Michael Tolbert Petroleum Engineer Office of Field Operations, Plans Section Phone: (504) 736-2867 Email: [email protected]

Total Page:16

File Type:pdf, Size:1020Kb

Michael Tolbert Petroleum Engineer Office of Field Operations, Plans Section Phone: (504) 736-2867 Email: Michael.Tolbert@Boemre.Gov Page 1 of 1 Tolbert, Michael From: Tolbert, Michael Sent: Friday, January 28, 2011 10:21 AM To: '[email protected]' Cc: Peuler, Elizabeth; Hill, Chiquita; Wetzel, Nick; Saucier, Michael Subject: Supplemental Exploration Plan S-7445 for Lease OCS-G 7493 (GB 427) This email is to notify you that the following Supplemental Exploration Plan received October 28, 2010, amended November 19 and 30, December 3 and 9, 2010, and January 6, 21, and 27, 2011, has been deemed submitted in accordance with 30 CFR 250.231(a) and 232(d) as of January 28, 2011: Control Number - S-7445 Type - Supplemental Exploration Plan Operator – Shell Offshore Inc. Lease(s) - OCS-G 7493 (Block 427, Garden Banks Area) Activities Proposed – Add Wells O, P, and Q Michael Tolbert Petroleum Engineer Office of Field Operations, Plans Section Phone: (504) 736-2867 email: [email protected] 1/28/2011 Shell Offshore Inc P. O. Box 61933 New Orleans, LA 70161-1933 United States of America Tel +1 504 728 7215 Fax +1 504 728 6747 Email [email protected] January 26, 2011 Office of Field Operations Bureau of Ocean Energy Management Regulation & Enforcement 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394 Attn: Mike Tolbert Plans Group MS 5321 SUBJECT: Supplemental Exploration Plan OCS-G 7493, Garden Banks Block 427 Garden Banks 471 Unit Offshore, Louisiana S- 07445 In response to your information requests for subject plan received January 11, 2011 and January 18, 2011 concerning days required to drill a relief well, the following is furnished to the BOEM for public information: Relief well operations will immediately take priority and displace any activity from Shell’s contracted rig fleet. The dynamically positioned rig, Noble Danny Adkins, which is currently under contract to Shell, will be the preferred rig for blowout intervention work. It is expected to take an average of 14 days to safely secure the well that the rig is working on, up to the point the rig departs location, and a further estimated 3 days transit to mobilize to the relief well site. Additionally, in the event of a blowout, there is the distinct possibility that other non-Shell contracted rigs in the GOM could be utilized whether for increased expediency or better suitability. The worst case discharge scenario is based upon an 11 ¾” liner with ~4000’ of open hole to the top of the reservoir. The time to drill the relief well is approximately 71 days and an additional estimated 21 days to maneuver the relief well through precision ranging to intersect the well that has blown out. Therefore the total time to mobilize, transit and drill a relief well for Cardamom is 109 days. Should you require additional information, please contact me as indicated above. Kind regards Sylvia A. Bellone U. S. Department of the Interior OMB Control Number: 1010-0051 Minerals Management Service OMB Approval Expires: 12/31/2011 OCS PLAN INFORMATION FORM General Information Type of OCS Plan: X Exploration Plan (EP) Development Operations Coordination Document (DOCD) Company Name: Shell Offshore Inc. MMS Operator Number: 0689 Address: P. O. Box 61933 Contact Person: Sylvia Bellone New Orleans, LA 70161-1933 Phone Number: (504) 728-7215 E-Mail Address: [email protected] Lease(s): OCS-G 7493 Area: Garden Banks Block(s): 427 Project Name (If Applicable): NA Objective(s): X Oil Gas Sulphur Salt Onshore Base: Fourchon & Amelia Distance to Closest Land (Miles): 130 Description of Proposed Activities (Mark all that apply) X Exploration drilling Development drilling Well completion Installation of production platform Well test flaring (for more than 48 hours) Installation of production facilities Installation of caisson or platform as well protection structure Installation of satellite structure Installation of subsea wellheads and/or manifolds Commence production Installation of lease term pipelines Other (Specify and describe) Have you submitted or do you plan to submit a Conservation Information Document to accompany this plan? Yes X No Do you propose to use new or unusual technology to conduct your activities? Yes X No Do you propose any facility that will serve as a host facility for deepwater subsea development? Yes X No Do you propose any activities that may disturb an MMS-designated high-probability archaeological area? X Yes No Have all of the surface locations of your proposed activities been previously reviewed and approved by MMS? Yes X No Tentative Schedule of Proposed Activities Proposed Activity Start Date End Date No. of Days Preset anchors 12/01/10 12/31/10 30 Drill O 01/01/11 06/11/11 160 Drill P 01/01/12 06/10/12 160 Drill Q 01/01/13 06/13/13 160 Description of Drilling Rig Description of Production Platform Jackup Drillship Caisson Tension leg platform Gorilla Jackup Platform rig Well protector Compliant tower X Semisubmersible Submersible Fixed platform Guyed tower DP Semisubmersible Other (Attach Description) Subsea manifold Floating production system Drilling Rig Name (If Known): Noble Jim Thompson Spar Other (Attach Description) Description of Lease Term Pipelines From (Facility/Area/Block) To (Facility/Area/Block) Diameter (Inches) Length (Feet) N/A Form MMS-137 (December 2008 – Supersedes all previous editions of form MMS=137 which may not be used.) Page 1 of 4 OCS PLAN INFORMATION FORM (CONTINUED) Include one copy of this page for each proposed well/structure Proposed Well/Structure Location Well or Structure Name/Number (If renaming well or structure, reference previous name): O Subsea Completion Anchor Radius (if applicable) in feet: 14500’ X Yes No Surface Location Bottom-Hole Location (For Wells) Lease No. OCS-G 7493 Area Name Garden Banks Block No. 427 Blockline N/S Departure: 5965' FNL Departures (in feet) E/W Departure: 1400' FEL Lambert X-Y X: 1,836,040 coordinates Y: 10,004,915 Latitude/ Latitude Longitude 27.56962046 Longitude -92.39596682 TVD (Feet): MD (Feet): Water Depth (Feet): 2721’ Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name Area Block X Coordinate Y Coordinate Length of Anchor or No. Chain on Seafloor Paperwork Reduction Act of 1995 Statement: The Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35) requires us to inform you that MMS collects this information as part of an applicant’s Exploration Plan or Development Operations Coordination Document submitted for MMS approval. We use the information to facilitate our review and data entry for OCS plans. We will protect proprietary data according to the Freedom of Information Act and 30 CFR 250.196. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget Control Number. The use of this form is voluntary. The public reporting burden for this form is included in the burden for preparing Exploration Plans and Development Operations Coordination Documents. We estimate that burden to average 580 hours per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Mail Stop 4230, Minerals Management Service, 1849 C Street, N.W., Washington, DC 20240. Form MMS-137 (December 2008 – Supersedes all previous editions of form MMS=137 which may not be used.) Page 2 of 4 OCS PLAN INFORMATION FORM (CONTINUED) Include one copy of this page for each proposed well/structure Proposed Well/Structure Location Well or Structure Name/Number (If renaming well or structure, reference previous name): P Subsea Completion Anchor Radius (if applicable) in feet: 14500’ X Yes No Surface Location Bottom-Hole Location (For Wells) Lease No. OCS-G 7493 Area Name Garden Banks Block No. 427 Blockline N/S Departure: 5470' FNL Departures (in feet) E/W Departure: 1920' FEL Lambert X-Y X: 1,835,520 coordinates Y: 10,005,410 Latitude/ Latitude Longitude 27.57098950 Longitude -92.39756494 TVD (Feet): MD (Feet): Water Depth (Feet): 2721’ Anchor Locations for Drilling Rig or Construction Barge (If anchor radius supplied above, not necessary) Anchor Name Area Block X Coordinate Y Coordinate Length of Anchor or No. Chain on Seafloor Paperwork Reduction Act of 1995 Statement: The Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35) requires us to inform you that MMS collects this information as part of an applicant’s Exploration Plan or Development Operations Coordination Document submitted for MMS approval. We use the information to facilitate our review and data entry for OCS plans. We will protect proprietary data according to the Freedom of Information Act and 30 CFR 250.196. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget Control Number. The use of this form is voluntary. The public reporting burden for this form is included in the burden for preparing Exploration Plans and Development Operations Coordination Documents. We estimate that burden to average 580 hours per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Mail Stop 4230, Minerals Management Service, 1849 C Street, N.W., Washington, DC 20240. Form MMS-137 (December 2008 – Supersedes all previous editions of form MMS=137 which may not be used.) Page 3 of 4 OCS PLAN INFORMATION FORM (CONTINUED) Include one copy of this page for each proposed well/structure Proposed Well/Structure Location Well or Structure Name/Number (If renaming well or structure, reference previous name): Q Subsea Completion Anchor Radius (if applicable) in feet: 14500’ X Yes No Surface Location Bottom-Hole Location (For Wells) Lease No.
Recommended publications
  • Gulf Oil Disaster Complaint Exhibit 2: Deepwater Horizon Exploratory Plan
    United States Department of the Interior MINERALS MANAGEMENT SERVICE Gulf of Mexico OCS Region 120 1 Elmwood Park Boulevard New Orleans, Louisiana 701 23-2394 In Reply Refer To: MS 5231 April 6, 2009 Ms. Scherie Douglas BP Exploration & Production Inc 501 Westlake Park Boulevard Houston, Texas 77079 Dear Ms. Douglas: Reference is made to the following plan: Control No. N-09349 'n"L'e Initial Exploration Plan (EP) Received February 23, 2009, amended February 25, 2009 Lease (s) OCS-G 32306, Block 252, Mississippi Canyon Area (MC) You are hereby notified that the approval of the subject plan has been granted as of April 6, 2009, in accordance with 30 CFR 250.233(b)(1). This approval includes the activities proposed for Wells A and B. Exercise caution while drilling due to indications of shallow gas and possible water flow. In response to the request accompanying your plan for a hydrogen sulfide (H,S) classification, the area in which the proposed drilling operations are to be conducted is hereby classified, in accordance with 30 CFR 250.490 (c), as "H2S absent. 'I If you have any questions or comments concerning this approval, please contact Michelle Griffitt at (504) 736-2975. Sincerely, Dignally qncd by Michael M ic ha e 1 ~~b~~=MichaelTolbm,o. ou. go". <=us Dale: 1009 04.06 14:51!30 Tol bert -0soo' for Michael J. Saucier Regional Supervisor Field Operations UNITED STATES GOVERNMENT March 10, 2009 MEMORANDUM To: Public Information (MS 5030) From: Plan Coordinator, FO, Plans Section (MS 5231) Subject: Public Information copy of plan Control # N-09349 Type Initial Exploration Plan Lease(s) OCS-G32306 Block - 252 Mississippi Canyon Area Operator BP Exploration & Production Inc.
    [Show full text]
  • Plan Coordinator, FO, Plans Section (MS 5231)
    UNITED STATES GOVERNMENT August 5, 2019 MEMORANDUM To: Public Information (MS 5030) From: Plan Coordinator, FO, Plans Section (MS 5231) Subj ect: Public Information copy of plan Control # S-07968 Type Supplemental Exploration Plan Lease(s) OCS-G36134 Elock - 629 Mississippi Canyon Area Operator LLOG Exploration Offshore, L.L.C. Description Subsea Well C and C-ALT Rig Type Not Found Attached is a copy of the subject plan. It has been deemed submitted as of this date and is under review for approval Leslie Wilson Plan Coordinator Site Type/Name Botm Lse/Area/Blk Surface Location Surf Lse/Area/Blk WELL/C G36134/MC/629 6100 FNL, 5062 FEL G36134/MC/629 WELL/C-ALT G36134/MC/629 6100 FNL, 5112 FEL G36134/MC/629 LLOG EXPLORATION OFFSHORE, L.L.C. 1001 Ochsner Boulevard, Suite 100 Covington, Louisiana 70433 SUPPLEMENTAL EXPLORATION PLAN OCS-G 36134 LEASE MISSISSIPPI CANYON BLOCK 629 Prepared By: Sue Sachitana Regulatory Specialist LLOG Exploration Offshore, L.L.C. 985-801-4300-Office 985-801-4716-Direct [email protected] Date: July 10, 2019 LLOG EXPLORATION OFFSHORE, L.L.C. SUPPLEMENTAL EXPLORATION PLAN OCS-G 36134 MISSISSIPPI CANYON BLOCK 629 APPENDIX A Plan Contents APPENDIX B General Information APPENDIX C Geological, Geophysical Information APPENDIX D H2S Information APPENDIX E Biological, Physical and Socioeconomic Information APPENDIX F Waste and Discharge Information APPENDIX G Air Emissions Information APPENDIX H Oil Spill Information APPENDIX I Environmental Monitoring Information APPENDIX J Lease Stipulation Information APPENDIX K Environmental Mitigation Measures Information APPENDIX L Related Facilities and Operations Information APPENDIX M Support Vessels and Aircraft Information APPENDIX N Onshore Support Facilities Information APPENDIX O Coastal Zone Management Act (CZMA) Information APPENDIX P Environmental Impact Analysis APPENDIX Q Administrative Information Mississippi Canyon Block 629, OCS-G-36134 Supplemental Exploration Plan APPENDIX A PLAN CONTENTS (30 CFR Part 550.211 and 550.241) A.
    [Show full text]
  • Oil and Chemical Spills: Federal Emergency Response Framework
    Oil and Chemical Spills: Federal Emergency Response Framework David M. Bearden Specialist in Environmental Policy Jonathan L. Ramseur Specialist in Environmental Policy August 29, 2017 Congressional Research Service 7-5700 www.crs.gov R43251 Oil and Chemical Spills: Federal Emergency Response Framework Summary Thousands of oil and chemical spills of varying size and magnitude occur in the United States each year. When a spill occurs, state and local officials located in proximity to the incident generally are the first responders and may elevate an incident for federal attention if greater resources are desired. The National Oil and Hazardous Substances Pollution Contingency Plan, often referred to as the National Contingency Plan (NCP), establishes the procedures for the federal response to oil and chemical spills. The scope of the NCP encompasses discharges of oil into or upon U.S. waters and adjoining shorelines and releases of hazardous substances into the environment. The NCP was developed in 1968 and has been revised on multiple occasions to implement the federal statutory response authorities that Congress has expanded over time. Three federal environmental statutes authorized the development of the NCP: the Clean Water Act, as amended; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended; and the Oil Pollution Act of 1990. Several executive orders have delegated the presidential response authorities of these statutes to federal departments and agencies that implement the NCP. The lead federal agency serves as the On-Scene Coordinator to direct the federal response. Generally, EPA leads the federal response within the inland zone, and the U.S.
    [Show full text]
  • Blowout: Legal Legacy of the Deepwater Horizon Catastrophe:Federal Public Law and the Future of Oil and Gas Drilling on the Oute
    Roger Williams University Law Review Volume 17 | Issue 1 Article 10 Winter 2012 Blowout: Legal Legacy of the Deepwater Horizon Catastrophe:Federal Public Law and the Future of Oil and Gas Drilling on the Outer Continental Shelf David Pettit Natural Resources Defense Council David Newman Natural Resources Defense Council Follow this and additional works at: http://docs.rwu.edu/rwu_LR Recommended Citation Pettit, David and Newman, David (2012) "Blowout: Legal Legacy of the Deepwater Horizon Catastrophe:Federal Public Law and the Future of Oil and Gas Drilling on the Outer Continental Shelf," Roger Williams University Law Review: Vol. 17: Iss. 1, Article 10. Available at: http://docs.rwu.edu/rwu_LR/vol17/iss1/10 This Article is brought to you for free and open access by the Journals at DOCS@RWU. It has been accepted for inclusion in Roger Williams University Law Review by an authorized administrator of DOCS@RWU. For more information, please contact [email protected]. Federal Public Law and the Future of Oil and Gas Drilling on the Outer Continental Shelf David Pettit* and David Newmant I. INTRODUCTION Transocean's Deepwater Horizon offshore drilling rig, on lease to BP, exploded and caught fire on April 20, 2010. This event caused the deaths of eleven workers and resulted in an oil geyser that spewed millions of gallons of oil into the Gulf of Mexico.' The Deepwater Horizon sank two days after the explosion. Nearly three months later, on July 15, 2010, BP was finally able to cap the well.2 The Flow Rate Technical Group, a group of scientists from federal agencies and academic institutions, estimated that * David Pettit, a 1975 graduate of UCLA Law School, is a Senior Attorney for the Natural Resources Defense Council.
    [Show full text]
  • Ntl 2010-N06
    OMB Control Number: 1010-0183 OMB Expiration Date: February 28, 2014 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT NTL No. 2010-N06 Effective Date: June 18, 2010 NATIONAL NOTICE TO LESSEES AND OPERATORS OF FEDERAL OIL AND GAS LEASES, OUTER CONTINENTAL SHELF (OCS) Information Requirements for Exploration Plans, Development and Production Plans, and Development Operations2015-N01 Coordination Documents on the OCS Purpose No. Pursuant to 30 CFR 250.213(g) an Exploration Plan (EP) must be accompanied by a blowout scenario description. 30 CFR 250.243(h) imposes the same requirement for a Development and Production Plan (DPP) and a Development and Coordination Document (DOCD).1 Pursuant to 30 CFR 250.219 and 250.250, all plans must also be accompanied by information regarding oil spills, includingNTL calculations of your worst case discharge scenario. In April 2008, the Gulf of Mexico Region issued NTL No. 2008-G04 (Information Requirements for Exploration Plans and Development Operations Coordination Documents in the Gulf of Mexico),2 and pursuant to 30 CFR 250.201(c), limited the information required to accompany plans you submit to the Bureau of Ocean Energy Management, Regulation, and Enforcement (BOEM) (formerly known as MMS) with regard to a blowout scenario andBOEM worst case discharge scenario. The purpose of this Notice to Lessees and Operators (this NTL) is to rescind the limitations set forth in NTL No. 2008-G04 regarding a blowout scenario and worst case discharge scenario, and to provide national guidanceby to Lessees and Operators regarding the content of the information BOEM requires in your blowout scenario and worst case discharge scenario descriptions.
    [Show full text]
  • July 21, 2016 U.S. Securities and Exchange Commission 100 F Street, NE Washington, DC 20549-1090
    July 21, 2016 U.S. Securities and Exchange Commission 100 F Street, NE Washington, DC 20549-1090 Attn: File No. S7-06-16, Docket No. 33-10064, Business and Financial Disclosure Required by Regulation S-K The Institute for Policy Integrity at New York University School of Law,1 University of Chicago Abrams Environmental Law Clinic,2 and Oceana3 respectfully submit these comments in response to the Securities and Exchange Commission’s “concept release” on business and financial disclosures. Specifically, in response to the SEC’s question about increasing environmental disclosures,4 these comments advocate for either new rules or an interpretive release with guidance clarifying the disclosure requirements around the risks from offshore oil and gas operations, particularly in frontier areas like ultra-deepwater and the Arctic Ocean. The SEC is tasked with the tripartite mission of protecting investors; maintaining fair, orderly, and efficient markets; and facilitating capital formation.5 In pursuit of that mission, the SEC requires certain mandatory disclosures by issuers of securities. This disclosure regime is driven by the concept that all investors should have access to certain facts about an investment.6 The disclosure of meaningful information to the public creates a common pool of knowledge that investors may use to evaluate for themselves whether to buy, sell, or hold a particular security.7 With changing 1 Policy Integrity is a non-partisan think tank dedicated to improving the quality of government decision-making through advocacy and scholarship in the fields of administrative law, cost-benefit analysis, and public policy. These comments do not necessarily reflect the views of NYU School of Law, if any.
    [Show full text]
  • Oil Spill by the Oil Rig “Deepwater Horizon”
    Case 2:10-md-02179-CJB-SS Document 21088 Filed 07/20/16 Page 1 of 3 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA IN RE: OIL SPILL BY THE OIL § MDL No. 2179 RIG “DEEPWATER HORIZON” § IN THE GULF OF MEXICO, § SECTION: J ON APRIL 20, 2010 § This document relates to all cases. § JUDGE BARBIER § MAG. JUDGE SHUSHAN ORDER [BP’s Motion for Order of Disposal of Material (Rec. doc. 19381)] CONSIDERING BP Exploration & Production Inc., BP America Production Company, and BP America Inc.’s (“BP”) motion for an order governing the disposal of source material and other substances, it is hereby ORDERED: 1. WHEREAS BP collected oil and other material from various containment and recovery vessels at the well site and from surface recovery efforts during the summer of 2010; 2. And whereas BP also collected volumes of surrogate oil for use in contexts where actual Macondo oil was not essential; 3. And whereas BP, since 2010, has advertised the availability of such materials, and has made, and continues to make, such recovered and collected material available to interested researchers; 4. And whereas BP has satisfied the demand for such materials and that demand has almost completely ended; 5. And whereas the volumes of oil and other materials currently held by BP far exceed the demand that reasonably might be expected in the future; Case 2:10-md-02179-CJB-SS Document 21088 Filed 07/20/16 Page 2 of 3 6. And whereas BP has moved this Court seeking to dispose properly of superfluous oil and other material, but to continue to maintain supplies that still exceed the likely future demand by researchers and scientists; 7.
    [Show full text]
  • COMPLAINT for VIOLATIONS of the FEDERAL SECURITIES LAWS and ENGLISH COMMON LAW Case 4:14-Cv-01068 Document 1 Filed in TXSD on 04/18/14 Page 2 of 100
    Case 4:14-cv-01068 Document 1 Filed in TXSD on 04/18/14 Page 1 of 100 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF TEXAS HOUSTON DIVISION ) MARYLAND STATE RETIREMENT AND ) PENSION SYSTEM, ) ) CIVIL ACTION NO. _____________ Plaintiff, ) ) vs. ) ) ) ) BP, PLC; BP AMERICA, INC.; BP ) JURY TRIAL DEMANDED EXPLORATION & PRODUCTION, INC.; ) ANTHONY B. HAYWARD; ANDREW G. ) INGLIS; DOUGLAS J. SUTTLES, ) ) ) Defendants. ) ) ) ) ) ) ) ) COMPLAINT FOR VIOLATIONS OF THE FEDERAL SECURITIES LAWS AND ENGLISH COMMON LAW Case 4:14-cv-01068 Document 1 Filed in TXSD on 04/18/14 Page 2 of 100 TABLE OF CONTENTS Page I. NATURE OF THE ACTION AND OVERVIEW ............................................................. 2 II. JURISDICTION AND VENUE ......................................................................................... 7 III. PARTIES .......................................................................................................................... 10 A. Plaintiff ................................................................................................................. 10 B. Defendants and Related Parties ............................................................................ 11 IV. SUBSTANTIVE ALLEGATIONS .................................................................................. 16 A. Prior Incidents of Safety Lapses ........................................................................... 16 B. The Baker Report .................................................................................................. 20
    [Show full text]
  • Bp Gulf of Mexico Oil Spill
    BP GULF OF MEXICO OIL SPILL John Wyeth Griggs* Synopsis: The blowout of BP‟s Macondo well in the Gulf of Mexico on April 20, 2010, provided the first major test of the national oil spill containment and response apparatus put in place by the Oil Pollution Act of 1990. News media coverage of the blowout displayed a lack of awareness of the Act or the mechanisms it had put in place to respond to major oil spills. Many questions raised by the media are answered or explained by the statute and its regulations. This article discusses the Act‟s provisions as they relate to the Macondo blowout, its effectiveness in dealing with the spill, and the prospects for amending the law. I. The Macondo Blowout .............................................................................. 57 II. The Oil Pollution Act of 1990 .................................................................. 59 A. Who Is in Charge? ............................................................................. 59 B. Why Was the Government Slow to Respond? ................................... 62 C. Why Did It Take So Long to Stop the Spill? ..................................... 63 D. Is There a Cap on BP‟s Liability? ...................................................... 67 E. Why Was BP‟s Permission Required for Private Clean-up Efforts? ............................................................................................... 69 F. To What Penalties Is BP Subject? ..................................................... 69 G. What Damages Will BP Have to Pay? ..............................................
    [Show full text]
  • Washington Report Volume XXXV,III Number 7 DECEMBER, 2010
    WASHINGTON REPORT VOLUME XXXV,III NUMBER 7 DECEMBER, 2010 SPECIAL EDITION 2010 NOIA FALL MEETING REVIEW The largest gathering of NOIA members Thredgold reported that the “Great Reces- in six years attended the 2010 fall meeting sion” officially started in December of 2007 October 28 – 30 at the Phoenician Resort and, despite appearances, ended around in Scottsdale, Arizona. June of 2009. However, he said we are go- ing down the wrong road of spending, that Sessions focused heavily on the regula- some say could end in a slide back into re- tory and economic challenges facing the cession. The current U.S. economy is “like offshore industry in the wake of the Ma- an engine with two gas pedals pushed all Liz Cheney condo well incident, and speakers likewise the way to the floor,” he said, and with the shared their views on the impact of the various bailouts of corporate America and Gulf spill, as well as their thoughts on the no corresponding bailouts to the masses, 2010 elections. the general public has lost confidence in the Administration as well as in Congress. GENERAL SPEAKERS LIZ CHENEY Thredgold noted that the economy is evolv- Middle East policy expert and founder of ing and becoming increasingly more tech- KeepAmericaSafe.com, Liz Cheney kicked nical, making employees today much more off the meeting Friday night with a speech productive than they were even a year ago. entitled, “American Politics: 2010, 2012 The computer skills required in this new and Beyond”. Liz charmed the audience economy earn a job applicant 15-20 per- with stories about her father, Dick Cheney.
    [Show full text]
  • Exposing the Risks of Drilling & Spilling in the Great Australian Bight
    INTENTIONS:Crude Exposing the risks of drilling & spilling in the Great Australian Bight Greenpeace Australia Pacific Crude Intentions: Exposing the risks of drilling & spilling in the Great Australian Bight Greenpeace Australia Pacific Independent Expert Opinion 20 November 2018 Richard Steiner, Professor and Marine Conservation Specialist (University of Alaska, ret.) Marine Conservation Biologist/ Oil Spill Consultant Oasis Earth, Anchorage Alaska USA www.oasis-earth.com; [email protected] Cover photo: A pelican sits covered with oil from the Deepwater Horizon wellhead in Barataria Bay. The heavier oil has moved into the bay covering more wildlife everyday. The BP leased Deepwater Horizon oil platform exploded April 20 and sank after burning, leaking record amounts of crude oil from the broken pipeline into the sea © Jose Luis Magana/Greenpeace This page: Drone footage of Bunda Cliffs in the Great Australian Bight. ©Jaimen Hudson/Greenpeace www.greenpeace.org02 Greenpeace Australia Pacific Crude Intentions: Exposing the risks of drilling & spilling in the Great Australian Bight CONTENTS 01 Executive Summary 03 02 Introduction 05 03 Great Australia Bight (GAB) Marine Ecosystem 06 04 Proposed Equinor GAB Project 09 05 Blowout Risk 10 06 Risk Reduction 13 07 Blowout Source Containment 15 08 GAB Worst Case Discharge (WCD) 17 A. Equinor WCD model (2018) 17 B. Trajectory Model (Lebreton, 2015) 18 C. Environmental Exposure Model (Ellis, 2016) 20 D. Spill Response Capability 22 09 Ecological Impacts of Marine Oil Spills – Overview
    [Show full text]
  • Deepwater Disaster: How the Oil Spill Estimates Got It Wrong
    Best guess versus worst case Deepwater disaster: how the oil spill estimates got it wrong “There is no crude emanating from that riser.” Then the official estimate was 1000 barrels a day, then 5000. The true figure was 58 000 barrels of oil a day leaking into the Gulf of Mexico. Why did the authorities so consistently underestimate the flow from the Deepwater disaster, and what damage did those underestimates do? Ian MacDonald reveals the smoking gun behind BP’s erroneous statistics. On April 20th, 2010, the explosion and sinking of a consequential variable in the ongoing emergency: the semi-submersible drilling rig called Deepwater Horizon discharge rate of oil: that is, the number of barrels of oil killed 11 people and initiated a furious eruption of oil per day gushing into the ocean far below the surface. and gas from BP’s Macando well, which was located Official reports on the release and discharge rates in 1500 m of water 75 km southeast of Grand Island, were issued by authorities of the Unified Command, Louisiana. The discharge was virtually unabated for which was an often uneasy alliance between BP and 84 days until a steel cap was installed and successfully the US government represented by no less than four closed, staunching the flow completely, on 15th July. cabinet-level departments (of Commerce, Energy, Emergency operations continued around the clock to Homeland Security, and the Interior). Unfortunately, it drill a second, intercepting, shaft and install a final plug took these authorities a very long time to get the rate into the bottom of the blown-out well.
    [Show full text]