf. The proposals recommended by this Local Development Plan1 (LDP) to replace the current masterplan must be subsequently considered in adopted Unitary Development Plan (UDP). The UDP relation to the published vision of the LDP upon its identified the BDL regeneration initiative as one of the adoption in March 2018. priorities under the plan, and it is assumed that this will be taken forward into the LDP. The LDP will be a long-term land use and development strategy focused on achieving sustainable development, and will: • guide development for housing, employment, retail and other uses • set out policies that will be used to decide planning applications and • safeguard areas of land requiring protection or enhancement.
Page 12 vision, objectives and strategic growth & spatial options