Light Rail Efficiency Newsletter for Mountain View Double Track

Total Page:16

File Type:pdf, Size:1020Kb

Light Rail Efficiency Newsletter for Mountain View Double Track CENTRAL EXPWY Proposed Light Rail Downtown Caltrain Realignment Improvements in Mountain View Phase 1 Project Transit Center Phase 2 Project Mountain View Proposed Construction Staging Area VTA’s Light Rail Efficiency Program includes track Relocation of Crossing improvements that yield benefits for local residents, and Signal Equipment businesses, and VTA riders. Existing Station Platform Benefits include: CASTRO ST VTA Light Rail Mountain View • More frequent service, including commute hour Park & Ride Lot Caltrain Stevens Creek express service W. EVELYN AVE Relocated Crossing and • Improved light rail connections to Caltrain service Signal Equipment BUSH Whisman • Fewer delays at the Whisman and Mountain View WHISMAN stations Station • Faster travel times to and from the Mountain View Evelyn Whisman Station. Station Park & Ride Lot The proposed improvements involve adding a second set (Closure) of light rail tracks from the Mountain View Station to the Existing VTA Whisman Station (and also an increased capacity to park Traction Power extra trains at the Mountain View Station). The single set Substation of tracks in this area often creates service delays with CALDERON impacts that ripple throughout the light rail system. 85 CENTRAL EXPWY Evelyn This work will be done in two phases. The first phase Park & Ride Lot E. EVELYN AVE adds a second track from the Mountain View Station to just west of State Route (SR) 85 and also constructing a new, longer train storage track adjacent to the station. Almost 45 percent of light rail riders DANA Projected completion date for this work is July 2015. transfer to or from Caltrain at the 237 Mountain View Station. This project PIONEER Before the second phase of construction can take place, provides improved schedule Caltrain tracks need to be realigned between the Evelyn reliability for better transfers. Light Rail Station and SR 237 to create space for VTA’s Phase 1 second track. This work will be completed by December $26.6 Million 2014. Project Caltrain The second phase of construction will begin at SR 85, Budget $6.4 Million MOORPARK cross over Central Expressway, and end at the Whisman Station. The Phase 2 Project is within one of narrowest sections of railroad right-of-way between San Francisco Phase 2 and Gilroy. Projected completion date is October 2015. $30 Million Mountain View Double Tracking Project Project Schedule This project adds another light rail track Phase Two Realignment of Caltrain tracks between the Mountain View and • Extends second light rail track by • Will be completed at the same time as Caltrain Realignment VTA Trackwork Phase One VTA Trackwork Phase Two Whisman stations where currently only about 3,000 feet from west side of Phase 1 due to timing constraints and to one track exists. It also adds additional Design: May 2014 Environmental: April 2013 Environmental: August 2014 SR 85 to Whisman Station avoid construction conflicts with other train storage capacity at the Mountain Caltrain work planned for the area. Contract award: August 2014 Design: April 2014 Design: July 2014 View Station. • Requires removal of Evelyn Station, Completion: December 2014 Contract award: August 2014 Contract award: December 2014 which is between the northbound Interesting Facts: Project Details: Completion: July 2015 Completion: October 2015 Caltrain track and the single VTA track • Total track length – 4,400 feet = 0.8 mile = Phase One and is located where the second light 14 2/3 football fields rail track will be added Caltrain • Adds second, 1,400-foot light rail track • Travel time savings of up to 30%. by extending the existing storage track • VTA’s Board of Directors will be asked Examples: 17% from downtown Mountain Phase 1 east of the Mountain View Station to approve the station consolidation. View to Lockheed Martin, 30% from future Phase 2 toward the west side of SR 85 When taken out of service in early Milpitas BART Station to Levi’s Stadium • Constructs replacement storage track. 2015, customers will use either the • Storage track will hold two three-car trains. 2013 2014 2015 Mountain View or Whisman stations. LIGHT RAIL EFFICIENCY Mountain View PROGRAM Spring 2014 Community Newsletter Public Meeting May 22, 2014 Information inside Fremont Proposed VTA Light Rail System (2017) Red Line Red Line Express – Peak hours only Green Line Blue Line Blue Line Express Purple Line Stations with Park & Ride Lots Transfer Stations Light Rail Efficiency Project/Mountain View How to contact us: Levi’s Stadium – August 2014 Project website: vta.org/lre-mv VTA’s BART Extension to Silicon Valley – 2017 Quick Facts Project e-mail: [email protected] A second LRT track enables north- and south-bound Project phone number: (408) 321-7575 1405-9452 trains to operate simultaneously between Whisman TTY only: (408) 321-2330 and Mountain View stations. This simple improvement allows VTA to: • Double the frequency of peak hour service with a new Express line To receive e-mail updates • Improve connections at the Mountain View regarding this project go to the Proposed Light Rail Changes Add Capacity, Reduce Travel Times Transit Center with Caltrain, buses, and shuttles project web page and look for this • Reduce delays in light rail service symbol in top right corner of the page and VTA is planning improvements to its Efficiency Program: increase ridership, New express peak hour service light rail system and service to improve speed up the system, spend transit between Mountain View and Alum • Provide convenient service to Levi’s Stadium click on it. Provide the requested informa- tion and VTA will keep you informed about efficiency and meet future service dollars wisely, and actively respond to Rock will be added, which will provide in Santa Clara and direct service to BART in Downtown Mountain View is a the project as it progresses. demands. the changing needs of the valley. a direct link between the Milpitas BART Milpitas (opening in 2017) vibrant multi-modal community. Station projected to open in 2017 and There are a series of construction The opening of Levi’s Stadium in Santa downtown Mountain View. Additionally, projects at the core of the Light Rail Clara, the rapidly expanding transit express service from south San Jose If you would like more information in your language, please contact Efficiency Program. The projects villages and commercial developments to downtown San Jose will also be VTA’s Community Outreach Department at (408) 321-7575. include installing a second set of light along North First Street in San Jose expanded from peak hour to all day rail tracks in the Mountain View area, Si desea más información Kung gusto ninyo ng higit and the opening of VTA’s BART Silicon service. en su idioma, por favor pang impormasyon sa Valley Extension in 2017 will all adding a pocket track in Santa Clara at comuníquese con el inyong wika, mangyaring contribute to the need to provide Levi’s Stadium, and improvements to These investments in its light rail Programa de Extensión a la tawagan and Community increased levels of service while speed light rail service through down- system will enable VTA to improve Comunidad, Community Outreach Department ng fulfilling new opportunities and satisfy- town San Jose. on-time performance and Outreach, de VTA sa (408) 321-7575. ing new service demands. deliver significant time These improvements will facilitate VTA al (408) 321-7575. savings to current exciting changes to light rail service. Four goals are guiding VTA’s Light Rail and future riders..
Recommended publications
  • FACT SHEET: Transit Light Rail Speed and Safety Enhancements
    FACT SHEET: Transit Light Rail Speed and Safety Enhancements Project Description The Light Rail Speed and Safety Enhancements study has reviewed a series of speed and safety features designed to enhance light rail operations and efficiency. This study has developed conceptual designs and recommendations for safety, speed, and reliability enhancements in three study areas: one along North First Street, one in Downtown San Jose, and one comprised of key, low-speed zones and specific spot locations throughout the system. Project Goals • Enhance safety, mobility, and access for all travelers • Improve travel times and reliability for transit passengers • Increase transit ridership • Support community input and adopted land use and mobility policies Current Activities • Advancing project definition, technical studies, and conceptual design • Stakeholder outreach • Advancing signal timing changes on North First Street • Final design of a pilot project in Downtown San Jose • Securing additional funding North First Street The project area is along North First Street between Interstate 880 (I-880) and Tasman Drive. Light rail currently operates at 35 mph in the median of this stretch of North First Street which includes eight light rail stations and over twenty intersections. The project is focused on transit signal priority and traffic signal programming. Green lights will hold as the light rail approaches the intersection which will improve travel time. Traffic signals will be reprogrammed to adjust timing based on traffic patterns. This will reduce the time a green light is held after vehicles and pedestrians have crossed an intersection. The removal of left turns on Tasman at North First Street will reduce wait time for light rail, vehicles, and pedestrians.
    [Show full text]
  • BLUE LINE Light Rail Time Schedule & Line Route
    BLUE LINE light rail time schedule & line map Baypointe View In Website Mode The BLUE LINE light rail line (Baypointe) has 2 routes. For regular weekdays, their operation hours are: (1) Baypointe: 12:29 AM - 11:46 PM (2) Virginia: 12:16 AM - 11:33 PM Use the Moovit App to ƒnd the closest BLUE LINE light rail station near you and ƒnd out when is the next BLUE LINE light rail arriving. Direction: Baypointe BLUE LINE light rail Time Schedule 17 stops Baypointe Route Timetable: VIEW LINE SCHEDULE Sunday 12:30 AM - 10:20 PM Monday Not Operational Virginia Station West Virginia Street, San Jose Tuesday Not Operational Children's Discovery Museum Station Wednesday 12:29 AM - 11:46 PM Convention Center Station Thursday 12:29 AM - 11:46 PM 300 Almaden Bl, San Jose Friday 12:29 AM - 11:46 PM San Antonio Station Saturday 12:29 AM - 11:47 PM 200 S 1st St, San Jose Santa Clara Station Fountain Alley, San Jose BLUE LINE light rail Info Saint James Station Direction: Baypointe Stops: 17 Japantown/Ayer Station Trip Duration: 33 min 15 Hawthorne Way, San Jose Line Summary: Virginia Station, Children's Discovery Museum Station, Convention Center Station, San Civic Center Station Antonio Station, Santa Clara Station, Saint James 800 North 1st Street, San Jose Station, Japantown/Ayer Station, Civic Center Station, Gish Station, Metro/Airport Station, Karina Gish Station Court Station, Component Station, Bonaventura North 1st Street, San Jose Station, Orchard Station, River Oaks Station, Tasman Station, Baypointe Station Metro/Airport Station 1740 North First
    [Show full text]
  • Baltimore Region Rail System Plan Report
    Baltimore Region Rail System Plan Report of the Advisory Committee August 2002 Advisory Committee Imagine the possibilities. In September 2001, Maryland Department of Transportation Secretary John D. Porcari appointed 23 a system of fast, convenient and elected, civic, business, transit and community leaders from throughout the Baltimore region to reliable rail lines running throughout serve on The Baltimore Region Rail System Plan Advisory Committee. He asked them to recommend the region, connecting all of life's a Regional Rail System long-term plan and to identify priority projects to begin the Plan's implemen- important activities. tation. This report summarizes the Advisory Committee's work. Imagine being able to go just about everywhere you really need to go…on the train. 21 colleges, 18 hospitals, Co-Chairs 16 museums, 13 malls, 8 theatres, 8 parks, 2 stadiums, and one fabulous Inner Harbor. You name it, you can get there. Fast. Just imagine the possibilities of Red, Mr. John A. Agro, Jr. Ms. Anne S. Perkins Green, Blue, Yellow, Purple, and Orange – six lines, 109 Senior Vice President Former Member We can get there. Together. miles, 122 stations. One great transit system. EarthTech, Inc. Maryland House of Delegates Building a system of rail lines for the Baltimore region will be a challenge; no doubt about it. But look at Members Atlanta, Boston, and just down the parkway in Washington, D.C. They did it. So can we. Mr. Mark Behm The Honorable Mr. Joseph H. Necker, Jr., P.E. Vice President for Finance & Dean L. Johnson Vice President and Director of It won't happen overnight.
    [Show full text]
  • Smart Location Database Technical Documentation and User Guide
    SMART LOCATION DATABASE TECHNICAL DOCUMENTATION AND USER GUIDE Version 3.0 Updated: June 2021 Authors: Jim Chapman, MSCE, Managing Principal, Urban Design 4 Health, Inc. (UD4H) Eric H. Fox, MScP, Senior Planner, UD4H William Bachman, Ph.D., Senior Analyst, UD4H Lawrence D. Frank, Ph.D., President, UD4H John Thomas, Ph.D., U.S. EPA Office of Community Revitalization Alexis Rourk Reyes, MSCRP, U.S. EPA Office of Community Revitalization About This Report The Smart Location Database is a publicly available data product and service provided by the U.S. EPA Smart Growth Program. This version 3.0 documentation builds on, and updates where needed, the version 2.0 document.1 Urban Design 4 Health, Inc. updated this guide for the project called Updating the EPA GSA Smart Location Database. Acknowledgements Urban Design 4 Health was contracted by the U.S. EPA with support from the General Services Administration’s Center for Urban Development to update the Smart Location Database and this User Guide. As the Project Manager for this study, Jim Chapman supervised the data development and authored this updated user guide. Mr. Eric Fox and Dr. William Bachman led all data acquisition, geoprocessing, and spatial analyses undertaken in the development of version 3.0 of the Smart Location Database and co- authored the user guide through substantive contributions to the methods and information provided. Dr. Larry Frank provided data development input and reviewed the report providing critical input and feedback. The authors would like to acknowledge the guidance, review, and support provided by: • Ruth Kroeger, U.S. General Services Administration • Frank Giblin, U.S.
    [Show full text]
  • GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY Transit Oriented Development Best Practices February 2007
    FEBRUARY GREATER CLEVELAND 2007 REGIONAL TRANSIT AUTHORITY TOD in Practice San Francisco, CA Dallas, TX Boston, MA Baltimore, MD St.Louis, MO Portland, OR Washington DC Lessons Learned Establishing Roles Developing the Development Using Regional Strengths 1240 West 6th Street Cleveland, OH 44113 216.566-5100 TRANSIT ORIENTED www.gcrta.org DEVELOPMENT BEST PRACTICES 2007 Greater Cleveland Regional Transit Authority 1240 West 6th Street, Cleveland, OH 44113 216.566.5100 www.gcrta.org Best Practices Manual GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY Table of Contents PAGE Introduction .......................................................................................................................1 TOD in Practice .................................................................................................................3 Bay Area Rapid Transit (BART) and Santa Clara County Valley Transportation Authority (VTA): San Francisco Bay Area, CA................................................................................5 Dallas Area Rapid Transit (DART): Dallas, TX..............................................................15 Massachusetts Bay Transportation Authority (MBTA): Boston, MA................................23 Metro: Baltimore, MD ..................................................................................................32 Metro: St. Louis, MO....................................................................................................36 Tri-County Metropolitan Transportation District of Oregon (Tri-Met):
    [Show full text]
  • Agenda Michael J
    BOARD OF DIRECTORS 2014 TOM NOLAN, CHAIR JERRY DEAL, VICE CHAIR JOSÉ CISNEROS MALIA COHEN ROSE GUILBAULT ASH KALRA ADRIENNE TISSIER PERRY WOODWARD KEN YEAGER AGENDA MICHAEL J. SCANLON EXECUTIVE DIRECTOR PENINSULA CORRIDOR JOINT POWERS BOARD Bacciocco Auditorium, 2nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 July 3, 2014 – Thursday 10:00 a.m. 1. Pledge of Allegiance 2. Call to Order/Roll Call 3. Public Comment Public comment by each individual speaker shall be limited to two minutes 4. Consent Calendar RESOLUTIONS Members of the public or Board may request that an item under the Consent Calendar be considered separately a) Approval of Minutes of Special Meeting of June 5, 2014 b) Approval of Minutes of Regular Meeting of June 5, 2014 c) Authorize Executing a Funding Agreement with the City of San Mateo to Provide $100,000 for the Hillsdale Station Capital Plan d) Authorize Executing a Construction and Maintenance Agreement with the Santa Clara Valley Transportation Authority and a First Amendment to Grant of Easement and Agreement Over a Portion of the Caltrain Corridor Near the Mountain View Caltrain Station 5. Chairperson’s Report 6. Report of the Citizens Advisory Committee 7. Report of the Executive Director a) Caltrain Modernization Update INFORMATIONAL 8. Acceptance of Statement of Revenues and Expenses for MOTION May 2014 9. Authorize Adoption of Revised Codified Tariff, Adoption of RESOLUTION Findings for a Statutory Exemption Under California Environmental Quality Act, and Approval of Associated Title VI Equity Analysis Page 1 of 3 Peninsula Corridor Joint Powers Board July 3, 2014 Agenda 10.
    [Show full text]
  • Understanding TOD (Golem)
    VTA’s Joint (TOD) Development Program SPUR: Understanding TOD June 7, 2018 12:30-1:30pm Overview • VTA’s Goals for TOD and Transit Oriented Communities • VTA’s Joint Development Portfolio • VTA Owned Properties: Opportunities and Challenges • How to support and get involved VTA’s Approach to Transit Oriented Communities Joint Development Policy Goals: 1.Revenue 2.Ridership 3.Neighborhood Strategies: • Public-Private TOD on VTA sites • Station area improvements • Partnerships to increase private TOD around stations TOD located in Milpitas adjacent to VTA Light Rail line 3 VTA’s Current Joint Development Portfolio 25 sites (+ BART Phase 2) 205 acres Potential Development: Residential: Commercial: 5,100+ units 4.3 million+ sq. ft. 1,800+ 13,000+ jobs affordable created 4 5 VTA Owned Properties - Opportunities • Catalyst to create transit oriented communities • Affordable housing • Workforce / apprenticeships • Complete Streets improvements to enhance multi-modal access Affordable Housing at Ohlone/Chynoweth Station 6 VTA Owned Properties - Challenges • Getting market based entitlements for residential mixed-use • Avoiding over-investment in parking, which reduces revenues • Winning neighborhood, political acceptance Example of TOD promoting multi-modal lifestyle at River View adjacent to VTA’s River Oaks Station, North • Creating credibility, momentum San Jose with developers 7 VTA Owned Properties - Approach • Identify opportunities, issues, replacement parking strategy • Engage community & build support • Competitive developer selection
    [Show full text]
  • 2017 Triennial On-Site Safety Review of Santa Clara Valley Transportation Authority (Vta)
    2017 TRIENNIAL ON-SITE SAFETY REVIEW OF SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) RAIL TRANSIT SAFETY BRANCH SAFETY AND ENFORCEMENT DIVISION CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102 September 19, 2018 Final Report Daren Gilbert, Manager Rail Transit Safety Branch Safety and Enforcement Division 287047411 2017 TRIENNIAL ON-SITE SAFETY REVIEW OF SANTA CLARA VALLEY TRANSPORTATION AUTHORITY ACKNOWLEDGEMENT The California Public Utilities Commission’s Rail Transit Safety Branch (RTSB) conducted this system safety program review. Staff members directly responsible for conducting safety review and inspection activities include: Daren Gilbert, Rail Transit Safety Branch Program Manager Stephen Artus, Program and Project Supervisor Steven Espinal, Senior Utilities Engineer Rupa Shitole, CPUC Representative to VTA, Utilities Engineer Michael Borer, Rail Transit Operations Safety Section Supervisor Debbie Dziadzio, Senior Transportation Operations Supervisor Matthew Ames, Senior Transportation Operations Supervisor John Madriaga, Track Inspector Salvador Herrera, Track Inspector Michael Rose, Operating Practices Inspector Richard Fernandez, Operating Practices Inspector Adam Freeman, Equipment Inspector (Mechanical) James Matus, Equipment Inspector (Mechanical) Shane Roberson, Signal and Train Control Inspector Claudia Lam, Senior Utilities Engineer Specialist – Risk Assessment Jamie Lau, Utilities Engineer Arun Mehta, Utilities Engineer Howard Huie, Utilities Engineer Joey Bigornia, Utilities Engineer
    [Show full text]
  • Summary of Changes in Santa Clara 2019 NTSP Route # 2019 NTSP
    Summary of Changes in Santa Clara 2019 2019 NTSP Changes from Current Network NTSP Route Name Route # 20 Sunnyvale Caltrain Santa Clara areas served include Santa Clara Station - Milpitas BART Square, Mission College, Agnew Rd., and Station (NEW ROUTE) Montague Expwy. 21 Stanford Shopping Merges two current routes: Route 35 and Center - Santa Clara Route 32. Caltrain Station 22 Palo Alto Transit Center None. - Eastridge Transit Center 23 De Anza College - Alum • Rerouted to remain along Stevens Creek Rock Transit Center Blvd. between Winchester Blvd. & Bascom Ave. • Decreased weekday frequency from 12 minutes to 15 minutes. 53 Sunnyvale Caltrain • Serves Santa Clara Caltrain Station via Station - Santa Clara Homestead Rd. This routing replaces part Caltrain Station of current Route 81. • Increased weekday frequency from 60 minutes to 30 minutes. 57 Old Ironsides Station - • Increased weekday frequency from 30 West Valley College minutes to 15 minutes. • Provides connections to other frequent routes (e.g. Routes 22, 522, 23, 523, 26, Orange Line and Green Line) 59 Old Ironsides Station - New route that services parts of current Valley Fair Transit Routes 60 and 23. Center (NEW ROUTE) • Connects Old Ironsides Station with Santa Clara Caltrain Station • Also connects to Valley Fair Transit Center via Forest Ave. 60 Milpitas BART Station - • Rerouted northern portion of route from Winchester Transit Santa Clara Station; serves San Jose Center Airport and Milpitas BART Station. • The current network’s northern portion of the route serving Monroe St., Great America Pkwy., Mission College areas are serviced by new Route 59. 330 Almaden Expressway & Discontinued due to low ridership.
    [Show full text]
  • Chicago Transit Authority (CTA)
    06JN023apr 2006.qxp 6/21/2006 12:37 PM Page 1 All Aboard! Detailed Fare Information First Bus / Last Bus Times All CTA and Pace buses are accessible X to people with disabilities. This map gives detailed information about Chicago Transit # ROUTE & TERMINALS WEEKDAYS SATURDAY SUNDAY/HOL. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUNDAY/HOL. # ROUTE & TERMINALS WEEKDAYS SATURDAY SUNDAY/HOL. Authority bus and elevated/subway train service, and shows Type of Fare* Full Reduced Reduced fares are for: You can use this chart to determine days, hours and frequency of service, and Fare Payment Farareboebox Topop where each route begins and ends. BROADWAY DIVISION ILLINOIS CENTER/NORTH WESTERN EXPRESS Pace suburban bus and Metra commuter train routes in the 36 70 Division/Austin east to Division/Clark 4:50a-12:40a 5:05a-12:40a 5:05a-12:40a 122 CASH FARE Accepted on buses only. $2 $1 Devon/Clark south to Polk/Clark 4:00a-12:10a 4:20a-12:00m 4:20a-12:15a Canal/Washington east to Wacker/Columbus 6:40a-9:15a & CTA service area. It is updated twice a year, and available at CTA Children 7 through 11 BUSES: CarCardsds It shows the first and last buses in each direction on each route, traveling Polk/Clark north to Devon/Clark 4:55a-1:20a 4:55a-1:05a 4:50a-1:15a Division/Clark west to Division/Austin 5:30a-1:20a 5:40a-1:20a 5:45a-1:20a 3:40p-6:10p Exact fare (both coins and bills accepted). No cash transfers available. years old.
    [Show full text]
  • Route(S) Description 26 the Increased Frequency on the 26 Makes the Entire Southwestern Portion of the Network Vastly More Useful
    Route(s) Description 26 The increased frequency on the 26 makes the entire southwestern portion of the network vastly more useful. Please keep it. The 57, 60, and 61 came south to the area but having frequent service in two directions makes it much better, and riders from these routes can connect to the 26 and have much more areas open to them. Thank you. Green Line The increased weekend service on the Green line to every twenty minutes is a good addition of service for Campbell which is seeing markedly better service under this plan. Please keep the increased service. Multiple Please assuage public concerns about the 65 and 83 by quantifying the impact the removal of these routes would have, and possible cheaper ways to reduce this impact. The fact is that at least for the 65, the vast majority of the route is duplicative, and within walking distances of other routes. Only south of Hillsdale are there more meaningful gaps. Mapping the people who would be left more than a half mile (walkable distance) away from service as a result of the cancellation would help the public see what could be done to address the service gap, and quantifying the amount of people affected may show that service simply cannot be justified. One idea for a route would be service from winchester transit center to Princeton plaza mall along camden and blossom hill. This could be done with a single bus at a cheaper cost than the current 65. And nobody would be cut off. As far as the 83 is concerned, I am surprised the current plan does not route the 64 along Mcabee, where it would be eq..
    [Show full text]
  • VTA Fares Took Effect in 2009, When VTA Increased the Base Fare from $1.75 to $2.00 and Also Raised Eco Pass Fares by Approximately 20%
    Administration and Finance Committee Thursday, May 18, 2017 12:00 PM VTA Conference Room B-106 3331 North First Street San Jose, CA ADDENDUM TO AGENDA 24.X. ACTION ITEM – Recommend that the VTA Board of Directors approve the Special Event Service Policy. ADMINISTRATION & FINANCE COMMITTEE Thursday, May 18, 2017 12:00 PM VTA Conference Room B-106 3331 North First Street San Jose, CA AGENDA CALL TO ORDER 1. ROLL CALL 2. PUBLIC PRESENTATIONS: This portion of the agenda is reserved for persons desiring to address the Committee on any matter not on the agenda. Speakers are limited to 2 minutes. The law does not permit Committee action or extended discussion on any item not on the agenda except under special circumstances. If Committee action is requested, the matter can be placed on a subsequent agenda. All statements that require a response will be referred to staff for reply in writing. 3. ORDERS OF THE DAY CONSENT AGENDA 4. ACTION ITEM -Approve the Regular Meeting Minutes of April 20, 2017. 5. ACTION ITEM -Recommend that the VTA Board of Directors review and accept the Fiscal Year 2017 Statement of Revenues and Expenses for the period ending March 31, 2017. 6. ACTION ITEM -Recommend that the VTA Board of Directors authorize the General Manager to purchase Property and Casualty insurance coverage for General and Auto Liability, Public Officials & Employment Practices Liability, Cyber Liability, Environmental Impairment & Pollution Liability, Crime, Blanket Railroad Protective Liability, and Property Insurance renewing the annual Operations Insurance Program for Fiscal Year 2018 for an amount not to exceed $3,500,000.
    [Show full text]