Electricity Act 1989

Total Page:16

File Type:pdf, Size:1020Kb

Electricity Act 1989 Page 1 This Schedule has been prepared by the Department of Energy and Climate Change (DECC) in connection with the Energy Bill 2015-16. It is also available online at the Bills before Parliament pages on www.parliament.uk ENERGY BILL 2015-16 “KEELING” SCHEDULE This Schedule shows the Electricity Act 1989, including all previous amendments, as it would look when amended by the Energy Bill 2015-16, were the Bill to be enacted in the state in which it was introduced to the House of Commons (HC Bill 92 2015-16) It has been prepared by the DECC, using legislation.gov.uk as its primary source, checked against Lex- isNexis. Its purpose is to assist readers of the Bill and help inform debate on it. It does not form part of the Bill and has not been endorsed by Parliament. DECC January 2016 Electricity Act 1989 PART I ELECTRICITY SUPPLY Introductory 1 . 2 . [3A The principal objective and general duties of the Secretary of State and the Authority] [3B Guidance on social and environmental matters] [3C Health and safety] [3D Exceptions from sections 3A to 3C] [3E Binding decisions of the Agency for the Cooperation of Energy Regulators and of the European Com- mission] [3F Authority to consult and cooperate with other authorities] Licensing of supply etc 4 Prohibition on unlicensed supply etc [5 Exemptions from prohibition] [5A Duties of distribution exemption holders] [5B Duties of supply exemption holders] [6 Licences authorising supply, etc] [6A Procedure for licence applications] Page 2 [6B Applications for transmission licences] [6C Competitive tenders for offshore transmission licences] [6D Section 6C: supplemental provision] [6E Property schemes in respect of offshore transmission licences] [6F Offshore transmission during commissioning period] [6G Section 6F: meaning of "commissioning period"] [6H Sections 6F and 6G: modification of codes or agreements] 7 Conditions of licences: general [7A Transfer of licences] [7B Uniform prices etc in certain areas of Scotland] 8 Conditions for funding certain companies engaged in nuclear generation in Scotland [8A Standard conditions of licences] 9 General duties of licence holders 10 Powers etc of licence holders [Electricity transmission and the operation of electricity interconnectors: independence] [10A Electricity transmission and the operation of electricity interconnectors: requirement for certain partici- pants to be certified as independent] [10B Application for certification] [10C Report where applicant connected with a country outside the European Economic Area] [10D Certification] [10E Grounds for certification] [10F The ownership unbundling requirement] [10G The ownership unbundling requirement: supplementary] [10H Designation for the purposes of EU electricity legislation] [10I Monitoring and review of certification] [10J Review of certification: requirement to provide information etc] [10K Report as to any connection of certified person with a country outside the European Economic Area] [10L Continuation or withdrawal of certification] [10M Prohibition on the exercise of certain shareholder rights and rights of appointment] [10N Validity of acts infringing section 10M] [10O Interpretation] Modification of licences 11 . [11A Modification of conditions of licences] [11B Modification of conditions under section 11A: supplementary] Page 3 [Appeal from decisions of the Authority] [11C Appeal to the [CMA]] [11D Procedure on appeal to [CMA]] [11E Determination by [CMA] of appeal] [11F [CMA's] powers on allowing appeal] [11G Time limits for [CMA] to determine an appeal] [11H Determination of appeal by [CMA]: supplementary] 12 . [12A . .] [12B . .] 13 . 14 . [14A . .] 15 Modification by order under other enactments [15A Licence modifications relating to new electricity trading arrangements] [Duties of electricity distributors] [16 Duty to connect on request] [16A Procedure for requiring a connection] [17 Exceptions from duty to connect] 18 . 19 Power to recover expenditure 20 Power to require security [21 Additional terms of connection] [22 Special agreements with respect to connection] 23 Determination of disputes 24 The public electricity supply code [Enforcement of obligations of regulated persons] 25 Orders for securing compliance 26 Procedural requirements 27 Validity and effect of orders [27A Penalties] [27B Statement of policy with respect to penalties] [27C Time limits on the imposition of financial penalties] Page 4 [27D Interest and payment of instalments] [27E Appeals] [against penalties] [27F Recovery of penalties] [27G Consumer redress orders] [27H Remedial action under a consumer redress order] [27I Other procedural requirements in relation to consumer redress orders] [27J Statement of policy with respect to consumer redress orders] [27K Time limits for making consumer redress orders] [27L Enforcement of consumer redress orders] [27M Appeals against consumer redress orders] [27N Consumer redress orders: miscellaneous] [27O Maximum amount of penalty or compensation] 28 Power to require information etc Provisions with respect to supply generally 29 Regulations relating to supply and safety 30 Electrical inspectors 31 Use etc of meters Protection of public interest [32 The renewables obligation] [32A Further provision about the renewables obligation] [32B Renewables obligation certificates] [32BA . .] [32C Section 32B: supplemental provision] [32D Amounts of electricity specified in certificates] [32E Section 32D: transitional provision and savings] [32F Use of renewables obligation certificates issued in Northern Ireland] [32G Payment as alternative to complying with renewables obligation order] [32H Allocation of amounts to electricity suppliers] [32I Costs of the Authority and the Northern Ireland authority] [32J Information] [32K Renewables obligation order: general provision] [32L Renewables obligation orders: procedure] [32LA Renewables obligation closure order] [32LB Renewables obligation closure orders: procedure] [32M Interpretation of sections 32 to 32M] Page 5 [32N The certificate purchase obligation] [32O Further provision about the certificate purchase obligation] [32P Certificate purchase levy] [32Q Use of levy payments] [32R Designation of a CFD counterparty as purchasing body or administrator] [32S GB certificates] [32T NI certificates] [32U Sections 32S and 32T: supplemental provision] [32V Certificate purchase orders: amounts of electricity stated in certificates] [32W Section 32V: transitional provision and savings] [32X Certificate purchase orders: information] [32Y Certificate purchase orders: corresponding provision] [32Z Certificate purchase orders: general provision] [32Z1 Certificate purchase orders: procedure] [32Z2 Interpretation of sections 32N to 32Z2] 33 Fossil fuel levy 34 Fuel stocks etc at generating stations 35 Provisions supplementary to section 34 36 Consent required for construction etc of generating stations [36A Declarations extinguishing etc public rights of navigation] [36B Duties in relation to navigation] [36C Variation of consents under section 36] 37 Consent required for overhead lines 38 Preservation of amenity and fisheries Consumer protection: standards of performance 39 Electricity supply: performance in individual cases [39A Standards of performance in individual cases: electricity distributors] [39B Standards of performance in individual cases: disputes] 40 Electricity supply: overall performance [40A Overall standards of performance: electricity distributors] [40B Procedures for prescribing or determining standards of performance] [41A Promotion of reductions in carbon emissions: [. .] electricity distributors and electricity suppliers] [41B Promotion of reductions in home-heating costs: electricity distributors and electricity suppliers] 42 Information with respect to levels of performance [42A Information to be given to customers about overall performance] Page 6 [42AA Publication of statistical information about standards of performance] [42AB Information relating to complaints handling standards] [42B . .] [42C Remuneration and service standards] Consumer protection: miscellaneous 43 Functions with respect to competition [43A . .] [43B . .] [44 Maximum prices for reselling electricity] [44A Billing disputes] [[Article 37] Disputes] [44B Meaning of "[Article 37] dispute"] [44C Determination of disputes] [44D Time limit for determinations] . 45 . 46 . [46A . .] Other functions of Director [47ZA . .] 47 General functions [47A Power to require information etc for the purpose of monitoring] 48 Publication of information and advice 49 Keeping of register [49A Reasons for decisions] 50 . 51 . 52 . 53 . Provisions with respect to Consumers' etc Councils Page 7 54 . 55 . 56 Continuity of employment of officers of abolished Councils [Alteration of activities requiring licence] [56A Power to alter activities requiring licence] [56B Application by Authority for order including new activities] [56C References to [CMA]] [56CA References under section 56C: time limits] [56CB References under section 56C: application of Enterprise Act 2002] [56D Reports on references] [56E Application by Authority for order excluding activities] [56F Consultation by Secretary of State about order excluding activities] [56FA New licensable activities: smart meters] [56FB Section 56FA: supplemental] [56FC Competitive tenders for licences for new licensable activities] Miscellaneous [56G Service by Authority of certain notices on] [Citizens Advice and Citizens Advice Scotland] 57 . 58 Directions restricting the use of certain information 59 Making
Recommended publications
  • The Law of the National Rivers Authority the Law of the National Rivers Authority
    NATIONAL RIVERS AUTHORITY NRA by Centre for Law in Rural A reas U.C.W. Aberystwyth Notional Rivers Aumortty Information Centre [Head Office Class No m Accossion No National Information Centre The Environment Agency Rio House Waterside Drive Aztec West BRISTOL BS12 4UD Due for return THE LAW OF THE NATIONAL RIVERS AUTHORITY THE LAW OF THE NATIONAL RIVERS AUTHORITY by WILLIAM HOWARTH B.A., LL.M. Director of the Centre for Law in Rural Areas and Lecturer in Law, University College of Wales, Aberystwyth The National Rivers Authority and the Centre for Law in Rural Areas, University College of Wales, Aberystwyth 1990 © W illiam Howarth 1990 ISBN 1 872662 00 5 Published by The National Rivers Authority and the Centre for Law in Rural Areas, University College of Wales, Aberystwyth Copies of this work may be obtained from: The Director, Centre for Law in Rural Areas, University College of Wales, Aberystwyth, Dyfed, SY23 3DZ. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright holder. Printed by Cambrian Printers, Aberystwyth. FOREWORD The Water Act 1989 brings about a dramatic restructuring of the water industry in England and Wales through an overall separation of the responsibilities for utility and regulatory functions in relation to water. This division of the industry will allow a greater degree of specialism to be developed, and ultimately will prove more effective both in satisfying the needs of water consumers and also in safeguarding in general aquatic environment.
    [Show full text]
  • Investments in Power Generation in Great Britain C.1960-2010
    Qualitative Research in Accounting & Management Investments in power generation in Great Britain c.1960-2010: The role of accounting and the financialisation of investment decisions Liz Warren, Martin Quinn, Gerhard Kristandl, Article information: To cite this document: Liz Warren, Martin Quinn, Gerhard Kristandl, (2017) "Investments in power generation in Great Britain c.1960-2010: The role of accounting and the financialisation of investment decisions", Qualitative Research in Accounting & Management, https://doi.org/10.1108/QRAM-01-2016-0002 Permanent link to this document: https://doi.org/10.1108/QRAM-01-2016-0002 Downloaded on: 25 December 2017, At: 00:42 (PT) References: this document contains references to 91 other documents. To copy this document: [email protected] The fulltext of this document has been downloaded 10 times since 2017* Access to this document was granted through an Emerald subscription provided by emerald- srm:425905 [] For Authors If you would like to write for this, or any other Emerald publication, then please use our Emerald for Authors service information about how to choose which publication to write for and submission guidelines are available for all. Please visit www.emeraldinsight.com/authors for more information. Downloaded by UNIVERSITY OF ADELAIDE At 00:42 25 December 2017 (PT) About Emerald www.emeraldinsight.com Emerald is a global publisher linking research and practice to the benefit of society. The company manages a portfolio of more than 290 journals and over 2,350 books and book series volumes, as well as providing an extensive range of online products and additional customer resources and services. Emerald is both COUNTER 4 and TRANSFER compliant.
    [Show full text]
  • Evolution and Gestalt of the State in the United Kingdom
    Martin Loughlin Evolution and Gestalt of the state in the United Kingdom Book section (Accepted version) (Refereed) Original citation: Originally published in: Cassese, Sabino, von Bogdandy, Armin and Huber, Peter, (eds.) The Max Planck Handbooks in European Public Law: The Administrative State. Oxford, UK: Oxford University Press, 2017 © 2017 Oxford University Press This version available at: http://eprints.lse.ac.uk/81516/ Available in LSE Research Online: June 2017 LSE has developed LSE Research Online so that users may access research output of the School. Copyright © and Moral Rights for the papers on this site are retained by the individual authors and/or other copyright owners. Users may download and/or print one copy of any article(s) in LSE Research Online to facilitate their private study or for non-commercial research. You may not engage in further distribution of the material or use it for any profit-making activities or any commercial gain. You may freely distribute the URL (http://eprints.lse.ac.uk) of the LSE Research Online website. This document is the author’s submitted version of the book section. There may be differences between this version and the published version. You are advised to consult the publisher’s version if you wish to cite from it. Ius Publicum Europaeum: The Max Planck Handbook of European Public Law Vol. I: Public Law and Public Authority § 15: United Kingdom Martin Loughlin Outline 1. INTRODUCTION 2. STATE 2.1. Introduction 2.2. State formation 2.3. The Crown, the Government and the Body Politic 2.4. Crown Prerogatives 3.
    [Show full text]
  • Water Resources Act 1963
    Changes to legislation: There are currently no known outstanding effects for the Water Resources Act 1963. (See end of Document for details) Water Resources Act 1963 1963 CHAPTER 38 An Act to provide for the establishment of river authorities and a Water Resources Board, to confer on them, and on the Minister of Housing and Local Government, new functions in relation to water resources in England and Wales, and to provide for the transfer to river authorities of functions previously exercisable by river boards and other bodies; to make further provision for controlling the abstraction and impounding of water, for imposing charges in respect of licences to abstract or impound water, and for securing the protection and proper use of inland waters and water in underground strata; to enable corresponding provision to be made in relation to the Thames and Lee catchment areas and certain other areas in or adjacent to London; and for purposes connected with the matters aforesaid. [31st July 1963] Extent Information E1 For the extent of this Act see s. 137(2)(3) Modifications etc. (not altering text) C1 Act extended by S.I. 1972/971, Sch. 1 Pt. A C2 The base date version of this Act is as revised to 1.12.1991 and takes into account the effects (if any) on it of consolidating legislation which came into force at that date. C3 Act modified by S.I. 1974/607, art. 13(1)(2) C4 Act modified by Channel Tunnel Act 1987 (c. 53, SIF 102), s. 6, Sch. 2 Pt. II para.
    [Show full text]
  • Electricity Act, 1947
    Electricity Act, 1947. io & it GEo. 6. CH. 54. ARRANGEMENT OF SECTIONS. PART I. BRITISH ELECTRICITY AUTHORITY AND AREA ELECTRICITY BOARDS. Section. i. Main functions of Electricity Boards. 2. Additional functions of Electricity Boards. 3. Constitution of Central Authority and Area Boards. 4. Definition and variation of areas. 5. Powers of Minister in relation to Central Authority. 6. Powers of Central Authority and Minister in relation to Area Boards. 7. Consultative Councils. 8. Annual reports of Central Authority and Area Boards. 9. Compulsory purchase of land. ro. Power of Electricity Boards to promote and oppose Bills. ii. Electricity Boards not to be exempt from taxation, etc. 12. Liability of Electricity Boards in actions, etc. i,'ART II. ACQUISITION OF ELECTRICITY UNDERTAKINGS. Vesting of Assets. Bodies to whom Part II of Act applies. 1.4. Vesting of assets of electricity undertakings. 15. Provisions as to undertakings of local authorities. 16. Right of pre-emption for local authorities in respect of land vested in an Electricity Board. 17. Composite companies. i8. Disclaimer of agreements and leases. 1g. Subsequent transfer of property from one Electricity Board to another. Compensation to Holders of Securities. 20. Compensation to holders of securities of bodies other than local authorities. 2r. Appointment of stockholders' representative. A i CH. 54. Electricity Act, 1947. ro & ii GEO. 6. Compensation to Local Authorities. Section. 22. Compensation to local authorities. 23. Further compensation. to local authorities in respect of severance. 24. Further compensation to local authorities in respect of capital works. Compensation to Composite Companies. 25. Compensation to composite companies. Control of Dividends and Interest and Safeguarding of Assets pending transfer.
    [Show full text]
  • The UK Experience: Privatization with Market Power
    The UK Experience: Privatization with Market Power David M Newbery Department of Applied Economics Cambridge, UK 8 February 1999 1. Introduction The UK has three quite distinct electricity supply industries (ESIs) in the three different jurisdictions of England and Wales, Scotland and Northern Ireland. In England and Wales (with a population just over 50 million and a peak demand of just over 49 GW) the industry was under public ownership from 1948-90, and for most of this period, the Central Electricity Generating Board (CEGB) operated all generation and transmission as a vertically integrated statutory monopoly, with 12 Area Boards acting as regional distribution monopolies. The CEGB had interconnectors to Scotland and France, with whom it traded electricity. Scotland (with a population of 5.1 million and peak demand of 5.6 GW, including exports of 800 MW to England) has always retained a degree of autonomy (in law and government) within Britain, while England and Wales are normally treated as a single jurisdiction.1 In Scotland there were two vertically integrated geographically distinct utilities, combining generation, transmission, distribution and supply, one serving the north, the other serving the south. Northern Ireland (with a population of 1.7 million and peak demand of 1.5 GW) is physically separate from the mainland, and the grid connection with Eire in the south had been severed by terrorist activity so that it was a small isolated system. It included all four functions within a single vertically integrated state-owned company, Northern Ireland Electricity (NIE). 2. Restructuring and ownership changes The Electricity Act 1989 divided the CEGB, with its 74 power stations and the national grid, into four companies.
    [Show full text]
  • An Assessment of the Impact of Regulatory Models for Drinking
    An Assessment of the Impact of Regulatory Models for Drinking Water Quality In the UK by Annabelle May Submitted for Doctorate of Philosophy School of Engineering University of Surrey September 2007 © Annabelle May 2007 ProQuest Number: 27607843 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. uest ProQuest 27607843 Published by ProQuest LLO (2019). Copyright of the Dissertation is held by the Author. All rights reserved. This work is protected against unauthorized copying under Title 17, United States Code Microform Edition © ProQuest LLO. ProQuest LLO. 789 East Eisenhower Parkway P.Q. Box 1346 Ann Arbor, Ml 4 8 1 0 6 - 1346 Abstract The main objectives of this study were to assess the influence of regulation on drinking water quality and to explore how drinking water quality regulation is practiced in other countries to establish if the regulatory paradigm in England and Wales and the regulatory mechanisms used by the Drinking Water Inspectorate (DWI) have been effective, and finally, whether potential for Improvement exists. Drinking water quality data from Scotland, Northern Ireland and England and Wales was used to aid an assessment of the three regulatory models found in the United Kingdom. The assessment was also Informed by knowledge acquired through practical observation of regulators, interviews with key personnel and a literature review.
    [Show full text]
  • Ofgem Section 23 Determination RBA-TR-A-DET-159 (PDF)
    Determination No. RBA/TR/A/DET/159 DETERMINATION OF DISPUTES UNDER SECTION 23 OF THE ELECTRICITY ACT 1989 BETWEEN CITY OF WESTMINSTER, LONDON BOROUGH OF CAM DEN, LONDON BOROUGH OF ISLINGTON AND EDF ENERGY NETWORKS (LPN) PLC 1. INTRODUCTION 1.1. On 3 December 2007, EDF Energy Networks (LPN) pic ("EDF") referred to the Gas and Electricity Markets Authority (""the Authority") a dispute with the City of Westminster ("Westminster"), and a separate dispute with the London Borough of Camden ("Camden"), for determination by the Authority under section 23 of the Electricity Act 1989 (as amended) (the "Act"). On 24 January 2008, EDF referred an additional dispute with the London Borough of Islington ("Islington") to the Authority for determination. In this document, Camden, Westminster and Islington are, where appropriate, collectively referred to as "the Councils". 1.2. The principal point for determination in these disputes is who bears responsibility in law for renewing the rising and lateral mains ("R&Ls") inside the common parts of particular mufti-occupancy apartment blocks under the freehold ownership of the Councils1, and who bears the cost of such renewal. In very broad summary, EDF maintains that the relevant Council is responsible for the R&Ls at the block under its freehold ownership and therefore it (rather than EDF) should in each case bear the costs of replacing the R&Ls. The three Councils maintain that EDF is obliged to replace the R&Ls and to bear the costs of the replacement. 1.3. The parties to the disputes have confirmed in writing that they are content for their identities to be disclosed in this document and its Appendix and the accompanying parties' Submission Documents.
    [Show full text]
  • 8. China's Electricity Sector
    8. China’s Electricity Sector Powering growth, keeping the lights on and prices down Stephen Wilson, Yufeng Yang and Jane Kuang1 Introduction and historical context Electricity is essential for both human and national development. China’s leaders—many of them engineers—have long understood this. Indeed, improved and increased electricity supply were integral to at least two of the ‘four modernisations’ in Deng Xiaoping’s landmark closing speech at the Third Plenary Session of the Eleventh Party Congress on 18 August 1977. At the founding of the People’s Republic in 1949, China had just 1.85 GW of installed electricity generation capacity and a population of more than 540 million (Jowett 1984). To put this in context, 1.85 GW is less than 2,000 MW—the capacity of a typical modern large coal-fired or nuclear power plant with two units. By 1982, China’s installed power generation capacity had reached 50 GW for a population that passed the 1 billion mark in that census year (Jowlett 1984), about 800 million of whom lived in rural areas with limited or no access to electricity (Peng and Pan 2006, citing the in-depth chapter on China in IEA 2002). By 1990, according to UN data, installed generation capacity had reached 138 GW, and according to the World Bank, more than 94 per cent of the population had access to electricity. In 2011, China’s installed generation capacity passed the 1,000 GW mark, and has since overtaken the United States to become the largest power system in the world.
    [Show full text]
  • Water Services Regulation Authority Water Industry
    WATER SERVICES REGULATION AUTHORITY WATER INDUSTRY ACT 1991, SECTION 13(1) Modification of the Conditions of Appointment of Thames Water Utilities Limited Made on 30 March 2015 Coming into effect on 1 April 2015 The Water Services Regulation Authority, in exercise of the power conferred on it by section 13(1) of the Water Industry Act 1991 (“the Act”), after giving notice as required by section 13(2) of the Act, hereby makes the modifications described in the Schedule attached hereto to the Conditions of the Appointment of Thames Water Utilities Limited (“the Appointee”) as a water and sewerage undertaker under Chapter 1 of Part II of the Act, the Appointee having consented to these modifications. Signed for and on behalf of the Water Services Regulation Authority Keith Mason Senior Director of Finance and Networks 1 Schedule 1. Condition A is deleted and replaced with the following text: “Condition A: Interpretation and Construction 1 Unless the contrary intention appears: (1) words and expressions used in these Conditions and references in these Conditions to enactments shall be construed as if they were in an Act of Parliament and the Interpretation Act 1978 applied to them; (2) references in these Conditions to enactments shall include any statutory modification thereof after the transfer date; (3) words and expressions used in these Conditions shall have the same meaning as in any provision of the Water Industry Act 1991; (4) references in these Conditions to sections and Schedules are references to sections of, and Schedules to, the Water Act 1989; and (5) references in these Conditions to paragraphs are references to paragraphs of the Condition in which the reference appears and references to sub- paragraphs are references to sub-paragraphs of the paragraph in which the reference appears.
    [Show full text]
  • Bankside Power Station: Planning, Politics and Pollution
    BANKSIDE POWER STATION: PLANNING, POLITICS AND POLLUTION Thesis submitted for the degree of Doctor of Philosophy at the University of Leicester by Stephen Andrew Murray Centre for Urban History University of Leicester 2014 Bankside Power Station ii Bankside Power Station: Planning, Politics and Pollution Stephen Andrew Murray Abstract Electricity has been a feature of the British urban landscape since the 1890s. Yet there are few accounts of urban electricity undertakings or their generating stations. This history of Bankside power station uses government and company records to analyse the supply, development and use of electricity in the City of London, and the political, economic and social contexts in which the power station was planned, designed and operated. The close-focus adopted reveals issues that are not identified in, or are qualifying or counter-examples to, the existing macro-scale accounts of the wider electricity industry. Contrary to the perceived backwardness of the industry in the inter-war period this study demonstrates that Bankside was part of an efficient and profitable private company which was increasingly subject to bureaucratic centralised control. Significant decision-making processes are examined including post-war urban planning by local and central government and technological decision-making in the electricity industry. The study contributes to the history of technology and the environment through an analysis of the technologies that were proposed or deployed at the post-war power station, including those intended to mitigate its impact, together with an examination of their long-term effectiveness. Bankside made a valuable contribution to electricity supplies in London until the 1973 Middle East oil crisis compromised its economic viability.
    [Show full text]
  • Water Act 1981
    c.12 ELIZABETH II Water Act 1981 1981 CHAPTER 12 An Act to provide for increasing the borrowing powers of the British Waterways Board and to make further provision relating to water supply. [15th April 1981] EIT ENACTED by the Queen's most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and BTemporal, and Commons, inthis present Parliament assembled, and by the authority of the same, as follows:— 1.—(l) For paragraph (iv) of subsection (3) of section 19 of Increased the Transport Act 1962 there shall be substituted the following borrowing powers of British "(iv) for the British Waterways Board £25 million or such Waterways greater sum not exceeding £35millionas the Secretary of Board. State may by order made by statutory instrument specify." 1962 c. 46. (2) After the said subsection (3) there shall be inserted the following subsection— "(3A) An order made under paragraph (iv) of subsection (3) above shall be made by statutory instrument, and no such order shall be made unless a draft of the order has been approved by resolution of the House of Commons." (3) Section 3 of the Transport (Financial Provisions) Act 1977 1977 c. 20. is hereby repealed. 2 c. 12 Water Act 1981 Exemption 2.—(1) Notwithstanding anything in section 30 or in any from charges charges scheme made under section 31 of the Water Act 1973 or for water for in any agreement made under section 27 of the Water Act 1945, fire fighting. but subject to the provisions of any order made under subsection 1973 c.
    [Show full text]