VI. ISSUES and OPPORTUNITIES /RECOMMENDATIONS the Study Area Has a Number of Attributes, Both Natural and Manmade, That Compleme

Total Page:16

File Type:pdf, Size:1020Kb

VI. ISSUES and OPPORTUNITIES /RECOMMENDATIONS the Study Area Has a Number of Attributes, Both Natural and Manmade, That Compleme Issues and Opportunities VI. ISSUES AND OPPORTUNITIES /RECOMMENDATIONS The Study Area has a number of attributes, both natural • Zoning controls, design regulations, clustering, and and manmade, that complement and contribute to the incentives to developers can be utilized to achieve overall makeup of the community. Based on observations community benefi ts and a balanced site plan. of existing conditions, and with input from the Town and local residents, the area’s strengths and weaknesses were In the Area-Wide Plan, there needs to be a balance identifi ed. among the interests involved - both from the private property owner’s perspective and the public interest. Building consensus on how to shape inevitable growth, The economic viability of proposed developments needs control design, and ensure preservation of community to be considered while community benefi ts are sought. character is essential in order to achieve community- Consensus building and organized community support planning objectives. The following concepts have helped are valuable for preservation of historic resources, shape the community dialogue relative to preservation and open spaces, and agriculture as both an industry and future development opportunities. for its aesthetic benefi t. • Not all properties can simply be bought by the Town for open space. The Community Preservation Fund This chapter addresses the issues and opportunities that were has limited resources and not all property owners are discussed as part of the community involvement process and willing sellers. Preservation of properties important for lays out recommendations that respond to the identifi ed drinking water protection and agricultural preservation issues and capitalize on the opportunities. are noted as priorities by Town offi cials, followed by Exhibit VI-1, entitled “Issues and Opportunities,” identifi es wetlands, contiguous open space and trail connections, many of the concerns raised, objectives identifi ed and and hamlet greens/recreational areas. opportunities recommended for a balanced area-wide plan, • Existing zoning in certain locations may not be in prioritizing preservation and tempering development in a accordance with present community vision, however, manner that is in keeping with community character. changes can only be achieved by amending the Detailed Hamlet Area Concept Plan Proposals are provided in Comprehensive Plan which is the blueprint upon which the following chapter along with specifi c recommendations the zoning map must be based. for zoning map changes to designate the new zoning • Additional zoning and design regulations can be classifi cation of Hamlet Offi ce/Residential and Hamlet instituted, if shown to be in the interest of public and Commercial/Residential, preliminary design and streetscape health, safety, and welfare, to help shape development recommendations, and protection strategies for historic where it occurs and protect community character, resources, scenic protection, and agricultural resources. natural features, scenic resources, and historic heritage resources. EASTPORT/SPEONK/REMSENBURG/WESTHAMPTON AREA STUDY VI-1 Issues and Opportunities Woodfield Gables extent of RTPDD New interchange would allow proposal to be defined development for more convenient access for and mitigation to be determined. commercial/industrial users and (Opportunity to combine with Sand Mine 0 2000' Suffolk County Community College reclamation/ redevelopment effort). Current Potential extension of Sunrise Highway Land use destination: residential subdivision Service Road opens up development and as-of-right receiving area for PBCs. Approved multi-unit senior opportunities in the northwest quadrant housing development for former dragstrip Study Area Boundary Existing Sand Mines: Potential redevelopment of existing Reclamation of former sand mines presents opportunities for commercial recreation commercial nurseries and vacant To Paumanock Path (motocross park, RV/tent camping, equestrian and golf). land (including the 44-acre Central Suffolk Hospital property) for 1 Hampton Sand Corporation commercial tourism (hotel/spa) golf AY course resort (RTPDD). Traffic directed HW 2 Piano and Heinlein HIG towards the north buffer provided ISE NR 3 Huntington Ready Mix Concrete (still active) along Old Country Road. SU Hampton West Park, existing town recreation facility. Opportunity 4 West Hampton Mining Aggregates to enhance access through trailblazer signage on main roadway and connection to existing/proposed trail network. Town Trustees Public Access Areas (Public access can be enhanced through coordinated signage program. Further enhancement of selected areas by landscaping and park benches) Study Area Gateways D (Incorporate signage and landscaping Existing agricultural lands are A to enhance entryways) 1 3 O SUFFOLK COUNTY a potential resource for the 2 R AIRPORT western portion of the Town D Existing Trail Segments A E H Proposed Trail Segments R Potential redevelopment E V opportunity at site of existing I Existing Scenic Roadway Designation bus storage facility and R Incorporate Overlay District D surrounding properties L LIRR to Preserve Access Lands O Proposed Extension of O Scenic Roadway Designation Provide opportunities for L D CO 4 traffic calming measures for UN Roadway Subject to Flooding TRY pedestrians/school children ROAD PP.S..S. X Unguarded Railroad Crossings Present Last remaining duck farm MMAINAIN Potential Risk to Pedestrians/Motorists STREET in Southampton, potential historical tourist attraction/ Potential to expand/enhance Wildlife Observation Platform X access to Beaverdam Lake interpretive center, park X M (Proposed Western GEIS) IL L (Cook’s Pond) R Y O Potential for improved AY A A D Potential Relocation Area intermodal use of railroad E W U M H Opportunity for expansion ONT G PP.S..S. (selected light industrial uses, LIRR facility) station area and use of N AUK I E H of existing Town community center parking area as a trailhead V A to accommodate more comp- S rehensive community functions Use of Native Plantings as Buffer P I PP.S..S. Enhancements and to Screen L and creation of a hamlet green. Reconfigure roadway L Existing Industrial Uses I alignment to accommodate H traffic roundabout. Improves P Encourage/Promote Pedestrian safety concerns for motorists. Connections/Pathways to All Schools Opportunity to preserve important PP.S..S. Emphasizing Pedestrian Safety community open space and preserve ET Potential municipal MAIN STRE important community viewshed recreation resource (pre-existing marina) Exhibit VI-1 Recently acquired property provides potential for passive recreation uses Potential recreation ISSUES AND OPPORTUNITIES and waterfront access expansion area Examine potential traffic Eastport / Remsenburg / Speonk calming measures along Potential walking Stokes Poges Tidal Marsh Property with large pond ("Water Hole") Montauk Highway and trail connections area identified for potential suitable for redevelopment Westhampton Area Strategy Study Phillips Avenue including to school enhancement through wetland as commercial recreation sidewalks along North restoration, kayak launch and (campground/swimming). Town of Southampton, New York Phillips Avenue Potential development bird watching observation access Can be connected to adjacent for tax ratables Town-owned parkland parcel (MUPDD " Feather Factory") Saccardi & Schiff, Inc. - Planning and Development Consultants BASE MAP SOURCE: Town of Southhampton GIS VI-2 Saccardi & Schiff, Inc. Issues and Opportunities AREAS SUBJECT TO CHANGE (1) The Core Hamlet Center of Speonk - Generally defi ned as the area along Montauk Highway between The Study Area encompasses over 14 square miles. However, the Speonk Post Offi ce and Nidzyn Avenue, with much of the land use pattern is already developed, primarily frontage along North Phillips Avenue up to the LIRR in the form of single-family housing and small vacant lots Train Station. This area includes Peppercorn’s Country currently experiencing infi ll development pressures. Much Store and the new hamlet center shopping plaza, multi- of vacant acreage is located within the Core Preservation unit housing complexes, restaurants and an approved, Area of the Central Pine Barrens and, thus, is subject to but not yet constructed, hamlet green and playground development restrictions. Large assemblages of property area. designated as as-of-right residential receiving area districts (RRADs) for transfers of development rights from the Core (2) The Primary Industrial Area of Speonk - Generally Preservation Area (i.e., Pine Barrens Credits (PBCs)) are defi ned as the area along Speonk-Riverhead Road, sprinkled along the northerly periphery of Old Country approximately one mile from its intersection with Old Road. Several development petitions seeking changes to Country Road north of the pre-existing mobile home the zoning map or special fl oating zone designations in the park, up to a point just south of the Sunrise Highway Study Area are pending. underpass. This area includes Montecalvo Asphalt, South Fork Mason Supply, and BB&S Lumber. A In the “Existing Conditions” chapter, several sites were pre-existing non-conforming junkyard is located west identifi ed that have either outlived their current use, have not of Speonk-Riverhead Road in the Aquifer Protection been put to their best use, present opportunities for additional Overlay District, adjacent to Hampton Sand and tax ratables, or are subject to development pressures. The Gravel – a resource depleted mining
Recommended publications
  • New York State Public Transportation Safety Board Rail Safety Section Abbreviated Report Case Number: 9531
    NEW YORK STATE PUBLIC TRANSPORTATION SAFETY BOARD RAIL SAFETY SECTION ABBREVIATED REPORT CASE NUMBER: 9531 DATE OF ACCIDENT: October 14, 2007 CARRIER: MTA Long Island Rail Road TYPE OF ACCIDENT: Collision SYNOPSIS: On Sunday, October 14, 2007, at approximately 6:22 p.m., the conductor on board westbound train #8709 operating on the Montauk Branch east of Southampton Station reported to the train’s engineer that he heard a loud banging noise outside the rear end of the first passenger car. The eight car train was made up of six coach cars and two locomotives and was traveling at a speed of approximately 40 mph in an area where the maximum allowable speed is 65 mph. There were approximately 250 passengers on board the train and the train crew consisted of an engineer, a conductor, and an assistant conductor. Approximately eight minutes later, when the train arrived at the next scheduled stop in Southampton, the conductor detrained and visually inspected the outside of the train. The conductor found damage consistent with being struck by an object along the side of four of the six coach cars and an automobile wiring harness hanging from one of the coach cars. At 6:35 p.m., the conductor radioed the Long Island Rail Road Movement Bureau of the damage he discovered. The Movement Bureau ordered the train to continue on to Speonk Station and to hold there for MTA Police and LIRR supervisory personnel to further inspect the train. Passengers on board the train were discharged at Speonk Station at 6:48 p.m.
    [Show full text]
  • General Notice 4-20 Continued
    Long Island Rail Road Jamaica, NY August 27, 2018 General Notice No.4-20 Effective 3:29 AM Monday, August 27, 2018 (A) Entire Railroad Timetable Special Instruction 1103-A General Notice replacement pages for Special Instruction 1103-A On Page I-45, Special Instruction 1103-A has been revised as follows: A keying device to interrupt crossing signals has been added at the following location: “Executive Drive, Deer Park. Located on east end of station platform on No. 2 track only.” Employees must discard Special Instructions Pages I-45 and I-46 and replace with Replacement Pages “I-45 and I-46” attached to and part of this General Notice. (B) Entire Railroad Timetable Special Instruction 1103-H General Notice replacement pages for Special Instruction 1103-H On Page I-49, Special Instruction 1103-H has been revised as follows: 11th row information relating to Commack road “Direction” has been changed to Both, under “Location” 1st crossing west of JS Interlocking has been added Employees must discard Special Instructions Pages I-49 and I-50 and replace with Replacement Pages “I-49 and I-50” attached to and part of this General Notice. (C) Entire Railroad Mainline Branch – Wyandanch Passenger Station Renovation of the of north side platform at Wyandanch Passenger Station has been completed. Newly installed westward and eastward 6/8/10 & 12 car markers located on the platform. All westward trains will platform twelve “12” cars. All eastward trains will platform twelve “12” cars. (D) Entire Railroad Timetable Authority – General Notices General Notice 4-5, Paragraph (D) is annulled.
    [Show full text]
  • New York State Public Transportation Safety Board Rail Safety Section Abbreviated Report Case Number: 9600
    NEW YORK STATE PUBLIC TRANSPORTATION SAFETY BOARD RAIL SAFETY SECTION ABBREVIATED REPORT CASE NUMBER: 9600 DATE OF ACCIDENT: December 13, 2007 CARRIER: MTA –Long Island Rail Road TYPE OF ACCIDENT: Grade Crossing ACCIDENT SYNOPSIS: At 2:51 p.m. on Thursday, December 13, 2007, LIRR train #2709 departed Montauk Station. The train, operated by an engineer, conductor, assistant conductor, and ticket collector, consisted of six bi-level coach cars and one locomotive. As the westbound train approached the Gleason Drive grade crossing in East Quogue, New York, the engineer reported seeing a vehicle without its lights on obstructing the tracks. The engineer repeatedly sounded the train’s horn and placed the train’sbrakes in emergency but could not avoid striking the automobile on the crossing. According to police reports, at approximately 4:06 p.m., the driver stated that while traveling northbound on Gleason Drive the vehicle skidded on the slick roadway and slid off the east end of the crossing pad surface becoming stuck. The driver claimed he attempted to free the stuck vehicle for approximately ten minutes but was unsuccessful. When the driver heard the horn of the approaching train, he exited the vehicle and moved a safe distance away. The vehicle was struck and knocked approximately forty feet across the crossing striking the signal case on the southwest side of the crossing and came to rest. The speed of the train at the time of the impact was estimated to be 55 MPH. Damage to rail equipment was minimal and consisted of damage to the brake piping, step ladder, snow plow and brake hoses.
    [Show full text]
  • The Long Island Rail Road
    Long Island Rail Road Jamaica, NY September 10, 2018 General Notice No.4-23 Effective 12:01 AM Monday, September 10, 2018 (A) Entire Railroad Timetable Special Instruction 1901-B General Notice replacement pages for Special Instruction 1901-B On Pages I-92 and I-96, Special Instruction 1901-B has been revised as follows: On Pages, I-92 and I-96 under MAIN LINE Kew gardens and Forest Hills, in Sta. Cap. column, “4” has been changed to “6”, in the “6” car column, “H-4” has been changed to “*” and in the 8, 10, 12 car column, “H-4” has been changed to “H-6”. Employees must discard Special Instruction Pages I-91, I-92, I- 95, and I-96 and replace with Replacement Pages “I-91, I-92, I- 95, and I-96” attached to and part of this General Notice. (B) Entire Railroad Timetable Authority – General Notices General Notice 4-21 Paragraph (A1) is annulled General Notice 4-21 Paragraph (A2), 12 switch cross over paragraph – delete “(blocked and spiked normal)” and delete the last two paragraphs in their entirety. General Notice 4-21 Paragraphs (A3), (A4) and (A5) delete “see map on page 12” General Notice 4-21 Paragraph (A6) delete “see map on page 11-13” General Notice 4-21 Paragraphs (A9) and (A10) delete “see map on page 13” General Notice 4-21 Paragraph (C4) delete “6th row containing information related to Giaquinto has been removed.” (C) Entire Railroad Timetable Station Pages Employees must make the following changes in ink: On Page III, Main line Branch, change “FARM 1 R-From Divide” to read “FARM R-From Divide” and change “FARM 2 R-From Divide” to read “PW R-From Divide”.
    [Show full text]
  • 7367-7373 Derailment Case
    NEW YORK STATE PUBLIC TRANSPORTATION SAFETY BOARD RAIL SAFETY SECTION PTSB CASES #7367 AND #7373 INVESTIGATION OF TWO DERAILMENTS INVOLVING THE MTA - LONG ISLAND RAIL ROAD ON #73 SWITCH IN JAY INTERLOCKING, JAMAICA, NEW YORK ON JANUARY 23, 2003 AND JANUARY 25, 2003 SYNOPSIS On Thursday, January 23, 2003 eastbound equipment train #3800 derailed in the Jay Interlocking which is located in Jamaica, Queens, New York. The rear wheel set on the third car and the lead set on the fourth car derailed as they passed over #73 switch. Two days later, on Saturday, January 25, 2003, eastbound equipment train #8738 derailed four wheels on the lead truck of the first coach car (the second car in the consist) as it too passed over #73 switch. Neither train was carrying passengers at the time it derailed. In both cases, at least one car passed over #73 switch before the derailments occurred. Both derailments caused moderate damage to the track and car equipment. The cause of the derailments was not determined until after the second derailment on January 25, 2003 when the investigation discovered that a newly installed switch point on #73 switch's right hand switch point was not manufactured to the correct specifications . The defective switch point and its companion stock rail were installed one day before the first derailment on January 22, 2003 . INVESTIGATION Accident Scene : The Jay Interlocking is located west of Jamaica Station, in Queens, New York. The station and interlocking is one of the railroads busiest hubs with all trains routed through this interlocking going to the various branch lines .
    [Show full text]
  • Summary of Recommended Changes to the Executive Budget
    SUMMARY OF RECOMMENDED CHANGES TO THE EXECUTIVE BUDGET STATE FISCAL YEAR 2018‐19 TABLE OF CONTENTS Financial Plan and Revenue ............................................................................................................... 1 Summary of Recommended Changes by Agency PUBLIC PROTECTION & GENERAL GOVERNMENT .................................................................. 1‐1 EDUCATION, LABOR & FAMILY ASSISTANCE ........................................................................ 30‐1 HEALTH & MENTAL HYGIENE ............................................................................................... 44‐1 TRANSPORTATION, ECONOMIC DEVELOPMENT & ENVIRONMENTAL CONSERVATION ..... 53‐1 JUDICIARY ............................................................................................................................. 70‐1 DEBT SERVICE ....................................................................................................................... 71‐1 FINANCIAL PLAN Financial Plan On an All‐Funds basis, the SFY 2018‐19 Enacted Budget is estimated to total $168.3 billion, for annual growth of 2.8 percent. The Enacted Budget projects State Operating Funds spending of $100.1 billion, which is an increase of $1.94 billion or 2.0 percent over SFY 2017‐18. Total State fund spending (including Special Revenue Funds and Capital Projects) is projected at $112.6 billion for growth of $5.6 billion or 5.3 percent over last year. General Fund spending is projected at $75.5 billion, an 8.3 percent increase over SFY 2017‐18 with
    [Show full text]
  • V. Land Use Strategies (PDF)
    V. LAND USE STRATEGIES WHB\Southampton Master Plan 85 File: report.doc THIS PAGE LEFT INTENTIONALLY BLANK WHB\Southampton Master Plan 86 File: report.doc V. LAND USE STRATEGIES A. Preservation and Smart Growth The construction of single-family homes is one of the primary driving forces generating the current increase in traffic during the peak summer season. The increase in new home construction permitted over a 10% or 23,000 person increase in year round and seasonal residents and guests during the same nine year period. In addition, the construction of over 500 houses per year represents thousands of jobs spread out to construction sites all over the South Fork. The increase in the number of homes built between 1991 and 2000 dramatically increased the number of jobs devoted to single-family home construction and increased the flow of traffic during the A.M. and P.M. peak hours. There is some evidence that as the number of houses being constructed fell off following 2000, that increases in A.M. and P.M. weekday peak hour of a traffic flow stabilized and possibly decreased temporarily, while total daily traffic flows continued to rise. As these new single-family homes are occupied, they on average, generate 10 or more daily trips when in use. The residents generate trips to stores, schools, recreation and work activities. Service providers generate trips for fuel oil deliveries, landscaping, sanitation, cleaning services and others. Many of these additional trips occur outside of the weekday A.M. and P.M. peak hours and thus, have contributed to the continuing increase in total daily traffic.
    [Show full text]
  • Finance Committee Meeting January 2017
    Finance Committee Meeting January 2017 Committee Members L. Schwartz, Chair F. Ferrer, Vice Chair D. Jones C. Moerdler J. Molloy M. Pally J. Samuelson P. Trottenberg V. Vanterpool J. Vitiello P. Ward C. Wortendyke N. Zuckerman Finance Committee Meeting 2 Broadway, 20th Floor Board Room New York, NY 10004 Monday, 1/23/2017 12:30 - 1:45 PM ET 1. PUBLIC COMMENTS PERIOD 2. APPROVAL OF MINUTES – DECEMBER 12, 2016 Finance Committee Minutes Dec 2016 Final - Page 4 3. 2017 COMMITTEE WORK PLAN 2017 Work Plan - Page 12 4. BUDGETS/CAPITAL CYCLE BudgetWatch (Handout) Finance Watch Finance Watch - Page 20 5. MTA HEADQUARTERS & ALL-AGENCY ITEMS Action Items Municipal Finance Disclosure Policies and Procedures - Page 30 Report and Information Items Special Report: Finance Department 2016 Year-End Review Presentation (Available in the Exhibit Book and MTA.Info) MTA Financial Statements 3rd Quarter for the Nine-Months Ended September 2016 (Available in the Exhibit Book and MTA.Info) Procurements MTAHQ Procurement Report - Page 42 MTAHQ Non-Competitive Procurement - Page 44 MTAHQ Competitive Procurements - Page 46 6. METRO-NORTH RAILROAD (No Items) 7. LONG ISLAND RAIL ROAD, and MTA CAPITAL CONSTRUCTION (No Items) 8. NEW YORK CITY TRANSIT and MTA BUS OPERATIONS NYCT Procurements - Page 48 9. BRIDGES AND TUNNELS B & T Procurement - Page 50 10. FIRST MUTUAL TRANSPORTATION ASSURANCE COMPANY (No Items) 11. MTA CONSOLIDATED REPORTS Mid-Year Forecast and November Forecast vs. Actual Results - Page 52 Statement of Operations - Page 55 Overtime - Page 64 Subsidy, Interagency Loans and Stabilization Fund Transactions - Page 69 Debt Service - Page 77 Positions - Page 79 Farebox Operating and Recovery Ratios - Page 82 MTA Ridership - Page 83 Fuel Hedge - Page 107 12.
    [Show full text]
  • 91 Montauk Highway Brochure
    28.8 ACRE DEVELOPMENT SITE FOR SALE 91 Montauk Highway East Moriches, NY 11940 Offering Summary Property Overview Sale Price: Price Upon Request Calling All Developers! 28.8 Acres Situated On Montauk Highway In East Moriches, New York. Incredible Opportunity To Take Advantage Of People Lot Size: 28.8 Acres Flocking To Eastern Long Island And To Bring A New Residential Development To The South Shore Of Long Island. This site is made up of 4 Zoning: A1 Residential individual parcels. Situated within minutes of Sunrise Highway, (Route 27) County: Suffolk with easy access to other major throuroghfares. East Moriches is considered a gateway to the Hamptons and has extremely strong A1 Residential/J2 Zoning: Business demographics. DO NOT MISS THIS RARE OPPORTUNITY! Traffic Count: 12,000 Property Highlights 28.8 Acres Total Minutes From Sunrise Highway Ideal Location at The Gateway to the Hamptons For More Information: Michael G. Murphy Dennis Gandley Executive Vice President Licensed Real Estate Salesperson Head of Operations 631.858.2406 631.858.2460 [email protected] [email protected] Click for Agent Profile Click for Agent Profile WWW.ELLIMANCOMMERCIAL.COM 110 WALT WHITMAN ROAD, HUNTINGTON STA., NY 11746. 631.549.7401. © 2021 DOUGLAS ELLIMAN COMMERCIAL, LLC. ALL MATERIAL PRESENTED HEREIN IS INTENDED FOR INFORMATION PURPOSES ONLY. WHILE THIS INFORMATION IS BELIEVED TO BE CORRECT, IT IS REPRESENTED SUBJECT TO ERRORS, OMISSIONS, CHANGES OR WITHDRAWAL WITHOUT NOTICE. ALL PROPERTY INFORMATION, INCLUDING, BUT NOT LIMITED TO SQUARE FOOTAGE, ROOM COUNT, ZONING IN THE LISTING SHOULD BE VERIFIED BY YOUR OWN ATTORNEY, ARCHITECT OR ZONING EXPERT.
    [Show full text]
  • Appendix B the Existing Transportation System Elements
    Appendix B The Existing Transportation System Elements and Deficiencies B-1 THIS PAGE LEFT INTENTIONALLY BLANK B-2 THE EXISTING TRANSPORTATION SYSTEM ELEMENTS 1. Rail Transportation Existing Service and Ridership There are five train stations currently serving the Town of Southampton on the Long Island Rail Road’s Montauk Branch. These stations are located in Speonk, Westhampton, Hampton Bays, Southampton and Bridgehampton1. The train station stops at Quogue and Southampton College were discontinued in 1996 by the LIRR reportedly due to low ridership. Water Mill was previously closed. The entire Long Island Rail Road Service Map is shown in Figure B-1. Service on the Long Island Rail Road (LIRR) is summarized in Table B-1 and B-2. The additional summer service includes extra trains added primarily on Friday afternoons and evening in the eastbound direction and on Sundays and holidays in the westbound direction. Leave Penn Speonk Westhampto Hampton Southampton Bridgehampto Montauk Station n Bays n Weekday 12:35 A.M. 2:47 A.M. 2:53 A.M. 3:03 A.M. 3:13 A.M. 3:21 A.M. 3:58 A.M. 7:49 A.M. 9:44 A.M. 9:50 A.M. 10:00 A.M. 10:10 A.M. 11:18 A.M. 11:53 A.M. 11:04 A.M. 1:15 P.M. 1:21 P.M. 1:31 P.M. 1:41 P.M. 1:49 P.M. 1:59 P.M. 1:54 P.M. – -- 3:41 P.M. 3:50 P.M. 4:02 P.M. 4:10 P.M.
    [Show full text]
  • Finance Committee Meeting
    Finance Committee Meeting April 2018 Committee Members L. Schwartz, Chair F. Ferrer, Vice Chair N. Brown* I. Greenberg* D. Jones C. Moerdler J. Molloy M. Pally S. Rechler P. Trottenberg V. Vanterpool J. Vitiello P. Ward C. Weisbrod C. Wortendyke N. Zuckerman Finance Committee Meeting 2 Broadway, 20th Floor Board Room New York, NY 10004 Monday, 4/23/2018 12:15 - 1:30 PM ET 1. PUBLIC COMMENTS PERIOD 2. APPROVAL OF MINUTES – MARCH 19, 2018 Finance Committee Minutes - Page 4 3. 2018 COMMITTEE WORK PLAN 2018 Work Plan - Page 10 4. BUDGETS/CAPITAL CYCLE BudgetWatch (Handout) Finance Watch Finance Watch - Page 18 5. MTA HEADQUARTERS & ALL-AGENCY ITEMS Action Item MTA 2017 Annual Investment Report (Full Report Available in the Exhibit Book and MTA.Info) - Page 28 Report and Information Items Annual Report of Variable Rate Debt Presentation (Exhibit Book & MTA.Info) DRAFT MTA Financial Statements Fiscal Year-End Twelve-Months Ended December 2017 (Exhibit Book & MTA.Info) Procurements MTAHQ Procurement Report - Page 30 MTAHQ Competitive Procurements - Page 32 MTAHQ Ratifications - Page 37 6. METRO-NORTH RAILROAD & LONG ISLAND RAIL ROAD LIRR Procurement - Page 45 7. NEW YORK CITY TRANSIT, and MTA BUS OPERATIONS NYCT Procurements - Page 47 8. BRIDGES AND TUNNELS B&T Procurements - Page 49 9. FIRST MUTUAL TRANSPORTATION ASSURANCE COMPANY Capital Market Based Re Insurance - Page 53 10. MTA CONSOLIDATED REPORTS Statement of Operations - Page 57 Overtime - Page 63 Subsidy, Interagency Loans and Stabilization Fund Transactions - Page 68 Debt Service - Page 77 Positions - Page 79 Farebox Operating and Recovery Ratios - Page 82 MTA Ridership - Page 83 Fuel Hedge Program - Page 107 11.
    [Show full text]
  • The Long Island Rail Road
    Long Island Rail Road Jamaica, NY September 4, 2018 General Notice No. 4-21 General Notice 4-21 contains information related to and supersedes General Notices 4-1 through 4-20. General Notices 4-1 through 4-20 are to be discarded. Effective 12:01 AM Tuesday, September 4, 2018 (A1) Entire Railroad Physical Characteristics – Farm Interlocking No 2 track Between Farm 1 and Farm 2 Int. has been converted to a stub ended track with a barricade erected 2280 feet east of SB 2 Farm 1 Int. This stub ended track accommodates 25 cars and is accessible only from the west end of Farm 1 Int. No. 2 track to be reconfigured as part of the double track project. Pinelawn Long Siding has been converted to a stub ended track with a barricade erected 180 feet west of the second facing point hand thrown switch west of long siding electric lock (hand thrown switch toward JD Posillico Materials siding). This stub ended track is accessible only from the east end via the long siding electric lock. Pinelawn long siding to be reconfigured as part of the double track project. 2E signal (Farm 2 westerly limit). out of service to be removed. 3W signal (Farm 2 easterly limit). out of service to be removed. All Dual Control switches in Farm 2 Int. out of service and removed. (21 and 13 switches). See Map on Page 10. (A2) Entire Railroad Physical Characteristics – JS Interlocking Reconfigured JS Interlocking R-Divide in service and relocated as follows: 1841 feet west from the west end of Deer Park Psgr.
    [Show full text]