THE HIDDEN STORY BEHIND CHINA's RAILWAY BOOM – a TAKEAWAY for INDIA Pratosh Menon Intern, Chennai Centre for China Studies O

Total Page:16

File Type:pdf, Size:1020Kb

THE HIDDEN STORY BEHIND CHINA's RAILWAY BOOM – a TAKEAWAY for INDIA Pratosh Menon Intern, Chennai Centre for China Studies O Image Courtesy: Wang Wei Issue Map VIII THE HIDDEN STORY BEHIND CHINA’S RAILWAY BOOM – A TAKEAWAY FOR INDIA Pratosh Menon Intern, Chennai Centre for China Studies October 5 2019 About the Author Pratosh Menon is a final year high school student based in Singapore. He has represented and won awards for his schools in quizzes, math competitions, debates, and conferences and generally ranks at the top of his class in academics. Passionate about animal rights, the environment and new technologies he hopes to be able to develop revolutionary solutions that help change human behavior and the way we use resources to stop the harmful impacts on the environment. About C3S The Chennai Centre for China Studies (C3S), registered under the Tamil Nadu Societies Registration Act 1975 (83/2008 dated 4th April 2008), is a non-profit public policy think tank. We carry out in depth studies of developments relating to China with priority to issues of interest to India such as geopolitical, economic and strategic dynamics of India-China relations, Chinas internal dynamics, border issues, Chinas relations with South Asian countries, prospects of trade, the evolution of Chinese politics and its impact on India and the world, ASEAN and SAARC relations, cultural links, etc. C3S attempts to provide a forum for dialogue with China scholars in India and abroad and give space for the expression of alternate opinions on China related topics. Additionally, events, lecture discussions and seminars are organised on topics of current interest. What is an Issue Map? C3S launches its Issue Map initiative. The reports under this series analyse the status and developments of current scenarios in detail. They attempt to aid the reader to get a more comprehensive idea of the issue being addressed through a detailed illustration in the form of images, data and facts. Issue Maps are available for download as PDFs. Introduction China currently has over 31,000 km1 of high-speed track, accounting for two-thirds of the global high- speed railway network. Although such large-scale development by a developing country has led the China Railway (CR) raking up over US$ 700 billion dollars2 in debt, it brings to the table a plethora of wide-ranging benefits for the country. The greatest advantage the growth of HSR (high speed rail) has provided China – is the fact that working in cities has become cheaper. With cities being far more expensive to live in as compared to rural areas, high-speed rail has enabled individuals to live in the more affordable regions surrounding the main cities. This has facilitated not only the growth of surrounding rural communities and towns, but has also increased production in the city. For example, although Shanghai has a population of 22 million3, HSR has enabled over 75 million people to be within an hour’s commute (the cost of second-class rail passes is far less than the additional rent one is forced to pay in China’s tier-1 cities). The cost of the cheapest high- speed railway pass is works out to only US$ 5.70 a trip4. Given the average worker will take approximately 400 trips a year – the annual money spent in commuting sums up to US$ 2280. The money saved in living in a neighbouring city like Jiaxing, more than compensates for the money spent on the train-trips. Given India’s discrete political and economic situation, replicating such a project will certainly be a herculean task. However, India has much to gain from another story hidden deep within China’s railway growth over the past two decades – the improvement of traditional (non HSR) train services. The average speed of long-distance passenger trains in India on the whole has not really changed from the 1960s. There is still enormous scope for the Indian government to adapt existing infrastructure to meet the growing number of passengers. Interestingly China’s railways in the early 1990s were similar to India – low punctuality and trains boasting an average speed of just 48 km/h. Today, the average speed of Chinese passenger trains is 93 km/h, which for reference is faster than almost every passenger service in India. INDIA: Average speed of a passenger train in India today: 50.6 km/h5 Average speed of a passenger train in India in 1993: 46.4 km/h6 Increase in speed for India since 1993 ~ 9% CHINA: Average speed of a passenger train in China today: 92.8 km/h7 Average speed of a passenger train in China in 1993: 48.1 km/h8 Increase in speed for China since 1993 ~ 93% Interestingly, the annual amount the Chinese government invested into improving and maintaining non-high-speed rail services was similar to the amount allotted by the Indian government for the Railways. To this end, the Chinese government invested US$ 26 billion during the fiscal year 2018-19, whereas the Indian government invested US$ 23 billion. However, since only 1.4 billion passengers9 use non high-speed trains in China compared to the approximately 3.6 billion for India10, it should be noted that the amount invested per passenger is over two and a half times that of India. Though in the grand scheme of things this data is somewhat misleading, noting that passenger traffic on trunk lines in China is in fact 8% more than that in India. The contra-distinct conditions the two railways find themselves in today can be primarily attributed to the different pathways they followed from the early 1990s. While India focused on improving top speeds of coaches and designing new, more powerful locomotives, China took a different path – focusing on the development of existing track and signalling infrastructure. On the point of India and coach speed, it should be noted that the transition from ICF coaches to LHB coaches has been the corner-stone in India’s drive for speed, since such a transition would result in increasing the maximum operational speed of passenger trains from 110 km/h to 130 km/h*. However, only 8% of total running track in India supports speeds in excess of 110 km/h. Interestingly, the top speed for the majority of passenger trains in China is very similar at 120 km/h+. This research aims to study why non-high-speed passenger trains in China have become much faster and efficient in comparison with India despite being technologically very similar. The research takes into account the feasibility of looking into the replication of China’s railway maintenance and development given the fact that non-high-speed rail infrastructure in China sees similar funding to that in India and has levels of technological development comparable to existing Indian rail infrastructure. The paper will cover four key points which highlight the cause to such a discrepancy – China’s signalling reform and a comparison with India’s current signalling system Track maintenance in the two countries Differences in train scheduling The effect of freight train services on passenger services in the two countries China’s Signalling reforms – Railway signalling in China: On the 1st of April 1997, the government initiated the China Railway Speed Up Campaign (中国铁路大提速) which was led by Yan Ming, Chief Professor of Southwest Jiaotong University. By the end of the 1st Speed Up Campaign out of six, the average speed of a train rose from 48.1 km/h to 54.9 km/h11. An integral part of the campaign was to improve the signalling technology, allowing trains to have shorter headway times amidst growing passenger traffic. From 2004, China successively removed the traditional fixed block signalling system and installed the Chinese Train Control System (CTCS), based on the European Train Control System (ETCS). Today, all of China’s signalling systems are based on CTCS. Such systems* do away with cab signalling (no physical signals are present beside tracks); instead trains communicate with fixed radio stations and the train behind and ahead to ensure they are running at a safe speed. *There are various levels of ETCS/CTCS. Today most of China’s railways are fitted with CTCS levels 2,3 and 4. CTCS Level 2 works as a digital radio-based system. Movement authority and other signal aspects are displayed in the cab for the driver. Apart from a few indicator panels, it is therefore possible to dispense with trackside signalling. However, the train detection and the train integrity supervision still remain in place at the trackside. Train movements are monitored continually by the radio block centre using this trackside-derived information. The movement authority is transmitted to the vehicle continuously with speed information and route data. Positioning beacons are used and the distance between two positioning beacons, the train determines its position via sensors. The positioning beacons are used in this case as reference points for correcting distance measurement errors. The on-board computer continuously monitors the transferred data and the maximum permissible speed. The driver is then able to proceed at the speed which the system says is safe to travel at. CTCS Level 3 is similar to that of CTCS Level 2, except Balises are used instead of track- side circuitry. (Equivalent to ETCS Level 2) CTCS Level 4 varies from the above by eliminating radio-block centres and allowing trains to directly communicate with one another. Therefore, the speed of trains varies depending on the speed of the trains ahead and behind it. This is similar to ETCS Level 3, which is still in development. However, China has already implemented CTCS Level 4. Reference: Academic Dictionaries and Encyclopedias. (2019). European Train Control System. [online] Available at: https://enacademic.com/dic.nsf/enwiki/1055017 [Accessed 12 Jul.
Recommended publications
  • Current Affairs
    Mahendra Publication CONTENTS Pvt. Ltd. VOL-13 ISSUE -05 Editor Success Saga 5 N.K. Jain IBPS 6-9 Advisors Spotlight 10 Neeraj Chabra The People 12-22 K.C.Gupta News Bytes 24-84 Minister of Railways Flags off Country’s first Antyodaya Registered Office Express running between Ernakulam - Howrah 85-87 Mahendra Publication Pvt. Ltd. Swachh Bharat Milestone- 100 districts in India declared ODF 88 103, Pragatideep Building, Shri Kiren Rijiju launches “MySSB APP” 89 Plot No. 08, Laxminagar, President of India inaugurates international conference on ‘Bharat Bodh’ 90 District Centre, New Delhi - 110092 Lok Sabha passes the Enemy Property Bill 2016 91 TIN-09350038898 29th Academy Awards 2017 92-93 w.e.f. 12-06-2014 Que Tm - General Awareness 95-100 NP QUIZ 102-104 Branch Office Graphic Factory 106-112 Mahendra Publication Pvt. Ltd. Who’s Who 113 E-42,43,44, Sector-7, Noida (U.P.) For queries regarding ANTYODAYA EXPRESS promotion, distribution & advertisement, contact:- [email protected] Ph.: +91-9670575613 SWACHH BHARAT MILESTONE Owned, printed & published by N.K. Jain 103, Pragatideep Building, SHRI KIREN RIJIJU LAUNCHES “MYSSB APP” Plot No. 08, Laxminagar, District Centre, New Delhi - 110092 Please send your suggestions and grievances to:- ‘BHARAT BODH’ Mahendra Publication Pvt. Ltd. CP-9, Vijayant Khand, Gomti Nagar Lucknow - 226010 E-mail:[email protected] LOK SABHA PASSES THE ENEMY © Copyright Reserved PROPERTY BILL 2016 # No part of this issue can be printed in whole or in part without the written permission of the publishers. # All the disputes are subject to Delhi 29TH ACADEMY AWARDS 2017 jurisdiction only.
    [Show full text]
  • Indian Railways Facts & Figures 2016-17
    INDIAN RAILWAYS FACTS & FIGURES 2016-17 BHARAT SARKAR GOVERNMENT OF INDIA RAIL MANTRALAYA MINISTRY OF RAILWAYS (RAILWAY BOARD) KEY STATISTICS 2016-17 1. Route Length (Kms.) - Broad Gauge (1.676 M.) 61,680 - Metre Gauge (1.000 M.) 3,479 - Narrow Gauge 2,209 (0.762 M. and 0.610 M.) Total 67,368 2. Double and Multiple Track - Broad Gauge 22,021 (Route Kms.) - Metre Gauge - Total 22,021 3. Electrified Track (Route Kms.) - Broad Gauge 25,367 - Metre Gauge - Total 25,367 4. Number of Railway Stations 7,349 5. Number of Railway Bridges 1,44,698 6. Traffic Volume Passengers Originating (Millions) 8,116 Passenger Kms. 1,149,835 Tonnes Originating (Rev. Traffic) (Millions Tonnes) 1,106.15 Tonne Kms. (Millions) 620,175 7. Number of Employees (Thousands) 1308 8. Revenue (` in Millions) 1,65,292.20 9. Expenses (` in Millions) 1,59,029.61 10. Rolling Stock - Locomotives: - Steam 39 - Diesel 6,023 - Electric 5,399 Total 11,461 - Passenger Carriages 64,223 - Freight Cars/Wagons 2,77,987 Note : All the figures, unless otherwise stated, are as at the end of the fiscal year i.e. March 31, 2017. CONTENTS Review of the year 5 Originating Passengers & Average Lead 6 Passenger Kilometres 7 Passenger Services 8 Passenger Revenue 9 Freight Operations — Originating Tonnage 10 — Net Tonne Kms. 11 — Freight Train & Wagon Kms. 12 — Commodity wise Loading 13 — Commodity wise NTKms. 14 — Average Lead 15 — Revenue 16 — Commodity wise Earnings 17 Rolling Stock — Locomotives 18 — Passenger Coaches 19 — Freight Cars/Wagons 20 Track/Route Kilometres 21 Gross Tonne Kilometres 22 Electrification 23 Signalling 24 Telecommunication 25 Personnel 26 Revenue 27 Expenses 28 Net Revenue & Excess/Shortfall 29 Assets 30 Asset Utilisation 31 Engine Kms.
    [Show full text]
  • दक्षिण रेलवे/Southern Railway चेन्नैमंडल/Chennai Division
    दक्षिण रेलवे/Southern Railway चेन्नैमंडल/Chennai Division No.PUB/MAS/2019/30 Date.14.10.2019 प्रेस क्षवज्ञप्ति / PRESS RELEASE CHANGES IN PATTERN OF TRAIN SERVICES According priority to Passenger Safety and Safety of train operations, as a part of ongoing Engineering works, Line Block/Power Block is permitted in Nayadupeta –DoravariChatram sections on 19th October 2019from 08:15 hrs to 17:15 hrs. (09 Hours) REGULATION OF TRAIN SERIVICES 1. Train No. 12711 – Vijayawada – Dr.M.G.R Chennai Central Pinakini Express leaving Vijayawada at 06:00 hrs on 19th October 2019 will run on the slow line between Nayadupeta – DoravariChatramto be regulated/delayed for about 60 minutes. 2. Train No. 12296 – Danapur – K.S.R Bangalore City Junction SanghaMitraExpress leaving Danapur at 20:10hrs on 17th October 2019 will run on the slow line between Nayadupeta – DoravariChatramtobe regulated/delayed for about 75 minutes. 3. Train No 02841 – Santragachi – Dr.M.G.R Chennai Central Super fast express leaving Santragachi at 12:40 hrs on 18th October 2019 will run on the slow line between Nayadupeta – DoravariChatramto be regulated/delayed for about 55 minutes . 4. Train No 12655 - Ahmedabad – Dr.M.G.R Chennai Central Navjeevan Express leaving Ahmedabad at 07:30 hrs on 18th October 2019 will run on the slow line between Nayadupte – DoravariChatramt to be regulated/delayed for about 75 minutes . 5. Train No 12841 – Howrah Junction - Dr.M.G.R Chennai Central Coromandel Express leaving Howrah at 14:50 hrs on 18th October 2019 to be regulated/delayed for about 195 minutes EMU TRAIN SERVICES FULLY CANCELLED 1.
    [Show full text]
  • 04-Cover Page Provide by IRCTC (07-08-2018)
    Fare Tables for 2018-19 Shatabdi/Duronto Jan Shatabdi Garib Rath Distance Slabs Exe. Class CC Non-AC CC CC II 3AC CC (Kilometers) (`) (`) (`) (`) (`) (`) (`) 2201 - 2250 - - - - - 1254 1099 2251 - 2300 - - - - - 1280 1122 2301 - 2350 - - - - - 1306 1146 2351 - 2400 - - - - - 1333 1169 2401 - 2450 - - - - - 1359 1192 2451 - 2500 - - - - - 1384 1215 2501 - 2550 - - - - - 1412 1238 2551 - 2600 - - - - - 1437 1261 2601 - 2650 - - - - - 1465 1286 2651 - 2700 - - - - - 1490 1309 2701 - 2750 - - - - - 1517 1333 2751 - 2800 - - - - - 1543 1356 2801 - 2850 - - - - - 1569 1379 2851 - 2900 - - - - - 1596 1403 2901 - 2950 - - - - - 1622 1409 2951 - 3000 - - - - - 1648 1414 * Basic Fares 2014-15 Trains newly introduced Humsafar Express: Base fare of AC-3 tier of Humsafar train is 1.15 times of the base fare of AC-3 tier superfast Mail/Express trains, which is applicable for the first passenger block of 50% and thereafter a 10% increase for every 10% increase in the passenger block for the remaining 50%. Fare of tatkal charges is 1.5 times of Humsafar basic fares. Other charges like reservation fee, superfast surcharge, GST etc. as applicable are levied separately. Catering charge is optional for meals. The fare of Humsafar is inclusive of bedroll charges. The advance reservation period (ARP) will be 120 days. Antyodaya train: Antyodaya Express train is a long distance superfast service with fully unreserved coaches. Base fare of unreserved second class of Antyodya Express train is 15% higher than the base fare of unreserved second class of Mail/Express trains. Other changes like superfast surcharges, Mela surcharge if applicable etc. is levied separately. Tejas Express: The basic fare of AC chair car and Executive class of Tejas Express is 1.20 times of the basic fare of respective classes of Shatabdi trains.
    [Show full text]
  • History of Rail Transportation and Importance of Indian Railways (IR) Transportation
    © IJEDR 2018 | Volume 6, Issue 3 | ISSN: 2321-9939 History of Rail Transportation and Importance of Indian Railways (IR) Transportation 1Anand Kumar Choudhary, 2Dr. Srinivas Rao 1Research Student, MATS University, Raipur, Chhattisgarh, India 2MATS school of Management Studies and Research (MSMSR), MATS University, Raipur, Chhattisgarh, India ____________________________________________________________________________________________ Abstract-Transportation is important part of people which is directly and indirectly connected with people. Its enable trade between people which is essential for the development of civilization. Various authors have described number of dimension regarding the Indian Railways. This study explains history of rail transportation and also describe journey of railway in India and discuss importance about rail transportation. Keywords- History of Rail Transport and Indian Railways, Organisation Chart of IR 1. Introduction Transportation is the backbone of any economic, culture, social and industrial development of any country. Transportation is the movement of human, animal and goods from one location to another. Now a day we are using so many method for transporting like air, land, water, cable etc. transportation is find installation infrastructure including roads, airway, railway, water, canels and pipelines and terminal (may be used both for interchange of passenger and goods). 2. Rail Transport Rail transport is where train runs along a set of two parallel steel rails, known as a railway or railroad. Passenger transport may be public where provide fixed scheduled service. Freight transport has become focused on containerization; bulk transport is used for large volumes of durable item. Rail transport is a means of transferring of passenger and goods on wheeled running on rail, also known as tracks, tracks usually consist of steel rails, installed on ties (sleepers) and ballast.
    [Show full text]
  • Delhi to Agra Train Schedule and Fare
    Delhi To Agra Train Schedule And Fare How sworn is Stanly when erupting and first-aid Vaughan dimidiated some crusades? Is Harlin physiologic or touristic after carabinerscoruscant Hakim unmeaningly ingenerated and deservedly. so sullenly? Polycrystalline and intransitive Leopold focalise vortically and tellurizes his Iba approved transport buses found this train fare in trains runs between stations include: the bus tickets in india gate no concessional fare of the taj. Iri he added to. If yes, here nothing will keep to inventory of object same. Many daily basis via yamuna expressway from the fare of jabalpur superfast that might be! Chennai To Namakkal Bus schedules Bus Fares Bus Timings Distance Yapm Yl 201. Book an online cab from Chennai to Namakkal cabs and this best deals on regular cab booking. About posts and fare news and come accompanied by train? Taxi To Taj Mahal From Delhi Lowest Fare Package From Delhi. We will come accompanied by train fare is delhi to archaeological survey: find the trains timing? How much does it and save money or simply ask you see the international companies do, to delhi agra train schedule and fare, the bangalore to! How many trains having only provided for a commission when we are the optimal variant for! We hope you to delhi agra and train schedule fare. It creates a soulful atmosphere of western terrains of the Indian subcontinent. Situated in this is located nearby monuments of train to schedule and delhi agra fare from. First choice such as devised by your first shatabdi fare is currently on sanitization during the.
    [Show full text]
  • Current Affairs Q&A PDF 2019 Subscribe(Buy)
    Current Affairs Q&A PDF Current Affairs Q&A PDF 2019 Contents Current Affairs Q&A – July 2019 .......................................................................................................................... 2 INDIAN AFFAIRS ............................................................................................................................................. 2 INTERANTIONAL AFFAIRS ......................................................................................................................... 78 BANKING & FINANCE ................................................................................................................................ 102 BUSINESS AND ECONOMY ....................................................................................................................... 119 AWARDS AND RECOGNITIONS ............................................................................................................... 136 APPOINTMENTS & RESIGNS .................................................................................................................... 156 ACQUISITIONS AND MERGERS ............................................................................................................... 178 SCIENCE & TECHNOLOGY ....................................................................................................................... 180 ENVIRONMENT ........................................................................................................................................... 194 SPORTS .........................................................................................................................................................
    [Show full text]
  • FINAL11 PDF.Pdf
    CHAPTER ONE PROFILE OF THE PROBLEM 1 (1.1): ANALYSIS OF ACCIDENT IN 5 YEARS: Safety in Indian Railways becomes a subject of discussion when there is an accident. The review of train accidents of the last 5 years (2009-10 to 2013-14) for which the data is available indicates that a large number of accidents happen because of derailments & at level crossing. It is also clear that more than 80% of the accidents are caused by Human Failure (Railway Staff or Otherwise). The good sign however is that the number of accidents per million kilometers run and number of causalities per million passengers carried has come down in the last few years. Fig. (1.1): Graph of 5 years accident history. Fig. (1.2): Percentage graph of 5 years accident history. 2 (1.2): HISTORY OF FIRE ACCIDENTS AFTER INDEPENDENCE OF INDIA: Although there are 23 accidents in past 5 years but once a time it was very high even more then there is a complete list of Fire accidents in Indian Railways in which casualties were very high. 1. 23 February 1985 – Rajnandgaon train fire, Madhya Pradesh, India: Over 50 people were killed when an express train caught fire. [1] 2. 16 April 1990– Patna rail disaster, near Patna, India: 70 killed as shuttle train is gutted by fire. 3. 6 June 1990: Thirty-five killed in a fire accident in train at Gollaguda in Andhra Pradesh. 4. 10 October 1990: Forty killed in a fire in a train near Cherlapalli in Andhra Pradesh. 5. 26 October 1994: Twenty-seven killed as 8001 DN Mumbai–Howrah Mail caught fire on its S5 Sleeper class coach between Lotapahar and CKP stations (SE Railway) at 02.51 AM.
    [Show full text]
  • Booking Train Ticket Through Internet Website: Irctc.Co.In Booking
    Booking Train Ticket through internet Website: irctc.co.in Booking Guidelines: 1. The input for the proof of identity is not required now at the time of booking. 2. One of the passengers in an e-ticket should carry proof of identification during the train journey. 3. Voter ID card/ Passport/PAN Card/Driving License/Photo Identity Card Issued by Central/State Government are the valid proof of identity cards to be shown in original during train journey. 4. The input for the proof of identity in case of cancellation/partial cancellation is also not required now. 5. The passenger should also carry the Electronic Reservation Slip (ERS) during the train journey failing which a penalty of Rs. 50/- will be charged by the TTE/Conductor Guard. 6. Time table of several trains are being updated from July 2008, Please check exact train starting time from boarding station before embarking on your journey. 7. For normal I-Ticket, booking is permitted at least two clear calendar days in advance of date of journey. 8. For e-Ticket, booking can be done upto chart Preparation approximately 4 to 6 hours before departure of train. For morning trains with departure time upto 12.00 hrs charts are prepared on the previous night. 9. Opening day booking (90th day in advance, excluding the date of journey) will be available only after 8 AM, along with the counters. Advance Reservation Through Internet (www.irctc.co.in) Booking of Internet Tickets Delivery of Internet Tickets z Customers should register in the above site to book tickets and for z Delivery of Internet tickets is presently limited to the cities as per all reservations / timetable related enquiries.
    [Show full text]
  • 26 May 2014 to 22 May 2017
    ACHIEVEMENTS OF MINISTRY OF RAILWAYS (26 May 2014 to 22 May 2017) I.PASSENGER AMENITIES AND DIGITAL INDIA INITIATIVES ​ ● Railway Ministry made sustained efforts during the three years to enhance passenger earnings and no. of passenger. 1st time in recent year negative growth has been seized and increase in the number of passenger and earning started. ● 8221 Million Passenger Travelled in 2016-17 as against 8151 Million passengers in 2015-16 registering a growth ( +0.89 %). Passenger Earnings in 2016-17 is estimated at Rs. 2,000 crore more than last year.The total earnings in 2016-17 are estimated to be around Rs.47, 400 crore. This is the highest ever passenger earnings. ● To promote E ticketing, Implemented competitive ticket booking facility to the public at large. Service charges on e-ticket booked through IRCTC has been withdrawn. Cashless reservations (e tickets) have gone up from 58% to 68 %. Provided POS machines at important stations for reservation reducing waiting time in purchase. ● A more passenger friendly app with enhanced ease namely ÍRCTC- Rail Connect’ with additional features launched. In addition to this, the existing UTSONMOBILE app has been improved with additional payment option of PayTM & Mobikwik. ● Yatri Ticket/Sewa Kendra (YTSK) Scheme launched to allow private agents to operate ticketing terminals for selling reserved as well as unreserved tickets. ● E-Ticketing portal in Hindi launched. ● Provision made for acceptance of international debit and credit cards for payment of E-ticket through IRCTC website ● New Services : Indian Railways implemented , 262 new services, 135 extensions of trains and 25 increase in frequency in last three years.
    [Show full text]
  • Two and a Half Years Achievements of Ministry of Railways (May 2014 to Nov 2016)
    Two and a Half years achievements of Ministry of Railways (May 2014 to Nov 2016) I.Passenger Amenities and Digital India Initiatives ● Social media platforms on Facebook, Twitter and YouTube with the handle @railminindia launched. Ministry of Railways employed first of its kind, a real time 24x7 public grievance system through Twitter and provided medical, security and other emergency assistance to travelling passengers. ● All India Security Helpline ‘182’ setup to report any untoward incident and seek emergency help during travel & ‘138’ to provide for all other query/complaints during travel ● A mobile based application viz. Complaint Management System (COMS) launched. ● E-catering facility launched at 250 stations. 408 railway stations designated for providing E-catering ● Catering made optional in Train No. 12025 & 12026 (Pune - Secunderabad Shatabdi) and 12953 & 12954 (August Kranti Rajdhani) Trains for a period of 45 days on experimental basis. ● A massive scheme for providing Water Vending Machines (WVMs) to provide RO Water at affordable prices is under implementation by Railway PSU IRCTC ● Enhanced Reservation quota for Senior Citizens and Women from two lower berths per coach to four lower berths per coach in Sleeper class ● Tatkal reservation timings have been staggered to serve dual purpose of providing convenience to and for staggering traffic on the e-ticket portal. All agents are debarred from booking tickets during first thirty minutes of opening of booking ● Automatic refund of Confirmed /RAC e-tickets on cancellation of trains similar to waitlisted e-tickets is granted without filing of TDR ● Time limit for booking reserved tickets was increased to 120 days w.e.f.
    [Show full text]
  • Tuesday, April 26, 2016 / Vaisakha 6, 1938 (Saka) ______
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Tuesday, April 26, 2016 / Vaisakha 6, 1938 (Saka) ______ *MATTERS UNDER RULE 377 (i) SHRI RODMAL NAGAR laid a statement regarding need to establish a Kendriya Vidyalaya at Narsinghgarh in Rajgarh parliamentary constituency, Madhya Pradesh. (ii) SHRI SUBHASH CHANDRA BAHERIA laid a statement regarding need to expedite setting up of a rail coach factory at Bhilwara, Rajasthan. (iii) SHRI PANKAJ CHAUDHARY laid a statement regarding need to set up an Integrated Ayush Hospital in Maharajganj district, Uttar Pradesh. (iv) SHRI GOPAL SHETTY laid a statement regarding need to take measures for welfare of farmers in the country. * laid on the Table as directed by the Chair. (v) DR. ANSHUL VERMA laid a statement regarding need to provide electricity connection to Kasturba Gandhi Balika Vidyalayas in Hardoi parliamentary constituency, Uttar Pradesh. (vi) SHRIMATI JAYSHREEBEN PATEL laid a statement regarding need to accord early approval to the proposal of Government of Gujarat for declaration of areas around various wildlife sanctuaries in the State as eco-sensitive zones. (vii) SHRI SUSHIL KUMAR SINGH laid a statement regarding need to provide PNG in Aurangabad parliamentary constituency, Bihar. (viii) SHRI NANA PATOLE laid a statement regarding need to create awareness among people regarding importance of donation of organs. (ix) SHRI HARISH MEENA laid a statement regarding need to ensue student friendly academic environment at NIT, Srinagar, Jammu and Kashmir. (x) SHRI ASHOK MAHADEORAO NETE laid a statement regarding need to speed up the process for construction of Wadsa-Gadchiroli and Nagpur-Nagbheed railway lines in Maharashtra.
    [Show full text]