Growth of Sa's Road Infrastructure: What To

Growth of Sa's Road Infrastructure: What To

GROWTH OF SA’S ROAD INFRASTRUCTURE: WHAT TO EXPECT SKHUMBUZO MACOZOMA CHIEF EXECUTIVE OFFICER SANRAL SOUTH AFRICAN FORUM OF CIVIL ENGINEERING CONTRACTORS | LR 2/6/3/138 IN ORDER TO DEFINE A FUTURE – IT MUST BE PROPERLY CONTEXTUALISED NATIONAL DEVELOPMENT PLAN o Too few people work o Goal is to eradicate poverty and inequality Acknowledgement that national o The quality of school education for o development is not linear but rather black people is poor cyclical – opt for a virtuous cycle where Infrastructure is poorly located, o one element feeds off of another or inadequate and under- enables another maintained o Infrastructure is a catalyst but not a o Spatial divides hobble inclusive panacea – the economy must grow development o Roles of Govt and Private sector are distinct and not inter-changeable South African Forum of Civil Engineering Contractors | LR 2/6/3/138 2 WHAT THE NDP 2030 SAYS o GFCF at 30% of GDP o Public infrastructure investment at 10% of GDP financed through tariffs, PPPs, Taxes and Loans and focused on Transport, Energy and Water. o New spatial norms and standards o Faster and more inclusive economic growth o SA needs to fix the future - Starting today o Focused leadership (long-term) o Support for plans (participation and consultation) o Institutional capability (capable developmental State) o Resource mobilisation and agreement on trade-offs (some things may have to wait) o Sequencing and willingness to prioritise (focus on a few strategic priorities) o Clarity on responsibility (and hence accountability) South African Forum of Civil Engineering Contractors | LR 2/6/3/138 3 1998-2010: Horizon 2010 SANRAL - OUR JOURNEY • Road network growth • Intro of private finance • Accelerated investment • Regional trunk network ROAD NETWORK • Technical Excellence o Growth from 6700km to 22000km • Support for other roads authorities o What next? – 25000km or 35000km? FUNDING 2010-2020: MTSF 2015 and 2019 o Growth from R1.2bn to R20bn o Non-Toll: R15bn; Toll: R5bn in 2017 • Road network growth o Public & Private funds – R15bn in 2009 • e-Toll and toll uncertainty National Treasury custodian of funding policy o • Economic slowdown – less funds TOLL ROADS • Reputation & public trust deficit • Leadership transition o 2952km or 13% of SANRAL network o R128bn worth of projects uncertain o Call for new toll roads policy Urgency of resolution of e-Toll debacle o 2020-2030: Horizon 2030 ORGANISATION • Focus on long term visioning • Review of network growth o Staff growth from some 89 staff to 359 staff since 1998 o Operating model review • Review of funding model o Institutional strengthening • Long term roads plan STRATEGY • Review of SANRAL mandate • Review of RA support model Departure from Horizon 2010 approach o • Emphasis on relevance o 1. Visioning – 2. Planning – 3. Funding • Aggressive transformation agenda South African Forum of Civil Engineering Contractors | LR 2/6/3/138 4 SANRAL MTEF BUDGET 2017-2019 MTEF 309 Projects R50.7 billion South African Forum of Civil Engineering Contractors | LR 2/6/3/138 5 NON TOLL BUDGET (R’000) South African Forum of Civil Engineering Contractors | LR 2/6/3/138 6 THE OTHER HALF OF THE STORY Initial Capital Project Costs Current Status Designation - Toll (R’000 2014R) GFIP Phase 2 (New Routes) R 25 768 840 GFIP Phase 3 (Upgrades) R 17 655 160 R300 Cape Town Ring Road R 4 861 600 N1/N2 Winelands R 9 316 100 Joint Planning and Reprioritisation Toll abandoned N2 Botrivier to Port Elizabeth R 11 272 540 Basic Planning (Non-Toll) N2 Wild Coast (Ndwalane to Haul roads construction underway R 7 578 656 O&M Toll Funding Model Agreed Mtamvuna River) (SIP 3) Mtentu bridge awarded SANRAL KEY MEDIUM N2 Durban South (Prospecton) to North R 7 847 000 Detail Design (non-toll) TERM PROJECTS (Umdloti) N2 Richards Bay to Ermelo R 7 284 140 Detail Design (non-toll) N3 Pietermaritzburg (Twickenham) to Durban (EB R 15 777 205 Detail Design (non-toll) Cloete) (SIP 2) New alignment required – Van N3 De Beers (SIP 2) R 5 500 000 Reenen Development Project Detailed investigations underway N4/PWV3 extension Pampoen Nek Construction Started R 1 716 900 Toll abandoned Pampoen nek construction (Non Toll) N12 Johannesburg to R 2 731 700 Basic Planning (Non Toll) Klerksdorp N12 Benoni to Witbank R 811 840 Basic Planning (Non Toll) R72/N2 Port Elizabeth to East Detail Design, Phased Construction South African Forum of Civil Engineering Contractors | LR 2/6/3/138 R 6 301 200 London Started (Non Toll) 7 SANRAL Funding Trend R 40 000 000 FUNDING LANDSCAPE R 35 000 000 R 30 000 000 ROAD NETWORK R 25 000 000 R 20 000 000 2030 Roads Plan to inform future national roads projects o Rand ('000) o Network management to be informed by funding policy R 15 000 000 position adopted o New roads, road transfers, capacity expansions and R 10 000 000 improvements face the biggest risk R 5 000 000 FUNDING R 0 Funding envelope threatened – need decision on roads o Financial Year funding Toll Non Toll Other Total Note: 5% Annual Non Toll Budget Increase o Budget per/km severely constrained Quality index vulnerable Budget per Road Kilometre Trend o 35 000 R 2 000 000 o Trade-offs must be made R 1 800 000 30 000 RELEVANCE R 1 600 000 25 000 R 1 400 000 Drive projects with biggest development potential o R 1 200 000 o Community development projects 20 000 o Road safety R 1 000 000 Public transport enablement 15 000 o R 800 000 OWN REVENUE Network Length (km) 10 000 R 600 000 R 400 000 5 000 Join SA Inc in pursuing Africa and elsewhere R 200 000 o perBudget Kilometre(2017 ofRoadRands) o Best practice Roads authority support 0 R 0 o 1998 2002 2006 2010 2014 2018 2022 2026 2030 Year Network Length (km) + 2000 km/year Network Length (km) + 200 km/year South African Forum of Civil Engineering Contractors | LR 2/6/3/138 Budget/Km + 2000 km/year Budget/Km + 200 km/year Note: 5% Annual Non Toll Budget Increase8 SMME Budget Trend R 20 000 000 3000 TRANSFORMATION R 18 000 000 2500 R 16 000 000 R 14 000 000 2000 BUDGET TREND R 12 000 000 R 10 000 000 1500 o Black SMME Spend generally < 25% of budget o Black SMME Spend reached highest level of 83% of total R 8 000 000 Budget (R (R '000) Budget SMME Spend in 2009, but has since slipped to 50-55% 1000 Number of SMME R 6 000 000 o New PPPFA Regulations demand a MINIMUM of 30% sub- contracting for projects above R30m – SANRAL wants partners R 4 000 000 that will commit beyond the minimum 500 R 2 000 000 SMME DEVELOPMENT R 0 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 o The number of SMMEs out there is cause for concern – role of Year industry in creating sustainable SMMEs SANRAL Budget (Rbn) Total SMME Budget (Rbn) Black SMME Budget (Rbn) Total SMME No Black SMME No o SANRAL visibility in “development“ limited o Local SMMEs cry foul – Generally Grades 1-4 Black Owned Enterprises Appointed by SANRAL o SMMEs demand direct contracts with SANRAL 2015/2016 MISSED OPPORTUNITIES Total SMMEs Black SMMEs % Black SMMEs Localisation o Count Rbn Count Rbn Count Rand o Training Sustainable job creation o 2 056 3.6 1009 2.0 49% 55% o Cyclical development – alignment of key government interventions & private 2016/2017 RISKS Total SMMEs Black SMMEs % Black SMMEs SANRAL Office invasions o Count Rbn Count Rbn Count Rand o Project disruptions and paralysis of service delivery o Project delays and escalating costs South African Forum of Civil Engineering Contractors | LR 2/6/3/138 1 833 4.0 1045 2.1 57% 53% TRANSFORMATION Ownership • More aggressive demands on Large Construction Sector Equitable Access • Limitation of number of contracts per company per province and nationally • Equitable allocation of projects across CIDB grades • Balance of JVs and sub-contracting • Sanral to have more say in sub-contracting • Review of project packaging – size, duration, budget Community Empowerment • Direct benefit of communities in materials sourced locally Supply Chains • Create space for black business in rigid supply chains – materials, equipment etc. Competition • Create space for black business in Toll Operations and all supporting sectors in Sanral business SMME Development and Support • Sanral to play a more direct role in emerging contractor development South African Forum of Civil Engineering Contractors | LR 2/6/3/138 10 10 FLAGSHIP PROJECTS 2017-2024 Mtentu N2 WILD COAST bridge Ntafufu o Project Cost ~ R9bn 2 Mega Bridges – Mtentu Awarded; Msikaba Retender o Msikaba o Brownfields improvements – East London to Port St Bridge Johns Ndwalane Lusikisiki o Greenfields section – Port St Johns to Mzamba Access roads and Community Development projects o Port St Johns MOLOTO ROAD o Project Cost R5bn o 3 sections – Limpopo, Mpumalanga, Gauteng o Limpopo – Improvement of single carriageway o Mpumalanga and Gauteng – Dualling of carriageway o Access roads and Community Development projects South African Forum of Civil Engineering Contractors | LR 2/6/3/138 11 PROJECTED ROAD INFRASTRUCTURE TREND OVER NEXT DECADE NATIONAL ROADS o Sustained road maintenance levels – fundamental engineering approach o Non-toll network – capital expenditure on recently “transferred roads” to improve QI – is this the right focus? o Toll network – Delayed implementation of new major capital projects due to “anti-toll” drive and pressure on public allocations o Delivery of flagship projects - N2 Wild Coast; Moloto Road; Van Reenen Development Project o Toll Concessions – Maybe one, but highly uncertain PROVINCIAL AND MUNICIPAL ROADS o Pressure for capital investment on dilapidated and/or congested secondary strategic road network o Pressure for

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us