Sheffield Development Framework

Total Page:16

File Type:pdf, Size:1020Kb

Sheffield Development Framework WORK IN PROGRESS Transformation and Sustainability SHEFFIELD DEVELOPMENT FRAMEWORK PREFERRED OPTIONS FOR CITY SITES For consideration by Cabinet – 11 April 2007 Development Services Sheffield City Council Howden House 1 Union Street Sheffield S1 2SH April 2007 WORK IN PROGRESS Availability of this document See Chapter 2 ‘How to Comment’ This document is available on the Council’s website at www.sheffield.gov.uk/sdfconsult If you would like a copy of this document in large print, audio format, Braille, on computer disk, or in a language other than English, please contact us for this to be arranged: telephone (0114) 273 4212, or e-mail [email protected], or write to: SDF Team Development Services Howden House 1 Union Street Sheffield S1 2SH WORK IN PROGRESS CONTENTS Page 1. Introduction to the Preferred Options 1 2. How to Comment on the Options 5 3. The Spatial Context 7 4. Allocations – Process and Justification 9 5. Site Allocations 13 6. Citywide Distribution of Preferred Option Allocated Sites 27 7. Infrastructure Constraints 33 Appendices A Preferred Options for Allocated Sites 37 B Rejected Options: Unallocated Development Sites 153 C Rejected Options: Non-Development Sites 165 D Sites developed or in use or under construction 175 WORK IN PROGRESS 1. INTRODUCTION TO THE PREFERRED OPTIONS What is the Sheffield Development Framework? 1.1 The Sheffield Development Framework is the City Council’s Local Development Framework, prepared in accordance with the Planning and Compulsory Purchase Act 2004. It consists of a series of planning documents, including several statutory Development Plan Documents to replace the existing Unitary Development Plan. 1.2 The Development Plan Documents take a long-term (10-15 year) view of: how the city develops spatially its physical form and the location of different land uses the protection and enhancement of the environment the design of areas and buildings the connecting up of the city through the location of development and transport systems. What is the City Sites document about? 1.3 The City Sites document identifies those sites in the city that are allocated for specific uses and indicates the uses and the specific requirements for the development of sites where these are known. Sites are allocated to ensure that we have enough land for particular needs, especially for housing and employment. 1.4 The document does not propose the allocation of all development sites. In some cases, for example, in Flexible Use Areas, it may not be appropriate to identify a single use. And a large number of sites come forward as ‘windfalls’, which, by definition, cannot be identified, let alone allocated, in advance. Details of the latest development sites are reported in the annual Housing Land Survey and the Business and Industry Land Survey. 1.5 The City Sites document is closely related to two other documents: The Core Strategy, which includes the overall vision, aims and objectives of the Sheffield Development Framework, which set the overall context for the Framework’s spatial policies and allocations The City Polices document, which identifies broad Policy Areas across the city and appropriate land uses in each and sets out criteria to be satisfied to achieve the objectives of the Core Strategy. 1.6 The City Sites document also needs to be read alongside the Proposals Map of the Sheffield Development Framework. The map shows the allocated sites and how they relate to the broader pattern of Policy Areas that are defined in the City Policies document. 1 WORK IN PROGRESS 1.7 The site allocations have to be consistent not only with the Core Strategy and City Policies but also have to: generally conform with relevant policies in the Regional Spatial Strategy be consistent with national planning policy. How do the Preferred Options fit in to the process? 1.8 National planning policy requires the Council to involve communities in the development of options for its Local Development Framework. We are using four defined stages for this involvement: Emerging Options – an informal floating of possible options that the Council is considering and identifying alternative choices where appropriate – Emerging Options for the City Sites were consulted on in February to April 2006 Preferred Options – the Emerging Options are narrowed down and consultation is on the broad directions that the Council is minded to take having weighed up the alternatives – this is the current stage Submission version – the Preferred Options will be revised and developed to form the version that is submitted to the Government and there is an immediate period for comment Public examination – following submission, the document is considered by a planning inspector and subjected to public examination, after which the inspector makes binding recommendations and the Council adopts the final revised version. Options and Allocations 1.9 The Emerging Options City Sites document included a list of sites city-wide for consideration for allocation for a range of uses. Additional sites have since emerged which have been considered for allocation and are also included in this document. 1.10 On each site for consideration, two related questions have been asked: a) Should a site be allocated? b) What use should the site be allocated for? 1.11 Some of the sites are no longer considered for allocation because they are under construction or were developed as at 31 December 2006 or have other constraints that mean they cannot be brought forward as an allocation. 2 WORK IN PROGRESS 1.12 The majority of sites from the Emerging Options that merit allocation have been retained. Some uses that were considered on a particular site have now been rejected and where this has happened the reasons are given. However, the scope for choice within the city is limited because of the many constraints on development and the large requirements that need to be provided for over the period covered by the Development Plan documents. 1.13 There is expected to be a further consultation shortly before the document is submitted, in order to include newly identified sites and to update the status and information about sites, as a result of the Preferred Options consultation and changes in circumstances. The Status of Preferred Options 1.14 Unlike the Emerging Options, the Preferred Options have been approved by the Council, as a basis for consultation. They provide an indication of the allocations that the Council is thinking of submitting to the Government. 1.15 The options will begin to influence other plan preparation and if there is significant clear support in the consultation, they might inform some planning decisions. This might apply, for example, where they are required to meet the requirements of recent national policy. Although the Unitary Development Plan, along with the current Regional Spatial Strategy, remains the statutory development plan for the city, its site allocations are largely out-of-date and the options in this consultation document are the most recent indication of what the existing development policies mean in terms of specific allocations over the next 10 to 15 years. In such cases they could be seen as having a role akin to the Supplementary Planning Documents. They do not carry any statutory weight themselves because they have not yet been through the independent public scrutiny required for that. In the meantime, any use of the allocation options to inform future planning decisions must take into account the representations made in the forthcoming consultation. 3 WORK IN PROGRESS 2. HOW TO COMMENT ON THE OPTIONS What to comment on 2.1 The present consultation on Preferred Options for the SDF City Sites is being carried out at the same time as the equivalent consultation on the City Policies and the Proposals Map. By making these documents available at the same time it will be possible for consultees to see how the various documents could fit together. 2.2 The Core Strategy will not be open for formal comment at this stage and it will be submitted to the Government in September, when there will be a final opportunity to make comments. The present document anticipates the submission version of the Core Strategy in some respects and readers will be able to refer to the latest draft, which will be placed on the Council’s website, before being considered by the Council’s Cabinet. 2.3 We would welcome your views on any or all of the above documents but recognise that there is a lot of material and you will want to give us your considered view. Therefore, please concentrate your comments on the aspects that concern you most. Do you support the overall approach of the option or options? Do you support the specific criteria that are being proposed? If not, how would you prefer to see them changed? In each case, what are your reasons for what you recommend? Where to view material 2.4 This document can be viewed or downloaded on the Council’s website: www.sheffield.gov.uk/sdf Reference copies are available at First Point at: Howden House (1 Union Street in the City Centre) Chapeltown (Station Road) Crystal Peaks (1-3 Peaks Square, Waterthorpe) Hillsborough (in the Barracks) and also at all Sheffield Library Branches, including the local studies section of the Central Library. 5 WORK IN PROGRESS 2.5 If you are unable to visit one of these facilities and do not have access to the internet then please contact the SDF Team (see contact details below) and copies will be made available to you. 2.6 If you wish to buy a hard copy of a document (or an extract) please contact the SDF Team (see contact details below). 2.7 If you would like a copy of this document in large print, audio format, Braille, on computer disk, or in a language other than English, please contact us for this to be arranged (see contact details below).
Recommended publications
  • Sheffield City Council Place
    SHEFFIELD CITY COUNCIL PLACE REPORT TO CITY CENTRE SOUTH AND EAST PLANNING DATE 03/05/2011 AND HIGHWAYS COMMITTEE REPORT OF DIRECTOR OF DEVELOPMENT SERVICES ITEM SUBJECT APPLICATIONS UNDER VARIOUS ACTS/REGULATIONS SUMMARY RECOMMENDATIONS SEE RECOMMENDATIONS HEREIN THE BACKGROUND PAPERS ARE IN THE FILES IN RESPECT OF THE PLANNING APPLICATIONS NUMBERED. FINANCIAL IMPLICATIONS N/A PARAGRAPHS CLEARED BY BACKGROUND PAPERS CONTACT POINT FOR Chris Heeley TEL 0114 2736329 ACCESS Lucy Bond NO: 0114 2734556 AREA(S) AFFECTED CATEGORY OF REPORT OPEN 2 Application No. Location Page No. 11/00821/FUL 271 Chesterfield Road Sheffield 6 S8 0RT 11/00812/CHU Players Sports Bar 125 West Street 12 City Centre Sheffield S1 4ER 11/00696/RG3 Land At South Side Of Road Between Train Tracks And River Rother 26 Station Road Halfway Sheffield 11/00596/FUL Curtilage Of 36 High Street Beighton 36 Sheffield S20 1EA 11/00588/CHU 26 - 30 Division Street Sheffield 47 S1 4GF 11/00557/FUL Wellington House 39 Wellington Street 57 Sheffield S1 4HF 11/00503/FUL 7 Rockingham Street Sheffield 73 S1 4EA 11/00427/FUL 30 Bellhouse Road Sheffield 87 S5 6HL 3 11/00394/FUL Plot V Europa View 95 Sheffield Business Park Phase I Sheffield 11/00389/FUL Prego Unit 7 103 The Plaza 8 Fitzwilliam Street Sheffield S1 4JB 11/00246/REM Land Between Lock Lane And 303 Sheffield Road 114 Tinsley Sheffield S9 2FY 11/00223/FUL Kelham Island Museum To Brooklyn Works Green Lane 124 Sheffield S3 8RY 10/04045/FUL Site Of 159 To 165 West Street 138 City Centre Sheffield S1 4EW 10/03699/RG3 Land Off Meadowhall
    [Show full text]
  • Successful Neighbourhoods Scrutiny and Policy
    SUCCESSFUL NEIGHBOURHOODS 9th July 2009 SCRUTINY AND POLICY DEVELOPMENT BOARD Closed Circuit Television 1. Introduction 1.1 This report presents to the Successful Neighbourhoods Scrutiny and Development Board with information to support discussions on: • The degree to which CCTV is situated on public and private land • The legal powers available to use CCTV in different scenario’s • The way in which the South Yorkshire Police and the City Council supervise CCTV’s use • The degree to which such systems have proved to be useful in deterring and detecting crime and anti-social behaviour • Ethics and civil liberty issues which restrain the use of CCTV on public and private land 1.2 This information is provided in respect of the City Council’s CCTV monitoring station only. 2. Background 2.1 The City Councils CCTV monitoring station receives images from 136 cameras situated around Sheffield City Centre and a number of inner City locations. The equipment is linked by fibre optic network and images are shared with the SWISS (Sheffield Wide Imaging Switching System) partners. Partners include South Yorkshire Police, Meadowhall, Supertram and Urban Traffic Control. The station also monitors a range of audio feeds including Pubwatch, CCRAC (City Centre Retailers against Crime) and Airwaves (Police Communications System). 2.2 The Monitoring Station also monitors Bus Lane traffic in the Wicker and Hillsborough areas and provides images recording contraventions to Urban Traffic Control. 3. The degree to which CCTV is situated on public and private land 3.1 Attached at Appendix A is list of camera’s and their locations within the City.
    [Show full text]
  • Case Study : Tinsley Viaduct Scope of Work
    CASE STUDY : TINSLEY VIADUCT PROJECT INTRODUCTION Tinsley viaduct is a two-tier steel box girder viaduct which opened in 1968 as a key structure on the M1 motorway near Sheffield in Yorkshire. The M1 is one of the UK’s main motorway arteries and a key economic link between the north and south of England. The upper deck of the viaduct serves the M1 and the lower deck serves the A631 which is part of the strategic road network around Sheffield. The maintenance of Tinsley Viaduct is the responsibility of Highways England and sits in Area 12 where A- one+, a joint venture between Costain, Colas and Jacobs, has the maintenance framework contract. A key project within the maintenance programme in 2019 was the repair and resurfacing of both lanes of the A631. As one of the UK’s leading road infrastructure repair specialists, Metrail Construction Ltd was selected by A-one+ to carry out the bridge deck waterproofing and associated concrete repairs on the south bound carriageway. SCOPE OF WORK The contract awarded to Metrail covered the following scope of work on a total of 18,000sq m of deck and 1850sq m of walkway: • Remove existing waterproofing • Remove existing walkway surfacing • Scrape the main deck to remove any remaining surfacing and waterproofing • Identify and carry out concrete repairs prior to waterproofing • Apply waterproofing, including bond coat, with a proprietary waterproofing system • Apply combined waterproofing/high friction surfacing on the walkway. HEAD OFFICE : UNIT 13 STATION ROAD INDUSTRIAL ESTATE, HAILSHAM, EAST SUSSEX, BN27 2EY T: 01825 761360 REGIONAL OFFICE : BIG PICTURE HOUSE, PONTEFRACT ROAD, SNAITH, DN14 0DE T: 01405 808230 1 SCOTLAND OFFICE : MAXIM BUSINESS PARK, MAXIM 1 - 1ST FLOOR, 2 PARKLANDS WAY, MOTHERWELL, ML1 4WR T: 01417 397510 CASE STUDY : TINSLEY VIADUCT PROGRAMME The works required a traffic management scheme to be put in place to enable two-way traffic on the north bound carriageway which then allowed a full closure of the south bound carriageway.
    [Show full text]
  • South Yorkshire
    INDUSTRIAL HISTORY of SOUTH RKSHI E Association for Industrial Archaeology CONTENTS 1 INTRODUCTION 6 STEEL 26 10 TEXTILE 2 FARMING, FOOD AND The cementation process 26 Wool 53 DRINK, WOODLANDS Crucible steel 27 Cotton 54 Land drainage 4 Wire 29 Linen weaving 54 Farm Engine houses 4 The 19thC steel revolution 31 Artificial fibres 55 Corn milling 5 Alloy steels 32 Clothing 55 Water Corn Mills 5 Forging and rolling 33 11 OTHER MANUFACTUR- Windmills 6 Magnets 34 ING INDUSTRIES Steam corn mills 6 Don Valley & Sheffield maps 35 Chemicals 56 Other foods 6 South Yorkshire map 36-7 Upholstery 57 Maltings 7 7 ENGINEERING AND Tanning 57 Breweries 7 VEHICLES 38 Paper 57 Snuff 8 Engineering 38 Printing 58 Woodlands and timber 8 Ships and boats 40 12 GAS, ELECTRICITY, 3 COAL 9 Railway vehicles 40 SEWERAGE Coal settlements 14 Road vehicles 41 Gas 59 4 OTHER MINERALS AND 8 CUTLERY AND Electricity 59 MINERAL PRODUCTS 15 SILVERWARE 42 Water 60 Lime 15 Cutlery 42 Sewerage 61 Ruddle 16 Hand forges 42 13 TRANSPORT Bricks 16 Water power 43 Roads 62 Fireclay 16 Workshops 44 Canals 64 Pottery 17 Silverware 45 Tramroads 65 Glass 17 Other products 48 Railways 66 5 IRON 19 Handles and scales 48 Town Trams 68 Iron mining 19 9 EDGE TOOLS Other road transport 68 Foundries 22 Agricultural tools 49 14 MUSEUMS 69 Wrought iron and water power 23 Other Edge Tools and Files 50 Index 70 Further reading 71 USING THIS BOOK South Yorkshire has a long history of industry including water power, iron, steel, engineering, coal, textiles, and glass.
    [Show full text]
  • Darnall Works Darnall Road, Sheffield, South Yorkshire
    Darnall Works Darnall Road, Sheffield, South Yorkshire Park Estates A Unique Opportunity to Purchase or Rent a Large Mixed Use Site Available to Buy or Rent Price on Application Darnall Works Darnall Works Welcome to Darnall Works Consisting of Seven Units with Potential for Additional Development An excellent opportunity has arisen to acquire commercial space at on an Access can be gained to the site from Darnall Road with a service road with ample parking and industrial site of approximately 7.2 acres. The site contains multiple character provides good access to each of the units. buildings of historical importance, some dating back to 1835. Darnall Works opened in 1835 and is a former steelworks site, which has been extended and adapted to meet the amount of space, needed throughout the years. Still occupying the site are Darnall Works consists of seven units and has the potential for additional developments The Crucible Steel shops and the main building. In 1912, a new company, Kayser Ellison and Co, subject to necessary planning consents. Units within the site could be utilised for a took on the site and established new steelworks consisting of electric arc furnaces, however they variety of purposes such as office spaces, workshops, warehousing and cranage. left the site unused by the end of the 20th century. Darnall Works became largely derelict in the years that it was vacant but in 2010, an investment was made to contribute to the restoration of the southeast and south crucible workshops in order to enable new businesses to make use of the sites buildings.
    [Show full text]
  • Air Quality Action Plan for Sheffield 2003
    Air Quality Action Plan for Sheffield 2003 Environmental Protection Air Quality Action Plan for Sheffield April 2003 Air quality action planning in Sheffield and Rotherham Status This is the draft action plan for improving air quality in Sheffield. At the present time it does not represent the official position of Sheffield City Council or any of the other bodies and agencies with responsibilities in the area. Local Sheffield City Council Authority: Service Nick Chaplin, Environmental Protection Manager Manager Officer for Steve Simmons contact Address 2-10 Carbrook Hall Road Sheffield S9 2DB Telephone 0114 273 4607 number Email address [email protected] Sheffield City www.sheffield.gov.uk/services/del/ers/Environmental_protection Council Environmental Protection Service website Air quality Sheffield City Centre Clean Air Partnership: partnership www.sheffieldairaction.com websites M1 Corridor Clean Air Partnership www.m1airaction.com 3 Air quality action plan for Sheffield AIR QUALITY ACTION PLAN FOR SHEFFIELD Executive Summary The Issue Poor air quality has been shown to be detrimental to health at concentrations similar to those seen in many parts of the UK. A series of reports have been produced by Sheffield City Council to investigate air quality throughout the City, including most recently the Stage 4 Review and Assessment report published in December 2002. These reports forecast that annual average concentrations of nitrogen dioxide (NO2) will exceed the standard laid down in the national air quality strategy in designated Air Action Zones1 in two parts of Sheffield, the City Centre and areas around the M1. The largest contributions to NO2 levels in the two AAZs are from road traffic (for both the M1 and the city centre) and ‘area’ sources (for the city centre alone, covering the domestic, commercial, public and small industry sectors).
    [Show full text]
  • Meadowhall Shopping Centre Tinsley Roundabout M1 J34 A6178
    RETAIL INVESTMENT WITH DEVELOPMENT Meadowhall POTENTIAL LOCATED ON Shopping Centre A GATEWAY SITE NEXT TO MEADOWHALL M1 Shepcote Lane / Plumpers Road, J34 Sheffield S9 1UP Tinsley Roundabout Lane A6178 ote pc e h S Shepcote Lane / Plumpers Road, Sheffield Executive Summary Location Area Situation Description Planning Tenure Tenancy Further Information ExecutiveExecutive SummarySummary Location Area Situation Description Planning Tenure Tenancy Further Information Shepcote Lane / Plumpers Road, Sheffield Executive Summary • Strategically important gateway investment/ development opportunity positioned off Junction 34 of the M1 Motorway close to Meadowhall Shopping Centre and transport interchange which is also the proposed location of the HS2 station for the Sheffield region. • Currently producing an income of £68,500 per annum with the prospect of rental growth and lease re-gear. • Comprising two sites positioned off Shepcote Lane. The Northern plot of land comprises a two-storey retail unit and car park currently occupied by retailer, American Golf. The second plot comprises three former terrace properties currently utilised as a café, together with a separate workshop and cleared amenity land. • Unconditional offers are invited for the combined freehold interest (subject to the leasehold interests granted). Executive Summary Location Area Situation Description Planning Tenure Tenancy Further Information Shepcote Lane / Plumpers Road, Sheffield A6133 36 A638 A635 A635 M1 Goldthorpe A1(M) Location A6195 Doncaster A6195 The property is located in Sheffield, the principal 35a administrative and commercial centre of South A616 A629 Yorkshire and one of the UK’s major cities with the A616 6th highest population and a GVA of £28.2 billion Stocksbridge A61 35 annually. The city is the fourth largest in England Coinsbrough 2 2 with a resident population of 550,000 and a travel to work population of around 1,500,000.
    [Show full text]
  • Sheffield Local Plan (Formerly Sheffield Development Framework)
    Sheffield Local Plan (formerly Sheffield Development Framework) Consultation Schedule – City Policies and Sites Consultation Draft 2010 Full Schedule of individual comments and Council responses on the City Policies and Sites Consultation Draft, Proposals Map and Sustainability Appraisal – June 2010 Representations on City Policies and Sites Consultation Draft................................................................2 Representations on City Policies and Sites Proposals Map………………………………………………112 Representations on City Policies and Sites Consultation Draft Sustainability Appraisal………………136 Representations on City Policies and Sites Consultation Draft Document Section Comment Name of individual/ Nature of Summary of Comment Council response Recommendation ID organisation comment Introduction - General dcps13 Mr Derek Hastings, Object Paragraph 1.7 should reflect that Government policy documents Local development plan policy must be consistent with national No change is proposed. comment Rivelin Valley are non-statutory and that, under the plan-led system, planning policy and the new National Planning Policy Framework will Conservation Group policies should be included in the Development Plan to carry carry considerable weight. But there is no need to duplicate it. maximum weight. Although this can leave the impression of omissions from local policy, duplicating national policy will not add any further weight and any variations in wording could create uncertainty about which applies . Introduction - General dcps14 Mr Derek Hastings, Object The proposed "cull" of planning policies is unacceptable. The The issue is partly dealt with in the response to dcps13. The No change is proposed. comment Rivelin Valley length of the document is irrelevant. Policies included in non- issue of length is relevant, having been raised by the Core Conservation Group statutory national or local policy carry less weight than the Strategy Inspector.
    [Show full text]
  • Terminus - 08.08.15 Date: 8Th August 2015
    1 David Cotterrell: Terminus - 08.08.15 Date: 8th August 2015 Focussing on the absurd beauty of infrastructure in a post-industrial landscape, Terminus is an exhibition of new artwork considering the legacy of masterplanned dreams.The exhibition includes new and existing installations by David Cotterrell as well as commissions by Ron Wright and Michael Day. Private View: Saturday, 8 August, 4-7 pm Location: The Scottish Queen, 21-24 South Street, Park Hill, Sheffield, S2 5QX Exhibition Dates: 9 August 9 September 2015 : Open every day, 2pm - 6.30pm (free entry) Curator's Introduction: David Cotterrell brings three site-specific artworks to The Scottish Queen in Park Hill this summer. Exploring the legacy of the Tinsley Cooling Towers site, these new works focus on the absurd beauty of infrastructure in a post-industrial landscape. Commissioned by Sheffield City Council as an initial phase of / part of the Tinsley Art Project , Terminus is supported by, S1 Artspace, Urban Splash, E.ON, Sheffield Hallam University, Sheffield Robotics, The European Regional Development Fund and the National Lottery through Arts Council England. Filmed from the E.ON biomass power stations chimney over the course of a day, On Englands pleasant pastures seen documents the sweeping vistas of the Tinsley Viaduct, the biomass plant local sewage works, train lines and canals that jostle for space alongside the hills of the Peak District. At 90m in the air, the view is one that would have been visible from the top of the Cooling Towers, which were demolished in 2008. Cotterrell climbed the chimney in July with a six-lens spherical camera to record the panorama of landscape and infrastructure, which is projected on a bespoke curved wall in the gallery.
    [Show full text]
  • Police and Crime Plan 2017-21 2018 Summary Police and Crime Plan
    Keeping People Safe Summary of the Police and Crime Plan for South Yorkshire 2017 - 2021 2 The role of the Police and Crime Commissioner Every four years, people in each police force area in the country elect a Police and Crime Commissioner (PCC) to represent them. My job as PCC is to set the priorities of the police and criminal justice services in South Yorkshire on your behalf. I do this by producing a Police and Crime Plan, setting out what I believe are your priorities for policing and crime. I then communicate this to the police, partner agencies such as the local authority and the NHS, the Police and Crime Panel (local councillors who hold me to account), the Home Office - and the public. Within the Plan is a list of issues that the public, police and partners have identified as areas of concern. (For the full version go to my website: www.southyorkshire-pcc.gov.uk) The Chief Constable, who is responsible for the day-to-day running of the Force, must deliver the priorities and meet the outcomes I have set out in the plan. I hold the Chief Constable to account on the delivery of policing through my Public Accountability Board, which meets in public each month, as well as less formal meetings, discussions and reports throughout the year. I also hold the budget for policing and crime services in South Yorkshire and allocate money to deliver the plans to meet the priorities. This money is collected from a range of sources though principally Government grants and the Council Tax precept.
    [Show full text]
  • Part 5 the VISION and STRATEGY
    Part 5 THE VISION AND STRATEGY 5.0 The Vision Statement .......................................................47 5.1 Masterplan Principles ......................................................48 5.2 A Strategy for Change........................................................50 5.3 The Five Core Strategies ..................................................51 5.4 Transportation & Movement Strategy .............................56 5.5 The Lower Don Valley Masterplan ...................................60 5.6 Regeneration Benefits ......................................................62 Lower Don Valley Masterplan Study Urban Strategies Inc. 45 Over the next twenty years, the Lower Don Valley will be transformed into an attractive, safe and healthy place to live, work and visit. A vibrant and exciting new mix of community, leisure, retail, office and business uses will act as anchors for the area’s new residential communities. In harmony with its residential population, the Lower Don Valley will be a nationally recognised and highly sought-after location for business. Capitalising on its unique and authentic industrial heritage, the Lower Don Valley will be a distinct, yet fully integrated destination within Sheffield. It will be considered a model of sustainability in social, economic and environmental terms. The Lower Don Valley will be a 21st Century Gateway for England’s fastest growing city and most impressive urban regeneration story yet - Sheffield. Lower Don Valley Masterplan Study Urban Strategies Inc. 47 5.1 Masterplan Strategic Principles Build on the established strengths of the area. Direct new uses to locations that support The Vision for the Lower Don Valley describes an area that is authentic, The Lower Don Valley should retain its status and grow as one of appropriate infrastructure. vibrant, distinctive and highly livable. To guide this transformation over Sheffield’s foremost locations for employment and leisure.
    [Show full text]
  • The Roads Implementation Plan , Item
    ROADS IMPLEMENTATION PLAN 1 My Vision is that We will build a transport system that works for everyone, connecting people to the places they want to go within the Sheffield City Region as well as nationally and internationally. This is an important time for the Sheffield City Region. With a programme of national, regional and local transport investment planned, it is important that we have a clear plan to join up this investment to ensure we build a transport system that is fit for the 21st century. SCR to complete once remainder of Plan is ratified 2 CONTENTS FOREWORD SCR ROADS IMPLEMENTATION PLAN 1.0 Purpose of the Plan 2.0 Background 3.0 Delivering the Plan 4.0 Measuring Success 3 PURPOSE OF THE PLAN The Sheffield City Region (SCR) Transport Strategy sets out how we intend to better connect our major urban and economic centres to enable the better flow of people, goods, businesses and ideas across the City Region, as well as promoting our rural and visitor economies. By doing so we will help create jobs, secure new investment and grow our economy. The Strategy is underpinned by three goals: The Strategy also envisages a series of implementation plans, some of which the SCR will lead, some of which we will contribute to and some of which we will seek to influence. The Strategy envisages four key programmes, as shown below. This is the Roads Implementation Plan within the Transport Strategy. 4 The underlying theme of the Roads Implementation Plan is that how we use roads needs to change if we are to address issues such as congestion and air quality, contribute to our net-zero targets and create a better public and active travel network as part of the SCR’s whole transport network.
    [Show full text]