World Bank Document Annex 4 PROCUREMENT PLAN General Public Disclosure Authorized 1. Project Information: Nigeria: Transforming Irrigation Management in Nigeria 2. Bank’s approval Date of the Procurement Plan: May 2014 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Public Disclosure Authorized Method Threshold Prior Review Procurement Method US$ Threshold ICB (Goods and Non-consulting Equal to and above 1. services) 5,000,000 All NCB (Goods and Non- Equal to or above 2. Consulting Services) Below 5,000,000 US$ 1,000,000 Equal to or above 3 ICB (Works) 20,000,000 All Equal to or above Public Disclosure Authorized 4. NCB (Works) Below 20,000,000 10,000,000 Shopping (Goods) Below US$ 100,000 None Shopping (Vehicles) - From 1st line distributors Below US$ 500,000 None 5. Shopping (Works) Below US$ 200,000 None Public Disclosure Authorized 2. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 3. Procurement Packages with Methods 1 2 3 4 5 6 7 Ref Description Estimated Procureme Domestic Review Comments . Cost nt Preferen by Bank No. US$ Method ce (Prior / million (yes/no) Post) 01 Rehabilitation of 115 ICB No Prior Bakalori Dam and Rehabilitation/Impr ovement of Bakalori Irrigation Scheme 02 Rehabilitation and 85 ICB No Prior Improvement of Kano Irrigation Scheme 03 Rehabilitation and 60 ICB No Prior Extension of Hadejia Valley Irrigation Scheme 04 Rehabilitation of 6 40 ICB No Prior No. Dams 05 Supply and 0.6 NCB No Post Installation of Hydrometric Equipment for Sokoto Rima Basin 06 Flood Plain 1.35 NCB No Prior Mapping for EPP (BIP & MRVIP) 07 Bathymetric Survey 0.20 NCB No Post of Goronyo, Zobe and Bakolori Dams 08 Procurement of 0.3 Shopping No Post Field and Operational Vehicles 09 Procurement of 0.1 Shopping No Post Computers 10 Procurement of 0.1 Shopping No Post Office Equipment III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Method Threshold Prior Review (USD) Threshold (USD) 1. Competitive Methods (Firms); Equal to or above All QCBS, QBS, LCS, FCS 300,000 2. Consultant Qualification Below 300,000 None 3. Single Source Selection (Firms & N/A All Individuals) 4. Individuals N/A Above 100,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods 1 2 3 4 5 6 Ref. No. Description of Assignment Estimated Selection Review Comments Cost Method by Bank US$ (Prior / Post) Million 01 Engineering Supervision 2.7 QCBS Prior of the Rehabilitation of Bakalori Dam and Irrigation Scheme 02 Technical Assistance for 2.0 QCBS Prior Dam Safety Assurance & Training for Dam & Reservoir Dept. and RBDA Staff 03 Dam Safety Panel of 1.0 IC Prior Series of Experts individual consultant contracts on specific aspects of dam 04 Technical Feasibility and 2.0 QCBS Prior detailed Design of Dadin Kowa Irrigation Scheme 05 Engineering Supervision 1.5 QCBS Prior of Rehabilitation and Extension of Kano Rima Irrigation Scheme 06 Engineering Supervision 0.65 QCBS Prior of Rehabilitation and Extension of Hadejia Valley Irrigation Scheme 07 Elaboration of 1.0 QCBS Prior Resettlement Action Plan for Kano River and Hadejia Valley Irrigation Schemes 08 Technical Assistance for 1.5 QCBS Prior WUA in Bakalori and Middle Rima Valley Irrigation Schemes 09 Technical Assistance for 1.0 QCBS Prior WUA in Kano River and Hadejia Valley Irrigation Schemes. 10 Technical Assistance on 4.0 QCBS Prior Farmers-Market Linkages and for the Establishment of FMCs 11 Support to RBDAs; 1.5 QCBS Prior Assessment, capacity Building and Strategic Planning 12 Development of 1.0 QCBS Prior Information Database and information System 13 Development of an 1.0 QCBS Prior Electronic and Document Management System 14 ESIA for Kano River and 0.6 QCBS Prior Hadejia Valley Irrigation Schemes 15 ESIA for Dadin Kowa 0.5 QCBS Prior Irrigation Scheme 16 ESIA for Middle Rima 0.1 IC Prior Valley Irrigation Scheme 17 Development of M&E 0.06 IC Post Manual 18 Development of Financial 0.06 IC Post Management Manual 19 Applied Research Grant 2.3 N/A Prior Grantees will on Irrigated Agriculture be selected competitively on the bases of Call for Research Proposals PROCUREMENT Nigeria : Transforming Irrigation Management in Nigeria PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2017-04-05 Revised Plan Date(s): (comma delineated, leave blank if none)2019-10-24 Project ID: P123112 GPN Date: Project Name: Transforming Irrigation Management in Nigeria Loan / Credit No: IDA / 55060 Executing Agency(ies): Transforming Irrigation Management In Nigeria Federal Coordinating Office WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-TRIMING NCO-12728- CW-RFB / River Training Component 1: Water Works in the Hadejia- Resources Management and Single Stage - One IDA / 55060 Prior Request for Bids Open - National 5,100,000.00 3,663,272.09 Signed 2017-02-09 2017-02-09 2017-05-04 2017-06-19 2017-07-31 2020-06-29 Jama’are River Basin Dam Operation Envelope Located in Jigawa State, Improvement. Nigeria NG-TRIMING NCO-12726- Component 1: Water CW-RFB / Works for Resources Management and Open - Single Stage - One Rehabilitation and IDA / 55060 Prior Request for Bids 125,000,000.00 0.00 Canceled 2017-03-23 2017-03-23 2017-05-18 2017-07-17 2017-09-13 2021-09-06 Dam Operation International Envelope Expansion of Irrigation Improvement. Scheme in KRIS and HVIS NG-TRIMING NCO-14084- CW-RFB / Works for Component 2: Irrigation Open - Single Stage - One Rehabilitation and IDA / 55060 Development and Prior Request for Bids 79,920,874.00 73,941,076.47 Signed 2016-02-01 2016-02-23 2016-05-03 2016-08-06 2017-03-29 2021-03-08 International Envelope Conversion of Bakolori Management. Irrigation Scheme NG-TRIMING NCO-19039- CW-RFB / Rehabilitation of Component 4: Institutional Pending Single Stage - One 4Nos Houses for TRIMING IDA / 55060 Development and Project Post Request for Bids Open - National 239,862.00 0.00 Implementati 2015-11-11 2015-11-11 2015-12-15 2016-01-08 2016-01-18 2016-07-16 Envelope field officers at Bunkure Management. on under KRIP in Kano State FMWR/TRIMING/2018/ICB/ Component 1: Water W/01 / Dam Safety Resources Management and Open - Single Stage - One improvement works of IDA / 55060 Prior Request for Bids 96,000,000.00 0.00 Canceled 2018-06-29 2018-07-27 2018-10-05 2018-11-02 2019-01-25 2022-02-25 Dam Operation International Envelope Bakolori, Zobe and Goronyo Improvement. dams in two lots FMWR/TRIMING/2018/SH/W/ 01 / Rehabilitation of additional 3 Nos House for Housing of community radio Component 2: Irrigation Under at Hadejia Valley Irrigation Request for Single Stage - One IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-03-31 2018-05-04 2018-10-15 Scheme, Dadinkkowa and Quotations Envelope Management. on Goronyo Irrigation Schemes and Remodeling of Studio rooms at Bakolori and Kano Scheme FMWR/TRIMING/2018/SH/W/ 02 / Upgrading and Securing of 4nos Component 3: Enhancing Pending Agricultural Development Agricultural Productivity Request for Single Stage - One IDA / 55060 Post Open - National 70,000.00 0.00 Implementati 2018-04-25 2018-05-28 2018-09-12 Projects offices allocated for and Support to Value Quotations Envelope on TRIMING project Farmers Chains. Field and Business School activities FMWR/TRIMING/2018/NCB/ Component 3: Enhancing W/01 / Construction of Pending Agricultural Productivity Single Stage - One Farmers Management and IDA / 55060 Post Request for Bids Open - National 4,000,000.00 0.00 Implementati 2018-03-23 2018-04-13 2018-05-25 2018-06-13 2018-07-18 2019-02-22 and Support to Value Envelope Service Delivery Center in on Chains. 4 TRIMING project schemes Page 1 FMWR/TRIMING/2018/NCB/ W/02 / Construction of Tomato Collection Centers in Kano River Irrigation Component 3: Enhancing Pending Scheme to support tomato Agricultural Productivity Single Stage - One IDA / 55060 Post Request for Bids Open - National 700,000.00 0.00 Implementati 2018-03-21 2018-03-26 2018-05-02 2018-05-23 2018-07-20 2018-11-17 farmers in their productive and Support to Value Envelope on alliances with Dangote Chains. tomato processing company and other offtakers in Nigeria FMWR/TRIMING/2018/SH/W/ 04 / Additional works at Kano River Irrigation Scheme, Hadejia Valley Component 2: Irrigation Pending Request for Single Stage - One Irrigation Scheme and IDA / 55060 Development and Post Open - National 200,000.00 0.00 Implementati 2018-03-24 2018-05-03 2018-09-24 Quotations Envelope Bakolori Irrigation Scheme Management. on including one block, fence, gate houses, landscaping and BTC security wire FMWR/TRIMING/2016/ICB/ W/002 / Rehabilitation & Expansion of Kano River Component 1: Water Under Irrigation Scheme (KRIS) Resources Management and Open - Single Stage - One IDA / 55060 Prior Request for Bids 125,000,000.00 0.00 Implementati 2017-03-17 2017-03-23 2017-06-29 2017-12-18 2018-05-16 2022-04-29 and Hadejia Valley Irigation Dam Operation International Envelope on Scheme (HVIS) and Dam Improvement.
Recommended publications
  • List of Dams and Reservoirs 1 List of Dams and Reservoirs
    List of dams and reservoirs 1 List of dams and reservoirs The following is a list of reservoirs and dams, arranged by continent and country. Africa Cameroon • Edea Dam • Lagdo Dam • Song Loulou Dam Democratic Republic of Congo • Inga Dam Ethiopia Gaborone Dam in Botswana. • Gilgel Gibe I Dam • Gilgel Gibe III Dam • Kessem Dam • Tendaho Irrigation Dam • Tekeze Hydroelectric Dam Egypt • Aswan Dam and Lake Nasser • Aswan Low Dam Inga Dam in DR Congo. Ghana • Akosombo Dam - Lake Volta • Kpong Dam Kenya • Gitaru Reservoir • Kiambere Reservoir • Kindaruma Reservoir Aswan Dam in Egypt. • Masinga Reservoir • Nairobi Dam Lesotho • Katse Dam • Mohale Dam List of dams and reservoirs 2 Mauritius • Eau Bleue Reservoir • La Ferme Reservoir • La Nicolière Reservoir • Mare aux Vacoas • Mare Longue Reservoir • Midlands Dam • Piton du Milieu Reservoir Akosombo Dam in Ghana. • Tamarind Falls Reservoir • Valetta Reservoir Morocco • Aït Ouarda Dam • Allal al Fassi Dam • Al Massira Dam • Al Wahda Dam • Bin el Ouidane Dam • Daourat Dam • Hassan I Dam Katse Dam in Lesotho. • Hassan II Dam • Idriss I Dam • Imfout Dam • Mohamed V Dam • Tanafnit El Borj Dam • Youssef Ibn Tachfin Dam Mozambique • Cahora Bassa Dam • Massingir Dam Bin el Ouidane Dam in Morocco. Nigeria • Asejire Dam, Oyo State • Bakolori Dam, Sokoto State • Challawa Gorge Dam, Kano State • Cham Dam, Gombe State • Dadin Kowa Dam, Gombe State • Goronyo Dam, Sokoto State • Gusau Dam, Zamfara State • Ikere Gorge Dam, Oyo State Gariep Dam in South Africa. • Jibiya Dam, Katsina State • Jebba Dam, Kwara State • Kafin Zaki Dam, Bauchi State • Kainji Dam, Niger State • Kiri Dam, Adamawa State List of dams and reservoirs 3 • Obudu Dam, Cross River State • Oyan Dam, Ogun State • Shiroro Dam, Niger State • Swashi Dam, Niger State • Tiga Dam, Kano State • Zobe Dam, Katsina State Tanzania • Kidatu Kihansi Dam in Tanzania.
    [Show full text]
  • The Epidemiology and Chemotherapeutic Approaches to the Control of Urinary Schistosomiasis in School-Age Children
    Atalabi and Adubi BMC Infectious Diseases (2019) 19:73 https://doi.org/10.1186/s12879-018-3647-y RESEARCHARTICLE Open Access The epidemiology and chemotherapeutic approaches to the control of urinary schistosomiasis in school-age children (SAC): a systematic review Tolulope Ebenezer Atalabi1* and Taiwo Oluwakemi Adubi2 Abstract Background: Human schistosomiases are acute and chronic infectious diseases of poverty. Currently, epidemiological data of urinary schistosomiasis (US) in school-age children (SAC) and adults are often reported together making it difficult to ascertain the true status of the disease. Based on this premise, we set out to carry out this review. Method: To achieve this aim, we carried out a computer-aided search of PubMed, Web of Science, Science Direct, African Journals OnLine (AJOL) and the database of World Health Organization. However, the information obtained from these sources was supplemented with additional literatures from Mendeley,ARTICLE Research Gate, and Google. Results: The search yielded 183 literatures of which 93 full text research, review and online articles were deemed fit for inclusion. Our key findings showed that: (1) of all World Health Organization (WHO) Regions, Africa is the most endemic zone for US, with Kenya and Senegal recording the highest prevalence and mean intensity respectively; (2) SAC within the range of 5–16 years contribute most significantly to the transmission cycle of US globally; (3) gender is a factor to watch out for, with male often recording the highest prevalence and intensity of infection; (4) contact with open, potentially infested water sources contribute significantly to transmission; (5) parental factors (occupation and education status) predispose SAC to US; (6) economic vis a vis ecological factors play a key role in infection transmission; and (7) in the last decade, a treatment coverage of 45% was never achieved globally for SAC or non-SAC treatment category for urinary schistosomiasis.
    [Show full text]
  • The Influence of Dams on the Growth and Development of Nigerian Economy
    THE INFLUENCE OF DAMS ON THE GROWTH AND DEVELOPMENT OF NIGERIAN ECONOMY 1VICTOR. ABHIELE. OKOSUN, 2AKONGBOWA .BRAMWELL. AMADASU 1General Studies Department, College of Education, Ekiadolor, Benin City, Nigeria. 2Department of Public Administration, Benson Idahosa University Benin City, Nigeria. E-mail: [email protected] Abstract— The kernel of this paper is on the influence of dams on growth and development of the Nigerian economy. Countries in “the third world”, less developed nations and advanced nations recognize the sin qua non role of dams in the overall development of their economies, most particularly in the rural and urban sectors. Thereby, efflorescing growth and development. A corollary to the former sentence gave impetus to Nigeria to embark upon the construction and maintenance of dams all over the nation. Nigeria spent a colossal sum of over 10 (ten) trillion dollars in the construction of dams. However, a microscopic view of Nigeria political landscape will reveal that the construction of dams is laced with a misgrill success and failures. This finds expression in the plethora of problems bedeviling the policy. These problems include the issue of corruption, inadequate funds etc. Consequently, the paper defines the concept of dams and development. The paper is explicated with the aid of holistic theory and system theory. The nexus or the interconnect between dams, growth and development is orchestrated. The socio-economic cum political pathologies benighting the construction and the maintenance of dams is discussed. Epitomizing, the paper opines that the government policy on the construction of dams and its maintenance in all ramifications, is a veritable pedestal for the development of Nigerian economy.
    [Show full text]
  • The Influence of Dams on the Growth and Development of Nigerian Economy
    International Journal of Management and Applied Science, ISSN: 2394-7926 Volume-2, Issue-1, Special Issue-1, Jan.-2016 THE INFLUENCE OF DAMS ON THE GROWTH AND DEVELOPMENT OF NIGERIAN ECONOMY 1VICTOR. ABHIELE. OKOSUN, 2AKONGBOWA .BRAMWELL. AMADASU 1General Studies Department, College of Education, Ekiadolor, Benin City, Nigeria. 2Department of Public Administration, Benson Idahosa University Benin City, Nigeria. E-mail: [email protected] Abstract— The kernel of this paper is on the influence of dams on growth and development of the Nigerian economy. Countries in “the third world”, less developed nations and advanced nations recognize the sin qua non role of dams in the overall development of their economies, most particularly in the rural and urban sectors. Thereby, efflorescing growth and development. A corollary to the former sentence gave impetus to Nigeria to embark upon the construction and maintenance of dams all over the nation. Nigeria spent a colossal sum of over 10 (ten) trillion dollars in the construction of dams. However, a microscopic view of Nigeria political landscape will reveal that the construction of dams is laced with a misgrill success and failures. This finds expression in the plethora of problems bedeviling the policy. These problems include the issue of corruption, inadequate funds etc. Consequently, the paper defines the concept of dams and development. The paper is explicated with the aid of holistic theory and system theory. The nexus or the interconnect between dams, growth and development is orchestrated. The socio-economic cum political pathologies benighting the construction and the maintenance of dams is discussed. Epitomizing, the paper opines that the government policy on the construction of dams and its maintenance in all ramifications, is a veritable pedestal for the development of Nigerian economy.
    [Show full text]
  • Fish Biodiversity and Fishing Methods of Some Waterbodies in Katsina
    International Journal of Fisheries and Aquatic Studies 2014; 1(6): 218-221 ISSN: 2347-5129 IJFAS 2014; 1(6): 218-221 Fish biodiversity and fishing methods of some © 2013 IJFAS www.fisheriesjournal.com waterbodies in Katsina State of Nigeria Received: 11-05-2014 Accepted: 13-06-2014 M. Ahmad, F.U. Shagari and A.N. Sani M. Ahmad Department of forestry and fisheries, Abstract Usmanu Danfodiyo University Knowledge of the fishing methods and the fish stock of some major water bodies in Katsina State is Sokoto, Nigeria. important for use in appraising the fisheries potential in the areas and similar ecosystem subject to similar F.U. Shagari ecological pressure. The study was carried in three water bodies: Ajiwa dam, Ajiwa; Jibiya dam, Jibiya Department of forestry and fisheries, Local government and Zobe dam, Dutsinma Local government. During the study, the fishermen’s catches Usmanu Danfodiyo University and fishing activities were recorded. The fish species at the landing site were identified using keys by Sokoto, Nigeria. Reed et al., (1967) and some pamphlets (species summary). Fish species composition recorded in Ajiwa dam belongs to 5 families: Bagridae (17.8%), Claridae (19.4%), Cichlidae (28.9%), Momyridae (13.8%) A.N. Sani and Schilbedae (20.0%). In addition to the 5 families of fish species in Ajiwa dam, the catches in Jibiya Department of forestry and fisheries, dam composed of Characidae (3.0%), Cyprinidae (1.0%) and Mochokidae (7.5%), while those of Zobe Usmanu Danfodiyo University dam composed of Characidae (2.5%). In all, the water bodies, Cichlidae made up the highest percentage Sokoto, Nigeria.
    [Show full text]
  • Ppp Resource Department Periodic Report
    PPP RESOURCE DEPARTMENT PERIODIC REPORT Prepared by Special Projects Unit Date: 5th April, 2018 PPP Resource Department: Report for the Period of March 2018 Table of Contents Summary of P3RD Projects (Chart) ……………………………..…………………………. 3 Summary of OBC/FBC Reports ……………………………………..……………………….. 4 Traffic Light Dashboard for PPP Projects & Stages …………………………………… 5 Energy & Urban Infrastructure ………………………………………..…….... 5 Social Infrastructure ……………………………………………………………..………..…. 17 Special Projects ………………………………………………………..……… 29 Summary of all OBC and FBC Compliance Certificates Granted y ICRC …….. 35 P3RC Core Activities/Programmes Aligned to ICRC Objectives & KPIs .……… 40 2 | Page PPP Resource Department: Report for the Period of March 2018 Summary of P3RD Projects Traffic Summary of P3RD Projects Dash Board at Development Phase (73 Projects) Traffic Dash Board at Procurement Phase (7 Projects) 1% (1 Project) Inactive 14% 29% (1 Project) (21 Projects) Inactive Moderately inactive Moderately inactive 70% 86% Active (51 Projects) (6 Projects) Active 3 | Page PPP Resource Department: Report for the Period of March 2018 SUMMARY OF OBC/FBC CERTIFICATES ISSUED (2018) Overall Title Summary JAN FEB MAR 2018 Total OBC certificates granted 501 1 2 1 4 FBC certificates granted 152 - 3 - 3 1 - See details on page 35 2 - See details on page 38 4 | Page PPP Resource Department: Report for the Period of March 2018 TRAFFIC LIGHT DASHBOARD FOR PPP PROJECTS & STAGES: (Preparation-Development and Procurement) ENERGY & URBAN INFRASTRUCTURE UNIT (33 Projects) 25 20 20 15 Ina Mo 10 Act 8 5 4 1 0 0 5 | Page PPP Resource Department: Report for the Period of March 2018 Energy & Urban Infrastructure DEVELOPMENT PHASE (28 Projects) TRAFFIC MDAs PROJECTS STATUS LIGHT 1 Federal Ministry of Power, Development of 9MW Oyan Dam Unsolicited Bid • OBC review concluded and Compliance Works & Housing (Power) Project Certificate issued on 8th March, 2017 • The Project Delivery Team (PDT) meeting with Transaction Advisers (TA) took place on the 28th July 2017.
    [Show full text]
  • Supporting Report 6 Water Resources Management Plan
    SUPPORTING REPORT 6 WATER RESOURCES MANAGEMENT PLAN WATER RESOURCES MANAGEMENT PLAN Water Resources Management Plan SR6.1 Operation and Maintenance of Existing Dams SR6.1.1 Enhancement of Dam Management SR6.1.2 Dam Safety Management SR6.1.3 Basic Concept for Dam Modification/Rehabilitation SR6.2 Hydrological Monitoring SR6.2.1 Nigeria Hydrological Service Agency (NIHSA) SR6.2.2 Hydrological Monitoring for Surface Water SR6.3 Consideration of Risk Associated with Climate Change and Trans‐boundary Waters SR6.3.1 Climate Change SR6.3.2 Trans‐boundary Water SR6.3.3 Coping Strategy on Risk associate with Climate Change and Trans‐boundary Water SR6.4 Water Environment Management SR6.4.1 Water Environment Conservation SR6.4.2 Water Quality Management SR6.4.3 Problems and Issues on Water Environment Management SR6.4.4 Proposed Plans for Water Environment Management Improvement SR6.5 Water Allocation and Regulation SR6.5.1 Current Condition and Issues on Water Allocation and Regulation SR6.5.2 Proposed Framework on Water Allocation and Regulation SR6.5.3 Proposed Projects The Project for Review and Update of Nigeria National Water Resources Master Plan Contents Page SR 6.1 Operation and Maintenance of Existing Dams ................................................................. SR6-1 SR6.1.1 Enhancement of Dam Management .................................................................................... SR6-1 SR6.1.2 Dam Safety Management.................................................................................................... SR6-4
    [Show full text]
  • Infrastructure Concession Regulatory Commission Public Private Partnership Projects Pipeline
    INFRASTRUCTURE CONCESSION REGULATORY COMMISSION PUBLIC PRIVATE PARTNERSHIP PROJECTS PIPELINE In furtherance of the mandate of the Infrastructure Concession Regulatory Commission to provide guidance and regulations for Infrastructure Public Private Partnerships (PPPs); and pursuit to Section 2(4) of the Infrastructure Concession Regulatory Commission (Establishment, etc) Act 2005, this is a publication of Federal Government projects eligible for PPP contracts. The projects are in line with the transformation agenda of the President, His Excellency, Dr. Goodluck Ebele Jonathan, GCFR, and are being developed by relevant Ministries, Departments and Agencies (MDAs) of the Federal Government, with the guidance of the ICRC and in line with the Infrastructure Concession Regulatory Commission Act 2005, and the National Policy on PPPs (N4P). 2013 PPP Pipeline Project List Up-Date S/N PROJECT AND DESCRIPTION PHASE AND PROPOSED MDA PPP MODEL 1 2nd Niger Bridge -Implementation Phase Fed. Min. of Works A Greenfield bridge and associated -Build Operate Transfer approach access road over the River Niger connecting Asaba and Onitsha. 2 Rehabilitation and Upgrade of the -Procurement Phase: Fed. Min. of Works Murtala Mohammed International Selection of preferred Airport (MMIA) Road to Apakun bidder concluded Junction, Lagos - Build Operate Expansion of MMIA access road from Transfer basis a 4-lane dual carriageway to an 8- lane road with vehicular and pedestrian bridges at appropriate locations 3 Rehabilitation and Upgrade of Lagos – -Development Phase: Fed. Min. of Works Iseyin – Kishi – Kaiama Road Outline Business Case The Lagos – Iseyin – Kishi – Kaiama Preparation. Road, Lot IA – will provide direct - Build Operate connectivity between Lagos and the Transfer basis North-West Zone.
    [Show full text]
  • The Contribution of Zobe Dam to the Socio-Economic Development of Makera Community Dutsinma Local Government Area, Katsina State North-Western Nigeria
    International Journal of Environmental Monitoring and Analysis 2019; 7(3): 75-82 http://www.sciencepublishinggroup.com/j/ijema doi: 10.11648/j.ijema.20190703.13 ISSN: 2328-7659 (Print); ISSN: 2328-7667 (Online) The Contribution of Zobe Dam to the Socio-Economic Development of Makera Community Dutsinma Local Government Area, Katsina State North-Western Nigeria Badamasi Jamda Saidu 1, *, Godwill Geofrey Jidauna 3, Jamila Kira Sanusi 3, Daniel Davou Dabi 2 1Department of Geography, Federal University Kashere, Kashere, Nigeria 2Department of Geography and Planning, University of Jos, Jos, Nigeria 3Department of Geography and Regional Planning, Federal University Dutsinma, Katsina, Nigeria Email address: *Corresponding author To cite this article: Badamasi Jamda Saidu, Godwill Geofrey Jidauna, Jamila Kira Sanusi, Daniel Davou Dabi. The Contribution of Zobe Dam to the Socio- Economic Development of Makera Community Dutsinma Local Government Area, Katsina State North-Western Nigeria. International Journal of Environmental Monitoring and Analysis . Vol. 7, No. 3, 2019, pp. 75-82. doi: 10.11648/j.ijema.20190703.13 Received : May 21, 2018; Accepted : June 12, 2019; Published : September 20, 2019 Abstract: This study examines the contribution of Zobe dam to the socio-economic development of Makera Community Dutsinma LGA, Katsina State north-western Nigeria. The study identified types of socio-economic activities supported by the dam and their impact. Total of 392 questionnaires was administered to adults target population using stratified random sampling technique. Descriptive and inferential statistics were used to analyze the data. Findings revealed main economic activities supported by the dam are farming (60.46%), fishing (30.10%), domestic water supply (5.52%) and livestock watering (3.057).
    [Show full text]
  • Dam Structures and Types in Nigeria: Sustainability and Effectiveness
    Water Conservation and Management (WCM) 3(1) (2019) 20-26 Water Conservation & Management (WCM) DOI: http://doi.org/10.26480/wcm.01.2019.20.26 ISSN: 2523-5664 (Print) ISSN: 2523-5672 (Online) CODEN: WCMABD REVIEW ARTICLE DAM STRUCTURES AND TYPES IN NIGERIA: SUSTAINABILITY AND EFFECTIVENESS Youdeowei, P.O1; Nwankwoala, H.O2*, Desai, D.D3 1Institute of Geosciences and Space Technology, Rivers State University, Nkpolu-Oroworukwo, Port Harcourt, Nigeria 2Department of Geology, University of Port Harcourt, Nigeria 3Department of Civil Engineering, Faculty of Engineering, Rivers State University, Nkpolu-Oroworukwo, Port Harcourt, Nigeria *Corresponding Author Email: [email protected] This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited ARTICLE DETAILS ABSTRACT Article History: This paper focused on the various dams in Nigeria, their effectiveness with respect to configuration and purpose, sizes, lifespan and sustainability. The study observed the causes of dam failures and also compared their lifespans Received January 2019 to their configuration, location and objectives. The results obtained from this study shows that Nigeria has large, Accepted 2 February 2019 medium and small dams which are also single and multipurpose. The dam structures will live out their lifespan as Available 04 2019 estimated from the designs, work effectively and sustainably except for action of some factors such as change in the 1 hydrology of the dam location, changes in the design criteria and natural disasters. The need to know the degree to Online 27 February which dam structures achieve its expected result or purpose, the lifespan of each dam before rehabilitation and the sustainability of the dams in Nigeria, bringing the attention of the government and private owners to the need of dam construction and maintenance is the basis of this paper.
    [Show full text]
  • Analysis of Water from Some Dams in Katsina State, Nigeria
    IOSR Journal of Applied Chemistry (IOSR-JAC) e-ISSN: 2278-5736.Volume 7, Issue 1, Ver. I. (Feb. 2014), PP 01-09 www.iosrjournals.org Analysis of Water from some Dams in Katsina State, Nigeria Fatima B. Suleiman1*, Abdul A. Audu2 1Department of Chemistry, Federal College of Education, Katsina, Nigeria 2Department of Pure and Industrial Chemistry, Bayero University, Kano, Nigeria Abstract: The study was conducted to assess seasonal variations in some parameters of water collected from seven different dams in Katsina State, Nigeria using standard procedures. The samples were collected from five locations situated in the east, west, north, south and midpoint in each of the seven dams in the rainy season, harmattan and dry seasons for two years. The temperature, pH and Dissolved Oxygen content of the samples were measured in-situ at the site of collection using a Brannan mercury thermometer, Wagtech international potatest portable pH meter and an auto cal Dissolved Oxygen meter respectively. Other parameters tested are Turbidity which was measured using a HACH 2100N Turbidimeter while Total Solid, Total Suspended Solid and Total Dissolved Solids were determined using gravimetric method. The average reading for the two years was used in the analysis. The maximum temperature values were obtained in the dry season and lowest in harmattan. The mean conductivity values for all the samples was found to be highest in the dry season and lowest in the rainy season. All the values were however within the 1200µScm-1 Maximum Acceptable Limit recommended by WHO. The Turbidity and Dissolved Oxygen values were found to be highest in the rainy season.
    [Show full text]
  • Harnessing Natural Resources for Youth Employment Generation in Katsina State, Nigeria
    Direct Research Journal of Public Health and Environmental Technology Vol. 5 (3), pp. 41-48, May 2020 ISSN 4372-2603 DOI: https://doi.org/10.26765/DRJPHET20688451 Article Number: DRJPHET20688451 Copyright © 2020 Author(s) retain the copyright of this article https://directresearchpublisher.org/drjphet/ Review Paper Harnessing Natural Resources for Youth Employment Generation in Katsina State, Nigeria Bilkisu Usman Mutawalli Department of Basic and Applied Sciences, College of Science and Technology, Hassan Usman Katsina Polytechnic, P. M. B. 2052, Katsina, Katsina State, Nigeria. Author E-mail: [email protected] Received 5 April 2020; Accepted 11 May, 2020 Natural resources exploitation is an essential condition for human were used to generate data for the study. The natural resource of existence and throughout the history of mankind humans have the state consists of atmospheric, mineral, vegetation and water utilized natural resources to produce the materials they need to resources that have not been fully harnessed to generate develop and sustain human populations. Nigeria is one of the employment for a large number of teeming youths in the State. developing countries that are endowed with a huge and vast array This is due mainly to various challenges faced in harnessing the of natural resources in different states of the federation including natural resources of the State. It is recommended that these Katsina State. This paper examines how the natural resources of challenges should be overcome to enable the harnessing of these the State can be harnessed to generate employment for the resources for youth employment generation. youths. Secondary sources of data generated through desk research from textbooks, conference papers, journal articles, Keywords : Harness, natural resources, youth employment, environmental reports, magazines and internet sourced materials Katsina State INTRODUCTION Natural resources are any property of the natural or serving man’s needs.
    [Show full text]