Project Environmental and Social Management Plan
Total Page:16
File Type:pdf, Size:1020Kb
REPUBLIC OF ARMENIA MINISTRY OF TRANSPORT, COMMUNICATION AND INFORMATION TECHNOLOGIES TRANSPORT PROJECTS IMPLEMENTATION ORGANIZATION SNCO Public Disclosure Authorized LIFELINE ROAD NETWORK IMPROVEMENT PROJECT Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION Public Disclosure Authorized REHABILITATION OF THE SECTION AT KM 0+000 - KM 1+543 OF THE ROAD AREVSHAT-ABOVYAN OF THE RA ARARAT MARZ Public Disclosure Authorized October 2017 PART 1: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL & ADMINISTRATiVE Country Armenia Project title Rehabilitation of Arevshat-Abovyan road section. Scope of project The project envisages rehabilitation of the km 0+000 - km 1+543 section of the and activity Arevshat-Abovyan road. Design work is done in accordance with acting norms and standard designs. The main technical parameters adopted in the design: >; Subgrade width 11m > Carriageway width 7 m > Width of shoulders 1.5m > Sidewalks length 2,1 km The following works are designed on the basis of visual observation, topography and geological surveys, laboratory test result and environmental measures: > Reconstruction of the road )> Earthworks > Repair of artificial structures and installation of new ones > Installation of precast chutes > Road safety improvement (installation of traffic signs and marking) > Relocation of utilities > Construction of sidewalks > Repair of the bridges Institutional WB Project Management arrangements Nargis Ryskulova Transport Projects (Name and Task Team Leader Implementation Organization contacts) SNCO Vardan Karapetyan Director Sona Poghosyan Head of Social impact management service Gevorg Afyan Head of Environmental impact management service Implementation Safeguard Supervision Contactor arrangements Darejan Kapanadze, Environment Construction Contractor (Name and Sanjay Agarwal, Social Ararat RCM LLC contacts) A SITE DESCRIPTION Name of site Arevshat-Abovyan road section Describe site Ararat Marz Attachement 1: location Site Map_[x]Y [IN Who owns the Community/State land? Description of Project area is located in the Ararat marz of Armenia. The section starts from geographic, the beginning of Arevshat community and ends at the end of Abovyan physical, community. It passes through the southem slopes of Geghama mountains. The biological, relief of the designed road is foothills. Altitude marks varies between 910m and geological, 975m.The relief is erosion-bare, represented by diagonal erosion mountains of hydrographic upper Neogene (N23-Q3) Medium Quaternary em. Among relief types, there and socio- are widespread badlands. economic Soils are mountainous- steppe ones represented by mountainous-brown dry context steppe soils. -The section is located in the landscape-hydrological zone of Azat-Arpa river The average water flow is 2.5-5.0/sec. per 1 km2. The construction site is located in 1 Climatic zone. Weather in summer is hot ano dry and weatherin winter is cold windless. Annual average air temperature 11.7 oC. Average temperature in the coldest month -4 OC. Average temperature in the warmest month 25.50C. Absolute maximum temperature in summer 430C. Minimum temperature in winter -290 C. Annual average wind speed 0.8 m/sec. Annual precipitation 238 mm. Maximum depth of soil freezing 4 1cm. There are two communities - Arevshat and Abovyan - situated along the road to be rehabilitated. The number of main population of the Arevshat community is 2468 people (from which about 52 % are women) and in Abovyan community is 1550 people (from which about 50% are women). The rural municipality of Arevshat community is located just at the beginning of the project mad. Along the whole road to be rehabilitated there are private houses. There are no mullistore buildings along the road. The private houses are mainly from one to two store. In Abovyan the school is located at km 1+100. Near the school there is a shop. At km 0+850 there is an another shop and at km 0+018 there is a car wash. There is an access ramp at km 0+880 with 120 m length to the rural municipality which is included in the rehabilitation works either Locations and Water to be supplied for construction works will be delivered to construction distance for sites in tanks or provided from a source for which the Water Use Permit is material issued to allow water intake. Aggregates will be obtained from the licensed sourcing, providers located within the project area. Contractor may also extract especially aggregates; in this case contractor must obtain an extraction license prior to aggregates, commencement of extraction. Asphalt will be purchased from an official water, stones supplier. LEGISLATION Identify national Environmental permits required for accomplishing the works envisaged by the & local project. legislation & >o Construction license to be possessed by Construction Contractor, permits that > Construction permit to be obtained by the Construction Contractor from apply to project rural municipality, activity > Mining license to be possessed by Construction Contractor in case it operates a borrow pit, > Agreement for disposal of construction waste to be obtained by Construction Contractor from Head of Community. PUBLIC CONSULTATION Identify when I Public consultations have been carried out in the project area; this included the where the public presentation and discussion of ESMP to the population and representatives of consultation the local municipalities. The minutes of the public consultation, photos, process took questions and answers are attached (See Attachment 3). place INSTITUTIONAL CAPACITY BUILDING Will there be any []N or[x]Y General Orientation training on the ESMP should be delivered to capacity Contractors staff after Contractor's mobilization prior to start physical building? construction works commencement by TPlO with assistance of the supervision consultant. Attachment 2 includes the capacity building program. 3 È о- 1 аv ¸ ³а о о о ÁÍ о о ´ .Á ´A1 . Ï .n °7 ¤ t° е Q 1 t7 О [1 Е t º. ¡} ³ _ е Á Á Á Á Á Á , f · ³J ¤ О О О ¡³ ¤ О О ¤ i3 "' - ¸ S U U U 4? .U U t] U ¡ v. ¨ 47 ¨ ..... Пs ³3» ³t3 ti1 ¨ N 4 ³i Í U] i!} ¹'} {Л U7 U? U3 LI} (f} U] 1i (U ³Е· ПА ¤ ¨ ³ir ´1 ³S· ' ¤ Z3 ер»? t1I+ ´a1k³ Q3 N ´ rU dis ¤ aS ³1 Q ¸ Á» ¸ ¸ ¸ ¸ ³n +» ¸ Á¿ ¸ ' _ _ _ _ _ _ _ _ _ . tl? `¸ ' ` ¸ vy ³¿ cn °³n `¸ -¸ cn `cn U 7 ]- ]- ?' .`$r¤ ]- `rаË , ¼ .. w Æ iÇ + =Ë +._-:¿ vi ¸ ³ _Áа v Á ¤ ³а , Á ¿s а ' ci ¸ ¿s  ' È . ¤ D ´ D а ¤ f3 ¡3 ¤ ¤ Z ¤ ¤ - ³ ³ ³ ³ z_ i .' v Å º ., ~' ½ ¤ ' ¸ ¸ ¸ ¸ ¸ ¸ ¸ ³n ?- ? ' ' ´s +, °- !1# ½ , ! , .. .. ,. Æ а Á¤·` +-°r» ¸ +-Á 13 ¤ t ь U ´¸ Á n-. ¤ Ás Q а.¤ Áа. v t ¶ ¸ _¡ . ¡ ± V ........ О { ¨ 7 Ã О W .. (6 iiS tiP 6 ² ,[) LL1 О cU v £ ¸ à [Æ ³Л U ¸ ¤ +Cr4 ; ' Иà ' , ¤ 7 I"' 'V G] ' Й ., Q ¡? 7' ¤ ¸ , f± ¸ ' N е' ' },¤ , ¸½´Г а W'³ * itS Е ¤ ³± О t¤. tÆ fl ,. ¡ ¤ Ë ' º ¨ А О S rЛ ,¡3 D 't  N ¡) t¸41 О -а °³3 ..-. ´] '; ь ¤ ¡ ¡ {1 W L1 L ³» ³3 "Q о ¡] (± О iY ' U q Á '° ´ ° ° » Á r°» ¹ ³¸ -is [} à ¹ ¸ о U in ¸ ,, . Á _ ¸ ' . i о r F ÁÍ_ Æ ' +» - ³ v , Á à Á[ . о a i ¹ а ' Е _ ° ,³ t} ' - g` È ' t,fJ о7 ¡] ¡] W Ëi t7 2 £ ¿s . Е i9 ¸ W ё .а È ? , tа» ·, " . Â È r ?s 1- tL -}` "- ' -¤ . `s¿ 'º (L 7 -' '? D Áо о о Q sa - tL ÆJ ns tÇs ° N -.. `· ³Æ ¿s ³ i ÁÆ а°Í . . ° N s ͹ е р [`z , ГÁ ;а ; ¸ . '' ' .` , Á² ` º ¸ ° Á² 'Æ Á; È 3 ¡37 N S] ' 3 ` ¸ QS 7 {li ¡] 7. L (Q - = ¸ ¸» О L ¡? .¼ '= . р tll +'^ ' ¡3 {13 ¹[F v ;½+ Æ- ¡ , Æ? И ,³} 9F ¨ - П G3 ¡ 'fЛ S] [ Æ . i93 !D Uy6 - . ¸ а ° ¿3 +р - ,И , ´ ¸dS} ³/ à ¢3 Í Á È ro 4  s w Á . аÆ , , ¸ ¸ ' }¸, L ,j ° µ- Áа ¹ ³ll v,  ³· ° » а еÏÁi ¿ ¿t . ³. ° Е £ t +- р - Á о " ¹ z' ¸ È Ç... È + -  . Ã а ¡`z°Â ¹ `m N . Q . ai ' [³ . ¸ Á rU. ¸ ¿s ³'a i- È . s¿. о Áа ', Á Á ' v`a i ..°о ¹ ¸ " _ ÁÍ Å - .s D ¹ ¸ ¹ tts .? ¹ ³i ¹ s а . - . ' . ' ¸ о ' È rn Á·а ro ³, · ¿ ³ ¸ Á ¸ c U . © t cU , ' ¸ Á ¸ ii it1 ¹ , . Á ¹ ¿·³· ? N е ct7 рÃ Е :... 3t] е -_ '- Lv ³¿s Q ³v 'Q '¿ ° ia .' .,. ³Æ ir+ ? È ¡ Â. ai. .[ » ³· Á ¸ ¸' ro'Á» i- ¸ Á¸ о ¸ ¸ `+° ³ °- ¹ ' .- È j ° ² ³» `- ¸ ' ° а¸ о ¸ È °, ¸? · º Á· ' [а _ _ ´U . U [i? £ ¨ -} ' RS t 'w t uj -ty 1] , ¡3? ¡а . +. а ¸ ¸ Á· · ³ ' р ³· - _ ' È - ³`Æ .' а - ¸ _ ' _, ¿r _È t n Í ¹ ''O .´ Á.. ' -° аÍ а ¸' ÂÂ о ° ` ¸ о , . ai ` Á È о _ È È ³· ² ¿ ¹ о 3, .. ³ ¸ . - - ' Á° - ° . _ ³ ' _¹ ¸ _QÆ ³s' ³А ¹ .? ¸ Á' о` ¹ s » ¿' а» .._³ ÁÆ ³¸ ÁD }s, ¹ р s ¸ ¹ ³[s ´ L , ¸ s s 3 ¿ °- а + È ¹ ё ³ U È cL ¸ ' ³ Á» L È , - ´ ³t Á аÆ 'D -- . Á -  -? а. - е3. ³а ,_vÁ x. Qa ³ z Á ´ Á ,L ._ ОÅ [z' = ' ¸  р а ´ vaU Á еà . r  'о ²rr ss ; рÅ . t² ,, , as Á. · а² Á È - ' . ' . .- ³ , ,' ' Á Á. s о ; Á F- Á³. - ...,-.¿1 {¡ 1° ¸ Q . Ci ² ¡а3· ; .. ¡] .², f-° - F- =- ¸ U Еsu z' · +, g ¿1 ´ % i3³ rn . ' ®: -O Âа Á а, , t ¤ , tП Á ³? V] 7 . ¹ ¡ tе j Æ ;t ' ¸ ,_. ¸ , о =' ¡7 i3 Á . Н а i U .а ¼ ° `° ` v Á Q, n. ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST Waste management (a) Waste collection and dis posal pathways and sites will be identified for a I] major waste types expected from excavation, demolition and construction activities. (b) Mineral construction and demolition wastes will be separated from general refuse, organic, liquid and chemical wastes by on-site sorting and stored in appropriate containers. (c) Construction waste will be collected and disposed properly by licensed collectors. (d) The records of waste disposal will be maintained as proof for proper management as designed.