9. Overall Experiences of ERMC Value of Professional Work Phase S.N. Project Title Location Detail Client/ Finance Period Services NRs. (Months) (Million) FS ES EIA IEE SI SES- GIS CPD DED BDT SM CA TRN 9.1 Transport Sector 9.1.1 Highways, Hill Roads, Green Roads, etc. International Projects 1 Program Management and Institutional Strengthening (PMIC) CS/02, Loan Yerevan Municipality, ADB/SWEROAD April 2012 to July 21 20 No. 2752 ARM (Sustainable Urban Development Investment Program- Republic of Armenia 2015   Project 1), Yarevan Development Project, Yerevan Municipality 2 Road Safety Consultancy Services for TA-8027 REG: South Asia Road and Bhutan ADB Manila January- 12 10   Safety Programme (Phase 1: Kingdom of Bhutan and Nepal) (45281-001) December 2013 National Projects 1 Road Improvement Project Phase III (Ranke-Rabi Bhendetar Road - 90km Central and Eastern Department of Roads December 2015 565 28.76 and Charikot-Tamakoshi-Jiri Road - 55km) Contract No.: RIP-IIII/3371334/CS- Development Region of to November  001/71/72) Nepal 2020 2 Feasibility Study, Detailed Engineering Survey, Design and Preparation of Nepal Department of Roads, Foreign August 2016 to 88.5 54.06 DPR, Environmental and Social Study for Improvement of Double Lane Cooperation Branch November 2017 Bituminous Standard, Contract Packaging and Preparation of Bidding    Documents of: 1. Kohalpur-Surkhet (Bangesimal) Road (Ratna Highway, H012) and -Pokhara Road Section (Siddhartha Highway, H10) 3 Sustainable Urban Transport Project: Design and Supervision Kathmandu, Nepal KSUTP / ADB June 2016 to 141 32.78  Consultant for various works under KSUTP (DSC-KSUTP) July 2017 4 Central and Eastern NIRTTP, Foreign Cooperation March 2015 to 50.5 18.1 Environmental and Social Study for Kathmandu (Nagdhunga) Naubise Development Region of Branch, DoR / World Bank February 2018  Mugling and Kakarbhitta - Pathalaiya Section Road and Bridges Nepal 5 Bajura and Achhham DoR, Planning Monitoring and June 2017 to 6 6.86 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) Districts Evaluation Unit November 2017  of 6 Roads (Total 112km), Contract No. PMEU/337159/073/74 DPR-33) 6 Baitadi, Dadeldhura, DoR, Planning Monitoring and June 2017 to 6 6.98 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) Bajura, Jhapa, Sindhuli Evaluation Unit November 2017  of 7 Roads (Total 120km), Contract No. PMEU/337159/073/74 DPR-23) and Ramechhap Districts 7 National Rural and Renewable Energy Programme (NRREP): Impact Study Nepal Alternative Energy Promotion March 2017 to 4 1.55 of Community Electrification RFP # AEPC/NRREP/CESC/2073/74-14: Centre (AEPC) June 2017  Professional Indemnity Insurance 8 Monitoring and Evaluation of Road Maintenance Works Executed by Road Nepal Road Board Nepal, World Bank August 2017- 3.5 0.1  Agencies November 2017 9 Manang, Mustang, Dolpa Department of Roads July 2017 to 5 1.74 Feasibility Study and Report Preparation of Manang - Mustang - Dolpa - and Jumla Districts of November 2017   Jumla Road (PMEU/337362/073/74 F-1) Nepal 10 Feasibility Study of Roads: i. Seti Lokmarg (Tikapur Bauniya Khanda), Kailali Kailali and Department of Roads April 2014 to 2 0.39 (18km), ii) Dasharathchanda 3 Sunnakhan Chenejarga Ringroad, Baitadi May 2014  (15km) (P18-PMEU-070/71)

ERMC (P.) Ltd. 19 ..ProjectTitle S.N. 2Dti uvy einadCs siaeo i ilHgwy3k (Dailekh- Highway-36km Survey,Design,ManagementandSupervision ofRuralRoadConstruction Hill Mid 23 of Estimate Cost and Design (Dailekh- Survey, Highway-36km Detail Hill Mid of 22 Estimate Cost and Design Survey, Detail 21 20 Traffic,surfaceDistressandRoadRoughness SurveysofStrategicRoad 19 EnvironmentImpactAssessment(EIA)ofNum-Kimanthanka Road(72km) 18 Monitoring andEvaluationofRoadMaintenanceWorksExecutedby 17 Consulting ServicesforSupportingImplementationofEnvironment 16 15 DrySeason RoadConsultant,FeasibilityStudy,DetailedDesignand 14 Sustainability StudyofInfrastructureSub-ProjectsImplementedinPAF 13 12 ToSupport andAssistDepartmentofLocalDevelopment(DoLIDAR)forthe 11 4Survey,Design,Management andSupervisionofRuralRoadConstruction of 24 ERMC (P.)Ltd. A Ag Credit No.:4664 Meheltoli Ramghat- Singashen(14.6km),Desigade-Mahabu (12.5km)andChupra- Dullu Dullu (construction of35kmRoadand22mspan GamuKholaMotorableBridge) Construction SupervisionofUpgrading Dolakha-SingatiSectionofRoad Network of NorthSouth Environmental Studies/CumulativeStudies Revision/Improvement inEMFandEnvironmentalGuideline,(vi)Special Organizing EnvironmentalInformationinMIS,(iv)IEEofSub-Projects,(v) Monitoring andEvaluationofSub-Projects,(iii)Feeding,Maintaining Framework inProgrammeDistricts(i)EMFOrientationTraining,(ii) Road, 33km)(P2) Rajmarga-150km, Khandbari-Kimathanka-40km,Tamakoshi-Lamabager Preparation ofDetailedProjectReportNorthSouthHighway(Koshi Construction SupervisionofRoad(140km) ADB GrantNo.0227–NEP Component (PPC1-Road)ofTransportProjectPreparatoryFacility(TPPF), Consulting ServicesforProjectPreparatoryConsultant1Road appraisal Documentsforapprox1100kmroadsand35bridges. Investment PlanandPreparationofContractDocumentsProject Study, SIA/IEEandDetailedDesign,CostEstimate,Preparationof Sector DevelopmentProgram(RRRSDP)-2(PrioritizationofRoad,Feasibility Preparation offollowonProjectRuralReconstructionabdRehabilitation Myanglung-Sankranti Bazaar(68km)RoadProject,Terathum District ssisted District encies ) ), , Packa Packa ( SRN ( 19 km g g ) e-19 e-18 ( Koshi s ) ) RoadPro ) Hi g hwa j ect, DailekhDistrict y

( GESU/NS ( (IDA GrantNo:H525-NEP& KH ) -01/066/067 ) alk ititRuralAccessProgram Phase- l vrtecutyPFWrdBn Dec2011-March Salyan, Rasuwa,Kaskiand PAF/WorldBank Surkhet, Pyuthan,Gulmi, All overthecountry ea O,HI March2009to Sept2010-Sept DOR,HMIS DOR/GESU Nepal Sankhuwasava Uda oah ititUpperTamakoshiHydroelectric February2011- PAF,Kamalpokhari/WorldBank PAF districtsofNepal and Dolakha Districts Sankhuwasawa Departmentof Roads,Project Nepal Rural Districts) Kathmandu, Nepal(38 eahmDsrc RuralAccess ProgramPhase- Terathum District alk ititDR i-ilHgwyMyJl 0991 1 9 9 May-July2009 May-July2009 DOR,Mid-HillHighway DOR,Mid-HillHighway Dailekh District Dailekh District ea RoadBoardNepal, WorldBank Nepal y a Location Detail p ur District

let iac Period Client/ Finance AD/oIA WrdBn December2011- RAIDP/DoLIDAR /WorldBank 017-Dailekh 2/DFID (ContractNo-RAP-2008- H Project, UperTamakoshi Project, DepartmentofRoads Management andQualityControl Asset Management,Contract Directorate (ADB) Nepal RRRSDP-2, DoLIDAR.MoFLD, 021-Terathum 2/DFID (ContractNo-RAP-2008- y dro p ower Limited ) ) May 2012 February 2009- June 2012 February 2009- October 2014 August 2013to A November 2011- September 2013 January 2009to November 2009 December 2013 July-December ugust 2010-July January 2011 March 2012 2011 2012 2011 2011

7 20.23 28.67 373 346 Professional (Months) 6 49.3 366 6 226 363 81.50 18 44 14 51.10 15 59.55 75 415 94 6113 76 1.34 5 1.7 9 Services NRs. Value of (Million)                             FS   ES  EIA IEE 

SI Work Phase SES- GIS CPD DED  BDT 20 SM CA TRN ..ProjectTitle S.N. 7ImplementationofDRILPatHumla,Survey, Design,IEE,SocialMobilisation 37 ImplementationofDRILPatJumla,Survey, Design, IEE,SocialMobilisation 36 ImplementationofDRILPatKalikot,Survey, Design,IEE,SocialMobilisation 35 ImplementationofDRILPatLamjungDistrict, Survey,Design,IEE,Social 34 (EIA/SIA) Assessment Impact Social and Assessment Impact Environmental 33 Detailed Survey,DesignandCostEstimateofPatan-PanchesworRoad 32 Detailed Survey,DesignandCostEstimateofSundarijal8-Mahankal- 31 Pre-Feasibility StudyofMidHillRoad,Musikot-Chaurjhari-Jajarkot-Meheltoli- 30 Environmental AssessmentofCommunityGroupSub-ProjectsinProgramme 29 for Supervision Construction and IEE Design, 28 Engineering Detailed 27 26 Engineering ServicesfortheImplementationofRoadConstructionActivities 25 9EvrnetlIpc seseto Saljhundi-Juthepauwa- of Assessment Impact Environmental 39 ImplementationofDRILPat Gorkha,Survey,Design,IEE,Social Mobilisation 38 ERMC (P.)Ltd. Tumkot Section(25 Km) and ConstructionSupervisionofHilsa-Simikot RuralRoad,SalliKhola- and ConstructionSupervisionofNagma -SinjaChoutha(55Km) Kotbadha (30Km) and ConstructionSupervisionofKhulalu -Laiphu(38Km),Phalulu Sotipasal -Duipapal(23.5Km) Mobilisation andConstructionSupervision ofPaudhi-Sundarbazar of OuterRingRoadProject(72km)inKathmanduValley (3+050 -6+100),Baitadi Mulkharka Okhreni-ChisapaniRoad(10km) Dailekh Road and AppraisalforEnvironmentalSocialAssessmentofSub-project. Environment andSocialAssessment,(c)IEE/EIAofSub-projects,(d)Review Monitoring andEvaluationofSub-projects,(b)TrainingProgramfor District (Darhula,Mugu,Pyuthan,Kapilbastu,RamechhapandSiraha),(a) 15 km)andc)–Jatahi(18inDhanushaDistrict Birendra Bazar–Yadukuwa–Mahinathpur(42km)b)Janakpur–Yadukuwa( Initial EnvironmentalExamination(IEE)StudyofTeraiRoads,a)MRM- U Reconstruction abdRehabilitationSectorDevelopmentProgram(RRRSDP) Central ImplementationSupportConsultant(CISC) and socialMobilisationofMarke-RampurRoad(2.2kmsection)Salyan, Selected RuralAreas(PASRA).Survey,DesignandConstructionSupervision in Salyan,PyuthanandJajarkotdistrictsforPovertyAllevationProgramme Sundharedhun Ghalyachowk (47Km), Aruwa-Barpa(45Km) and ConstructionSupervision ofGorkha-Arughat(15Km), Gorkha - pg radin g ofBisnumatiLinkRoadUEIPKathmanduMetro ( g 215 Km a ( 37km ) ) Road for Rural p olitan Cit y ap n Rupandehi and Distric Palpa ahad Metropiltan Cit Kathmandu Distric Jajarkot andDailekh ul ititDOLIDAR/DDC / DOLIDAR/DDC DOLIDAR/DDC / February-April January-Feb DOLIDAR/DDC & Bhakta DRILP-DDCBaitadi Lalitpur (Kathmandu, Kathmandu Valley DDC DRILP, Baitadi DDC, Kathmandu May2008to and Siraha Kapilbastu, Ramechhap Darhula, Mugu,Pyuthan, DOR/GESU Rural Districts) Kathmandu, Nepal(38 Jajarkot Districts Salyan, Pyuthanand okaDsrc DOLIDAR/DDC / y , Kathmandu Location Detail t t p ur District ) UEIP/ADB Loan-1966-NEP Kathmandu MetropolitanCity, let iac Period Client/ Finance o/E July2004 to Dec DoR/GEU March2007to ORRDP/DUDBC June-July2008 DoR, PlanningBranch (ADB LoanNo.2092Nep(SF)) (ADB LoanNo.2092Nep(SF)) (ADB LoanNo.2092Nep(SF)) (ADB LoanNo.2092Nep(SF)) July2005to PAF, Chakupat/WorldBank No: 0093-NEP(SF)) January2009 to RRRSDP, DoLIDAR((ADBGrant GTZ/PASRA Lalitpur (ADB LoanNo.2092 Nep(SF)) ( SF ) December 013 December 08to September 2009 January 2007to January 2007to January 2007to December 2008 Februar March 2007to March 2007to August 2011 August 2011 August 2011 August 2011 August 2011 March 2008 Oct 2007to July 2009 2007 2008 2008 y 2009 Professional (Months) 2033 1200 2033.4 1200 2033.25 1200 33.3 1200 33.4 1200 0 12.00 100 129 518 00.68 10 34.5 93 50.93 15 15.62 31 03.8 50 0.36 7 0.20 0.15 5 5 Services NRs. Value of (Million)                       FS        ES   EIA IEE

SI Work Phase SES- GIS CPD DED BDT 21 SM CA TRN ..ProjectTitle S.N. 2Survey,DesignandConstructionSupervision ofDipayal-Mallek-Patihalne 52 ConsultancySurveyontheImplementation of RCIWactivitiesinPyuthan 51 Road Kalanki to Nagdhunga of Detailed SurveyandDesignofHilsa–SimakotRoad,OkhrenKagruKhola(9 Estimate Cost 50 and Design Survey, Detail 49 Detailed Survey,DesignandCostEstimateofRingroadCorridor,RingRoad 48 Detailed Survey,DesignandCostEstimateofDachhinkali-ChaimaleRoad 47 Survey, DesignandConstructionSupervisionofTalloDungeshwortoMathilo 46 Survey, Design&ConstructionSupervisionofDailekh–Mahavu(16km)and 45 44 Detailed Survey,DesignandCostEstimateofJhadeni-Gothadi-MathaJagat- 43 Detailed Survey,DesignandCostEstimateofBanaKhola-Taxar-Dulegauda 42 (27 (Mirmi) Corridor Detailed Survey,DesignandCostEstimateofRuralRoad(10km),Bhaktapur Kaligandaki of 41 Estimate Cost and Design Survey, Detail 40 ERMC (P.)Ltd. ( ( Road (20km),KhalangaJogitariRural (20km) Machhi-Gaumukhi RuralRoad(45km),Damti-Bahane-Syaulibang Rural District: Survey,DesignandConstruction SupervisionofSarebangphedi- Salli KholaRoad Km), PaniTaluwan–Bummuchhe(Tumkot)Road(7KagruKhola Valley Bridge toGyoseriandBishnumatiRoadCorridor(24Km)inKathmandu Track, SinamangalBagmatiBridge,BridgetoJorpati, (7 Km)andPharping-HumaneBhanjyang(11inKathmandu dun Chu Singasain RuralRoad(23Km),DailekhDistrict. Survey, DesignandConstructionSupervisionofRamghat-Thatikhand- Khairini MotorableRoad(14km)PalpaDistrict Huwas RuralRoad(10km),SyangjaDistrict Rural Road(10km),Naudanda-KarkinetaWaling- District km Di 9.11 Km p ) g a p reswor Road y ra –Meheltoli al-Daud Section ) - 8 lanehi ( 16 Km ( 9 Km ( g 25 km hwa ) RuralRoad ) ) , Humla y ) withKalankiIntersection DistrictRoadPro ( 40 Km ) , DotiDistrict. j ect . ul ititDCHmaJune2007to DDCHumla Humla District alk ititGZRN April2006to GTZ/RPN Dailekh District ahad DOR,DivisionRoad Office, Kathmandu alk ititGZRN April2006to GTZ/RPN 0.7434 Dailekh District 3 MaytoJuly2007 DOR,TrafficUnit Baglung, Gulmi yta ititGZRN aiprMarch2005- GTZ/RPN.Lalitpur Pyuthan District ApriltoJune June2006to ApriltoJuly2007 City DDCKathmandu Kathmandu Metropolitan GTZ/RPN DDCPalpa ApriltoJuly2007 Dailekh District ApriltoJuly2007 DDCSyangja,RAIDP-WorldBank DDCBhaktapur oiDsrc D oiadRPDI November2004- DDCDotiandRAP/DFID Location Detail let iac Period Client/ Finance Kathmandu Kathmandu DOR, DivisionRoadOffice, pi oJl 0730.35 3 April toJuly2007 November 2005 April toJune March 2008 June 2008 June 2008 Sept 2007 May 2008 2006 2006 Professional (Months) 1 3.5 115 7 6.78 272 4.7 125 01.7 30 51 15 01.00 20 61.8 36 0.20 3 0.50 9 0.20 5 0.60 3 Services NRs. Value of (Million)

                      FS                          ES EIA IEE

SI Work Phase SES- GIS CPD DED BDT 22 SM CA TRN ..ProjectTitle S.N. 0FeasibilityStudyofDeuraliVhanjyangKavre toGalpaVhanjyang 70 FeasibilityStudy “Thori–GalchhiRoadProject(182.40KM)” 69 May-July2001 DetailedEngineeringSurveyanddesignofGaighat KatariRoadinUdayapur 68 DetailedEngineeringSurveyandDesignof Himali ChiyaBaganSetumadi 67 DetailedEngineeringSurveyandDesignof Chatra, Beltar,GaighatRoadin Road, 66 Km) (12 Saridobhan-Khanigaon Detailed Survey,Design,IEEandConstructionSupervisionofChauriKhola of Design 65 DoR,Kaski and Survey Detailed 64 Detailed FeasibilityStudyofChitwan-Khurkure-Badhara-Thakur 63 Detailed FeasibilityStudyofChannabhattiGosaikundaRoad 62 Detailed Survey,DesignandIEEofMallaj-Lekhphat-SalijaRoad15km. 61 Detailed Survey,DesignandConstructionSupervisionofMadanKundari- 60 Detailed Survey&DesignandIEEofGuphaSanguTamorDobhanRural 59 Detailed Survey,DesignandIEEofGopetar-Phagune-CharibhanjyangRural 58 Feasibility Study(150Km),DetailedSurvey,Planningand 57 Road Rural Survey, DesignandIEEofChupraMeheltoli(16km),Dailekh-Mahavu(25 Dingla Hile of 56 Supervision Construction and IEE Design, Survey, 55 54 Survey, Design&ConstructionSupervisionofDailekh–Mahavu(16km)and 53 ERMC (P.)Ltd. ( 2. Betrawati-Mailung-Syaphrubesi RoadSection(31.134Km). 1. Galchhi-Trishuli-Betrawati RoadSection(35.516Km). of followingStrategic Roads: Detailed ProjectReport(DPR)ofRoads withDedicatedTwoLaneStandards Detailed EngineeringSurvey,DCPTest, DesignofRoadandPreparation A Ramechha District 8Km. Road, 9Km. Uda to GalpaVhanjyangRuralRoadinRamechhapDistrict,20Km Bhyanjyang Chitwan-39km. Sindhu Gunsi RuralRoad,7Km Road Road Pooling Project Engineering Design(100Km)ofRoad(7.5m,9m,12m)KamerotarLand km Singasain RuralRoad(40Km),DailekhDistrict. Survey, DesignandConstructionSupervisionofRamghat-Thatikhand- Chu 49.4 Km ccess RoadofKhareKholaH ) andRam y p a ra –Meheltoli ( ( p 20 Km 5 Km p ur District,12Km. alanchok, 27km. ) , Bho p ) inKavre/Ramechha . ) g jp hat-Thatikhand-Sin ur District. ( 25 km ) DistrictRoadPro y dro p District,25Km. g p asain ower Pro ( 15 km j ect j ect ) , DailekhDistrict. acta ititDCPnhhrJune-July2003 DDCPanchthar okaDsrc P a-ue20 0.15 3 May-June2005 BPC Dolkha District alk ititDCDiehadRPDI November2004- DDCDailekhandRAP/DFID Dailekh District dyprDsrc ititOfc dypr DR Jan-March, 1992 DistrictOfficeUdayapur,(DOR) iduacokDsrc o,Pann rnhMay-July2001 DoR,PlanningBranch aljn ititDCTpeugJune-Aug.2003 DDCTaplejung Rasuwa Districts Dhading, Nuwakotand dyprDsrc DistrictOffice Udayapur, Departmentof Road,Design Udayapur District Udayapur District May-July2001 User'sGroup/DDCRamechhap/ DoR,Planning Branch DoRBhaktapur/DDC Ramechhap District District Municipality, Bhaktapur May2004- Madhyapur Thimi DDCDailekhandRAP/DFID Dailekh District Dhading Districts Parsa, Chitwanand alk ititDCDiehadRPDI 0320 20.7 12 2003-2005 DDCDailekhandRAP/DFID Dailekh District hju ititDCBopradRPDec2003toMay DDCBhojpurandRAP Bhojpur District aehpDsrc srsGop/DCRmchpJan1997 User'sGroup/DDC Ramechhap Ramechap District Location Detail let iac Period Client/ Finance ( PMEU/DOR Section Helvetas 2003 Ramechha KVTDC :

De Department ofRoads(DoR),AC p artment ofRoad p ) Q 4Fb21 to 07 June2016 2016 Feb 14 June 2016 12/2/2015 to27 Feb-Sept, 2003 Feb-July, 1990 Jan-Feb, 1991 Dec 2002-July March 2006 March 2006 2003 2006

Professional (Months) 2 4.7 125 1 3.5 115 8 5.45 288 01.20 30 0.11 2 0.70 8 0.08 2 0.11 2 0.09 2 0.30 5 0.03 6 0.08 2 0.11 2 0.80 8 0.10 3 0.09 2 0.19 6 Services NRs. Value of (Million)                                  FS          ES EIA    IEE

SI Work Phase SES- GIS CPD DED BDT 23 SM CA TRN 9.1.2 Bridge(RCC,Truss&Supension) ..ProjectTitle S.N. 1FeasibilityStudy,Detailed Engineering Survey,SoilInvestigation, 81 DetailedSurvey,DesignandGeotechnicalInvestigation ofKampughat(120 80 DetailedSurvey,DesignandGeotechnicalInvestigation ofManKholaRCC 79 FeasibilityStudy,DetailedEngineeringSurvey, SoilInvestigation, 78 FeasibilityStudy,DetailedEngineeringSurvey, SoilInvestigation, 77 DetailedSurvey,DesignandGeotechnicalInvestigation ofBhadaliNala, 76 Feasibility Study,DetailedEngineeringSurvey,SoilInvestigation, 75 Feasibility Study,DetailedEngineeringSurvey,SoilInvestigation, for 74 Support Technical other and Control Quality Supervision, Construction 73 Feasibility Study,DetailedEngineeringSurvey,SoilInvestigation, Flood Emergency 72 (Chatara), m Bridge-270 Koshi of Supervision Construction 71 Feasibility StudyandDetailDesignforConstructionofNewBridges 70 ERMC (P.)Ltd. Hydrological Studyand DetailedDesignof(ThoppalKholaBridge, Dhading m) inKhotangandThaple-BahuneDanda (200m)inOkhaldhungaDistrict Bridge (175m),BardiyaDistrict Jal Hydrological StudyandDetailedDesign ofMariyaKholaBridgealong Hydrological StudyandDetailedDesign ofMajhuwaKholaBridge,Jhapa Daulatpur, BardiyaDistrict Gui Bhyagute KholaBridgeBajhang;BarjugadBridge,Thadokholaand Mahakali BridgeDarchula;KapadiNadiBridge,KumreliGadinDoti; Patharaiya NadiBridgeandDhangadiCampusChatakpurKailali; Hydrological StudyandDetailedDesignofPackage-25(9bridges), Khola BridgeandSanoBaluwainDhanushaDistrict Kataniya NadiBridgeinSirahaDistrict;DamariKholaBridge,ThuloBaluwa Mainabaathi KholaBridge,JharanaSorbanBridgeand Bridge, PokliKholaBridgeandLikhuinOkhaldhungadistrict; Hydrological StudyandDetailedDesignofPackage-6(10bridges),Krinsha Slab Deck RCC with long (96m Gaughat at and WellFoundation) Nadi Man over Bridge Motorable Kusumba Khola Bridge,OrahiAurahiPehariKhiola 068/69) (10bridges),PatuwakoKuloBridge,RaptiKholaDaduwa Hydrological StudyandDetailedDesignofPackage-34(BP-661-DSD-34- Dama Maintenance ofExistingBridges p g a ad Brid p g ur-Bhutaha RoadSunsari e RehabilitationPro g hat Brid g e inBa g e, kiranNalaBrid j ura District j ect. ( ADB GrantNo0150-NEP ( SMBCP-ES-01 g e inBankeDistrict. ) ( SF ) . ak ititDR rdePoetMay2013toJuly DoR,BridgeProject Bajhang andBajuraDistrict Kailali, Darchula,Doti, usr ititSunsariMorangBridge hdn ititDR rdeUi June-July2008 0.517 DoR,BridgeUnit 4 May-July2009 May-July2010 0.504 DOLIDAR,TrailBridgeSection Region Eastern Development 4 DoR,BridgeUnit May-July2010 DOLIDAR,TrailBridgeSection Bardiya District DoLIDAR,RuralRoad/Bridge Dhanusha District Okhaldhunga, Sirahaand Banke District RoadSectorDebvelopment Nepal atr eino ea O,PoetDrcoae(D)Nov2011toDec DOR,ProjectDirectorate(ADB) Eastern RegionofNepal Location Detail let iac Period Client/ Finance o,Big ntJune2009to DoR, BridgeUnit Construction Project,DOR Trail BridgeProgramme,Pulchowk Suspension BridgeDivision,Local June2009to DoR, BridgeUnit Programme Project (RSDP),DoR,Nepal Feb 2015toAug December 2009 December 2009 December 2012 March-July 009 May-July 2009 July 2010to 2014 2015 2014 Professional (Months) 5 100 150 5 67.8 155 05.99 40 26.19 42 04.53 40 4.4 46 0.27 5 0.15 2 0.44 4 0.15 2 Services NRs. Value of (Million)                              FS    ES EIA IEE

SI Work Phase SES- GIS CPD DED BDT 24 SM CA TRN ..ProjectTitle S.N. 5Dtie niern uvy olIvsiainadDtie einadCost and Design Detailed and Investigation Soil Survey, Engineering Detailed 95 MarchtoJuly DetailedSurvey,DesignandGeotechnicalInvestigation ofKharjyangKhola 94 DetailedSurvey,DesignandGeotechnicalInvestigation ofSangeKholaRCC 93 DetailedEngineeringSurvey,SoilInvestigation andDetailDesignEstimateof 92 DRO,Bharatpur DetailedSurvey,DesignandCostEstimate of BudhiSheraMoterableRCC 91 Detailed Survey,DesignandGeotechnicalInvestigationofGhatteKholaRCC ChitwanDistrict 90 Feasibility Study,DetailedSurvey,DesignandGeotechnicalInvestigationof 89 Argakhanchi in Bridge Hydrological StudyandonBedAggradationsofLotharRiver RCC Khola 88 Kharjyang of Supervision Construction 87 Detailed EngineeringSurvey,SoilInvestigation,HydrologicalStudyand 86 Detailed EngineeringSurvey,SoilInvestigation,HydrologicalStudyand 85 Detailed EngineeringSurvey,SoilInvestigation,HydrologicalStudyand 84 Environmental ImpactAssessment(EIA)ofAurahiBridgeandGumnah 83 Feasibility Study,DetailedEngineeringSurvey,SoilInvestigation, 82 6ConstructionSupervisionof BalleKholaBridge-18mandNarikot KholaBridge 96 ERMC (P.)Ltd. ) echtaKoaRvrCosn ln abzr-Bgro od(71 m), (17.10 Road Bagarkot - (8.7 Bagbazar Road along Rampur Crossing - Marke Khola Ruwa KholaRiverCrossing alongBhatkanda-RelRoad(14.3m) River along - Balle Khola Crossing Marke m), River along Perchhetta Crossing Khola (16 m), river Pani Road Khola m), Phhelo Gaumukhi (16.5 (18m), Road - Rampur Road Machhi Bahane - along Damti Bridge along Bridge Khola m), (18 Road Bridge Khodpe–BajhangandMahawaKholaBridgem,BrindabanBadgoNawalparasi Kanchaniya BridgealongHulakiSadak,Bahadurganj–Kapilvastu,BahuligadhKhola Road, BangangaBridgealongGorusingheThaulihawaRoadatRamghat,Kapilvastu, Bardiya, KhakraulaBridgeTikapur-Kailali,ThulighadalongSahajpurDeepayal Badalpur –RajapurRoadBardiya,BudhiKuloalongBhimapurGohiwala siaeof Estimate RCC Bridge(40m),ArgakhanchiDistrict Bridge (40m),Tanahun Chepeghat DhumilikuwaMoterableBridge Bridge (40m) Bridge (30m),Kaski Kali GandakiMotorableSuspensionBridge(40m), Detailed Desi Distict Detailed DesignofBenighatBridgeoverTrishuliRiver,Dhading,Gorkha Detailed DesignofTinauMotorableBridgeandDuiMuhan,Rupandehi Brid Hydrological StudyandDetailedDesignof(8bridges), 16m, KharibotKhola VentedCauseway-18m)inPyuthandistrict g e inMahendraRa . hrbtKoaBig ln aeaghd ahi-Guuh Road Gaumukhi - Machhi - Sarebangphedi along Bridge Khola Kharibot g n ofKha g j mar eri Brid g a, Bardi g e overKha y a g eri RiverChitwanDistict Budhi Kuloalong District Bajhang andNawalparasi Bardiya, Kailali,Kapilvastu, Pyuthan District Dadeldhura, Salyanand ajn ititDC ajn June-Augst2007 April2006to April2006to June-Augst2007 DOLIDAR,TrailBridgeSection July2006to DOLIDAR,TrailBridgeSection Argakhanchi District DDC,Lamjung JulytoDec2006 DDC,Nuwakot DoR,BridgeUnit Lamjung District DoR,BridgeUnit June2007to Mustang District DOLIDAR,TrailBridgeSection May2007toJuly Argakhanchi District District DDC,Rupandehi Dhading andGorkha yta ititGZRNkwMyt e 0681.0 8 MaytoDec2006 GTZ/RPN-kfw Pyuthan District hta ititDO hrtu May2007toJuly DRO,Bharatpur Chitwan District ady ititDRGS Sept2007toAug DOR/GESU Bardiya District Location Detail let iac Period Client/ Finance o,Big ntJuly2007toMay DoR, BridgeUnit T/P.Lltu March2005- GTZ/RPN. Lalitpur R,BaaprMay2007toJuly DRO, Bharatpur September 2005 January 2007 August 2006 August 2006 Sept 2008 2006 2007 2008 2007 2007 2007

Professional (Months) 00.50 10 53.82 25 00.6 10 0.55 9 0.35 0.45 5 5 0.50 5 0.46 0.46 4 4 0.35 0.3 4 4 0.30 3 0.44 4 0.5 5 Services NRs. Value of (Million)                         FS          ES  EIA IEE   

SI Work Phase SES- GIS CPD DED BDT 25 SM CA TRN 9.1.4 Railways andMetro 9.1.3 Airports ..ProjectTitle S.N. 1 DetailedSurveyandDesignofHimganga(120mspan),Chandikhola (46m), 110 DetailedSurvey,Design and GeotechnicalInvestigationofKaliGandaki June-July2003 109 DetailedSurvey,Design and GeotechnicalInvestigationofHosteDovan- 108 DetailedSurvey,Designand GeotechnicalInvestigationofSitalPati(120m 107 DDCPanchthar DetailedFeasibilityStudy ofModiKholaBridges(30m),FuserBridge 106 DetailedSurvey,Design and GeotechnicalInvestigationofBhuthahaKhola PanchtharDistrict 105 DetailedSurvey,Designand GeotechnicalInvestigationofBhuthahaKhola 104 FeasibilityStudyofChabdi Khola RCCBridgeinTanahunDistrictand 103 DetailedSurvey&Designof NawaKholaBridge(120mspan). 102 FeasibilityStudy,Survey, DesignandSoilInvestigationofLocalTrailBridge 101 SurveyDesignandSoilInvestigation ofLocalTrailBridgeEP-11-Siddhi 100 113 114 112 111 9FaiiiySuyo ia rde(C)i hp ititJaaDR rdeUi uySp20 0.1 2 July-Sep2004 DoR,BridgeUnit JunetoDec05 Jhapa DoR,BridgeUnit SunsariDistrict Feasibility StudyofTimaiBridge(RCC)inJhapaDistrict 99 Detailed Survey,DesignandInvestigationofDwariKholaBridge(23.5m). 98 Truss Steel Community Pilot of Supervision Construction and Design Survey, 97 ERMC (P.)Ltd. ( Section (115km)ofMechi-Mahakali Railway Detailed Engineering SurveyandDesignofRailwayLineButwal-Lamahi (SF): SouthAsiaTourismInfrastructure Development Project-STAIDP) Buddha AirportUpgradingComponent(Loan no2579GrantNo0179NEP Design andConstructionSupervisionConsultancy ServicesforGautam Pro Capacity DevelopmentofCAAN,AirTransport CapacityEnhancement and Taxiwa Construction SupervisionConsultantfor PavementImprovementofRunway Betaulikhola (55m),Pumdung(35m)and MelamchiKhoa(70m)Bridge Gorkha (55m),LandrangatLamjung bridges (120mspan),SunkoshiRiverat Khahareghat (90m),NayaSanguin Hulaki SanguinIlam(35m)andKawaKhola35mCharangawatiBridge Kavre (240mspan),TawaKhola(46m),Ranajor(90m)Bridgeand span) andJagatSuspensionBridgeinRamechhapDistrict. RCC BridgeinSunsariVDC.(75mSpan). RCC Bridge.(75mSpan). Banarawa RCCBridgeinRupandehiDistrict in IlamandDhankutaDistrict(EP-3). La Khola, Mayum(Gorkhe),inIlam&Ragighat,Magmaya,Hatikharkha, rdeoe oaaiKoaaogTab-Gdmhu odi Lalitpur in Road Godamchaur - Thaib along Khola (Package No:3/con/Rural/062/063) Godawari over Bridge 35m g j uwa inDhankuta ect ) , KaliBandaiBrid [ ADB LoanNo2581andGrantNo:0181 Ne y ofTIAPro g j ect e ( 150m ) andMadiNadiBrid p al g e ( SF ( 65m )]

) lmadDakt ititSD TP2003 SBD/LTBP Ilam andDhankutaDistrict ahad,NplCivilAviationAuthorityof Kathmandu, Nepal ahad,NplCivilAviationAuthorityof Kathmandu, Nepal Distric Kaski, SyangjaandParbat Region ofNepal CivilAviationAuthorityofNepal Western Development Butawal Sindhupalchowk andKavre Ramechhap, District May-July2001 Tanahun andMyagdi May-July2001 and DolakhaDistrict. SuspensionBridgeDivision,Local Ramechhap, Ilam,Bhojpur Ramechhap District DoR, DoR,Biratnagar 2003 Sunsari District Sunsari District District Tanahu andRupendehi SBD/Helvetas Ilam andDhankutaDistrict aiprDsrc OIA,TalBig eto April2006to DOLIDAR,Trail BridgeSection Lalitpur District Location Detail t let iac Period Client/ Finance o,Pann rnhMay-July2001 DoR, PlanningBranch Ne Ne Development Projectt Metrorail andMonorail Department ofRailway, Rail, (CAAN)/ADB Trail BridgeProgramme,Pulchok/ Suspension BridgeDivision,Local Trail BridgeProgramme,Pulchok Suspension BridgeDivision,Local Trail BridgeProgramme,Pulchowk Suspension BridgeDivision,Local Trail BridgeProgramme,Pulchowk Babarmahal DoR, PlanningBranch, p p al/ADB al/TIA September 2011- September 2018 December 2014 November 2020 Feb-Sept, 2001 Jan -June2000 June-July 2002 August 2016to February 2009 March 2012- August 2015 July 2017- 2000 2002 Professional (Months) 2 114.5 129 4 364.00 72.80 242 210 00.726 10 7164.95 87 0.17 2 0.27 4 0.40 0.40 6 0.40 6 0.19 6 2 0.20 0.20 2 0.10 2 0.07 0.22 3 1 4 0.32 2 Services NRs. Value of (Million)                      FS      ES EIA IEE  

SI Work Phase SES- GIS CPD DED BDT 26 SM  CA  TRN Preparation ofBidding,ContractDocument&Tendering, Note: 9.2 HydropowerandEnergy ..ProjectTitle S.N. 117 116 115 0FeasibilityandInitialEnvironment ExaminationStudyofKawadi Khola 10 2FeasibilityandInitialEnvironment ExaminationStudyofNyaurigad 12 FeasibilityStudyandInitial EnvironmentalExamination(IEE)Study of 11 ERMC (P.)Ltd. r-esblt td fUprJirkSoaePoetNplDE March2015to DoED May2016to Nepal FeasibilityStudyandInitialEnvironmentalExamination(IEE)of 9 May2017to EnvironmentalandSocialImpactAssessment(ESIA)ofKarnali(Chisapani) 8 DoED Pre-feasibilityStudyofUpperJhimrukStorageProject 7 FeasibilityandInitialEnvironmentalExamination(IEE)StudyofLower 6 DetailEngineeringDesignandEnvironmentalImpactAssessmentincluding 5 DoED Nepal FeasibilityStudyandEnvironmentalImpactAssessmentofNaumure 4 FeasibilityStudyandEIAofKarnaliStage-1HydropowerProject 3 FeasibilityandEnvironmentalImpactAssessmentStudyofSunkoshi23 2 Nepal FeasibilityandEnvironmentalStudyofSetiRiver-6(SR-6)StorageProject 1 IndependentEngineer(Firm)fortheFeasibilityStudyPhaseofORIOMini 3 TA-8630BHU:PromotingCleanEnergyDevelopmentinBhutan-F-002 2 EnvironmentalandSocialImpactoftheIsimbaHydropowerProjecton 1 FS Pikhuwa KholaHydropowerProject(10 MW); Multipurpose Project(10,000MW); Chameliya HydropowerProject(20MW) Social ImpactAssessmentofBudhiGanga HydropowerProject(20MW) Multipurpose Project Hydropower Project Hydro PowerProject(10-MiniSites) Renewable/Master Plan(47275-001) Kalagala OffSetArea S Feasibility StudyofMassRapidTransit(UndergroundandElevatedRailway) Sector ofMechi-MahakaliRailwayandItahari-BiratnagarLink Detail SurveyandDesignofElectrifiedRailwayLineforInaruwaKakarbhitta Sukhkhad-Gaddachowki Section(94km)ofMechiMahakaliRailway Detailed EngineeringSurveyandDesignofElectrifiedRailwayLinefor Hydropower Project (10 MW Hydropower Project (10 MW Chyadu KholaHydropower Project(10MW), National Projects International Projects y :FeasibilityStudy, stem inKathmanduValle ES :EnvironmentalStudy, y

EIA CA :EnvironmentalImpactAssessment, :ContractAdministration&ConstructionSupervision, ahad,NplDepartmentofRailway,Railway Kathmandu, Nepal ea oDJuly2016to October2015to April2016to DoED July2016to DoED DoED May2017to Nepal Nepal DoED Nepal DoED/KuwaitFundfor Arab ,Nepal DoED Nepal June2014-June UgandaEnergyCredit Nepal AsianDevelopmentBank MinistryofEnergyandMineral Uganda Bhutan Uganda Region ofNepal Eastern Development Region Far WesternDevelopment ea oDJuly2016to DoED Nepal ea oDJuly2016to July2016to DoED DoED Nepal Nepal SI : Survey&Investigation, Location Detail GIS: GIS Mapping, SES let iac Period Client/ Finance and MetroDevelo Economic Development(KFAED) Capitalisation Company Development/World Bank Metrorail andMonorail Department ofRailway,Rail, Development Projectt Metrorail andMonorail Department ofRailway,Rail, :SocioeconomicStudy, T: Trainings p ment Pro CPD j ect :Conceptual&PreliminaryDesign, January 2018 July 2016 September 2016 November 2018 November 2019 2016 February 2017 November 2018 November 2019 March 2018 March 2018 November 2018 August 2016 June 2015to 2016 July 2015-July December 2017 May 2016tp November 2016 August 2016to September 2018 December 2012 July 2017- February- Professional (Months) 15 25.25 61.50 1103 61.5 44.5 76.5 53.5 30.5 139 828 380 2 191 229 134 134 57 57 80 131.28 66 66 269.5 72 20 DED :DetailedEngineeringDesign, 40.61 Services NRs. Value of 376.55 117.23 178.89 (Million) 138.37 239.17 19.63 25.97 19.86 19.87 18.20 18.50                   FS  ES     EIA

BDT IEE :ContractPackaging, SI Work Phase SES- GIS CPD DED BDT 27 SM CA TRN ..ProjectTitle S.N. 0Dti niern td fMiaKoaHdooe rjc 1 W op itit oDJuly2012-Jan DoED PreparationofGuidelines for PowerSystemOptimizationofHydropower 32 RolpaDistrict FeasibilityStudyandInitialenvironmentalExamination (IEE)StudyofIkhuwa 31 DetailEngineeringStudyofMaiwaKholaHydropower Project(16MW) 30 April2015-April FeasibilityStudyandInitialenvironmentalExamination (IEE)StudyofIower 29 ConsultingServicesonDesignandSupervision ofSanjen(upper)(14.5MW) 28 ConsultingServicesonDesignandSupervision ofRashuwagadi 27 DetailSurveyofSindabesi-Leknath33KVTransmission lineform 26 DoED Feasibility StudyandEnvironmentImpactAssessment(EIA)of 25 May2015- May2015- Feasibility StudyandEnvironmentImpactAssessment(EIA)of 24 Feasibility StudyandEnvironmentalImpactAssessment(EIA)ofBeni- 23 Nepal Feasibility StudyandInitialEnvironmentExamination(IEE)ofMyagdi 22 Preparation ofPowerhouseDesignGuidelinesHydropowerProjects 21 DoED DoED Preparation ofInspectionGuidelinesforHydropowerPlants,Substations& TaplejungDistrict,Nepal 20 RolpaDistrict,Nepal Feasibility StudyandEIAofSimbuwaKholaHydropowerProject(53MW) 19 Feasibility andIEEStudyofLungriKholaHydropowerProject(10MW) 18 Detailed EngineeringDesignofBudhiGangaKholaSmallHydrpower(6.2 17 Detailed EngineeringDesignofInkhuKholaSmallHydropowerProject(20 16 Detailed EngineeringDesignofLowerHonguKholaSmallHydropower 15 Detailed EngineeringDesignofSiwaKholaSmallHydropowerProject(15 14 Feasibility andInitialEnvironmentExaminationStudyofBheriKhola 13 3Ntoa uvyo nryCnupinadSpl iuto fNplNplWC,SnaDra May2012-July WECS,SingaDurbar Nepal NationalSurveyofEnergy ConsumptionandSupplySituationof Nepal 33 ERMC (P.)Ltd. Pro Khola H Che and SanjenHydroelectricProjects Hydroelectric Project(111MW) Mijuredanda toLekhnathSubstation,Kaski Sankhuwa KholaHydropowerProject(25 MW) Sankhuwa Khola-1HydropowerProject(30MW) Kaligandaki HydropowerProject(50MW) Khola HydropowerProject,MyagdiDistrict(32MW) Transmission Lines MW MW Project (23.5MW) MW) Hydropower Project(10MW j ) ) ects p e H y y dro dor p p ower Pro ower Pro j ect j ect, Lam ( 30 MW j un (42.5) ) g &GorkhaDictricts ( 15 MW )

Bjr itit ea oDJuly2015-July July2015-July DoED BajuraDistrict,Nepal DoED ,Nepal akuaaaDsrc oDMarch2012-Feb DoED Sankhuwasawa District ehah ak E Nov2013-Jan RashuwagadiHydropower Oct2014-April NEA Oct2014-April April2015- Rashuwagadi Lekhnath, Kaski Bhojpur District Sankhuwasawa and DoED Sankhuwasawa District DoED Myagdi districts DoED Baglung, Parbatand July2016to Nepal July2015-July July2015-July DoED DoED Solukhumbu District,Nepal DoED Taplejung District,Nepal Nepal auaSanjenJalvidhyutCompany Rasuwa ea oDApril2012-Feb DoED Nepal District Lamjung andGorkha Location Detail s let iac Period Client/ Finance oDJuly2012-Dec DoED oDOct2014-April Company Limited May2014-Nov DoED DoED Limited 2017 2019 2017 2017 October 2015 2018 2017 December 2018 2017 November 2017 November 2017 2017 2016 February 2013- Dec 2012-Dec Dec 2016 2014 2013 2013 2014 2016 2013 2014 Professional (Months) 51.75 43.75 10430.00 1190 84.5 62.6 130 130 0 17.00 109 5 600.00 454 154 617.16 96 29.01 82 315.75 73 79 90 61 90 90 68.90 56 69 Services NRs. Value of (Million) 18.78 10.91 24.91 11.65 20.18 18.19 21.61 23.00 19.87 19.81 23.00 23.00 19.94 0.57                          FS ES         EIA    IEE 

SI Work Phase SES- GIS   CPD DED BDT 28 SM CA TRN Preparation ofBidding,ContractDocument& Tendering, Note: ..ProjectTitle S.N. 5Inspection, MaintenanceandMonitoringoftheBuiltStructuresTshoRolpa 45 Feasibility Study&DetailSurveyandDesignoftheRajamtarMicrohydro 44 May2010toJuly 122KV TransmissionLineTopographicalSurveyfromHetaudatoBarda 43 Feasibility Study&DetailSurveyandDesignoftheChauriKhola-GunsiMicro- 42 Feasibility Study,DetailedSurveyandDesignConstructionSupervision 41 Detail Survey &DesignofPathanKholaMHPBhanbhave-2,Badachaur 40 Detailed surveyofKaligandaki132KvTransmissionLineCorridorProject DOI 39 Detailed surveyofMarshyangdi132KvTransmissionLineCorridorProject 38 BankeDistrict InitialEnvironment Examination(IEE)StudyofNepalPortionfor400KVD/C 37 Detailed DesignofBheri-BabaiDiversionHydropowerProject(48MW) 36 35 34 ERMC (P.)Ltd. FS ( ( GLOF RiskReductionProjectAreaSiteandMonitoringofMHPPowerPlant. Pro Ghhat. H of theChauriKholaBokseMicroHydropower(30KW)project. Gulmi andKhur Ne Transmission SystemforEvacuationofPowerfromArun-3HEPDhalkebarin ADB TA7666-NEP,EnergyAccessandEfficiencyImprovementProjectII Survey andSIAofNalsingGadHydropowerStorageProject–410MW, Land andPropertyInventorySurveyincludingSocio-economicBaseline 170km 75 km y :FeasibilityStudy, dro p j ect. al p ) ower &Pro ) p a KholaMHP,Hadhade-1Dhanm j ect ES ( :EnvironmentalStudy, 40 KW ) . EIA CA :EnvironmentalImpactAssessment, :ContractAdministration&ConstructionSupervision, y da. um ititUe' ru/AP Jan2002- User'sGroup/AEPC aeha itit VDC GunsiBhadaure, Ramechhap District. Distric Lamjung andManang Distric Lamjung andManang ea JNLd ni Jan2011-July SJVNLtd, Nepal District. TshoRolpa,Dolakha Distric Makawanpur andChitwan June-Dec2011 User'sGroup/LocalNGO's/ADB . ADB,Manila Nepal Nepal aeha itit srsGop/D Nov-Dec,2000 User'sGroup/ADB Ramechhap District. SI : Survey&Investigation, Location Detail t t t GIS: GIS Mapping, SES let iac Period Client/ Finance Pro NEA, EngineeringServices, Pro NEA, EngineeringServices, E olLb wymh Jan-March,1998 NEA soilLab,Swayambhu Ramechha Fund DHM, BabarmahalNorvegien Bokse, Kavre of Energy Development Committee,Ministry Nalsing GadHydropowerProject :SocioeconomicStudy, j j ect Develo ect Develo TRN: p Trainings /ADB p p ment De ment De p p CPD artment artment :Conceptual&PreliminaryDesign, Jan toJune2010 Jan toJune2010 Nov 2004-July February-July March 2003 2011 2001 2011 2002 2013 2005 Professional (Months) 417.50 94 20.38 12 76.00 27 02.00 10 20.25 12 232.12 32 16 0.39 6 0.08 3 2.05 9 0.07 4 DED :DetailedEngineeringDesign, Services NRs. Value of (Million) 0.45 0.63

           FS    ES  EIA

BDT IEE      :ContractPackaging, SI Work Phase SES- GIS CPD DED BDT 29 SM CA TRN 9.3.1 WaterSupplyandSanitation 9.3 WaterSupply,SanitationandUrbanDevelopment ..ProjectTitle S.N. 13 12 11 10 14 ERMC (P.)Ltd. 9 8 7 6 5 4 3 2 1 Water SupplyImprovementProjectinNepal Resettlement ActionPlanSurvey(Part2)forPreparatoryonPokhara Monitoring andEvaluationofBatchIXSchemes,CentralRegion-Package2 Monitoring andEvaluationofBatchIXSchemes,CentralRegion-Package1 X Schemes(RWSSIP/S/QCBS-020) CDA BaselineStudyincludingAudioVisualSurveyinsamplebasisofBatch Region -Package2 Monitoring andEvaluation(M&E)forBatchXXISchemes,Central Region -Package1 Monitoring andEvaluation(M&E)forBatchXXISchemes,Central Project (SSTWSSSP) Grant 0157-NEP,SecondSmallTownsWaterSupplyandSanitationSector Supply ImprovementProject(AdditionalFinancing)LoanNo.3255 Design andSupervisionConsultant(DSC-05):KathmanduValleyWater Project ADB TA-9171NEP:SecondKathmanduValleyWaterSupplyImprovement Pro Construction SupervisionofGreaterRamechhap DrinkingWaterSupply Feasibility Study,DetailedEngineeringSurvey, DetailedDesignand River Improvement andSewageTreatment PlantConstructionforBagmati Project ManagementConsultingServices. SewerageConstruction,Road DWSS/ADBSecond SmallTownWaterSupply andSanitationProject Town WatersupplyandSanitationProject (Batch-II,Package1), Evaluation ofSukhad,Kailali,Musikot(Khalanga, RukumandSitalpatiSalyan Detailed Design,ConstructionManagement, ImplementationMonitoringand Design andSupervisionConsultant(DSC) forFeasibilityStudyandPlanning, Project TA 35173-012NEP:ThirdSmallTownsWaterSupplyandSanitationSector Baitadi, DWSS/ADBSecond SmallTownWaterSupplyandSanitation Project Shiva Nagar-Kailali, Ghasi- KanchanpurandDashrathNagar Municipality- Implementation Monitoring andEvaluationofNarayanMunicipality-Dailekh, Detailed Designor Review,ConstructionManagement, Design andSupervision Consultant(DSC)forFeasibilityStudy andPlanning, j ect Kaski, Nepal Central RegionofNepal Central RegionofNepal Nepal DWSS,Panipokhari Central RegionofNepal Central RegionofNepal ADBManila,EA-KUKL Nepal ADB Kathmandu, Nepal Kathmandu, Nepal ahad alyHighPowerCommittee forIDBC, Kathmandu Valley AsianDevelopment Bank Regional Mid andFarWesternDev Nepal a etr e einlSSTWSSSP/ADB,Department of Far WesternDevRegional aeha ititSCIEOSisFebruary2011- SDC/ITECOSwiss Ramechhap District Location Detail let iac Period Client/ Finance NJS ConsultantsCo.Ltd. RWSSFDB /WorldBankDFID RWSSFDB /WorldBankDFID RWSSFDB /WorldBank RWSSFDB /WorldBankDFID RWSSFDB /WorldBankDFID Bagmati Civilization Intigrated Developmentfor Panipokhari Water SupplyandSewerage, SSTWSSSP/ADB, Departmentof Panipokhari Water SupplyandSewerage, September 2013- January 2013to December 2015 December 2014 December 2012 December 2014 December 2014 December 2016 December 2018 December 2018 November 2017 November 2017 December 2014 December 2015 A January 2017- to March2017 March 2017to March 2017to June 2013to June 2013to June 2017to August 2020 May 2010to ugust 2015to July 2017to March 2014 Oct 2011to Professional (Months) 12 16.35 31.25 2 26.86 228 39.40 305 6 36.15 160 123 126 154 517 30 79 37 32 18 15 Services NRs. Value of (Million) 105.11 17.00 18.97 19.35 2.84 3.10 2.80 6.63 3.81 4.60                        FS    ES EIA IEE  

SI Work Phase SES- GIS CPD   DED BDT 30 SM CA TRN ..ProjectTitle S.N. 25 24 23 22 21 20 19 18 17 16 15 ERMC (P.)Ltd. Phase ProposalofBatch–VIIISchemes (Package-III,Central) Schemes Cycle,FinalizationofDesignEstimate aspartofImplementation Batch –VIISchemes,PreFeasibilitySite AppraisalofBatch–VIIIandIX Implementation PhasesofBatch–VISchemes &DevelopmentPhaseof Implementation PhaseBatch–VIIandVIII Schemes,Developmentand Compliance andProcessMonitoring EvaluationofDevelopmentand Monitoring andEvaluationofBatchV,VI andVIISchemes NEP(SF) Nov2011-Feb Level MonitoringConsultancyServices(Package 5) Community BasedWaterSupplyandSanitation Project,RegionalandDistrict NEP(SF) Level MonitoringConsultancyServices(Package4) RWSSFDB/WorldBank Community BasedWaterSupplyandSanitationProject,RegionalDistrict District) Tamgas WaterSupply-GulmiandSandikharkaSupplyinArgakhanchi May-July2012 Alloverthecountry Water Supply-Sunsari,Makarahar-KaraiyaSupply-Rupandehi, Water SupplyandSanitationSectorProject(Package-2,Mahendranagar Feasibility Study,DetailedEngineeringSurveyandDesignofSmallTown RWSSFDB/WorldBank Ministry ofPhysicalPlanningandWorks(MPPW)theGON.(RFP126,ICB. Consulting ServicesforDesigningM&E/MISSystemRWSSsectorin Alloverthecountry Long-Term SustainabilityStudyofBatch-IIISchemes Technical, OperationalandEnvironmentalAuditofBatch-VIISchemes EPSP (ContractIDNo:EPSP/S/CQS/35) Impact EvaluationofEmployement/Self-EmployementServices(ESES) (Contract IDNo:EPSP/S/CQS/33) Third PartyMonitoringandBeneficiarySatisfacyionSurveyofEPSP for BagmatiRiver Construction, RoadImprovementandSewageTreatmentPlantConstruction Project ManagementConsultingServices(Package-I).Sewerage Improvement Project ADB TA-7936NEP:PreparingtheKathmanduValleyUrbanEnvironemnt (ADB LoadnNo.2008 (ADB LoanNo.2008 consisting of

and Jumla JunetoDec MPPW/RWSSFDB/World Bank Nepal Region Central Development Dang, Gulmi,Kalikot,Mugu and Salyan Dailekh, Darchula,Dolpa Nepal Development Regionof Eastern andMid-Western MinistryofPeace and MinistryofPeace and Eastern Nepal HighPowerCommitteeforIDBC, March2012-Oct Eastern Nepal ADBManila,EA-KUKL Kathmandu Kathmandu, Nepal Location Detail

let iac Period Client/ Finance BSP WSABAugust2006to CBWSSP, DWSS/ADB Panipokhari RWSSFDB/World Bank/DFID BSP WSABAugust2006to CBWSSP, DWSS/ADB Panipokhari Water SupplyandSewerage, STWSSSP/ADB, Departmentof support Project/WorldBank Reconstruction, EmergencyPeace support Project/WorldBank Reconstruction, EmergencyPeace Bagmati Civilization Intigrated Developmentfor Spetember 2013- Spetember 2013- July 2010to December 2010 December 2010 December 2010 December 2008 May 2009to Jan 2008to May 2014 May 2014 2009 2012 2012 2012 Professional (Months) 1 23.10 214 0 6.00 100 6 17.00 163 23.05 100 049.42 50 550.00 35 04.70 10 58.00 65 2.50 5 1.50 8 3.90 9 Services NRs. Value of (Million)

                        FS ES EIA IEE

SI Work Phase SES- GIS CPD DED BDT 31 SM CA TRN ..ProjectTitle S.N. 35 34 33 32 31 30 29 28 27 26 37 36 ERMC (P.)Ltd. Schemes Schemes Schemes andConstructionMaterialQualitySpotCheckingofBatch–VI Design EstimateaspartofImplementationPhaseProposalBatch–VI Feasibility SiteAppraisalofBatch–VIISchemesCycle,Finalization Batch –VISchemes&DevelopmentPhaseofVIISchemes,Pre Phase Batch–VSchemes,DevelopmentandImplementationPhasesof Compliance andProcessMonitoringEvaluationofImplementation Phase ProposalofBatch–VIIISchemes(Package-IV,Central) Schemes Cycle,FinalizationofDesignEstimateaspartImplementation Batch –VIISchemes,PreFeasibilitySiteAppraisalofVIIIandIX Implementation PhasesofBatch–VISchemes&DevelopmentPhase Implementation PhaseBatch–VIIandVIIISchemes,Development Compliance andProcessMonitoringEvaluationofDevelopment elhKPSuyo ac-VShmsAloe h onr WSD/ol akFeb-June2006 Feb-June2006 RWSSFDB/WorldBank RWSSFDB/WorldBank Alloverthecountry Alloverthecountry Nepal andEvaluationstudyof24RWHS schemesin18districtsofNepal. Preparation ofNationalGuidelinesforRain WaterHarvestingSystemof Pro Design EstimateandDrawingPreparation ofWaterSupplyandSanitation Immediate ImpactStudyofBatchIVSchemes Health KAPStudyofBatch-IVSchemes worker WorkingindistrictLevel. Training NeedAssessmentandPreparation ofTrainingsMaterialforHealth schemes Technical, OperationalandEnvironmental AuditofBatch-IVSchemes(103 NEP(SF) Level MonitoringConsultancyServices(Package1) Community BasedWaterSupplyandSanitationProject,RegionalDistrict Monitoring andEvaluationofBatchV,VIVIISchemes Schemes andConstructionMaterialQualitySpotCheckingofBatch–VI Design EstimateaspartofImplementationPhaseProposalBatch–VI Feasibility SiteAppraisalofBatch–VIISchemesCycle,Finalization Batch –VISchemes&DevelopmentPhaseofVIISchemes,Pre Phase Batch–VSchemes,DevelopmentandImplementationPhasesof Compliance andProcessMonitoringEvaluationofImplementation Monitoring andEvaluationofBatchVII,VIIIIXSchemes Monitoring andEvaluationofBatchV,VIVIISchemes Jha Town WaterSupply and sanitationSectorProject(Package-11, - Detailed Engineering SurveyDesignandConstructionSupervision ofSmall Trijuga-Udayapur) Water Supplyandsanitation SectorProject(Package-3,Fikkal-Ilam and Detailed EngineeringDesignandConstruction SupervisionofSmallTown j p ect andMicro-Irri a, Bardibas-Mahottari andKamalamai-Sindhuli ) (Package3,CentralDevelopmentRegion) (Package2,EasternDevelopmentRegion) g ation Pro j ect inJumla,SurkhetandDailekhdistricts ) (ADB LoanNo.2008 consisting of consisting of consisting of Dailekh districts Jumla, Surkhetand atr e.Rgo RWSSFDB/WorldBank/DFID Eastern Dev.Region . Jhapa, Mahottari& Eastern DevRegional, Feb-June2007 RWSSFDB/WorldBank All overthecountry RWSSFDB/WorldBank/ DFID Central Dev.Region Region Central Development l vrtecutyDepartmentofWaterSupplyand MaytoAugust All overthecountry NHTC/MOPH All overthecountry District Dadeldhura andBaitadi Pyuthan, Kapilbastu, & UdayapurDistrict Eastern DevRegion,Ilam Location Detail let iac Period Client/ Finance EI ea July2005 toSept CECI, Nepal Panipokhari Pani Water SupplyandSewerage, STWSSSP/ADB, Department of Panipokhari Panipokhari RWSSFDB/World Bank/DFID Sewerage, Panipokhari August2006to CBWSSP, DWSS/ADB Panipokhari /ADB Sanitation SectorProject, DWSS, Small TownWaterSupplyand p okhari December 2004 November 2006 November 2006 December 2010 March 2004- to May2010 to May2010 May 2009to 2001 -2006 2002 -2006 May 2010 2006 2006

Professional (Months) 1 5.00 115 7 9.00 170 9 19.00 192 6 20.00 163 02.00 40 00.70 30 28.00 72 55.80 95 0.14 2 3.00 8 0.80 0.70 4 4 Services NRs. Value of (Million)                             FS     ES EIA IEE

SI Work Phase  SES- GIS CPD DED BDT 32 SM CA TRN ..ProjectTitle S.N. 50 49 48 47 46 45 44 43 42 41 40 39 38 51 ERMC (P.)Ltd. IV &VSchemes(Package5) Scheme andPakuwal w/sSchemes. Detail EngineeringSurvey,DesignandImplementation forKumalw/s VDC Dhulkhu-8w/sschemeinDhulkhu VDC. w/s SchemeinSarsyunKharkaVDCSalyani w/sschemeinThuloParsel Detail EngineeringSurvey,DesignandImplementation fortheChukhaBensi in KavreplanchokDistrict&5w/sscheme. Prefeasibility Studyof5w/sSchemeinRamechhap District,15w/sScheme in KavreplanchokDistrict&5w/sscheme. Prefeasibility Studyof5w/sSchemeinRamechhap District,15w/sScheme Jan-Dec2003 Seceme inArmalaw/sSchemesandKisti-Ekhate w/sScheme. Detail EngineeringSurvey,DesignandImplementation forLekhNathw/s RWSSFDBPanipokhari Scheme andHattiSundew/sschemein MakawanpurDistrict Detail EngineeringSurvey,DesignandImplementation forChhatiwanw/s Madan Kundariw/sSchemeinVDC. w/s schemeinBaluwaVDC,TamaghatSchemesPanchkhalVDCand Detailed EngineeringSurvey,DesignandImplementationoftheSerabensi Damar w/sScheme,PhaparbariBhairabdandaSchemes. Detailed EngineeringSurvey,DesignandImplementationoftheBhimsen Harvesting SysteminNepal. Detailed FeasibilityStudy&ProjectPreparationofRainWater Material QualitySpotCheckforapprox.58SOsandw/sschemes Baitadi, Darchula,Surkhet,Jajarkot,Kailali,BardiyaandDangDistricts) in MidWesternandFarDevelopmentRegion(Humla,Jumla,Mugu, New SOAssessment(NGOSelection)forBatch-V(25SOsand50Scheme) Development PhaseWaterSupplySchemes(4schemesofMCDC)in Compliance andProcessPerformanceMonitoringStudyofBatch-III Monitoring andEvaluation Monitoring &Evaluation Banthali w/sandScheme inSimthaliw/sScheme. Scheme inChaubas VDC,Dhusiniw/sSchemeinSivalaya Sano Scheme inSapingVDC, DudGaunw/sSchemeinChaubas VDC,Kavrew/s Detail EngineeringSurvey, DesignandImplementationforSaping w/s Assessment ofBatch–VSchemes,MaterialQualitySpotCheck of BatchI,IIandIIIRWSSFDB,New(SupportOrganization)SO Monitoring &EvaluationandDesignFinalisationofRehabilitationSchemes Appraisal withWaterQualityTestingofBatch–VandVISchemes, Part ofImplementationPhaseProposalofBatchIVandV,Pre-feasibilitySite Implementation PhaseSchemesandFinalisationofDesignEstimateasa ConsistingofComplianceandProcess of Batch IVandVDevelopment Nepal Development Regionsof Mid andFarWestern Central, Eastern,Western, aaaprDsrc WS PKRDN20 0.23 3 Jan 1998 -Aug 2000 2000 RWSSBFD/RSDAN Kavrepalanchowk District Kavre Region in RWSS/PPUK/RSDAN Central Development RWSS/PPUK/RSDAN Makawanpur District Makawanpur District Region, KaskiDistrict. Western Development Distric Region, Kavrepalanckowk Central Development Kavrepalanchowk District Central DevRegion, District Region, Makawanpur Central Development Dev Region Eastern Central&Western Development Region Mid andFarWestern RWSSFDB/WorldBank/DFID Eastern Dev.Region Kavrepalanchowk District Region in Central Development Location Detail p t alanchowk District let iac Period Client/ Finance WSF/RDNJan1998 - Dec. RWSSBFD/ RSDAN WSD/PU ar Jan2000-June RWSSFDB/ PPUKKavre Panipokhari RWSSFDB/World Bank/DFID WSD/NEH ahad Jan1998-June RWSSFDB/ NWEEHAKathmandu Kavre /WorldBank Prathamic UpcharKendra(PPUK) RWSSFDB &Paropokar Jan-Dec,2000 Bank RWSSFDB, PPUKKavre/World DWSS, Panipokhari Panipokhari RWSSFDB/World Bank/DFID Panipokhari WSD/PU Dec1997- Jan RWSSFDB/ PPUK September 2006 Dec 2003-March January 2002to Jan 2000-June Jan 2000-June Sep-03 1999 2001 1999 2000 2001 2001 2004 2000 Professional (Months) 5 5.50 150 . 0.10 0.5 80.50 18 40.38 14 40.35 14 0.45 18 80.35 18 80.58 18 0.15 9 0.28 0.39 9 7 0.45 0.25 6 4 Services NRs. Value of (Million)

       FS         ES EIA IEE

SI Work Phase       SES- GIS CPD DED BDT 33 SM  CA TRN Preparation ofBidding,ContractDocument& Tendering, Note: 9.3.2 WasteWaterandSolid Management ..ProjectTitle S.N. 4DesignandSupervisionConsultant(DSC-04): KathmanduValleyWastewater 64 63 62 61 60 59 58 57 56 55 54 53 52 67 EnvironmentalImpactAssessment ofTobudoleLandfillSiteatBhaktapur 66 65 ERMC (P.)Ltd. FS Management Project;ADBLoan3000NP Contract No.CASSC02 Kathmandu ValleyWasteWaterManagement ProjectLoanNo.3000, Manthali Ramechha Detailed FeasibilityStudyofSewerageProject inKamalamaiSindhuli, Sept2007-Jun Pro Project WardNo.1,2,3,4and9,Bensi Sahar,Lamjung;JanakpurSewerage Project Bazararea,DarsingDaharhum, Syangja; BensiSaharSewerage TDF/RamgramMunicipality Detailed FeasibilityStudyofSewerageProjectinBayarghariBazar Drainage inSirsiyaVDC. Detailed Study&DesignandImplementationofLowCostStormWater KapilbastuDistrict Detailed FeasibilityStudyofSewerageProjectinRamgramMunicipality Supervision ofDhanewaGroundWaterSupplySchemeinJahabaVDC Preparation ofDetailedDesignandCostEstimateConstuction Su Preparation ofDetailedDesignandCostEstimateConstuction Supervision ofTahaliandBishnuToleWaterSupplySanitationScheme Preparation ofDetailedDesignandCostEstimateConstuction Supervision ofDaman-PalungWaterSupplyandSanitationProject Preparation ofDetailedDesignandCostEstimateConstuction Su Supervision ofTharuTole,ChamareToleandMusariGroundWater Preparation ofDetailedDesignandCostEstimateConstuction Deurali VDCGothpaniw/sscheme w/s schemeinKattikeDeuraliVDCUpallo scheme inKavreplanchokdistrictKuwalw/sSarmthliVDCBokse Detail engineeringsurvey,designandimplementationforthefollowingw/s Chaubas VDC. VDC, Jogitarw/sSchemeinGothPaniKodka Scheme inVekhsimleVDC,GodamChauurw/sSanuBnthali Detail EngineeringSurvey,DesignandImplementationforNeptaw/s D A79-E:Cpct eeomn o at aaeet ea D aia ASMM June2011to ADBManila,EA-SWMRMC Solid WasteManagement ofMunicipilitiesNepal Preparation ofNational EnvironmentalImpactAssessment(EIA) Guidelinefor Municipality Nepal ADB TA7597-NEP: Capacity DevelopmentforWasteManagement :FeasibilityStudy, p pp j ect Munici ervision ofRatan l y andSanitationSchemes p alit y Area,Janak ES p p andBalkotBhakta ut WaterSu :EnvironmentalStudy, p ur; pp l y andSanitationScheme p ur EIA CA :EnvironmentalImpactAssessment, :ContractAdministration&ConstructionSupervision, Bhakta Sindhuli, Ramechapand Nuwakot Lamjung, sirahaand Syangja, Dhanusha, ahad,NplADBManila,EA-KUKL KUKL,PID/ADB Kathmandu, Nepal Kathmandu, Nepal Region, ParsaDistrict. Central Development July2004toFeb EcologyServiceCenter,Chitwan Nawalparasi District Dolkha 1999-2001 Bhimeswor Municipality, OMNIDevelopmentSociety Daman VDC,Makawanpur Kavrepalanchowk District Region in Central Development Kavrepalanchowk District Region in Central Development ea W&M Jan2003-Dec SWM&RMC Nepal Bhaktapur District Bhaktapur Municipality, anprVC aaON eeomn oit 2003-2005 OMNIDevelopmentSociety Ratnapur VDC, Chandraniyapur, Rautahad SI : Survey&Investigation, Location Detail p ur GIS: GIS Mapping, SES let iac Period Client/ Finance WS aiohr March2004-July DWSS, Panipokhari WS aiohr November2006 DWSS, Panipokhari AENplIAJan2002-July SAFE Nepal/IDA 1999-2001 OMNI DevelopmentSociety (JJAKPASS), PPUK Dec1996- Jan Sarasphai Karyakram Janatako KhanePaniRa RWSSFDB/ PPUK hkau uiiaiy2004to 2005 Bhaktapur Municipality MIDvlpetScey1994-1997 OMNI DevelopmentSociety :SocioeconomicStudy, TRN: Trainings CPD :Conceptual&PreliminaryDesign, 2005 September 2012 May 2017- Sptember 2018 February 2014- to August2007 Jan 1995-Feb 2020 2008 2004 2003 1998 1997 2004 e Professional (Months) 1 100.24 716 6 320 660 50.50 25 80.58 18 80.58 18 640.00 36 00.90 10 0.50 8 0.65 9 2.65 2.35 3 3 0.20 2 0.60 0.20 6 4 2.75 3 0.21 3 DED :DetailedEngineeringDesign, Services NRs. Value of (Million)                    FS           ES EIA

BDT IEE  :ContractPackaging, SI Work Phase SES- GIS CPD DED BDT 34 SM CA TRN 9.3.3 UrbanPlanningandInfrastructureDevelopment ..ProjectTitle S.N. 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 86 85 84 ERMC (P.)Ltd. ( aeoa adoln rjc 10 a)MadhyapurThimi Mun. ropani), Land Development,PoolingandPlanning ofOuterRingRoad(1000 KamalamaiMunicapility, February2011- Kamerotar LandpoolingProject(1500ha.) Urban LandDevelopment-LandPooling at RatmateArea(100ha) ADBManila,EA-DUDBC ropani), Land Development,PoolingandPlanning ofOuterRingRoad(10500 Chovar-Satungal SectorofOuterRingRoad Implementation andSupervisionWorkfor LandPoolingandServiceTrackin Nepal ADB TA77727-NEP:PreparingtheIntegratedUrbanDevelopmetnProject "One Cit Kavre, Panchkhal Centers inthefiveDevelopmentRegionsofNepalforestablishment Study ofUrbanSystemComprisingMunicipilities/SmallTowns/Market TulsipurMunicipality, Dang Preparation ofLongTermDevelopmentPlanPanchkhalValley Infrastructure DevelopmentinPalpaandDharan,TownFund Develo South AsiaTourismInfrastructureDevelopmentProject,Lumbini (SF)/STIUEIP Urban EnvironmentImprovementProject,ADBLoan:2650NEP Project ManagementConsultingServicesforSecondaryTownsIntegrated Project (IUDP),ADBLoanNo.2851/Grant:0284-NEP Project ManagementSupportConsultantsofIntegratedUrbanDevelopment Public TransportProject Project Management,DetailedDesignandSupervisionofLumbiniClean (PURPP) Project SupportConsultant:Pro-PoorUrbanRegenerationPilot 022-CS/K3G-010-CS) Construction SupervisionofTulsipurBusParkandShoppingStalls(K3SL- Municipality Construction SupervisionofBirendranagarBusParkin ropani), Land Development, Land PoolingandPlanningofOuterRing Road(1000 ropani), Land Development, Land PoolingandPlanningofOuterRing Road(1000 ropani), Land Development, Land PoolingandPlanningofOuterRing Road(1000 TDF ) p ment TrustCom Package-1 Package-1 (BhatedhikurotoThali/Danchi, Bhaktapur) Package-4 Package-3 Package-2 y OneIdentit y ". p onent ubn,Kplat D onN 59 E Feburary2012to ADBLoanNo2579-NEP Lumbini, Kapilbastu ap n hrnWrdBn January2012to WorldBank Palpa andDharan aiprDsrc DoUDBC,OuterRingRoad Lalitpur District Bhaktapur Kathmandu, Lalitpurand Bhakta Sindhuli DoUDBC,OuterRingRoad Kirtipur Area,Kathmandu Munici Birgunj Municipalities Butwal, Biratnagarand Kathmandu, KavreValley, Nepalgunj Municipality, MinistryofCulture,Tourismand Janakpur, Dharanand LalitpurSub-MetroplitanCity/World Lumbini, Kapilbastu Kathmandu, Nepal Surkhet Birendranagar Municipality, aiprDsrc DoUDBC,Outer RingRoad DoUDBC,Outer RingRoad Lalitpur District DoUDBC,OuterRingRoad Lalitpur District Lalitpur District l ieRgoso ea UB May2011to DUDBC All fiveRegionsofNepal Location Detail p p alit ur District y usprMncplt,Dn D June2017- Tulsipur Municipality,Dang/TDF let iac Period Client/ Finance UB February2011- DUDBC VD,Aa aa Jan.2003-Feb. KVTDC, AnamNagar oDC EPABJan2007to Development Project DoUDBC, UEIP/ADB Development Project DoUDBC, OuterRingRoad Development Project June2011to STIUEIP, PCO/DUDBC,ADB DUDBC, IUDP,PCO/ADB Civil Aviation,Lumbini Bank April2016to Birendranagar Municipality/TDF Development Project Development Project Development Project September 2016 December 2018 December 2015 December 2016 April -Dec2006 April -Dec2006 April -Dec2006 April -Dec2006 February 2009- February 2010 March 2013to March 2016to October 2017 October 2007 August 2011 April 2007to April 2015to March 2009 June 2015 June 2017 June 2013 July 2011 Jul 2004 y 2011 Professional (Months) 1. 42.99 119.5 1550.00 21.5 1 82.31 316 316 21.97 126 16 719.40 17 56.00 55 210.00 62 52.99 15 52.60 25 115.7 11 1.7 16 0.50 6 0.53 4 0.60 6 0.60 0.60 6 0.60 6 6 Services NRs. Value of (Million) 91.20 1.7                           FS       ES EIA IEE   

SI Work Phase SES- GIS CPD DED BDT 35 SM CA TRN 9.3.4 BuildingandArchitect ..ProjectTitle S.N. 105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 ERMC (P.)Ltd. ealdDsg n osrcinSpriino rtv rmr colKveaacokDsrc LoveGreenNepal(LGN), Kavre Kavrepalanchowk District Detailed Designand ConstructionSupervisionofPrativaPrimary School Mandir Detailed Designand ConstructionSupervisionofJayaSantosi Machalachitra National Tradin Architecture Designing, Planning,StructuralDesigningandEstimating of Truss ShedatBirgunjICD;ContractNo: NIRTTP/PCO/NITDB/S/QCBS-16 Rehabilitation ofBhairahawaPavement WorksandConstructionofSteel (NIRTTP) Project Steel Transportation of Construction and and Works Truss ShedatBirgunjICD;ContractNo: NIRTTP/PCO/NITDB/S/QCBS-16 Pavement Trade Bhairahawa of Regional Rehabilitation India Nepal / PIUDSC-1) Design andConstructionSupervisionof School Reconstruction(EEAP/MOE Federal StateIncludingPreparationofDPR ofCulturalMuseumineachstate Preparation ofMasterPlanSevenSelected DestinationsinEachof7 Contract No.UGIIP/DUDBC/S/QCBS-4 July-Oct009 2006 Urban GovernanceandInfrastructureImprovementProjectII(UGIIP-II) Contract No.UGIIP/DUDBC/S/QCBS-3 Urban GovernanceandInfrastructureImprovementProjectII(UGIIP-II) Pokhara andLahanBranchOfficeBuildingsofRastriyaBanijyaBankLtd. Consulting Servicesfor(RBB-CS-01-073/74)A/EDesignandSupervisionof SEZProject,MOI Ltd. Thapathali andBasantpurBranchOfficeBuildingsofRastriyaBanijyaBank DDC,Mustang Consulting Servicesfor(RBB-CS-03-073/74)A/EDesignandSupervisionof JumlaDistrict Manohara KholaWholesaleMarketArea Mustangdistrict Architecture Designing,Planning,StructuralDesigningandEstimatingof of KamalamaiMunici Detailed EngineeringDesign,IEEandConstructionSupervisionofUEIP Pre-feasibility StudyofIndustrialInfrastructureorSEZinJumla Imadole, Ichan Integrated LocalDevelopmentProjectPreparationof4VDCs(Gothatar, and Katun Preparation ofPhysicalDevelopmentPlanBishnuBudhanilkantha,Imadol Master PlanofMuktinathAreaMustangDistrict Manohara KholaWholesaleMarketArea Architecture Designing,Planning,StructuralDesigningandEstimatingof ropani), Land Development,PoolingandPlanningofOuterRingRoad(1000 Package-5 j e VDCinKathmanduValle g g u Nara Buildin p alit y g an andGoldhun y Com

p lex atPokhara y g a VDC ) ohr,KsiDsrc T ahad Dec.2003-May NTLKathmandu Pokhara, KaskiDistrict Sindhuli Kamalamai Municapilities, Bhakta Kathmandu, Lalitpurand Bhakta Kathmandu, Lalitpurand aauDsrc rjc e eatet E Feb- July2010 ProjectDevDepartment, NEA Tanahu District Birgunj, Nepal akuaaDsrc JayaSantosiMa Chalachitra Sankhusawa District November 2016- EEAP,CLPIU-MOUD/ADB All overNepal aiprDsrc DoUDBC,Outer RingRoad Lalitpur District l eea ttso ea MinistryofCulture, Tourismand All FederalStatesofNepal Nepal 4 MunicipalitiesofWestern ofNepal 5 MunicipalitiesofMid July2017to Districts ofNepal Pokhara andSiraha RastriyaBanijyaBankLtd. Kathmandu, Nepal AgriBusinessPropmotionCentre, Bhaktapur/ Kathmandu AgriBusinessPropmotionCentre, Bhaktapur/ Kathmandu Location Detail p p ur ur Branch let iac Period Client/ Finance Nepal Transport, DepartmentofRoads, Ministry ofInfrastructure& Government ofNepal(GoN), oDC VD April2006to May-July2010 DoUDBC, KVTDC DoUDBC, KVTDC oDC EPABJan2007to DoUDBC, UEIP/ADB Mandir, Argakhanchi UB,UIPI August2017 to August2017 to Civil Aviation DUDBC, UGIIP-II DUDBC, UGIIP-II July2017to Rastriya BanijyaBankLtd. MoA MoA Development Project September 2019 December 2015 July 2014to September 2019 March-April 2006 March-April 2006 Se December 2018 April -Dec2006 October 2017 May 2017to March 2018 March 2018 p Jul tember 2010 1999 2004 2000 y 2006 -

4 1.48 147 4 1.52 147 Professional (Months) 12232.09 1172 654.80 36.5 4 21.25 144 4 51.41 52.87 341 347 50.38 15 52.60 25 0.12 9 0.50 2 0.51 6 0.97 5 0.85 8 0.50 5 0.30 6 0.15 2 0.15 0.60 2 6 Services NRs. Value of (Million)                             FS     ES EIA IEE  

SI Work Phase SES- GIS CPD   DED  BDT 36 SM CA TRN Preparation ofBidding,ContractDocument&Tendering, Note: ..ProjectTitle S.N. 113 112 111 110 109 108 107 106 ERMC (P.)Ltd. 114 FS and LalitpurMunicipalitesatleastmorethan50building Various (atleast300)privateresidentialbuildingsinKathamndu,Vhaktapur School DhuskunPrimarySchool, Detailed DesignandConstructionSupervisionofGaneshLowerSecondary SindhupalachowkDistrict Detailed DesignandConstructionSupervisionofDhuskunPrimarySchool Byabasta SamiteeinTangal,Kathmandu Detailed DesignandConstructionSupervisionofRadhaKrishnaDevsthan Trust (nowKathmanduMedicaCollege,K.U.)GahanaPokhari Detailed DesignandConstructionSupervisionofSamundraManaEducation School Detailed DesignandConstructionSupervisionofJorpatiLowerSecondary Deu Ghat DetailedDesignandConstructionSupervisionofJagannathSantiKunja, School Detailed DesignandConstructionSupervisionofGoldenFuturePrimary School Detailed DesignandConstructionSupervisionofJhiganaDeviPrimary :FeasibilityStudy, ES :EnvironmentalStudy, EIA CA :EnvironmentalImpactAssessment, :ContractAdministration&ConstructionSupervision, ahad ManyprivateClientsinvarious Kathmandu arplnhw ititGaneshLowerSecondarySchool, Kavrepalanchowk District RadhaKrishnaDevsthan SamundraManaEducationTrust Kathmandu District Kathmandu District JorpatiLowerSecondarySchool, JagganathSantiKunja,DeuGhat Kavrepalanchowk District Tanahu District GoldenFuturePrimarySchool, Kavrepalanchowk District JhiganaDeviPrimarySchool, Kavrepalanchowk District SI : Survey&Investigation, Location Detail GIS: GIS Mapping, SES Sindhupalchok let iac Period Client/ Finance parts ofthecity Panchkhal Byabasta Samitee,Tangal Gahana Pokhari,Kathmandu Panchkhal VDC&LGNKavre. Kathandu Tanahu, HeadOffice:Tangal, Panchkhal/ &LGNKavre Panchkhal/LGN Kavre :SocioeconomicStudy, TRN: Trainings CPD :Conceptual&PreliminaryDesign, 1998-2004 1994 1993 1994 1994 1998 1999 1999 1999 Professional (Months) 81.50 18 0.13 7 0.09 6 0.18 0.12 2 0.12 7 7 0.12 0.13 9 9 DED :DetailedEngineeringDesign, Services NRs. Value of (Million) 0.80

FS ES EIA

BDT IEE   :ContractPackaging, SI Work Phase SES- GIS CPD DED BDT 37 SM CA TRN 9.4.1 Irrigation 9.4 WaterResource,IrrigationandNaturalResourcesManagement ..ProjectTitle S.N. 12 11 10 14 13 ERMC (P.)Ltd. 9 8 7 6 5 4 3 2 1 rjc rprto td,T o 29NPCmuiyIrgto rjc NplABMnl,E-O August2009to 2010-2014 ADBManila,EA-DOI DOI,IWRMP/WorldBank Irri Initial EnvironmentalExamination(IEE)StudyofRaniJamaraKulariya Nepal Nepal Project PreparationStudy,TANo.7229-NEPCommunityIrrigation Irri Construction SupervisionofMainCanalCh0+614to15+000kmSikta Irrigation InfrastructureDevelopmentandImprovement,IWRMP 85000 haandDetailedEngineeringDesignofIrrigationProject-46000ha) Bheri-Babai IrrigationProject(LidarSurvey,PreparationofOrtho-Photo- Works inMainCanalCh15+00to35+000kmofSiktaIrrigationProject Construction Supervision,QualitycontrolandContractManagementofCivil Irrigation Project Design andSupervisionofHydromechanicalWorksHeadworksSikta Development ofDunduwaIrrigationSystem Detailed Planning,EngineeringDesignofBranchCanalsandCommandArea 73/CS-1) of BangangaIrrigationSystem(6350ha)(PackageNumber:BIMD/072- Detailed EngineeringSurvey,DesignandCostEstimatefortheRehabilitation Mana Bhulke Irrigation SubProjects (212 ha), Sunsari District Sapta Kohi Irrigation SubProject (300 a), Sunsari District Lohandra Dataram Paini Irrigation SubProjects (200 ha), Kali Koshi No. 1Paini (203 ha), Sunsari District Feasibility StudyandSubprojectImplementation Planof Community –ManagedIrrigatedAgriculture SectorProject(PackageNo.B), Remaining CommandAreaDevelopment Works, Irrigation Project Preparation ofApproachManualandImplementationGuidelinesforSmall Jumla, Surkhetand Dailekh Districts Design Estimateand DrawingPreparationofMicro-Irrigation Projectin Dan Detailed Surveyand DesignofBastiKholaandBetIrrigation Projectin Preparation ofParcellaryMapsIrrigated Areasfor24600ha Drawings andEstimateof Completed DetailedDesignofCAD,10302 ha. Development, ProtectionandOtherRelated WorksandReviewofthe Drawing, VerificationandEstimateofCommand Area(6300ha) Quality ControlofConstructionWorks, g g ation Pro ation Pro g , 300ha. g ement inPro j j ect, Kailali ect j ect RelatedActivities. Silt Ejectors ii. andotherrelatedWorks DetailedSystemPlanning,Design, iii. Detailed Planning,Design, i.

Supervision and v. iv. Project agDsrc I,Srht2000 DIO,Surkhet Dang District all ititFRD O July2009to FWRID,DOI Dec2009to DOI,SiktaIrrigationProject Banke district District Rautahat andSarlahi ak ititDI it riainPoetMay2012to DOIMWRID November2013 DOI,SiktaIrrigationProject Banke district DOI,SiktaIrrigationProject Banke district September2016 June2016to Banke district DOI,SiktaIrrigationProject Nepalgunj, BankeDistrict DepartmentofIrrigation Kapilbastu, Nepal ea oIA July-December District Morang andSunsari DoLIDAR Nepal Dailekh districts Jumla, Surkhetand Location Detail let iac Period Client/ Finance (SFD) LoanNo5/465 Project/Saudi forDevelopment DOI, BagmatiIrrigation Directorate (RPSU),Biratnagar CMAISP /RegionalIrrigation EI ea July2005 toSept CECI, Nepal May 2017 A to February2018 to October2017 December 2009 November 2007 ugust 2010-Nov January 2015 to May2008 March 2013 2008-2013 June 2010 2005 2011 2009

Professional (Months) 0. 51.20 107.4 1450.78 41.4 0 20.46 202 2 100.00 526 19.98 128 20.45 283 0 26.42 303 51 15 19.92 96 52.77 15 51.33 15 51.10 15 0.14 2 0.25 5 Services NRs. Value of (Million)

        FS                   ES EIA IEE

SI Work Phase  SES- GIS CPD DED BDT 38 SM CA TRN 9.4.3 RiverBasinPlanningandDevelopment 9.4.2 Agriculture ..ProjectTitle S.N. 0MliDmninlSuyo h amt ie ai amt ai raWC,SnaDra July06toDec08 WECS,SingaDurbar Bagmati BasinArea March-July2008 ApriltoNov2008 MultiDimensionalStudyof theBagmatiRiverBasin RVWRMP,Helvetas/Finnida and 30 DHMBabarmahal Sand Gravel, of Extraction on (EIA) HumlaDistrict,Karnali Assessment Impact WIDP,DivisionNo. 5,Bhairahawa, Environmental 29 NarayaniBasin PreparationofStationInventorywithCross-Section SurveyofNarayaniBasin 28 RupandehiDistrict WaterUseMasterPlan(WUMP)Preparation ofHumlaDistrict 27 DetailedStudiesforthePreparationofRiver TrainingMasterPlanofRiu 26 MasterPlanStudyforTinauIntegratedDevelopment Works 25 UpdatingandUpgradingWaterResourcesInformation Systemand 24 23 22 21 20 19 18 17 16 15 3Peaaino ae nue aadMpo akiRvrBsnKna ie ai WD,Plhw MarchtoJuly MarchtoJuly ApriltoJuly2006 DWIDP,Pulchowk DWIDP,Pulchowk DWIDP,Pulchowk Kankai RiverBasin Tinau RiverBasin Mahakali RiverBasin PreparationofWaterInduced HazardMapofKankaiRiverBasin 33 PreparationofWaterInduced HazardMapofTinauRiverBasin 32 PreparationofWaterInduced HazardMapofRangoonRiver 31 ERMC (P.)Ltd. A ole rmRpiRvr uo hl,Ga hl n auKoai Dang in Khola Patu and Khola Gwar Khola, Distric Musot River, Rapti from Boulder River CentralandWestern 1990 Baseline SurveyofPACTdistricts(ContractIDPACT/12/2010) AF/S/QCBS/40/2013) Commercialization andTrade(RFPNo.:PACT-39-SBC-CF-PACT- Consultancy ServicesforTechnicalAssistanceProjectAgriculture Nawal Detailed SurveyandDesignofJanakpurPiparIrrigationProjectin DOI/ADB Nawal Detailed SurveyandDesignofBaragadahiKawasotiIrrigationProjectin District, 1000ha Detail SurveyandDesignofBhumahiIrrigationProjectinNawalparasi BardiyaDistrict Socio-economic BenchMarkSurveyofRajapurIslandRehabilitationProject. Pro Feasibility StudyofBanlekhIrrigationProject,LanaKedareshwor Pro Jutpani IrrigationProject,ThalahiKirkichauraha Dhading DistrictBhagawanpurIrrigationProjectGumdi Assessment StudyofthefollowingdifferentProjectinBara,Chitawanand Irri Dhading, 70haMajhitarIrrigationProjectinDhanding,1340HaPathahan Irrigation ProjectinDhadingDistrict,90haparabetarproject Detailed SurveyandDesignofthefollowingIrrigationProjectJogimara ssessment ofBasin/Sub-BasinWaterAvailibili g j j ation Pro ect, Uma ect andLadaGadIrri t p p arasi District,400ha arasi District,700ha j j ect inChitwan an Irri g ation g ation Pro j ect. yy

( IWRMP/World Bank ) hdn hta ititIrgto etrPoet 1992 IrrigationSectorProject. Dhading &ChitwanDistrict agDsrc D agNov2007to DDCDang Dang District Develo Mid andFarWestern aaprs ititDistrictIrrigationOffice, FeasibilityStudyProject,DOI Nawalparasi District Nawalparasi District aibsuDsrc FeasibilityStudy Project, DOI, Kapilbastu District hta WD,Plhw June-Dec2008 DWIDP,Pulchowk Chitwan Re ProjectforAgricultural All overNepal 1990 FeasibilityStudyProject,DOI Nawalparasi District Dhading District Bara, Chitwanand g ion ofNe Location Detail p ment Re p al g ion Rupandehi let iac Period Client/ Finance ES ig ubrMarch2012-Feb WECS, SingaDurbar STWrdBn July-Oct2011 PSCT/World Bank Nawal Mahara Mahara NEP/H813-NP (PACT) Credit/GrantNo:5180- Commercialization andTrade riainSco rjc 1991 Irrigation SectorProject p arasi jg j an an g j July 2018 November 2016- March toDec June 2008 2009 1990 9010.07 1990 1 1990 2006 2013

Professional (Months) 5 201.31 958 82.26 18 49.70 94 01.30 10 24.30 82 00.64 0.60 10 10 0.17 2 0.11 2 0.75 6 7.27 8 0.3 7 0.54 9 0.13 2 0.56 3 0.50 2.60 7 9 0.84 5 Services NRs. Value of (Million)          FS                   ES EIA IEE      

SI Work Phase SES- GIS CPD DED BDT 39 SM CA TRN 9.4.4 FloodForecastingandEarly WarningandManagement ..ProjectTitle S.N. 2FgEei td fKtmnuVle ahad H,Bbraa July,2003 DeterminationofFloodWarning andDangerLevelofSetiRiver in Flood 51 June2005- DetailedTopographicalSurveyandLandscaping andRiverTrainingof 50 June2005- DHM,Babarmahal PreliminaryStudyofBoardersRiversinNepal, (Package-5)-ArraNadi, 49 DWIDP,Pulchowk PreliminaryStudyofBoardersRiversinNepal, (Package-3)-SinghaNadi, Kathmandu 48 DWIDP,Pulchowk KamalaRiverBasin November2004- Nov2004-July PreliminaryStudyofBoardersRiversinNepal, (Package-4)-DheduNadi, Bagmati RiverBasin 47 Legal, Policy andInstitutionalStructureforIntegratedWaterResources 46 DHM,Babarmahal Preparation ofWaterInducedHazardMapKamalaRiver DHM,Babarmahal 45 Preparation ofWaterInducedHazardMapBagmatiRiver 44 Extraction andDigitizationofAutographicChartKathmanduAirport1993- 43 Kathmandu Fog EpedicStudyofKathmanduValley Kathmandu 42 Extraction andDigitizationofAutographicChartKathmanduAirport1988- 41 Digitization SynopticReportofKathmanduAirport1973-1977 40 Digitization RadiosondeDataofKathmandu1977-1979 39 DhanushatoRautahat GISBased StudyofRiverSysteminTeraifromDhanusatoRautahatDistricts Bara,ParsaandChitwan 38 GISBased StudyofRiverSysteminTeraifromBaratoChitwanDistricts 37 Development ofGISDatabasefromExistingDistrictWaterUseInventory 36 Study andInvestigationSurveyofLotharKholaRiverBasinAdjoining 35 Evaluation StudyoftheEffectivenessModelRiverTrainingandSabo 34 2ConductingKosiRiverCross- SectionSurvey,HazardMapPreparation, 52 ERMC (P.)Ltd. Nadi, TilaweNadiandSirsi A Forecasting Stations Ja Muse NalaandSisawaNala. Surkhi River,chakrihawaNadi,SurangKhola, SotwaNala,JamuharRiver, Bhutiya Nadi,KadiyaAruwaRiver, JamuneRiverandBangiRiver. Mana 1999 1992 Studies Rivulets forWaterInducedDisaster Works carriedoutbyDWIDPinGirubariKhola,Nawalparasi Institutional Stren (Emergency floodDamage RehabilitationProject(EFDRP), Part E Embankment Breach Analysis,soilSamplingandAnalysis(Package 1), muwa Nadi,ThuteOdarShakharibas Nadi,DhuthahaGad gg anath SantiKun g ement inRiverBasinContext g thenin j a, DeuGhat. g ofDWIDPfordisaster riskReduction y a NadiinParsadistrict. )

aauDsrc JagganathSanti Kunja,DeuGhat Tanahu District Region Eastern Development Region, ParsaDistrict. Central Development ak,PkaaPatclAto ot saNovember2013- PracticalAction SouthAsia Kaski, Pokhara District. Region, Nawalparasi Central Development Region, BaraDistrict. Central Development Nov03-July04 Nov2003-July DHM,Babarmahal DHM,Babarmahal Kathmandu Kathmandu WECS,SingaDurbar ApriltoJuly2006 Nepal district DWIDP,Pulchowk Chitwan andNawalparasi Nawalparasi District District districts ea ES ig ubrMarch-July2005 WECS,singa Durbar Nepal Location Detail let iac Period Client/ Finance Tanahu Development Bank DWIDP, EFDRP/Asian WD,Plhw Feb-June,2002 DWIDP, Pulchowk WD,Plhw Feb-June,2002 Feb-June,2002 DWIDP, Pulchowk DWIDP, Pulchowk ApriltoJuly2006 DWIDP, Pulchowk WD,Plhw June2005- June2005- DWIDP, Pulchowk DWIDP, Pulchowk A Feb -May2012 February 2014 pril 2006toJuly Januar Januar January 2006 January 2006 July 2005 2005 2006 1997 2004 y y 2006 2006

Professional (Months) 41.20 1.30 24 24 00.60 10 20.36 0.32 12 12 20.60 12 67.60 16 0.1 3 0.60 7 0.45 6 0.16 5 0.16 0.16 5 5 0.25 0.25 1 2 0.40 7 1.00 5 0.25 0.1 1 3 Services NRs. Value of (Million)

         FS                 ES EIA IEE       

SI Work Phase SES- GIS CPD DED BDT 40 SM CA TRN 9.4.5 NaturalResourcesManagement ..ProjectTitle S.N. 8IaePoesn o lce fNplHmlynRgo DMBbraa June-July2009 Jan-May2006 Jan-May2006 DHMBabarmahal DHMBabarmahal LekhnathMunicipality, Nov2005-April HimalayanRegion 2001 GlacierOut-burstStudy,Topographical andByathematicSurvey of March-July2008 DHMBabarmahal 73 TopographicalandByathematicSurveyofBhairabkunda andGosaikunda DHMBabarmahal MarchtoJuly Nepal 72 Inspection,MaintenanceandMonitoringofthe BuiltStructuresofTshoRolpa 71 RTP,DOI,Jawalakhel DHMBabarmahal WaterResourcesStudyofRupatal,Pokhara 70 Nepal DHMBabarmahal 69 Nepal ImageProcessingforGlacierofNepal 68 May-July2009 PreparationofFloodMitigationPlanforRangoon Khola,Deldhura Nepal 67 PreparationofFloodHazardMapNepal 65 DischargeMeasurementatallGaugingStation ofFFP 66 Nepal DHMBabarmahal Discharge MeasurementatallGaugingStationofFFP 64 Oct09toJun Detailed StudiesforthePreparationofRiverTrainingMasterPlan 63 WesternNepal Updating HydrometerStationCalibratiounderFFP. JantoJune2010 62 Discharge MeasurementatallGaugingStationofFFP February2011- 60 DWIDP,Pulchowk ChitwanandMakawanpur Determination ofFloodDangerLevelinForecastingStations 61 Development ofFloodForecastingModelforNarayaniBasin DHMBabarmahal 59 MajorRiverBasinofNepal Preparation ofWaterInducedHazardMapEastRaptiRiverBasin DHMBabarmahal 58 MajorRiverBasinofNepal Determination ofFloodDangerLevelinForecastingStations 57 Determination ofFloodDangerLevelinForecastingStationsKarnali 55 Discharge MeasurementatallGaugingStationofFFP 56 Discharge MeasurementatallGaugingStationofFFP 54 Conducting KoshiRiverFloodForecastingandEarlyWarning 53 ERMC (P.)Ltd. Surroundin Lakes inSindhu GLOF RiskReductionProjectAreaSite and MonitoringofMHPPowerPlant. Initial EnvironmentalExaminationofRupataal DamConstructionProject Narayani River Narayani andRaptiBasin Koshi River riverat ChisapaniandRaptiRiveratRajaiya reduction (EFDRP), PartEInstitutionalStrengtheningofDWIDPfordisasterrisk System(Package 2),EmergencyFloodDamageRehabitationProject g AreaofTsho-Rol p alchowk districts p a GlacierLakes. iduacokDsrc H,Bbraa May-July2004 DHM,Babarmahal Sindhupalchowk District District. Tsho Rolpa,Dolakha Pokhara, Kaski Lekhnath Municipality, July06-March MarchtoJuly DWIDP,Pulchowk Narayani Basin,Chitwan JantoJune2010 DHMBabarmahal Western Nepal DHMBabarmahal Eastern River Basin Karnali andRaptiriver Region Eastern Development Pokhara, Kaski District. Tsho Rolpa,Dolakha Location Detail let iac Period Client/ Finance Fund July2008to DHM, BabarmahalNorvegien Lekhnath Municipality February2011- DHM Babarmahal Development Bank DWIDP, EFDRP/Asian ehahMncplt July2008to Lekhnath Municipality Fund DHM, BabarmahalNorvegien November 2004- April-July, 2003 Feb-May 2012 Januar Januar June 2011 June 2011 July 2005 2006 2009 2010 2009 07 y y 2009 2009 Professional (Months) . 1.56 6.5 00.80 10 52.00 25 0.30 3 0.65 3 0.30 3 0.85 9 0.88 9 0.78 9 0.30 0.16 3 0.42 0.14 5 3 3 0.10 2 0.27 3 0.50 0.47 3 3 0.50 0.30 5 4 0.40 3 Services NRs. Value of (Million) 0.63

  FS      ES EIA IEE                 

SI Work Phase SES- GIS CPD DED BDT 41 SM CA TRN 9.5 Mapping 9.4.6 ClimateChangeAdaptation ..ProjectTitle S.N. 0PreparationofProposedGLD RoadonCadastralMapinTenUrbanizing 10 PPCR-Building ResiliencetoClimateRelatedHazards(Loan/Credit/Grant 75 Building ResilienceofWatershedsinMountainEco-RegionsProject(ADB 74 3Udtn nutilShmsadPeaaino otaeKtmnuMnsr fIdsr ueJl 084 June-July2008 MinistryofIndustry Kathmandu Trijuga Municipality, UpdatingIndustrial Schemesand Preparation ofSoftware 13 PreparationofDigitalBase MapofTrijugaMunicipality(3300ha) 12 DistrictLevelLandUseMap Updating,PreparationofDistrictLevel LandUse 11 ERMC (P.)Ltd. DigitizationandPreparationofGeodatabaseCadastralMapsChabahil 9 DistrictLevelLandUseMapUpdating,Preparationof 8 DigitizationandPreparationofGeodatabaseCadastralMapsBanke, 7 PreparationofVDCLevelPresentLandUseMap,SoilCapability 6 PreparationofExistingdigitalLandUseMap12VDCsKathmandu 5 PreparationofVDCLevelPresentLandUseMap,SoilCapability 4 DigitizationandPreparationofGeodatabaseCadastralMapsKapilbastu, 3 PreparationofVDCLevellandresourcesmaps(PresentLandUseMap,Soil 2 PreparationofVDCLevellandresourcesmaps(PresentLandUseMap,Soil 1 and KaskiNa for LandUseZonin Zoning Maps,PreparationofGISDatabase andPreparationofDistrictProfile Surkhet, Kailali-Tika Pro Birendranagar andBhandaraVDCofChitawan District,NationalLandUse Superimpose ofCadastralLayersforChainpur, Khairahani,Kathar, Map, DetailLandUseZoningVDC ProfileforLandUseZoningand Valle Chitwan Districts,NationalLandUsePro Superimpose ofCadastralLayersforJutpani,PipleandShaktikhorVDCs Map, DetailLandUseZoningVDCProfileforand Dang, SurkhetandKanchanpurDistricts(KhandaGha). reports forsixVDCsofPalpaDistrict,NationalLandUseProject Land UseZoningandSuperimposeofCadastralLayers),database Map, LandCapabilityDetailUseZoningVDCProfilefor reports forsixVDCsofKailaliDistrict,(Package:19) Land UseZoningandSuperimposeofCadastralLayers),database Map, LandCapabilityDetailUseZoningVDCProfilefor VDC's ofKathmandu No. TF013557/TF013665)ContractPPCR/DHM/S/FBS-11 Grant 0357-NEP) for LandUseZonin Zoning Maps,Preparation ofGISDatabaseandPreparation ofDistrictProfile j ect y p i Office g g p

( ( ur andDhan 7 Districts 25 Districts ) ) g adi andBardiaDistricts j ect hta,NplNtoa adUePoet O December-April NationalLandUseProject,DOS Chitwan, Nepal Nepal Mid andFarWestern NationalLandUseProject, Palpa District,Nepal NationalLandUseProject, Kailali District,Nepal Ne Mid andFarWestern ea adUeZnn,DSMyJl 0930 May-July2009 LandUseZoning, DOS January-July Nepal LandUseZoning, DOS 6 Nepal May-July2011 KVTDC, AnamNagar Kathmandu Valley ea Departmentof LandInformation Nepal ahad VD a-uy21 6 May-July2010 KVTDC Kathmandu DepartmentofHydrologyand Nepal Region ofNepal Far WesternDevelopment Uda hta,NplLn s oig O a-uy21 100 May-July2011 LandUseZoning,DOS Chitwan, Nepal p y al a Location Detail p ur let iac Period Client/ Finance UB pi oJl 086 ApriltoJuly 2008 DUDBC and Archiv Department ofLandInformation Management Ministry ofLandReformand Management Ministry ofLandReformand and Record and Record Department ofLandInformation Ne Metereology, Kathmandu, (DSCWM)/ADB and WatershedManagement Department ofSoilConservation p al/World Bank 2015 April 2015-July to March2016 December 2015 A June 2014-May pi-uy21 15 April-July 2011 ugust 2014-July a-o 0240 Jan-Nov 2012 January-June 2012 2018 2019 2010 2010

Professional (Months) 79 210.00 27.99 100 7 266.00 679 120 15 Services NRs. Value of (Million) 17.50 0.20 9.99 0.80 9.00 7.40 8.70 4.80 0.63 4.60 6.47 0.63 9.99

  FS                                       ES EIA IEE

SI Work Phase SES- GIS CPD DED BDT 42 SM CA TRN Preparation ofBidding,ContractDocument& Tendering, Note: ..ProjectTitle S.N. 4Peaaino ititEvrnet(E) fAha itit chmDsrc RAP/RCIW(DFID/GTZ) andDDC RAP/RCIW(DFID/GTZ) andDDC AchhamDistrict DailekhDistrict Preparation ofDistrictEnvironment(DEB)AchhamDistrict. 24 Preparation ofDistrictEnvironmentBrief(DEB)DailekhDistrict. 23 BidurMunicapility, Mapping andPlanningServicesforZone-IILeaseholdForestry 22 DhulikhelMunicapility, Preparation andSupplyofUrbanMapforBidurMunicipality,Nuwakot 21 Preparation andSupplyofUrbanMapforDhulikhelMunicipality,Kavre 20 KamalamaiMunicapility, Preparation andSupplyofUrbanMapforKamalamaiMunicipality,Sindhuli 19 Development ofGISDatabasefromExistingDistrictWaterUseInventory 18 GISMapping ofAgriculturalResourcesandPotentialPocketareasinCDP 17 GISbased PovertyandSocialMappingofinCLDPDistricts 16 GIS basedPovertyandSocialMappingofinCLDPDistricts 15 GISbased PovertyandSocialMappingofinCLDPDistricts 14 ERMC (P.)Ltd. FS Baitadi, Dadeldhura,DotiandAchhamDistricts Livestock ProgrammeincludingSindhupalchowk,Lamjung,Pyuthan,Salyan, Studies District District Nawalparasi, Tanahun,Lamjung,Palpa,Arghakhanchhi,GulmiandBaglung and Mu Surkhet, Dailekh,Jajarkot,Rukum,Salyan,Pyuthan,Rolpa,Humla,Jumla Darchula andBa Banke, Bardiya,Kailali,Kanchanpur,Doti,Dadeldhura,Baitadi,Achham, :FeasibilityStudy, s s g u Districts j an g ES Districts :EnvironmentalStudy, EIA CA :EnvironmentalImpactAssessment, :ContractAdministration&ConstructionSupervision, (Package 3) (Package 2) (Package 1) Re Far WesternDevelopment Development Region Mid andFarWestern Development Region Mid andFarWestern Development Region Mid andFarWestern Achham Districts Dadeldhura, Dotiand Pyuthan, Salyan,Baitadi, Sindhupalchowk, Lamjung, WECS,SingaDurbar Eastern Nepal Nuwakot Kavre Sindhuli SI g ion : Survey&Investigation, Location Detail GIS: GIS Mapping, SES Dailekh let iac Period Client/ Finance A NEP (SF) MOA, CLDP-ADBLoanNo.2071- NEP (SF) MOA, CLDP-ADBLoanNo.2071- NEP MOA, CDP-ADBLoanNo.1778- NEP (SF) MOA, CLDP-ADBLoanNo.2071- Programme Leasehold ForestryandLivestock EPDDCABMay2007toJuly March2007to Jan2007toJuly UEIP/DUDBC/ADB UEIP/DUDBC/ADB UEIP/DUDBC/ADB chham :SocioeconomicStudy, ( SF TRN: ) Trainings CPD :Conceptual&PreliminaryDesign, A A A A A February 2008 pril 2006toJuly pril 2006toJuly pril 2006toJuly pril 2006toJuly pril 2006toJuly May 2007to 2003-2004 2003-2004 Jul 2006 2006 2006 2006 2006 2008 2008 y 2008

Professional (Months) 66 14 18 12 0.20 3 0.30 3 0.60 0.40 7 0.60 3 0.60 3 0.60 3 3 DED :DetailedEngineeringDesign, Services NRs. Value of (Million) 3.30 0.96 1.37 0.77

    FS                             ES EIA

BDT IEE :ContractPackaging, SI Work Phase SES- GIS CPD DED BDT 43 SM CA TRN 9.6 HumanResourceManagementandCapacityBuilding ..ProjectTitle S.N. 21 20 19 18 17 16 15 14 13 12 11 10 ERMC (P.)Ltd. 4 5 3 1 9 8 7 6 2 Grou Workers (CW)andCommunityTechnician(CT),Batch-VIII,17days(4 Central Development Training onCAP/HHSincludingConflictManagementforCommunity WesternDevelopment Ferrocement TankTrainingtoCTforBatchVIII-Package-2(RFP140) Basic ForemanPlumbingTrainingforBatchVIII-Package-3(RFP139) Grou Workers (CW)andCommunityTechnician(CT),Batch-IX,17days(4 Training onCAP/HHSincludingConflictManagementforCommunity su Training onWaterandSanitationSchemeDesignconstruction Octo Sos including ConflictManagementTrainingtoCWsandCTsofBatch-IXNew PovertyAlleviationFund,GoN Training onCommunityActionPlanning/Health,HygineandSanitation Province6and7ofNepal Packa Skills DevelopmentProjectGrant0345-NEP:ThirdPartyMonitoringFirmfor Feasibility StudyforPovertyAlleviationProjectsinProvinces6&7 A Trainings onGISMapping ofAgriculturalResourcesandPotential Pocket Mid andFarWestern Trainings onGISbased PovertyandSocialMappingofinCLDP Districts da Farmers LevelSkillDevelopment Trainings(2groups,25participants-30 da JT/JTA LevelSkillDevelopmentTrainings (1groupsof25participants-90 Schemes forJT/JTA(2groupsof25participants-35 days) Basic InductionTrainingonImplementation ofSmallScaleIrrigation Partici Land DevelopmentandGPSSurveyTrainings Basic MarketingDevelopmentTrainingto ProjectPartners, Conduction ofGISTrainingstoMunicipal Staff(7days) Conduction ofGISTrainingstoMunicipal Staff(7days) Conduction ofGISTrainingstoMunicipal Staff(7days) CentralDevelopment Conduction ofGISTrainingstoMunicipalStaff(7days) Basic ForemanPlumbingTrainingforBatchVII-Package-2(RFP128) Grou Workers (CW)andCommunityTechnician(CT),Batch-VII,17days(4 Training onCAP/HHSincludingConflictManagementforCommunity 0063- NEP(SF)] reas inCDPDistricts p y y s s ervision forTechnicalSu ( Packa ) ) p p p p s g s s ) ) ) ants e NumberNo:SDP/CS/08-070/71 . . , Packa g ) e 2 ) g e3. (7 daystraining,4groupswith25participants each) p ervisor ( Ten Da y s ( 7daysTrainingsfor17 ) [ADB GrantNo. Trijuga Municaplity,Udayapur Kamalamai Municaplity,Kavre Bidhur Municaplity,Nuwakot Dhulikhel Municaplity,Kavre ea CouncilforTechnicalEducation& Nepal Re Far WesternDevelopment uwl ea RWSSFDB/WorldBank/DFID Butwal, Nepal Development Region) Dhulikhel (Central Re Far WesternDevelopment Re DoUDBC,OuterRing Road Far WesternDevelopment Kathmandu Re Re Develo Region Far WesternDevelopment Re Region Eastern Development eagn RWSSFDB/WorldBank/DFID Nepalgunj RWSSFDB/WorldBank/DFID Bardibas andPathalaiya ead n hlke RWSSFDB/WorldBank/DFID Hetauda andDhulikhel g g g g g g ion ion ion ion ion ion Location Detail p ment Re g ion let iac Period Client/ Finance Vocational Trainin rjg uiiaiy EPABJul-08 Trijuga Municipality,UEIP/ADB Jul-08 Jul-08 Jul-08 Kamalamai Municaplity,UEIP/ADB Dhulikhel Municipality,UEIP/ADB Dhulikhel Municipality,UEIP/ADB NEP MOA, CLDP-ADBLoa nNo.2071- WSD/IA BJuly2012to Pani RWSSFDB/ IDA/WB Develo NEP MOA, CDP-ADBLoa nNo.1778- NEP MOA, CDP-ADBLoa nNo.1778- NEP MOA, CDP-ADBLoanNo.1778- Pani RWSSFDB/World Bank/DFID Pani RWSSFDB/World Bank/DFID Pani RWSSFDB/World Bank/DFID NEP (SF) MOA, CDP-ADBLoanNo.1778- NEP (SF)] MOA, CADP-[ADBGrantNo.0063- Panipokhari Panipokhari Panipokhari p p p p ( ( ( ( okhari okhari okhari okhari SF SF SF SF p ment Pro ) ) ) ) j ect g

( CTEVT ) A A A A Dec 2005toMay March-May 2011 March-May 2011 December 2011 June-July 2008 June-July 2009 April-May 2012 Februar pril 2006toJuly pril 2006toJuly pril 2006toJuly pril 2006toJuly October 2007 October 2009 September to Septemberto August 2012 May 2015to March-June November- Ap ber 2016to 2008 2006 2006 2006 2006 2006 ril 2018 y 2017

Professional (Months) 0 16.33 201 21.30 1.90 12 12 21.90 12 15.90 71 0.10 3 0.15 0.20 0.20 2 0.20 2 2 2 0.40 0.60 3 1.40 3 1.00 3 3 0.80 3 3.60 3 1.80 3.10 8 8 1.00 5 3.50 8 2.20 6 Services NRs. Value of (Million)

FS ES EIA IEE 

SI Work Phase SES-     GIS CPD DED BDT 44 SM CA               TRN Preparation ofBidding,ContractDocument& Tendering, Note: ..ProjectTitle S.N. 31 30 29 28 27 26 25 24 23 22 ERMC (P.)Ltd. FS CAP forCommunit Refresher TrainingProgramonBasicHealthandSanitationEducation TS Batch-V, Training ProgramonRuralWaterSupplySchemeDesignandSupervisionfor V SOS,RWSSFDB. Ferrocement TankConstructionTrainingsonCommunityTechnicianofBatch- Worker Workin Training NeedAssessmentandPreparationofTrainingsMaterialforHealth to CWsandCTsofSOsStaffforBatch–VII CAP, Health,HygieneandSanitationIncludingConflictManagementTraining Technician (CT),Batch-V,17days(2Groups). including ConflictManagementforCommunityWorkers(CW)and TL, FC/SSBatch-V(3daysforoldstaff),2Groups.(c)TrainingonCAP/HHS Refresher TrainingProgramonCAP/HHSincludingConflictManagementfor and FieldCoordinator(FC),BatchV,(7days),2Groups(b)CAP/HHS (a) TrainingProgramonCAP/HHSincludingConflictManagementforTL,SS Community Technician(CT),Batch-VI,17days(4Groups). CAP/HHS includingConflictManagementforCommunityWorkers(CW)and and FieldCoordinator(FC),BatchVI,(7days),1Groups(b)Trainingon (a) TrainingProgramonCAP/HHSincludingConflictManagementforTL,SS AOinaino FSt pria,BthV as( rus ahad n eagn WSD/ol akJune-Aug2005 days ineachMunicipality) Land DevelopmentTrainingsinUEIPtowns (5daysatKathmanduand2 8, Total41Trainin RWSSFDB/WorldBank Financial ManagementTraining-16,MunicipalUrbanDevelopmentTraining- KathmanduandNepalgunj Management Trainings-1,HumanResourcesTraining-16, Support forRevenueMobilization8UEIPMunicipalities(Construction Training ProgramonGeneralMunicipalInstitutionalStrengtheningand SA OrientationonPFSiteAppraisal,BatchV-3days(3Groups) :FeasibilityStudy, ( 10 da g indistrictLevel. g y y s Workers,BatchIV-3da ES s ) ) :EnvironmentalStudy, EIA y CA ( s 2 Grou ( :EnvironmentalImpactAssessment, :ContractAdministration&ConstructionSupervision, 2 Grou p s ) p s ) Bidur andNuwakot Kathmandu, Banepa,Panauti, eagn RWSSFDB/WorldBank/DFID Nepalgunj Nuwakot Panauti, Bidurand Kathmandu, Banepa, Dhulikhel, Sindhuli, Bharatpur, Ratnanagar, RWSSFDB/WorldBank/DFID RWSSFDB/WorldBank/DFID andNepalgunj Kathmandu Develo Mid andFarWestern RWSSFDB/WorldBank/DFID RWSSFDB/WorldBank/DFID Pokhara andKathmandu Nepalgunj l vrtecutyNT/MP MaytoAugust NHTC/MOPH All overthecountry SI : Survey&Investigation, Location Detail p ment Re g GIS: ion GIS Mapping, SES let iac Period Client/ Finance oDC EPABMarch2006to DoUDBC, UEIP/ADB Pani RWSSFDB/World Bank/DFID Pani oDC EPABJan2007to DoUDBC, UEIP/ADB Pani Pani Panipokhari Panipokhari :SocioeconomicStudy, p p p p okhari okhari okhari okhari TRN: Trainings CPD :Conceptual&PreliminaryDesign, September 2008 Sept -Nov2007 December 2006 September to July -August Dec 2005to March 2006 Sept 2007 Sep-04 Dec-04 2004 2006 Professional (Months) 66.60 16 1.09 3 1.5 4 0.50 1 0.50 0.50 1 0.72 2 3 3.00 8 0.80 6 1.80 4 DED :DetailedEngineeringDesign, Services NRs. Value of (Million)

FS ES EIA

BDT IEE :ContractPackaging, SI Work Phase SES- GIS CPD DED BDT 45 SM CA           TRN