Completed, Current and Proposed Major Development Schemes in Liverpool’S World Heritage Zone
Total Page:16
File Type:pdf, Size:1020Kb
Location of recently completed, current and proposed major development schemes in Liverpool’s World Heritage Zone COMPLETED SCHEMES (Jan 2012-Dec 2016) D1 SCHEMES CURRENTLY ON SITE PROPOSED SCHEMES WORLD HERITAGE SITE WORLD HERITAGE SITE BUFFER ZONE LIVERPOOL WATERS Crown copyright and database rights 2017 Ordnance Survey A1 100018351. F1 Development Summary: B1 C1 World Buffer Combined Heritage Site Zone total Value of schemes £427m £704m £1,131m completed since (£1.13bn) January 2012 F2 Value of schemes on £113m £355m £468m site Value of proposed £132m £932m £1,064m F3 schemes (£1.06bn) F4 D2 Value of Liverpool £5,500m - £5,500m Waters developments (£5.5bn) TOTALS: £6,172m £1,991m £8,163m (£6.17bn) (£1.99bn) (£8.16bn) D12 D9 F9 D13 F8 F11 D8 D5 D11 F18 D4 F12 D10 F17 F5 F16 F10 F13 D6 A8 F15 F6 B2 D16 A2 F14 F7 E1 E2 D14 D15 A23 A7 A10 A9 C3 A22 A19 A24 D7 B5 B3 E3 C2 C4 B4 E4 A20 A6 D17 D19 A15 D18 A21 A5 A11 D20 A4 A3 A16 D22 A12 A25 C8 C5 D3 A18 A17 E7 B6 C11 C12 A26 B8 C7 F26 E5 C13 B11 F20 A28 C10 C6 B13 C14 A27 B7 F19 A13 E6 C9 D26 D23 F21 C15 A34 B14 A14 D21 B10 B9 A30 D27 F21405 D24 C18 B12 E8 A29 F24 D25 B15 A31 A35 D28 F22 C16 A32C17 D29 F23 E9 D32 A33 F29 D48 D47 F27 D30 F30 A36 D49 D46 D33 D31 F39 F40 E10 D34 F41 E11 F31 A37 F28 F42 D50 D5127 F32 F4 4 F43 F34 F33 F45 F47 D45 C20 D52 F48 D44 D35 E15 E14 D43 A40 A41 F49 C19 E12 F35 F46 D53 F37 B16 C21 C22 B17 D54 D36 A44 F36 A43 D5528 F51 E13 D37 A45 F50 A42 A47 D56 F38 A46 C24 C23 C25 D38 F57 D39 D42 A38 D41 F58 D57 D58 E1734 F52 A39 D40 F53 F60 F54 E18 E16 F59 D63 F55 F62 D60 D62 D61 F63 F61 F64 F66 D59 E19 F68 D64 E20 F56 F67 D70 D65 F55 D66 D67 F71 D68 F65 D67 F69 D71 D69 F70 D72 World Heritage Zone and Buffer Area Development Schedule This schedule provides detailed information on schemes in the WHS and Buffer Zone, some of which have been completed in the last 5 years, are on site, have a live planning application submitted/pending or have received planning consent. HER: 1 or 2 or 2* = Listed Buildings by grade H = Other Unlisted Heritage Assets WORLD HERITAGE SITE SCHEMES COMPLETED JANUARY 2012 – DECEMBER 2016 A1 MAP HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED REF A1 Titanic Hotel & Conversion to 150 bedroom 4 star hotel Stanley Dock £36m July 2014 2* Conference Centre, with retail/leisure at ground floor and gym Properties Ltd Stanley Dock in basement. Rum warehouse converted to conference and banqueting centre. A2 Central Library, William Refurbishment of the city's main library, Liverpool City £50m April 2013 2* Brown Street including partial demolition and rebuilding Council A3 Lime Street Station Refurbishment of underground station Merseyrail £5m August 2012 A4 “Shankly Hotel”, Conversion to mixed use leisure/gym, Signature Living £20m December H Victoria Street ground floor offices, hotel (65 rooms), 2016 A2 apart-hotel (69 serviced apartments), bar/restaurant, basement car park and rooftop garden terrace. A5 Tinlings Building, and Conversion to 132 student bedrooms with VITA (Crosshall) Ltd £10m September H Crosshall Buildings, 5-7 ground floor commercial units 2014 Crosshall Street A6 3a Crosshall Street Conversion of vacant building to 67 VITA (Chapel) Ltd £5m September H student bedrooms with rooftop extension 2013 A7 97-105 Dale Street Conversion of 1st to 3rd floors as 10 Garry Usherwood £0.5m September residential apartments Associates Ltd 2016 A8 “The Richmond”, 24 To extend and convert existing office Middle England £10m April 2013 2 Hatton Garden building to 51 serviced apartments Developments Ltd A4 A9 “Jamworks – The Conversion to 86 bedroom student Jamworks/StayCity £5m March 2015 2* Bridewell”, Cheapside accommodation A10 37 Cheapside Conversion and extension to create 12 BTE Limited £0.75m December bedroom student bedrooms 2016 A11 “Doubletree by Conversion of former Municipal Annexe to Doubletree by Hilton £50m October 2 Hilton”, 6-14 Sir Thomas form 87 bedroom, 4 star hotel 2015 Street A12 Stanley Court, 19-23 Conversion of existing office building to 48 Rich Link Investments £2m August 2016 Stanley Street student apartments Ltd A13 “Hoax Hostel”, 50-54 Conversion to 240 bedspace (49 room) Satboard Hotels Ltd £3m July 2013 A11 H Stanley Street hostel accommodation with bar and restaurant A14 Signature Hotel, Refurbishment of former flood damaged Signature Living £1.5m April 2013 H Stanley Street Print Hotel as 6 serviced apartments A15 Apple Apartments, 2 Conversion of upper floors to 136 studio Rich Link Investments £10.5m August 2016 Moorfields apartments (35 of which are serviced Ltd apartments) A16 Ibis Styles Hotel, Conversion of building to 122 bedroomed Benmore Group £10m October H Pioneer Buildings, 57- hotel with ground floor Tesco Metro, and 2013 67 Dale Street new 288 space multi-storey car park to the rear A17 Aloft Liverpool, 1-9 Conversion of former office building to 116 Ashall Property Ltd £18m November 2* North John Street bedroom hotel with restaurant 2014 A16 A18 Z Hotel, State House, Conversion from offices to 92 room Z Hotels Liverpool Ltd £2.5m April 2013 22 Dale Street budget hotel with ground floor retail A19 18-20 Tithebarn Street Conversion of upper floors to 30 student Stockton Properties Not September H bedrooms disclosed 2015 A20 “Tempest”, 12 Conversion of ground floor to retail, Capital & Centric £6m August 2015 Tithebarn Street café/restaurant; refurbishment of vacant offices on 6 floors above A21 Travelodge, 30-38 Conversion of office building to 125 Aviva Investors £8m December H Exchange Street East bedroom Travelodge budget hotel 2012 A22 The Albany, Old Hall 6 courtyard level apartments and 2 Infinity (Albany) £0.6m September 2* Street commercial units in the basement facing Developments Ltd 2014 Old Hall Street A17 A23 Cotton House, Old Hall Conversion of 5th floor from offices to Bruntwood £3m November H Street training suite; new restaurant and 2015 refurbishment of commercial units on ground floor A24 Irwell Chambers, 5 Conversion of basement to 14x1 and 1x2 L3 Living £1m October H Union Street bedroom serviced apartments 2014 A25 Walker House, Refurbishment/fit out of 16,000 sq ft office Moorfields Corporate £0.5m December 2 Exchange Buildings space Recovery 2014 A26 “Tune Hotel”, 3-19 Conversion of former offices to 99 Hotel Land & £6.5m August 2015 2 Castle Street bedroom budget hotel Development A27 10-18 Castle Street Major refurbishment of upper floor office Kilpatrick Property £0.5m April 2012 2 space Co A26 MAP HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED REF A28 Oriel Chambers, 14 Refurbishment of two neighbouring office Bruntwood £0.5m October 1 Water Street buildings 2016 A29 Britannia Buildings, 36- Conversion of upper floors to 21 bedroom Mr Martin Smith £1.2m February H 54 Fenwick Street hotel 2015 A30 7 The Strand Conversion from offices to 96 apartments Seven Capital (The £6m September H (Wellington Buildings) Strand) Ltd 2016 A31 Tom’s Tavern, 50 Refurbishment of vacant building to bar C&G Holdings Ltd £0.5m September H Brunswick Street and eaterie 2016 A32 James Street Station Refurbishment of underground railway Merseyrail £5m April 2013 A30 A31 station A33 30 James Street – Conversion to 65 bedroom 4 star “Titanic Signature Living £5.5m August 2014 2* Home of the Titanic themed” apart-hotel A34 Royal Liver Building, Refurbishment of 28,000 sq ft on 8th floor for Royal London Asset £1m July 2013 1 Pier Head letting to Pershing, subsidiary of the Bank Management of New York Mellon A35 Cunard Building Refurbishment of 4th and 5th floor offices Liverpool City Not November 2* (60,000 sq ft) Council disclosed 2014 A36 Port of Liverpool Refurbishment of 5,100 sq ft offices on the Rathbone £0.8m January 2* Building, Pier Head 2nd floor Investment 2016 Management A37 Mann Island Two residential buildings with 376 Countryside £120m June 2012 apartments, and one office building all Neptune LLP A34 A35 A36 with ground floor restaurants/cafés, basement parking, and public open space. A38 Revolucion de Cuba, New Cuban bar and eaterie Cuba £1.5m June 2016 1 Albert Dock A39 Mattel Play, Albert Conversion to “Mattel Play Liverpool”, Heritage Great £1.5m April 2016 1 Dock Mattel Toys family entertainment centre Britain A40 25 Duke Street and 7 Conversion with extension to create 4 SAB Property & £0.25m December 2 Campbell Street serviced apartments and refurbishment of Investment Ltd 2012 ground floor shop A41 “Epsley Cort”, 12 Conversion of former warehouse to 54 Middle England £2m February A37 H Gradwell Street student bedrooms Developments Ltd 2013 A42 “The Paper Mill”, 28-30 To convert and extend existing building to Middle England £3m February H Henry Street create 102 student rooms with communal Developments Ltd 2013 facilities A43 “Le Bateau”, 62 Duke Conversion of upper floors to 4 x 4 Not disclosed £0.5m January H Street bedroom serviced apartments above 2015 ground floor restaurant A44 Epic Apart-Hotel, 75 Conversion of derelict office building to a Epic Hotels £1m April 2015 H Duke Street 19 suite apart-hotel A45 Atlantic Container Partial demolition and 4 storey Langtree Group plc £8m April 2016 Lines, 90 Duke Street redevelopment to provide offices with basement car park A40 A46 “The Podworks”, Partial conversion of lower Betterview Ltd £1m September H Dakota Building, 32-34 ground/basement levels to 19 bedroom 2012 Henry Street hotel, including hotel bar and restaurant.