Light Rail Efficiency Newsletter for Mountain View Double Track
Total Page:16
File Type:pdf, Size:1020Kb
CENTRAL EXPWY Proposed Light Rail Downtown Caltrain Realignment Improvements in Mountain View Phase 1 Project Transit Center Phase 2 Project Mountain View Proposed Construction Staging Area VTA’s Light Rail Efficiency Program includes track Relocation of Crossing improvements that yield benefits for local residents, and Signal Equipment businesses, and VTA riders. Existing Station Platform Benefits include: CASTRO ST VTA Light Rail Mountain View • More frequent service, including commute hour Park & Ride Lot Caltrain Stevens Creek express service W. EVELYN AVE Relocated Crossing and • Improved light rail connections to Caltrain service Signal Equipment BUSH Whisman • Fewer delays at the Whisman and Mountain View WHISMAN stations Station • Faster travel times to and from the Mountain View Evelyn Whisman Station. Station Park & Ride Lot The proposed improvements involve adding a second set (Closure) of light rail tracks from the Mountain View Station to the Existing VTA Whisman Station (and also an increased capacity to park Traction Power extra trains at the Mountain View Station). The single set Substation of tracks in this area often creates service delays with CALDERON impacts that ripple throughout the light rail system. 85 CENTRAL EXPWY Evelyn This work will be done in two phases. The first phase Park & Ride Lot E. EVELYN AVE adds a second track from the Mountain View Station to just west of State Route (SR) 85 and also constructing a new, longer train storage track adjacent to the station. Almost 45 percent of light rail riders DANA Projected completion date for this work is July 2015. transfer to or from Caltrain at the 237 Mountain View Station. This project PIONEER Before the second phase of construction can take place, provides improved schedule Caltrain tracks need to be realigned between the Evelyn reliability for better transfers. Light Rail Station and SR 237 to create space for VTA’s Phase 1 second track. This work will be completed by December $26.6 Million 2014. Project Caltrain The second phase of construction will begin at SR 85, Budget $6.4 Million MOORPARK cross over Central Expressway, and end at the Whisman Station. The Phase 2 Project is within one of narrowest sections of railroad right-of-way between San Francisco Phase 2 and Gilroy. Projected completion date is October 2015. $30 Million Mountain View Double Tracking Project Project Schedule This project adds another light rail track Phase Two Realignment of Caltrain tracks between the Mountain View and • Extends second light rail track by • Will be completed at the same time as Caltrain Realignment VTA Trackwork Phase One VTA Trackwork Phase Two Whisman stations where currently only about 3,000 feet from west side of Phase 1 due to timing constraints and to one track exists. It also adds additional Design: May 2014 Environmental: April 2013 Environmental: August 2014 SR 85 to Whisman Station avoid construction conflicts with other train storage capacity at the Mountain Caltrain work planned for the area. Contract award: August 2014 Design: April 2014 Design: July 2014 View Station. • Requires removal of Evelyn Station, Completion: December 2014 Contract award: August 2014 Contract award: December 2014 which is between the northbound Interesting Facts: Project Details: Completion: July 2015 Completion: October 2015 Caltrain track and the single VTA track • Total track length – 4,400 feet = 0.8 mile = Phase One and is located where the second light 14 2/3 football fields rail track will be added Caltrain • Adds second, 1,400-foot light rail track • Travel time savings of up to 30%. by extending the existing storage track • VTA’s Board of Directors will be asked Examples: 17% from downtown Mountain Phase 1 east of the Mountain View Station to approve the station consolidation. View to Lockheed Martin, 30% from future Phase 2 toward the west side of SR 85 When taken out of service in early Milpitas BART Station to Levi’s Stadium • Constructs replacement storage track. 2015, customers will use either the • Storage track will hold two three-car trains. 2013 2014 2015 Mountain View or Whisman stations. LIGHT RAIL EFFICIENCY Mountain View PROGRAM Spring 2014 Community Newsletter Public Meeting May 22, 2014 Information inside Fremont Proposed VTA Light Rail System (2017) Red Line Red Line Express – Peak hours only Green Line Blue Line Blue Line Express Purple Line Stations with Park & Ride Lots Transfer Stations Light Rail Efficiency Project/Mountain View How to contact us: Levi’s Stadium – August 2014 Project website: vta.org/lre-mv VTA’s BART Extension to Silicon Valley – 2017 Quick Facts Project e-mail: [email protected] A second LRT track enables north- and south-bound Project phone number: (408) 321-7575 1405-9452 trains to operate simultaneously between Whisman TTY only: (408) 321-2330 and Mountain View stations. This simple improvement allows VTA to: • Double the frequency of peak hour service with a new Express line To receive e-mail updates • Improve connections at the Mountain View regarding this project go to the Proposed Light Rail Changes Add Capacity, Reduce Travel Times Transit Center with Caltrain, buses, and shuttles project web page and look for this • Reduce delays in light rail service symbol in top right corner of the page and VTA is planning improvements to its Efficiency Program: increase ridership, New express peak hour service light rail system and service to improve speed up the system, spend transit between Mountain View and Alum • Provide convenient service to Levi’s Stadium click on it. Provide the requested informa- tion and VTA will keep you informed about efficiency and meet future service dollars wisely, and actively respond to Rock will be added, which will provide in Santa Clara and direct service to BART in Downtown Mountain View is a the project as it progresses. demands. the changing needs of the valley. a direct link between the Milpitas BART Milpitas (opening in 2017) vibrant multi-modal community. Station projected to open in 2017 and There are a series of construction The opening of Levi’s Stadium in Santa downtown Mountain View. Additionally, projects at the core of the Light Rail Clara, the rapidly expanding transit express service from south San Jose If you would like more information in your language, please contact Efficiency Program. The projects villages and commercial developments to downtown San Jose will also be VTA’s Community Outreach Department at (408) 321-7575. include installing a second set of light along North First Street in San Jose expanded from peak hour to all day rail tracks in the Mountain View area, Si desea más información Kung gusto ninyo ng higit and the opening of VTA’s BART Silicon service. en su idioma, por favor pang impormasyon sa Valley Extension in 2017 will all adding a pocket track in Santa Clara at comuníquese con el inyong wika, mangyaring contribute to the need to provide Levi’s Stadium, and improvements to These investments in its light rail Programa de Extensión a la tawagan and Community increased levels of service while speed light rail service through down- system will enable VTA to improve Comunidad, Community Outreach Department ng fulfilling new opportunities and satisfy- town San Jose. on-time performance and Outreach, de VTA sa (408) 321-7575. ing new service demands. deliver significant time These improvements will facilitate VTA al (408) 321-7575. savings to current exciting changes to light rail service. Four goals are guiding VTA’s Light Rail and future riders..