Contracted Capacity Register 2017-08 Northern Powergrid Contracted Capacity Register - August 2017 Region Grid Supply Point Supply Point Primary Status Fuel Type Installed Capacity (kVA) Export Capacity (kVA) Northeast Blyth 132kV Linton Denwick Accepted Mini CHP (<1MW) 189 189 Northeast Blyth 132kV Linton Denwick Connected Photovoltaic 485 485 Northeast Blyth 132kV Linton Linton 66/20kV Accepted Onshore Wind 189 189 Northeast Blyth 132kV Linton Linton 66/20kV Connected Photovoltaic 69 69 Northeast Blyth 132kV Linton Linton 66/20kV Connected Onshore Wind 69 68 Northeast Blyth 132kV Linton Lynemouth Connected Onshore Wind 2,420 2,420 Northeast Blyth 132kV Linton Middlemoor Windfarm Connected Onshore Wind 57,000 57,000 Northeast Blyth 132kV Linton Wandylaw Windfarm Connected Onshore Wind 21,580 21,580 Northeast Blyth 132kV Linton Warkworth Connected Photovoltaic 84 84 Northeast Blyth 132kV Linton Widdrington Church Wind Farm Connected Onshore Wind 8,632 8,632 Northeast Blyth 132kV Linton Widdrington Steads Wind Farm Connected Onshore Wind 19,474 19,474 Northeast Blyth 132kV Lynemouth Power Lynemouth Power Direct Accepted Biomass & Energy Crops (not CHP) 21,053 21,053 Northeast Blyth 132kV Lynemouth Power Lynemouth Power Direct Connected Biomass & Energy Crops (not CHP) 420,000 400,000 Northeast Blyth 132kV Lynemouth Windfarm Lynemouth Windfarm Direct Connected Onshore Wind 31,500 31,500 Northeast Blyth 66kV Blyth 66kV Ashington Accepted Photovoltaic 4,211 4,211 Northeast Blyth 66kV Blyth 66kV Ashington Connected Photovoltaic 132 132 Northeast Blyth 66kV Blyth 66kV Ashington Connected Onshore Wind 3,410 3,410 Northeast Blyth 66kV Blyth 66kV Ashington Connected Landfill gas, sewage gas, biogas (not CHP) 1,379 1,000 Northeast Blyth 66kV Blyth 66kV Benton Square Connected Photovoltaic 189 189 Northeast Blyth 66kV Blyth 66kV Blyth Offshore Windfarm Connected Offshore Wind 105,053 105,053 Northeast Blyth 66kV Blyth 66kV Cramlington Biomass Generation Accepted Medium CHP (>=5MW, <50MW) 31,579 31,579 Northeast Blyth 66kV Blyth 66kV Fawdon T1 Connected Photovoltaic 16 16 Northeast Blyth 66kV Blyth 66kV Fawdon T1 Connected Landfill gas, sewage gas, biogas (not CHP) 2,316 2,200 Northeast Blyth 66kV Blyth 66kV Maddison Street Connected Photovoltaic 32 32 Northeast Blyth 66kV Blyth 66kV Maddison Street Connected Offshore Wind 4,000 16 Northeast Blyth 66kV Blyth 66kV Maddison Street Connected Other Generation 4,000 4,000 Northeast Blyth 66kV Blyth 66kV Morpeth Connected Photovoltaic 65 65 Northeast Blyth 66kV Blyth 66kV Morpeth Connected Onshore Wind 15,789 15,150 Northeast Blyth 66kV Blyth 66kV Morpeth Connected Unknown 16 16 Northeast Blyth 66kV Blyth 66kV Reservoir Connected Photovoltaic 45 45 Northeast Blyth 66kV Blyth 66kV Reservoir Connected Onshore Wind 275 275 Northeast Blyth 66kV Blyth 66kV Seaton Burn T1 Connected Photovoltaic 16 16 Northeast Blyth 66kV Blyth 66kV Seghill Connected Photovoltaic 84 84 Northeast Blyth 66kV Blyth 66kV Seghill Connected Landfill gas, sewage gas, biogas (not CHP) 4,150 4,000 Northeast Blyth 66kV Blyth 66kV West Hartford Connected Photovoltaic 16 16 Northeast Blyth 66kV Blyth 66kV West Hartford Connected Onshore Wind 4,200 4,000 Northeast Fourstones 20kV Fourstones 20kV Fourstones 20kV Direct Connected Photovoltaic 50 100 Northeast Fourstones 20kV Fourstones 20kV Fourstones 20kV Direct Connected Onshore Wind 36,000 36,000 Northeast Fourstones 20kV Fourstones 20kV Fourstones 20kV Direct Connected Unknown 16 16 Northeast Fourstones 20kV Fourstones 33kV Ray Fell Windfarm Connected Onshore Wind 54,000 53,000 Northeast Hartmoor Hartmoor Amberton Road Connected Onshore Wind 526 526 Northeast Hartmoor Hartmoor Amberton Road Connected Other Generation 2,105 2,000 Northeast Hartmoor Hartmoor Brenda Trading Connected Mini CHP (<1MW) 526 526 Northeast Hartmoor Hartmoor Brenda Trading Connected Photovoltaic 8 8 Northeast Hartmoor Hartmoor Brenda Trading Connected Onshore Wind 16 16 Northeast Hartmoor Hartmoor Hartmoor 66/20kV Accepted Onshore Wind 526 526 Northeast Hartmoor Hartmoor Hartmoor 66/20kV Connected Photovoltaic 558 558 Region Grid Supply Point Supply Point Primary Status Fuel Type Installed Capacity (kVA) Export Capacity (kVA) Northeast Hartmoor Hartmoor Hartmoor 66/20kV Connected Onshore Wind 8,250 7,750 Northeast Hartmoor Hartmoor Peterlee West Connected Mini CHP (<1MW) 365 365 Northeast Hartmoor Hartmoor Peterlee West Connected Photovoltaic 319 319 Northeast Hartmoor Hartmoor Peterlee West Connected Onshore Wind 14,526 14,461 Northeast Hartmoor Hartmoor Worset Lane Generation Accepted Other Generation 52,520 52,520 Northeast Hartmoor Hartmoor Wynyard Accepted Mini CHP (<1MW) 284 284 Northeast Hartmoor Hartmoor Wynyard Connected Onshore Wind 27,789 28,470 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Hawthorn Pit Connected Photovoltaic 66 66 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Hawthorn Pit Connected Onshore Wind 14,826 14,766 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Houghton Connected Photovoltaic 408 3,000 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Houghton Connected Landfill gas, sewage gas, biogas (not CHP) 2,000 2,000 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Houghton Connected Small CHP (>=1MW, <5MW) 2,100 2,100 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Peterlee Industrial Connected Photovoltaic 5,263 5,236 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Stoney Cut Accepted Photovoltaic 379 168 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Stoney Cut Connected Photovoltaic 111 111 Northeast Hawthorn Pit Grid Hawthorn Pit Grid Stoney Cut Connected Onshore Wind 8,784 8,784 Northeast Knaresborough Harrogate 132/11kV Harrogate 132/11kV Direct Accepted Photovoltaic 895 895 Northeast Knaresborough Harrogate 132/11kV Harrogate 132/11kV Direct Connected Photovoltaic 147 147 Northeast Knaresborough Harrogate 132/11kV Harrogate 132/11kV Direct Connected Onshore Wind 66 66 Northeast Knaresborough Harrogate 132/33kV Knabs Ridge Connected Onshore Wind 16,000 16,900 Northeast Knaresborough Harrogate 132/33kV Starbeck Connected Photovoltaic 526 500 Northeast Knaresborough Harrogate 132/33kV Starbeck Connected Onshore Wind 49 49 Northeast Knaresborough Harrogate 132/33kV Starbeck Connected Unknown 1,516 437 Northeast Knaresborough Husthwaite Husthwaite 33/11kV Connected Photovoltaic 4,357 4,357 Northeast Knaresborough Husthwaite Husthwaite 33/11kV Connected Onshore Wind 216 216 Northeast Knaresborough Husthwaite Husthwaite 33/11kV Connected Landfill gas, sewage gas, biogas (not CHP) 7,905 7,905 Northeast Knaresborough Husthwaite Sessay Bridge Connected Photovoltaic 3,750 3,750 Northeast Knaresborough Husthwaite Sessay Bridge Connected Biomass & Energy Crops (not CHP) 500 500 Northeast Knaresborough Wormald Green 132/11kV Wormald Green 132/11kV Direct Accepted Storage 8,421 8,421 Northeast Knaresborough Wormald Green 132/11kV Wormald Green 132/11kV Direct Connected Photovoltaic 435 435 Northeast Knaresborough Wormald Green 132/11kV Wormald Green 132/11kV Direct Connected Onshore Wind 85 84 Northeast Knaresborough Wormald Green 132/33kV Boroughbridge Connected Photovoltaic 50 50 Northeast Knaresborough Wormald Green 132/33kV Boroughbridge Connected Hydro 105 60 Northeast Knaresborough Wormald Green 132/33kV Coneythorpe Connected Photovoltaic 4,032 4,032 Northeast Knaresborough Wormald Green 132/33kV Coneythorpe Connected Hydro 105 106 Northeast Knaresborough Wormald Green 132/33kV Coneythorpe Connected Waste Incineration (not CHP) 32,737 32,737 Northeast Knaresborough Wormald Green 132/33kV Darley Connected Hydro 13 13 Northeast Knaresborough Wormald Green 132/33kV Ripon Accepted Photovoltaic 5,263 5,263 Northeast Knaresborough Wormald Green 132/33kV Ripon Connected Photovoltaic 471 610 Northeast Knaresborough Wormald Green 132/33kV Ripon Connected Hydro 100 100 Northeast Lackenby Lackenby Bran Sands Connected Landfill gas, sewage gas, biogas (not CHP) 526 300 Northeast Lackenby Lackenby Carlin How T1 T2 Connected Photovoltaic 131 131 Northeast Lackenby Lackenby Carlin How T1 T2 Connected Onshore Wind 1,780 1,780 Northeast Lackenby Lackenby Carlin How T3 T4 Connected Onshore Wind 540 540 Northeast Lackenby Lackenby Cleveland Potash Accepted Storage 6,316 6,316 Northeast Lackenby Lackenby Cleveland Potash Connected Medium CHP (>=5MW, <50MW) 23,158 23,158 Northeast Lackenby Lackenby Grangetown Accepted Landfill gas, sewage gas, biogas (not CHP) 1,155 1,155 Northeast Lackenby Lackenby Grangetown Connected Photovoltaic 13,935 53 Northeast Lackenby Lackenby Guisborough T1 T2 Connected Photovoltaic 4,004 4,004 Northeast Lackenby Lackenby Guisborough T1 T2 Connected Biomass & Energy Crops (not CHP) 410 410 Region Grid Supply Point Supply Point Primary Status Fuel Type Installed Capacity (kVA) Export Capacity (kVA) Northeast Lackenby Lackenby Prissick Connected Photovoltaic 53 70 Northeast Lackenby Lackenby Redcar Connected Onshore Wind 500 500 Northeast Lackenby Lackenby Spencerbeck Accepted Landfill gas, sewage gas, biogas (not CHP) 5,368 5,368 Northeast Lackenby Lackenby Warrenby Generation Connected Offshore Wind 65,263 65,368 Northeast Norton Bowesfield Seamer Wind Farm Connected Onshore Wind 10,800 10,800 Northeast Norton Bowesfield Stokesley Accepted Small CHP (>=1MW, <5MW) 2,105 2,105 Northeast Norton Bowesfield Stokesley Connected Photovoltaic 50 50 Northeast Norton Bowesfield Stokesley Connected Onshore Wind 140 185 Northeast Norton Bowesfield Stokesley Connected Small CHP (>=1MW, <5MW) 4,000 4,000 Northeast Norton Bowesfield Urlay Nook Accepted Photovoltaic 3,895 3,895 Northeast Norton Darlington Central Cowton Connected
Recommended publications
  • Housing Land Supply Position Statement 2020/21 to 2024/25
    www.eastriding.gov.uk www.eastriding.gov.uk ff YouYouTubeTube East Riding Local Plan 2012 - 2029 Housing Land Supply Position Statement For the period 2020/21 to 2024/25 December 2020 Contents 1 Introduction ............................................................................................................ 1 Background ........................................................................................................................ 1 National Policy .................................................................................................................. 1 Performance ...................................................................................................................... 3 Residual housing requirement ......................................................................................... 5 2 Methodology ........................................................................................................... 7 Developing the Methodology ........................................................................................... 7 Covid-19 ............................................................................................................................. 8 Calculating the Potential Capacity of Sites .................................................................... 9 Pre-build lead-in times ................................................................................................... 10 Build rates for large sites ..............................................................................................
    [Show full text]
  • Blue Rebrands
    hub cover issue 6 22/7/08 11:18 Page 1 Two become Check out the very latest industry news at One www.hub-4.com Issue 6 Materials Handling | Recycling | Quarrying Blue rebrands Tel: 0845 230 4460 email: [email protected] www.bluegroup.co.uk 2008 5 T: +44 (0)1283 212121 F: +44 (0)1283 217342 E-mail: [email protected] [email protected] www.extec.eu www.fintec.com hub cover issue 6 22/7/08 11:19 Page 3 17 – 19 September 2008 Atakent Exhibition Centre Almaty Kazakhstan 14th International Exhibition for the Mining and Processing of Metals and Minerals The place to scoop up more opportunities Miss Anna Aleinikova Event Manager ITE Group plc Tel: +44 20 7596 5186 Fax: +44 20 7596 5096 Email: [email protected] Hub-Mag-Issue-6 22/7/08 11:12 Page 1 Safety is THE issue CONTENTS A Bromsgrove company was fined NEWS page 2 £5000 after an employee suffered a COVER STORY page 8 serious injury when a 30 kg lump of RECYCLING page 11 sandstone fell on his head. The Health Recresco solves aluminium problem Recycling plant provides a tailor-made solution and Safety Executive (HSE) prosecuted the for MSK company following the incident in March €1m plant solves sticky problem 2007. The victim had been working overtime at a power Hadley’s raise recycling rates by investing in new plant Waste Industry feels the grab of material handlers operated machine and went to clean it out when the large block Soil and rubble gets a recycling boost of sandstone fell approximately 6 m, striking him on the back of NEW ON SITE page 19 the head.
    [Show full text]
  • Building Offshore Wind in England CORE: Centres for Offshore Renewable Engineering
    Building Offshore Wind in England CORE: Centres for Offshore Renewable Engineering BUSINESS IS 2 Building Offshore Wind in England Ministerial Foreword Offshore wind is a UK success story and the UK is open for business. The UK is the world leader in offshore wind. We have more offshore wind installed than anywhere else in the world. We are an island nation, blessed with strong winds and shallow seas – and this energy resource is on our doorstep. We are determined to move to cleaner electricity generation and offshore wind has an important role to play in our long term plan for a balanced, low carbon energy mix. I want the UK to secure the economic benefits of this new industry. Through our offshore wind industrial strategy, the Government is committed to working in partnership with business to build a competitive, innovative UK supply chain for offshore wind, delivering jobs and economic growth. Building a strong supply chain needs the commitment and expertise of local partners, working alongside central government to support businesses who want to invest here. The Centres for Offshore Renewable Engineering (CORE) partnership offers an integrated and cooperative approach between Government and Local Enterprise Partnerships in England, to provide the best possible support to businesses choosing England as an investment location. The Rt Hon Matthew Hancock MP Minister of State for Business, Enterprise and Energy CORE brings together the relevant expertise from UK Central Government and the six major investment hubs in England to support business growth and showcase opportunities for foreign direct investment (FDI) for the offshore wind sector.
    [Show full text]
  • Contract Leads Powered by EARLY PLANNING Projects in Planning up to Detailed Plans Submitted
    Contract Leads Powered by EARLY PLANNING Projects in planning up to detailed plans submitted. PLANS APPROVED Projects where the detailed plans have been approved but are still at pre-tender stage. TENDERS Projects that are at the tender stage CONTRACTS Approved projects at main contract awarded stage. Agent: Plan My Property, 1 Regent Street, Council of Kings Lynn & West Norfolk Norfolk Job: Detail Plans Granted for 4 Plans Granted for housing Client: Cambridge Ltd Agent: John Thompson & Partners Ltd, 17 Street, Skipton, North Yorkshire, BD23 1JR Tel: Fraisthorpe Wind Farm Limited, Willow Court, Finedon, Wellingborough, Northamptonshire, Developer: Trundley Design Services, Salgate houses Client: Mr. David Master Developer: City Council Agent: Cambridge City Council, - 23 Calton Road, Edinburgh, Lothian, EH8 01756 700364 West Way, Minns Business Park, Oxford, OX2 MIDLANDS/ NN9 5NB Tel: 01933 383604 Barn, Islington Road, Tilney All Saints, King’s Peter Humphrey Associates, 30 Old Market, The Guildhall, Market Square, Cambridge, CB2 8DL Contractor: Keepmoat Homes Ltd, Land Adjacent, Halton Moor Road 0JB Tel: 01865 261300 NOTTINGHAM £4.8M Lynn, Norfolk, PE34 4RY Tel: 01553 617700 Town Centre, Wisbech, Cambridgeshire, PE13 3QJ Contractor: Keepmoat Homes, 950 Regeneration House, Gorsey Lane, Coleshill, Halton £1m DURHAM £0.8M EAST ANGLIA Land South Of, Abbey Lane Aslockton LEICESTER £1.1M 1NB Tel: 01945 466966 Capability Green, Luton, Bedfordshire, LU1 Birmingham, West Midlands, B46 1JU Tel: Planning authority: Leeds Job: Outline Brancepeth
    [Show full text]
  • Archaeology in Northumberland Friends
    100 95 75 Archaeology 25 5 in 0 Northumberland 100 95 75 25 5 0 Volume 20 Contents 100 100 Foreword............................................... 1 95 Breaking News.......................................... 1 95 Archaeology in Northumberland Friends . 2 75 What is a QR code?...................................... 2 75 Twizel Bridge: Flodden 1513.com............................ 3 The RAMP Project: Rock Art goes Mobile . 4 25 Heiferlaw, Alnwick: Zero Station............................. 6 25 Northumberland Coast AONB Lime Kiln Survey. 8 5 Ecology and the Heritage Asset: Bats in the Belfry . 11 5 0 Surveying Steel Rigg.....................................12 0 Marygate, Berwick-upon-Tweed: Kilns, Sewerage and Gardening . 14 Debdon, Rothbury: Cairnfield...............................16 Northumberland’s Drove Roads.............................17 Barmoor Castle .........................................18 Excavations at High Rochester: Bremenium Roman Fort . 20 1 Ford Parish: a New Saxon Cemetery ........................22 Duddo Stones ..........................................24 Flodden 1513: Excavations at Flodden Hill . 26 Berwick-upon-Tweed: New Homes for CAAG . 28 Remapping Hadrian’s Wall ................................29 What is an Ecomuseum?..................................30 Frankham Farm, Newbrough: building survey record . 32 Spittal Point: Berwick-upon-Tweed’s Military and Industrial Past . 34 Portable Antiquities in Northumberland 2010 . 36 Berwick-upon-Tweed: Year 1 Historic Area Improvement Scheme. 38 Dues Hill Farm: flint finds..................................39
    [Show full text]
  • THE CASE AGAINST WINDFARMS Country Guardian Has Been Researching the Impact of Windfarms on the Environment Since Its Formation in 1992
    1 THE CASE AGAINST WINDFARMS Country Guardian has been researching the impact of windfarms on the environment since its formation in 1992. Its research document "The Case Against Windfarms" is detailed and runs to about 20 A4 pages. Most recently updated in May 2000 it is printed below, preceded by a statement of Country Guardian's Policy on Windfarms. You can use the Index on the left to go straight to a specific section, or read it straight through, or download it A. THE CASE FOR WIND "FARMS" EXAMINED B. THE SCALE OF DEVELOPMENT REQUIRED C. THE PROBLEM OF INTERMITTENCY D. LANDSCAPE QUALITY OF WIND "FARM" SITES E. BEAUTIES OR BEASTS? F. WIND TURBINES OFFSHORE? G. THE NOISE FACTOR H. TELEVISION INTERFERENCE I. WIDER ENVIRONMENTAL CONSEQUENCES J. SAFETY K. TOURISM, JOBS, HOUSE PRICES L. THE EFFECT ON BIRDS M. PUBLIC OPINION N. WHY THE NEW PHENOMENON OF WINDFARMS? O. GOVERNMENT POLICY P. EUROPEAN UNION POLICY Q. KYOTO R. WIND 'FARMS' AND THE PLANNING SYSTEM S. THE FUTILITY OF SUPPLY-SIDE SOLUTIONS T. HOW CAN ELECTRICITY NEEDS BE MET? U. THE VALUE OF LANDSCAPE V. CONCLUSION Country Guardian's Policy on Windfarms Country Guardian believes that the development of commercial wind power that has taken place with government support since 1990 is misguided, ineffective and neither environmentally nor socially benign. We accept that wind energy has a role and that the countryside has always changed and will always change but we argue that the environmental and social cost of the development of commercial wind energy is quite out of proportion to any benefit in the form of reduced emissions.
    [Show full text]
  • G59 Generator Protection Settings - Progress on Changes to New Values (Information Received As at End of 2010 - Date of Latest Updates Shown for Each Network.)
    G59 Generator Protection Settings - Progress on Changes to new Values (Information received as at End of 2010 - Date of latest updates shown for each network.) DNO [Western Power Distribution - South West Area] total responses as at 05/01/11 User Data Entry Under Frequency Over Frequency Generator Generator Generator Changes Generator Stage 1 Stage 2 Stage 1 Stage 2 Agreed to capacity capacity capacity changes Site name Genset implemented capacity unable Frequency Frequency Frequency Frequency Comments changes (Y/N) installed agreed to implemented (Y/N) to change (MW) (Hz) (Hz) (Hz) (Hz) (MW) change (MW) (MW) Scottish and Southern Energy, Cantelo Nurseries, Bradon Farm, Isle Abbots, Taunton, Somerset Gas Y Y 9.7 9.7 9.7 0.0 47.00 50.50 Following Settings have been applied: 47.5Hz 20s, 47Hz 0.5s, 52Hz 0.5s Bears Down Wind Farm Ltd, Bears Down Wind Farm, St Mawgan, Newquay, Cornwall Wind_onshore Y N 9.6 9.6 0.0 0.0 47.00 50.50 Contact made. Awaiting info. Generator has agreed to apply the new single stage settings (i.e. 47.5Hz 0.5s and 51.5Hz 0.5s) - British Gas Transco, Severn Road, Avonmouth, Bristol Gas Y Y 5.5 5.5 5.5 0.0 47.00 50.50 complete 23/11/10 Cold Northcott Wind Farm Ltd, Cold Northcott, Launceston, Cornwall Wind_onshore Y Y 6.8 6.8 6.8 0.0 47.00 50.50 Changes completed. Generator has agreed to apply the new single stage settings (i.e. 47.5Hz 0.5s and 51.5Hz Connon Bridge Energy Ltd, Landfill Site, East Taphouse, Liskeard, Cornwall 0.5s).Abdul Sattar confirmed complete by email 19/11/10.
    [Show full text]
  • Lantern Slides Illustrating Zoology, Botany, Geology, Astronomy
    CATALOGUES ISSUED! A—Microscope Slides. B—Microscopes and Accessories. C—Collecting Apparatus D—Models, Specimens and Diagrams— Botanical, Zoological, Geological. E—Lantfrn Slides (Chiefly Natural History). F—Optical Lanterns and Accessories. S—Chemicals, Stains and Reagents. T—Physical and Chemical Apparatus (Id Preparation). U—Photographic Apparatus and Materials. FLATTERS & GARNETT Ltd. 309 OXFORD ROAD - MANCHESTER Fourth Edition November, 1924 This Catalogue cancels all previous issues LANTERN SLIDES illustrating Zoology Birds, Insects and Plants Botany in Nature Geology Plant Associations Astronomy Protective Resemblance Textile Fibres Pond Life and Sea and Shore Life Machinery Prepared by FLATTERS k GARNETT, LTD Telephone : 309 Oxford Road CITY 6533 {opposite the University) Telegrams : ” “ Slides, Manchester MANCHESTER Hours of Business: 9 a.m. to 6 p.m. Saturdays 1 o’clock Other times by appointment CATALOGUE “E” 1924. Cancelling all Previous Issues Note to Fourth Edition. In presenting this New Edition we wish to point out to our clients that our entire collection of Negatives has been re-arranged and we have removed from the Catalogue such slides as appeared to be redundant, and also those for which there is little demand. Several new Sections have been added, and, in many cases, old photographs have been replaced by better ones. STOCK SLIDES. Although we hold large stocks of plain slides it frequently happens during the busy Season that particular slides desired have to be made after receipt of the order. Good notice should, therefore, be given. TONED SLIDES.—Most stock slides may be had toned an artistic shade of brown at an extra cost of 6d.
    [Show full text]
  • Corporate Responsibility Report 2007 Corporate Responsibility Report 2007
    Corporate Responsibility Report 2007 Corporate Responsibility Report 2007 Index Page number Welcome 2 Performance Summary 2007 3 Managing our Responsibilities Our Approach 6 Governance 7 Environment 8 Stakeholder Engagement 11 Scope 12 Benchmarking and Recognition 13 Our 12 Impacts 15 Provision of Energy 16 Health and Safety 25 Customer Experience 35 Climate Change and Emissions to Air 43 Waste and Resource Use 52 Biodiversity 62 Sites, Siting and Infrastructure 70 Employment Experience 75 Customers with Special Circumstances 88 Community 94 Procurement 107 Economic 113 Assurance Statement 116 Page 1 of 118 www.scottishpower.com/CorporateResponsibility.asp Corporate Responsibility Report 2007 Welcome 2007 was a landmark year for our business with the successful integration of ScottishPower and IBERDROLA. The new enlarged IBERDROLA Group ended 2007 as one of the worlds largest electricity companies by market capitalisation. Through the friendly integration, now successfully completed, we have reinforced our shared commitment to Corporate Responsibility. Our reporting year has been aligned to IBERDROLA so going forward we will be working on a calendar year basis. Achieving Scottish Business in the Community Large Company of the Year in 2007 was an important endorsement for ScottishPowers work and to our commitment to environmental and social issues. During 2007, we have announced significant investments in sustainable generation projects and environmental technologies; increased our 2010 target for delivery of wind energy projects in the UK to 1,200 MW and established partnerships that will help secure Scotlands place as the world leader in marine energy. In addition, we announced the UKs largest energy crop project and embarked on a major study into cleaner coal generation.
    [Show full text]
  • Distribution Network Review
    A DISTRIBUTION NETWORK REVIEW ETSU K/EL/00188/REP Contractor P B Power Merz & McLellan Division PREPARED BY R J Fairbairn D Maunder P Kenyon The work described in this report was carried out under contract as part of the New and Renewable Energy Programme, managed by the Energy Technology Support Unit (ETSU) on behalf of the Department of Trade and Industry. The views and judgements expressed in this report are those of the contractor and do not necessarily reflect those of ETSU or the Department of Trade and Industry.__________ First published 1999 © Crown copyright 1999 Page iii 1. EXECUTIVE SUMMARY.........................................................................................................................1.1 2. INTRODUCTION.......................................................................................................................................2.1 3. BACKGROUND.........................................................................................................................................3.1 3.1 Description of the existing electricity supply system in England , Scotland and Wales ...3.1 3.2 Summary of PES Licence conditions relating to the connection of embedded generation 3.5 3.3 Summary of conditions required to be met by an embedded generator .................................3.10 3.4 The effect of the Review of Electricity Trading Arrangements (RETA)..............................3.11 4. THE ABILITY OF THE UK DISTRIBUTION NETWORKS TO ACCEPT EMBEDDED GENERATION...................................................................................................................................................4.1
    [Show full text]
  • 10Th July 2000
    News Release 14 March 2012 Siemens awards multi-million tower contract to South Wales firm Fifteen towers destined for Mynydd y Betws wind farm project as Mabey Bridge is awarded first contract by the UK’s largest provider of wind turbines Siemens, the leading global engineering and technology company, has announced that it has placed an order with South Wales based Mabey Bridge to manufacture towers for 15, 2.3MW turbines bound for the Mynydd y Betws wind farm in Carmarthenshire. Siemens will supply, transport, install and commission the two-section 63-metre- high, 105 tonne towers for local developer, Cambrian Renewable Energy Limited (CREL), owned by the ESB, Ireland’s main electricity utility company. The wind turbines will have a tip height of 110 metres, and an installed capacity of up to 34.5MW. The project will generate electricity to power approximately 18,250 households, equivalent to almost a quarter of Carmarthenshire. More than two million tonnes of carbon dioxide emissions will be saved over the lifetime of the project. The towers will be delivered in summer 2012 and the project is due for completion by February 2013. Originally developed by CREL, a Welsh consortium of Eco2 and local investors, Mynydd y Betws Wind Farm was acquired in June 2010 by ESB. ESB is committed to halving its carbon emissions by 2020 and achieving carbon net-zero emissions Page 1 of 3 by 2035. In addition to Mynydd y Betws, other projects include the Fullabrook Wind Farm in Devon and the West Durham Wind Farm. Commenting on the Mynydd y Betws Wind Farm project a spokesperson from ESB said: "ESB is committed to realising benefits for local communities by developing new green energy sources.
    [Show full text]
  • Northeast England – a History of Flash Flooding
    Northeast England – A history of flash flooding Introduction The main outcome of this review is a description of the extent of flooding during the major flash floods that have occurred over the period from the mid seventeenth century mainly from intense rainfall (many major storms with high totals but prolonged rainfall or thaw of melting snow have been omitted). This is presented as a flood chronicle with a summary description of each event. Sources of Information Descriptive information is contained in newspaper reports, diaries and further back in time, from Quarter Sessions bridge accounts and ecclesiastical records. The initial source for this study has been from Land of Singing Waters –Rivers and Great floods of Northumbria by the author of this chronology. This is supplemented by material from a card index set up during the research for Land of Singing Waters but which was not used in the book. The information in this book has in turn been taken from a variety of sources including newspaper accounts. A further search through newspaper records has been carried out using the British Newspaper Archive. This is a searchable archive with respect to key words where all occurrences of these words can be viewed. The search can be restricted by newspaper, by county, by region or for the whole of the UK. The search can also be restricted by decade, year and month. The full newspaper archive for northeast England has been searched year by year for occurrences of the words ‘flood’ and ‘thunder’. It was considered that occurrences of these words would identify any floods which might result from heavy rainfall.
    [Show full text]