2.ERMC Experiences Updated2018

Total Page:16

File Type:pdf, Size:1020Kb

2.ERMC Experiences Updated2018 9. Overall Experiences of ERMC Value of Professional Work Phase S.N. Project Title Location Detail Client/ Finance Period Services NRs. (Months) (Million) FS ES EIA IEE SI SES- GIS CPD DED BDT SM CA TRN 9.1 Transport Sector 9.1.1 Highways, Hill Roads, Green Roads, etc. International Projects 1 Program Management and Institutional Strengthening (PMIC) CS/02, Loan Yerevan Municipality, ADB/SWEROAD April 2012 to July 21 20 No. 2752 ARM (Sustainable Urban Development Investment Program- Republic of Armenia 2015 Project 1), Yarevan Development Project, Yerevan Municipality 2 Road Safety Consultancy Services for TA-8027 REG: South Asia Road Nepal and Bhutan ADB Manila January- 12 10 Safety Programme (Phase 1: Kingdom of Bhutan and Nepal) (45281-001) December 2013 National Projects 1 Road Improvement Project Phase III (Ranke-Rabi Bhendetar Road - 90km Central and Eastern Department of Roads December 2015 565 28.76 and Charikot-Tamakoshi-Jiri Road - 55km) Contract No.: RIP-IIII/3371334/CS- Development Region of to November 001/71/72) Nepal 2020 2 Feasibility Study, Detailed Engineering Survey, Design and Preparation of Nepal Department of Roads, Foreign August 2016 to 88.5 54.06 DPR, Environmental and Social Study for Improvement of Double Lane Cooperation Branch November 2017 Bituminous Standard, Contract Packaging and Preparation of Bidding Documents of: 1. Kohalpur-Surkhet (Bangesimal) Road (Ratna Highway, H012) and Butwal-Pokhara Road Section (Siddhartha Highway, H10) 3 Kathmandu Sustainable Urban Transport Project: Design and Supervision Kathmandu, Nepal KSUTP / ADB June 2016 to 141 32.78 Consultant for various works under KSUTP (DSC-KSUTP) July 2017 4 Central and Eastern NIRTTP, Foreign Cooperation March 2015 to 50.5 18.1 Environmental and Social Study for Kathmandu (Nagdhunga) Naubise Development Region of Branch, DoR / World Bank February 2018 Mugling and Kakarbhitta - Pathalaiya Section Road and Bridges Nepal 5 Bajura and Achhham DoR, Planning Monitoring and June 2017 to 6 6.86 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) Districts Evaluation Unit November 2017 of 6 Roads (Total 112km), Contract No. PMEU/337159/073/74 DPR-33) 6 Baitadi, Dadeldhura, DoR, Planning Monitoring and June 2017 to 6 6.98 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) Bajura, Jhapa, Sindhuli Evaluation Unit November 2017 of 7 Roads (Total 120km), Contract No. PMEU/337159/073/74 DPR-23) and Ramechhap Districts 7 National Rural and Renewable Energy Programme (NRREP): Impact Study Nepal Alternative Energy Promotion March 2017 to 4 1.55 of Community Electrification RFP # AEPC/NRREP/CESC/2073/74-14: Centre (AEPC) June 2017 Professional Indemnity Insurance 8 Monitoring and Evaluation of Road Maintenance Works Executed by Road Nepal Road Board Nepal, World Bank August 2017- 3.5 0.1 Agencies November 2017 9 Manang, Mustang, Dolpa Department of Roads July 2017 to 5 1.74 Feasibility Study and Report Preparation of Manang - Mustang - Dolpa - and Jumla Districts of November 2017 Jumla Road (PMEU/337362/073/74 F-1) Nepal 10 Feasibility Study of Roads: i. Seti Lokmarg (Tikapur Bauniya Khanda), Kailali Kailali and Baitadi District Department of Roads April 2014 to 2 0.39 (18km), ii) Dasharathchanda 3 Sunnakhan Chenejarga Ringroad, Baitadi May 2014 (15km) (P18-PMEU-070/71) ERMC (P.) Ltd. 19 Value of Professional Work Phase S.N. Project Title Location Detail Client/ Finance Period Services NRs. (Months) (Million) FS ES EIA IEE SI SES- GIS CPD DED BDT SM CA TRN 11 To Support and Assist Department of Local Development (DoLIDAR) for the Kathmandu, Nepal (38 RRRSDP-2, DoLIDAR. MoFLD, August 2013 to 76 113 Preparation of follow on Project of Rural Reconstruction abd Rehabilitation Rural Districts) Nepal October 2014 Sector Development Program (RRRSDP)-2 (Prioritization of Road, Feasibility Study, SIA/IEE and Detailed Design, Cost Estimate, Preparation of Investment Plan and Preparation of Contract Documents and Project appraisal Documents for approx 1100 km roads and 35 bridges. 12 Consulting Services for Project Preparatory Consultant 1 for Road Nepal Department of Roads, Project November 2011- 363 226 Component (PPC1-Road) of Transport Project Preparatory Facility (TPPF), Directorate (ADB) September 2013 ADB Grant No. 0227 – NEP 13 Sustainability Study of Infrastructure Sub-Projects Implemented in PAF All over the country PAF/World Bank Dec 2011-March 18 1.50 Assisted Districts 2012 14 Dry Season Road Consultant, Feasibility Study, Detailed Design and Surkhet, Pyuthan, Gulmi, RAIDP/DoLIDAR /World Bank December 2011- 366 49.3 Construction Supervision of Road (140 km) (IDA Grant No: H525-NEP& Salyan, Rasuwa, Kaski and December 2013 Credit No.: 4664) Udayapur District 15 Preparation of Detailed Project Report of North South Highway (Koshi Sankhuwasawa and Asset Management, Contract July-December 9 1.7 Rajmarga-150km, Khandbari-Kimathanka-40km, Tamakoshi-Lamabager Dolakha Districts Management and Quality Control 2011 Road, 33 km)(P2) Project, Department of Roads 16 Consulting Services for Supporting Implementation of Environment PAF districts of Nepal PAF, Kamalpokhari/World Bank February 2011- Framework in Programme Districts (i) EMF Orientation Training, (ii) March 2012 Monitoring and Evaluation of Sub-Projects, (iii) Feeding, Maintaining and 75 9.55 Organizing Environmental Information in MIS, (iv) IEE of Sub-Projects, (v) Revision/Improvement in EMF and Environmental Guideline, (vi) Special Environmental Studies/Cumulative Environmental Studies 17 Monitoring and Evaluation of Road Maintenance Works Executed by Road Nepal Road Board Nepal, World Bank August 2010-July 5 1.34 Agencies 2011 18 Environment Impact Assessment (EIA) of Num-Kimanthanka Road (72 km) Sankhuwasava DOR/GESU Sept 2010-Sept 15 1.10 of North South (Koshi) Highway (GESU/NS (KH)-01/066/067) 2011 19 Traffic, surface Distress and Road Roughness Surveys of Strategic Road Nepal DOR, HMIS March 2009 to 14 4 Network (SRN) November 2009 20 Dolakha District Upper Tamakoshi Hydroelectric January 2009 to 94 15 Construction Supervision of Upgrading of Dolakha-Singati Section of Road Project, Uper Tamakoshi January 2011 (construction of 35 km Road and 22m span Gamu Khola Motorable Bridge) Hydropower Limited 21 Detail Survey, Design and Cost Estimate of Mid Hill Highway-36km (Dailekh- Dailekh District DOR, Mid-Hill Highway May-July 2009 9 1 Dullu), Package-18 22 Detail Survey, Design and Cost Estimate of Mid Hill Highway-36km (Dailekh- Dailekh District DOR, Mid-Hill Highway May-July 2009 9 1 Dullu), Package-19 23 Survey, Design, Management and Supervision of Rural Road Construction of Dailekh District Rural Access Program Phase- February 2009- 346 28.67 Ramghat- Singashen (14.6 km), Desigade-Mahabu (12.5 km) and Chupra- 2/DFID (Contract No-RAP-2008- June 2012 Meheltoli (19 km) Road Project, Dailekh District 017-Dailekh) 24 Survey, Design, Management and Supervision of Rural Road Construction of Terathum District Rural Access Program Phase- February 2009- 373 20.23 Myanglung-Sankranti Bazaar (68 km) Road Project, Terathum District 2/DFID (Contract No-RAP-2008- May 2012 021-Terathum) ERMC (P.) Ltd. 20 Value of Professional Work Phase S.N. Project Title Location Detail Client/ Finance Period Services NRs. (Months) (Million) FS ES EIA IEE SI SES- GIS CPD DED BDT SM CA TRN 25 Engineering Services for the Implementation of Road Construction Activities Salyan, Pyuthan and GTZ/PASRA Lalitpur January 2009 to 93 4.5 in Salyan, Pyuthan and Jajarkot districts for Poverty Allevation Programme in Jajarkot Districts July 2009 Selected Rural Areas (PASRA). Survey, Design and Construction Supervision and social Mobilisation of Marke-Rampur Road (2.2 km section) Salyan, 26 Central Implementation Support Consultant (CISC) for Rural Kathmandu, Nepal (38 RRRSDP, DoLIDAR ((ADB Grant December 08 to 518 129 Reconstruction abd Rehabilitation Sector Development Program (RRRSDP) Rural Districts) No: 0093-NEP (SF)) December 013 27 Detailed Engineering Design, IEE and Construction Supervision for Kathmandu Metropiltan Kathmandu Metropolitan City, Oct 2007 to 31 5.62 Upgrading of Bisnumati Link Road of UEIP Kathmandu Metropolitan City City, Kathmandu UEIP/ADB Loan-1966-NEP (SF) February 2009 28 Initial Environmental Examination (IEE) Study of Terai Roads, a) MRM- Dhanusha District DOR/GESU May 2008 to 15 0.93 Birendra Bazar–Yadukuwa– Mahinathpur (42 km) b) Janakpur – Yadukuwa ( December 2008 15 km) and c) Janakpur – Jatahi (18 km) in Dhanusha District 29 Environmental Assessment of Community Group Sub-Projects in Programme Darhula, Mugu, Pyuthan, PAF, Chakupat/World Bank July 2005 to District (Darhula, Mugu, Pyuthan, Kapilbastu, Ramechhap and Siraha), (a) Kapilbastu, Ramechhap September 2009 Monitoring and Evaluation of Sub-projects, (b) Training Program for and Siraha 100 12.00 Environment and Social Assessment, (c) IEE/ EIA of Sub-projects, (d) Review and Appraisal for Environmental and Social Assessment of Sub-project. 30 Pre-Feasibility Study of Mid Hill Road, Musikot-Chaurjhari-Jajarkot-Meheltoli- Jajarkot and Dailekh DoR, Planning Branch June-July 2008 10 0.68 Dailekh Road (215 Km) District 31 Detailed Survey, Design and Cost Estimate of Sundarijal 8-Mahankal- DDC, Kathmandu DDC February-April 5 0.15 Mulkharka Okhreni-Chisapani Road (10 km) 2008 32 Detailed Survey, Design and Cost Estimate of Patan-Pancheswor Road DRILP, Baitadi DRILP-DDC Baitadi January- Feb 5 0.20 (3+050 - 6+100), Baitadi 2008 33 Environmental
Recommended publications
  • Terms of References for Preparation of the Detailed Project Proposal For
    Terms of References for Preparation of the Detailed Project Proposal for the implementation of intensive value chain development program of vegetable and fruits in the 13 selected North-South road corridor of Nepal 1. Background Agriculture is the major contributing sector in national economy and this is possible by increasing production and productivity of crops, vegetables and fruits. Increasing agriculture productivity is also necessary for enhancing food security and is possible only when we can develop the value chain of fruits and vegetables. Therefore, it is utmost necessary to develop value chain of fruits and vegetables to increase market potentiality and comparative advantage. Government of Nepal has given priority for the value chain development in agriculture through the budget speech and it was clearly mentioned in the agriculture sector transformation guideline 2075 implementation action plan issued by the Ministry of Agriculture and Livestock development. With the increasing commercialization of agricultural, especially fruits and vegetables has been given high priority by many development agencies including government, non-government, private and donor agencies. Various agencies are promoting fruits and vegetable value chain in the various road corridor of the Nepal. But a consolidated and comprehensive project proposal has not been prepared so far for the implementation of intensive value chain development program of fruits and vegetables in the potential north-south road corridor in Nepal. Keeping in this in view and according to the approved annual program of Center for Agricultural Infrastructure Development and Mechanization Promotion (CAIDMP) for the fiscal year 2075/76, it is targeted to prepare Detailed Project Proposal for the implementation of intensive value chain development program of vegetable and fruits in the 13 selected North-South road corridor of Nepal Accordingly, it is also planned to prepare detail project proposal through consultancy service according to the related acts and rules of Nepal.
    [Show full text]
  • Water Resources of Nepal in the Context of Climate Change
    Government of Nepal Water and Energy Commission Secretariat Singha Durbar, Kathmandu, Nepal WATER RESOURCES OF NEPAL IN THE CONTEXT OF CLIMATE CHANGE 2011 Water Resources of Nepal in the Context of Climate Change 2011 © Water and Energy Commission Secretariat (WECS) All rights reserved Extract of this publication may be reproduced in any form for education or non-profi t purposes without special permission, provided the source is acknowledged. No use of this publication may be made for resale or other commercial purposes without the prior written permission of the publisher. Published by: Water and Energy Commission Secretariat (WECS) P.O. Box 1340 Singha Durbar, Kathmandu, Nepal Website: www.wec.gov.np Email: [email protected] Fax: +977-1-4211425 Edited by: Dr. Ravi Sharma Aryal Mr. Gautam Rajkarnikar Water and Energy Commission Secretariat Singha Durbar, Kathmandu, Nepal Front cover picture : Mera Glacier Back cover picture : Tso Rolpa Lake Photo Courtesy : Mr. Om Ratna Bajracharya, Department of Hydrology and Meteorology, Ministry of Environment, Government of Nepal PRINTED WITH SUPPORT FROM WWF NEPAL Design & print : Water Communication, Ph-4460999 Water Resources of Nepal in the Context of Climate Change 2011 Government of Nepal Water and Energy Commission Secretariat Singha Durbar, Kathmandu, Nepal 2011 Water and its availability and quality will be the main pressures on, and issues for, societies and the environment under climate change. “IPCC, 2007” bringing i Acknowledgement Water Resource of Nepal in the Context of Climate Change is an attempt to show impacts of climate change on one of the important sector of life, water resource. Water is considered to be a vehicle to climate change impacts and hence needs to be handled carefully and skillfully.
    [Show full text]
  • Pre-Feasibility Report for Irrigation Project of Kosi-Mechi Intrastate Link Project (Cca 214812 Ha) for Providing Irrigation Facilities in Four Districts of Bihar
    PRE-FEASIBILITY REPORT FOR IRRIGATION PROJECT OF KOSI-MECHI INTRASTATE LINK PROJECT (CCA 214812 HA) FOR PROVIDING IRRIGATION FACILITIES IN FOUR DISTRICTS OF BIHAR 1.0 EXECUTIVE SUMMARY The proposed Irrigation Project of Kosi-Mechi Intrastate Link Project (CCA 214812 Ha) is for providing irrigation facilities in four districts (Araria, Purnea, Kishanganj and Katihar) of Bihar. The objective of the project is to increase the irrigation facilities in four districts of Bihar. The applicant is seeking prior environmental clearance from EAC from the MOEFCC, New Delhi. The Form-I and PFR is prepared by Centre for Envotech & Management Consultancy Pvt. Ltd. (NABET Accredited Consultant QCI No. 20. a. SALIENT FEATURES OF THE PROJECT Location of Project The proposed link command (Culturable Command Area) comprising 214812 ha (2.15 lakh ha) is falling in Araria, Purnea, Kishanganj and Katihar districts of Bihar. The link canal traverses towards Lat. 260 14′ 27″ N & Long. 87º 22' 00" to Lat. 26º 21' 47"N & Long. 870 57′ 23″ E. The link canal forms its northern boundary while river Parman and river Mahananda form the western and eastern boundaries. In south it is spread upto river Ganga. Existing Hanuman Nagar Barrage Geographical Location is Lat. 26°11'00"N & Long. 860 54' 00"E. Location Map is enclosed as Annexure-I General Feature of Project The existing alignment of EKMC from Reduced along with Latitude and Distance (RD) 0.00 km to RD 41.30 km is proposed to Longitude be utilised unchanged with remodelling. The New proposed canal from EKMC RD 41.30 km to outfall Point in Mechi (RD 117.500 km) Beyond the EKMC tail end RD 41.30 km, the link canal traverses towards south–east direction upto RD 53.156 km.
    [Show full text]
  • Federal Democratic Republic of Nepal
    FEDERAL DEMOCRATIC REPUBLIC OF NEPAL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT FEDERAL DEMOCRATIC REPUBLIC OF NEPAL NEPAL AGRICULTURE RESEARCH COUNCIL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT NEPAL AGRICULTUREPREPARATORY RESEARCH SURVEY COUNCIL ON JICA'S COOPERATION PROGRAM FOR AGRICULTUREPREPARATORY AND RURAL SURVEY DEVELOPMENT IN NEPALON JICA'S COOPERATION PROGRAM - FOODFOR AGRICULTURE PRODUCTION ANDAND AGRICULTURERURAL DEVELOPMENT IN TERAI - IN NEPAL - FOOD PRODUCTION AND AGRICULTURE IN TERAI - FINAL REPORT MAIN REPORT FINAL REPORT MAIN REPORT OCTOBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY OCTOBER(JICA) 2013 JAPAN INTERNATIONALNIPPON KOEI COOPERATION CO., LTD. AGENCY VISION AND SPIRIT(JICA) FOR OVERSEAS COOPERATION (VSOC) CO., LTD. NIPPON KOEI CO., LTD. C.D.C. INTERNATIONAL CORPORATION VISION AND SPIRIT FOR OVERSEAS COOPERATION (VSOC) CO., LTD. 4R C.D.C. INTERNATIONAL CORPORATION JR 13 - 031 FEDERAL DEMOCRATIC REPUBLIC OF NEPAL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT FEDERAL DEMOCRATIC REPUBLIC OF NEPAL NEPAL AGRICULTURE RESEARCH COUNCIL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT NEPAL AGRICULTUREPREPARATORY RESEARCH SURVEY COUNCIL ON JICA'S COOPERATION PROGRAM FOR AGRICULTUREPREPARATORY AND RURAL SURVEY DEVELOPMENT IN NEPALON JICA'S COOPERATION PROGRAM - FOODFOR AGRICULTURE PRODUCTION ANDAND AGRICULTURERURAL DEVELOPMENT IN TERAI - IN NEPAL - FOOD PRODUCTION AND AGRICULTURE IN TERAI - FINAL REPORT MAIN REPORT FINAL REPORT MAIN REPORT OCTOBER 2013 JAPAN INTERNATIONAL
    [Show full text]
  • 2.3 Nepal Road Network
    2.3 Nepal Road Network Overview Primary Roads in Nepal Major Road Construction Projects Distance Matrix Road Security Weighbridges and Axle Load Limits Road Class and Surface Conditions Province 1 Province 2 Bagmati Province Gandaki Province Province 5 Karnali Province Sudurpashchim Province Overview Roads are the predominant mode of transport in Nepal. Road network of Nepal is categorized into the strategic road network (SRN), which comprises of highways and feeder roads, and the local road network (LRN), comprising of district roads and Urban roads. Nepal’s road network consists of about 64,500 km of roads. Of these, about 13,500 km belong to the SRN, the core network of national highways and feeder roads connecting district headquarters. (Picture : Nepal Road Standard 2070) The network density is low, at 14 kms per 100 km2 and 0.9 km per 1,000 people. 60% of the road network is concentrated in the lowland (Terai) areas. A Department of Roads (DoR’s) survey shows that 50% of the population of the hill areas still must walk two hours to reach an SRN road. Two of the 77 district headquarters, namely Humla, and Dolpa are yet to be connected to the SRN. Page 1 (Source: Sector Assessment [Summary]: Road Transport) Primary Roads in Nepal S. Rd. Name of Highway Length Node Feature Remarks N. Ref. (km) No. Start Point End Point 1 H01 Mahendra Highway 1027.67 Mechi Bridge, Jhapa Gadda chowki Border, East to West of Country Border Kanchanpur 2 H02 Tribhuvan Highway 159.66 Tribhuvan Statue, Sirsiya Bridge, Birgunj Connects biggest Customs to Capital Tripureshwor Border 3 H03 Arniko Highway 112.83 Maitighar Junction, KTM Friendship Bridge, Connects Chinese border to Capital Kodari Border 4 H04 Prithvi Highway 173.43 Naubise (TRP) Prithvi Chowk, Pokhara Connects Province 3 to Province 4 5 H05 Narayanghat - Mugling 36.16 Pulchowk, Naryanghat Mugling Naryanghat to Mugling Highway (PRM) 6 H06 Dhulikhel Sindhuli 198 Bhittamod border, Dhulikhel (ARM) 135.94 Km.
    [Show full text]
  • River Culture in Nepal
    Nepalese Culture Vol. XIV : 1-12, 2021 Central Department of NeHCA, Tribhuvan University, Kathmandu, Nepal DOI: https://doi.org/10.3126/nc.v14i0.35187 River Culture in Nepal Kamala Dahal- Ph.D Associate Professor, Patan Multipal Campus, T.U. E-mail: [email protected] Abstract Most of the world civilizations are developed in the river basins. However, we do not have too big rivers in Nepal, though Nepalese culture is closely related with water and rivers. All the sacraments from birth to the death event in Nepalese society are related with river. Rivers and ponds are the living places of Nepali gods and goddesses. Jalkanya and Jaladevi are known as the goddesses of rivers. In the same way, most of the sacred places are located at the river banks in Nepal. Varahakshetra, Bishnupaduka, Devaghat, Triveni, Muktinath and other big Tirthas lay at the riverside. Most of the people of Nepal despose their death bodies in river banks. Death sacrement is also done in the tirthas of such localities. In this way, rivers of Nepal bear the great cultural value. Most of the sacramental, religious and cultural activities are done in such centers. Religious fairs and festivals are also organized in such a places. Therefore, river is the main centre of Nepalese culture. Key words: sacred, sacraments, purity, specialities, bath. Introduction The geography of any localities play an influencing role for the development of culture of a society. It affects a society directly and indirectly. In the beginning the nomads passed their lives for thousands of year in the jungle.
    [Show full text]
  • 38349-031: South Asia Subregional Economic Cooperation Airport
    Initial Environmental Examination August 2020 NEP: South Asia Subregional Economic Cooperation Airport Capacity Enhancement Project - Gautam Buddha Airport Prepared by the Ministry of Culture, Tourism and Civil Aviation, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 8 July 2020) Currency unit – Nepalese rupee (NPR) NPR1.00 = $ 0.008370 $1.00 = NPR 119.48 ABBREVIATIONS ACEP - Airport Capacity Enhancement Project ADB - Asian Development Bank BOQ - Bill of Quantities CAAN - Civil Aviation Authority of Nepal CSC - Construction Supervision Consultant DoA - Department of Archaeology EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMoP - Environmental Monitoring Plan EPA - Environmental Protection Act GBA - Gautam Buddha Airport GoN - Government of Nepal GRM - Grievance Redress Mechanism GRC - Grievance Redress Committee IEE - Initial Environmental Examination IFC EHS - International Finance Corporation Environmental Health and Safety ITB - International Terminal Building MoFE - Ministry of Forests and Environment MoPE - Ministry of Population and Environment OHS - Occupational Health and Safety PPC - Project Preparatory Consultant PMU - Project Management Unit PPEs - Personal Protective Equipment/s PPTA - Project Preparation Technical Assistance REA - Rapid Environmental Assessment SASEC - South Asia Subregional Economic Cooperation SEMR - Semi-annual Environmental Monitoring Report SPS - Safeguards Policy Statement (ADB) TIA - Tribhuvan International Airport WHO - World Health Organization WEIGHTS AND MEASURES ºC - degree Celcius cm - centimeter dBA - decibels A km - km ppm - parts per million GLOSSARY Bikram Sambat (B. S.) – Nepalese calendar year that runs from mid-April to mid-April. Unless otherwise stated, year ranges written in the form 2015/016 denote a single calendar year. NOTES i.) The fiscal year (FY) of the Government ends on 15 July.
    [Show full text]
  • Table of Province 05, Preliminary Results, Nepal Economic Census
    Number of Number of Persons Engaged District and Local Unit establishments Total Male Female Rukum East District 1,020 2,753 1,516 1,237 50101PUTHA UTTANGANGA RURAL MUNICIPALITY 276 825 501 324 50102SISNE RURAL MUNICIPALITY 464 1,164 620 544 50103BHOOME RURAL MUNICIPALITY 280 764 395 369 Rolpa District 5,096 15,651 8,518 7,133 50201SUNCHHAHARI RURAL MUNICIPALITY 302 2,231 1,522 709 50202THAWANG RURAL MUNICIPALITY 244 760 362 398 50203PARIWARTAN RURAL MUNICIPALITY 457 980 451 529 50204SUKIDAHA RURAL MUNICIPALITY 408 408 128 280 50205MADI RURAL MUNICIPALITY 407 881 398 483 50206TRIBENI RURAL MUNICIPALITY 372 1,186 511 675 50207ROLPA MUNICIPALITY 1,160 3,441 1,763 1,678 50208RUNTIGADHI RURAL MUNICIPALITY 560 3,254 2,268 986 50209SUBARNABATI RURAL MUNICIPALITY 882 1,882 845 1,037 50210LUNGRI RURAL MUNICIPALITY 304 628 270 358 Pyuthan District 5,632 22,336 12,168 10,168 50301GAUMUKHI RURAL MUNICIPALITY 431 1,716 890 826 50302NAUBAHINI RURAL MUNICIPALITY 621 1,940 1,059 881 50303JHIMARUK RURAL MUNICIPALITY 568 2,424 1,270 1,154 50304PYUTHAN MUNICIPALITY 1,254 4,734 2,634 2,100 50305SWORGADWARI MUNICIPALITY 818 2,674 1,546 1,128 50306MANDAVI RURAL MUNICIPALITY 427 1,538 873 665 50307MALLARANI RURAL MUNICIPALITY 449 2,213 1,166 1,047 50308AAIRAWATI RURAL MUNICIPALITY 553 3,477 1,812 1,665 50309SARUMARANI RURAL MUNICIPALITY 511 1,620 918 702 Gulmi District 9,547 36,173 17,826 18,347 50401KALI GANDAKI RURAL MUNICIPALITY 540 1,133 653 480 50402SATYAWOTI RURAL MUNICIPALITY 689 2,406 1,127 1,279 50403CHANDRAKOT RURAL MUNICIPALITY 756 3,556 1,408 2,148
    [Show full text]
  • Abbreviation and Acronyms
    Assessment of Hydropower Potential of Nepal Final Report Abbreviation and Acronyms AHEP : Available Gross Hydroelectricity Potential ASTER : Advance Spaceborne Thermal Emission and Reflection Radiometer AMF : Average Monthly Flow APHRODITE : Asian Precipitation Highly Resolved Observational Data Integration Towards Evaluation B : Breadth BCDP : Building Code Development Project B/C : Benefit-Cost Ratio BoQ : Bill of Quantities CAR : Catchment Area Ratio CCT : Central Churia Thrust CFRD : Concrete Faced Rock Fill Dam COD : Commercial Operation Date DCF : Discounted Cash Flow DEM : Digital Elevation Model DHM : Department of Hydrology & Meteorology DMG : Department of Mines & Geology DoED : Department of Electricity Development d/s : Downstream E : East EIA : Environmental Impact Assessment EMI : Equal Monthly Installment ESA : European Space Agency ESRI : Environmental System Research Institute EU-DEM : European Union Digital Elevation Model FDC : Flow Duration Curve WECS i Assessment of Hydropower Potential of Nepal Final Report GHEP : Gross Hydroelectricity Potential GIS : Geographic Information System GLOF : Glacial Lake Outburst Flood GoN : Government of Nepal GPS : Global Positioning System GWh : Giga Watt-Hour H : Height ha : Hectares HEC-HMS : Hydrologic Engineering Center-Hydrologic Modeling System HFL : High Flood Level HFT : Himalayan Frontal Thrust HPP : Hydropower Project HRU : Hydrological Response Unit ICOLD : International Commission on Large Dams ICIMOD : International Center for Integrated Mountain Development IDC : Interest
    [Show full text]
  • Leaving No One Behind in the Health Sector an SDG Stocktake in Kenya and Nepal
    Report Leaving no one behind in the health sector An SDG stocktake in Kenya and Nepal December 2016 Overseas Development Institute 203 Blackfriars Road London SE1 8NJ Tel. +44 (0) 20 7922 0300 Fax. +44 (0) 20 7922 0399 E-mail: [email protected] www.odi.org www.odi.org/facebook www.odi.org/twitter Readers are encouraged to reproduce material from ODI Reports for their own publications, as long as they are not being sold commercially. As copyright holder, ODI requests due acknowledgement and a copy of the publication. For online use, we ask readers to link to the original resource on the ODI website. The views presented in this paper are those of the author(s) and do not necessarily represent the views of ODI. © Overseas Development Institute 2016. This work is licensed under a Creative Commons Attribution-Non-Commercial Licence (CC BY-NC 4.0). Cover photo: A mother brings her child to be vaccinated for TB during routine vaccinations at a district public health office, immunisation clinic, Pokhara, Nepal. © Jim Holmes for AusAID. Acknowledgements This report has been contributed to and written by an international and multidisciplinary team of researchers comprising: Tanvi Bhatkal, Catherine Blampied, Soumya Chattopadhyay, Maria Ana Jalles D’Orey, Romilly Greenhill, Tom Hart, Tim Kelsall, Cathal Long, Shakira Mustapha, Moizza Binat Sarwar, Elizabeth Stuart, Olivia Tulloch and Joseph Wales (Overseas Development Institute), Alasdair Fraser and Abraham Rugo Muriu (independent researchers in Kenya), Shiva Raj Adhikari and Archana Amatya (Tibhuvan University, Nepal) and Arjun Thapa (Pokhara University, Nepal). We are most grateful to all the interview participants we learnt from during the course of the work and to the following individuals for their support and facilitation of the research process: Sarah Parker at ODI.
    [Show full text]
  • Department of Roads
    His Majesty’s Government of Nepal Ministry of Works and Transport Department of Roads Nov ‘99 Number 12 HMIS News Highway Management Information System, Planning Branch, DOR Traffic Database New Director General in DoR Maintenance and Rehabilitation Coordination Unit (MRCU) Mr. Ananda Prasad Khanal took charge as the Director General st has developed a database application for storing and processing of Department of Roads on 1 November 1999. Before that he traffic data obtained from Automatic Logger and Manual traffic was working as Deputy Director General, Planning Branch. count conducted every year by the Planning Branch. This database is useful in maintaining the data systematically. It Mr. Ananda Prasad Khanal did the Bachelor in Civil eliminates the tradition of keeping data in spreadsheet instead Engineering from Indian Institute of Technology (I.I.T) of in Access. This database is not the substitute of the software Bombay in 1968. He joined the Department of Roads in 1968 dROAD6 installed in the Highway Management Information and has been working since then. He had worked as assistant System (HMIS). engineer, divisional engineer, zonal engineer, Regional director, Project director of ADB Project Directorate Office The design of this database uses Microsoft Access 97 software and DDG of Planning Branch. He has visited several countries and incorporates Access 2000. Minimum hardware and has vast and diverse experience in the field of road requirements are a Pentium processor, 16Mb of Ram (32 MB construction, maintenance and planning. Preferred), and 1.5 MB of spare storage capacity. The database can be accessed through a straightforward menu system that is All the staffs of DoR congratulate him in his new appointment displayed in the following format.
    [Show full text]
  • Beyond Hydropower: Towards an Integrated Solution for Water, Energy and Food Security in South Asia
    International Journal of Water Resources Development ISSN: 0790-0627 (Print) 1360-0648 (Online) Journal homepage: https://www.tandfonline.com/loi/cijw20 Beyond hydropower: towards an integrated solution for water, energy and food security in South Asia Golam Rasul, Nilhari Neupane, Abid Hussain & Binaya Pasakhala To cite this article: Golam Rasul, Nilhari Neupane, Abid Hussain & Binaya Pasakhala (2019): Beyond hydropower: towards an integrated solution for water, energy and food security in South Asia, International Journal of Water Resources Development To link to this article: https://doi.org/10.1080/07900627.2019.1579705 © 2019 The Author(s). Published by Informa UK Limited, trading as Taylor & Francis Group. Published online: 19 Mar 2019. Submit your article to this journal View Crossmark data Full Terms & Conditions of access and use can be found at https://www.tandfonline.com/action/journalInformation?journalCode=cijw20 INTERNATIONAL JOURNAL OF WATER RESOURCES DEVELOPMENT https://doi.org/10.1080/07900627.2019.1579705 Beyond hydropower: towards an integrated solution for water, energy and food security in South Asia Golam Rasul, Nilhari Neupane, Abid Hussain and Binaya Pasakhala International Centre for Integrated Mountain Development, Kathmandu, Nepal ABSTRACT ARTICLE HISTORY South Asia is energy-poor, water-stressed, and food-deficient, and Received 31 August 2018 these problems are expected to intensify with high population Accepted 31 January 2019 growth, rapid economic growth and industrialization, urbanization, KEYWORDS and changing climate. Although the water, energy, and food security Water-energy-food nexus; challenges are interconnected, they are dealt with in isolation, which South Asia; Himalayan rivers; fails to address the challenge of trade-offsandexacerbatesthe hydropower; integrated river problems.
    [Show full text]