77-87, Lumley Road, Skegness, PE25 3LS Design & Access Statement – February 2021

Total Page:16

File Type:pdf, Size:1020Kb

77-87, Lumley Road, Skegness, PE25 3LS Design & Access Statement – February 2021 77-87, Lumley Road, Skegness, PE25 3LS Design & Access Statement – February 2021 In support of an application for the “modernisation” and “Change of Use” of the property and ancillary buildings. Design and Access Statement 1 002-002_v01 1.0 Introduction The Design and Access Statement has been prepared to support an application for the change of use of the existing Beales department store. Including one of the purpose-built external storage buildings to the rear of the property. Including within the proposal are some minor amendments to the street front elevation. 2.0 Background Skegness is a seaside town in East Lindsey District of Lincolnshire England, its known as its sited-on Lincolnshire’s coast line of the North Sea. The town is 43miles east of Lincoln and 22 miles north-east of Boston. With a population of 19,579 as of 2011, it is the largest settlement in East Lindsey. It also incorporates Winthorpe and Seacroft, and forms a larger built-up area with the resorts of Ingoldmells and Chapel St Leonards to the north. The town is on the A52 and A158 roads, connecting it with Boston and the East Midlands, and Lincoln respectively. Skegness railway station is on the Nottingham to Skegness (via Grantham) line. Properties within the town vary drastically depending on their location, with all styles of modern and traditional architecture being present, this allows the town to have an eclectic and pleasing atmosphere as its development and expansions can be sympathetically viewed. Properties off Lumley Street understandably vary in style and design, simply due to the nature of being a high street of a busy seaside town. The majority of the buildings are built from local red brick with stone cills and lintels as features. A proportionate number of the buildings have traditionally or modernised to incorporate coloured renders, usually favouring lighter tones such as creams & white. 3.0 Site & Setting The site itself is around 2286sqm or 0.2256Ha split into two plots, the larger being the main department store of 1664sqm and the smaller of 622sqm being the store and carparking provision. Both sites adopt a relatively rectangular shape and have seen there far share of activity of the past years. The department store is of terrace nature with third party properties adjoined on each side elevation. The main building elevation fronts the high street known as Lumely Road (B1451) with the rear elevation backing onto Prince George Street. The second plot equally fronts onto Prince George Street with the remainder three remaining elevations backing onto neighbouring third party properties. Design and Access Statement 2 002-002_v01 4.0 Change of Use Justification The application is based on two straight forward change of use applications, the main one being the additional use to the main department store to allow for the provision of an internal “Roller Rink” which would class it as Sui Generis, as its an area or place for outdoor sport or recreation, not involving motorised vehicles or firearms. The secondary change of use is of the rear remote store, its current use is E (D) or Sui Generis to provide an “Escape Room” which could be classed as an amusement centre . 5.0 Ecology The site in question has very little ecology value, the majority of the site is a physical structure, with a small portion being parking provision with the ground fully hard paved with tarmac. 6.0 Listed Building 77-87, Lumley Road formally known as “Beales Department Store” is not a listed building, and there are a limited number of a properties within the town which carry a listed classification. The closest of these being the Grade II listed Jubilee Clock Tower which is sited at the end of Lumley Road at the junction with Grand Parade. 7.0 Acoustics Acoustically none of the proposed change of uses would increase the current acoustic levels associated with there activities. And thus, no additional acoustic treatments have been proposed. 8.0 Drainage The proposal is to utilise all existing drainage provision already associated with the current department store. Thus, there is no detriment being proposed. Communicate has been had with Nicola Farr (Lincolnshire Area, Environment Agency) with regards to Floor Risk Assessments and I can confirm the advice is as below “quoted”. The National Planning Policy Framework (paragraph 163, footnote 50) states that all proposals in Flood Zone 3, including minor development and changes of use, require a flood risk assessment. However, the Planning Practice Guidance clarifies that ‘Site-specific flood risk assessments should always be proportionate to the degree of flood risk’. Design and Access Statement 3 002-002_v01 Our advice for development in East Lindsey’s coastal area is based mainly on our coastal hazard mapping: this shows the modelled consequences should the sea defences be breached, under standard scenarios for present day and with climate change. The mapping shows that the site lies beyond the area at risk of flooding in case of a breach. Although in Flood Zone 3, it is therefore considered low risk. In addition, the amendments to the shop front would be classed as ‘minor development’ and unlikely to increase susceptibility to flooding. The containers could be a concern in a high-risk area, depending on the contents, but not in this case. We therefore do not require that a flood risk assessment be submitted. It may be advisable to submit to East Lindsey a short ‘flood risk statement’ outlining the situation as described above. 9.0 Design The proposed design put forward with the application is intended to sympathetically enhance the building so it can accommodate the needs of a modern business. New signage provisions have been put forward which are in a style which is aesthetically pleasing to the high street, but of a size and scale which is in-keeping with the building whilst being proponent enough to promote patrons. The proposal for new security shutters to the ground floor windows has been put forward as unfortunately the area is subjected to an increased risk of forced entry and thus the proposal will be a positive deterrent to unwanted access. The application also proposes the upgrade of one of the shop fronts to incorporate a serving window, this will allow sale of goods to customers directly off the high street. The first floor will see a number of its windows boarded and rendered over to match existing, this proposal will maximise the potential for the internal space. With reference to the remote store unit off Prince George Street, no external modification is proposed, however a change of use is requested the facility can be used as an “Escape Rooms” amusement. 10.0 Conclusion Generally, its understood that any modernisation or upgrade to a towns high street is positive news for the local economy. The proposal put forward are all very sympathetic to the building and its surrounding neighbours, but will allow the facility to be brought back into use and trade in a positive secure fashion, it will also see the increase need for employment to the town. The upgrade of previously redundant unit is also positive for the community and will hopefully see more tourists enter the town to further benefit the local economy. Design and Access Statement 4 002-002_v01 .
Recommended publications
  • Rail Lincs 66
    The Great East–West barrier Friends of the Barton Line Have you ever tried to escape from The Friends have been exasperated by Lincoln, not easy is it? the spate of unreliability and lack of Rail Lincs Rail? Lincs? Number 66 June 2013 ISSN 1350-0031 Although we have two through trains a information, earlier in the year, which was Lincolnshire & South Humberside Branch of the LINCOLNSHIRE day to London, ironically leaving within a extremely undermining the efforts of Railway Development Society N e w s l e t t e r few minutes of each other, even getting to those who were trying to promote the line. London is not easy as the connections at The first train of each day from Newark are not always good with, at times, Cleethorpes to Barton and back was Good attendance at Cleethorpes AGM the shuttle from Lincoln waiting for the being substituted by a coach service until London train to vacate platform 3. the start of the Sunday service on 19 May. We would like to see a better service via Nottingham but the constraints of the flat Since the introduction of the new crossing at Newark means that even timetable the Class 185 working has altering stopping patterns to improve been replaced by a Class 153 calling at all services from Hykeham is impossible stations, but terminating at Grimsby Town because of the lack of paths across the on the return run. However this service is East Coast Main Line, so any hope of a currently being replaced by a bus; more frequent service is a non starter.
    [Show full text]
  • Skegness Burgh Le Marsh
    Poacher Line Railway Walks Be a responsible walker Great Days Out on the Poacher Line Introduction Walks by Train Please remember the countryside is a place where people live and work and where This linear walk links Skegness and Wainfleet railway stations. wildlife makes its home. To protect the Lincolnshire countryside for other visitors This linear walk links Skegness and Wainfleet railway stations on the please respect it and on every visit follow the Countryside Code. Thank you. Skegness east coast of Lincolnshire. The 78 miles of railway line between Nottingham and Skegness • Be safe - plan ahead and follow any signs is known as the Poacher Line and is a community rail line/service. • Leave gates and property as you find them Burgh le Marsh - Wainfleet Skegness is the County’s most famous seaside resort and the home Community rail lines aim to involve local people in the development • Protect plants and animals, and take litter home of the first Butlins holiday camp and the Jolly Fisherman. Prior to the and running of local and rural routes, services and stations. • Keep dogs under close control arrival of the railway in Skegness in 1873 it was a village with less • Consider other people than 400 residents. The town expanded during the 2oth century and This is one of seven linear walks linking stations on the Poacher Line. is still a popular holiday destination. If you have enjoyed this walk why not try the others: Most of all enjoy your visit to the Lincolnshire countryside This leaflet is one in a series of walk leaflets produced by Lincolnshire County Now 8km (5 miles) from the sea, Wainfleet once stood on the coast 1) Radcliffe to Nottingham 10½ km (6½ miles) Council’s Countryside Access Team to help you explore and enjoy the County’s and was an important port until it became silted up in the 15th 2) Bottesford to Aslockton 10 km (6 miles) countryside.
    [Show full text]
  • Quarter 3 2013/14 Update Quarter 4 2013/14 Update
    Information for Economic Scrutiny Quarter 3 2013/14 Update Quarter 4 2013/14 Update Area Contact Service Description Team Plan Activity No/Title Commentary include metrics - this is not published just used for briefing Commentary include metrics - this is not published just used for briefing Economic Infrastructure Economic Infrastructure Commentary T2.02 Agree our broadband delivery plan with BDUK and set up a robust programme to Completed in Quarter 2 2012/13 Completed in Quarter 2 2012/13 implement the plan. Public service network (PSN), pilot Digital Networks Sally Hewitt JB projects, business/community T2.04 Facilitate community solutions to poor connectivity including the Online Revolution solutions pilots. T4.01 Deliver new econ infrastructure projects designed to supp business growth & job T4 01 75% complete for 2013/14 - The Canebuzo development at Long Sutton received Practical Completion in December and T4 01 100% complete for 2013/14 - The Canebuzo development at Long Sutton was completed and marketing is now taking creation. marketing is now taking place to attract tenants to the seven new units which will provide workspace for up to 45 new jobs. The place to attract tenants to the seven new units which will provide workspace for up to 45 new jobs. The Wyvern House Wyvern House development in Lincoln is now completed and open. A successful opening event took place in December 2013 development in Lincoln is now completed and open. A successful opening event took place in December 2013 which attracted a which attracted a lot of interest. One tenant has moved in and two more are due to move in soon.
    [Show full text]
  • Streetscape Design Manual
    Streetscape design manual CONTENTS Contents 1. Introduction 6-8 2. Policy and Legislative Background 9 3. Design Process 10-39 3.1 Quality Audits 11 3.1.1 The street environment: issues to keep in mind 11 3.1.2 Where and when should Quality Audits be carried out? 11 3.1.3 Quick Quality Audit 12 3.1.4 The Quality Audit Process 13 3.1.5 Lincolnshire County Council Quality Audit process 14 3.1.6 Developer-funded design 21 3.1.7 Incremental de-cluttering (see also Section 4.3.2) 25 3.1.8 Community Street Audits 26 3.2 Understanding local distinctiveness 29 3.2.1 Examples of elements of the street scene which can add to a ‘sense of place’ 29 3.2.2 Traditional road signs in Lincolnshire (TRiL) 29 3.3 Street Clutter 31 3.4 Consultation 32 3.4.1 Accessibility 32 3.4.2 Crime and fear of crime 33 3.4.3 Energy effciency 36 3.4.4 Setting up partnerships and community engagement 37 3.5 Seeking funding 39 4. Design Principles 40-90 4.1 Check list for design process 40 4.2 Flow chart for design principles 42 4.3 General Principles 43 4.3.1 Introduction 43 4.3.2 Impact and scale of works 44 4.3.3 Construction (Design and Management) Regulations 2015 (CDM 2015) 44 4.3.4 Shared space 44 4.3.5 Visibility 49 4.3.6 Materials 50 4.3.7 Laying of surfacing 50 4.3.8 Ensuring quality of workmanship 51 4.3.9 Contemporary design 52 4.3.10 Accessibility for people with disabilities 55 4.3.11 Guard rails 56 Last updated December 2016 3 CONTENTS 4.3.12 Traffc signals 58 4.3.13 Street lighting 60 4.3.14 Cycling 60 4.3.15 Trees and planting 60 4.3.16 Decoration of utility service boxes 61 4.3.17 Bus stop infrastructure 61 4.3.18 Kerbs 61 4.3.19 Junctions, crossings and accesses 62 4.3.20 One-way streets 62 4.4 Vehicle dominant 62 4.4.1 Urban 62 4.4.2 Rural 66 4.5 Multi-purpose streets 73 4.5.1 Urban 73 4.5.2 Village centres and suburban streets 77 4.6 Pedestrian dominant 84 4.7 Historic streets 87 4.8 New development 88 5.
    [Show full text]
  • East Midlands Rail Franchise Public Consultation
    Scarborough York Leeds Manchester Doncaster Liverpool Sheffield Barton-on -Humber Chesterfield Worksop Lincoln Grimsby Crewe Matlock Cleethorpes Mansfield Skegness Sleaford Grantham Stoke-on-Trent Derby Nottingham East Midlands Parkway Loughborough Peterborough Norwich Leicester Corby Ely Market Harborough Kettering Bedford Luton St Pancras East Midlands Rail Franchise Public Consultation Driving Growth in the East Midlands – Connectivity as a Driver for Social and Economic Prosperity July 2017 East Midlands Rail Franchise | Public Consultation Public Consultation | East Midlands Rail Franchise East Midlands Rail Franchise Public Consultation Driving Growth in the East Midlands – Connectivity as a Driver for Social and Economic Prosperity July 2017 East Midlands Rail Franchise | Public Consultation The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website: www.gov.uk/government/organisations/department-for-transport General enquiries: forms.DepartmentforTransport.gov.uk © Crown copyright 2017 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU or email: [email protected] Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned.
    [Show full text]
  • East Lindsey Economic Baseline 2016
    East Lindsey Economic Baseline 2016 1 EAST LINDSEY ECONOMIC BASELINE 2016 Table of Contents EXECUTIVE SUMMARY ........................................................................................ 4 Business Creation and Survival ...................................................................................................42 The Visitor Economy ........................................................................................................................43 1. INTRODUCTION ................................................................................................ 9 Geography of East Lindsey ............................................................................................................10 4. PEOPLE AND COMMUNITIES .......................................................................45 Structure of the Report ...................................................................................................................11 Population Structure .......................................................................................................................47 Age ..........................................................................................................................................................48 2. STRATEGIC CONTEXT .....................................................................................12 Overseas Migration...........................................................................................................................49 National Agenda - Productivity and
    [Show full text]
  • For Sale Investment 132 Lumley Road Skegness Pe25 3Na
    FOR SALE INVESTMENT 132 LUMLEY ROAD SKEGNESS PE25 3NA 3,354 SQ FT (313 SQ M) NIA ▪ Freehold retail investment ▪ Prime High Street location approximately 75 metres west of Grand Parade & Jubilee Clock Tower ▪ Let upon a 10 year IRI lease from 20 March 2017 (8½ years unexpired) at a current rent of £26,500 pa ▪ Price reflects a net initial yield of 8.9% PRICE - £290,000 Lambert Smith Hampton 01522 698888 1 Oakwood Road, Doddington Road, Lincoln LN6 3LH www.lsh.co.uk INVESTMENT 132 LUMLEY ROAD, SKEGNESS LOCATION TENANCY Skegness is a seaside town on the Lincolnshire coast located Let upon an internal repairing and insuring lease for a term of 10 approximately 43 miles east of Lincoln. In the 2011 Census years from 20 March 2017 (approximately 8½ years unexpired) at Skegness had a population of 19,579. a current rent of £26,500 per annum. The lease provides for the rent to be reviewed on 20 March 2022 and every fifth anniversary The A52 passes through the town from Boston to Mablethorpe. of that date. The A158 connects Lincoln to Skegness, and connects with the A16 to the north via the A1028. National Express operates direct PRICE daily coaches from East Midlands cities in the warmer months of £290,000. A purchase at this level will reflect a net initial yield of the year. 8.9% having deducted standard purchasers’ costs of 2.9%. Skegness railway station is the terminus for the Grantham to VAT Skegness Line. Trains run the full length of this and the The price quoted in these particulars is exclusive of VAT.
    [Show full text]
  • Skegness to Wainfleet
    CITY • COUNTRY • COAST SKEGNESS TO WAINFLEET 4 1/2 hour walk Starting from Skegness Railway Station, this walk takes you along the coast linking you 8km to Wainfleet. Explore the county’s most famous seaside resort, stop off for a taste of Batemans Brewery and visit the Magdelen College Museum in Wainfleet. SKEGNESS TO WAINFLEET CITY • COUNTRY • COAST START Skegness Railway Station, Wainfleet Road Public carparks in Skegness and the Market Place in Wainfleet. WALK LOCATION Along the coast Grid Reference: TF 562 632 WALK LENGTH 12 km (7 1/2 miles) - Up to 4 1/2 hours to complete The walk uses field paths and quiet lanes, which may be muddy and uneven in places. REFRESHMENTS There’s plenty to offer in both Skegness and Wainfleet From various chip shops to sweets and sticks of rock. Public toilets are also available. FOR MORE INFORMATION TRAIN TIMES BUS INFORMATION TOURIST INFORMATION National Rail Enquiries East Midlands Railway Lincolnshire County Council Tourist information Centre Tel: 03457 484950 Tel: 03457 125678 lincolnshire.gov.uk/busrailtravel Tel: 01522 526450 www.nationalrail.co.uk www.eastmidlandsrailway.co.uk Lincsbus.info www.visitlincolnshire.com Traveline.info For guided walks throughout the year, please visit poacherline.org.uk Poacher Line Community Rail Partnership @poacherline SKEGNESS TO WAINFLEET CITY • COUNTRY • COAST MAP & DIRECTIONS Please note: All our walks can be done in the reverse direction if required 7 6 5 SOUTH IEW BURGH LE MARSH 4 SKEGNESS 8 2 3 9 1 A52 10 CROFT 11 A52 B1195 n i a r D WAINLEET k n ALL SAINTS a B Wainfl w eet Haven o C 12 Nottingham to Skegness Take the Poacherline Nottingham Netherfield Radcliffe Bingham Aslockton Elton & Orston Bottesford Grantham Ancaster Rauceby Sleaford Heckington Swineshead Hubberts Bridge Boston Thorpe Culvert Wainfleet Havenhouse Skegness For guided walks throughout the year, please visit poacherline.org.uk SKEGNESS TO WAINFLEET Leave Skegness railway station and turn left.
    [Show full text]
  • 12 Bus Time Schedule & Line Route
    12 bus time schedule & line map 12 Alford - Boston View In Website Mode The 12 bus line (Alford - Boston) has 2 routes. For regular weekdays, their operation hours are: (1) Alford: 1:50 PM (2) Boston: 9:20 AM Use the Moovit App to ƒnd the closest 12 bus station near you and ƒnd out when is the next 12 bus arriving. Direction: Alford 12 bus Time Schedule 79 stops Alford Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 1:50 PM Bus Station, Boston Pipe O∆ce Lane, Boston Tuesday 1:50 PM Boots, Boston Wednesday 1:50 PM Market Place, Boston Thursday 1:50 PM Greyfriars Surgery, Boston Friday Not Operational South Square, Boston Saturday Not Operational Quakers Lane, Boston Rowley Road, Boston Bargate Bridge, Boston 12 bus Info Hospital Lane, Boston Direction: Alford Stops: 79 Mill Inn, Boston Trip Duration: 100 min Line Summary: Bus Station, Boston, Boots, Boston, Burton Inn, Boston Greyfriars Surgery, Boston, Quakers Lane, Boston, Bargate Bridge, Boston, Hospital Lane, Boston, Mill Ball House Ph, Boston Inn, Boston, Burton Inn, Boston, Ball House Ph, Wain≈eet Road, Fishtoft Civil Parish Boston, Johnson's Garden Centre, Boston, Wythes Lane, Haltoft End, Jolly Farmer Lane, Haltoft End, Johnson's Garden Centre, Boston The Castle Inn, Haltoft End, The Admiral Nelson Ph, Wain≈eet Road, Fishtoft Civil Parish Benington, Fire Station, Leverton, St Helena's Church, Leverton, Sheepgate, Leverton, Southƒelds Lane, Old Wythes Lane, Haltoft End Leake, Bricklayers Arms Ph, Old Leake, The Minstrels, Wrangle, Tooley Lane, Wrangle, Broadgate
    [Show full text]
  • Coastal Lincolnshire Housing Market Area Local Investment Plan
    Coastal Lincolnshire Housing Market Area Local Investment Plan April 2011 – 2026 Contents Executive Summary 1.0 Introduction Pg 5 2.0 Vision Pg 5 3.0 Current Strategic Context Pg 7 4.0 The Place - Area Profile Pg 11 5.0 Key Issues and Solutions Pg 15 6.0 Themes and Project Plan Development Pg 36 7.0 Schemes and projects – Now to 3 years Pg 37 8.0 Future schemes and projects Pg 58 9.0 Priorities within the Local Investment Plan Pg 78 10.0 Resources Pg 80 11.0 Consultation and Engagement Pg 82 12.0 Equality and Diversity Pg 82 13.0 Governance and Plan Delivery Pg 83 14.0 Monitoring and Review Pg 83 15.0 Risk Pg 84 16.0 Glossary Pg 85 Appendix 1 Strategic Document Evidence Base / Status Appendix 2 Lincolnshire Strategic Document Summary Appendix 3 Boston Borough Strategic Document Summary Appendix 4 East Lindsey Strategic Document Summary Appendix 5 Boston Borough Project Grid Appendix 6 East Lindsey Project Grid Appendix 7 Prioritisation Scoring Methodology If you would like this information in another language, large print, Braille or audio cassette please contact Boston Borough Council or East Lindsey District Council For further information on this document please contact: The Housing Strategy Department Boston Borough Council Municipal Building West Street, Boston PE21 8QR Tel: 01205 314518 Email: [email protected] Or The Housing Strategy Department East Lindsey District Council Tedder Hall Manby Park Louth Lincs LN11 8UP Tel: 01507 601111 ext 805 E-mail [email protected] Coastal Lincolnshire HMA Local Investment Plan Page 1 Executive Summary This is the first Coastal Lincolnshire Housing Market Area Local Investment Plan between Boston Borough Council, East Lindsey District Council and Lincolnshire County Council in partnership with the Homes and Communities Agency (HCA) - the National Housing and Regeneration Agency for England.
    [Show full text]
  • Everything You Need to Know Before You
    Everything you need to know before you go! Welcome W HAT ' S INSIDE Some need−to−knows Thank you so much for choosing Some need-to-knows Just before we start, here are a few things 3 you might need to remember: Make the most of your first day Butlins for your family break. Before you go You can arrive on the resort at any time We’re really looking forward to HOLIDAY CONFIRMATION 4 Activities from midday onwards, so why not keep welcoming you and your family You’ll need to bring your paper confirmation your swimming things in a separate bag 5 Perfect for tots along so that you can check in. so that you can leave your luggage in the to our Skegness Resort. 5 Perfect for 5-8 yrs CHECKING IN car and enjoy Splash Waterworld before 6 you check in – don’t forget the towels! We thought you might have some Perfect for 9-12 yrs When you arrive on the resort you’ll be questions about your break, like 7 directed to your Check In area, for full details Perfect for teens what to expect, what’s included and 8 please see page 20. Although we make sure all the information in this guide is correct at Perfect for adults the time of print, on rare occasions we’ll need to make changes at how to settle in quickly... so we’ve 9 the last minute without any time to let you know. Splash Waterworld tried to provide all the answers in 10 Sports this handy guide.
    [Show full text]
  • Page 81 and High Street
    Information for Economic Scrutiny Quarter 1 2013/14 Update Quarter 2 2013/14 Update Quarter 3 2013/14 Update Area Contact Service Description Team Plan Activity No/Title Commentary include metrics - this is not published just used for briefing Commentary include metrics - this is not published just used for briefing Commentary include metrics - this is not published just used for briefing Economic Infrastructure Economic Infrastructure Commentary Economic Infrastructure Commentary Economic Infrastructure Commentary T2.02 Agree our broadband delivery plan with BDUK and set up a robust programme to Completed in Quarter 2 2012/13 Completed in Quarter 2 2012/13 Completed in Quarter 2 2012/13 implement the plan. Public service network (PSN), pilot Digital Networks Sally Hewitt JB projects, business/community T2.04 Facilitate community solutions to poor connectivity including the Online Revolution 50% complete for 2013/14 via SLA with Community Lincs. Online revolution project almost complete but project has received 50% complete for 2013/14. Community Lincs continue to offer community support if required and are supporting non-internet solutions pilots. extra funding - 50% of Pilot areas now live and will be completed by September 2013. ERDF funded BCLR signed in August users to get online. Online revolution pilot is live and attracting users. 2013 and will enable 12 industrial areas to have better broadband and some business support in Lincolnshire and Rutland. T4.01 Deliver new econ infrastructure projects designed to supp business growth & job 25% complete for the year 2013/14. The Canebuzo development at Long Sutton is on site and proceeding towards completion. T4 01 50% complete for the year 2013/14.
    [Show full text]