October 16, 2018 VIA E-FILING Kimberly D. Bose Secretary Federal

Total Page:16

File Type:pdf, Size:1020Kb

October 16, 2018 VIA E-FILING Kimberly D. Bose Secretary Federal October 16, 2018 VIA E-FILING Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Alice Falls Hydroelectric Project (FERC No. 5867-053) Supplemental Information to the Pre-Application Document Dear Secretary Bose: Alice Falls Hydro, LLC (Alice Falls Hydro), a wholly owned subsidiary of Eagle Creek Renewable Energy, LLC (Eagle Creek), is the licensee and operator of the Alice Falls Hydroelectric Project, FERC No. 5867 (Project), located on the Ausable River in the Hamlet of Keeseville, Clinton and Essex Counties, New York. On September 28,2018, Alice Falls Hydro electronically filed with the Federal Energy Regulatory Commission (FERC or Commission) the Notice of Intent to File a License Application (NOI) and accompanying Pre-Application Document (PAD) for the Project. Subsequent to filing the PAD, Alice Falls Hydro obtained, via a FERC eLibrary request, these additional documents available only on microfilm, which had not been available at the time of the PAD filing. Accordingly, Alice Falls Hydro is filing the following information to update and/or supplement information provided in the PAD, as follows: Attachment A provides the 1993 Exhibit F and replaces the 1992 Exhibit F documents provided in Appendix H (CEII) of the PAD. Attachment A also provides the Single Line Drawing which is the same as that provided in the PAD filing. Attachment B provides the 1993 Exhibit G and replaces the Exhibit G document provided in Appendix E of the PAD. Note the figures in the PAD denote the 1990 Exhibit G Project boundary. These figures will be updated in the draft and final license application filings to denote the 1993 Exhibit G project boundary. Attachment C provides the Alice Falls Project 401 Water Quality Certificate issued by the New York State Department of Environmental Conservation (NYSDEC) on September 19, 1983. Note that the PAD (page 4-13) incorrectly states the date of issuance as September 19, 1984. This date will be corrected in the draft and final license application filings. Eagle Creek Renewable Energy 116 N. State Street, PO Box 167, Neshkoro, WI 54960-0167 Tel: 920-293-4628 – Fax: 920-293-8087 www.eaglecreekre.com Alice Falls Hydroelectric Project (FERC No. 5867-053) October 16, 2018 Supplemental Information to the Pre-Application Document Page 2 of 2 Exhibit F (Attachment A) is Critical Energy Infrastructure Information (CEII) as defined by the Commission at 18 CFR § 388.113(c), and this information has been removed from the public version of the PAD. In accordance with the Commission’s filing guidelines, all CEII is included in a separate volume (Volume II) that has been clearly labeled as CEII. Alice Falls Hydro respectfully requests that this information be accorded treatment as CEII, as it consists of Project facility and other information relating to the “production, generation, transportation, transmission, or distribution of energy” (18 CFR § 388.113(c)). Should you have any questions or comments related to the NOI, PAD, or any other information presented above, please contact me at 973-998-8400 or at [email protected]. Sincerely, Michael Scarzello Director cc: Distribution List Susan Giansante, Eagle Creek Renewable Energy, LLC Robert Gates, Eagle Creek Renewable Energy, LLC Karen Klosowski, Kleinschmidt Katie Sellers, Kleinschmidt Enclosed: Attachment A 1993 Exhibit F (CEII) Attachment B 1993 Exhibit G Attachment C Alice Falls Project 1983 401 Water Quality Certification Eagle Creek Renewable Energy 116 N. State Street, PO Box 167, Neshkoro, WI 54960-0167 Tel: 920-293-4628 – Fax: 920-293-8087 www.eaglecreekre.com ALICE FALLS PROJECT (FERC NO. 5867-053) DISTRIBUTION LIST Federal Governmental Agencies Andrew Tittler Agency Counsel John Eddins U.S. Department of the Interior Archaeologist/Program Analyst One Gateway Center Advisory Council on Historic Preservation Suite 612 Office of Federal Agency Programs Newton, MA 02458 401 F Street NW, Suite 308 [email protected] Washington, DC 20001-2637 [email protected] Peter Lopez Deputy Regional Administrator Bruce Maytubby U.S. Environmental Protection Agency, Bureau of Indian Affairs, U.S. Department Region 2 of the Interior 290 Broadway Eastern Regional Office New York, NY 10007-1866 545 Marriott Drive, Suite 700 [email protected] Nashville, TN 37214 [email protected] David Stilwell U.S. Fish and Wildlife Service Michael Penpony New York Field Office, Region 5 National Oceanic and Atmospheric 3817 Luker Road Administration Cortland, NY 13045 Greater Atlantic Regional Fisheries Office [email protected] 55 Great Republic Drive Gloucester, MA 01930-2276 Steve Patch [email protected] U.S. Fish and Wildlife Service New York Field Office, Region 5 Joseph Seebode 3817 Luker Road Deputy District Engineer Cortland, NY 13045 U.S. Army Corps of Engineers, New York [email protected] District 26 Federal Plaza John Wiley New York, NY 10278-0090 U.S. Fish and Wildlife Service New York Field Office, Region 5 Andrew Raddant 3817 Luker Road Regional Environmental Officer Cortland, NY 13045 U.S. Department of the Interior [email protected] Office of Environmental Policy and Compliance, Northeast Region Andrew Milliken 15 State Street, 8th Floor Complex Manager Boston, MA 02109 U.S. Fish and Wildlife Service [email protected] Lake Champlain Fish and Wildlife Conservation Office 11 Lincoln Street Essex Junction, VT 05452 [email protected] ALICE FALLS PROJECT (FERC NO. 5867-053) DISTRIBUTION LIST Kevin Mendik State Governmental Agencies Environmental Protection Specialist U.S. National Park Service Robert Stegemann 15 State Street Regional Director Boston, MA 02109 New York State Department of Environmental Conservation, Region 5 Robert Francis Breault 1115 NYS Route 86 Center Director PO Box 296 U.S. Geological Survey Ray Brook, NY 12977-0296 New York Water Science Center - Potsdam [email protected] Field Office 22 Depot Street Robert Streeter Potsdam, NY 13676 Regional Water Engineer [email protected] New Yor State Department of Environental Conservation, Region 5 John Spain 1115 NYS Route 86 Regional Engineer PO Box 296 Federal Energy Regulatory Commission, Ray Brook, NY 12977-0296 Division of Dam Safety and Inspections [email protected] New York Regional Office 19 West 34th Street Suite 400 Paul Jensen New York, NY 10001-3006 Regional Wildlife Manager [email protected] New York State Department of Environmental Conservation, Region 5 Brian Shumon 1115 NYS Route 86 FEMA Region Representative PO Box 296 Federal Emergency Management Agency Ray Brook, NY 12977-0296 New York Office [email protected] 26 Federal Plaza Room 1337 Lance Durfey New York, NY 10278-0002 Regional Fisheries Manager [email protected] New York State Department of Environmental Conservation, Region 5 Duncan Hay 1115 NYS Route 86 National Park Service, Northeast Region PO Box 296 15 State Street Ray Brook, NY 12977-0296 Boston, MA 02109 [email protected] [email protected] Marc Migliore Regional Permit Administrator New York State Department of Environmental Conservation, Region 5 1115 NYS Route 86 PO Box 296 Ray Brook, NY 12977-0296 [email protected] ALICE FALLS PROJECT (FERC NO. 5867-053) DISTRIBUTION LIST Captain Daniel Darrah Michael Lynch, Division Director Regional Chief Environmental Conservation New York State Office of Parks, Recreation, Officer & Historic Preservation, State Historic New York State Department of Preservation Office Environmental Conservation, Region 5 Peebles Island State Park 1115 NYS Route 86 P.O. Box 189 PO Box 296 Waterford, NY 12188-0189 Ray Brook, NY 12977-0296 [email protected] [email protected] Matthew Maraglio Captain John Streiff Coastal Review Specialist Regional Forest Ranger New York Department of State New York State Department of Office of Coastal, Local Government, and Environmental Conservation, Region 5 Community Sustainability 1115 NYS Route 86 One Commerce Plaza PO Box 296 99 Washington Avenue Ray Brook, NY 12977-0296 Albany, NY 12231-0001 [email protected] [email protected] Hon. Kathleen H. Burgess Supervisor Secretary to the Commission New York Department of State New York State Public Service Commission Division of Coastal Resources, Consistency Empire State Plaza Review Unit Agency Building 3 One Commerce Plaza Albany, NY 12223-1350 99 Washington Avenue [email protected] Albany, NY 12231-0001 James Denn Josh Clague Public Information Officer Forest Preserve Planner New York State Public Service Commission New York State Adirondack Park Agency Empire State Plaza PO Box 99 Agency Building 3 1133 NYS Route 86 Albany, NY 12223-1350 Ray Brook, NY 12977 [email protected] [email protected] Rose Harvey Tim Post Commissioner Region 5 Habitat Manager New York State Office of Parks, Recreation, New York State Department of & Historic Preservation Environmental Conservation, Region 5 Empire State Plaza 625 Broadway Agency Building 1 Albany, NY 12233-4756 Albany, NY 12238 [email protected] [email protected] ALICE FALLS PROJECT (FERC NO. 5867-053) DISTRIBUTION LIST Erin Donhauser Towns Environmental Analyst 1 New York State Department of Lynn A Jarvis Environmental Conservation, Region 5 Town Clerk 1115 NYS RTE 86 Town of Chesterfield PO Box 296 1 Vine Street Ray Brook, NY 12977 PO Box 456 [email protected] Keeseville, NY 12944 Counties Gerald Morrow Supervisor John Zurlo Town of Chesterfield County Clerk 1 Vine Street Clinton County PO Box 456 Government Center Keeseville, NY 12944 137 Margaret Street [email protected] Plattsburgh, NY 12901 [email protected] Bonnie Hopkins Town Clerk Joseph A Provoncha Town of Ausable County Clerk 111 Ausable Street Essex County Keeseville, NY 12944 County Clerk's Office & DMV [email protected] 7559 Court Street PO Box 247 Sandy Senecal Elizabethtown, NY 12932 Supervisor [email protected] Town of Ausable 111 Ausable Street Keeseville, NY 12944 Peter Hagar [email protected] District Manager Clinton County Soil and Water Tribes Conservation District 6064 Rt.
Recommended publications
  • 2 Boxes ACCESS: Open to Research ACQUISITION: PROCESSED BY: Margie Amodeo
    Constitutional Council for the Forest Preserve UC0055 1 of 1 Constitutional Council for the Forest Preserve 1966-1976 UC0055 QUANTITY: 2 boxes ACCESS: Open to research ACQUISITION: PROCESSED BY: Margie Amodeo Biographical Note: The Constitutional Council for the Forest Preserve formed in January 1966 as a coalition to be prepared challenges to Article XIV at the New York State Constitutional Convention. It was designed to serve as a liaison at the time of the Convention and in May 1968 elected to continue serving to alert organizations state-wide to a variety of concerns that related to the problems of the Forest Preserve. When the coalition was founded, officers from over fifty organizations joined along with the individual memberships were issued. Proposed changes to the constitution were bundled and voted on as a whole and rejected by every New York county. The CCFP continued to function as a group seeking to maintain Forest Preserve protection within the state constitution. As of January 1971, the Council consisted of 138 members. The officers included David Newhouse (who would also become an advisor to the TSCFA), David Sive, Arthur M. Crocker, R. Watson Pomeroy and William K. Verner. The consortium was dissolved in 1976 because as David Newhouse, CCFP Chairman, writes, “its function is now fulfilled by other organizations such as EPL and The Adirondack Council.” Any remaining funds were transferred to the Adirondack Council. Scope and Content Note: This Collection includes evidence of not only the internal discussion informing the opinions and decisions of this group of environmentalist leaders but letters and statements from members to political leaders.
    [Show full text]
  • Guidelines for Constructing Local Roads in New York's Adirondack Park Edward J
    5 Guidelines for Constructing Local Roads in New York's Adirondack Park Edward J. Kearney, New York state Department of Transportation, Albany The Adirondack Park in upstate New York contains more than 23 000 phasize that aesthetics and engineering are mutually km2 (9000 rniles2) of public and private lands. Most stote·owned land is dependent and that roads can be built that will be designated by the state constitution to remain "forever wild", and de­ operationally safe and efficient and easier and cheaper velopment of private land is closely controlled by the Adirondack Park to maintain and yet will blend attractively into the sur­ Agency, which is part of the executive branch of the state government and also has jurisdiction over construction of new municipal roads and rounding landscape. Figures 1 and 2 show examples of expansions of existing ones. Guidelines that have been developed for use good construction practices in the park, a11d Figure 3 in lieu of review of individual local road projects by the Adirondack Park shows an example of what should be avoided. Agency are presented and discussed. The guidelines are presented in Many researchers have questioned the applicability seven categories: (a) planning, (b), alignment, (c) cross section, (d) road­ of the American Association of state Highway and bed construction, (e) riding surface, (f) bridges and culverts, and (g) gen­ Transportation Officials (AASHTO) Geometric Design eral construction. Their objective is to ensure that local roads are con­ Guide for Local Roads and streets (!) and Highway De­ structed or reconstructed so that they fit harmoniously into the natural surroundings and impart the feeling of being in a park.
    [Show full text]
  • 2010 the Adirondack Park the Adirondack Park Is the Largest Park in the Contiguous Through Public Education and Advocacy for the United States
    State of the Park 2010 The Adirondack Park The Adirondack Park is the largest park in the contiguous Through public education and advocacy for the United States. It contains six million acres, covers one- protection of the Park’s ecological integrity and wild fifth of New York State and is equal in size to neighboring character, the Adirondack Council advises public and Vermont. The Adirondack Park is nearly three times the private policy makers on ways to safeguard this last size of Yellowstone National Park. remaining great expanse of open space. More than half of the Adirondack Park is private land, devoted principally to hamlets, forestry, agriculture and open-space recreation. The Park is home for 132,000 permanent and 110,000 seasonal residents, and hosts ten million visitors yearly. The remaining 45 percent of the Park is publicly owned Forest Preserve, protected as “Forever Wild” by the Lake Placid NYS Constitution since 1894. One Tupper Lake million acres of these public lands Elizabethtown are protected as Wilderness, where non-mechanized recreation may be enjoyed. The majority of the public land (more than 1.3 million acres) is Wild Forest, where motorized uses are permitted on designated waters, Indian Lake roads and trails. Old Forge Plants and wildlife abound in the Park. Old growth forests cover more than 100,000 acres of public land. The western and southern Adirondacks are gentle landscapes of Lake George hills, lakes, wetlands, ponds and streams. In the northeast are the High Peaks. Forty- three of them rise above 4,000 feet and 11 have alpine summits that rise above the timberline.
    [Show full text]
  • Hpcandvmwfpubliccomments
    This is an example of a mass email letter sent to NYSDEC. Dear Boreal UMP Comments, Thank you for the chance to comment on the High Peaks Wilderness Complex and the Vanderwhacker Mountain Wild Forest Draft Unit Management Plan Amendments. The following are my recommendations to the DEC: (1) The DEC comment period should be 90 days, not 45 days; and the hearings should be scheduled all around the state not just in Albany and Newcomb (on May 23). There are many critical management issues in these areas that require thoughtful review. (2) The parking lot proposed at the end of Gulf Brook Road, at the end of the Wild Forest corridor, 500 feet from Boreas Ponds, should be for disabled access only, through the DEC CP-3 program. The potential for "keg rolls", as occurred at Marcy Dam, is too high to allow general public parking (referred to as "universal access" in the UMP) in this area, which is surrounded by lands and waters which are to be managed as Wilderness. (3) The historic log cabin at 4 Corners should be retained, and maintained, with historic interpretive signage, and also for possible use for DEC forest ranger administrative purposes. The area surrounding the cabin should also be managed with historic interpretive signage reflecting the other structures that were there, and the rich logging history of the area. (4) There should be no parking area created at the 4 Corners. Parking should be limited to the existing lot (referred to as the Fly Brook Lot in the UMP); automobiles and other motorized vehicles should not pass beyond the gate at this lot, except for those with valid CP-3 disabled permits, accompanied by a forest ranger.
    [Show full text]
  • Adirondack Park Agency Letterhead
    NOTE: The attachments referred to herein are on file at the Agency and are on the Agency's website. Copies are also available for inspection on request. DRAFT AGENCY MINUTES AUGUST 12-13, 2010 THURSDAY, AUGUST 12, 2010 AGENCY MEMBERS, DESIGNEES AND EXECUTIVE STAFF PRESENT Curt Stiles, Chairman Richard Booth, Member Arthur Lussi, Member Frank Mezzano, Member William Thomas, Member Leilani Ulrich, Member F. William Valentino, Member Cecil Wray, Member James Fayle, Designee, NYS Department of Economic Development Elizabeth Lowe, Designee, NYS Department of Environmental Conservation Terry Martino, Executive Director John Banta, Counsel Note: Riele Morgiewicz, Designee, NYS Department of State, monitored the meeting from her office via live webcast. LOCAL GOVERNMENT REVIEW BOARD PRESENT Frederick Monroe, Executive Director AGENCY STAFF PRESENT Holly Kneeshaw, Assistant Director, Regulatory Programs Keith McKeever, Public Information Director Robert Kreider, Information Technology Specialist 2 Kathleen Regan, Associate Natural Resources Planner Mary Reardon, Secretary 1 Paul Van Cott, Associate Attorney Stephen Erman, Special Assistant for Economic Affairs Rita Quinn, Environmental Program Specialist 2 Deborah Lester, Secretary to Executive Director P.O. Box 99 • NYS Route 86 • Ray Brook, NY 12977 • 518 891-4050 • 518 891-3938 fax • www.apa.state.ny.us DRAFT AGENCY MINUTES August 12-13, 2010 Page 2 Chairman Stiles called the meeting to order at 9:02 a.m. He noted this meeting marked the first anniversary of Executive Director Terry Martino joining the Agency. He noted the absence of Department of State Designee Morgiewicz, who would be monitoring Thursday's meetings from her office via live webcast and attending Friday's meeting in person.
    [Show full text]
  • 119Opn17-Decision.Pdf
    This opinion is uncorrected and subject to revision before publication in the New York Reports. ----------------------------------------------------------------- No. 119 In the Matter of World Trade Center Lower Manhattan Disaster Site Litigation. --------------------------------- Stanislaw Faltynowicz, et al., Appellants, State of New York, Intervenor-Appellant, v. Battery Park City Authority, et al., Respondents. --------------------------------- Santiago Alvear, Appellant, State of New York, Intervenor-Appellant, v. Battery Park City Authority, Respondent. --------------------------------- Peter Curley et al., Appellants, State of New York, Intervenor-Appellant, v. Battery Park City Authority, Respondent. Andrew W. Amend, for intervenor-appellant. Luke W. Nikas, for appellants Alvear, et al. Daniel S. Connolly, for respondents. FEINMAN, J.: This matter comes to us from an order of the United States Court of Appeals for the Second Circuit certifying the following questions pursuant to Rule 500.27 of this Court: - 1 - - 2 - No. 119 "(1) Before New York State's capacity-to-sue doctrine may be applied to determine whether a State-created public benefit corporation has the capacity to challenge a State statute, must it first be determined whether the public benefit corporation 'should be treated like the State,' [(Clark-Fitzpatrick, Inc. v Long Island R.R. Co., 70 NY2d 382 [1987])], based on a 'particularized inquiry into the nature of the instrumentality and the statute claimed to be applicable to it,' [(John Grace & Co. v State Univ. Constr. Fund, 44 NY2d 84 [1978])], and if so, what considerations are relevant to that inquiry?; and "(2) Does the 'serious injustice' standard articulated in [Gallewski v H. Hentz & Co. (301 NY 164 [1950])], or the less stringent 'reasonableness' standard articulated in [Robinson v Robins Dry Dock & Repair Co.
    [Show full text]
  • The Adirondack Park at a Crossroad: a Road Map for Action
    The Adirondack Park at a Crossroad: A Road Map for Action www.AdirondackWild.org The Adirondack Park at a Crossroad: A Road Map for Action by Adirondack Wild: Friends of the Forest Preserve Part 1 – New Threats Emerge: State Government Strays from its Park Mission Copyright: Adirondack Wild: Friends of the Forest Preserve, 2015. Primary authors of Part 1 of this report are Adirondack Wild’s Staff Partners David Gibson and Dan Plumley and Consultant Dr. Michael Klemens. This team works with an editorial committee comprised of Chris Amato, Peter Brinkley, John Johanson and Ken Rimany. Particular thanks are also owed to Adelaide Camillo and Carl George for their careful reading and helpful editing. We also thank our entire Board of Directors and Advisory Council and a number of other people outside the organization for their advice and comments. We are thankful for the design talents of Jack Graber, and the production talents of Miller Printing, Amsterdam, New York. We thank Steve Signell and Frontier Spatial for the concept of the front cover design, and illustrator David Kiphuth for the inside illustration of the Park at a Crossroad. FUNDING SUPPORT The Adirondack Park at a Crossroad: A Road Map for Action is made possible by the generous financial support of the following organizations and individuals: The Bay and Paul Foundations Artwork by David Kiphuth Overhills Foundation Adirondack Wild: Friends of the Forest Preserve builds upon The Camp Fire Conservation Fund the work of hundreds of spirited men and women who have Furthermore: A program of the J.M. Kaplan Fund stood up for wilderness and the forest preserve − against tremendous odds − since 1885.
    [Show full text]
  • Silver Lake Wilderness Unit Management Plan Resolution March 9, 2006 Page 2
    New York State Department of Environmental Conservation Division of Lands and Forests SILVER LAKE WILDERNESS AREA Silver Lake Wilderness Sacandaga Primitive Area Cathead Mountain Primitive Area UNIT MANAGEMENT PLAN April 2006 GEORGE E. PATAKI, Governor DENISE M. SHEEHAN, Commissioner THIS PAGE INTENTIONALLY LEFT BLANK Silver Lake Wilderness Area Silver Lake Wilderness Sacandaga Primitive Area Cathead Mountain Primitive Area Unit Management Plan April 2006 New York State Department of Environmental Conservation Division of Lands & Forests 625 Broadway Albany, NY 12233-4254 (518) 473-9518 www.dec.state.ny.us THIS PAGE INTENTIONALLY LEFT BLANK MEMORANDUM TO: The Record FROM: Denise M. Sheehan SUBJECT: Silver Lake Wilderness Area Final Unit Management Plan (Final UMP) The Final UMP for the Silver Lake Wilderness Area Final Unit Management Plan (Final UMP) has been completed. The Final UMP is consistent with the guidelines and criteria of the Adirondack Park State Land Master Plan, the State Constitution, Environmental Conservation Law, and Department rules, regulations and policies. The Final UMP/FEIS includes management objectives and a five year budget and is hereby approved and adopted. RESOLUTION ADOPTED BY THE ADIRONDACK PARK AGENCY WITH RESPECT TO SILVER LAKE WILDERNESS, SACANDAGA PRIMITIVE AND CATHEAD MOUNTAIN PRIMITIVE AREAS UNIT MANAGEMENT PLAN March 9, 2006 WHEREAS, Section 816 of the Adirondack Park Agency Act directs the Department of Environmental Conservation to develop, in consultation with the Adirondack Park Agency, individual
    [Show full text]
  • China Protected Areas Leadership Alliance Project
    China Protected Areas Leadership Alliance Project Strengthening Leadership Capacity for Effective Management of China’s Protected Areas YEAR III A partnership of the China State Forestry Administration The Nature Conservancy China Program East-West Center 10 May—8 June 2010 Table of Contents Executive Summary………………………………………………………………………………….…..…1 Map of China Model National Nature Reserves ………………………………………………………...…5 Descriptions of China’s 51 Model National Nature Reserves…………………………………..….………7 Training Needs for Protected Area Managers……………………………………………………….….…..20 Year III Participants……………….…………..………………………………………………….………...22 Participant Contact Information………………………………………………..…………….…….…….....31 Classroom Training Schedule, Beijing Forestry University ….……………………………………...…….34 Overview of Field Study and Collaborative Learning Component………......……………….……..…..….36 Map of U.S. Study Tour……………………….………………………………………………………..…..41 U.S. Field Study Agenda………………………………………………………………………...….………43 U.S. Field Study Organizations & Speakers……………………………………………….………..……...58 U.S. Field Study Speaker Contact Information……………………………………………………………..81 Project Staff ……………………………………….……………………………………………………......87 Project Staff Contact Information……………………………………………………………………….......90 Executive Summary Protection of the natural and cultural heritage of China depends on the effective management of the nation’s protected areas. The Government of China has set aside fifteen percent of its land as “protected areas,” including nature reserves and national parks. These protected
    [Show full text]
  • Land Regulation at Fire Island National Seashore
    National Park Service U.S. Department of the Interior Planning, Construction and Facility Management Thanks,Northeast Tina,Region for coordinating this. LAND REGULATION AT FIRE ISLAND NATIONAL SEASHORE A HISTORY AND ANALYSIS, 1964-2004 FIRE ISLAND NATIONAL SEASHORE SPECIAL HISTORY STUDY LAND REGULATION AT FIRE ISLAND NATIONAL SEASHORE A HISTORY AND ANALYSIS, 1964-2004 NED KAUFMAN & CHARLES STARKS PREPARED UNDER COOPERATIVE AGREEMENT WITH THE NIVERSITY OF ASSACHUSETTS U M NORTHEAST REGION NATIONAL PARK SERVICE U.S. DEPARTMENT OF THE INTERIOR SEPTEMBER 2008 Table of Contents List of Figures .................................................................................................................................v List of Tables……………………………………………………………………………………...v Executive Summary and Research Findings (Kaufman & Starks) .......................................... vii Introduction (Kaufman) ………………………………………………………………………….1 Study Methodology………………………………………………………………………….2 Chapter One: Origins, Goals, and Methods of Land Use Regulation at Fire Island………...5 (Kaufman) Fire Island in 1964…………………………………………………………………………….……5 Changing Concepts of Parks…………………………………………………………………..……...…….9 Fire Island Is Established…………………………………………………………………………….……......11 Defining the Seashore’s Public Purpose: Conservation or Recreation………………………….……......12 Public Support for the Seashore…………...………………………………………..…………………..27 Private Property within the Seashore.………………………………………………………………………..45 Figures to Chapter One...…………………………………………………………….…………72 Chapter Two: The
    [Show full text]
  • FY 2018 NYS Executive Budget Financial Plan
    FY 2018 Capital Program and Financing Plan Andrew M. Cuomo, Governor Robert F. Mujica Jr., Budget Director Table of Contents Introduction ................................................................................................................................................. 1 Reporting on State Debt ..................................................................................................................... 2 For More Information ............................................................................................................................ 2 Executive Summary ................................................................................................................................. 5 FY 2018 Capital Spending Disbursements and Financing Sources ........................................ 5 Capital and Debt At-A-Glance ........................................................................................................... 6 FY 2018 Capital Plan ............................................................................................................................ 7 Use of Monetary Settlements .......................................................................................................... 12 Capital Projects Spending Overview ............................................................................................. 18 Debt Outstanding ................................................................................................................................ 18 Debt Issuances ...................................................................................................................................
    [Show full text]
  • New York State Department of State
    March 8, 2017 DEPARTMENT OF STATE Vol. XXXIX Division of Administrative Rules Issue 10 NEW YORK STATE REGISTER INSIDE THIS ISSUE: D Residential Treatment Facility Designation D Residential Health Care Facility Quality Pool D Uniform Code of Bridge Inspection State agencies must specify in each notice which proposes a rule the last date on which they will accept public comment. Agencies must always accept public comment: for a minimum of 45 days following publication in the Register of a Notice of Proposed Rule Making, or a Notice of Emergency Adoption and Proposed Rule Making; and for 30 days after publication of a Notice of Revised Rule Making, or a Notice of Emergency Adoption and Revised Rule Making in the Register. When a public hearing is required by statute, the hearing cannot be held until 45 days after publication of the notice, and comments must be accepted for at least 5 days after the last required hearing. When the public comment period ends on a Saturday, Sunday or legal holiday, agencies must accept comment through the close of business on the next succeeding workday. For notices published in this issue: – the 45-day period expires on April 22, 2017 – the 30-day period expires on April 7, 2017 ANDREW M. CUOMO GOVERNOR ROSSANA ROSADO SECRETARY OF STATE NEW YORK STATE DEPARTMENT OF STATE For press and media inquiries call: (518) 474-0050 For State Register production, scheduling and subscription information call: (518) 474-6957 E-mail: [email protected] For legal assistance with State Register filing requirements call: (518) 474-6740 E-mail: [email protected] The New York State Register is now available on-line at: www.dos.ny.gov/info/register.htm The New York State Register (ISSN 0197 2472) is published weekly.
    [Show full text]