For Personal Use Only Use Personal For

Total Page:16

File Type:pdf, Size:1020Kb

For Personal Use Only Use Personal For x ANZ NOTICE OF MEETING 2012 ANNUAL GENERAL MEETING TABLE OF CONTENTS Location of the Annual General Meeting 02 Annual General Meeting Agenda 04 How the Annual General Meeting will be conducted 04 Notice of 2012 Annual General Meeting 05 ANZ Shareholder Centre Website 05 2012 Annual Report and 2012 Shareholder Review 05 Explanatory Notes 07 For personal use only 2012 Annual General Meeting 1 Australia and New Zealand Banking Group Limited ABN 11 005 357 522 NOTICE OF MEETING LOCATION OF THE ANNUAL GENERAL MEETING Wednesday, 19 December 2012 10:00 am (Perth time) Perth Convention and Exhibition Centre, Riverside Theatre, 21 Mounts Bay Road, Perth, Western Australia WELLINGTON ST MURRY ST MURRAY ST HAY ST WELLINGTON ST THE PERTH CONVENTION AND EXHIBITION CENTRE The Perth Convention and Exhibition GEORGE ST HAY ST Centre is located in the heart of Perth MURRAY ST ELDER ST city, adjacent to the Swan River. The Centre is easily accessible by car, MILLIGAN ST train, bus, taxi and on foot. MILLIGAN ST ST GEORGES TCE HAY ST MALCOLM ST MOUNT ST SPRING ST ST GEORGES TCE MILL ST MOUNTS BAY RD WILLIAM ST RD M I CONVENTION CENTRE AY T B C TS H N E U L O L M F R M E I E TC W HE For personal use only L A L FR Y EE WAY 2 NOTICE OF MEETING TRANSPORT OPTIONS PUBLIC TRANSPORT Perth Underground station (Mandurah and Joondalup Railway Line) located WALKING TAXI on the corner of William Street and Walking access into the Centre on Perth Convention and Exhibition Murray Street Mall. Level 1 is via Mill Street or Mounts Bay Centre is a designated Cab Spot Perth Central station (Armadale- Road. Level 2 can be accessed via the location. A taxi phone is located at the Thornlie Railway Line, Fremantle Esplanade Busport overpass. Plaza Entry doors on Level 1. The Cab Railway Line and Midland Railway Spot number is 1088. Alternatively, to Line) located along Wellington Street DRIVING book a taxi, please contact: (across from Forrest Place). Access to the City of Perth Convention Swan Taxis 13 13 30 Centre Car Park is via Mill Street, Black and White Taxis 13 10 08 An underground walkway connects Mounts Bay Road and the Riverside the Perth Central station to the Perth Drive off ramp of the Mitchell Freeway. BUSES Underground station. Access to Level 1 Plaza area is from Esplanade Busport is located FERRIES Mill Street or Mounts Bay Road. adjacent to the Perth Convention and Exhibition Centre. Many bus services A ferry service operates across the depart and arrive at the Esplanade Swan River between Barrack Street Busport including the free CBD ‘Blue Jetty (Perth) and Mends Street CAT’ service. Perth’s other major Jetty (South Perth). Barrack Street busport is the Wellington Street Bus Jetty is only a short walk to the Station, located along Wellington Centre. Services operate daily from 7:50am to 7:20pm (extended times For personal use only Street next to the Perth Central train station. operate on weekdays and during the summer months). TRAINS For all bus, train or ferry information, Esplanade train station is located at the or to plan your journey, please doorstep of the Centre and services contact Transperth on 13 62 13. For the Mandurah and Joondalup Railway hearing impaired TTY please contact Line. Other train stations within close (08) 9428 1999. proximity of the Centre include: 2012 Annual General Meeting 3 NOTICE OF MEETING ANNUAL GENERAL MEETING AGENDA Wednesday, 19 December 2012 9:00 am Registration Opens 9:15 am Morning Tea 10:00 am Annual General Meeting commences Welcome to Shareholders – Chairman Chief Executive Officer’s presentation Items of Business Please join the Chairman, To ensure that as many shareholders A shareholder information stand will John Morschel, the Directors as possible have the opportunity to be available in the area outside the speak, shareholders are requested to Meeting room. In addition Directors and senior executives of ANZ observe the following guidelines: and senior executives will be available for refreshments after the • please keep questions as brief as after the Meeting. Annual General Meeting possible and relevant to the matters Discussion will take place on each being discussed; item of business prior to shareholders HOW BUSINESS WILL BE • if a shareholder has more than one being asked to vote. CONDUCTED AT THE MEETING question, please ask all questions at The Annual General Meeting is an the one time; and WEBCAST AND PHOTOGRAPHY important event and we encourage • shareholders should not ask We have arranged for the Annual shareholders to actively participate. questions at the Meeting that they General Meeting to be filmed and may have as an individual customer. broadcast via a webcast which Important information about the These questions should be taken up can be viewed at anz.com/agm. conduct of the Meeting is set with the ANZ representatives after After the Meeting you can also out below. the Meeting. watch an archived recording on the ANZ website. DISCUSSION AND ASKING Shareholders who are unable to QUESTIONS attend the Meeting or who may prefer We have arranged for photographs Discussion will take place on all the to register questions in advance are to be taken at the Meeting. If you items of business as set out on page 5. invited to do so. attend the Meeting in person, you may be included in photographs or A Questions from Shareholders form The Explanatory Notes also provide the webcast recording. further information relating to the has been included in the AGM mailing items of business. and is also available on the website. For the safety and security of all those We will attempt to address as many of present at the Meeting, cameras and Shareholders will have the the more frequently asked questions recording devices are not permitted. opportunity to ask questions at the as possible in the Chairman’s and Upon entry to the Meeting room, you Annual General Meeting (including Chief Executive Officer’s presentations For personal use only will be asked to present your bag for a an opportunity to ask questions of to the Meeting. the Auditor). security search. 4 NOTICE OF MEETING NOTICE OF 2012 ANNUAL GENERAL MEETING Notice is given that the 44th Annual General Meeting of Australia and New Zealand Banking Group Limited will be held at the Perth Convention and Exhibition Centre, Riverside Theatre, 21 Mounts Bay Road, Perth, Western Australia on Wednesday, 19 December 2012 at 10:00am (Perth time). BUSINESS 1. ANNUAL REPORTS 4. INCREASE IN NON-EXECUTIVE (b) TO RE-ELECT To consider the Annual Report, DIRECTORS’ FEE CAP MR J. P. MORSCHEL Financial Report and the Reports of To consider and, if thought fit, to Mr Morschel is retiring and, the Directors and of the Auditor for pass the following resolution as an being eligible, offers himself for the year ended 30 September 2012. ordinary resolution: re-election as a Director. “That the maximum annual aggregate 2. ADOPTION OF THE (c) TO RE-ELECT REMUNERATION REPORT amount of remuneration (within MR LEE HSIEN YANG the meaning of the Company’s Mr Lee is retiring and, being To adopt the Remuneration Report for Constitution) that Non-Executive the year ended 30 September 2012. eligible, offers himself for re- Directors are entitled to be paid for election as a Director. The vote on this resolution is their services as Directors out of the advisory only. funds of the Company under rule 6. ELECTION OF 10.2(a) of the Constitution be increased NON-BOARD-ENDORSED 3. GRANT OF PERFORMANCE by $500,000 and fixed at $4,000,000.” CANDIDATE – MR R. J. REEVES RIGHTS TO MR MICHAEL SMITH Mr Reeves, being eligible, offers 5. ELECTION OF To consider and, if thought fit, to himself for election as a Director. pass the following resolution as an BOARD-ENDORSED ordinary resolution: CANDIDATES (a) TO ELECT MS P. J. DWYER “That approval is given for the Company to grant to the Company’s Ms Dwyer, having been appointed Chief Executive Officer, Mr Michael by the Board after the date of the Smith, Performance Rights under the 2011 Annual General Meeting, is ANZ Share Option Plan on the terms retiring in accordance with the set out in the Explanatory Notes to Company’s Constitution and, this Notice of Meeting.” being eligible, offers herself for election as a Director. ANZ SHAREHOLDER CENTRE WEBSITE 2012 ANNUAL REPORT Our shareholder website has recently been updated to better serve our shareholders. Shareholders are able to view information in the manner that best suits them. Documents are available in various formats – view online, download or request a hard copy. 2012 ANNUAL REPORT AND For personal use only RIGHT PLACE RIGHT TIME 2012 SHAREHOLDER REVIEW The Annual Report provides detailed financial data and information on the Group’s performance as required to comply with applicable regulatory requirements. We also issue a Shareholder Review which is a non-statutory document covering key performance areas, financial information, remuneration details and corporate responsibility. These documents are available at anz.com/annualreport or by calling the Share Registrar on 1800 11 33 99 (within Australia) or (61 3) 9415 4010 (outside Australia) to request a hard copy. 2012 Annual General Meeting 5 NOTICE OF MEETING VOTING RESTRICTIONS VOTING RESTRICTIONS If you do not wish to appoint the FOR ITEMS 3 AND 4 Chairman of the Meeting to vote in VOTING RESTRICTIONS FOR ITEM 2 In accordance with the ASX Listing favour of items 2, 3 and/or 4, it will The Corporations Act prohibits Rules, the Company will disregard any be important for you to complete Directors and other key management votes cast on items 3 and 4 by each the voting directions in respect personnel of the Company (details Director (except, in the case of item 3, of those items in Step 2 of the of whose remuneration are included those who are ineligible to participate Proxy Form.
Recommended publications
  • Yanchep Rail Extension Part 2.Pdf
    Report and recommendations of the Environmental Protection Authority Yanchep Rail Extension Part 2 - Eglinton to Yanchep Public Transport Authority Report 1656 November 2019 Yanchep Rail Extension Part 2 – Eglinton to Yanchep Environmental impact assessment process timelines Date Progress stages Time (weeks) 12/09/2018 EPA decides to assess – level of assessment set 18/10/2018 EPA approved Environmental Scoping Document 6 22/05/2019 EPA accepted Environmental Review Document 31 27/05/2019 Environmental Review Document released for public 5 days review 08/07/2019 Public review period for Environmental Review Document 6 closed 15/10/2019 EPA accepted Proponent Response to Submissions 10 24/10/2019 EPA completed its assessment 2 20/11/2019 EPA provided report to the Minister for Environment 4 25/11/2019 EPA report published 3 days 09/12/2019 Close of appeals period 2 Timelines for an assessment may vary according to the complexity of the proposal and are usually agreed with the proponent soon after the Environmental Protection Authority (EPA) decides to assess the proposal and records the level of assessment. In this case, the EPA met its timeline objective to complete its assessment and provide a report to the Minister. Dr Tom Hatton Chairman 18 November 2019 ISSN 1836-0483 (Print) ISSN 1836-0491 (Online) Assessment No. 2174 Environmental Protection Authority Yanchep Rail Extension Part 2 – Eglinton to Yanchep Executive Summary The Yanchep Rail Extension: Part 2 – Eglinton to Yanchep Proposal (the proposal) was referred to the Environmental Protection Authority (EPA) by the proponent, the Public Transport Authority, on 25 August 2018.
    [Show full text]
  • City of Joondalup Local Emergency Management Arrangements
    City of Joondalup Local Emergency Management Arrangements Including the Local Recovery Handbook and Local Recovery Plan Version 1 PUBLIC VERSION joondalup.wa.gov.au 1 City of Joondalup Local Emergency Management Arrangements Local Emergency Management Arrangements These arrangements have been produced and issued under the authority of S. 41(1) of the Emergency Management Act 2005, endorsed by the Wanneroo - Joondalup Local Emergency Management Committee and the Council of the City of Joondalup. The Arrangements have been tabled for noting with the North Metropolitan District Emergency Management Committee and State Emergency Management Committee. The City of Joondalup Local Emergency Management Arrangements has been structured in three (3) distinct parts (including annexures); • The Local Emergency Management Arrangements (the whole document), • The Local Recovery Handbook, and • The City of Joondalup Local Recovery Plan. The purpose is to provide the overarching legislative requirements (the Local Emergency Management Arrangements), the legislative context for recovery (the Local Recovery Handbook) and an operational guide for the recovery phase of an emergency (the Local Recovery Plan). ____________________________________________________________________ __________________________________ Chair Date Wanneroo – Joondalup Local Emergency Management Committee ____________________________________________________________________ __________________________________ Endorsed by City of Joondalup Date City of Joondalup Local Emergency Management
    [Show full text]
  • 2011-12 Budget Paper 1 Budget Speech
    Speech by Hon Christian Porter MLA Treasurer; Attorney General Thursday 19 May 2011 Mr Speaker, I move that this Bill be read a second time. INTRODUCTION Mr Speaker, the Liberal-National Government’s third budget is framed in the context of a growing Western Australian economy, but also in an environment that remains uncertain globally, and contends with uneven levels of economic activity domestically. Mr Speaker, this is a budget about fundamental choices. In preparing the 2011-12 State Budget, the Western Australian Government faced one immense structural challenge, and, in the face of that challenge, had to make a central and pivotal decision about the best approach now – for the future of our State’s economy. The problem is the rapid and massive decline in Western Australia’s share of GST grants. In short, Western Australia’s prime source of revenue for building the State’s future, our mining royalties, is being effectively transferred out of Western Australia by the Commonwealth through the Commonwealth Grants Commission (CGC), in an unprecedented way. The pivotal decision has been whether, in the face of a collapse in GST revenue over coming years, do we as a State Government wind-back our infrastructure investment program, or do we stay the course and continue to invest in the critical social and economic infrastructure that we require to prosper and continue growing. This budget will make real changes in people’s lives by transforming Western Australia through the delivery of major social infrastructure, and also by providing better services to benefit all Western Australians. Mr Speaker today I am proud to announce a $442million surplus in the 2011-12 State Budget.
    [Show full text]
  • West Leederville Activity Centre Plan West Leederville Activity Centre Plan
    West Leederville Activity Centre Plan West Leederville Activity Centre Plan 2 Contents Executive Summary 5 Access, Movement and Parking 52 APPENDIX 1 83 Introduction 6 Access, Movement and Parking Planning Principles 52 Community and Stakeholder Consultation 83 Transit Oriented Development (TOD) 52 Business Survey 83 PART ONE: Centre Overview & Analysis 9 Achieving a High Degree of Public Transport Part 1 - Planning Scenarios for Change 83 Centre Context 10 Connectivity 53 Part 2 - Detailed Planning 83 Movement 12 Promoting Cycling and Walking 54 Car Parking Supply and Management 55 APPENDIX 2 84 Activity 20 Street Design 55 Council Decisions 84 Urban Form 23 Public Domain 61 23 June 2009 84 Services 29 Public Domain Planning Principles 61 25 May 2010 84 Public spaces 61 21 December 2010 84 PART TWO: Planning Scenarios 31 Landscaping 61 Planning Scenarios 33 Sustainability 61 APPENDIX 3 85 Scenario 1 – Modest Change 34 Sustainability Planning Principles 61 Glossary of Terms 85 Scenario 2 – Targeted Change 36 Detailed Planning for each Node 62 Scenario 3 – Significant Change (‘Blue Sky’) 38 Cambridge ‘High Street’ Node 63 Comparison of the Three Scenarios 40 Southport Street Node 66 Community Node 69 PART THREE: The Plan 41 Leederville Station Link 71 Preferred Scenario 43 Kerr Street to Abbotsford Street Residential Area 76 Land Use & Activity 47 Land Use Planning Principles 47 PART FOUR: Implementation 79 Future Land Use 47 Implementation 80 Residential Dwellings 49 Implementation Schedule 80 Retail Needs Assessment - Collaboration 81
    [Show full text]
  • Yanchep Rail Extension Part 2 Public Transport Authority of Western Australia
    Yanchep Rail Extension Part 2 Public Transport Authority of Western Australia Carbon and Energy Assessment Report PTA_METRONET_YRE Part 2 Carbon and Energy Assessment Report | 1 14 May 2019 PTA Contract 180505 Carbon and Energy Ass essment R eport Public Tr ans port Authority of Western Austr alia Carbon and Energy Assessment Report Yanchep Rail Extension Part 2 Project No: IW194200 Document Title: Carbon and Energy Assessment Report Document No.: PTA_METRONET_YRE Part 2 Carbon and Energy Assessment Report Revision: 1 Date: 14 May 2019 Client Name: Public Transport Authority of Western Australia Client No: PTA Contract 180505 Project Manager: Lara Mist Author: Susan Regan File Name: IW194200 YRE Part 2 Carbon and Energy Assessment Report_Rev1.docx Jacobs Australia Pty Limited 11th Floor, Durack Centre 263 Adelaide Terrace PO Box H615 Perth WA 6001 Australia T +61 8 9469 4400 F +61 8 9469 4488 www.jacobs.com © Copyright 2019 Jacobs Australia Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Document history and status Revision Date Description By Review Approved A 30/04/2019 Draft for internal review SR JM JM B 01/05/2019 Draft for Project Director review SR DM DM 0 3/5/2019 Issue for client review SR DM DM 1 14/5/2019 Final for client issue JM DM DM PTA_METRONET_YRE Part 2 Carbon and Energy Assessment Report i Carbon and Energy Assessment Report Contents 1.
    [Show full text]
  • 2012-13 Budget Paper No. 3
    2012-13 Budget Economic and Fiscal Outlook Budget Paper No. 3 Presented to the Legislative Assembly on 17 May 2012 2012-13 BUDGET ECONOMIC AND FISCAL OUTLOOK Budget Paper No. 3 PRESENTED TO THE LEGISLATIVE ASSEMBLY ON 17 MAY 2012 2012-13 Economic and Fiscal Outlook © Government of Western Australia Excerpts from this publication may be reproduced, with appropriate acknowledgement, as permitted under the Copyright Act. For further information please contact: Department of Treasury Locked Bag 11 Cloisters Square WA 6850 Telephone: +61 8 6551 2777 Facsimile: +61 8 6551 2500 Email: [email protected] Website: http://ourstatebudget.wa.gov.au Published May 2012 John A. Strijk, Government Printer ISSN 1448–2630 2012-13 BUDGET ECONOMIC AND FISCAL OUTLOOK TABLE OF CONTENTS Page UNDER TREASURER’S CERTIFICATION ....................................................................... i CHAPTER 1: OVERVIEW..................................................................................................... 1 Economic and Revenue Outlook .............................................................................................. 3 Fiscal Outlook............................................................................................................................ 5 Budget Objectives...................................................................................................................... 8 Leadership................................................................................................................................ 8
    [Show full text]
  • Extract from Hansard [COUNCIL — Wednesday, 11 May 2016] P2669c-2683A Hon Ken Travers; Hon James Chown; Hon Lynn Maclaren
    Extract from Hansard [COUNCIL — Wednesday, 11 May 2016] p2669c-2683a Hon Ken Travers; Hon James Chown; Hon Lynn MacLaren “PUBLIC TRANSPORT FOR PERTH IN 2031” Motion HON KEN TRAVERS (North Metropolitan) [1.36 pm]: I move — (1) That the Council note that — (a) the Liberal–National government released in July 2011 a “Draft for Consultation” of their plan “Public Transport for Perth in 2031”; (b) the draft plan proposed two transformational projects by 2020 — (i) the fast-tracking of the northern suburbs railway extension to Yanchep; and (ii) construction of a central northern corridor/Curtin/UWA light rail; (c) the draft plan identified that the following infrastructure was required in the next five to 10 years — (i) a new rail station at Karnup (near Paganoni Road); and (ii) upgrades to Canning Bridge and Stirling Stations; (d) the draft plan proposed a number of on-road bus rapid transit projects be built by 2020, commencing with a bus rapid transit system between Ellenbrook and Bassendean and across to Morley. (2) That the Council calls on the government to — (a) explain why it has taken two years to release the final version of this plan; (b) outline whether it is still committed to the projects and the timelines outlined in the draft plan; and (c) provide detailed reasons, including passenger modelling, for any changes it has made to priority projects or their timing. Interestingly, notice of this motion was given some three years ago to try to find out what had happened to the government’s public transport plan that had then been sitting around and not finalised for two years.
    [Show full text]
  • Cycle Wanneroo City of Wanneroo
    Cycle Wanneroo City of Wanneroo Wanneroo Bike Plan | 0 7 July 2015 Wanner oo Bi ke Plan City of Wanner oo Wanneroo Bike Plan Cycle Wanneroo Project no: IW041400 Document title: Wanneroo Bike Plan Document No.: Revision: 0 Date: 7 July 2015 Client name: City of Wanneroo Client no: Client Reference Project manager: Project Manager Author: Claire Ashburn / Kevan Weaver/ Emmerson Richardson File name: I:\PBIF\Projects\IW041400\Deliverables\Reports\Draft Plan\Cycle Wanneroo V11.docx Jacobs Australia Pty Limited 11th Floor, Durack Centre 263 Adelaide Terrace PO Box H615 Perth WA 6001 Australia T +61 8 9469 4400 F +61 8 9469 4488 www.jacobs.com © Copyright 2015 Jacobs Australia Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs’ Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Review Approved A 8th May 2015 First Draft – Outline structure & Working compilation KW B 26 May 2015 Draft Version 2 – Including Client Comments KW C 3 June 2015 Steering Group Additions KW 0 7 July 2015 Final Report KW ER KW i Wanneroo Bike Plan Contents Foreword from Major of Wanneroo .....................................................................................................................
    [Show full text]
  • Yanchep Rail Extension Part 2 2020 Annual Compliance Assessment.Pdf
    DIVISION OR LOGO Yanchep Rail Extension Part 2: Eglinton to Yanchep Annual Compliance Report EPBC 2018/8262 Reporting Period: 25 May 2020 – 31 December 2020 For more information contact Public Transport Authority Public Transport Centre, West Parade, Perth WA 6000 PO Box 8125, Perth Business Centre, Perth WA 6849 Telephone: (08) 9326 2000 Email: [email protected] www.pta.wa.gov.au Contents 1. Introduction ............................................................................................................................ 3 1.1. Approval under the Environmental Protection and Biodiversity Conservation Act 1999 .... 3 1.2. Purpose of this Report ...................................................................................................... 3 2. Compliance ............................................................................................................................ 5 Attachment A – Clearing within Banksia Woodlands of the Swan Coastal Plain Threatened Ecological Community ............................................................................................................... 11 Attachment B – Clearing within foraging habitat including potential breeding trees ............ 13 Attachment C – Clearing within Chuditch potential habitat ..................................................... 15 Attachment D - Indirect Impacts Environmental Management Plan Audit ............................. 17 Attachment E – Construction Environmental Management Plan Audit .................................. 19 Attachment
    [Show full text]
  • Transport Impact Assessment
    TRANSPORT IMPACT ASSESSMENT Project: Sunningdale Primary School Client: EIW Architects Author: Anthony Anastas Version: 0 Document # 1905002-TIA-001 CONSULTING CIVIL AND TRAFFIC ENGINEERS 1 ST. FLOOR, 908 ALBANY HIGHWAY, EAST VICTORIA PARK WA 6101. PHONE|+61 8 9355 1300 FACSIMILE| +61 8 9355 1922 EMAIL| admin@ shawmac.com.au Document Status Version Prepared By Reviewed By Approved By Date 1 Anthony Anastas Paul Nguyen Paul Nguyen 10/07/19 File Reference: Y:\Jobs Active 2019\T&T - Traffic & Parking\EIW_Sunningdale Primary School_1905002\Report\EIW Sunningdale Primary School TIA.docx i | P a g e Contents 1. Introduction and Background ....................................................................................................... 1 2. Proposed Development ................................................................................................................ 2 2.1. Student Numbers ................................................................................................................................... 2 2.2. Car Parking and Access Arrangement ................................................................................................... 2 3. The Site and Surrounding Road Network ..................................................................................... 4 3.1. Site Location and Land Use ................................................................................................................... 4 3.2. Road Network .......................................................................................................................................
    [Show full text]
  • P7428b-7447A Ms Katie Hodson-Thomas
    Extract from Hansard [ASSEMBLY - Wednesday, 27 October 2004] p7428b-7447a Ms Katie Hodson-Thomas; Acting Speaker; Mr Matt Birney; Mrs Cheryl Edwardes; Mr David Templeman; Mr Paul Omodei; Ms Alannah MacTiernan; Speaker; Mr Tony McRae WESTERN AUSTRALIA’S TRANSPORT SYSTEM Motion MS K. HODSON-THOMAS (Carine) [4.28 pm]: I move - That this House condemns the Gallop Labor Government for its failure to properly maintain and expand Western Australia’s transport system. I will raise a number of matters that relate particularly to transport issues. Over the past few weeks I have been in constant receipt of e-mails from a user of the northern suburbs railway line. He is a regular user of the Joondalup railway line into the city. He catches the train from the Glendalough station. It has been interesting reading his e-mails outlining the problems he has encountered on the Joondalup line. I will refer to some of those e-mails today. Recently the new railcar sets arrived in the northern suburbs and the Clarkson station opened. Propaganda on the Mitchell Freeway states “They’re called train passengers” and “Tomorrow, catch the train”. The chap to whom I have referred catches the train regularly. He has been very good. I understand that he has worked with the Public Transport Authority and that he has been in contact with the minister’s office and me. I commend the employee from the PTA who has been corresponding with the commuter to try to rectify some of the matters that the commuter has raised in e-mails to the PTA and to me.
    [Show full text]
  • Local Planning Strategy
    LOCAL PLANNING STRATEGY 1 CONTENTS Executive Summary 3 Local Planning Strategy Map 4 Part 1 Introduction 5-6 Background to the City of Joondalup Purpose of the LPS Community consultation Part 2 State and Regional Planning Context 7-13 Part 3 Local Government Policy Context 15-16 Part 4 Municipal Profile and Key Issues 17-53 Population and Housing Economy and Employment Retail and Commerce Transport Tourism Community Facilities Public Utilities and Services Recreation and Open Space Physical Features and Environment Heritage and Conservation Urban Design Rural Land Part 5 Strategic Planning Themes 54 Part 6 Strategies and Actions 55-64 Joondalup City Centre Housing Commercial Centres Transport Employment Heritage Public Open Space Environment Part 7 Implementation and Review 68-69 Implementation Next steps Review Appendices 70-95 Issues Papers 1 - 7 Analysis of community feedback from Issues Papers surveys 2 EXECUTIVE SUMMARY The City of Joondalup (draft) Local Planning Strategy has been prepared in accordance with the City’s statutory requirements under the Planning and Development Act 2005. The purpose of the Local Planning Strategy is to enable Council and the community to determine the vision and strategic planning direction for the City of Joondalup for the next fifteen to twenty years. Preparation of the Local Planning Strategy has included assessment of all relevant state, regional and council plans, policies and strategies. Community input into the strategy has been achieved through surveys on key planning issues. The Local Planning Strategy has been arranged into 6 main parts: 1. An introduction which provides the background to the development of the Local Planning Strategy 2.
    [Show full text]