Late 2021 2019 Housing Design Awards Winner Carefully Crafted City Living
Total Page:16
File Type:pdf, Size:1020Kb
On sale: Now Ready to move into: Late 2021 2019 Housing Design Awards Winner Carefully Crafted City Living Holbeck Urban Village, the long-established heart of Leeds’ independent creative scene, is a key element of the city’s South Bank, one of Europe’s most significant regeneration areas. 68 new homes made up of townhouses, apartments and penthouses are being created at The Ironworks by the UK’s leading responsible real estate business, PfPigloo, and the development represents a long-awaited step forward in further cementing the reputation of Holbeck Urban Village as a great place to live, work and play. Designed with a nod to the heritage architecture that surrounds The Ironworks – a legacy of Leeds’ Industrial Revolution - these modern, energy efficient homes are close enough to enjoy all that the city centre has to offer and just far enough away to feel more ‘village’ than ‘city’. 2 3 Townhouses, apartments and penthouses The Ironworks includes 51 one and two bedroom apartments, 2 three bed penthouses and, unusually in Leeds city centre, 15 two and three-bedroom townhouses.. Each home has its own private outdoor space, with fixtures and fittings that are high quality, good-looking and sustainable, right down to the door handles. Interior layouts have been interrogated time and again, to create homes that are as functional and comfortable as they can be. Inspired by the forge that once stood here, The Ironworks homes have been designed to make the most of natural light throughout the day. 4 Specifications: Flooring • Engineered oak floor in corridors, kitchen, living and dining areas • Carpets in bedrooms • Porcelain tiled flooring in the bathrooms Bathrooms • Stainless steel fixtures and fittings • Porcelain tiled walls • White, wall hung bathroom suite • Steel (apartment); Aluminium (town/penthouse) towel radiator Kitchens • Fully fitted kitchen units with soft close doors and drawers • Silestone worktop and splashback (apartments/townhouses) or Deckton worktop and splashback (penthouses) • Stainless steel mixer tap Appliances • Bosch integrated fridge-freezer • Bosch integrated dishwasher • Bosch stainless steel integrated electric oven with Blanco black glass induction hob General • American white oak veneer doors • Brushed stainless steel door handles, sockets and switches. • Electric WiFi managed radiators (apartments/ penthouses); Classic wet system radiators (townhouse) • LED spotlights and pendant lighting 6 Neighbourhood Winner of the 2015 Urbanism Awards ‘Great Neighbourhood Award’, the area has the distinctive feel of a friendly village within one of the best cities in the UK. Some of Leeds’ most loved, long-established independent pubs, cafes and restaurants are all within a few minutes’ walk of The Ironworks, as well as two gyms, Leeds Liverpool Canal and its own public space, the art park ‘Wonderwood’. • 7 minute walk from the southern entrance to Leeds Station (the proposed location for High Speed Rail) • 10 minute walk to the city’s bars, restaurants, shops and cultural life • 12 minute walk to The Holbeck – the oldest social club in Britain – now a traditional members’ bar and an open development space for artists • 15 minute walk from the public park, Holbeck Moor 7 The Midnight Bell, walkway through to Water Lane SCALE BAR 0 0 0 0 0 0 0 mm 1 0 :NOTE : Do not scale from this drawing, use figured dimensions only. Scale bar shown for reference only. NORTH POINT TH04 TH11 TH05 TH06 TH07 TH08 TH09 TH10 TH03 TH12 Ground Floor TH02 TH13 CYCLE STORE TH01 TH14 A colours amended 28.06.20 Rev Description Date Dr by App by original by date created Approved by Author 05/13/20 Approver NICK BROWN : ARCHITECTS 5B Calls Landing BIN STORE The Calls Round Foundry Media Centre Media Foundry Round Leeds PLANT LS2 7EW t: 0113 3235733 www.nickbrownarchitects.com project CLEANERS THE IRON WORKS, LEEDS STORE drawing title: Plan project number A001 2014-072 COMMERCIAL COMMERCIAL drawing number revision Marketing GF A Floorplans TH15 scale: issue status 1 : 200 @A3 CONSTRUCTION ISSUE NOTES Contractor must verify all dimensions on site before commencing any work or shop drawings. Report any discrepancies before commencing work to the Architect. If this drawing exceeds the quantities taken in any way, the architects are to be informed before the work is initiated. Only figured dimensions to be taken from this drawing. Do not scale off this drawing. Drawings based on Ordnance Survey and/or existing record drawings - design and drawing content subject to Site Survey, Structural Survey, Site Investigations, Planning and Statutory Requirements and Approvals. Marketing GF Plan Work within the Construction (Design & Management) Regulations 2007 is not to start until a Health & Safety Plan has been produced. 1 : 200 This drawing is Copyright and must not be reproduced without consent of Nick Brown Architects Ltd David Street E N S 8 W First Floor Second Floor SCALE BAR SCALE BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 mm mm 1 0 1 0 : :NOTE : NOTE : Do not scale from this drawing, use figured dimensions only. Scale Do not scale from this drawing, use figured dimensions only. Scale bar shown for reference only. bar shown for reference only. NORTH POINT NORTH POINT TH04 TH11 TH04 TH11 TH03 TH12 TH03 TH12 TH05 TH06 TH07 TH08 TH09 TH10 TH05 TH06 TH07 TH08 TH09 TH10 TH02 TH13 TH13 TH02 TH01 TH14 A colours amended 28.06.20 A colours amended 28.06.20 Rev Description Date Dr by App by Rev Description Date Dr by App by original by date created Approved by original by date created Approved by A107 A110 Author A207 05/13/20 Approver A210 Author 05/13/20 Approver NICK BROWN : ARCHITECTS A108 A109 NICK BROWN : ARCHITECTS A208 A209 5B Calls Landing 5B Calls Landing The Calls The Calls Leeds Leeds wm LS2 7EW LS2 7EW t: 0113 3235733 t: 0113 3235733 www.nickbrownarchitects.com www.nickbrownarchitects.com project project THE IRON WORKS, LEEDS THE IRON WORKS, LEEDS A105 A102 A205 A204 A203 A202 A106 A104 A103 A101 drawing title: A206 A201 drawing title: Plan Plan TH15 project number project number 2014-072 2014-072 TH15 drawing number drawing number revision revision Marketing 1st Marketing 2nd A A scale: issue status scale: issue status @A3 1 : 200 @A3 CONSTRUCTION 1 : 200 CONSTRUCTION ISSUE ISSUE NOTES NOTES Contractor must verify all dimensions on site before commencing any work or shop drawings. Contractor must verify all dimensions on site before commencing any work or shop drawings. Report any discrepancies before commencing work to the Architect. If this drawing exceeds the quantities taken in any Report any discrepancies before commencing work to the Architect. If this drawing exceeds the quantities taken in any way, the architects are to be informed before the work is initiated. way, the architects are to be informed before the work is initiated. Only figured dimensions to be taken from this drawing. Do not scale off this drawing. Only figured dimensions to be taken from this drawing. Do not scale off this drawing. Drawings based on Ordnance Survey and/or existing record drawings - design and drawing content subject to Site Drawings based on Ordnance Survey and/or existing record drawings - design and drawing content subject to Site Survey, Structural Survey, Site Investigations, Planning and Statutory Requirements and Approvals. Marketing 1st Plan MarketingSurvey, Structural Survey, Site Investigations, Planning and Statutory 2nd Requirements and Approvals.Plan Work within the Construction (Design & Management) Regulations 2007 is not to start until a Health & Safety Plan has Work within the Construction (Design & Management) Regulations 2007 is not to start until a Health & Safety Plan has been produced. been produced. 1 : 200 1 : 200 This drawing is Copyright and must not be reproduced without consent of Nick Brown Architects Ltd This drawing is Copyright and must not be reproduced without consent of Nick Brown Architects Ltd 9 SCALE BAR 0 0 0 0 0 0 0 mm 1 0 :NOTE : Do not scale from this drawing, use figured dimensions only. Scale bar shown for reference only. NORTH POINT SCALE BAR 0 0 0 0 0 0 0 mm 1 0 :NOTE : Do not scale from this drawing, use figured dimensions only. Scale bar shown for reference only. NORTH POINT Third Floor Fifth Floor A colours amended 28.06.20 A307 A310 Rev Description A507Date Dr by App by A510 original by date created Approved by Author 05/13/20 Approver A308 A309 A508 A509 NICK BROWN : ARCHITECTS 5B Calls Landing The Calls Leeds LS2 7EW t: 0113 3235733 www.nickbrownarchitects.com project THE IRON WORKS, LEEDS A colours amended 28.06.20 Rev Description Date Dr by App by A305 A302 A505 A502 original by date created Approved by A306 A304 A303 A301 A506 A504 A503 A501 Author 05/13/20 Approver drawing title: SCALE BAR Plan NICK BROWN : ARCHITECTS SCALE BAR 0 0 0 0 0 0 0 0 0 0 project 0number 0 0 0 5B Calls Landing The Calls mm 1 0 Leeds 2014-072 LS2 7EW mm : 1 0 NOTE : drawing number revision t: 0113 3235733 : Do not scale from this drawing, use figured dimensions only. Scale NOTE : Marketing 3rd bar shown for reference only.www.nickbrownarchitects.com A project Do not scale from this drawing, use figured dimensions only. Scale bar shown for reference only. scale: issue status NORTHTHE IRON POINT WORKS, LEEDS 1 : 200 @A3 CONSTRUCTION NORTH POINT ISSUE NOTES Contractor must verify all dimensions on site before commencing any work or shop drawings. drawing title: Report any discrepancies before commencing work to the Architect. If this drawing exceeds the quantities taken in any way, the architects are to be informed before the work is initiated. Plan Marketing 3rd Plan Only figured dimensions to be taken from this drawing.