Discussion on Practice of Green Highway Construction Based on High Quality Objectives

Total Page:16

File Type:pdf, Size:1020Kb

Discussion on Practice of Green Highway Construction Based on High Quality Objectives E3S Web of Conferences 145, 02041 (2 020) https://doi.org/10.1051/e3sconf/20 2014502041 IAECST 201 9 Discussion on practice of green highway construction based on high quality objectives Gensheng Han1, Wu Zeng1, Hua Liang1, Dan Wang2*, Shegang Shao2and Jian Wang2 1Guangchang Ji'an Expressway Construction Project Office of Jiangxi Expressway Investment Group Co., Ltd 2Research Institute of Highway Ministry of Transport, Beijing, 100086, China Abstract: Creating green roads is an objective requirement for the transformation and development of the transportation industry. It is also an objective requirement for advancing the supply-side structural reform of the transportation industry and building a satisfactory transportation for the people. It is also an objective requirement for achieving a beautiful China. The author puts forward some practical experiences of green highway construction through the construction of the typical demonstration project of the Guangji expressway green highway. rivers, and has many air, water and acoustic environment 1 Introduction sensitive points. As the Technical Standards for Highwayswas updated, the central divider of nearly 170 Through the construction of the typical demonstration kilometers of sections was replaced by New Jersey project of the green highway of the Guangji expressway, guardrails, and road landscape coordination and traffic the author deeply realizes that the top-level design is the guidance were poor. key to the implementation of the green highway. The The natural environment and ecological environment green highway construction must be implemented in the of the area that the project passes through are beautiful, entire process and comprehensively. The supervision and the Ganjiang river, Meijiang river, and Minjiang river management of the soil and water conservation industry is flow through the area, and the tourism resources of "green, the key, and the significance of typical demonstration lies red, patina" are rich. Along the line, there are scenic spots in the achievement of replicable and popularizable results. such as Qingyuan mountain, Cuiwei peak, and the Baili lotus belt. There are red resorts such as the revolutionary 2 Project description cradle Jinggang mountain, the former site of the Ningdu uprising command, as well as Diaoyuan ancient village, The Guangji expressway is the section from the seventh Wugu village, Meigang ancient village, Yangyi ancient link of the Shenhai expressway on the national highway Village, cultural monuments such as Ouyangxiu memorial network to Putian, Fujian, and Yanling, Hunan (G1517). hall and Yan tower in Song Dynasty. The Jinggang spirit The project will pass through six counties and districts in and the Soviet union spirit originated here. Luling culture, three cities including Fuzhou, Ganzhou and Jian. The Hakka culture, and tea culture complement each other total length of the route is 189.276 kilometers, and the here. estimated budget of the project is 12.624 billion yuan. 41.28 million cubic meters of earthwork and stonework for the entire Guangji expressway; 158 4 General layout of the high starting bridges with a total length of 35159 linear meters and a point bridge ratio of 18.7%; 4 hubs, 11 interchanges, 3 service areas and 1 parking area. 4.1. Clear positioning According to the strategic deployment of the green 3 Engineering features highway construction and the overall requirements of the The Guangji expressway is located in the over-wet area of experimental zone of ecological civilization, combined the south of the Yangtze river. The geomorphic units are with the characteristics of the project, comprehensively complex. There are red sandstone hilly landforms in the coordinate the project construction, overall planning, and middle of Jiangxi, Laoshan mountainous terrain, and Jitai scientific positioning, which are used to guide and basin. The number of rainy and foggy days is large, and implement the entire process of the project construction, the water bodies are large. Red gauze is widely distributed and strive to create high-quality highway engineering . along the road, passes through many residential areas and *Corresponding author’s e-mail: [email protected] © The Authors, published by EDP Sciences. This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/). E3S Web of Conferences 145, 02041 (2 020) https://doi.org/10.1051/e3sconf/20 2014502041 IAECST 201 9 4.2. Project Vision 5.4. Learn from others and improve quality construction ability Guang Chong Ming De, Ji Zhu Model 5.4.1. New equipment for bridge pavement 4.3. Guiding ideology We must firmly establish five development concepts, 5.4.2. New method of prestressed engineering implement green road construction, strive to build ecological civilization demonstration roads, and achieve 5.4.3. New technology for slope protection healthy and sustainable development of road construction 5.4.4. Stone blasting new technology 4.4. Construction Concept We want to be intelligent and innovative, green, and 5.5. Strengthen supervision and create a quality creative, and strive for excellence and safe construction site 4.5. Construction goals 5.5.1. "Regulations" implementation responsibility We must work hard together, cultivate elites with sincerity, and create excellent products with perseverance 5.5.2. "Civil defense" raises awareness 5 High-quality green road construction 5.5.3. "Physical defense" strengthens the foundation 5.1. Scientific selection, consolidating the 5.5.4. "Technical defense" enhancement capability foundation for quality construction 5.6. Simultaneous measures to help quality 5.1.1. We need to innovate and choose the contractor engineering construction 5.1.2. We must reasonably divide the construction bids 5.6.1. Sunlight supervision 5.1.3. We must implement general contracting for 5.6.2. Green demolition mechanical and electrical engineering design, construction and maintenance 5.6.3. Cultural guidance 5.2. Carefully crafted, constructing quality Dalin 6 Green road construction experience facilities 6.1. Top-level design is the key to green road 5.2.1. Dalin facilities standardization implementation 5.2.2. Precision beam field operation As the main body of the highway project construction, the construction management unit should first start with the overall layout of the high-level project and clearly 5.3. Process management, outline quality entity define the goal, "take the method from the top, only the engineering middle, and the middle, so it goes down." At the beginning of the project design, Guangji expressway was 5.3.1. Taking labor competition as the starting point, and closely linked to the connotation of "green" and "quality", promoting typical approaches to achieve overall and planned ahead, to make the top-level design. The excellence guiding ideology of “firmly establishing the five development concepts”, the construction concept of “smart innovation, green quality, ingenuity, and the 5.3.2. Taking the first demonstration system as the key pursuit of excellence” were clarified, and the project point to promote standard work across the board vision of “Guang Chongmingde, Jizhu Model” was established, and “considered together” "Fine, sincere 5.3.3. Using concrete appearance as a breakthrough point, education of elites, perseverance tree boutique," the goal carefully create quality engineering of construction. Further optimize and improve the engineering design according to the concept of green highways, and lay a 2 E3S Web of Conferences 145, 02041 (2 020) https://doi.org/10.1051/e3sconf/20 2014502041 IAECST 201 9 solid foundation for the implementation of green implement the concept of green highways during the highways. Through the design optimization in the two construction process. Actively promote the construction stages of preliminary design and construction drawing of green highways through measures such as land design, the project's permanent land use has been reduced conservation, material conservation and recycling, and by 1,600 mu, of which 264 mu of arable land has been environmental protection. The design is just a "blueprint", reduced and basic farmland has not been occupied. but the construction is really "earthmoving", and there is Earthwork volume has been reduced by 3.7 million cubic still much room for improvement in the construction of meters; 15 uranium or rare-earth mines or mining areas green highways. In order to implement the concept of have been bypassed or basically bypassed,4 ecologically green highway in the construction stage, the Guangji sensitive areas such as Ningdu Meijiang National project proposed the "green construction" goals, Wetland Park, Qingyuan Mountain Provincial Forest including the content of Yonglin combined with land Park, and water source protection areas such as the conservation, special management of soil extraction and source river (Fujiang) protection area or fetching water abandonment, engineering wounds near natural Mouth 15. The third is to implement high standards and ecological restoration, environmental (water) protection standardized management, formulate relevant monitoring and improvement, green production management systems, introduce corresponding incentive technology for asphalt pavement, etc. mechanisms, and concreteize the concept of green highways, and make them executable and inspectable. 6.4. Actively participate in environmental (water) Guangji expressway combined with the project
Recommended publications
  • Adapting to Climate Change: Building a Network of Solutions
    JULY–AUGUST 2012 NUMBERTR 281 NEWS Adapting to Climate Change Building a Network of Solutions Ⅲ State, Regional, and Local Initiatives Ⅲ Learning from Severe Weather Events Ⅲ Solar, Green, and LED-Lit Highways Ⅲ The Ready Benefits of Ecodriving Ⅲ Scenario Planning for Priorities TRANSPORTATION RESEARCH BOARD 2012 EXECUTIVE COMMITTEE* Chair: Sandra Rosenbloom, Professor of Planning, University of Arizona, Tucson Vice Chair: Deborah H. Butler, Executive Vice President, Planning, and CIO, Norfolk Southern Corporation, National Academy of Sciences Norfolk, Virginia National Academy of Engineering Executive Director: Robert E. Skinner, Jr., Transportation Research Board Institute of Medicine National Research Council Victoria A. Arroyo, Executive Director, Georgetown Climate Center, and Visiting Professor, Georgetown University Law Center, Washington, D.C. The Transportation Research Board is one J. Barry Barker, Executive Director, Transit Authority of River City, Louisville, Kentucky William A. V. Clark, Professor of Geography (emeritus) and Professor of Statistics (emeritus), Department of of six major divisions of the National Geography, University of California, Los Angeles Research Council, which serves as an Eugene A. Conti, Jr., Secretary of Transportation, North Carolina Department of Transportation, Raleigh independent adviser to the federal gov- James M. Crites, Executive Vice President of Operations, Dallas–Fort Worth International Airport, Texas ernment and others on scientific and Paula J. C. Hammond, Secretary, Washington State Department of Transportation, Olympia technical questions of national impor- Michael W. Hancock, Secretary, Kentucky Transportation Cabinet, Frankfort tance, and which is jointly administered Chris T. Hendrickson, Duquesne Light Professor of Engineering, Carnegie Mellon University, Pittsburgh, by the National Academy of Sciences, the Pennsylvania National Academy of Engineering, and Adib K.
    [Show full text]
  • Landscape Urbanism for the Highway City of Springfield Orn Th End Piyawut Inthasorn University of Massachusetts - Amherst, [email protected]
    University of Massachusetts Amherst ScholarWorks@UMass Amherst Landscape Architecture & Regional Planning Landscape Architecture & Regional Planning Honors Projects Spring 5-14-2010 Landscape Urbanism for the Highway city of Springfield orN th End Piyawut Inthasorn University of Massachusetts - Amherst, [email protected] Follow this and additional works at: https://scholarworks.umass.edu/larp_honors Part of the Environmental Design Commons, Landscape Architecture Commons, Other Geography Commons, Urban, Community and Regional Planning Commons, and the Urban Studies and Planning Commons Inthasorn, Piyawut, "Landscape Urbanism for the Highway city of Springfield North End" (2010). Landscape Architecture & Regional Planning Honors Projects. 1. Retrieved from https://scholarworks.umass.edu/larp_honors/1 This Article is brought to you for free and open access by the Landscape Architecture & Regional Planning at ScholarWorks@UMass Amherst. It has been accepted for inclusion in Landscape Architecture & Regional Planning Honors Projects by an authorized administrator of ScholarWorks@UMass Amherst. For more information, please contact [email protected]. Landscape Urbanism for the Highway city of Springfield North End By Piyawut Inthasorn, BSLA 2010 University of Massachusetts Amherst Department of Landscape Architect and Regional Planning 1 Content Introduction 3 Springfield North End Highway Analysis/ Problems 6-13 Landscape Urbanism 13-17 Four co-ecological system concepts 18-35 Recommendation 36-42 Conclusion 42-45
    [Show full text]
  • City of Winters 2025 Climate Action Plan
    City of Winters 2025 Climate Action Plan Adopted by the Winters City Council, XXXXX, 20192020 Contacts: City of Winters Public Works Department Environmental Services 318 First Street Winters, CA 95694 530-795-4910 City of Winters Community Development Department Planning Division 318 First Street Winters, CA 95694 530-794-6713 March 2019 2020 Acknowledgements Yolo Energy Watch provided the funding for preparation of Winters’ 2020 2025 Climate Action Plan. The Climate Action Plan’s foundation is based on the City of Winters’ Climate Action Plan Technical Report, which was prepared by the Sustainable Design Academy of the University of California, Davis. The CAP was developed with the technical report and with the assistance from City employees and leaders. The following individuals are specifically acknowledged for their time in the creation of this document. Members of City Council: Bill Biasi, Mayor Wade Cowan, Mayor Pro-Tempore Harold Anderson, Council Member Jesse Loren, Council Member Pierre Neu, Council Member City Manager Office: John W. Donlevy, Jr., City Manger Ethan Walsh, City Attorney Tracy Jensen, City Clerk Public Works Administration: Carol Scianna, Environmental Services Manager Eric Lucero, Public Works Operations Manager Prepared by: Annie Levan and David Springer Special thanks are due to John Mott-Smith, Yolo County Climate Change Advisor and Yolo Energy Watch Program Manger, who facilitated the funding arrangements for this project. Another special thanks goes to Dr. Deb Niemeier, whose expertise in climate science provided the technical basis. Table of Contents Acronyms and Abbreviations .............................................. 1 Executive Summary ............................................................ 3 Introduction and Overview ................................................. 4 Guide to Focus Areas ........................................................ 13 Mobility ............................................................................ 14 Building and Infrastructure ..............................................
    [Show full text]
  • Green Highway Partnership
    Green Highways Partnership FACT SHEET FS.01 COLLABORATING for PROGRESS The Mid-Atlantic Green Highways Partnership (GHP) was formed to promote inovative streamlining and market-based approaches to meet transportation needs while promoting environmental stewardship so both are “better than before,” with an emphasis on sustainability! Why was the GHP Formed? GREEN HIGHWAYS CHARACTERISTICS First, the partners recognized the increased demand and expectations from the public for improved transportation systems and protection of our natural • Provides a net increase in environmental functions and values to the watershed. environment. As this demand increased, the players also found themselves in an increasingly complex environment. Things just aren’t as simple as they • Goes beyond the minimum standards set once seemed to be. These factors, coupled with the increasing cost of doing forth by environmental law and regulations. business and ever shrinking resources, partnerships formed to encourage • Identifies and protects historical and cultural innovation, smart thinking, and good government to address our common landmarks. goals. The GHP facilitates coordination and communication amongst these • Maps all resources in the area in order to many entities and their varied interested early in the planning process to be identify, avoid, and protect critical resource most effective. areas. • Uses innovative, natural methods to reduce What Makes a Green Highway? imperviousness, and cleanse all run-off with- in the project area. Under the GHP, green highways are not defined by a list of requirements. Green highways are defined by an effort to go “beyond compliance” and leave • Maximizes the use of existing transportation the project area “better than before” through community partnering, environ- infrastructure, provides multi-modal trans- portation opportunities, and promotes ride- mental stewardship, and transportation network improvements in safety and sharing/public transportation.
    [Show full text]
  • Powerpoint Templates
    ECOBUILD SEMINAR Malaysia Grren Highway Index - MyGHI by Ir. Dr. Rosli Mohamad Zin Construction Research Centre (CRC), UTM Date : September 2014 Venue : PWTC KL Presentation Outline Sustainability Issues MyGHI Sustainability Issues ` Global Warming ◦ Gradual increase of earth and ocean temperature as the result of the built up certain gases ` Greenhouse gases 2 ◦ Heat-trapping gases – CO , CFC, CH4 & NO2 ¾ Transportation,Transportation, factories,factories, electricelectric citycity fromfrom coalcoal--firedfired planplan produceproduce COCO2 ¾ CuttingCutting downdown trees,trees, fewerfewer treestrees meanmean lessless conversionconversion ofof COCO2 toto oxygenoxygen Global Warming & Greenhouse gases 4 5 6 “NIMBY Syndrome” Not In My Back Yard Lack of Awareness 8 THINK GLOBALLY, ACT LOCALLY 10 • Intergenerational equity: = Equity between generations • Intragenerational equity: = Equity within a generation Equity ` Renewable Resources ◦ Wind, water, solar… ` Non-Renewable Resources ◦ Fossil fuels (coal, oil, gas) and minerals… ¾ SustainableSustainable raterate ofof useuse ofof aa nonnon--renewablerenewable resourceresource isis lessless thanthan oror equalequal toto thethe raterate atat whichwhich aa renewablerenewable resourceresource cancan bebe broughtbrought onon streamstream toto replacereplace itit [Hartwick Rule] Resource Depletion 12 What the professionals can do? 14 SDSD PRINCIPLESPRINCIPLES 16 ¾ ThereThere hashas toto bebe aa betterbetter wayway…… 18 Land Clearing ¾ Potential impacts should be considered before actions are taken…
    [Show full text]
  • Green Transportation Infrastructure: Challenges to Access and Implementation
    GREEN TRANSPORTATION INFRASTRUCTURE: CHALLENGES TO ACCESS AND IMPLEMENTATION HEARING BEFORE THE SUBCOMMITTEE ON TECHNOLOGY AND INNOVATION COMMITTEE ON SCIENCE AND TECHNOLOGY HOUSE OF REPRESENTATIVES ONE HUNDRED TENTH CONGRESS FIRST SESSION MAY 10, 2007 Serial No. 110–27 Printed for the use of the Committee on Science and Technology ( Available via the World Wide Web: http://www.house.gov/science U.S. GOVERNMENT PRINTING OFFICE 34–909PS WASHINGTON : 2007 For sale by the Superintendent of Documents, U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: toll free (866) 512–1800; DC area (202) 512–1800 Fax: (202) 512–2250 Mail: Stop SSOP, Washington, DC 20402–0001 VerDate 11-MAY-2000 12:26 Aug 13, 2007 Jkt 034909 PO 00000 Frm 00001 Fmt 5011 Sfmt 5011 C:\WORKD\T&I07\051007\34909 SCIENCE1 PsN: SCIENCE1 COMMITTEE ON SCIENCE AND TECHNOLOGY HON. BART GORDON, Tennessee, Chairman JERRY F. COSTELLO, Illinois RALPH M. HALL, Texas EDDIE BERNICE JOHNSON, Texas F. JAMES SENSENBRENNER JR., LYNN C. WOOLSEY, California Wisconsin MARK UDALL, Colorado LAMAR S. SMITH, Texas DAVID WU, Oregon DANA ROHRABACHER, California BRIAN BAIRD, Washington KEN CALVERT, California BRAD MILLER, North Carolina ROSCOE G. BARTLETT, Maryland DANIEL LIPINSKI, Illinois VERNON J. EHLERS, Michigan NICK LAMPSON, Texas FRANK D. LUCAS, Oklahoma GABRIELLE GIFFORDS, Arizona JUDY BIGGERT, Illinois JERRY MCNERNEY, California W. TODD AKIN, Missouri PAUL KANJORSKI, Pennsylvania JO BONNER, Alabama DARLENE HOOLEY, Oregon TOM FEENEY, Florida STEVEN R. ROTHMAN, New Jersey RANDY NEUGEBAUER, Texas MICHAEL M. HONDA, California BOB INGLIS, South Carolina JIM MATHESON, Utah DAVID G. REICHERT, Washington MIKE ROSS, Arkansas MICHAEL T. MCCAUL, Texas BEN CHANDLER, Kentucky MARIO DIAZ-BALART, Florida RUSS CARNAHAN, Missouri PHIL GINGREY, Georgia CHARLIE MELANCON, Louisiana BRIAN P.
    [Show full text]
  • Illinois - Livable and Sustainable Transportation Rating System and Guide
    I-LAST™ Illlliinoiis - Liivablle and Sustaiinablle Transportatiion Ratiing System and Guiide In conjjunctiion wiith the Illlliinoiis Joiint Sustaiinabiilliity Group I-LAST V 2.02 September 27, 2012 I-LAST™ Illinois - Livable and Sustainable Transportation Rating System and Guide © 2009 & 2012 IDOT, IRTBA, and ACEC-IL - All Rights Reserved I-LAST V 2.02 September 27, 2012 Table of Contents Acknowledgements ..................................................................................................................... 3 Introduction ................................................................................................................................. 4 I-LAST Project Environmental Sustainability Rating System Scorecard ...................................... 7 P-1: Context Sensitive Solutions .............................................................................................. 18 P-2: Land Use / Community Planning ...................................................................................... 20 D-1: Alignment Selection .......................................................................................................... 22 D-2: Context Sensitive Design ................................................................................................. 25 E-1: Protect, Enhance or Restore Wildlife Communities ........................................................... 31 E-2: Protect, Enhance, Restore Native Plant Communities ...................................................... 35 E-3: Noise Abatement .............................................................................................................
    [Show full text]
  • Green Highway Ratings for Existing NH& SH in Tamilnadu – a Case Study
    ISSN: 0974-2115 www.jchps.com Journal of Chemical and Pharmaceutical Sciences Green highway ratings for existing NH& SH in Tamilnadu – a case study R. Suresh Assistant Professor, Department of Civil Engineering, Vel Tech High Tech Dr. Rangarajan Dr. Sakunthala Engineering College, Chennai, Tamil Nadu *Corresponding author: [email protected] ABSTRACT A Green highway rating system is a proposed standard for quantifying sustainable practices associated with the design and construction of roadways. Various techniques and standards can be incorporated within green highways like natural resources, construction methods, operation & maintenance. Such a standard helps improvement and innovation in roadway sustainability, and provide baseline sustainability standards for planning and designing of highways. An attempt is made to rate the existing National highway (NH) & State highway (SH) in Tamil Nadu using Green highway Rating System (GHRS) to implement the sustainability in highways in the future. Recommendations are then made to improve their performance towards green highways from normal highway. Each infrastructure project, before start of the project must undergo the Environmental Impact Assessment (EIA) process to protect our society in economy, environment and technology. This could improve our social value like reduction in pollution, accident reduction, encourage the number of users and improve the environment life and quality. To reduce the impacts in the future, the green highway rating system and green highway construction guidelines should be followed strictly while during construction, operation& maintenance in all phases throughout the lifetime of the highway. KEY WORDS: Green, standard, existing. 1. INTRODUCTION Green Highway is the essential object to our country growth. Ratings are an important tool to the decision makers.
    [Show full text]
  • Storm Water Management Criteria for Malaysia Green Highway
    STORM WATER MANAGEMENT CRITERIA FOR MALAYSIA GREEN HIGHWAY TUAN NOR HAZWANI BINTI TUAN SOH A project report submitted in partial fulfillment of the requirements for the award of the degree of Master of Science (Construction Management) Faculty of Civil Engineering Universiti Teknologi Malaysia JANUARY 2013 iii Especially dedicated to: My parents Tuan Soh Tuan Losin & Siti Fatimah Mahamad Who give motivation and loves... My beloved supervisor, Prof. Dr. Muhd Zaimi Abd Majid Who give the guidance with continuously in finishing this thesis... All my friends For their helping and loyalty of this friendship... iv ACKNOWLEDGEMENT Assalamualaikum w.b.t. In the name of Allah, the most gracious, the most compassionate. I am grateful that is preparing this project report, I was given the opportunity to be in contact with many people, researchers and practitioners. They have contributed towards my feeling and thoughts. In particular, I would like to express my greatest gratitude to my supervisor, Prof. Dr. Muhd Zaimi Abd Majid for encouragement, guidance and critics. Without the continuous support, this project would not be as it is present here. I would like to convey my gratitude to Mr. Mudathir and Mr Bigah Yao for kindly help me in giving the idea, suggestion and co-operation for me to finish my master project I also would like to tank all Green Highway team members for helping me in collecting the data for this project. I would also like to take this opportunity to express my sincere appreciation my beloved friend Zarina Yusof, Farah Nadiah and Norizaidah for spending such a valuable time with me.
    [Show full text]
  • Factors for Implementing Green Highway Concept in Toll Road Development Investment in Indonesia Muhammad Yunus Asy’Ary1,*, Christiono Utomo1
    Advances in Social Science, Education and Humanities Research, volume 474 Proceedings of the 2nd International Seminar on Science and Technology (ISSTEC 2019) Advances in Social Science, Education and Humanities Research, volume 474 Proceedings of the 2nd International Seminar on Science and Technology (ISSTEC 2019) Factors for Implementing Green Highway Concept in Toll Road Development Investment in Indonesia Muhammad Yunus Asy’Ary1,*, Christiono Utomo1 1Department of Management Technology, Institut Teknologi Sepuluh Nopember, Indonesia *Corresponding author: [email protected] ABSTRACT One of the national strategy project programs in Indonesia is the development of toll roads in several regions with a public private partnership scheme by cooperating with toll road business entities (BUJT) as investors and developer. With the existence of global environmental issues, the concept of the green highway must also be applied in the development of toll roads in Indonesia. This research is to find out the factors that apply the green highway concept that is significant to investment decisions on toll road development. This research uses a questionnaire survey method and interviews to obtain data based on the perceptions of the toll road developer in Indonesia. Questionnaire questions consist of several aspects of the concept of green highway based on the green highway rating system in toll road development in Indonesia. Based on the result of the survey, there were twenty categories divided into six aspects consisting of water management and drainage, green materials, sustainable sites, energy emissions and waste reduction, social and economic, life-cycle analysis. Keywords: toll road development, green highway, green rating, investment. Green highway rating system can be interpreted as a tool that is used as a reference in a sustainable concept that 1.
    [Show full text]
  • THE TREE RING March 20, 2017 | $5 | Vol
    COAL PLANT CLOSING | GRIZZLY TRANSPLANTS? | SOUTHWEST RIVER RETURNS High Country ForN people whoews care about the West THE TREE RING March 20, 2017 | $5 | Vol. 49 No. 5 | www.hcn.org 49 No. | $5 Vol. March 20, 2017 How a landmark investigation stopped a Washington timber-poaching gang | By Ben Goldfarb CONTENTS Editor’s note Barbecues, large and small Whenever I feel a bit down about the fact that, after electing a billionaire president who campaigned on promises to help the working class, we are now fighting a breathtakingly brazen attempt to enact the agenda of corporate America, I find it helpful to remember that we’ve seen all of this — or at least some of it — before. Mark Twain called the late 1800s the “Gilded Age.” Historian Vernon Parrington, however, preferred the more cynical term “The Great Barbecue,” referring to the government’s brutal seizure of the West’s lands and their subsequent giveaway to white settlers, land speculators, and railroad, mining and timber barons. “Congress had rich gifts to bestow — in lands, tariffs, subsidies, favors of all sorts,” wrote Parrington, “and when influential citizens made their wishes known to the reigning statesmen, the sympathetic A bigleaf maple tree in Capitol Forest near Olympia, Washington. Tree poachers have scraped bark politicians were quick to turn the government into from its surface to reveal the quilted figure they covet, leading investigators to suspect the fairy godmother the voters wanted it to be. A COURTESY ANNE MINDEN it might have been the poachers’ next target. huge barbecue was spread to which all presumably were invited.” FEATURE One hundred years later, in the 1980s, the next course was served by the Reagan Revolution.
    [Show full text]
  • Revision of Sustainable Road Rating Systems: Selection of the Best Suited System for Hungarian Road Construction Using TOPSIS Method
    sustainability Article Revision of Sustainable Road Rating Systems: Selection of the Best Suited System for Hungarian Road Construction Using TOPSIS Method Réka Szpotowicz (née Nádasi) * and Csaba Tóth Department of Highway and Roadway Engineering, Budapest University of Technology and Economics, 1111 Budapest, Hungary; [email protected] * Correspondence: [email protected] Received: 28 August 2020; Accepted: 23 October 2020; Published: 26 October 2020 Abstract: There are a number of sustainable and environmentally friendly techniques and methods currently available in the construction industry. To promote sustainable development, different rating and certificating systems that evaluate the level of sustainability during the development of infrastructure construction projects have been developed. The aim of the research presented in this paper was to examine the applicability of sustainability rating systems in Hungary and find the most suitable option. After a review of commonly used rating systems, i.e., Greenroads, GreenLITES, I-LAST, Envision, and INVEST, the most suitable existing rating system is selected with the help of the Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS) mathematical decision analysis method. This was achieved by utilizing 12 categories of input data (weights) analyzed through TOPSIS. The input data (weights) of the TOPSIS method were determined by a small research group of industry experts and academic professionals based on Hungarian practices and methodology. As a result of the calculation, the study found that the Envision rating system satisfies the criteria best, closely followed by Greenroads. Keywords: sustainability; Hungarian construction practice; road rating systems; TOPSIS 1. Introduction It is widely agreed that the construction industry has one of the most significant impacts on our environment, contributing significantly to air pollution, resource depletion, waste generation, global warming, and climate change.
    [Show full text]