National Rivers Authority Severn-Trent Region

Total Page:16

File Type:pdf, Size:1020Kb

National Rivers Authority Severn-Trent Region NRA Severn-Trent 6 NATIONAL RIVERS AUTHORITY SEVERN-TRENT REGION NRA / OBJECTIVES FOR RIVERS AND CANALS AND RIVER WATER QUALITY 1992 ■ I '-'atlonal P Authority ', formation Ob-ntre .jd Office . ass N c jfg.fi__ ' •' : :V-;.sion N o MU ____ h i vers and Canals in the Severn-Trent Region of the National Rivers Authority 1992 This booklet describes the quality status of rivers and of canals in the Severn Trent Region; lists the waters designated as Salmonid or Cyprinid fisheries in the EC Freshwater Fisheries Directive Tor the Severn-Trent Region of the National Rivers Authority and also indicates stretches used for potable supply. In this report, the following definitions apply:- (i) Chemical Classes of Rivers Details are given in 3.1 at the back of the book. Classes are:- 1A Water of high quality suitable for potable • supply and capable of. supporting hign class game fisheries; 1B Water of less high quality than 1A, but suitable for substantially the same purpose. 2 Water suitable for potable supply after advanced treatment and capable of supporting reasonably good coarse fisheries. * 3 Water polluted to such an extent that fish are absent or only sporadically present. 4 Water grossly polluted and likely to cause a nuisance. (ii) River Quality Objective (RQO) Long term quality objectives, adopted by the then Severn-Trent Water Authority in 1979, in which all i major rivers and canaJs were classified having regard to their uses and environmental impact and which formed the basis of long-term pollution control strategy. (iii) Classification of Details are given in 3.2 at the back of the book classes Estuaries are:- A Good Quality B Fair Quality C Poor Quality D Bad Quality (iv) E C Directives Membership of the European Community by the United Kingdom imposes obligations to comply with Directives issued by the European Commission. The Directives referred to in the report are given in detail in Section 4. ODEC/418 1 The booklet is organised as follows:- 1 Summarised Data 1.1 Severn-Trent Region Statistics * Total lengths. 1.2 Compliance Statistics. 1.3 Summary of River and Canal Classification. 1.4 Summary of Tidal Waters Classification. 1.5 Changes in Quality Status detected during 1992. 2 Rivers and Canals 2.1 Detailed description of Rivers and Canals and their current quality and quality objective classification in the Severn-Trent Region. i 2.2 Main river currently not chemically classified. 3 Water Quality Criteria 3.1 Chemical Classification of River Water Quality. 3.2 Classification of Estuaries and Tidal Waters. 4 Relevant EC Directives 4.1 Standards Required by the Surface Water Abstraction Directive Statutory Instrument 1989 No. 1148. > 4.2 Dangerous Substances Directive List 1 and II Substances. 4.3 Statutory Environmental Quality Standards for List I Substances Statutory Instrument 1989 No. 2286. 4.4 Environmental Quality Standards for List II Substances DOE Circular 7/89. 4.5 Standards required by the EC Fisheries Directive No. 78/659/EEC. 4.6 Quality Standards for EIFAC. ODEC/418 2 Current and Objective Quality Classification for Rivers and Canals. 19.32 1. 1 Severn Trent Region Statistics Regional Length . K m Total classified rivers (freshwater) 5718 Total classified rivers (tidal) 79.4 Total classified canals 990.1 REGIONAL TOTAL_____ 6787 .4 i . 2 Compliance i Km % Total rivers (fresh) 4637. 81.0 complying with RQO. Total rivers (tidal) 51. 7 61.5 complying with RQO Total canals complying 877 .8 88.6 with RQO > Non-Compliance Total rivers (fresh) 1081 • 19.0 failing RQO Total rivers (tidal) 27.7 34.8 Total canals failing 112.3 11.4 RQO River and_Canal Classification CLASS EQS 1991 1992 Km % Km % Km 1A 866.9 13.0 834.6 12 .4 806.9 12.0 IB 2867.6 42.7 2463.6 36 .7 2485.2 37.0 2 2663.1 39.7 2563.0 38 . 2 2607.7 38.8 3 274.7 4.*1 711.9 10 .7 683.2 10.2 4 - 99. 2 1..5 89.6 1.3 X 35.8 0.5 35j_8 0 . 5 35.8 0.5 TOTAL 6708.1 6708.1 6708.1 ODEC/131 - 3 - 1.4 Estuarv and Tidal Waters. Classification CLASS 1992 RQO Km % Km % A 28 35.3 44 . 3 55. 8 B 38 47.9 35.1 44.2 C 13.4 16.8 10 - D 0 - 0 - TOTAL 79.4 * 79.4 Summary The quality of 6787.5 Km of rivers and canals is monitored in this region. 5566.5 Km meet their current quality objectives (82.0%) 1221 Km fail to meet their current quality objectives (18.0%) OQUAU999 -'4 - CHANGES IN CLASSIFICATION a) UPGRADINGS WATERCOURSE REACH REPO RTED RQO LENGTH REASON/COMMENT QUAL ITY KM 1991 1992 Drakelow Brook Rd. Br. Drakelow- 2 IB IB 2.0 STW Closed. Achieves R. Stour objectives. R. Tern R. Strine - 2 IB 2 . 8.2 R. Strine improvements. R. Roden Exceeds objectives. Muchwenlock- Tick Hill - 3 2 2 . 1.5 Industrial & STW Farley Brook R Severn improvements. Now achieves objectives. Battlefield Long Marston STW to 3 IB IB 5.0 Sewerage improvements Brook Marchfront Br. 9 Achieves objectives. Gran Brook Long Marston STW 3 2 ' - 2 2.4 Industrial discharge to Marchfont Br. ceased. Improvements to Long Marston STW. Gran Brook Long Marston. depot 2 IB IB 1.4 Farm pollution to Long Marston STW » reduction. Horsebere Br Wells Bridge to 3 13 IB 6.0 Farm pollution R Severn reduction. R. Arrow Spernal Road Bridge 3 2 ■2 2 .1 Continued improvement - Cain Br' made by Spernal STW. Ban Brook Road Bridge Iron 2 IB IB 2.3 Previously wrongly Cross - R. Arrow downgraded. Wem Brook Shilton - 3 2 2 2.3 Achieves objectives. Bulkington STW R. Churaet Consall - Oakamoor 3 2 2 10.8 Improvements at STW. Achieves objectives. R. Churnet Oakamoor - R. Dove 2 IB IB 13 .0 Achieves objectives. Cauldwell Br. ^ Rosliston STW - 2 IB 2 2.4 Exceeds objectives. Darklands Brook R. Tame Minworth STW - 4 3 3 11.0 Sewerage improvements Lea Marston (Black Country Truck Sewer). Improvements at STW's. Achieves objectives. ) OD EC/131 - 5 - CHANGES IN CLASSIFICATION a) UPGRADINGS WATERCOURSE REACH REP01RTED RQO LENGTH REASON/COMMENT q u a l :[TY KM 1991 1992 Alfreton Brook Normanton STW - 3 2 2 6.5 Sewerage works R . Ambe r improvements. Enderby Brook Enderby STW - 3 2 2 1.5 Improvements to farm R Soar discharge and sewer overflows. R. Wreake Rotherby - R. Soar' 3 ; 2 2 12.5 Improvements to Melton STW. Bentley Brook Tansleywood Hse. 3 2 2 1. 3 Industrial effluent - R. Derwent i improvements. Wash Brook Oadby STW - 3 2 2 5.0 Improvements to Oadby R. Soar STW. R. Idle/Maun *-R. Meden - Gamston 3 2 2 10.5 ■ Improvements to Mansfield STW. Dalby Brook Nether Broughton 2 IB IB 7.5 Sewage works ’ to R. Smite improvements. Milton Brook Foremark Resr. - 3 2 2 4.8 Diversion of Mrlton STW R. Trent OOEC/131 - 6 - :h a n g e s in classification D) DOWNGRADINGS WATERCOURSE REACH REPOl*TED RQO LENGTH REASON/COMMENT QUAL tTY KM 1991 1992 R. Severn Newtown - R. Mule 1A IB ’ 1A 7.0 Effect of Newtown STW. Laughern Brook Woodalls Fm. Brdg 1A IB IB 6.0 Continues to achieve - Hallow' Mount objectives. Martin Brook Fernhill House - 2 3 2 2.5 Farm Drainage. R. Salwarpe r R. Red Strine Humber Brook - Conf IB 2 2 5.3 Continues to achieve R. Strine obj ectives. * Dick Brook U/S Worrals Mill - 1A ‘ IB ♦ IB 7.0 Continues to achieve R. Severn objectives. R. Stour Part of Tack Fm. - 2 3 2 3.5 Operation of sewer Overend tunnel. overflows. Leigh Brook Coombe Hill Foot IB 2 > IB ■ 5.0 Septic tank problems. bridge - R. CheIt Now improving. Ashleworth Br. Wick Ridge St. - IB 2 IB 3.0 Below Forthampton STW. R. Severn Low flow ponding. Preston Brook Laddin Farm - IB 2 1A 6.0 Trade effluent problems R. Leadon Occasional farm problems. Kempley.Brook • Whittocks End - IB 2 1A 5.0 Farm problem. Low flow Preston Brook lack of channel maintenance/ heavy weed growth. i - ■ Longhope Brook A4136 Bridge - IB 2 IB 5.0 Possibly agricultural.• Westbury Brook Investigation ongoing. Cannop Brook ' A48 Bridge - 2 3 2 3.5 Industrial Discharge to R. Severn be diverted. Colliers Brook Aylburton - 1A IB IB 5.0 Farm pollution and R. Severn 1 intermittent sewage overflow. 3DEC/131 - 7 - fGES IN CLASSIFICATION DOWNGRADINGS WATERCOURSE 1 REACH RE?GRTED RQC LENGTH REASON/COMMENT QUAL ITY KM 1991 1992 in • 3rook Upper Snodsbury - IB 2 13 r~t Low Clows weed growth. Pershope STW * 1 Brook Pershope STW - 2 3 2 3 . 5 Low flows, weed growth R. Avon aggravated by sewage 1 effluent. ^tlings Br. Trent & Mersey 3 4 2 1.4 Operation of sewer Canal Culvert - t overflows. R . Trent Ira Brook Pershore Road - IB 2 IB . 2 Under Investigation. 1 R . Rea * j’clands Br. Stanton STW*- 2 3 2 4,0 Sewer overflows'. Loss R. Trent of dilution for sewerage discharges/ minewater' discharges ceased, ■ * journe Whitacre '3rook - 13 2 13 3.5 Under Investigation. R. Tame 1 r 3rook Melbourne - 2 3 2 1.1 Sewage work-s. Improve- Ramsley 3rook expected. 1 L4ye Rowsley - 1A IB 1A 3.0 Cause unknown. R. Derwent lie Brook Park brook - 2 ■ 3 13 ,3.3 ‘ Sewage work impact. # Little Eaton jston Brook • Stonebridge East 2 3 2 7.5 Sewage works. Improve­ Leake - R. Soar ment expected. :ope Beck Scotton - S.
Recommended publications
  • Value for Money Integration in the Renegotiation of Public Private Partnership Road Projects by Ajibola Oladipo Fatokun
    Value for Money Integration in the Renegotiation of Public Private Partnership Road Projects By Ajibola Oladipo Fatokun A thesis submitted in partial fulfilment for the requirements for the degree of Doctor of Philosophy at the University of Central Lancashire October 2018 i STUDENT DECLARATION I declare that while registered as a candidate for the research degree, I have not been a registered candidate or enrolled student for another award of the University or other academic or professional institution I declare that no material contained in the thesis has been used in any other submission for an academic award and is solely my own work Signature of Candidate: ____________________________________________________ Type of Award: ________________________ PhD _______________________ School: ______________________ Engineering ____________________ ii ABSTRACT The governments of various countries have continued to adopt Public Private Partnership (PPP) for infrastructure projects delivery due to its many advantages over the traditional procurement method. However, concerns have been raised by stakeholders about the viability of PPP to deliver Value for Money (VfM), especially for the client. These discussions have generated debates and arguments in policy and advisory documents within the last decade mainly in the renegotiation of PPP water and transport projects and their VfM implications. Poor or non-achievement of VfM in PPP contracts renegotiation has led to this study in PPP road projects with the overall aim of integrating VfM considerations into the renegotiation process of PPP road projects. Mixed methodology research approach is used to achieve the objectives set for the study. Interviews and questionnaires of professionals involved in Design-Build-Finance-Operate (DBFO) road projects in the UK are used in the study.
    [Show full text]
  • A46 Coventry Junctions Upgrade (Binley Junction) Highways England Statement of Case
    A46 Coventry Junctions Upgrade (Binley junction) Highways England Statement of Case In respect of the Highways and Compulsory Purchase Orders under Provisions of the Highways Act 1980 January 2020 Page 1 of 72 A46 Coventry Junctions Upgrade (Binley junction) Highways England Statement of Case This page is left intentionally blank Page 2 of 72 A46 Coventry Junctions Upgrade (Binley junction) Highways England Statement of Case STATEMENT OF CASE for THE A46 TRUNK ROAD (COVENTRY JUNCTIONS UPGRADE (BINLEY)) (TRUNKING) ORDER 201[ ] and THE A46 TRUNK ROAD (COVENTRY JUNCTIONS UPGRADE (BINLEY)) (DETRUNKING) ORDER 201[ ] and THE A46 TRUNK ROAD (COVENTRY JUNCTIONS UPGRADE (BINLEY)) (SIDE ROADS) ORDER 2019 and THE A46 TRUNK ROAD (COVENTRY JUNCTIONS UPGRADE (BINLEY)) COMPULSORY PURCHASE ORDER 2019 Page 3 of 72 A46 Coventry Junctions Upgrade (Binley junction) Highways England Statement of Case Table of Contents Introduction ....................................................................................................... 10 Background ....................................................................................................... 14 Environmental Assessment of the Project ...................................................... 18 Traffic and Economic Assessment of the Scheme ......................................... 24 The Orders ......................................................................................................... 37 Page 4 of 72 A46 Coventry Junctions Upgrade (Binley junction) Highways England Statement of Case Conformity
    [Show full text]
  • Invertebrate Survey of the A30 and A38 Road Verges in Area 1 (Cornwall and Devon) Steven Falk Mark Tunmore October 2015
    Inspiring change for Important Invertebrate Areas in the UK Invertebrate Survey of the A30 and A38 road verges in Area 1 (Cornwall and Devon) 11th September 2014 Susan Thompson - Grants & Trusts Officer Steven Falk Mark Tunmore Saving the small things that run the planet October 2015 1 Executive summary Between late May and late August 2015, Buglife Services carried out an invertebrate survey of the A30 and A38 in Devon and Cornwall. 41 visits to 23 sample points were undertaken on the A30 and 25 visits to 18 sampling points were undertaken on the A38, and a range of invertebrate groups were targeted. 866 taxa were recorded, the list being dominated by flies (361), beetles (177), butterflies & moths (109), bugs (82), bees, ants & aculeate wasps (53), spiders & harvestmen (50), grasshoppers & crickets (11) and dragonflies & damselflies (11). Pitfall trapping (not permitted) would have extended the beetle and bug lists greatly. The list included a number of rare and scarce species (notably the tachinid fly Policheta unicolor and lygaeid bug Trapezonotus ullrichi) and seemingly the first SW England record for the Southern oak bush-cricket (Meconema meridionalis) which is a recent British colonist. The list reveals the tremendous variety of life cycle strategies and other ecological relationships associated with road verge invertebrates. Pollinators are very well represented within the species list. The list and sample sizes reveal the strong influence of surrounding habitat, geographic location, altitude and underlying geology/ground conditions. There is a discernible ‘Bodmin Moor effect’ (decreased abundance and diversity of thermophilic invertebrates with altitude) and a strong ‘Dartmoor effect’ (increased abundance and diversity of thermophilic invertebrates on the A38 east of Dartmoor).
    [Show full text]
  • Site Selection Appendix C.28
    Waste Core Strategy Site Options Consultation Waste Site Assessment Appendix C.28: Site 252 - Business/Industrial Park, Tewkesbury/Aschurch October 2009 Appendix C.28: Site 252 - Business/Industrial Park, Tewkesbury/Aschurch Site Maps and Images Site Map © Crown copyright. All rights reserved. Gloucestershire County Council 100019134 2008. Aerial Photo Imagery copyright Getmapping PLC. www.getmapping.com Appendix C.28: Site 252 - Business/Industrial Park, Tewkesbury/Aschurch Site Images Locational Information Site Details District Tewkesbury Parish Northway Tewkesbury Easting 391577 Northing 233604 Approximate Site Area 119 (hectares) Reasons for inclusion NB: Slight anomalies in site boundaries may have arisen The site was identified in the Tewkesbury Local Plan; was listed in from ‘clustering’ of sites from Tewkesbury Borough Council's Employment Land Review and contains more than one source and/or existing waste management facilities. the absence of detailed site plans in source documents. Date of WPA officer 5th December 2008 visit Appendix C.28: Site 252 - Business/Industrial Park, Tewkesbury/Aschurch Broad Description of This is a very large site which consists of three areas. Areas 1 and 2 are to Site (including current the west of the M5 and Area 3 is to the east. The site is based around activities on site, Junction 9 of the M5. location and neighbouring uses) AREA 1 - Is in between the A438 (Ashchurch Road) and Northway Lane. It consists of a large number of older units. Businesses in this area include: Jewsons, Tewkesbury Car Auctions, Cotteswold Dairy, Peugeot garage, Travelodge, Brewers Fayre. AREA 2 – This is a relatively new section of the business Park and is located to the north of Northway Lane.
    [Show full text]
  • Consultation Document
    Consultation Gloucestershire’s Local Transport Plan Document 2015-31 A reliable transport network providing door to door travel choices Gloucestershire Local Transport Plan 2015-2031 i Gloucestershire’s Local Transport Plan (2015 – 2031) Consultation Document Approved by Gloucestershire County Council Cabinet Date Approved 4th February 2015 Version 1.0 Last Revised February 2015 Review Date April 2015 Category Strategic Planning Owner Transport Planning Team Anyone wishing to comment on the County Council’s Local Transport Plan Target Audience Consultation Gloucestershire Local Transport Plan 2015-2031 CONSULTATION QUESTIONNAIRE ii Consultation Document Having your say Thank you for taking the time to respond to the first formal review of This phase of consultation will last for six weeks from 16th February until the 27th Gloucestershire’s third Local Transport Plan (LTP). The LTP sets the long term March 2015.You can register your views. strategy for transport delivery within Gloucestershire from 2015 to 2031. Within this consultation document a significant number of changes have been made from the Using the County Council’s consultation portal - existing LTP which was adopted in 2011. www.gloucestershire.gov.uk/consultations Downloading the documents from the County Council’s website - This consultation process seeks to understand the level of support for the http://www.gloucestershire.gov.uk/ltp3 and emailing your response to proposed changes relating to: [email protected] Accessing a paper copy from Gloucestershire Libraries or Council The proposed Link and Place Hierarchy for 2031; buildings and sending a completed questionnaire to The proposed update to the LTP’s policies; The proposed prioritisation of transport initiatives in the context of the new Strategic Planning Connecting Places Strategies (CPS); and Block 5, 1st floor, Shire Hall The removal of historic transport schemes from the highways register.
    [Show full text]
  • GLOUCESTERSHIRE COUNTY COUNCIL the Reason for the Closures Is for Carriageway Resurfacing
    GLOUCESTERSHIRE COUNTY COUNCIL The reason for the closures is for carriageway resurfacing. TEMPORARY CLOSURE AND NO PARKING AND NO WAITING ALONG A429 There will be no parking and no waiting throughout the duration of the works. STRATFORD ROAD MORETON IN MARSH TOWN AND BATSFORD PARISH COTSWOLD DISTRICT The roads are expected to be closed for 3-13 days per each location between the 1st April 2017 and Gloucestershire County Council intends to make an order to temporarily close under the Road Traffic 30th June 2017 or until the works have been completed. For further information, please contact Regulation Act 1984 (as amended) part of A429 Stratford Road from the junction with 3/126 Batsford Road to 08000 514 514 or visit www.gloucestershire.gov.uk the junction with 3/127 Todenham Road, a total distance of approximately 200 metres. The reason for the closure is for carriageway resurfacing. Advance warning of dates will be displayed by signs on site. There will be no parking and no waiting throughout the duration of the works. Alternative Route The road is expected to be closed on 29th March 2017 until 30th March 2017 between the hours of As signed on site. 09.30 – 15.00 each day or until the works have been completed. For further information, please contact Pedestrian access to premises on or next to the road and emergency access will be maintained. 08000 514 514 or visit www.gloucestershire.gov.uk DATED: 9th March 2017 For Head of Legal Services Alternative Route Via A429, A3400 Shipton on Stour/Chipping Norton, A44 Moreton in Marsh LW/63248 And as signed on site.
    [Show full text]
  • An Archaeological Desk-Based Assessment of a Site at Bourn, Cambridgeshire
    An archaeological desk-based assessment of a site at Bourn, Cambridgeshire. September 2012 prepared by Howard Brooks on behalf of Andrew Martin Planning CAT project ref.: 12/9a NGR: TL 341 585 (centre) Colchester Archaeological Trust Roman Circus House, Circular Road North, Colchester, Essex CO2 7GZ tel.: 07436 273304 email: [email protected] CAT Report 664 September 2012 Contents 1 Summary 2 2 What we know about archaeology in and around the proposed development site (PDS) 3 3 Archaeological sites and finds in and around the PDS 3.1 Introduction 7 3.2 Statutory sites: Scheduled Ancient Monument( SAM) 7 3.3 Statutory sites: Listed Buildings 8 3.4 Excavated or evaluated archaeological sites 10 3.5 Chance discoveries of archaeological material 21 3.6 Archaeological sites known as cropmarks 22 3.7 Field system and house platforms 23 3.8 Bourn airfield 25 4 Potential constraints on development 26 5 References and other sources 27 6 Glossary of terms used 29 7 Acknowledgements 29 1 An archaeological desk-based assessment of a site at Bourn, Cambridgeshire. 1 Summary This is an archaeological desk-based assessment of a proposed development site (PDS) at Bourn, Cambridgeshire. Excluding the airfield itself, there are six archaeological sites within the PDS – two ‘cropmark’ sites, two sites on which detectorists have found Roman coins and metalwork, a general reference to surviving fragments of a once more extensive medieval strip field system, and an approximate position of Roman burials (including a stone coffin). There is also a listed building within the application site (Bourn Grange). However, this will be unaffected by the proposed development.
    [Show full text]
  • 5304 Study of Land Surrounding Key
    Study of land surrounding Key Settlements in Cotswold District: Update Additional Sites 2015: Final Report to Cotswold District Council November 2015 Tel: 029 2043 7841 Email: [email protected] Web: www.whiteconsultants.co.uk Cotswold District Council Study of land surrounding Key Settlements in Cotswold District Update CONTENTS page PART 1 1 Introduction 3 2 Summary of findings 4 Tables Table 1 Additional sites landscape sensitivity: Housing/small scale mixed development PART 2 3 Site sensitivities Sites are considered in turn in settlement order with associated figures Andoversford 7 Down Ampney 10 Fairford 13 Lechlade 15 Mickleton 18 Moreton-in-Marsh 20 Northleach 22 Siddington 24 South Cerney 27 Stow-on-the-Wold 31 Tetbury 33 Willersey 36 Cover photo- Field adjacent to a development site north of Cirencester Road, Tetbury White Consultants 1 Additional sites 2015 final/021115 Cotswold District Council Study of land surrounding Key Settlements in Cotswold District Update PART 1 White Consultants 2 Additional sites 2015 final/021115 Cotswold District Council Study of land surrounding Key Settlements in Cotswold District Update 1. Introduction 1.1. White Consultants were appointed by Cotswold District Council in April 2014 to undertake an update of the landscape assessment around key settlements1 undertaken in 2000. 1.2. The scope of the study was to update the assessment taking into account the impact of any physical change since 2000, any revised assessments, policies and up-to-date guidance and focussing on the strategic housing land availability assessment (SHLAA) sites coming forward. The sites considered in this report are new sites that have been put forward for inclusion into the update of the SHLAA that is currently being carried out by Cotswold District Council.
    [Show full text]
  • Milestones & Waymarkers
    MILESTONES & WAYMARKERS The Journal of the Milestone Society incorporating On the Ground Volume Seven 2014 ISSN. 1479-5167 FREE TO MEMBERS OF THE MILESTONE SOCIETY MILESTONES & WAYMARKERS incorporating On the Ground Volume Seven 2014 MILESTONES & WAYMARKERS The Journal of the Milestone Society incorporating On the Ground Volume Seven 2014 The Milestone Society—Registered Charity No 1105688 ISSN 1479-5167 PRODUCTION TEAM John V Nicholls, 220 Woodland Avenue, Hutton, BRENTWOOD, Essex, CM13 1DA Email: [email protected] Supported by the Editorial Panel of Carol Haines, Mike Hallett, Keith Lawrence and David Viner MAIN CONTENTS INTRODUCTION This latest issue of one of the Society’s two principal Emergency Powers and the Milestones 3 publications in print marks ten years of publishing this A Cheshire milepost 6 Journal, now firmly established as an annual publication It happened at the milestone 7 and permanent place of record, especially as since 2011 The A34 – A Tribute to Ogilby? 11 it has incorporated the valuable On The Ground section, From the Archives previously published separately. Lost mileposts of the Middx & Essex Turnpike 12 Its seven issues between 2004 and 2010 together On the Ground 13 with seven issues of Milestones & Waymarkers since Scotland 2004 represents a significant archive, especially when 20 taken together with the Society’s six-monthly Newslet- ‘Crossing the Pennines’ Heritage Trail 21 ter, which by the turn of 2014/15 will have published 28 Milestones from Overseas issues since the very early days of the Society in 2001. Sri Lanka, Malta, New Zealand 22 Much has changed over that period, not least the Book Review: Moving Miles 26 growing use of the website to share new information and The Roehampton Mounting Block and ‘Milestone’ 27 increasingly to record activities.
    [Show full text]
  • M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation
    M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation March 2018 Registered office Bridge House, 1 Walnut Tree Close, Guildford, GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation M3 JUNCTION 9 IMPROVEMENT SCHEME PCF STAGE 2 (OPTION SELECTION) REPORT ON PUBLIC CONSULTATION Highways England Date: March 2018 Project no: 70015218 HE PIN: 551511 Prepared for: Highways England Bridge House Walnut Tree Close Guildford Surrey GU1 4LZ Mountbatten House Basing View Basingstoke RG21 4HJ Hampshire United Kingdom Tel: +44-(0) 1256 318800 www.wsp.com ii M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation QUALITY MANAGEMENT ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 REVISION 3 SUITABILITY Remarks P01 Date March 2018 Carole Lehman / Prepared by Adam Webb Signature Checked by Duncan Brooks Signature Authorised by Pradeep Agrawal Signature PIN: HE551511 Project number WSP ref: 70015218 Report number HE551511-WSP-GEN-M3J9PCF2-RP-TR-00048 iii M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation PRODUCTION TEAM CLIENT (HIGHWAYS ENGLAND) Major Projects Programme Lead Steve Hoesli Major Projects Senior Project Neil Andrew Manager Major Projects Project Manager Simon Hewett Senior User Representative Paul Benham WSP Tel: +44 (0)1684 851 751 RIS Area 3 Programme Director Steve O’Donnell RIS Area 3 Programme Manager Stuart Craig Tel: +44 (0)1256 318 660 Project Director Roland Diffey Tel: +44 (0)1256 318 777 Project Manager Pradeep Agrawal Tel: +44 (0)2031 169 090 iv M3 Junction 9 Improvement Scheme PCF Stage 2 – Report on Public Consultation TABLE OF CONTENTS Executive Summary ...................................................................................9 1.
    [Show full text]
  • Shropshire and Telford & Wrekin
    Interactive PDF Document Look for the pointer symbol for document links. • The Contents page has links to the relevant items. • The titles on the Chapters, Plans and Tables all link back to the Contents page. • Further interactive links are provided to aid your navigation through this document. Shropshire,Telford & Wrekin Minerals Local Plan 1996 - 2006 Adopted Plan April 2000 SHROPSHIRE COUNTY COUNCIL AND TELFORD & WREKIN COUNCIL SHROPSHIRE, TELFORD & WREKIN Minerals Local Plan 1996 to 2006 (Adopted Plan - April 2000) Carolyn Downs Sheila Healy Corporate Director: Corporate Director: Community & Environment Services Environment & Economy Community & Environment Services Environment & Economy Shropshire County Council Telford & Wrekin Council The Shirehall, Abbey Foregate Civic Offices, PO Box 212 Shrewsbury, Shropshire Telford, Shropshire SY2 6ND TF3 4LB If you wish to discuss the Plan, please contact Adrian Cooper on (01743) 252568 or David Coxill on (01952) 202188 Alternatively, fax your message on 01743 - 252505 or 01952 - 291692 i. Shropshire,Telford & Wrekin Minerals Local Plan 1996 - 2006 Adopted Plan April 2000 access to information... This Plan can be made available on request in large print, Braille or audio cassette. It may take us some days to prepare a copy of the document in these formats. If you would like a copy of the Plan in one of the above formats, please contact Adrian Cooper on (01743) 252568, or write to: Community & Environment Services Shropshire County Council The Shirehall Abbey Foregate Shrewsbury SY2 6ND You can fax us on (01743) 252505. You can contact us by e-mail on: [email protected] This Plan is also available on our websites at: http:/shropshire-cc.gov.uk/ and: http:/telford.gov.uk/ ii.
    [Show full text]
  • (Public Pack)Agenda Document for Cabinet, 08/06/2016 10:00
    CABINET 10.00 am on Wednesday 8 June 2016 MEETING PAPERS ATTACHED Cabinet Wednesday 8 June 2016 at 10.00 am Cabinet Suite - Shire Hall, Gloucester AGENDA Item Discussion Portfolio 1 Apologies Leader of Council To note any apologies for absence. 2 Minutes (Pages 1 - 18) Leader of Council To confirm the minutes of the meeting held on 20 April 2016, (minutes attached). 3 Declarations of Interest Leader of Council Cabinet members are invited to declare any pecuniary or personal interests relating to specific matters on the agenda. Please see note (a) at the end of the agenda 4 Questions at Cabinet Meetings Leader of Council To answer any written and/or oral questions from a County Councillor, (or anyone living or working in the county, or anyone who is affected by the work of the County Council), about matters which relate to any item on the agenda for this meeting. Up to 30 minutes is allowed for this item. The closing date for the receipt of written questions is 4.00 pm on Thursday 2 June 2016. Please send questions to the Chief Executive marked for the attention of Jo Moore (email: [email protected]) 8 June 2016 An oral question may be asked by a member of the public if notice of the question is given by the questioner to the person presiding at the meeting, or the Chief Executive’s representative, at least 30 minutes prior to the start of the meeting. Depending on the nature of the questions, it may not be possible to provide a comprehensive answer at the meeting, in which case a written answer will be provided as soon as reasonably possible after the meeting.
    [Show full text]