TRANSPORT DEPARTMENT NOTICE SPECIAL TRAFFIC and TRANSPORT ARRANGEMENTS for 2018 HONG KONG CYCLOTHON Notice Is Hereby Given That

Total Page:16

File Type:pdf, Size:1020Kb

TRANSPORT DEPARTMENT NOTICE SPECIAL TRAFFIC and TRANSPORT ARRANGEMENTS for 2018 HONG KONG CYCLOTHON Notice Is Hereby Given That TRANSPORT DEPARTMENT NOTICE SPECIAL TRAFFIC AND TRANSPORT ARRANGEMENTS FOR 2018 HONG KONG CYCLOTHON Notice is hereby given that special traffic and transport arrangements will be implemented on 14 October 2018 (Sunday) to facilitate the holding of the 2018 Hong Kong Cyclothon: I. TRAFFIC ARRANGEMENTS FOR THE RACE ON 14 October 2018 (Please refer to Figure 1 and Figure 2) (A) Road Closures The following major roads will be closed to all vehicular traffic at the time specified below (except vehicles with closed road permits issued by the Transport Department): KOWLOON Phase I From 8.00 pm on 13 October 2018 to about 6.30 pm on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) The layby outside Mody Road Garden. Phase II From 1.00 am to about 11.00 am on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) West Kowloon Highway southbound between Tsing Kwai Highway and the slip road of Lin Cheung Road southbound; (ii) The slip road leading from Lin Cheung Road southbound to Lai Cheung Road eastbound; and (iii) The slip road leading from Lai Po Road northbound to Tsing Sha Highway eastbound. Traffic Diversions: (i) Vehicles on Mei Ching Road will be prohibited from entering West Kowloon Highway southbound via the slip road leading from Mei Ching Interchange to West Kowloon Highway; and (ii) Vehicles on Lai Po Road northbound will be prohibited from entering the slip road leading to Tsing Sha Highway eastbound. Page 1 of 26 From 1.00 am to about 6.00 pm on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Princess Margaret Road Link southbound between Metropolis Drive and Hung Hom Bypass; (ii) Science Museum Road westbound between Salisbury Road and Science Museum Square; (iii) Both bounds of Hung Hom Bypass between Salisbury Road and Princess Margaret Road Link; (iv) The 2nd and 3rd lanes of Hung Hom Bypass eastbound between Princess Margaret Road Link and Hung Hom Road; (v) The 3rd and 4th lanes of Hung Hom Bypass westbound between Princess Margaret Road Link and Hung Hom Road; (vi) The 2nd and 3rd lanes of Hung Hom Road eastbound between Hung Hom Bypass and Hung Hum South Road; (vii) The 2nd and 3rd lanes of Hung Hom Road westbound between Tak Fung Street and Hung Hom Bypass; (viii) Hong Wan Path; (ix) The slip road leading from Metropolis Drive to Hung Hom Bypass; (x) Mody Lane; (xi) Mody Road between Mody Lane and Science Museum Road; (xii) Both bounds of Salisbury Road Underpass; (xiii) Salisbury Road southbound between Cross Harbour Tunnel Administation Building and Science Museum Road; and (xiv) Both bounds of Salisbury Road between Science Museum Road and Chatham Road South. Traffic Diversions: (i) Vehicles on Princess Margaret Road Link southbound will be diverted to turn right onto Metropolis Drive westbound; (ii) Vehicles on Metropolis Drive eastbound will be diverted to turn left onto Princess Margaret Road Link northbound or the down ramp slip road leading to Hung Lai Road eastbound; (iii) Vehicles on Science Museum Road southbound will be diverted to turn left onto Hong Chong Road northbound; (iv) Vehicles on Hung Hom Road southbound will be directed onto the slip road leading from Hung Hom Bypass to Cheong Wan Road and other destinations; (v) Vehicles on Chatham Road South southbound will be diverted to turn right onto Cameron Road westbound (except for franchised buses); or diverted to turn right onto Salisbury Road westbound after the completion of Phase III road closure as mentioned below (except for franchised buses); (vi) Vehicles on Salisbury Road eastbound will be diverted to turn left onto Chatham Road South northbound (except for franchised buses); (vii) Vehicles on Salisbury Road southbound near Hung Hom MTR Station will be diverted onto Hong Chong Road northbound; and Page 2 of 26 (viii) Vehicles on Mody Road eastbound will be diverted to make an U-turn at Mody Road near Mody Lane. Phase III From 2.30 am to about 9.30 am on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Salisbury Road westbound between Chatham Road South and Nathan Road; (ii) Salisbury Road eastbound U-turn slip road near Chatham Road South; and (iii) Chatham Road South southbound between Mody Road and Salisbury Road (except for franchised buses). Traffic Diversions: (i) Vehicles on Chatham Road South southbound will be diverted to turn right onto Cameron Road westbound; or (ii) turn left onto Mody Road eastbound [not applicable to vehicles exceeding 4 tonnes in weight or 7 metres in length]. From 2.30 am to about 11.00 am on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Kowloon Park Drive northbound between Salisbury Road and Canton Road; (ii) Peking Road westbound between Canton Road and Kowloon Park Drive; (iii) The 2nd and 3rd lanes of Middle Road westbound between Hankow Road and Kowloon Park Drive; (iv) Canton Road southbound between Haiphong Road and Salisbury Road; (v) Ashley Road southbound between Peking Road and Middle Road; (vi) Salisbury Road westbound between Star Ferry Pier and Nathan Road; (vii) Salisbury Road eastbound between Star Ferry Pier and Kowloon Park Drive; (viii) The 4th lane of Salisbury Road eastbound between Kowloon Park Drive and Hankow Road; (ix) The 4th and 5th lanes of Salisbury Road eastbound between Hankow Road and Nathan Road; (x) The 3rd and 4th lanes of Salisbury Road eastbound between Nathan Road and Middle Road; and (xi) The 5th to 6th lanes of Lin Cheung Road southbound between West Kowloon Highway and Jordan Road. Traffic Diversions: (i) Vehicles on Canton Road southbound will be diverted to turn left onto Haiphong Road eastbound; (ii) Vehicles on Middle Road westbound will be diverted to turn left onto Kowloon Park Drive southbound; (iii) Vehicles on Nathan Road southbound will be diverted to turn left onto Salisbury Road eastbound; Page 3 of 26 (iv) Vehicles on Lin Chueng Road southbound will be diverted to the slip road leading to Nga Cheung Road Flyover southbound and West Kowloon Highway southbound; and (v) Vehicles on Peking Road eastbound will be prohibited from turning right onto Ashley Road southbound. Phase IV From 3.00 am to about 11.00 am on 14 October 2018(depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Jordan Road eastbound between Jordan Road Flyover and Lin Cheung Road; (ii) The 4th lane of Jordan Road westbound between Wui Man Road and Lin Cheung Road; (iii) Jordan Road Flyover eastbound between Hoi Po Road and Lin Cheung Road northbound; (iv) Jordan Road Flyover westbound between Hoi Po Road and Nga Cheung Road; (v) The 3rd to 4th lanes of Lin Cheung Road northbound between Lin Cheung Road northbound U-turn slip road and Jordan Road; (vi) The 3rd to 4th lanes of Lin Cheung Road Underpass southbound between Lin Cheung Road northbound U-turn slip road and Austin Road West Underpass; (vii) Lin Cheung Road Lowest Level Underpass northbound between Austin Road West Underpass and Exit of Lin Cheung Road Lowest Level Underpass; (viii) Austin Road West westbound; (ix) Austin Road West Underpass westbound; (x) Austin Road West At-grade East Loop Road; and (xi) The elevated road of Nga Cheung Road northbound between Austin Road West and Jordan Road; Traffic Diversions: (i) Vehicles on Austin Road westbound will be diverted to turn onto Canton Road northbound or Canton Road southbound; (ii) Vehicles on Canton Road northbound will be prohibited from turning left onto Austin Road West westbound; (iii) Vehicles from International Commerce Centre (ICC) will be diverted to turn left onto the elevated road of Nga Cheung Road southbound; (iv) Vehicles on Jordan Road westbound leading for Lin Cheung Road will be diverted to make an U-turn at the northern roundabout of Nga Cheung Road, and turn left onto Lin Cheung Road northbound via Jordan Road eastbound; (v) Vehicles leaving To Wah Road will be diverted to turn left onto Lin Cheung Road northbound at Jordan Road eastbound; and (vi) Vehicles on Jordan Road Flyover westbound will be diverted to turn left onto the elevated road of Nga Cheung Road southbound. Phase V Page 4 of 26 From 4.15 am to about 11.00 am on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Canton Road northbound between China Hong Kong City and Austin Road west. Traffic Diversions: (i) Canton Road northbound between the ingress / egress of China Hong Kong City and Kowloon Park Drive will be re-routed to one-way southbound. During the above road closures, the Western Harbour Crossing will maintain normal traffic. Other Special Traffic Arrangements Vehicles exceeding 4 tonnes in weight or 7 metres in length will be prohibited from entering Mody Road between Chatham Road South and Mody Lane from 2.30 am to 6.00 pm on 14 October 2018. NEW TERRITORIES Phase I From 1.00 am to about 7.15 am on 14 October 2018 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Upper Deck of Lantau Link Kowloon bound.
Recommended publications
  • Special Traffic and Transport Arrangements for Hong Kong Cyclothon
    TRANSPORT DEPARTMENT NOTICE SPECIAL TRAFFIC AND TRANSPORT ARRANGEMENTS FOR HONG KONG CYCLOTHON Notice is hereby given that special traffic and transport arrangements will be implemented on 10 October 2015 (Saturday) and 11 October 2015 (Sunday) to facilitate the holding of the Hong Kong Cyclothon: I. TRAFFIC ARRANGEMENTS FOR THE RACES ON 10 OCTOBER 2015 (Please refer to Plan 1) (A) Road Closures The following major roads will be closed to all vehicular traffic at the time specified below (except vehicles with closed road permits issued by the Transport Department): From 4 pm on 10 October 2015 to about 1.00 am on 11 October 2015 (depending on the actual finishing time of the race, and complete clearance for safe re-opening of roads to vehicular traffic): (i) Both bounds of Hung Hom Bypass between Hung Hom Road and Salisbury Road ; (ii) Princess Margaret Road Link southbound between Metropolis Drive and Hung Hom Bypass; (iii) Salisbury Road westbound between Chatham Road South and Cheong Wan Road; (iv) Both bounds of Salisbury Road Underpass; (v) Salisbury Road southbound between Cross Harbour Tunnel Administration Building and Science Museum Road; (vi) Both bounds of Mody Lane; (vii) Both bounds of Mody Road between Mody Lane and Science Museum Road; (viii) Salisbury Road eastbound between Chatham Road South and entrance of the Tsim Sha Tsui East (Mody Road) Bus Terminus. (except slow lane for exclusive use of franchised bus only); (ix) Science Museum Road northbound between Salisbury Road and Science Museum Square. (x) The 3rd and 4th lanes of Salisbury Road eastbound between Nathan Road and Chatham Road South; and (xi) The 4th and 5th lanes of Salisbury Road westbound between Nathan Road and Chatham Road South.
    [Show full text]
  • Official Record of Proceedings
    HONG KONG LEGISLATIVE COUNCIL — 9 November 1994 743 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 9 November 1994 The Council met at half-past Two o'clock PRESENT THE PRESIDENT THE HONOURABLE JOHN JOSEPH SWAINE, C.B.E., LL.D., Q.C., J.P. THE CHIEF SECRETARY THE HONOURABLE MRS ANSON CHAN, C.B.E., J.P. THE FINANCIAL SECRETARY THE HONOURABLE SIR NATHANIEL WILLIAM HAMISH MACLEOD, K.B.E., J.P. THE ATTORNEY GENERAL THE HONOURABLE JEREMY FELL MATHEWS, C.M.G., J.P. THE HONOURABLE ALLEN LEE PENG-FEI, C.B.E., J.P. THE HONOURABLE MRS SELINA CHOW LIANG SHUK-YEE, O.B.E., J.P. THE HONOURABLE HUI YIN-FAT, O.B.E., J.P. THE HONOURABLE MARTIN LEE CHU-MING, Q.C., J.P. DR THE HONOURABLE DAVID LI KWOK-PO, O.B.E., LL.D., J.P. THE HONOURABLE PANG CHUN-HOI, M.B.E. THE HONOURABLE SZETO WAH THE HONOURABLE TAM YIU-CHUNG THE HONOURABLE ANDREW WONG WANG-FAT, O.B.E., J.P. THE HONOURABLE EDWARD HO SING-TIN, O.B.E., J.P. THE HONOURABLE RONALD JOSEPH ARCULLI, O.B.E., J.P. THE HONOURABLE MARTIN GILBERT BARROW, O.B.E., J.P. 744 HONG KONG LEGISLATIVE COUNCIL — 9 November 1994 THE HONOURABLE MRS PEGGY LAM, O.B.E., J.P. THE HONOURABLE MRS MIRIAM LAU KIN-YEE, O.B.E., J.P. THE HONOURABLE LAU WAH-SUM, O.B.E., J.P. DR THE HONOURABLE LEONG CHE-HUNG, O.B.E., J.P. THE HONOURABLE JAMES DAVID McGREGOR, O.B.E., I.S.O., J.P.
    [Show full text]
  • 1. the Meeting Was Resumed at 9:15 A.M. on 3.11.2016. 2. the Following
    1. The meeting was resumed at 9:15 a.m. on 3.11.2016. 2. The following Members and the Secretary were present at the resumed meeting: Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Professor S.C. Wong Vice-chairman Mr Lincoln L.H. Huang Dr Wilton W.T. Fok Mr Dominic K.K. Lam Mr Stephen H.B. Yau Dr F.C. Chan Mr David Y.T. Lui Mr Peter K.T. Yuen Mr Philip S.L. Kan Mr K.K. Cheung Mr Wilson Y.W. Fung Mr Alex T.H. Lai Professor T.S. Liu Ms Sandy H.Y. Wong Mr Franklin Yu Chief Traffic Engineer (New Territories West) Transport Department Mr Samson S.S. Lam Assistant Director (Environmental Assessment) Environmental Protection Department Mr K.F. Tang - 2 - Agenda Item 1 (Continued) [Open Meeting] Presentation and Question Sessions 3. The following government representatives, and further representers/ representers/commenters and their representatives were invited to the meeting at this point: Government Representatives Planning Department (PlanD) Mr Lawrence Y.C. Chau - District Planning Officer/Tsuen Wan and West Kowloon (DPO/TWK) Housing Department (HD) Ms Emily W.M. Ip - Planning Officer (PO) Ms May S.S. Yeung - Architect (A) Mr Chow Kwok Sang - Civil Engineer (CE) Transport Department (TD) Mr Honson H.S. Yuen - Chief Transport Officer/New Territories South West (CTO/NTSW) Mr Patrick K.H. Ho - Senior Engineer/Kwai Tsing (SE/KT) Further Representers, Representers, Commenters and Their Representatives F77 – 青衣美景花園業主立案法團 F1193 – Lau Siu Mee F1250 – Huang Wing Yu F1251 – 黃培燁 F1307 – Huang Chi Wang - 3 - F1552
    [Show full text]
  • To Browse the Annual Traffic Census 2018 on the Internet
    THE ANNUAL TRAFFIC CENSUS -2018- TSSD Publication No. 19CAB1 While every caution has been taken to ensure the accuracy of the information contained in this publication, the Transport Department of the Hong Kong Special Administrative Region Government is not to be held liable for any loss or damage arising from the use of these data. Acknowledgement should be made in reproducing in any manner in whole or part of this publication. TRAFFIC SURVEY AND SUPPORT DIVISION August 2019 © THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION SUMMARY During the year 2018, the annual average daily traffic (A.A.D.T.) in the territory showed the following changes as compared with that of 2017: General There were 784 434 vehicles licensed in Hong Kong at the end of 2018, representing an increase of 2.38% when compared with the corresponding figure in 2017. This total accounted for 90.7% of the number of registered vehicles. The highest percentage increase was found in private light bus, with a growth of 9.0%. There were 565 213 private cars licensed at the end of 2018. The number of franchised buses licensed was 6 151, an increase of 2.8% over 2017. The total number of goods vehicles licensed in 2018 was 117 567, showing an increase of 2.5% over 2017. During the year, road travel in the territory amounted to 38.25 million vehicle- kilometres per day. Of this total, 6.00 million vehicle-kilometres occurred on Hong Kong Island while 8.53 million vehicle-kilometres and 23.72 million vehicle- kilometres occurred in Kowloon and the New Territories respectively.
    [Show full text]
  • Transport Bureau
    1 Transport Bureau In the past year, we have been working on 79 pledges, of which : we have completed 25; we are on schedule with 40; four are under review; we are taking active measures to speed up the progress on three which are behind schedule; and we are pressing ahead with seven on-going commitments. The following sets out the detailed report for each main programme area. Transport Infrastructure Year Pledge Present Position Action Completed 1997 1. To finalise in 1997 our The proposed engineering schemes proposals on the way forward for the two projects were submitted to for the Ma On Shan/Tai Wai rail and approved in principle by the link and the Kowloon-Canton Executive Council (ExCo) in Railway extension. December 1997. The Kowloon- Canton Railway Corporation (KCRC) has been invited to submit proposals for implementing these two projects. 1994 2. To award a franchise to build The Tai Lam Tunnel and Yuen Long and operate the Tai Lam Tunnel Approach Road opened to traffic on and Yuen Long Approach Road 25 May 1998. sections of the Country Park Section of Route 3 by the end of 1994 and to complete the project in 1998. 1994 3. To improve traffic flow in the The Ting Kau Bridge opened to New Territories by building the traffic on 6 May 1998. Ting Kau Bridge by June 1997. 2 1994 4. To widen the Lung Cheung and We have completed the works. Ching Cheung Roads. Action in Progress : On Schedule 1997 5. To enhance the link between The investigation and preliminary Northwest New Territories and design work commenced in March Northeast Lantau by providing 1998.
    [Show full text]
  • (Translation) Minutes of the 116Th Meeting of the Kwai Tsing District
    (Translation) Minutes of the 116th Meeting of the Kwai Tsing District Council Date: 10 January 2019 Time: 2:31 p.m. – 5:01 p.m. Venue: K&T DO Conference Room Attendee Time of Arrival Time of Departure (p.m.) (p.m.) Mr LAW King-shing, BBS, MH (Chairman) Start of Meeting End of Meeting Mr CHOW Yick-hay, BBS, JP (Vice-chairman) Start of Meeting End of Meeting Mr CHAN Siu-man, Simon 2:36 End of Meeting Ms CHEUNG Wai-ching, Clarice Start of Meeting End of Meeting Mr CHOW Wai-hung, Rayman Start of Meeting End of Meeting Miss CHU Lai-ling Start of Meeting End of Meeting Mr HUI Kei-cheung 2:47 End of Meeting Ms KWOK Fu-yung 2:34 End of Meeting Ms LAM Chui-ling, Nancy, MH Start of Meeting End of Meeting Mr LAM Siu-fai Start of Meeting 4:16 Ms LAU Mei-lo Start of Meeting End of Meeting Mr LEE Chi-keung, Alan, MH Start of Meeting End of Meeting Mr LEUNG Chi-shing 3:01 End of Meeting Mr LEUNG Tsz-wing, Dennis Start of Meeting End of Meeting Mr LEUNG Kam-wai 2:43 End of Meeting Mr LEUNG Wai-man, MH Start of Meeting End of Meeting The Hon. LEUNG Yiu-chung 2:40 End of Meeting Mr LI Sai-lung Start of Meeting End of Meeting Miss LO Yuen-ting Start of Meeting End of Meeting The Hon. MAK Mei-kuen, Alice, BBS, JP Start of Meeting End of Meeting Mr NG Ka-chiu Start of Meeting End of Meeting Mr PAU Ming-hong Start of Meeting End of Meeting Mr POON Chi-shing, MH Start of Meeting End of Meeting Ms TAM Wai-chun, MH Start of Meeting End of Meeting Mr TANG Shui-wah, MH Start of Meeting End of Meeting Mr TSUI Hiu-kit 3:19 End of Meeting Mr WONG Bing-kuen 2:52 4:06
    [Show full text]
  • (Translation) Minutes of the 3 Meeting of the the Traffic and Transport
    (Translation) Minutes of the 3rd Meeting of the the Traffic and Transport Committee (2019) of Kwai Tsing District Council Date: 13 June 2019 Time: 2:30 p.m. – 6:17 p.m. Venue: K&T DO Conference Room Attendee Time of Arrival Time of Departure (p.m.) (p.m.) Mr TSUI Hiu-kit (Chairman) Start of Meeting End of Meeting Ms KWOK Fu-yung (Vice-chairman) Start of Meeting End of Meeting Mr CHAN Siu-man, Simon Start of Meeting 5:27 Ms CHEUNG Wai-ching, Clarice Start of Meeting 5:40 Mr CHOW Yick-hay, BBS, JP Start of Meeting 3:23 Mr CHOW Wai-hung, Rayman Start of Meeting End of Meeting Miss CHU Lai-ling Start of Meeting End of Meeting Mr HUI Kei-cheung 2:41 4:25 Ms LAM Chui-ling, Nancy, MH 2:44 End of Meeting Mr LAW King-shing, BBS, MH Start of Meeting 3:39 Mr LEE Chi-keung, Alan, MH Start of Meeting End of Meeting Mr LEUNG Chi-shing 2:50 End of Meeting Mr LEUNG Wai-man, MH 3:41 End of Meeting Mr LEUNG Kam-wai 2:58 End of Meeting Mr LEUNG Tsz-wing, Dennis Start of Meeting End of Meeting Mr LI Sai-lung Start of Meeting End of Meeting Miss LO Yuen-ting Start of Meeting End of Meeting Mr NG Ka-chiu 2:44 End of Meeting Mr NG Kim-sing 3:11 End of Meeting Mr PAU Ming-hong Start of Meeting End of Meeting Mr POON Chi-shing, MH Start of Meeting End of Meeting Ms TAM Wai-chun, MH Start of Meeting End of Meeting Mr WONG Bing-kuen 3:06 End of Meeting Mr WONG Yiu-chung, MH Start of Meeting End of Meeting Mr WONG Yun-tat 2:44 End of Meeting Mr CHOW Elson Start of Meeting 5:40 Mr HON Chun-yin Start of Meeting 3:33 Mr TAM Ka-chun, Warren Start of Meeting End of Meeting
    [Show full text]
  • Port and Airport Development
    CAPITAL WORKS RESERVE FUND (Payments) Sub- Approved Actual Revised head project expenditure estimate Estimate (Code) Approved projects estimate to 31.3.2001 2001–02 2002–03 ————— ————— ————— ————— $’000 $’000 $’000 $’000 Head 702—Port and Airport Development BUILDING Support Support—Intra-governmental services 2052GI Construction of the Air Traffic Control Complex and Tower, procurement of air traffic control and meteorological equipment and systems and related construction works............................... 1,250,000 972,350 25,300 8,000 2054GI Procurement of air traffic control, meteorological and postal mechanisation equipment and systems and related construction works for the new airport at Chek Lap Kok............................................... 1,140,000 956,259 10,000 8,000 2057GI Stand-alone government buildings, fitting-out works within Passenger Terminal Building and remaining equipment and systems........................ 2,425,800 1,981,201 11,500 23,182 2060GI Government facilities for the second runway of the new airport at Chek Lap Kok............................................... 602,000 514,709 10,000 11,303 ————— ————— ————— ————— Sub-total.......................................... 5,417,800 4,424,519 56,800 50,485 ————— ————— ————— ————— Others Support—others 2136GK Immigration, Fire Services and Customs and Excise facilities at the River Trade Terminal, in Area 38, Tuen Mun ............................................ 114,400 93,423 10 16 ————— ————— ————— ————— Sub-total.......................................... 114,400 93,423 10 16 ————— ————— ————— ————— Building works: total ................................ 5,532,200 4,517,942 56,810 50,501 ————— ————— ————— ————— CIVIL ENGINEERING Economic Air and Sea Communications—Port works 2056AP Hei Ling Chau typhoon shelter ................ 621,700 496,104 1,500 1,500 2108AP Northshore Lantau development feasibility study and site investigation ........................................ 62,800 51,921 2,500 733 ————— ————— ————— ————— Sub-total.........................................
    [Show full text]
  • 1. the Meeting Was Resumed at 9:05 A.M. on 27.10.2016. 2. The
    1. The meeting was resumed at 9:05 a.m. on 27.10.2016. 2. The following Members and the Secretary were present at the resumed meeting: Permanent Secretary for Development Chairman (Planning and Lands) Mr Michael W.L. Wong Professor S.C. Wong Vice-chairman Mr Lincoln L.H. Huang Mr Ivan C.S. Fu Dr F.C. Chan Mr David Y.T. Lui Mr Peter K.T. Yuen Mr Philip S.L. Kan Mr Alex T.H. Lai Professor T.S. Liu Ms Sandy H.Y. Wong Mr Franklin Yu Chief Traffic Engineer (New Territories West), Transport Department Mr Samson S.S. Lam Deputy Director of Environmental Protection (1) Environmental Protection Department Mr C.W. Tse Assistant Director/Regional 3, Lands Department Mr Edwin W.K. Chan - 2 - Tsuen Wan & West Kowloon District Agenda Item 1 (Continued) [Open Meeting] 3. The Chairman said that it was the third day of the hearing meeting for the further representations in respect of the draft Tsing Yi OZP No. S/TY/27 which commenced on 25.10.2016. 4. The Secretary said that Members’ declaration of interests as shown on the PowerPoint were reported in the first hearing session on 25.10.2016 (Paragraphs 4 and 5 of the minutes of 25.10.2016). No further declaration of interests had been received from Members since then. 5. The Chairman noted that reasonable notice had been given to the further representers, representers and commenters inviting them to attend the hearing. Other than those who were present or had indicated that they would attend the hearing, the rest had either indicated not to attend or made no reply.
    [Show full text]
  • PWSC(98-99)35 on 11 November 1998
    For discussion PWSC(98-99)35 on 11 November 1998 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 706 - HIGHWAYS Transport - Roads 711TH - Route 9 between Tsing Yi and Cheung Sha Wan Members are invited to recommend to Finance Committee - (a) to upgrade part of 711TH to Category A, entitled "Route 9 between Tsing Yi and Cheung Sha Wan - detailed design and associated site investigations", at an estimated cost of $473.5 million in money-of-the-day prices; and (b) to retain the remainder of 711TH in Category B. PROBLEM The existing capacity of the Cheung Tsing Highway, the Cheung Tsing Tunnel and the Tsing Kwai Highway will not be able to cope with the growing traffic demand by 2006. /PROPOSAL .. PWSC(98-99)35 Page 2 PROPOSAL 2. The Director of Highways, with the support of the Secretary for Transport, proposes to upgrade part of 711TH to Category A at an estimated cost of $473.5 million in money-of-the-day (MOD) prices to employ consultants to undertake the detailed design of the proposed section of Route 9 between Tsing Yi and Cheung Sha Wan, and to carry out the associated site investigations. PROJECT SCOPE AND NATURE 3. The scope of works of 711TH includes - (a) a 1.2 kilometre 3-lane twin-tube Nam Wan Tunnel at Tsing Yi, south of the Cheung Tsing Tunnel; (b) about 1.5 kilometres of dual 3-lane highway connecting the western end of Nam Wan Tunnel with Cheung Tsing Highway at the North West Tsing Yi Interchange; (c) about 4.9 kilometres of dual 3-lane highway connecting the eastern end of Nam Wan Tunnel with the West Kowloon Highway and the Lai Wan Interchange, including the Stonecutters Bridge of about 1,000-metres in span and the Ngong Shuen Chau Viaduct connecting the Stonecutters Bridge with the Lai Wan Interchange; (d) slip roads connecting Route 9 with the local road networks at Container Terminal Number 8 (CT8) and the proposed Container Terminal Number 9 (CT9); and (e) the associated environmental mitigation measures, traffic control and surveillance system, electrical and mechanical systems, geotechnical, landscape and drainage works.
    [Show full text]
  • 1. the Meeting Was Resumed at 9:10 A.M. on 26.4.2016. 2. the Following
    1. The meeting was resumed at 9:10 a.m. on 26.4.2016. 2. The following Members and the Secretary were present at the resumed meeting: Permanent Secretary for Development (Planning and Lands) Mr Michael W.L. Wong Chairman Professor S.C. Wong Vice-chairman Mr Lincoln L.H. Huang Professor K.C. Chau Mr Sunny L.K. Ho Mr Dominic K.K. Lam Dr F.C. Chan Mr Peter K.T. Yuen Mr K.K. Cheung Mr Wilson Y.W. Fung Dr C.H. Hau Mr Alex T.H. Lai Dr Lawrence K.C. Li Professor T.S. Liu Miss Winnie W.M. Ng Ms Sandy H.Y. Wong Mr Franklin Yu - 2 - Deputy Director of Environmental Protection (1) Mr C.W. Tse Principal Assistant Secretary (Transport) 3 Transport and Housing Bureau Miss Winnie M.W. Wong Chief Engineer (Works), Home Affairs Department Mr Martin W.C. Kwan Assistant Director (Regional 3), Lands Department Mr Edwin W.K. Chan 3. The Chairman said that the meeting was a continuation of the hearing of the representations and comments in respect of the draft Tsing Yi Outline Zoning Plan (Tsing Yi OZP) No. S/TY/27 commenced on 21.4.2016. [Professor S.C. Wong and Mr Dominic K.K. Lam arrived to join this session of the meeting at this point.] 4. The Secretary said that Members’ declaration of interests for the representations and comments had been made in the morning session of the hearing on 21.4.2016. No further declaration of interests had been received from Members since then, except that Mr Franklin Yu had declared business dealings with AECOM Asia Company Limited (AECOM) and Mott MacDonald Hong Kong Limited (MMHK) who were consultants of the Housing Department (HD), which would undertake the proposed public housing in respect of two of the amendment items of the Tsing Yi OZP.
    [Show full text]
  • Transport Department Notice
    TRANSPORT DEPARTMENT NOTICE Special Traffic and Public Transport Arrangements for the Hong Kong Marathon 2011 on 20 February 2011 Notice is hereby given that the following special traffic and public transport arrangements will be implemented on Sunday, 20 February 2011 to facilitate the holding of Hong Kong Marathon 2011. I. SPECIAL TRAFFIC ARRANGEMENTS FOR 10KM RACE AT ISLAND EASTERN CORRIDOR, HONG KONG ISLAND (A) Road Closures and Traffic Diversion (Please refer to Plans 2 and 3): The following roads will be closed to all vehicular traffic at the time as specified below (except vehicles with closed road permits issued by the Transport Department): Phase I From 2.00 am to about 9.30 am (depending on the exact finishing time of 10km race, and it is safe to re-open the roads to vehicular traffic): Road Closure: (i) Island Eastern Corridor eastbound between Victoria Park Road and Tung Hei Road slip road; (ii) Hing Fat Street slip road leading to Island Eastern Corridor eastbound; (iii) Man Hong Street slip road leading to Island Eastern Corridor eastbound; (iv) Taikoo Wan Road slip road leading to Island Eastern Corridor eastbound; and (v) The slip roads leading from Eastern Harbour Crossing exit to Island Eastern Corridor eastbound. Traffic Diversion: (i) Vehicles on Victoria Park Road eastbound heading for Island Eastern Corridor eastbound and Eastern Harbour Crossing will be diverted via Gordon Road, Electric Road and Java Road; (ii) Vehicles on Hing Fat Street heading for Island Eastern Corridor eastbound and Eastern Harbour Crossing
    [Show full text]