M JEFFERSON O N COLUMBIA T MONROE LAWRENCE OU 5 PENNSYLVANIA TURNPIKE COMMISSION CLEARFIELD R UNION CENTRE CARBON N BUTLER TO ARMSTRONG MP HA D RT SNYDER AN NO ERL MB HU MIFFLIN RT SCHUYLKILL LE NO H DRAWINGS FOR BEAVER IG H JUNIATA ALLEGHENY CAMBRIA BLAIR BERKS PERRY BUCKS DAUPHIN LEBANON M ND O ORELA N ESTM HUNTINGTON T EMERGENCY GENERATOR INSTALLATION 1 W G O M ER Y WASHINGTON BEDFORD CUMBERLAND

LANCASTER FAYETTE 3 4 E AT THE WAR CHESTER LA FRANKLIN DE GREENE SOMERSET 2 FULTON ADAMS YORK STATE ROUTE 29 SLIP RAMP PROJECT LOCATION LOCATION MAP NOT TO SCALE AT MILEPOST 319.62 DISTRICTCOUNTY TOWNSHIP / BOROUGH SECTION SHEETS

IN 4 CHESTER EAST WHITELAND CHESTER COUNTY ACCOUNT NO. EN-00009-03

DRAWING LIST ings\GENERAL\CS1.dwg Nov 12, 2014-1:47pm ohara 12, 2014-1:47pm ings\GENERAL\CS1.dwg Nov

WBS NO. PREPARED BY: APPROVED: EN-00009 DATE NETWORK NUMBER: XX BURNS ENGINEERING FILE NAME: CS-1 1835 MARKET STREET CHIEF ENGINEER, PENNSYLVANIA TURNPIKE COMMISSION DRAWING TYPE: GENERAL SUITE 300 RECOMMENDED: STRUCTURE NUMBER: XX , PA 19103 DATE

SECRETARY TREASURER, PENNSYLVANIA TURNPIKE COMMISSION DATE CHIEF ENGINEER PENNSYLVANIA TURNPIKE DATE COMMISSION COMMISSION APPROVAL Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw NOTES

SITE & UTILITY PLAN 4-1:47pmohara ings\CIVIL-STRUCTURAL\2013-141-C-1.dwg 12, 201 Nov ings\CIVIL-STRUCTURAL\2013-141-C-1.dwg

ENLARGED PLAN

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR SITE AND UTILITY PLAN FILE NAME: C-1 INSTALLATION DRAWING TYPE: CIVIL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: C-1 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 2 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw OUTLINE SPECIFICATION FOR BUILDING

PRE-FABRICATED BUILDING FOUNDATION DETAIL

PRE-FABRICATED BUILDING DETAIL GENERAL CIVIL/STRUCTURAL NOTES 4-1:47pm ohara 4-1:47pm

CONCRETE SIDEWALK DETAIL ings\CIVIL-STRUCTURAL\2013-141-S-1.dwg 12, 201 Nov ings\CIVIL-STRUCTURAL\2013-141-S-1.dwg

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR STRUCTURAL PLAN AND DETAILS FILE NAME: S-1 INSTALLATION DRAWING TYPE: STRUCTURAL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: S-1 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 3 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw GENERAL NOTES ABBREVIATIONS

CONSTRUCTION NOTES

GENERATOR BUILDING ATC

MECHANICAL LEGEND

MECHANICAL FLOOR PLAN m ohara m ings\MECHANICAL\2013-141-M1.dwg Nov ings\MECHANICAL\2013-141-M1.dwgNov 12,2014-1:47p

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR MECHANICAL NEW WORK PLAN FILE NAME: M-1 INSTALLATION DRAWING TYPE: MECHANICAL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: M-1 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 4 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw ELECTRICAL DEMOLITION NOTES ABBREVIATIONS

GENERAL ELECTRICAL NOTES

ELECTRICAL SITE - REMOVALS ELECTRICAL LEGEND pm ohara pm ings\ELECTRICAL\2013-141-DE1.dwg 12, ings\ELECTRICAL\2013-141-DE1.dwg 2014-1:47 Nov

SINGLE LINE - REMOVALS ELECTRICAL UTILITY BUILDING PLAN - EXISTING

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR ELECTRICAL REMOVALS FILE NAME: DE-1 INSTALLATION DRAWING TYPE: ELECTRICAL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: DE-1 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 5 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw ELECTRICAL NOTES: m ohara m ings\ELECTRICAL\2013-141-E1.dwg Nov ings\ELECTRICAL\2013-141-E1.dwgNov 12,2014-1:47p

SINGLE LINE - INSTALLATIONS

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR ELECTRICAL SINGLE LINE DIAGRAM FILE NAME: E-1 INSTALLATION DRAWING TYPE: ELECTRICAL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: E-1 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 6 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw ELECTRICAL NOTES:

ELECTRICAL SITE - INSTALLATIONS

PANEL GEN (FULL RATING) m ohara m ings\ELECTRICAL\2013-141-E2.dwg Nov ings\ELECTRICAL\2013-141-E2.dwgNov 12,2014-1:47p

PRE-FAB BUILDING - INSTALLATIONS

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR ELECTRICAL NEW WORK PLANS FILE NAME: E-2 INSTALLATION DRAWING TYPE: ELECTRICAL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: E-2 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 7 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw APX RECEPTACLE BOX DIRECT BURIED CONDUIT - UNPAVED AREA m ohara m

HANDHOLE DETAIL SYSTEM GROUNDING DETAIL ings\ELECTRICAL\2013-141-E3.dwg Nov ings\ELECTRICAL\2013-141-E3.dwgNov 12,2014-1:47p

PREPARED BY: WBS NO. EN-00009 STATE ROUTE 29 SLIP RAMP X NETWORK NUMBER: EMERGENCY GENERATOR ELECTRICAL DETAILS FILE NAME: E-3 INSTALLATION DRAWING TYPE: ELECTRICAL PREPARED FOR: STRUCTURE NUMBER: THE PENNSYLVANIA DISTRICT: 4 COUNTY: CHESTER DRAWING: E-3 SCALE: AS NOTED TURNPIKE COMMISSION TOWNSHIP / BOROUGH: EAST WHITELAND DATE: 11/12/2014 SHEET: 8 OF 8 Filename: J:\2013c\2013-141 Slip Ramp PTC Gen\Draw