The LM Joint Venture

The LM joint venture comprising Laing Today, we’re looking for suppliers to O’Rourke and J. Murphy & Sons Ltd has join us on our HS2 journey, and we’d been selected to deliver the northern like to hear from you. If you have: section of HS2 Phase 1’s enabling We have a wide variety of significant • an attitude that exhibits works. opportunities available, including quality and partnership We have proven experience of major surveying, ground investigation, • a willingness to embrace and rail infrastructure delivery, including ecology, archaeology, demolition, exhibit project wide safety, award winning projects for Network remediation, major and minor civil EDI, SEE, environment and Rail, Crossrail, Transport for London, works, and many more, at all tiers of community requirements Eurotunnel, London Underground, and the supply chain. • a willingness to ‘Walk the Transport for Greater Manchester. We’re committed to a fair and efficient Walk’ re health, safety and Together we are a world-class team assurance and prequalification wellbeing with an exceptional track record in process, so we’ll be working to the • an ambition to work with us engineering innovation, including acknowledged national guidelines, such for the long term especially off-site manufacturing, sustainability, as Achilles RISQS, Constructionline and in upskilling and driving employment, training and skills SSIP. opportunities for the team development. … then we want to meet you. Come and talk to us and tell us what you can offer. All of our opportunities across the EWC North area will be accessible through the CompeteFor portal. Log on to register your business.

4869 HS2 Contractor Day biogs_viz1.indd 1 20/04/2018 15:39 Costain Joint Venture

Costain Skanska Joint Venture (CSJV) We are looking to work with a variety

are delivering the southern section of of innovative and collaborative Key: Skanska Costain JV Enabling Works the enabling works for the new HS2 contractors, who will help us drive route. This section covers London our values throughout our supply South North Chiltern Euston up to the Colne Valley (near the chain. The right candidates will have Portal Northolt Corridor

M25). appropriate accreditations for Health Old Oak Common and Safety, Quality, and Environment. (Crossrail Interchange) London The works are expected to account for (Euston) Birmingham approximately £300m over 4-6 years. They will also be able to showcase their Interchange

London Under the contract, CSJV will deliver a commitment to Equality, Diversity, Old Oak Common Heathrow range of activities. These include utility Inclusion, Wellbeing and Ethical Airport diversions, ecology surveys, demolition, Sourcing. We ask our supply chain ground remediation, watercourse to build a portfolio of case studies Old Oak Common London activities, highways realignments, that show added value through their Heathrow Airport monitoring and instrumentation, activities. And we encourage our structural reinforcements, archaeology supply chain to engage with us and our Birmingham Interchange and site clearance, as well as tier 1 contractors. Northolt Corridor establishing site compounds. We encourage shared understanding North Chiltern Tunnel Portal CSJV have over 30 years’ experience of the project’s requirements for of working together. We are currently Health and Safety, Community Old Oak Common (Crossrail delivering multiple major UK Engagement, Skills, Employment, Interchange) infrastructure projects such as: Education, Environmental Management London (Euston) and Sustainability, BIM and Innovation. a. A14 Cambridge to Huntingdon Key: Skanska Costain JV Improvement Scheme, Highways We operate fair and transparent Enabling Works England payment processes in line with the b. London Power Project, Supply Chain Payment Charter. National Grid This Charter applies to all parties to contracts. It aims to help c. Paddington Bakerloo Line Link, create a more collaborative culture London Underground and ensure a strong, resilient and d. Bond Street Station and Paddington sustainable supply chain. “To lead the Enabling Works Station – Crossrail contracts. Contract in such a way the CSJV establish a reputation as the forerunner in the safe delivery of Delivering excellence collaborative high speed railway Our values are: programmes”. • Love for life • Passionate about excellence • One team spirit • Do the right thing

Bill Lomas CSJV Project Director

4869 HS2 Contractor Day biogs_viz1.indd 2 20/04/2018 15:39 Introducing Fusion

Fusion connects the expertise, schemes, woodland habitat creation, innovation and resources of three watercourse activities, utility diversions, world-leading engineering businesses; site clearance and establishing site Joining the Fusion Morgan Sindall, BAM Nuttall and compounds. family Ferrovial Agroman (UK), to design, To aid us in our project delivery, we construct and operate innovative All procurement are interested in engaging and working engineering solutions for large, opportunities associated with specialist service providers, within complex infrastructure programmes. with Fusion’s enabling works these areas. programme will be made Our track record of delivering legacy Creating a collaborative supply chain available to the supply infrastructure projects includes; HS1, chain via CompeteFor and London Olympics 2012, Crossrail and Our Fusion values: leadership, safety, Builders Profile. If you are Thames Tideway Tunnel. respect, integrity, innovation and new to these procurement collaboration are central to the way Delivering Area Central of HS2’s sites, toolkits and guidance we work. For us, collaboration is at the Enabling Works on Fusion’s procurement heart of everything we do, it guides process/systems are available In 2016, Fusion were awarded area the behaviours and attitudes of our on request and also via our central of HS2’s enabling works. people, and the culture of our joint Fusion JV website, Delivering essential preparatory works venture. It enables us to share ideas, fusion-jv.com. to some 100km of the phase 1 route, work with the best in their respective before major civil engineering activities fields, and build a richer shared legacy What’s more, supply chain begin. for our industry. partners also benefit from the opportunity to undertake We want to work with companies that Works undertaken to date have Fusion’s BeHighSpeed reflect these values and who look included; design and build of new onboarding course. To learn to deliver above and beyond initial ecological sites, ground remediation, more about the next steps requirements. From our supply chain advanced landscape planting. In your organisation needs partners we are a looking for; addition surveys have been a large to take or to register your percent of this work, both non- • Excellence, through quality interest for BeHighSpeed, intrusive and intrusive surveys, ranging products and services which are speak to a member of the from environmental, ecology, soil value for money Fusion team, or pick up and ground investigation, demolition • Champions of innovation details from the Fusion and archaeology. Additionally, the stand. Alternatively email • Understanding of the positive archaeological programme is expected [email protected] impact a diverse and inclusive to be the largest ever undertaken in for all enquiries. the history of Britain. workforce can create “Our vision and our role is For the future, typical activities to • The right attitudes and positives connecting people”. deliver within this contract, currently behaviours in leadership, health, include; highway design and build safety and wellbeing. fusion-jv.com

4869 HS2 Contractor Day biogs_viz1.indd 3 20/04/2018 15:39 Skanska, Costain and STRABAG

Skanska, Costain and STRABAG (SCS SCS will continue to carry the excellent JV) have been working collaboratively standards set by Costain Skanska JV on for many years on high profile projects the Enabling Works contract, and are around the world. Bringing together looking for avid suppliers to help us its collective strength and regional/ deliver the following packages; bridge international knowledge, SCS will beams, earthworks/groundworks, build the first section of the HS2 roadworks/signage, precast concrete route (Phase 1 Southern Main Works and traffic management. contracts Lots S1 and S2), which is in Commitment to Industry Change a tunnel between Euston and Old Oak Common and onwards to Northolt. Our joint core values;

The major contract awards mentioned • Love for Life SCS is committed to delivering above from HS2, are further testimony • One Team Spirit sustainable outcomes to the SCS collaborative approach and • Passionate about Excellence through the procurement and our strong track record in applying management of our supply • and Do the Right Thing technology-based innovative solutions chain, and as such we expect in the delivery of large-scale projects. At SCS, we believe our supply chain our suppliers to support us form an integral part of our team. 1. CSJV’s (Costain and Skanska Joint in achieving ‘best value for By treating our supply chain as an money’ for our projects. Venture) first collaboration, M25 extension of our workforce, we Junction 14 to 15, to build 3.3km of will apply the same principles and There will be clear and motorway for £44.5m work ethic to our suppliers as we consistent visibility of 2. CSJV delivered a £115 million section do to our own staff. SCS will use this all applicable tendering of the Channel Tunnel Rail Link, methodology to work together to opportunities for SCS delivering 9.4km of tunnels from develop long lasting relationships that through the tendering portal Stratford to Manor Park. deliver innovative methods of working, Compete for, including tender class leading behaviours and improved evaluation through the sister 3. CSJV are delivering a number outcomes. platform Delta. of Crossrail projects including Paddington Station, Bond Street The Delta system will Station, Royal Oak Portal and provide transparency in the Pudding Mill Lane portal. procurement process and a clear route for procurement 4. Skanska and STRABAG are currently decision making, along delivering Norway’s first railway with standardisation of tunnel to be built with a TBM in methodology within SCS and Arna-Bergen for completion during the supply chain. summer 2021 5. STRABAG helped to deliver more than 1,500 km of high-speed rail globally, such as the VDE8 line in Germany.

4869 HS2 Contractor Day biogs_viz1.indd 4 20/04/2018 15:39 Balfour Beatty VINCI

Balfour Beatty VINCI is a long- We are at the forefront of the We would love to hear from you established and successful joint application of Building Information if you: venture in the delivery of critical Modelling technology – driving real • are innovative, have impact and infrastructure between two global innovation and reducing risk for our want to positively influence the leaders: Balfour Beatty and VINCI customers. construction sector Construction. We always seek to develop the • measure yourself against the best In 2008, Balfour Beatty and VINCI best, most positive outcomes for all • have integrity and are fair, honest Construction set up a strategic alliance stakeholders by delivering on our and open to deliver major infrastructure projects promises and ensuring the excellence in the UK, including the Channel Tunnel of our people and supply chain • always show respect both at work and HS2. partners. Together Balfour Beatty and and within communities VINCI have over 16,000 SME supply • are committed to bringing forward Our industry often needs some of the chain partners in the UK. apprenticeships, jobs and upskilling largest companies to work together opportunities for local people to deliver the biggest and most critical Together we have successfully bid infrastructure projects. Collaborative and delivered a number of key decision making helps us to provide projects on Crossrail and we were All opportunities are accessible via the better value to our customers through recently awarded a Smart Motorways CompeteFor portal. Please log on to open and honest communications. Programme for Highways England, as register your business at well as two major contracts on HS2. www.competefor.com, email Enquiries- [email protected] or visit our

team at the Balfour Beatty VINCI stand.

4869 HS2 Contractor Day biogs_viz1.indd 5 20/04/2018 15:39 Align

ALIGN: Shaping the future of major infrastructure

An alliance of tradition and innovation, delivering transformational infrastructure Align is a joint venture of three Stage two will commence in early 2019 international and privately-owned and run until 2023, and will comprise the We readily welcome suppliers infrastructure companies; Bouygues design and build of C1. The integrated to engage with us, through Travaux Publics, a subsidiary of design team, known as Align-D, have demonstrating capabilities for Bouygues Construction, Sir Robert now completed the mobilisation phase the C1 technical requirements, but also with an outstanding McAlpine, and VolkerFitzpatrick, a of the scheme design. record in observing the highest subsidiary of VolkerWessels. Their Working with design partners Jacobs standards in Health & Safety, combined experience; both in the UK and Ingerop, the Align-D team are now innovation, diversity, skills, BIM, and worldwide, in delivering high-profile in the process of developing the Stage environmental management and infrastructure projects safely, on time one scheme design. sustainability. and on budget, has long established Our opportunities across the their reputation. Key Figures C1-Area Central will be accessible C1 Package The three main ALIGN companies through the CompeteFor portal collectively employ over 20,000 In July 2017, the ALIGN consortium, Please log on to register your people and have a combined parent- won the significant C1 package of the business, and come and talk to us group turnover of over £12.5bn. As UK High Speed 2 line (HS2). Lot C1 at our meet-the-buyer event on experienced contractors in the delivery consists of 21.6km of high speed rail May 10th 2018. of transport infrastructure, including infrastructure in a rural environment. current high-speed rail projects in the This will include a 3.37km viaduct, UK, France and Hong Kong, they are ALIGN’s partners-Align Design 15.75km twin-tubes tunnel and five vent able to manage complex projects from Align adds additional expertise in shafts handling both piston effect and inception to completion. transport infrastructure delivery through tunnel ventilation. ALIGN teams share a primary focus on its prestigious Align-D partners: Until the end of 2018, the team will be people, from employees, to the supply working on the development of the Jacobs chain and to the local communities; scheme design. Jacobs leads the global professional ensuring that project completion is services sector, with $15 billion in carried out in a safe, sustainable, fair, combined revenue and a talent-force and collaborative environment. more than 74,000 strong, Visit www. Between them, the Align companies jacobs.com have completed an impressive 178km of high-speed rail, 343km of rail tunnel Ingérop-Rendel and over 875km of linear projects, Ingérop, a multinational company active internationally. in more than 70 countries (includes UK-based Rendel) is one of France’s Please visit http://aligncjv.co.uk/ leading independent consultancies with extensive high-speed rail experience, amongst which, the recent Brittany-to-Loire high-speed line. Visit www.rendel-ltd.com Please contact the Supply chain team any time, at: [email protected]

4869 HS2 Contractor Day biogs_viz1.indd 6 20/04/2018 15:39 Eiffage Kier Joint Venture

The Eiffage Kier joint venture brings We are committed to improving lives, together international, market leading communities and the construction technical expertise with an industry industry by providing sustained We would love to leading track record. Our vision is to employment opportunities. We’ll hear from you if deliver exceptional services and results reduce barriers to work, upskill and that create a safe and sustainable high work with young people and diverse you: speed railway and future growth for groups to raise the profile of a • are passionate about and the UK. career in transport, engineering and respect the communities we construction. Eiffage and Kier each bring exceptional work in specialist expertise in the design, To achieve this, we partner with our • offer innovative solutions construction, operation, financing and supply chain to promote a culture maintenance of railway networks, where equality, diversity and inclusion • aspire to ‘do things better’ including the construction of one of flourish, where fair employment • want to bring jobs, skills and ’s latest high speed rail projects. practices are standard, where there is opportunities to local people considerate communication between We believe that true success comes all stakeholders and where we have • manufacture offsite from strong teamwork and working a safe and healthy workforce, whose closely with our suppliers and • help reduce carbon wellbeing matters to us. stakeholders to deliver customer All opportunities are excellence. We are keen to engage with supply accessible via the CompeteFor chain partners, no matter how big or portal. Please log on to small your organisation. register your business at www.competefor.com, email supplychainenquiries@ eiffagekier-hs2.team or visit our supply chain team at the Eiffage Kier stand.

4869 HS2 Contractor Day biogs_viz1.indd 7 20/04/2018 15:40