1 Dundas Street West, Suite 2500, Eaton Centre, Toronto, Ontario, Canada

Total Page:16

File Type:pdf, Size:1020Kb

1 Dundas Street West, Suite 2500, Eaton Centre, Toronto, Ontario, Canada 1 Dundas Street West, Suite 2500, Eaton Centre, Toronto, Ontario, Canada View this office online at: https://www.newofficeamerica.com/details/serviced-offices-dundas-street-wes t-toronto-ontario Positioned on the 25th level of a well known office building, this centre provides truly excellent views over Downtown and Lake Ontario beyond. Offices are unbranded and ready for new tenants to make them their own and are well provisioned with all essential services and amenities including high speed data points, meeting rooms, a state of the art security system and round the clock secure access. Transport links Nearest tube: Dundas Station (TTC) Nearest railway station: Union (via Edward St and University Ave - 6 mins 2.1 km) Nearest road: Dundas Station (TTC) Nearest airport: Dundas Station (TTC) Key features 24 hour access Access to multiple centres nation-wide Access to multiple centres world-wide Administrative support AV equipment Car parking spaces Close to railway station Conference rooms High speed internet IT support available Meeting rooms Modern interiors Near to subway / underground station Reception staff Security system Telephone answering service Town centre location Unbranded offices Video conference facilities Location Nestling at the centre of the Toronto entertainment district, this iconic tower is surrounded by an enviable array of top restaurants, cafes, hotels and other business facilities. Immediately to the left of the centre is the city's largest shopping mall and to the right is Ryerson University. This is a central location that affords good access to multiple major highways including the 401, 407, 404 and Q.E.W which makes getting to most other areas of the city a breeze - especially seeing as car parking is provided to tenants. Pearson International Airport is just over 20 minutes drive from this centre and Union Station is just 6 minutes. Points of interest within 1000 metres Library Building (library) - 184m from business centre Eaton Centre (mall) - 201m from business centre Ryerson University (university) - 264m from business centre Recreation and Athletics Centre (university) - 270m from business centre College Park (park) - 426m from business centre Joseph Sheard Parkette (park) - 452m from business centre College Park (mall) - 514m from business centre Court House (courthouse) - 553m from business centre 10 Dundas East (mall) - 60m from business centre Maple Leaf Gardens (stadium) - 645m from business centre Toronto Police Headquarters (police) - 676m from business centre Trump International Hotel & Tower (hotel) - 728m from business centre Four Seasons Centre for the Performing Arts (theatre) - 740m from business centre Moss Park (park) - 774m from business centre St. James Park (park) - 855m from business centre Shangri-La (hotel) - 915m from business centre Queen's Park (South) (park) - 984m from business centre Harrison Baths and Swimming Pool (swimming) - 985m from business centre All information contained in this document is for guide purposes only and NewOfficeAmerica.com.com cannot be held responsible for any inaccuracies or omissions. Please confirm all details with the agent representing this office space before proceeding. Full terms of service can be viewed at http://www.NewOfficeAmerica.com.com/terms-of-service..
Recommended publications
  • Strategic Action Plan for Prescott Downtown Revitalization
    Strategic Action Plan for Prescott Downtown Revitalization October 2012 Prepared by: Urban Marketing Collaborative Strategic Action Plan for Prescott Downtown Revitalization TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 VISION 1 3.0 STRATEGY FRAMEWORK AND PRINCIPLES 2 4.0 KEY COMPONENTS 4 5.0 ACTION PLAN 7 Organization 9 Physical Facilities 15 Marketing Prescott 19 Economic Development 27 Bold Step Forward 32 APPENDICES 34 1.0 INTRODUCTION The strategy developed for Downtown Prescott is based upon the results of the market analysis as well as the results of the presentation conducted in August 2012 with key stakeholders to prioritize issues and opportunities. The vision is to work as a branding tool and be kept as a standard to help guide all future decisions regarding civic, social, residential, and business development in Downtown. Actions that work towards fulfilling the vision should be implemented and ones that do not should be abandoned. Downtown Prescott has clear potential for appeal to residents and visitors through its waterfront beauty and its heritage buildings. While the town conducts seasonal events like the St. Lawrence Shakespeare Festival, it does not provide a seamless experience that encourages and facilitates residents and visitors to go from an event to then visiting a retail store or dining downtown. Downtown Prescott needs to create this holistic experience to draw in and keep its visitors returning to the downtown core. 2.0 VISION Downtown Prescott will take the relaxed lifestyle and affordability that is provided and extend this into an environment where greater and lengthier visitation will occur and new residents will be attracted.
    [Show full text]
  • Entrance Connection to Dundas Station
    Report for Action Entrance Connection to Dundas Station Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary This report requests the Board's approval for a new entrance connection to Dundas Station on Line 1 through the proposed building renovation at 595 Bay Street (Atrium on Bay). As a result of the new entrance connection, the existing open-stair station entrance on the northwest corner of Yonge Street and Dundas Street West, within the Dundas Street West right-of-way, will be closed. This report also seeks authority for staff to enter into a new entrance connection agreement and related agreements required to facilitate this new TTC entrance to Dundas Station to be constructed within the private development located at 595 Bay Street. Recommendations It is recommended that the Board: 1. Approve in principle the proposed new entrance connection to Dundas Station within the development located at 595 Bay Street and the subsequent closure of the existing entrance located at the northwest corner of Yonge Street and Dundas Street West, as illustrated in Attachments 1a, 1b and 2; and 2. Authorize the execution of a new entrance connection agreement, and any other agreements arising as a result of the development, on terms and conditions satisfactory to TTC's General Counsel. Implementation Points In accordance with Corporate Policy 8.3.0 (Entrance Connections), any entrance connection or amendment to an existing entrance connection requires the prior approval of the Board. Entrance connection refers to a physical, weather-protected or fully- protected enclosed structure between a development and a transit station.
    [Show full text]
  • Planning Rationale
    215-229 CHURCH ST. AND 117 DUNDAS ST. E FOR THE PEMBERTON GROUP This drawing is the property of the Architect and may not be reproduced or used without the express consent of the Architect. The Contractor is responsible for checking and verifying all levels and dimensions and shall report all discrepancies to the PROJECT NUMBER: 14072 Architect and obtain clarification prior to DATE: 8TH DECEMBER 2014 commencing work. ISSUED FOR: ZONING BY-LAW AMENDMENT ISSUED RECORD 2014-12-08 ISSUED FOR ZONING BY- LAW AMENDMENT REVISION RECORD PLANNING RATIONALE Church Street & Dundas Street East Pemberton Group December 2014 North ARCHITECTURAL DRAWINGS PROJECT CONSULTANTS 405-317 ADELAIDE STREET WEST TORONTO CANADA M5V 1P9 +1 416 599 9729 A000 COVER SHEET LANDSCAPE WWW.RAWDESIGN.CA A001 CONTEXT AND STATISTICS NAK DESIGN STRATEGIES A100 SITE PLAN 355 ADELAIDE ST W, STUDIO 400 14072 A101PARKING LEVEL 6 TORONTO ON M5V 1S2 A102 PARKING LEVEL 5 - 2 215-229 CHURCH ST. A103 PARKING LEVEL 1 AND 117 DUNDAS ST. A201 LEVEL 1 CIVIL EAST A202 LEVEL 2 COLE ENGINEERING GROUP LTD. PEMBERTON GROUP A203 LEVEL 3 70 VALLEYWOOD DRIVE A204 LEVEL 4 MARKHAM ON L3R 4T5 A205 LEVEL 5 A206 LEVEL 6 A207 LEVEL 7 TRAFFIC A208 LEVEL 8 – 46 MMM GROUP LIMITED A247 MECHANICAL LEVEL 100 COMMERCE VALLEY DRIVE W A248 ROOF THORNHILL ON L3T 0A1 COVER SHEET A401 WEST AND EAST ELEVATIONS A402 NORTH AND SOUTH ELEVATION A501 SECTION1 STRUCTURAL A502 SECTION 2 ADJELEIAN ALLEN RUBELI LTD 4211 YONGE STREET, SUITE 615 1 : 1 TORONT ON 2P 2A9 A000 C:\Revit Local\14072 Dundas and Church_sa.rvt TABLE OF CONTENTS Job No.
    [Show full text]
  • Second Exit Program Automatic Entrance at Five Stations
    Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 28, 2009 SUBJECT: FIRE VENTILATION UPGRADE SECOND EXIT PROGRAM AUTOMATIC ENTRANCE AT FIVE STATIONS ACTION ITEM RECOMMENDATION It is recommended that the Commission authorize staff to convert the conceptual layouts of second exits from a daily exit configuration to an automatic entrance configuration at five stations: College, Museum, Dundas, Dundas West and Wellesley, as outlined in this report. FUNDING Funds for the Second Exit Program are included in Program 3.9 – Buildings and Structures – Fire Ventilation Upgrade Project, as set out in pages 781-792, State of Good Repair/Safety Category of the TTC’s 2009-2013 Capital Program, which was approved by City Council on December 10, 2008. Reconfiguration of the second exits to automatic entrances will require additional funds based on specific site conditions. The increase in cost will be reflected in the 2010-2014 Capital Program Budget. BACKGROUND A Fire and Life Safety Assessment Study completed in 2002 identified fourteen high priority stations requiring an alternate means of egress from the station platform. Subsequently, the Second Exit Program was incorporated into the Fire Ventilation Upgrade Project to provide a second means of egress from station platforms at the following fourteen high priority stations: Broadview; Castle Frank; Pape; Dufferin; College; Museum; Wellesley; Dundas; Dundas West; Woodbine; Chester; Donlands; Greenwood; and Summerhill. FIRE VENTILATION UPGRADE SECOND EXIT PROGRAM AUTOMATIC
    [Show full text]
  • 2021 Budget Note Template
    2021 Program Summary Toronto Transit Commission While we aim to provide fully accessible content, there is no text alternative available for some of the content within these pages. If you require alternate formats or need assistance understanding our charts, graphs, or any other content, please contact us at [email protected]. Description The TTC provides reliable, transit service that draws its high standards of customer care from our rich traditions of safety, service and courtesy. TTC Conventional Service, provides 9.5 million service hours and 250 million service kilometers annually. Wheel-Trans service provides door-to-door accessible transit service for passengers with any disability that prevents them from using conventional transit services, including physical, sensory, cognitive and/or mental health disabilities. Both services operate 24 hours per day, 7 days per week. The TTC connects the diverse communities of Toronto to economic and social opportunities through an integrated network of subway, bus, streetcar and Wheel-Trans Services. This integrated network is comprised of 159 bus routes, 10 streetcar routes, 3 subway lines and 1 rapid transit line, with a fleet of 2,115 buses, 204 streetcars and 876 subway cars. Why We Do It The Toronto Transit Commission provides safe, reliable, seamless and accessible transit services to those who live in, work in, and visit Toronto. The TTC plays a central role in supporting the City’s social, economic and environmental policy objectives by improving mobility that connects people to employment, leisure, social and economic opportunities. The City of Toronto aims to deliver these outcomes equitably, efficiently and with excellent customer service to help improve the lives of Torontonians and work to earn their trust and confidence.
    [Show full text]
  • Attachment 1: Draft OPA 524 - Downtown Plan Pmtsas
    Attachment 1: Draft OPA 524 - Downtown Plan PMTSAs Authority: Planning and Housing Committee Item PH##.#, adopted by City of Toronto Council on [Month] [Day] and [Day], 2021 CITY OF TORONTO Bill BY-LAW -2021 To adopt Amendment 524 to the Official Plan for the City of Toronto respecting lands generally bounded by Lake Ontario to the south, Bathurst Street to the west, the mid-town rail corridor and Rosedale Valley Road to the north and the Don River to the east to which the Downtown Secondary Plan (OPA 406) is generally applicable. Whereas authority is given to Council under the Planning Act, R.S.O. 1990, c. P.13, as amended, to pass this By-law; and Whereas authority is given to Council under section 16(15) of the Planning Act, R.S.O. 1990, c. P.13, as amended, to delineate and establish Protected Major Transit Station Areas; and Whereas Council of the City of Toronto has provided adequate information to the public and has held at least one public meeting in accordance with section 17 the Planning Act; The Council of the City of Toronto enacts: 1. The attached Amendment 524 to the Official Plan is adopted pursuant to the Planning Act, as amended. Enacted and passed on [Month], 2021. Frances Nunziata, John D. Elvidge, Speaker Interim City Clerk (Seal of the City) 2 City of Toronto By-law -2021 AMENDMENT 524 TO THE OFFICIAL PLAN LANDS GENERALLY BOUNDED BY LAKE ONTARIO TO THE SOUTH, BATHURST STREET TO THE WEST, THE MID-TOWN RAIL CORRIDOR AND ROSEDALE VALLEY ROAD TO THE NORTH AND THE DON RIVER TO THE EAST TO WHICH THE DOWNTOWN SECONDARY PLAN (OPA 406) IS GENERALLY APPLICABLE The Official Plan of the City of Toronto is amended as follows: 1.
    [Show full text]
  • Getting Around Toronto Conference Location: YWCA Toronto 87 Elm St, Toronto, on M5G OA8
    Getting Around Toronto Conference Location: YWCA Toronto 87 Elm St, Toronto, ON M5G OA8 Arriving at Billy Bishop Airport — YTZ Arriving at Pearson Intl. Airport — YYZ This airport is on an island. To get between the island There are managed official taxi ranks for regulated taxis. and the mainland, use the airport’s ferry, or walk to the Approx. CAD$45 to downtown. mainland via the new tunnel. The Union Pearson (UP) rail line runs from Pearson to By Ferry Union Station downtown, every 15mins and takes 25mins. The ferry makes its very short run from the airport to All the details and how to use your Presto card from Eireann Quay (the south end of Bathurst Street) every www.upexpress.com. Some Presto information also given 15 minutes. Note that this is not the same ferry as the below. city-operated Toronto Island ferries — you cannot walk between the City Centre Airport and the rest of the Toronto Islands. Parking Walk through the Pedestrian Tunnel The Chelsea Hotel has a parking rate for guests of $36 A pedestrian tunnel connects Toronto’s mainland to the +HST per 24hrs, or $18 +HST per day. There is a 5’5” airport. From the mainland pavilion to the island atrium, height limit. I suggest if you are staying with the hotel, that the tunnel spans 853-feet and takes under six minutes you arrange this in advance and collect your ticket on the to complete the journey to the airport check-in area. way in. Featuring moving walkways and an escalator, the tunnel provides quick, reliable and easy access to the airport.
    [Show full text]
  • 97 Bus Time Schedule & Line Route
    97 bus time schedule & line map 97 Davisville Station View In Website Mode The 97 bus line (Davisville Station) has 4 routes. For regular weekdays, their operation hours are: (1) Davisville Station: 12:03 AM - 11:36 PM (2) Hilda Ave at Steeles Ave West: 12:01 AM - 11:31 PM (3) Wilson Ave at Yonge St: 12:16 AM - 11:46 PM (4) Yonge St at Queens Quay East North Side: 5:52 AM - 5:52 PM Use the Moovit App to ƒnd the closest 97 bus station near you and ƒnd out when is the next 97 bus arriving. Direction: Davisville Station 97 bus Time Schedule 46 stops Davisville Station Route Timetable: VIEW LINE SCHEDULE Sunday 12:22 AM - 11:40 PM Monday 12:07 AM - 11:36 PM Hilda Ave at Steeles Ave West 200 Hilda Ave, Toronto Tuesday 12:03 AM - 11:36 PM Steeles Av / Tangreen Crt Wednesday 12:03 AM - 11:36 PM 212 Steeles Avenue West, Toronto Thursday 12:03 AM - 11:36 PM Steeles Av Stop # 3719 Friday 12:03 AM - 11:36 PM Yonge St / Steeles Av Saturday 12:03 AM - 11:52 PM Yonge Street, Toronto Yonge St at Athabaska Ave 6600 Yonge Street, Toronto 97 bus Info Yonge St / Moore Park Av Direction: Davisville Station 6210 Yonge Street, Toronto Stops: 46 Trip Duration: 37 min Yonge St at Patricia Ave Line Summary: Hilda Ave at Steeles Ave West, 6062 Yonge Street, Toronto Steeles Av / Tangreen Crt, Steeles Av Stop # 3719, Yonge St / Steeles Av, Yonge St at Athabaska Ave, Yonge St / Drewry Av Yonge St / Moore Park Av, Yonge St at Patricia Ave, 20 Drewry Avenue, Toronto Yonge St / Drewry Av, 5800 Yonge St, Yonge St At Hendon Ave (Finch Station), Yonge St At Finch Ave,
    [Show full text]
  • Toronto Transit Commission Report No. Subject
    Form Revised: Februar y 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE : May 21, 2008 SUBJECT : SUBWAY ENTRANCE IDENTIFICATION ACTION ITEM: x INFORMATION ITEM: RECOMMENDATION It is recommended that the Commission: (a) Receive the final Summary Report on the TTC charrette produced by the Design Exchange; (b) Approve the revised standard pylon sign concept based on the outcome of the charrette, for trial installation, evaluation purposes and soliciting customer feedback; and (c) Endorse the use of a red accent to direct passengers to station entrances. FUNDING Funds for design standards, development of an enhanced silhouetted pylon sign and the TTC “red” accent for station entrances as well as customer research are available in the 2008 TTC Operating Budget. BACKGROUND At its meeting of February 27, 2007, the Commission requested staff to report on opportunities for beautifying the concrete above-ground subway entrances and improving the design of the station entrance signs. This report responds to that request. DISCUSSION On September 26, 2007, the Toronto Transit Commission, in partnership with the Design Exchange, hosted a design charrette to develop concepts related to subway station visibility. The charrette fostered community-based collaborative thinking in order to generate new concepts and ideas which would reinforce the TTC’s image and presence within the City. Participants invited to the event were stakeholders in the Toronto design community and included designers, architects, special interest groups, representatives of the City of Toronto and the Toronto Transit Commission. SUBWAY ENTRANCE IDENTIFICATION Page 2 The charrette was divided into three components. Initially a keynote address was given on design and identity by Dr.
    [Show full text]
  • Remaking Downtown Toronto: Politics, Development, and Public Space on Yonge Street, 1950-1980
    REMAKING DOWNTOWN TORONTO: POLITICS, DEVELOPMENT, AND PUBLIC SPACE ON YONGE STREET, 1950-1980 DANIEL G. ROSS A DISSERTATION SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY GRADUATE PROGRAMME IN HISTORY YORK UNIVERSITY, TORONTO, ONTARIO MARCH 2017 © DANIEL G. ROSS, 2017 Abstract This study explores the history of Toronto’s iconic downtown Yonge Street and the people who contested its future, spanning a period from the 1950s through to 1980 when the street was seldom out of the news. Through detailed analysis of a range of primary sources, it explores how the uses and public meanings of this densely-built commercial strip changed over time, in interaction with the city transforming around it. What emerges is a street that, despite fears for its future, remained at the heart of urban life in Toronto, creating economic value as a retail centre; pushing the boundaries of taste and the law as a mass-entertainment destination; and drawing crowds as a meeting place, pedestrian corridor, and public space. Variously understood as an historic urban landscape and an embarrassing relic, a transportation route and a people place, a bastion of Main Street values and a haven for big-city crime and sleaze, from the 1950s through the 1970s Yonge was at the centre of efforts to improve or reinvent the central city in ways that would keep pace with, or even lead, urban change. This thesis traces the history of three interventions—a pedestrian mall, a clean-up campaign aimed at the sex industry, and a major redevelopment scheme—their successes and failures, and the larger debates they triggered.
    [Show full text]
  • Yonge Street
    336 YONGE STREET PREMIER FLAGSHIP RETAIL FOR LEASE FOR MORE INFORMATION, PLEASE CONTACT: MATTHEW PIESZCHALA Sales Representative [email protected] 905 234 0376 GREG RABIN* Associate Vice President [email protected] 905 234 0377 *sales representative TABLE OF CONTENTS 01 EXECUTIVE SUMMARY 02 BUILDING FEATURES 03 STREETSCAPES 04 FLOOR PLANS 05 RESIDENTIAL DEVELOPMENT 06 PEDESTRIAN AND VEHICLE COUNTS 07 DEMOGRAPHICS ¢EXECUTIVE SUMMARY CBRE Retail Leasing Team is extremely excited to bring to market this Flagship Retail opportunity located at Yonge & Gould, also known as the Gateway to Ryerson University. The site is located directly across from the new Ryerson Student Learning Centre & a half block north of Canada’s busiest intersection, Yonge & Dundas. Yonge & Dundas has been, coined “Canada’s Times Square” & sees over 60 Million visitors per year. It is anchored by Toronto Eaton Centre, which is routinely in the top 3 performing malls in Canada & one of the top tourist destinations in the country. Toronto Eaton’s Centre has recently added new retailers Saks 5th Ave, Nordstrom & Uniqlo. Couple this with Ryerson University & their over 30,000 students’ makes this one of the most highly sought-after areas in the country. Why is Downtown Yonge the premier shopping and entertainment Q destination in the Greater Toronto Area? Toronto Eaton Centre Some 124,000 residents live achieves the highest retail within a 20-min radius of sales per square foot of any A significant 57% of visitors to the Downtown Yonge and close to mall in Canada, at $1,143/ District have the express purpose of 6,000 residential units completed, sq.ft shopping and the mean spend is over approved and proposed in and $100/person on average.
    [Show full text]
  • Making College Station Accessible and Second Exit/Entrance
    2045.9 For Action Making College Station Accessible and Second Exit/Entrance Date: July 14, 2020 To: TTC Board From: Chief Capital Officer Summary The purpose of this report is to obtain authorization for the award of Contract S2-17, College Station Second Exit/Entrance and Easier Access to Maystar General Contractors Inc. in the amount of $46,669,000.00, inclusive of all taxes, on the basis of lowest priced acceptable bid. The work for Contract S2-17 College Station - Second Exit/Entrance and Easier Access includes construction of stairs and two elevators from the northbound and southbound platforms to a new subway concourse level. The accessible path to street level will be provided through existing elevators within the College Park building. The construction phase of the contract is scheduled to commence in Q3 2020 and is expected to be completed by Q4 2023. Elevators are scheduled to be put into service by Q4 2023. Recommendations It is recommended that the Board authorize: 1. Award of Contract S2-17, College Station - Second Exit/Entrance and Easier Access to Maystar General Contractors Inc. in the amount of $46,669,000.00, inclusive of all taxes, on the basis of lowest priced acceptable bid. Financial Summary Sufficient funds for this expenditure are included in the TTC's 2020-2029 approved Capital Budget and Plan under Program 3.9 Building and Structures – Fire Ventilation Upgrade project, State of Good Repair/Safety category and Easier Access III project, Legislative category. The Fire Ventilation Upgrade total project cost is approximately $504 million, of which approximately $303 million has been committed to date.
    [Show full text]