Growth of Sa's Road Infrastructure: What To

Total Page:16

File Type:pdf, Size:1020Kb

Growth of Sa's Road Infrastructure: What To GROWTH OF SA’S ROAD INFRASTRUCTURE: WHAT TO EXPECT SKHUMBUZO MACOZOMA CHIEF EXECUTIVE OFFICER SANRAL SOUTH AFRICAN FORUM OF CIVIL ENGINEERING CONTRACTORS | LR 2/6/3/138 IN ORDER TO DEFINE A FUTURE – IT MUST BE PROPERLY CONTEXTUALISED NATIONAL DEVELOPMENT PLAN o Too few people work o Goal is to eradicate poverty and inequality Acknowledgement that national o The quality of school education for o development is not linear but rather black people is poor cyclical – opt for a virtuous cycle where Infrastructure is poorly located, o one element feeds off of another or inadequate and under- enables another maintained o Infrastructure is a catalyst but not a o Spatial divides hobble inclusive panacea – the economy must grow development o Roles of Govt and Private sector are distinct and not inter-changeable South African Forum of Civil Engineering Contractors | LR 2/6/3/138 2 WHAT THE NDP 2030 SAYS o GFCF at 30% of GDP o Public infrastructure investment at 10% of GDP financed through tariffs, PPPs, Taxes and Loans and focused on Transport, Energy and Water. o New spatial norms and standards o Faster and more inclusive economic growth o SA needs to fix the future - Starting today o Focused leadership (long-term) o Support for plans (participation and consultation) o Institutional capability (capable developmental State) o Resource mobilisation and agreement on trade-offs (some things may have to wait) o Sequencing and willingness to prioritise (focus on a few strategic priorities) o Clarity on responsibility (and hence accountability) South African Forum of Civil Engineering Contractors | LR 2/6/3/138 3 1998-2010: Horizon 2010 SANRAL - OUR JOURNEY • Road network growth • Intro of private finance • Accelerated investment • Regional trunk network ROAD NETWORK • Technical Excellence o Growth from 6700km to 22000km • Support for other roads authorities o What next? – 25000km or 35000km? FUNDING 2010-2020: MTSF 2015 and 2019 o Growth from R1.2bn to R20bn o Non-Toll: R15bn; Toll: R5bn in 2017 • Road network growth o Public & Private funds – R15bn in 2009 • e-Toll and toll uncertainty National Treasury custodian of funding policy o • Economic slowdown – less funds TOLL ROADS • Reputation & public trust deficit • Leadership transition o 2952km or 13% of SANRAL network o R128bn worth of projects uncertain o Call for new toll roads policy Urgency of resolution of e-Toll debacle o 2020-2030: Horizon 2030 ORGANISATION • Focus on long term visioning • Review of network growth o Staff growth from some 89 staff to 359 staff since 1998 o Operating model review • Review of funding model o Institutional strengthening • Long term roads plan STRATEGY • Review of SANRAL mandate • Review of RA support model Departure from Horizon 2010 approach o • Emphasis on relevance o 1. Visioning – 2. Planning – 3. Funding • Aggressive transformation agenda South African Forum of Civil Engineering Contractors | LR 2/6/3/138 4 SANRAL MTEF BUDGET 2017-2019 MTEF 309 Projects R50.7 billion South African Forum of Civil Engineering Contractors | LR 2/6/3/138 5 NON TOLL BUDGET (R’000) South African Forum of Civil Engineering Contractors | LR 2/6/3/138 6 THE OTHER HALF OF THE STORY Initial Capital Project Costs Current Status Designation - Toll (R’000 2014R) GFIP Phase 2 (New Routes) R 25 768 840 GFIP Phase 3 (Upgrades) R 17 655 160 R300 Cape Town Ring Road R 4 861 600 N1/N2 Winelands R 9 316 100 Joint Planning and Reprioritisation Toll abandoned N2 Botrivier to Port Elizabeth R 11 272 540 Basic Planning (Non-Toll) N2 Wild Coast (Ndwalane to Haul roads construction underway R 7 578 656 O&M Toll Funding Model Agreed Mtamvuna River) (SIP 3) Mtentu bridge awarded SANRAL KEY MEDIUM N2 Durban South (Prospecton) to North R 7 847 000 Detail Design (non-toll) TERM PROJECTS (Umdloti) N2 Richards Bay to Ermelo R 7 284 140 Detail Design (non-toll) N3 Pietermaritzburg (Twickenham) to Durban (EB R 15 777 205 Detail Design (non-toll) Cloete) (SIP 2) New alignment required – Van N3 De Beers (SIP 2) R 5 500 000 Reenen Development Project Detailed investigations underway N4/PWV3 extension Pampoen Nek Construction Started R 1 716 900 Toll abandoned Pampoen nek construction (Non Toll) N12 Johannesburg to R 2 731 700 Basic Planning (Non Toll) Klerksdorp N12 Benoni to Witbank R 811 840 Basic Planning (Non Toll) R72/N2 Port Elizabeth to East Detail Design, Phased Construction South African Forum of Civil Engineering Contractors | LR 2/6/3/138 R 6 301 200 London Started (Non Toll) 7 SANRAL Funding Trend R 40 000 000 FUNDING LANDSCAPE R 35 000 000 R 30 000 000 ROAD NETWORK R 25 000 000 R 20 000 000 2030 Roads Plan to inform future national roads projects o Rand ('000) o Network management to be informed by funding policy R 15 000 000 position adopted o New roads, road transfers, capacity expansions and R 10 000 000 improvements face the biggest risk R 5 000 000 FUNDING R 0 Funding envelope threatened – need decision on roads o Financial Year funding Toll Non Toll Other Total Note: 5% Annual Non Toll Budget Increase o Budget per/km severely constrained Quality index vulnerable Budget per Road Kilometre Trend o 35 000 R 2 000 000 o Trade-offs must be made R 1 800 000 30 000 RELEVANCE R 1 600 000 25 000 R 1 400 000 Drive projects with biggest development potential o R 1 200 000 o Community development projects 20 000 o Road safety R 1 000 000 Public transport enablement 15 000 o R 800 000 OWN REVENUE Network Length (km) 10 000 R 600 000 R 400 000 5 000 Join SA Inc in pursuing Africa and elsewhere R 200 000 o perBudget Kilometre(2017 ofRoadRands) o Best practice Roads authority support 0 R 0 o 1998 2002 2006 2010 2014 2018 2022 2026 2030 Year Network Length (km) + 2000 km/year Network Length (km) + 200 km/year South African Forum of Civil Engineering Contractors | LR 2/6/3/138 Budget/Km + 2000 km/year Budget/Km + 200 km/year Note: 5% Annual Non Toll Budget Increase8 SMME Budget Trend R 20 000 000 3000 TRANSFORMATION R 18 000 000 2500 R 16 000 000 R 14 000 000 2000 BUDGET TREND R 12 000 000 R 10 000 000 1500 o Black SMME Spend generally < 25% of budget o Black SMME Spend reached highest level of 83% of total R 8 000 000 Budget (R (R '000) Budget SMME Spend in 2009, but has since slipped to 50-55% 1000 Number of SMME R 6 000 000 o New PPPFA Regulations demand a MINIMUM of 30% sub- contracting for projects above R30m – SANRAL wants partners R 4 000 000 that will commit beyond the minimum 500 R 2 000 000 SMME DEVELOPMENT R 0 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 o The number of SMMEs out there is cause for concern – role of Year industry in creating sustainable SMMEs SANRAL Budget (Rbn) Total SMME Budget (Rbn) Black SMME Budget (Rbn) Total SMME No Black SMME No o SANRAL visibility in “development“ limited o Local SMMEs cry foul – Generally Grades 1-4 Black Owned Enterprises Appointed by SANRAL o SMMEs demand direct contracts with SANRAL 2015/2016 MISSED OPPORTUNITIES Total SMMEs Black SMMEs % Black SMMEs Localisation o Count Rbn Count Rbn Count Rand o Training Sustainable job creation o 2 056 3.6 1009 2.0 49% 55% o Cyclical development – alignment of key government interventions & private 2016/2017 RISKS Total SMMEs Black SMMEs % Black SMMEs SANRAL Office invasions o Count Rbn Count Rbn Count Rand o Project disruptions and paralysis of service delivery o Project delays and escalating costs South African Forum of Civil Engineering Contractors | LR 2/6/3/138 1 833 4.0 1045 2.1 57% 53% TRANSFORMATION Ownership • More aggressive demands on Large Construction Sector Equitable Access • Limitation of number of contracts per company per province and nationally • Equitable allocation of projects across CIDB grades • Balance of JVs and sub-contracting • Sanral to have more say in sub-contracting • Review of project packaging – size, duration, budget Community Empowerment • Direct benefit of communities in materials sourced locally Supply Chains • Create space for black business in rigid supply chains – materials, equipment etc. Competition • Create space for black business in Toll Operations and all supporting sectors in Sanral business SMME Development and Support • Sanral to play a more direct role in emerging contractor development South African Forum of Civil Engineering Contractors | LR 2/6/3/138 10 10 FLAGSHIP PROJECTS 2017-2024 Mtentu N2 WILD COAST bridge Ntafufu o Project Cost ~ R9bn 2 Mega Bridges – Mtentu Awarded; Msikaba Retender o Msikaba o Brownfields improvements – East London to Port St Bridge Johns Ndwalane Lusikisiki o Greenfields section – Port St Johns to Mzamba Access roads and Community Development projects o Port St Johns MOLOTO ROAD o Project Cost R5bn o 3 sections – Limpopo, Mpumalanga, Gauteng o Limpopo – Improvement of single carriageway o Mpumalanga and Gauteng – Dualling of carriageway o Access roads and Community Development projects South African Forum of Civil Engineering Contractors | LR 2/6/3/138 11 PROJECTED ROAD INFRASTRUCTURE TREND OVER NEXT DECADE NATIONAL ROADS o Sustained road maintenance levels – fundamental engineering approach o Non-toll network – capital expenditure on recently “transferred roads” to improve QI – is this the right focus? o Toll network – Delayed implementation of new major capital projects due to “anti-toll” drive and pressure on public allocations o Delivery of flagship projects - N2 Wild Coast; Moloto Road; Van Reenen Development Project o Toll Concessions – Maybe one, but highly uncertain PROVINCIAL AND MUNICIPAL ROADS o Pressure for capital investment on dilapidated and/or congested secondary strategic road network o Pressure for
Recommended publications
  • Explore the Northern Cape Province
    Cultural Guiding - Explore The Northern Cape Province When Schalk van Niekerk traded all his possessions for an 83.5 carat stone owned by the Griqua Shepard, Zwartboy, Sir Richard Southey, Colonial Secretary of the Cape, declared with some justification: “This is the rock on which the future of South Africa will be built.” For us, The Star of South Africa, as the gem became known, shines not in the East, but in the Northern Cape. (Tourism Blueprint, 2006) 2 – WildlifeCampus Cultural Guiding Course – Northern Cape Module # 1 - Province Overview Component # 1 - Northern Cape Province Overview Module # 2 - Cultural Overview Component # 1 - Northern Cape Cultural Overview Module # 3 - Historical Overview Component # 1 - Northern Cape Historical Overview Module # 4 - Wildlife and Nature Conservation Overview Component # 1 - Northern Cape Wildlife and Nature Conservation Overview Module # 5 - Namaqualand Component # 1 - Namaqualand Component # 2 - The Hantam Karoo Component # 3 - Towns along the N14 Component # 4 - Richtersveld Component # 5 - The West Coast Module # 5 - Karoo Region Component # 1 - Introduction to the Karoo and N12 towns Component # 2 - Towns along the N1, N9 and N10 Component # 3 - Other Karoo towns Module # 6 - Diamond Region Component # 1 - Kimberley Component # 2 - Battlefields and towns along the N12 Module # 7 - The Green Kalahari Component # 1 – The Green Kalahari Module # 8 - The Kalahari Component # 1 - Kuruman and towns along the N14 South and R31 Northern Cape Province Overview This course material is the copyrighted intellectual property of WildlifeCampus. It may not be copied, distributed or reproduced in any format whatsoever without the express written permission of WildlifeCampus. 3 – WildlifeCampus Cultural Guiding Course – Northern Cape Module 1 - Component 1 Northern Cape Province Overview Introduction Diamonds certainly put the Northern Cape on the map, but it has far more to offer than these shiny stones.
    [Show full text]
  • Directions from JHB Travelling East on the N12
    Directions From JHB Travelling East on the N12 towards Witbank, pass the Benoni, and Putfontein off ramp; take the Daveyton/ Springs. Turn left at the Stop.(After turning left, you will drive under the bridge) Take the first turn to your right hand side. Drive straight till you reach a set of traffic lights(Robots), turn left @ the Robots. Pass the 1st stop, then you take first left turn. @ the corner there you will see a driving school, then after passing it you will see US(Lapeng Village) on your right hand side. From Pretoria Travelling from Pretoria take R21 highway towards OR Tambo International Airport, pass OR Tambo airport and take the N12 Witbank Route, pass the Benoni, and Putfontein off ramp; and take the Daveyton/ Springs off ramp. Turn left at the Stop.(After turning left, you will drive under the bridge) Take the first turn to your right hand side. Drive straight till you reach a set of traffic lights(Robots), turn left @ the Robots. Pass the 1st stop, then you take first left turn. @ the corner there you will see a driving school, then after passing it you will see US(Lapeng Village) on your right hand side. Kruger National Park/ Mozambique Travelling West on the N12 towards Johannesburg. Take the Daveyton/Springs off ramp. Turn Right at the stop. Then you will reach another stop,just drive straight after that. Take the first turn to your right hand side. Drive straight till you reach a set of traffic lights(Robots), turn left @ the Robots. Pass the 1st stop, then you take first left turn.
    [Show full text]
  • Map & Directions: Regional Head Office Johannesburg
    Johannesburg Map & Directions: Regional Head Office Johannesburg Directions from Johannesburg Directions from OR Tambo PHYSICAL ADDRESS: CBD (Newtown) International Airport Yokogawa SA (Pty) Ltd Block C, Cresta Junction Distance: 12.8Km Distance: 48.3Km Corner Beyers Naude Drive and Approximate time: 23 minutes Approximate time: 39 minutes Judges Avenue Cresta Head west on Jeppe St towards Henry Get on to the R24 from To Parking Road Johannesburg, 2194 Nxumalo Street. Continue onto Mahlathini and Exit 46. Keep right at the fork to Street and turn right onto Malherbe Street continue on Exit 46, follow the signs for POSTAL ADDRESS: then turn left onto Lilian Ngoyi Street. Take R24/Johannesburg. Continue on the R24 Yokogawa SA (Pty) Ltd a slight right onto Burghersdorp Street and until it merges with the N12. Continue until PostNet Suite #222 a slight left onto Carr Street. Continue onto exit 113 and take that exit to get onto the Private Bag X1 Subway Street. Turn right onto Seventeenth N3 South/N12 toward M2/Kimberley/ Northcliff, 2115 Street then turn left onto Solomon Street. Germiston/Durban. Keep right at the fork Continue onto Annet Road. Take a slight and follow the signs for N3 S: -26.12737 E: 27.97000 right to stay on Annet Road and continue North/N1/Pretoria and merge onto N3 onto Barry Hertzog Avenue. Turn left onto Eastern Bypass/N1. Continue for 18km. Judith Road after the Barry Hertzog bends. Get into the left lane to take the M5/ Continue on Judith road to the T-junction Beyers Naude Drive exit towards and turn right onto Beyers Naude Drive Honeydew/Northcliff.
    [Show full text]
  • Hello Limpopo 2019 V7 Repro.Indd 1 2019/11/05 10:58 Driving the Growth of Limpopo
    2019 LIMPOPOLIMPOPO Produced by SANRAL The province needs adequate national roads to grow the economy. As SANRAL, not only are we committed to our mandate to manage South Africa’s road infrastructure but we place particular focus on making sure that our roads are meticulously engineered for all road users. www.sanral.co.za @sanral_za @sanralza @sanral_za SANRAL SANRAL Corporate 5830 Hello Limpopo 2019 V7 Repro.indd 1 2019/11/05 10:58 Driving the growth of Limpopo DR MONNICA MOCHADI especially during high peak periods. We thus welcome the installation of cutting-edge technology near the he Limpopo provincial government is committed Kranskop Toll Plaza in Modimolle which have already to the expansion and improvement of our primary contributed to a reduction in fatalities on one of the Troad network. busiest stretches of roads. Roads play a critical role in all of the priority SANRAL’s contribution to the transformation of the economic sectors identified in the Provincial Growth construction sector must be applauded. An increasing and Development Strategy, most notably tourism, number of black-owned companies and enterprises agriculture, mining and commerce. The bulk of our owned by women are now participating in construction products and services are carried on the primary road and road maintenance projects and acquiring skills that network and none of our world-class heritage and will enable them to grow and create more jobs. tourism sites would be accessible without the existence This publication, Hello Limpopo, celebrates the of well-designed and well-maintained roads. productive relationship that exists between the South It is encouraging to note that some of the critical African National Roads Agency and the province of construction projects that were placed on hold have Limpopo.
    [Show full text]
  • N2 Wild Coast Toll Highway Project
    N2 WILD COAST TOLL HIGHWAY PROJECT Date: 26 July 2017 MINUTES OF ENVIRONMENTAL MONITORING Time: 09h00 COMMITTEE MEETING NUMBER 4 Venue: Msikaba Conference Room, Wild Coast Sun No. Item Action 1. OPENING AND WELCOME 1.1 Opening Mr Drew (NMA Effective Social Strategists) opened the meeting and introduced Ms Ntene (Letsolo Consulting), Ms Nkosi (Department of Environmental Affairs - DEA) and Ms Van der Byl (Eastern Cape Parks and Tourism Agency - ECPTA). He said they are attending the meeting for the first time. Refer to the attached attendance register for a full list of attendees. 1.2 Apologies Apologies were given for Mr Denison (Wildlife and Environmental Society of South Africa - WESSA), Ms Kershaw (DEA), Mr Van der Merwe (Department of Agriculture, Forestry and Fisheries - DAFF) and Ms Makoa (South African National Roads Agency SOC Ltd - SANRAL). 1.3 Member Representatives Mr Drew said Ms Olivier (DEA) has moved from Biodiversity and Conservation to Transfrontier Parks and was replaced by Ms Kershaw (DEA) from Biodiversity and Conservation. He said Mr Pantshwa (Ingquza Hill Local Municipality) has left the municipality and they did not nominate a replacement. 2. ADOPTION OF AGENDA 2.1 The agenda was adopted as a suitable guide for the proceedings of the meeting without any amendments or additions. 3. PROGRESS UPDATE ON N2 WILD COAST TOLL HIGHWAY PROJECT - SANRAL 3.1 Mr Mclachlan (SANRAL) gave a presentation on progress on the project. Refer to Annexure I for details. 4. UPDATE ON FUNDING FOR BIODIVERSITY OFFSET AGREEMENT - ECPTA / SANRAL 4.1 Mr Mclachlan provided an update on the funding for the Biodiversity Offset Agreement (BOA) in his presentation on progress on the project.
    [Show full text]
  • 20 Sharland Street, Driehoek (Germiston)
    DIRECTIONS TO NEW PREMISES OF RGS GROUP/ MEGA MAGAZINES/ SMART THINKING - 20 SHARLAND STREET, DRIEHOEK (GERMISTON) From West Rand From South 1) N1 Western by pass 1) Get on M1 2) Follow signs to the N12 2) Use the right 2 lanes to take exit 10 to merge onto Francois Oberholzer Fwy/M2 3) Continue onto N12 toward Stad/City 4) Take Germiston Exit 3) Keep right, follow signs for M2/Germiston 5) Keep right follow signs for M2 Germiston 4) Continue onto Francois Oberholzer Freeway 6) Continue onto Francois Oberholzer Freeway 5) Turn left onto Refinery Road 7) Turn left onto Refinery Road 6) Turn left onto Sharland Street 8) Turn left onto Sharland Street 7) Destination : 20 Sharland Street 9) Destination : 20 Sharland Street From East Rand From Pretoria 1) Get on N12 toward Johannesburg 1) Take the ramp onto Nelson Mandela Dr/M3/M5 2) Continue on N12 to Germiston. Take exit 108-Geldenhuys 2) Continue to follow R21 from N3 Eastern Bypass/N12/N3 4) Use the right 3 lanes to take the R24 exit toward N3/Johannesburg 3) Merge onto N12 5) Continue onto R24 4) Use the left 3 lanes to take exit 113 for N3 S/N12 toward 6) Merge onto N12/R24 M2/Kimberley/Germiston/Durban 7) Use the left 3 lanes to take exit 113 for N3 S/N12 toward M2/Kimberley 5) Merge onto N3 Eastern Bypass/N12/N3\ /Germiston/Durban 6) At the interchange 108-Geldenhuys 8) Merge onto N3 Eastern Bypass/N12/N3 7) Use the left lane to follow signs for Germiston 9) At the interchange 108-Geldenhuys 8) Continue onto Francois Oberholzer Freeway 10) Use the left lane to follow signs for Germiston 9) Turn left onto Refinery Road 11) Continue onto Francois Oberholzer Freeway 10) Turn left onto Sharland Street 12) Turn left onto Refinery Road 11) Destination : 20 Sharland Street 13) Turn left onto Sharland Street 14) Destination : 20 Sharland Street 12) .
    [Show full text]
  • South Africa's National Roads Agency, 1998
    INCREASING TRANSPARENCY AND IMPROVING PROJECT MANAGEMENT: SOUTH AFRICA’S NATIONAL ROADS AGENCY, 1998 – 2011 SYNOPSIS Following the transition to democracy in 1994, South Africa experimented with ways to improve ministry effectiveness by separating policy-making functions from operations. The Department of Transport introduced principles of New Public Management and public-private partnerships to improve service delivery. The South African National Roads Agency Ltd. (SANRAL), led by Nazir Alli, reconfigured the procurement process and financing models for planning, design, construction, maintenance and operation of the country’s national road network. Increasing transparency in the tendering of contracts led to greater accountability on the part of project managers and contractors. This case study chronicles the steps that Alli and his staff took to build the agency and to deliver results on a large scale, culminating with the upgrade of the freeway connecting the cities of Johannesburg and Pretoria during the final months before the 2010 FIFA World Cup. Richard Bennet drafted this case study based on interviews conducted in Pretoria and Cape Town, South Africa, in March 2011. INTRODUCTION (SANRAL) at the time, recalled, “For all of us In the months leading up to the 2010 in South Africa, it was at the moment again FIFA World Cup, South Africa braced itself like April 1994 [when Nelson Mandela was for an influx of visitors from around the world. elected president]. …There was this huge Construction workers scrambled to finish enthusiasm to say we know we can do it, and major infrastructure upgrades, including the we’ve got to deliver. … Everybody pulled their first part of the Gauteng Freeway weight to make sure that we met those Improvement Project, an upgrade of the roads milestones.” The first phase of the project connecting the cities of Johannesburg and highlighted SANRAL’s ability to renovate and Pretoria.
    [Show full text]
  • N2 Wild Coast Issue 1 | June 2017 U P Da T E
    Produced by SANRAL N2 WILD COAST ISSUE 1 | JUNE 2017 U P DA T E Province of the EASTERN CAPE Vul’indlela REPUBLIC OF SOUTH AFRICA PROJECT NAME The N2 Wild Coast Toll Road Project PROJECT MANAGERS Craig McLachlan Fezekile Duze Rob Damhuis Edward Kruger Gcobani Socenywa Marlize Nel-Verwey Dr Mongezi Noah *Dr Noah is not a project manager but works on the project REGION Southern Region (Eastern Cape) COMPLETED N2 ROAD UPGRADE PROJECT; EASTERN CAPE, NEAR KOKSTAD. PICTURE: BRETT ELOFF PAGE 2 When will the construction start? What is the progress? Yes, work has started. Since 2011, SANRAL has been upgrading existing sections While we won’t always between Mthatha and Port St Johns, and agree, willingness to between East London and Mthatha. This compromise will ensure that is because the required Environmental the interest of the people Impact Assessment (EIA) Record of of the Eastern Cape and Decision was upheld in that year. Mpondoland in particular, On the greenfields section – this are prioritised ahead of any means areas where there has been no specific group interests. development - between Ndwalane outside Port St Johns and the Mthamvuna River near Port Edward, some preliminary work for the two mega-bridges have begun. So far, haul roads to the sites, as well as, the relocating of affected households adjacent MSIKABA BRIDGE SITE to the two bridges, have been started. Construction of the Msikaba and Mtentu bridges is expected to start in earnest during the second half of 2017. Final designs for the greenfield road section will be done during 2017 with construction MTENTU BRIDGE SITE projected to begin in 2018.
    [Show full text]
  • Mobile Accommodation Solutions CC
    Mobile Accommodation Solutions CC Direction Instructions A view of 10 Top Road, Anderbolt, Boksburg, 1459, South Africa – Mobile Accommodation Solutions CC From Pretoria (North) Travel along the R21 highway towards Johannesburg – Southern Direction. At Johannesburg international R 24 1221 split carry on towards Boksburg on the R21. Before highway comes to an end turn left onto N12 Witbank highway heading east. Pass the Rondebult offramp. Next offramp – Atlas – take the 2nd offramp – Atlas Road Boksburg/Anderbolt. Drive along 360° bend – across the highway – carry on towards Boksburg/Anderbolt on Atlast Road (south) – 1,35km down Atlast Road. Cross over North Rand Road intersection (Renault car agency on your right hand side). Carry along Atlas crossing over another robot (Spar on your right hand side). At the next robot – Top Road – turn right. Carry down Top Road for 200m – Entrance on your right hand side – number 10 Top Road. From Vereeniging (South) Travel along the R59 towards Johannesburg – Northern Direction. Closer to Alberton take the highway split N12 Witbank/W3 PTA. Travel in an easterly direction towards Johannesburg. Pass Voortrekker offramp. Pass the N3 split to Durban. Carry on on the N1 Pretoria/N12 Witbank towards Johannesburg. Pass the PPC factory on your left hand side. Carry on straight on the N12/N1 PTA/Witbank highway. Pass van Buuren offramp. As you approach Gilloolys interchange take the R24/N12 O.R. Tambo Witbank slid way. Carry on on the R24/N12 – 1km the highway splits Keep right. Carry on with R24 towards Witbank Boksburg. Pass offramp to Edenvale, Kraft Road, Jet Park, R21 O.R.
    [Show full text]
  • SANRAL-Integrated-Report-Volume-1
    2020 INTEGRATED REPORT VOLUME ONE LEADER IN INFRASTRUCTURE DEVELOPMENT The South African National Roads Agency SOC Limited Integrated Report 2020 The 2020 Integrated Report of the South African National Roads Agency SOC Limited (SANRAL) covers the period 1 April 2019 to 31 March 2020 and describes how the Agency gave effect to its statutory mandate during this period. The report is available in print and electronic formats and is presented in two volumes: • Volume 1: Integrated Report is a narrative and statistical description of major developments during the year and of value generated in various ways. • Volume 2: Annual Financial Statements and the Corporate Governance Report. In selecting qualitative and quantitative information for the report, the Agency has strived to be concise but reasonably comprehensive and has followed the principle of materiality—content that shows the Agency’s value-creation in the short, medium and long term. The South African National Roads Agency SOC Limited | Reg no: 1998/009584/30 The South African National Roads Agency SOC Limited | Reg no: 1998/009584/30 THE SOUTH AFRICAN NATIONAL ROAD AGENCY SOC LTD INTEGRATED REPORT Volume One CHAIRPERSON’S REPORT 1 CHIEF EXECUTIVE OFFICER’S REPORT 5 SECTION 1: COMPANY OVERVIEW 12 Vision, Mission and Principal Tasks and Objectives 13 Business and Strategy 14 Implementation of Horizon 2030 15 Board of Directors 20 Executive Management 21 Regional Management 22 SECTION 2: CAPITALS AND PERFORMANCE 24 1. Manufactured Capital 25 1.1 Road development, improvement and rehabilitation
    [Show full text]
  • Teaching Timetable 1St Semester, 2020/2021 Academic Year School of Education - Year 1 D/D Prog 7.00-10.00 Am 10.00-1.00.P.M 1.00-4.00 P.M
    SOUTH EASTERN KENYA UNIVERSITY TEACHING TIMETABLE 1ST SEMESTER, 2020/2021 ACADEMIC YEAR SCHOOL OF EDUCATION - YEAR 1 D/D PROG 7.00-10.00 AM 10.00-1.00.P.M 1.00-4.00 P.M. 4.00-7.00 P.M BED(Arts) CKS101-Comm. Skills in Kis.(Ms.Mbusya) TBH9 CGN101-Intr. to Geography(Dr. M. Kauti) TBH9 CLE101-Introduction to Linguistics (Dr. Kiliku) N12 CLE103-Hist.& Soc.of Eng. (Dr.Nyakundi) CPR103-Comparative Religion(J. Kabugi) N8 BED(Sc) SBL103-Invertebrate Zoology (Dr. Kasili) N11 BA CSO101- Intr. to Sociology (Ms. AWanjiku) N8 CPR103-Comparative Religion(J. Kabugi) N8 CGN101-Intr. to Geography(Dr. M. Kauti) TBH9 CPR103-Comparative Religion(J. Kabugi) N8 MONDAY BED(Arts) CPR101-Intr. to Phylosophy(Dr.O.Ogutu) TBH8 CGN103-Fieldwork & Res.Meths(Prof. Mutisya) TBH8 DAC101-Found. of Accounting I(ms. Ngeta) LT2 CLT103-Lang. Use in Lit. (Dr. W. Yenjela) N12 BED(Sc) SMA103-Calculus I LT2 SCH102-Intro to Organic Chem (Prof.Wanjala) LT1 ANS103-Animal Physiology & Anatomy N8 BA CPR101-Intr. to Phylosophy(Dr. O.Ogutu) TBH8 CGN103-F/work & Res.Meths(Prof. Mutisya) TBH8 TUESDAY BED(Arts) TPS101-Intr. to Psychology(Dr. Ogola) LT2 CCS001-Communication Skills LT2 BED(Sc) TPS101-Intr. to Psychology(Dr. Ogola) LT2 SMA101-Basic Mathematics LT2 CCS001-Communication Skills LT2 BA CAN101-Intro to Anthropology(Dr. Wekesa) TBH8 CCS001-Communication Skills LT2 WEDNESDAY BED(Arts) CKG101-Kenya Gov. & Politics(P. Ondere) TBH8 CCS010-HIV/AIDS LT2 BED(Sc) BCH106-Safety Methods in the LAB N8 CCS010-HIV/AIDS LT2 BA CSO103-Intro to Comparative Soc(Kezia) N5 CKG101-Kenya Gov.
    [Show full text]
  • 2018 INTEGRATED REPORT Volume 1
    2018 INTEGRATED REPORT VOLUME 1 Goals can only be achieved if efforts and courage are driven by purpose and direction Integrated Report 2017/18 The South African National Roads Agency SOC Limited Reg no: 1998/009584/30 THE SOUTH AFRICAN NATIONAL ROADS AGENCY SOC LIMITED The South African National Roads Agency SOC Limited Integrated Report 2017/18 About the Integrated Report The 2018 Integrated Report of the South African National Roads Agency (SANRAL) covers the period 1 April 2017 to 31 March 2018 and describes how the agency gave effect to its statutory mandate during this period. The report is available in printed and electronic formats and is presented in two volumes: • Volume 1: Integrated Report is a narrative on major development during the year combined with key statistics that indicate value generated in various ways. • Volume 2: Annual Financial Statements contains the sections on corporate governance and delivery against key performance indicators, in addition to the financial statements. 2018 is the second year in which SANRAL has adopted the practice of integrated reporting, having previously been guided solely by the approach adopted in terms of the Public Finance Management Act (PFMA). The agency has attempted to demonstrate the varied dimensions of its work and indicate how they are strategically coherent. It has continued to comply with the reporting requirements of the PFMA while incorporating major principles of integrated reporting. This new approach is supported by the adoption of an integrated planning framework in SANRAL’s new strategy, Horizon 2030. In selecting qualitative and quantitative information for the report, the agency has been guided by Horizon 2030 and the principles of disclosure and materiality.
    [Show full text]