FIGURE A9.2.1 N
Pond
Weir Drain Drain
Pp Weir
1A FB Stone Sultan Nazrin Shah Key Plan Centre N
FB
FB
FB Isis Stones Lock
Drain
Stone
Oxford Canal Landing Stage
Stone
SL FB MP FB Castle Mill Stream Sheepwash Channel FB FB Towing Path
FB FB FB Weir
Marker Post SL Sluice
Stream Worcester College Pond Bulstake SL
Stone
1B FB
Sluice
Oxford Canal
Castle Mill Stream 2 Sluice Towing Path
Tower
Track
UP RELIEF Wareham Stream
CR
Sports Court Hythe Bridge
Tunnel
CR
CR
CF Co Const & Ward Bdy Boro Const Bdy
Fisher
1C Row
River Thames or Isis Def
Pacey's Bridge FB
1S Gantry LB CR
Sluice
Osney Ditch LB TCBs Posts
Osney Bridge
Co Const & Ward Bdy Boro Const Bdy FB FB FB
MP
MP CR
Castle Mill Stream
FB
FB Posts DOWN RELIEF MP
Osney Stream
MP
Towing Path 13 1D OSNEY Sl Legend
1E Tree of high quality and value UP RELIEF 1
UP MAIN
DOWN MAIN
DOWN RELIEF 12D 1 Tree of moderate quality and value
1 Tree of low quality and value 1F 1 Tree unsuitable for retention
1G Root Protection Area (RPA)
Tree/vegetation to be retained 1H 12C 14 Tree/vegetation to be removed
Tree Preservation Order (TPO) Tree/Group/Area 1I
12B
UP RELIEF
UP MAIN
DOWN MAIN UP MAIN
DOWN RELIEF
NOTE - For details of trees please refer to the DOWN MAIN schedule of results in Annex A of Appendix 9.2.
2 6H 6I 12A 6J 6K 6L A01 MMS AC-W HK 06/21 FINAL 3 Rev By Chkd Apprvd Date Description
Client 4 5 6G
Red Hill House 227 London Road 6F Worcester, WR5 2JG 11 6E Tel: +44 (0) 1905 361 361 6D Fax: +44 (0) 1905 361 362 www.ch2m.com UP RELIEF 6C 6B Project 6A 163390 Oxford Corridor Phase 2- Environmental Impact Assessment
DOWN RELIEF Drawing
TREE RETENTION/REMOVAL PLAN - SHEET 1 UP RELIEF
UP MAIN
DOWN MAIN
DOWN RELIEF Drawn by: MMS Date:02/03/21 Checked by: AC-W Date:05/03/21 R6353488 R163290 Approved by: HK Date:05/03/21 7 0 5 10 15 20 Drawing No. Revision 9 15 8 163390-JAC-SKE-EEN-090200 A01 10 SCALE 1:250 (A1) METRES © Crown copyright and database rights 2021 Ordnance Survey 0100040692 Drawing Scale:1:250 at A1, 1:500 at A3