Chapter 21 Does Perth's Growing Wealth Lead To
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Yanchep Rail Extension Part 2.Pdf
Report and recommendations of the Environmental Protection Authority Yanchep Rail Extension Part 2 - Eglinton to Yanchep Public Transport Authority Report 1656 November 2019 Yanchep Rail Extension Part 2 – Eglinton to Yanchep Environmental impact assessment process timelines Date Progress stages Time (weeks) 12/09/2018 EPA decides to assess – level of assessment set 18/10/2018 EPA approved Environmental Scoping Document 6 22/05/2019 EPA accepted Environmental Review Document 31 27/05/2019 Environmental Review Document released for public 5 days review 08/07/2019 Public review period for Environmental Review Document 6 closed 15/10/2019 EPA accepted Proponent Response to Submissions 10 24/10/2019 EPA completed its assessment 2 20/11/2019 EPA provided report to the Minister for Environment 4 25/11/2019 EPA report published 3 days 09/12/2019 Close of appeals period 2 Timelines for an assessment may vary according to the complexity of the proposal and are usually agreed with the proponent soon after the Environmental Protection Authority (EPA) decides to assess the proposal and records the level of assessment. In this case, the EPA met its timeline objective to complete its assessment and provide a report to the Minister. Dr Tom Hatton Chairman 18 November 2019 ISSN 1836-0483 (Print) ISSN 1836-0491 (Online) Assessment No. 2174 Environmental Protection Authority Yanchep Rail Extension Part 2 – Eglinton to Yanchep Executive Summary The Yanchep Rail Extension: Part 2 – Eglinton to Yanchep Proposal (the proposal) was referred to the Environmental Protection Authority (EPA) by the proponent, the Public Transport Authority, on 25 August 2018. -
City of Joondalup Local Emergency Management Arrangements
City of Joondalup Local Emergency Management Arrangements Including the Local Recovery Handbook and Local Recovery Plan Version 1 PUBLIC VERSION joondalup.wa.gov.au 1 City of Joondalup Local Emergency Management Arrangements Local Emergency Management Arrangements These arrangements have been produced and issued under the authority of S. 41(1) of the Emergency Management Act 2005, endorsed by the Wanneroo - Joondalup Local Emergency Management Committee and the Council of the City of Joondalup. The Arrangements have been tabled for noting with the North Metropolitan District Emergency Management Committee and State Emergency Management Committee. The City of Joondalup Local Emergency Management Arrangements has been structured in three (3) distinct parts (including annexures); • The Local Emergency Management Arrangements (the whole document), • The Local Recovery Handbook, and • The City of Joondalup Local Recovery Plan. The purpose is to provide the overarching legislative requirements (the Local Emergency Management Arrangements), the legislative context for recovery (the Local Recovery Handbook) and an operational guide for the recovery phase of an emergency (the Local Recovery Plan). ____________________________________________________________________ __________________________________ Chair Date Wanneroo – Joondalup Local Emergency Management Committee ____________________________________________________________________ __________________________________ Endorsed by City of Joondalup Date City of Joondalup Local Emergency Management -
Newsletter #198 3/5/11 Researching Into, and Reviewing Comment On, Sustainable Transport
Transport Newsletter #198 3/5/11 Researching into, and reviewing comment on, Sustainable Transport NSW Transport Authority “The New South Wales Government has announced a new overarching transport authority to co- ordinate the delivery of services across the state. Under the plan the Roads and Traffic Authority, RailCorp, Sydney Buses and other transport agencies will be stripped of their procurement and long- term planning and policy development powers. Transport Minister Gladys Berejiklian says that will allow the agencies to focus entirely on delivering quality services to customers. ‘For too long our agencies have been acting in silos. We don't have that co-ordination across all modes of transport. Commuters have borne the brunt of a disjointed system’, Ms Berejiklian said. She says there will be fewer backroom jobs but more on the front-line. Further details about the plan were light on the ground, but Ms Berejiklian says it is hoped the new structure will be in place within 12 weeks.” Ref: ABC News, 19/4/11 www.abc.net.au/news/stories/2011/04/19/3195734.htm NSW Election “Barry O'Farrell's historic election victory has brought the Liberal-National Coalition to office for the first time in 16 years. At long last we now have a Government with a fresh and energetic new vision for the State and a real commitment to bold plans to upgrade infrastructure, especially public transport. First priority is the North- West rail link which is long overdue but also on the agenda is a light rail from Central out along Anzac Parade passing by the SCG, Randwick Racecourse, the University of NSW and Prince of Wales Hospital.” Ref: Malcolm Turnbull, Newsletter, 19/4/11 Perth’s Public Transport “Perth commuters face a double whammy of unaffordable petrol prices and inefficient public transport unless governments move their funding focus away from roads, a new report has claimed. -
Mr Troy Buswell
Extract from Hansard [ASSEMBLY — Thursday, 1 September 2011] p6615b-6617a Mr John McGrath; Mr Troy Buswell MANNING ROAD FREEWAY ON-RAMP Grievance MR J.E. McGRATH (South Perth — Parliamentary Secretary) [9.53 am]: My grievance is to the Minister for Transport. This is a grievance that I have made on many occasions in this house, and I guess what I am doing today is making an upgrade to a grievance that I have referred to before. The grievance is to do with transport in my electorate of South Perth. One of the main issues that has confronted me since being elected in 2005 is the need for an on-ramp onto the freeway south at Manning Road, which is fast becoming a major arterial road in the southern suburbs. If people travel down Manning Road, as I have mentioned many times in this house, when they get to the Kwinana Freeway and want to head south, possibly to the new Fiona Stanley Hospital when that is completed—it is going to be a major hospital in the southern corridor—they cannot do that; they have to go back up to Canning Bridge, navigate through two sets of lights, do a complete U-turn, and then come back down onto the freeway. It is crazy planning, and it has been like that for a long time. I do not think it was thought through properly when the engineers of those days extended the freeway further south from Canning Bridge. The other issue that has been raised since then refers to Canning Bridge itself. -
2011-12 Budget Paper 1 Budget Speech
Speech by Hon Christian Porter MLA Treasurer; Attorney General Thursday 19 May 2011 Mr Speaker, I move that this Bill be read a second time. INTRODUCTION Mr Speaker, the Liberal-National Government’s third budget is framed in the context of a growing Western Australian economy, but also in an environment that remains uncertain globally, and contends with uneven levels of economic activity domestically. Mr Speaker, this is a budget about fundamental choices. In preparing the 2011-12 State Budget, the Western Australian Government faced one immense structural challenge, and, in the face of that challenge, had to make a central and pivotal decision about the best approach now – for the future of our State’s economy. The problem is the rapid and massive decline in Western Australia’s share of GST grants. In short, Western Australia’s prime source of revenue for building the State’s future, our mining royalties, is being effectively transferred out of Western Australia by the Commonwealth through the Commonwealth Grants Commission (CGC), in an unprecedented way. The pivotal decision has been whether, in the face of a collapse in GST revenue over coming years, do we as a State Government wind-back our infrastructure investment program, or do we stay the course and continue to invest in the critical social and economic infrastructure that we require to prosper and continue growing. This budget will make real changes in people’s lives by transforming Western Australia through the delivery of major social infrastructure, and also by providing better services to benefit all Western Australians. Mr Speaker today I am proud to announce a $442million surplus in the 2011-12 State Budget. -
West Leederville Activity Centre Plan West Leederville Activity Centre Plan
West Leederville Activity Centre Plan West Leederville Activity Centre Plan 2 Contents Executive Summary 5 Access, Movement and Parking 52 APPENDIX 1 83 Introduction 6 Access, Movement and Parking Planning Principles 52 Community and Stakeholder Consultation 83 Transit Oriented Development (TOD) 52 Business Survey 83 PART ONE: Centre Overview & Analysis 9 Achieving a High Degree of Public Transport Part 1 - Planning Scenarios for Change 83 Centre Context 10 Connectivity 53 Part 2 - Detailed Planning 83 Movement 12 Promoting Cycling and Walking 54 Car Parking Supply and Management 55 APPENDIX 2 84 Activity 20 Street Design 55 Council Decisions 84 Urban Form 23 Public Domain 61 23 June 2009 84 Services 29 Public Domain Planning Principles 61 25 May 2010 84 Public spaces 61 21 December 2010 84 PART TWO: Planning Scenarios 31 Landscaping 61 Planning Scenarios 33 Sustainability 61 APPENDIX 3 85 Scenario 1 – Modest Change 34 Sustainability Planning Principles 61 Glossary of Terms 85 Scenario 2 – Targeted Change 36 Detailed Planning for each Node 62 Scenario 3 – Significant Change (‘Blue Sky’) 38 Cambridge ‘High Street’ Node 63 Comparison of the Three Scenarios 40 Southport Street Node 66 Community Node 69 PART THREE: The Plan 41 Leederville Station Link 71 Preferred Scenario 43 Kerr Street to Abbotsford Street Residential Area 76 Land Use & Activity 47 Land Use Planning Principles 47 PART FOUR: Implementation 79 Future Land Use 47 Implementation 80 Residential Dwellings 49 Implementation Schedule 80 Retail Needs Assessment - Collaboration 81 -
Canning Bridge Structure Plan Integrated Transport Strategy
City of Melville Canning Bridge Structure Plan Integrated Transport Strategy August 2014 Table of contents 1. Introduction ..................................................................................................................................... 1 1.1 Overview .............................................................................................................................. 1 1.3 Study requirements and content of strategy ........................................................................ 2 2. Regional Integrated Movement ...................................................................................................... 3 2.1 Regional context .................................................................................................................. 3 2.2 Regional movement demands ............................................................................................. 5 2.3 Regional responses ............................................................................................................. 7 3. Local Integrated Movement ..........................................................................................................13 3.1 Objectives and Challenges ................................................................................................13 3.2 Current issues and opportunities .......................................................................................16 3.3 Future Transport Demand ..................................................................................................23 -
Yanchep Rail Extension Part 2 Public Transport Authority of Western Australia
Yanchep Rail Extension Part 2 Public Transport Authority of Western Australia Carbon and Energy Assessment Report PTA_METRONET_YRE Part 2 Carbon and Energy Assessment Report | 1 14 May 2019 PTA Contract 180505 Carbon and Energy Ass essment R eport Public Tr ans port Authority of Western Austr alia Carbon and Energy Assessment Report Yanchep Rail Extension Part 2 Project No: IW194200 Document Title: Carbon and Energy Assessment Report Document No.: PTA_METRONET_YRE Part 2 Carbon and Energy Assessment Report Revision: 1 Date: 14 May 2019 Client Name: Public Transport Authority of Western Australia Client No: PTA Contract 180505 Project Manager: Lara Mist Author: Susan Regan File Name: IW194200 YRE Part 2 Carbon and Energy Assessment Report_Rev1.docx Jacobs Australia Pty Limited 11th Floor, Durack Centre 263 Adelaide Terrace PO Box H615 Perth WA 6001 Australia T +61 8 9469 4400 F +61 8 9469 4488 www.jacobs.com © Copyright 2019 Jacobs Australia Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Document history and status Revision Date Description By Review Approved A 30/04/2019 Draft for internal review SR JM JM B 01/05/2019 Draft for Project Director review SR DM DM 0 3/5/2019 Issue for client review SR DM DM 1 14/5/2019 Final for client issue JM DM DM PTA_METRONET_YRE Part 2 Carbon and Energy Assessment Report i Carbon and Energy Assessment Report Contents 1. -
2012-13 Budget Paper No. 3
2012-13 Budget Economic and Fiscal Outlook Budget Paper No. 3 Presented to the Legislative Assembly on 17 May 2012 2012-13 BUDGET ECONOMIC AND FISCAL OUTLOOK Budget Paper No. 3 PRESENTED TO THE LEGISLATIVE ASSEMBLY ON 17 MAY 2012 2012-13 Economic and Fiscal Outlook © Government of Western Australia Excerpts from this publication may be reproduced, with appropriate acknowledgement, as permitted under the Copyright Act. For further information please contact: Department of Treasury Locked Bag 11 Cloisters Square WA 6850 Telephone: +61 8 6551 2777 Facsimile: +61 8 6551 2500 Email: [email protected] Website: http://ourstatebudget.wa.gov.au Published May 2012 John A. Strijk, Government Printer ISSN 1448–2630 2012-13 BUDGET ECONOMIC AND FISCAL OUTLOOK TABLE OF CONTENTS Page UNDER TREASURER’S CERTIFICATION ....................................................................... i CHAPTER 1: OVERVIEW..................................................................................................... 1 Economic and Revenue Outlook .............................................................................................. 3 Fiscal Outlook............................................................................................................................ 5 Budget Objectives...................................................................................................................... 8 Leadership................................................................................................................................ 8 -
Chapter 1 Introduction and Outline
Department of Spatial Sciences Spatio-temporal Modelling of Accessibility to Train Stations for Park and Ride (PnR) Users Ting Lin This thesis is presented for the Degree of Doctor of Philosophy of Curtin University June 2017 Spatio-temporal Modelling of Accessibility to Train Stations for Park and Ride (PnR) Users DECLARATION To the best of my knowledge and belief this thesis contains no material previously published by any other person except where due acknowledgment has been made. This thesis contains no material which has been accepted for the award of any other degree or diploma in any university. Human Ethics (For projects involving human participants/tissue, etc) The research presented and reported in this thesis was conducted in accordance with the National Health and Medical Research Council National Statement on Ethical Conduct in Human Research (2007) – updated March 2014. The proposed research study received human research ethics approval from the Curtin University Human Research Ethics Committee (EC00262), Approval Number RD-02-13 Signature: Date: 2017/6/15 Declaration i Spatio-temporal Modelling of Accessibility to Train Stations for Park and Ride (PnR) Users ACKNOWLEDGEMENTS For the duration of this study, I have been very fortunate to receive support, encouragement and advice from a number of people, to whom I would like to express my sincere gratitude. First and foremost, my appreciation goes to my supervisor associate professor Jianhong (Cecilia) Xia and my cosupervisor Dr Todd P. Robinson and my thesis editor Gary McCarney. Thank you, Dr Jianhong (Cecilia) Xia for providing constant support and encouragement, always challenging me and ever available to provide advice on my research throughout my study program. -
Australia South West Corridor Railway
Australia South West Corridor Railway This report was compiled by the University of Melbourne, Melbourne, Australia. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A INTRODUCTION Type of project Project name Description of mode type Technical specification Principal transport nodes Major associated developments Parent projects Country/location Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms Description of key enabling mechanisms Key enabling mechanisms timeline Main organisations involved Planning and environmental regime Outline of planning legislation Environmental statements Overview of public consultation Ecological mitigation Regeneration Appraisal methods Complaints procedures Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Detailed description of route Detailed description of main and intermediate travel nodes Introduction Planning context -
Extract from Hansard [COUNCIL — Wednesday, 11 May 2016] P2669c-2683A Hon Ken Travers; Hon James Chown; Hon Lynn Maclaren
Extract from Hansard [COUNCIL — Wednesday, 11 May 2016] p2669c-2683a Hon Ken Travers; Hon James Chown; Hon Lynn MacLaren “PUBLIC TRANSPORT FOR PERTH IN 2031” Motion HON KEN TRAVERS (North Metropolitan) [1.36 pm]: I move — (1) That the Council note that — (a) the Liberal–National government released in July 2011 a “Draft for Consultation” of their plan “Public Transport for Perth in 2031”; (b) the draft plan proposed two transformational projects by 2020 — (i) the fast-tracking of the northern suburbs railway extension to Yanchep; and (ii) construction of a central northern corridor/Curtin/UWA light rail; (c) the draft plan identified that the following infrastructure was required in the next five to 10 years — (i) a new rail station at Karnup (near Paganoni Road); and (ii) upgrades to Canning Bridge and Stirling Stations; (d) the draft plan proposed a number of on-road bus rapid transit projects be built by 2020, commencing with a bus rapid transit system between Ellenbrook and Bassendean and across to Morley. (2) That the Council calls on the government to — (a) explain why it has taken two years to release the final version of this plan; (b) outline whether it is still committed to the projects and the timelines outlined in the draft plan; and (c) provide detailed reasons, including passenger modelling, for any changes it has made to priority projects or their timing. Interestingly, notice of this motion was given some three years ago to try to find out what had happened to the government’s public transport plan that had then been sitting around and not finalised for two years.