LBBD POS Tree Planting Strategy 2017.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

LBBD POS Tree Planting Strategy 2017.Pdf PROJECT TITLE: A1772 London Borough Of Barking and Dagenham Tree Planting Strategy Client: The London Borough of Barking and Dagenham Version Date Version Details Prepared by Checked by Approved by Principal V1.0 09.08.2017 Jon Sheaff, Margarida Oliveira, Margarida Oliveira Jon Sheaff Julia Halasz, Visakha Sroy, May MacIntyre V1.1 05.10.2017 Jon Sheaff, Margarida Oliveira, Margarida Oliveira Jon Sheaff Julia Halasz, Visakha Sroy, May MacIntyre This document has been prepared for the London Borough of Barking and Dagenham by: Jon Sheaff and Associates Unit 5.1, Bayford Street Business Centre London E8 3SE www.jonsheaff.co.uk Study team: JSA Jon Sheaff Margarida Oliveira Julia Halasz Visakha Sroy Tom Jackson May MacIntyre Acknowledgments The project team would like to thank LB Barking and Dagenham for contributing to the analysis, providing the necessary data and guidance in a timely matter. 2 LB Barking and Dagenham | Tree Planting Strategy KEdEd^ 1.0 džĞĐƵƟǀĞ^ƵŵŵĂƌLJ ϰ ϴ͘Ϭ ĂƌŬŝŶŐĂŶĚĂŐĞŶŚĂŵ͛ƐZĞŵĂŝŶŝŶŐ^ŝƚĞƐ Ϯϴ 8.1 Beam Parklands 8.2 Beam Valley Country Park 2.0 ^ƚƌĂƚĞŐŝĐŽŶƚĞdžƚŽĨdƌĞĞWůĂŶƟŶŐ ϲ 8.3 Castle Green 8.4 Chase Nature Reserve 8.5 Essex Road Gardens 8.6 Goresbrook Park 3.0 tŚLJYƵĂůŝƚLJWĂƌŬƐDĂƩĞƌ ϴ 8.7 Heath Park Open Space 8.8 King George’s Field ϴ͘ϵ <ŝŶŐƐƚŽŶ,ŝůůZĞĐƌĞĂƟŽŶ'ƌŽƵŶĚ ϰ͘Ϭ dƌĞĞƐŽŶƚƌŝďƵƚĞƚŽĂĞƩĞƌŽƌŽƵŐŚ ϭϬ 8.10 Newlands Park 8.11 Padnall Open Space 8.12 Parsloes Park ϴ͘ϭϯ WŽŶĚĮĞůĚWĂƌŬ 5.0 KƉĞŶ^ƉĂĐĞYƵĂůŝƚLJƐƐĞƐƐŵĞŶƚ ϭϮ 8.14 Quaker Burial Ground 8.15 Ripple Nature Reserve ϴ͘ϭϲ ^ĐƌĂƩŽŶ͛Ɛ&ĂƌŵĐŽƉĂƌŬ ϲ͘Ϭ ^ƚƌĂƚĞŐŝĐdƌĞĞWůĂŶƟŶŐWƌŝŽƌŝƟĞƐ ϭϲ 8.17 St Peter & St Paul’s Churchyard 8.18 Tantony Green 8.19 The Leys 7.0 WĂƌŬDĂƐƚĞƌƉůĂŶƐ ϭϴ 9.0 ^ƵŵŵĂƌLJŽĨdƌĞĞWůĂŶƟŶŐKƉƉŽƌƚƵŶŝƟĞƐ ϰϴ 7.1 Abbey Green 7.2 Barking Park 7.3 Central Park 7.4 Eastbrookend Country Park ϳ͘ϱ 'ƌĞĂƞŝĞůĚƐWĂƌŬ 7.6 Mayesbrook Park 7.7 Old Dagenham Park 7.8 St Chad’s Park 7.9 Valence Park LB Barking and Dagenham | Tree Planting Strategy 3 1 EXECUTIVE SUMMARY Barking and Dagenham recognises the importance of its stock of trees to the ŝŶƐŝŐŚƚŝŶƚŽƚŚĞƋƵĂůŝƚLJŽĨĞdžŝƐƟŶŐƚƌĞĞƐƚŽĐŬŽŶĞĂĐŚŽĨƚŚĞƐŝƚĞƐ͕ǁŚŝĐŚĨŽƌŵƐ health and well-being of its residents and the quality of life in the borough. ƚŚĞĨŽƵŶĚĂƟŽŶƐĨŽƌƚŚĞƐƵŐŐĞƐƚĞĚƚƌĞĞƐƚƌĂƚĞŐLJŝŶƚŚŝƐƌĞƉŽƌƚ͘ƐƵŵŵĂƌLJ Barking and Dagenham has an extensive stock of trees on its streets, within ƚĂďůĞŽĨƚŚĞƐƵŐŐĞƐƚĞĚƚƌĞĞƉůĂŶƟŶŐƐƚƌĂƚĞŐLJĐĂŶďĞĨŽƵŶĚŝŶƐĞĐƟŽŶϴ͘Ϭ͘ ŝƚƐƉĂƌŬƐĂŶĚŝƚƐĞdžƚĞŶƐŝǀĞŶĞƚǁŽƌŬŽĨŶĂƚƵƌĞƌĞƐĞƌǀĞƐ͘dŚĞƌĞŝƐĂƉĂƌƟĐƵůĂƌ ĐŽŶĐĞŶƚƌĂƟŽŶŽĨƚŚŝƐƐƚŽĐŬŝŶƚŚĞŐƌĞĞŶƐƉĂĐĞƐƚŚĂƚůŝĞĂůŽŶŐƚŚĞĞĂƐƚĞƌŶĨƌŝŶŐĞ dŚĞĚƌĂŌ>ŽŶĚŽŶŶǀŝƌŽŶŵĞŶƚ^ƚƌĂƚĞŐLJŝŶĐůƵĚĞƐĂŶŽďũĞĐƟǀĞƚŽŝŶĐƌĞĂƐĞ of the borough including Central Park, Eastbrookend Country Park, The Chase the tree canopy across London as a whole by 10% by 2050. ‘Measuring tree Nature Reserve and Beam Valley Parklands. canopy cover in London: An analysis using aerial imagery’, (GLA, 2015), found tree and woodland cover to be approximately 20% of the total area of Greater The Barking and Dagenham Parks and Open Spaces Strategy (POSS) assesses >ŽŶĚŽŶ;^ĞĞŚƩƉƐ͗ͬͬǁǁǁ͘ůŽŶĚŽŶ͘ŐŽǀ͘ƵŬͬƐŝƚĞƐͬĚĞĨĂƵůƚͬĮůĞƐͬŵĞĂƐƵƌŝŶŐͺƚƌĞĞͺ the quality of the borough’s tree stock in the context of a quality assessment ĐĂŶŽƉLJͺĐŽǀĞƌͺϮϬϭϱ͘ƉĚĨͿ͘ of green infrastructure assets prepared for the natural capital asset register ĨŽƌƚŚĞďŽƌŽƵŐŚ͘dŚĞWK^^ŝĚĞŶƟĮĞƐĨƵƌƚŚĞƌŽƉƉŽƌƚƵŶŝƟĞƐĨŽƌƚƌĞĞƉůĂŶƟŶŐ dŚĞWK^^ĚŽĞƐŶŽƚƋƵĂŶƟĨLJƚŚĞĐƵƌƌĞŶƚůĞǀĞůŽĨĐĂŶŽƉLJĐŽǀĞƌĂĐƌŽƐƐƚŚĞ ĂĐƌŽƐƐƚŚĞďŽƌŽƵŐŚ͘KďũĞĐƟǀĞsϱŽĨƚŚĞWK^^ĐƟŽŶWůĂŶƉƌŽƉŽƐĞƐƚŚĂƚƚŚĞ ďŽƌŽƵŐŚĂŶĚƚŚŝƐƌĞƉŽƌƚĚŽĞƐŶŽƚĐĂůĐƵůĂƚĞƚŚĞƚŽƚĂůĂĚĚŝƟŽŶŽĨƚƌĞĞĐĂŶŽƉLJ borough should ‘ĚĞǀĞůŽƉƉĂƌƚŶĞƌƐŚŝƉƐǁŝƚŚĞdžƚĞƌŶĂůŽƌŐĂŶŝƐĂƟŽŶƐƚŽĚĞǀĞůŽƉ cover expressed as a percentage of the borough’s total surface area. The ĂƚƌĞĞƉůĂŶƟŶŐƉƌŽŐƌĂŵŵĞƐĂĐƌŽƐƐƚŚĞďŽƌŽƵŐŚƚŽŝŵƉƌŽǀĞĂŝƌƋƵĂůŝƚLJ͕ŐƌĞĞŶͬ ĨŽůůŽǁŝŶŐƌĞƉŽƌƚƋƵĂŶƟĮĞƐƉŽƚĞŶƟĂůĂĚĚŝƟŽŶĂůƚƌĞĞƉůĂŶƟŶŐŝŶƚĞƌŵƐŽĨ ĞĐŽůŽŐŝĐĂůůŝŶŬƐďĞƚǁĞĞŶƉĂƌŬƐ͕ďŝŽŵĂƐƐ͕ĞƚĐ͛͘. tree numbers (for individual trees and linear forms such as avenues) and in terms of areas for tree groups, woodlands and orchards. Percentages for tree WƵƌƐƵĂŶƚƚŽƚŚŝƐŽďũĞĐƟǀĞ͕ƚŚĞWK^^ƉƌŽƉŽƐĞƐŵĂƐƚĞƌƉůĂŶƐĨŽƌƚŚĞďŽƌŽƵŐŚ͛Ɛ ĐŽǀĞƌĂŐĞĨŽƌǀĞŐĞƚĂƟŽŶƐƵƌǀĞLJĞĚŝŶĞĂĐŚŝŶĚŝǀŝĚƵĂůƉĂƌŬĂŶĚŽƉĞŶƐƉĂĐĞŝƐ ŶŝŶĞŵŽƐƚŝŵƉŽƌƚĂŶƚƉĂƌŬƐĂŶĚŽƉĞŶƐƉĂĐĞƐ͕ĂůůŽĨǁŚŝĐŚŝŶĐůƵĚĞƐŝŐŶŝĮĐĂŶƚ ŝĚĞŶƟĮĞĚŝŶƚŚŝƐƌĞƉŽƌƚ͘ƐĂĨƵƚƵƌĞĚĞǀĞůŽƉŵĞŶƚŽĨƚŚŝƐƐƚƵĚLJ͕ƚŚĞďŽƌŽƵŐŚ ƚƌĞĞƉůĂŶƟŶŐ͘^ĞĐƟŽŶϲ͘ϬŽĨƚŚŝƐƌĞƉŽƌƚĚĞƐĐƌŝďĞƐŝŶĚĞƚĂŝůƚŚĞƚƌĞĞƐƚƌĂƚĞŐLJ might wish to consider commissioning a detailed assessment of tree canopy ƉƌŽƉŽƐĞĚĨŽƌĞĂĐŚŽĨƚŚĞƐĞŶŝŶĞƐŝƚĞƐĂŶĚƚŚĞŝƌƌĂƟŽŶĂůĞƌĞůĂƟŶŐƚŽƚŚĞ cover across the borough as a whole and for individual Wards using the i-Tree ƐƚƌĂƚĞŐŝĐŽƵƚĐŽŵĞƐŽƵƚůŝŶĞĚŝŶƐĞĐƟŽŶϮ͘ϬŝŶƚŚŝƐƌĞƉŽƌƚ͘^ĞĐƟŽŶϱ͘ϬƉƌŽǀŝĚĞƐ methodology or aerial imagery techniques. 4 LB Barking and Dagenham | Tree Planting Strategy LB Barking and Dagenham | Tree Planting Strategy 5 2 STRATEGIC CONTEXT OF ADDITIONAL TREE PLANTING ACROSS BARKING AND DAGENHAM dŚĞWK^^ŝĚĞŶƟĮĞƐĂŶƵŵďĞƌŽĨĞĐŽŶŽŵŝĐ͕ƐŽĐŝĂůĂŶĚĞŶǀŝƌŽŶŵĞŶƚĂůďĞŶĞĮƚƐ • London Plan policies 5.10: Urban Greening and 7.21: Trees & of having good quality parks and open spaces across the borough which have Woodlands (2016) been reiterated in more detail in this document. The strategy develops a ŶƵŵďĞƌŽĨƚŚĞŵĞƐƚŚĂƚĞdžƉůŽƌĞƚŚĞĚĞůŝǀĞƌLJŽĨƚŚĞƐĞďĞŶĞĮƚƐŝŶƚĂŶĚĞŵǁŝƚŚ ͻ dŚĞĚƌĂŌ>ŽŶĚŽŶŶǀŝƌŽŶŵĞŶƚ^ƚƌĂƚĞŐLJ;ϮϬϭϳͿ a number of other strategies that the council has adopted. These include: dŚĞĚĞůŝǀĞƌLJŽĨŽďũĞĐƟǀĞsϱŽĨƚŚĞWK^^ĂĐƟŽŶƉůĂŶǁŝůůƌĞƐƉŽŶĚƉŽƐŝƟǀĞůLJ • The Borough Manifesto (2017) ƚŽƚŚĞĐŽƵŶĐŝů͛ƐƐƚƌĂƚĞŐŝĐŽďũĞĐƟǀĞƐĂƐĞdžƉƌĞƐƐĞĚŝŶƚŚĞŽƌƉŽƌĂƚĞWůĂŶĂŶĚŝƚƐ adopted strategies. • The Barking and Dagenham Growth Strategy (2013-23) • The Barking and Dagenham Housing Strategy (2012-17) • The Barking and Dagenham Health and Wellbeing Strategy (2015-18) ͻ dŚĞĂƌŬŝŶŐĂŶĚĂŐĞŶŚĂŵĚƵĐĂƟŽŶ^ƚƌĂƚĞŐLJ;ϮϬϭϰͲϭϳͿ ͻ dŚĞĂƌŬŝŶŐĂŶĚĂŐĞŶŚĂŵWůĂLJŝŶŐWŝƚĐŚĂŶĚKƵƚĚŽŽƌ^ƉŽƌƚƐ&ĂĐŝůŝƟĞƐ Strategy (2005-10) 6 LBL BarkingBararkinkingag andand DaDagenhamaagennnhamm | TreeTrT eee PlaPlantingannting StrStSStrategyateatatetegyg dĂďůĞϮ͘ϭ͘^ƚƌĂƚĞŐŝĐŽƵƚĐŽŵĞƐĚĞůŝǀĞƌĞĚďLJƚƌĞĞƉůĂŶƟŶŐ͘ ^dZd'/KhdKD^>/sZzdZW>Ed/E' OUTCOME/ OBJECTIVE ACTION PLAN ACTION TIMESCALE STRATEGIC OUTCOME STRATEGIC LINK NUMBER TARGET ŶŚĂŶĐĞƉƌŽƉĞƌƚLJǀĂůƵĞƐ͘DĂŬĞƚŚĞďŽƌŽƵŐŚĂŵŽƌĞ E1 Economic dƌĞĞƉůĂŶƟŶŐŝŶƚŽǁŶĐĞŶƚƌĞƐĂŶĚŐƌŽǁƚŚĂƌĞĂƐ DĞĚŝƵŵ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ĂƩƌĂĐƟǀĞƉůĂĐĞƚŽůŝǀĞĂŶĚǁŽƌŬ ZĞͲďĂůĂŶĐŝŶŐŽĨĨĂďƌŝĐŽĨƉƵďůŝĐŽƉĞŶƐƉĂĐĞďLJ E2 Economic ƌĞĚƵĐŝŶŐŚŝŐŚŵĂŝŶƚĞŶĂŶĐĞŐƌĂƐƐĂŶĚƐĞƫŶŐĂƐŝĚĞ ^ŚŽƌƚ ZĞĚƵĐƟŽŶŝŶŐƌŽƵŶĚŵĂŝŶƚĞŶĂŶĐĞůŝĂďŝůŝƚLJ 'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ĂƌĞĂƐƚŽǁŽŽĚůĂŶĚ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJͬ C1 ^ŽĐŝĂů dƌĞĞƉůĂŶƟŶŐĂƐƉĂƌƚŽĨĂŵĂƐƚĞƌƉůĂŶŶŝŶŐƉƌŽĐĞƐƐ ^ŚŽƌƚͬDĞĚŝƵŵ ĞƩĞƌƋƵĂůŝƚLJƉƵďůŝĐƌĞĂůŵ͕ůŽĐĂůĚŝƐƟŶĐƟǀĞŶĞƐƐ ,ŽƵƐŝŶŐ^ƚƌĂƚĞŐLJ C2 ^ŽĐŝĂů ZĞĐƌƵŝƟŶŐǀŽůƵŶƚĞĞƌƐƚŽƉůĂŶƚĂŶĚĐĂƌĞĨŽƌƚƌĞĞƐ DĞĚŝƵŵ ŶŚĂŶĐĞĚƐŽĐŝĂůĐŽŚĞƐŝŽŶĂŶĚƐŬŝůůĂĐƋƵŝƐŝƟŽŶ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽ ZĞƐŝĚĞŶƚƐĂĚŽƉƟŶŐŚĞĂůƚŚLJůŝĨĞƐƚLJůĞĂŶĚƉƌŽǀŝĚŝŶŐďĞƩĞƌ C3 ^ŽĐŝĂů WůĂŶƟŶŐŽƌĐŚĂƌĚƐ ^ŚŽƌƚͬDĞĚŝƵŵ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ,ĞĂůƚŚ^ƚƌĂƚĞŐLJ ƋƵĂůŝƚLJĨŽŽĚ /ŵƉƌŽǀĞĚĞĚƵĐĂƟŽŶĂůĂƩĂŝŶŵĞŶƚĂŶĚŝŵƉƌŽǀĞĚŚĞĂůƚŚ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ,ĞĂůƚŚ^ƚƌĂƚĞŐLJͬ C4 ^ŽĐŝĂů dƌĞĞƐĨŽƌŶĂƚƵƌĂůƉůĂLJ ^ŚŽƌƚͬDĞĚŝƵŵ ŽƵƚĐŽŵĞƐ ĚƵĐĂƟŽŶ^ƚƌĂƚĞŐLJ C5 ^ŽĐŝĂů WƌŽƚĞĐƟǀĞƚƌĞĞƉůĂŶƟŶŐƚŽůŝŵŝƚĂŶƟͲƐŽĐŝĂůďĞŚĂǀŝŽƵƌ ^ŚŽƌƚ ŶŚĂŶĐĞĚƐŽĐŝĂůĐŽŚĞƐŝŽŶ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽ ůŝŵĂƚĞĐŚĂŶŐĞĂĚĂƉƚĂƟŽŶĂŶĚĂŵŽƌĞƌĞƐŝůŝĞŶƚďŽƌŽƵŐŚ N1 ŶǀŝƌŽŶŵĞŶƚĂů dƌĞĞƉůĂŶƟŶŐƚŽůŝŵŝƚƵƌďĂŶǁĂƌŵŝŶŐ DĞĚŝƵŵͬ>ŽŶŐ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ŝŶĨƌĂƐƚƌƵĐƚƵƌĞ ůŝŵĂƚĞĐŚĂŶŐĞĂĚĂƉƚĂƟŽŶĂŶĚĂŵŽƌĞƌĞƐŝůŝĞŶƚďŽƌŽƵŐŚ N2 ŶǀŝƌŽŶŵĞŶƚĂů dƌĞĞƉůĂŶƟŶŐƚŽƐĞƋƵĞƐƚĞƌKϮ >ŽŶŐ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ŝŶĨƌĂƐƚƌƵĐƚƵƌĞ ůŝŵĂƚĞĐŚĂŶŐĞĂĚĂƉƚĂƟŽŶĂŶĚĂŵŽƌĞƌĞƐŝůŝĞŶƚďŽƌŽƵŐŚ N3 ŶǀŝƌŽŶŵĞŶƚĂů dƌĞĞƉůĂŶƟŶŐƚŽƐƵƐƚĂŝŶƐŽŝůƐĂŶĚƌĞĚƵĐĞŇŽŽĚƌŝƐŬ DĞĚŝƵŵͬ>ŽŶŐ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ŝŶĨƌĂƐƚƌƵĐƚƵƌĞ ůŝŵĂƚĞĐŚĂŶŐĞĂĚĂƉƚĂƟŽŶĂŶĚĂŵŽƌĞƌĞƐŝůŝĞŶƚďŽƌŽƵŐŚ N4 ŶǀŝƌŽŶŵĞŶƚĂů dƌĞĞƉůĂŶƟŶŐƚŽĂĚĚƌĞƐƐŝŵƉĂĐƚŽĨƵƌďĂŶƉŽůůƵƟŽŶ DĞĚŝƵŵͬ>ŽŶŐ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ŝŶĨƌĂƐƚƌƵĐƚƵƌĞ ^ƵƉƉŽƌƟŶŐďŝŽĚŝǀĞƌƐŝƚLJ͕ůŝŶŬŝŶŐŶĞŝŐŚďŽƵƌŚŽŽĚƐĂŶĚďĞƩĞƌ N5 ŶǀŝƌŽŶŵĞŶƚĂů ƌĞĂƟŶŐŐƌĞĞŶůŝŶŬƐĂŶĚĐŽƌƌŝĚŽƌƐ ^ŚŽƌƚͬDĞĚŝƵŵ ŽƌŽƵŐŚDĂŶŝĨĞƐƚŽͬ'ƌŽǁƚŚ^ƚƌĂƚĞŐLJ ůŝŶŬƐďĞƚǁĞĞŶĐŝƚLJĂŶĚĐŽƵŶƚƌLJƐŝĚĞ *Timescale: Short 1-3 years, Medium 4-6 years, Long 7-10 years LB Barking and Dagenham | Tree Planting Strategy 7 3 WHY QUALITY PARKS MATTER The borough of Barking and Dagenham is going to experience a period While the last twenty years has seen a general increase in the quality of urban ŽĨƌĂƉŝĚŐƌŽǁƚŚͲƚŚĞƉŽƉƵůĂƟŽŶŽĨƚŚĞďŽƌŽƵŐŚŝƐƐĞƚƚŽŝŶĐƌĞĂƐĞďLJϰϴй ƉĂƌŬƐƚŚƌŽƵŐŚƌĞǀŝǀĂůƉƌŽũĞĐƚƐ͕ĂŵŽƌĞŵĞĂƐƵƌĞĚĂŶĚƉƌŽĂĐƟǀĞĂƉƉƌŽĂĐŚ Existing and future parks between now and 2037. It is crucial then to plan ahead and develop a ŵƵƐƚďĞƵŶĚĞƌƚĂŬĞŶƚŽĂĚĚƌĞƐƐƚŚĞŬĞLJĐŚĂůůĞŶŐĞƐĂŶĚĐŽƉĞǁŝƚŚƉŽƉƵůĂƟŽŶ strategy for improving the quality of greenspaces to ensure Barking and growth. need to accommodate a Dagenham is considered a great place to live. The value of good quality open spaces has always been recognised by local population growth of The borough currently faces some key challenges including: ĐŽŵŵƵŶŝƟĞƐ͘ŶĞǀĞƌŐƌŽǁŝŶŐďŽĚLJŽĨƌĞƐĞĂƌĐŚĐŽŶĮƌŵƐƚŚĞǀŝƚĂůƌŽůĞƉĂƌŬƐ ĐĂŶƉůĂLJŝŶĐŽŶƚƌŝďƵƟŶŐƚŽďĞƩĞƌƋƵĂůŝƚLJŽĨƵƌďĂŶůŝĨĞ͘dƌĞĞƐŵĂŬĞƵƉƚŚĞ • High levels of obesity and long-term illness. We need to make the ďĂĐŬďŽŶĞŽĨĂŶLJƉĂƌŬĂŶĚĂƌĞŝŵƉŽƌƚĂŶƚƚŽĐŽŶƚƌŝďƵƟŶŐƚŽƚŚĞŽǀĞƌĂůůƋƵĂůŝƚLJ between now ďŽƌŽƵŐŚ͛ƐƉĂƌŬƐŵŽƌĞĂƩƌĂĐƟǀĞĂŶĚǀŝƐŝďůĞƚŽĞŶĐŽƵƌĂŐĞƉĞŽƉůĞƚŽĂĚŽƉƚ of the spaces. 48% ĂŶĂĐƟǀĞůŝĨĞƐƚLJůĞ͘ WĂƌŬƐŚĂǀĞƚŚƌĞĞŵĂŝŶďĞŶĞĮƚƐ͗ĐŽŶŽŵŝĐ͕^ŽĐŝĂůĂŶĚŶǀŝƌŽŶŵĞŶƚĂů͘dŚĞƐĞ and 2037 • LJŽƵŶŐƉŽƉƵůĂƟŽŶ͘WĂƌŬƐŶĞĞĚƚŽĐĂƚĞƌĨŽƌLJŽƵŶŐĂĚƵůƚƐĂŶĚĐŚŝůĚƌĞŶďLJ ĂƌĞĚĞƐĐƌŝďĞĚŝŶĚĞƚĂŝůŽŶƚŚĞĨŽůůŽǁŝŶŐƉĂŐĞĂŶĚĂƌĞũƵƐƚƐŽŵĞŽĨƚŚĞďĞŶĞĮƚƐ ƉƌŽǀŝĚŝŶŐĂĚĞƋƵĂƚĞƉůĂLJĨĂĐŝůŝƟĞƐ͘EĂƚƵƌĂůƉůĂLJŝŶǀŽůǀŝŶŐƚƌĞĞƐŝƐŽŶĞĨĂĐĞƚ of having good quality greenspaces. ŽĨƚŚŝƐĂŶĚĐĂŶĐŽŶƚƌŝďƵƚĞƚŽŵĂŬŝŶŐƉĂƌŬƐĂƉůĂLJĚĞƐƟŶĂƟŽŶ͘ • ůŝŵĂƚĞĐŚĂŶŐĞ͘WĂƌŬƐĐĂŶŚĞůƉƚŽůŝŵŝƚƚŚĞŝŵƉĂĐƚŽĨŇŽŽĚŝŶŐ͕ƵƌďĂŶ ǁĂƌŵŝŶŐĂŶĚĂŝƌƉŽůůƵƟŽŶ͘dƌĞĞƉůĂŶƟŶŐĐĂŶŚĞůƉƐĞƋƵĞƐƚĞƌĐĂƌďŽŶ͕ ƌĞĚƵĐĞƵƌďĂŶǁĂƌŵŝŶŐĞīĞĐƚƐ͕ĂŶĚƌĞĚƵĐĞƐƚŽƌŵǁĂƚĞƌƌƵŶͲŽī͘ • ŝŽĚŝǀĞƌƐŝƚLJ͘ŝǀĞƌƐĞƚƌĞĞƉůĂŶƟŶŐƚLJƉĞƐƐƵƉƉŽƌƚĂǁŝĚĞƌƌĂŶŐĞŽĨ habitats and make the borough more
Recommended publications
  • Thames Ward Community Project Reaching Communities
    THAMES WARD COMMUNITY PROJECT REACHING COMMUNITIES JULY 2017 Vision Thames Ward Community Project (TWCP) aims to build social cohesion within a deprived and fractured community, and to ensure that the massive social and physical upheaval that will transform this part of east London offers new opportunities for the local community. The project will bring together schools, community groups and residents from across Thames ward, over a period of three years, to develop initiatives that will improve the environment, achieve better health and quality of life for residents, increase their skills and job opportunities and ensure that they have a strong voice and can influence change in the area over the next decade. By year three, the project will have established a resident-led Community Development Trust to continue this work into the future and to ensure that the initiatives that emerge over the next three years are sustainable. Context The development programme on Barking Riverside is set to double the ward population over the next ten years. It is attracting new investment from developers and national programmes that could benefit the whole community. However, to date, there has been no significant investment in community development and, without a clear strategy to engage the whole community, there is a danger that the changes will not benefit the older, established community and might exacerbate divisions rather than bring people together. TWCP will employ skilled community organisers to ensure that residents (in the older estates as well as the new properties) benefit from new opportunities arising from Barking Riverside, and also support them in developing the sense of ownership and control that is needed to build a more resourceful, inclusive and forward looking community.
    [Show full text]
  • The London Rivers Action Plan
    The london rivers action plan A tool to help restore rivers for people and nature January 2009 www.therrc.co.uk/lrap.php acknowledgements 1 Steering Group Joanna Heisse, Environment Agency Jan Hewlett, Greater London Authority Liane Jarman,WWF-UK Renata Kowalik, London Wildlife Trust Jenny Mant,The River Restoration Centre Peter Massini, Natural England Robert Oates,Thames Rivers Restoration Trust Kevin Reid, Greater London Authority Sarah Scott, Environment Agency Dave Webb, Environment Agency Support We would also like to thank the following for their support and contributions to the programme: • The Underwood Trust for their support to the Thames Rivers Restoration Trust • Valerie Selby (Wandsworth Borough Council) • Ian Tomes (Environment Agency) • HSBC's support of the WWF Thames programme through the global HSBC Climate Partnership • Thames21 • Rob and Rhoda Burns/Drawing Attention for design and graphics work Photo acknowledgements We are very grateful for the use of photographs throughout this document which are annotated as follows: 1 Environment Agency 2 The River Restoration Centre 3 Andy Pepper (ATPEC Ltd) HOW TO USE THIS GUIDE This booklet is to be used in conjunction with an interactive website administered by the The River Restoration Centre (www.therrc.co.uk/lrap.php).Whilst it provides an overview of the aspirations of a range of organisations including those mentioned above, the main value of this document is to use it as a tool to find out about river restoration opportunities so that they can be flagged up early in the planning process.The website provides a forum for keeping such information up to date.
    [Show full text]
  • Thames River Basin Management Plan, Including Local Development Documents and Sustainable Community Strategies ( Local Authorities)
    River Basin Management Plan Thames River Basin District Contact us You can contact us in any of these ways: • email at [email protected] • phone on 08708 506506 • post to Environment Agency (Thames Region), Thames Regional Office, Kings Meadow House, Kings Meadow Road, Reading, Berkshire, RG1 8DQ The Environment Agency website holds the river basin management plans for England and Wales, and a range of other information about the environment, river basin management planning and the Water Framework Directive. www.environment-agency.gov.uk/wfd You can search maps for information related to this plan by using ‘What’s In Your Backyard’. http://www.environment-agency.gov.uk/maps. Published by: Environment Agency, Rio House, Waterside Drive, Aztec West, Almondsbury, Bristol, BS32 4UD tel: 08708 506506 email: [email protected] www.environment-agency.gov.uk © Environment Agency Some of the information used on the maps was created using information supplied by the Geological Survey and/or the Centre for Ecology and Hydrology and/or the UK Hydrographic Office All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Environment Agency River Basin Management Plan, Thames River Basin District 2 December 2009 Contents This plan at a glance 5 1 About this plan 6 2 About the Thames River Basin District 8 3 Water bodies and how they are classified 11 4 The state of the water environment now 14 5 Actions to improve the water environment by 2015 19 6 The state of the water
    [Show full text]
  • Microbiological Examination of Water Contact Sports Sites in the River Thames Catchment I989
    WP MICROBIOLOGICAL EXAMINATION OF WATER CONTACT SPORTS SITES IN THE RIVER THAMES CATCHMENT I989 E0 E n v ir o n m e n t Ag e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE K10 House, Waterside Drive, Aztec West. Almondsbury, Bristol RS32 4UD BIOLOGY (EAST) BIOLOGY (WEST) THE GRANGE FOBNEY MEAD CROSSBROOK STREET ROSE KILN LANE WALTHAM CROSS READING HERTS BERKS EN8 8lx RG2 OSF TEL: 0992 645075 TEL: 0734 311422 FAX: 0992 30707 FAX: 0734 311438 ENVIRONMENT AGENCY ■ tin aim 042280 CONTENTS PAGE SUMMARY 1 INTRODUCTION 2 METHODS 2 RESULTS 7 DISCUSSION 18 CONCLUSION 20 RECOMMENDATIONS 20 REFERENCES 21 MICROBIOLOGICAL EXAMINATION OF WATER CONTACT SPORTS SITES IN THE RIVER THAMES CATCHMENT 1989 SUMMARY Water samples were taken at sixty-one sites associated with recreational use throughout the River Thames catchment. Samples were obtained from the main River Thames, tributaries, standing waters and the London Docks. The samples were examined for Total Coliforms and Escherichia coli to give a measure of faecal contamination. The results were compared with the standards given in E.C. Directive 76/I6O/EEC (Concerning the quality of bathing water). In general, coliform levels in river waters were higher than those in standing waters. At present, there are three EC Designated bathing areas in the River Thames catchment, none of which are situated on freshwaters. Compliance data calculated in this report is intended for comparison with the EC Directive only and is not statutory. Most sites sampled complied at least intermittently with the E.C. Imperative levels for both Total Coliforms and E.coli.
    [Show full text]
  • Barking and Dagenham Is Supporting Our Children and Young People Like
    this Barking and Dagenham Working with a range of is supporting our children organisations, we’re running and young people like exciting FREE holiday clubs never before! for children and young people right across the borough who are eligible. To find out more about each programme, and to book your place, visit www.lbbd.gov.uk/free-summer-activities. Each activity includes a healthy lunch. For free activities in the borough for all families visit www.lbbd.gov.uk/newme-healthy-lifestyle This provision is funded through the Department for Education’s Holiday Activities and Food Programme. #HAF2021. Take part in a summer to remember for Barking and Dagenham! Location Venue Dates Age Group 8 to 11 years IG11 7LX Everyone Active at Abbey Leisure Centre Monday 26 July to Friday 20 August 12 to 16 years 4 to 7 years RM10 7FH Everyone Active at Becontree Heath Leisure Centre Monday 26 July to Friday 20 August 8 to 11 years 12 to 16 years 8 to 11 years RM8 2JR Everyone Active at Jim Peters Stadium Monday 26 July to Friday 20 August 12 to 16 years IG11 8PY Al Madina Summer Fun Programme at Al Madina Mosque Monday 2 August to Thursday 26 August 5 to 12 years RM8 3AR Ballerz at Valence Primary School Monday 26 July to Friday 20 August 5 to 11 years RM8 2UT Subwize at The Vibe Tuesday 3 August to Saturday 28 August 7 to 16 years Under 16 RM10 9SA Big Deal Urban Arts Camp from Studio 3 Arts at Park Centre Monday 26 July to Friday 6 August years Big Deal Urban Arts Camp from Studio 3 Arts at Greatfields Under 16 IG11 0HZ Monday 9 August to Friday 20
    [Show full text]
  • Brochure.Pdf
    1, 2, AND 3 BEDROOM APARTMENTS AND 4 BEDROOM TOWNHOUSES IN THE HEART OF BARKING RIVERSIDE We are thrilled to provide our customers with the opportunity to purchase ahead of general release at our exclusive Homebuyers Event. As an HBF five star builder, we strive to deliver the highest quality build and pride ourselves on the delivery of our projects. As a result, we may make design advancements to your home to further improve the quality, build and finishes. We will provide you with comprehensive build updates throughout the construction process to inform you of any changes across the scheme and your home. The detail in this brochure is correct at the time of print. FIELDERS QUARTER part of the award-winning riverside redevelopment & THE WIDER REGENERATION OF THE AREA 4 FIELDERS QUARTER ot only will residents benefit from everything that Barking Riverside has to Noffer, they will also benefit from having the City right on their doorstep. Just 12 miles away, central London is the home of vital tube and rail hubs, including Liverpool Street, which is ideally positioned on four London tube lines. The City also provides connections to all major London airports and is the home of various landmarks and leading business centres, such as the Gherkin and London Stock Exchange. 5 FIELDERS QUARTER ON YOUR DOORSTEP SHAPING NEW EXPERIENCES ONE IMPULSE AT A TIME hey say life is what you make it, and at Fielders Quarter this is no exception. It offers the ideal base for you to lead the life you Tdesire, no matter what your tastes, desires and emotions might dictate.
    [Show full text]
  • Barking Riverside: 1 Heritage and Ecology Combine to Create a Distinctive New Place
    Barking Riverside: 1 Heritage and ecology combine to create a distinctive new place LDA Design is helping to turn Barking Power Station in east London 2 3 into a distinctive new riverfront town, made special by its heritage, ecology and location. Stretching 2km along the northern banks of the River Thames, this ambitious new 180-hectare development is one of the UK’s largest regeneration projects. It will provide more than 10,000 homes, as well as new schools, and commercial and cultural spaces. LDA Design, in partnership with WSP, is delivering a Strategic Infrastructure Scheme (SIS), providing a framework for Barking Riverside’s parks, public realm and green spaces; its highways and streetscapes, flood defences, services, utilities and drainage. Starting with a clear vision based on extensive public consultation, our ‘First life’ approach aims to create a welcoming place where people belong. Client Barking Riverside Ltd. Services Masterplanning, Landscape Architecture Location Critical to its success is excellent connectivity. A new train station Barking, Barking & Dagenham and additional bus routes and cycle network will help to integrate Area Partners 180 ha Barking Riverside with its surroundings. The landscape strategy is key L&Q, WSP, Barton Willmore, Arcadis, Laing O’Rourke, Schedule to creating a safe, sociable, sustainable place to live. Proposals include Liftschutz Davidson Sandilands, DF Clark, Future City, 2016 - ongoing Temple, Jestico + Whiles, Tim O’Hare Associates, Envac, terraced seating with river views and a new park that moves into IESIS, XCo2 1 Barking Park 3D masterplan serene wetlands. New habitats will help boost biodiversity. 2 Community green 3 Terraced seating overlooking swales 1 1 Eastern Waterfront, looking west.
    [Show full text]
  • Regulatory Services Committee Agenda
    Public Document Pack REGULATORY SERVICES COMMITTEE AGENDA Thursday Havering Town Hall, 7.30 pm 19 December 2013 Main Road, Romford Members 11: Quorum 4 COUNCILLORS: Conservative Residents’ Labour Independent UKIP ( 6) ( 2) ( 1) Residents’ 1 ( 1) Barry Oddy Linda Hawthorn Paul McGeary Mark Logan Fred Osborne (Chairman) Ron Ower Barry Tebbutt (Vice-Chair) Rebbecca Bennett Jeffrey Brace Roger Evans Steven Kelly For information about the meeting please contact: Richard Cursons 01708 432430 [email protected] Regulatory Services Committee, 19 December 2013 AGENDA ITEMS 1 CHAIRMAN'S ANNOUNCEM ENTS The Chairman will announce details of the arrangements in case of fire or other events that might require the meeting room or building’s evacuation. The Chairman will announce the following: These are the arrangements in case of fire or other events that might require the meeting room or building’s evacuation. (Double doors at the entrance to the Council Chamber and door on the right hand corner (marked as an exit). Proceed down main staircase, out the main entrance, turn left along front of building to side car park, turn left and proceed to the “Fire Assembly Point” at the corner of the rear car park. Await further instructions. I would like to remind members of the public that Councillors have to make decisions on planning applications strictly in accordance with planning principles. I would also like to remind members of the public that the decisions may not always be popular, but they should respect the need for Councillors to take decisions that will stand up to external scrutiny or accountability.
    [Show full text]
  • Brent Valley & Barnet Plateau Area Framework All London Green Grid
    All Brent Valley & Barnet Plateau London Area Framework Green Grid 11 DRAFT Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 9 Area Description 10 Strategic Context 11 Vision 14 Objectives 16 Opportunities 20 Project Identification 22 Clusters 24 Projects Map 28 Rolling Projects List 34 Phase One Early Delivery 36 Project Details 48 Forward Strategy 50 Gap Analysis 51 Recommendations 52 Appendices 54 Baseline Description 56 ALGG SPG Chapter 5 GGA11 Links 58 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA11 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg . Cover Image: View across Silver Jubilee Park to the Brent Reservoir Foreword 1 Introduction – All London Green Grid Vision and Methodology Introduction Area Frameworks Partnership - Working The various and unique landscapes of London are Area Frameworks help to support the delivery of Strong and open working relationships with many recognised as an asset that can reinforce character, the All London Green Grid objectives.
    [Show full text]
  • LBR 2007 Front Matter V5.1
    1 London Bird Report No.72 for the year 2007 Accounts of birds recorded within a 20-mile radius of St Paul's Cathedral A London Natural History Society Publication Published April 2011 2 LONDON BIRD REPORT NO. 72 FOR 2007 3 London Bird Report for 2007 produced by the LBR Editorial Board Contents Introduction and Acknowledgements – Pete Lambert 5 Rarities Committee, Recorders and LBR Editors 7 Recording Arrangements 8 Map of the Area and Gazetteer of Sites 9 Review of the Year 2007 – Pete Lambert 16 Contributors to the Systematic List 22 Birds of the London Area 2007 30 Swans to Shelduck – Des McKenzie Dabbling Ducks – David Callahan Diving Ducks – Roy Beddard Gamebirds – Richard Arnold and Rebecca Harmsworth Divers to Shag – Ian Woodward Herons – Gareth Richards Raptors – Andrew Moon Rails – Richard Arnold and Rebecca Harmsworth Waders – Roy Woodward and Tim Harris Skuas to Gulls – Andrew Gardener Terns to Cuckoo – Surender Sharma Owls to Woodpeckers – Mark Pearson Larks to Waxwing – Sean Huggins Wren to Thrushes – Martin Shepherd Warblers – Alan Lewis Crests to Treecreeper – Jonathan Lethbridge Penduline Tit to Sparrows – Jan Hewlett Finches – Angela Linnell Buntings – Bob Watts Appendix I & II: Escapes & Hybrids – Martin Grounds Appendix III: Non-proven and Non-submitted Records First and Last Dates of Regular Migrants, 2007 170 Ringing Report for 2007 – Roger Taylor 171 Breeding Bird Survey in London, 2007 – Ian Woodward 181 Cannon Hill Common Update – Ron Kettle 183 The establishment of breeding Common Buzzards – Peter Oliver 199
    [Show full text]
  • Scoping Report – Local Plan
    SUSTAINABILITY APPRAISAL SCOPING REPORT The Havering Local Plan February 2015 Contents Page Introduction ................................................................................... 3 Task A1: Policy Review ................................................................... 4 Task A2: Baseline information ........................................................ 5 Task A3: Identified Sustainability Issues ......................................... 6 Task A4: Sustainability Appraisal (SA) Framework .......................... 9 Task A5: Consultation on the Scope of the SA ............................... 11 Appendix A: Relevant Plans and Policies ....................................... 12 Appendix B: Baseline Information ................................................ 42 Social Profile and Trends ................................................................... 42 Economic Profile and Trends ............................................................ 55 Environmental Profile and Trends..................................................... 61 Appendix C: List of Acronyms ....................................................... 68 2 Introduction This Sustainability Appraisal Scoping Report documents Stage A in the Sustainability Appraisal (SA) process for the new Havering Local Plan. It addresses the requirements of Strategic Environmental Assessment (SEA) as required under the European Union Directive 2001/42/EC and the Environmental Assessment of Plans and Programmes Regulations 2004 and Sustainability Appraisal as required by Section
    [Show full text]
  • London Sustainable Drainage Action Plan 2016
    LONDON SUSTAINABLE DRAINAGE ACTION PLAN 2016 LONDON SUSTAINABLE DRAINAGE ACTION PLAN COPYRIGHT Greater London Authority December 2016 Published by Greater London Authority City Hall The Queen’s Walk More London London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 ISBN Photographs © Copies of this report are available from www.london.gov.uk This document is supported by: LONDON SUSTAINABLE DRAINAGE ACTION PLAN CONTENTS EXECUTIVE SUMMARY 2 PART 1: WHY WE NEED AND WANT MORE SUSTAINABLE DRAINAGE 3 Surface water management in London 4 Surface water management challenges 5 What is sustainable drainage? 8 International experience of sustainable drainage 11 The case for sustainable drainage in London 12 Sustainable drainage vision 13 PART 2: THE SUSTAINABLE DRAINAGE ACTION PLAN 19 The Sustainable Drainage Action Plan 20 Understanding the opportunities and benefits of sustainable drainage 21 Delivering sustainable drainage through new developments via the planning system 23 Retrofitting sustainable drainage across London 25 What can you do? Delivering sustainable drainage through domestic and local neighbourhood measures 56 Funding opportunities and regulatory incentives 59 Monitoring 61 Appendix 1: Action plan by year 62 Appendix 2: References 71 LONDON SUSTAINABLE DRAINAGE ACTION PLAN 2 EXECUTIVE SUMMARY London is outgrowing its drains and sewers. The combined sewer system originally built over 150 years ago by Joseph Bazalgette has served us well, but it was designed for a smaller city with more green surfaces. The combined challenges of London’s growing population, changing land uses and changing climate mean that if we continue to rely on our current drains and sewers, we face an increasing risk of flooding.
    [Show full text]