September 12, 2009 Distances in Kilometers Between Stations on The
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Sl. No. Application Sl. No. Name of the Candidates and Father's JHARIA
JHARIA REHABILITATION AND DEVELOPMENT AUTHORITY List of Eligible Candidates for the post of Computer Operator Sl. Application Sl. Name of the No. No. candidates and Father's Sanjeev Kumar S/o Ramashish Yadav 1 173 B-11/94 Karmik Nagar, PO-ISM Campus, Dhanbad-826004 Manoj Kumar S/o HiralalAt-Loharkulhi 2 100 Post-Saraidhela, Dhanbad-828127 Shambhu Gupta S/o Nand Kishor Sahu 3 113 Gr-153, Gola Road Opp.-UCO Bank Ramgarh-829122 Ranglal Mandal S/o Subal Chandra Mandal 4 41 Qr. No.-A1/301, Koyla Nagar, Dhanbad Ajay Kumar S/o Krishna Sahu 5 17 Qr. No.-F-7B ACC Colony, Sindri, Dhanbad Neeraj Kumar Vishwakarma S/o Umashankar Vishwakarma 6 260 At-Bhuda C/o Gayatri Studio Rani Road, Dist.-Dhanbad PIN- 826001 Vikash Kumar S/o Kameshwar Pd. Singh 7 114 Gali No-10, Jai Prakash Nagar, Dhanbad PIN-826001 Rajat Kr. Singh S/o Akhilesh Singh 8 92 At-Bishanpur, Rajput Tola, Post-Mansahi, Distt.-Katihar (Bihar) PIN-854103 Md. Kadir Ansari S/o Md. Farid Ansari 9 101 At-Kanchandih, Post-Mugma Dhanbad-828204 Santosh Kr. Mandal S/o Ajit Kr. Mandal 10 103 At+Post-Mahuli, Distt-Darbhanga Bihar Pin-847201 Deepak Kumar S/o Gallu Mahto 11 74 At+Post-Badgaon Distt.-Ramgarh Jharkhand PIN-829134 Md Faiyaz Ansari S/o Muslim Ansari Shamsher Nagar, Near Quality bakery, Post-B.Polytechnic, 12 267 Dhanbd-828130 Sonali Saha D/o Lt. Shankar Kr. Saha 13 224 Telipara Kali Mandir , Masterpara Hirapur Dhanbad Kumari Janki Mahto D/o Kalipada Mahto 14 277 At-Baghmara, Post-Baliapur, dist.-Dhanbad PIN-828201 Shahjadi Khatoon D/o Md. -
ENVIRONMENTAL STATEMENT in FORM-V (Under Rule-14, Environmental Protection Rules, 1986)
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 2 (GROUP OF MINES) Mugma Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2008 Company Environmental Statement (Form-V) Cluster No. – 2 (Group of Mines) 2015-16 ENVIRONMENTAL STATEMENT FORM – V Environmental statement for the financial year ending 31st March, 2016 Cluster No. – 2 FOR THE YEAR: 2015-16 CONTENTS SL.NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-5 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-11 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 12-14 II NOISE LEVEL REPORT 15-16 III WATER QUALITY REPORT – MINE WATER QUALITY AND GROUND 17-20 WATER QUALITY IV GROUNDWATER LEVEL REPORT 21 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) Cluster No. – 2 (Group of Mines) 2015-16 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the EC for the Cluster, the work of Environmental Statement for Cluster No. -
Change Detection Analysis of Ground Water Quality And
CHANGE DETECTION ANALYSIS OF GROUND WATER QUALITY AND ITS MANAGEMENT IN THE DISTRICT DHANBAD, JHARKHAND, INDIA Shiv Kumar Gupta1, Kumar Nikhil2, Aditya Shrestkar3, Gaurav Gehlot4 1,3,4Students of B.Tech.(Final) in Environmental Science & Engineering, ISM, Dhanbad, Jharkhand, (India) 2Principal Scientist, CSIR-CIMFR, Barwa Road, Dhanbad, Jharkhand, (India) ABSTRACT Dhanbad, a major coal mining area of India for more than a century, is situated in the middle of the Damodar river basin. The thickness, size, extent and openness of the weathered zone and the interconnections of fractures govern the groundwater movement in the Dhanbad area of Jharkhand and the depth to ground water generally ranges from 2 to 10 m below ground level. Urbanisation and the unregulated growth of the population have altered the terrain and slope morphology of the area. As a consequence, changes have taken place in the surface drainage system which indirectly affects the hydrogeology while the water infiltration ratio has resulted in a lowering of the groundwater. Inadequate environmental protection measures in the coal mining and related industries as well as the presence of active and abandoned coal mines, waste dumps, coal washeries, coking coal plants, thermal power plants, refractories, steel, fertilizer and cement plants have resulted in significant water pollution. In this paper study had been conducted in all the nine block of district Dhanbad. Randomly five villages were selected from each block with well or handpump were selected according to the availability and water sampling, testing and analysis done for pH, EC, TDS, Salinity, Fe, Mn and Zn availability followed by its assessmentand management. -
Camscanner 07-06-2020 17.45.18
ftyk xzkeh.k fodkl vfHkdj.k] gtkjhckxA rduhfd lgk;d ¼lgk;d vfHk;ark ds led{k½ ds fjDr in ij fu;qfDr gsrq izkIr vkosnuksa dh izkjafHkd lwph ESSENTIAL QUALIFICATION ADDITIONAL QUALIFICATION OTHER CASTE AFFID B.E./ B.TECH IN CIVIL M.TECH/ P.G.D.C.A./ M.C.A/ MCA MARKS SL. STATE/ CERTIFI AVIT NAME F/H NAME SEX PERMANENT ADDRESS PRESENT ADDRESS D.O.B. CATG. AFTER 5 EXP. REMARKS NO. DISTRI CATE (YES/ TOTAL OBTAINE TOTAL OBTAINE POINTS CT (Y/N) COURSE % GE COURSE % GE NO) MARKS D MARKS MARKS D MARKS LESS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18PGDCA 19 20 21 22 VILLAGE-JARA TOLA, VILLAGE- SOLIYA, PO- B.E. IN MARKSHEE AVINASH LATE NARESH MURRAMKALA, PO PALANI, TALATAND, PS- 1 Male Y 25-11-1995 ST Y CIVIL N N T NOT MUNDA MUNDA +PS+DISTRICT-RAMGARH PATRATU, DISTRICT- ENGG. ATTACHED. 829122 Jharkhand Ramgarh 829119 Jharkhand G.R. HOUSE, SIR SYED G.R. HOUSE, SIR SYED NAGAR, KAJLAMANI ROAD, NAGAR, KAJLAMANI ROAD, B.E. IN MARKSHEE MD GAZNAFER JAMIL AKHTER KISHANGANJ, KISHANGANJ KISHANGANJ, KISHANGANJ 2 Male Y 01-05-1991 GEN - CIVIL N Y T NOT RABBANI RABBANI TOWN, TOWN, ENGG. ATTACHED. PS+BLOCK+DISTRICT- PS+BLOCK+DISTRICT- KISHANGANJ 855107 Bihar KISHANGANJ 855107 Bihar VILL- AMBAKOTHI, VILL- AMBAKOTHI, B.E. IN PRAMOD 3 SURESH RAM Male PO+PS+BLOCK+DISTRICT- PO+PS+BLOCK+DISTRICT- Y 20-03-1982 SC Y CIVIL 8000 5144 64.30 N Y KUMAR LATEHAR 829206 Jharkhand LATEHAR 829206 Jharkhand ENGG. -
Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no. -
1 RDD/000504 Mr. Umashankar Tiwari Mr. Late Rampujan Tiwari 04-12-1959 Y 10-05-1988 Male General 111 21 Y N Y N PIRO/ TARARI PATNA Avam Vanijya)
REVENUEDEPARTMENT 1OF29 RDDLETTERNO-2987,DATED29/03/2010 CR Avail. at Adverse Departmental Serial Graduate(Y Seniority Service Clear From Application_ID Name Father Name Post Date of Birth Date of Joining Sex Category least 1Yr of entry in Proceedings Current Posting Home District No. /N) No [Years] Vigilence(Y/N) 5Yrs CR(Y/N) Pending(Y/N) Prasar Padhadhikari(Udyog 1 RDD/000504 Mr. Umashankar Tiwari Mr. Late Rampujan Tiwari 04-12-1959 Y 10-05-1988 Male General 111 21 Y N Y N PIRO/ TARARI PATNA avam Vanijya) Late Dhaneshwar Prasad Prasar Padhadhikari(Udyog 2 RDD/000897 Mr. Ramesh Chandra Sinha 01-01-1960 Y 28/04/1989 Male General 117 20 Y N Y N Mahnar/ Vaishali PATNA Sinha avam Vanijya) Mr. SURENDRA KUMAR Mr. SRI BRIJNANDAN Prasar Padhadhikari(Udyog 3 RDD/000095 31/12/1960 Y 08-02-1989 Male General 120 20 Y N Y N WAZIRGANJ NALANDA SINHA PRASAD SINHA avam Vanijya) Prasar Padhadhikari(Udyog 4 RDD/000029 Mr. Sunil Kumar Singh Mr. Late Bajrangi Pd. singh 28/09/1958 Y 09-07-1989 Male General 121 20 Y N Y N khagaria LAKHISARAI avam Vanijya) Prasar Padhadhikari(Udyog District(D.R.D.A) West 5 RDD/001277 Mr. krishna mohan pathak Mr. sheo shagar pathak 15/01/1958 Y 01-12-1990 Male General 123 19 Y N Y N WEST CHAMPARAN avam Vanijya) Champaran Prasar Padhadhikari(Udyog 6 RDD/001138 Mr. VINAY KUMAR Mr. MAHENDRA KUMAR 01-07-1962 Y 02-01-1990 Male General 125 19 Y N Y N Bhagwanpur/Vaishali PATNA avam Vanijya) Mr. -
Environmental Statement in Form-V Cluster No
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2018-2019) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19 ENVIRONMENTAL STATEMENT FOR CLUSTER NO. – 1 (GROUP OF MINES) Environmental statement for the financial year ending 31st March, 2019 FOR THE YEAR: 2018-19 CONTENTS SL NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-6 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 7-17 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 18-22 II NOISE LEVEL 23 III MINE AND GROUND WATER QUALITY REPORT 24-30 IV GROUNDWATER LEVEL 31 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R. No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement for Cluster No. -
Selection of Consultancy Firm for Preparation of Comprehensive Mobility Plan for Dhanbad Under Urban Infrastructure & Governance (UIG)-Jnnurm
Selection of Consultancy Firm For Preparation Of Comprehensive Mobility Plan for Dhanbad Under Urban Infrastructure & Governance (UIG)-JnNURM URBAN DEVELOPMENT DEPARTMENT, June, 2009 GOVT. OF JHARKHAND, 4TH FLOOR, PROJECT BHAWAN, DHURWA, RANCHI- 834004 Comprehensive Mobility Plan (CMP) for Dhanbad City of Jharkhand 1. BACKGROUND Dhanbad : Introduction The district of Dhanbad in the country occupies a unique place as an important resource region which is a part of the South‐East resource region. The resource is the coal, often termed as “Black Diamond”, a term which befits its importance as basic fuel in most industries. The Dhanbad district has the largest coal reserves, about 13,000 million tons of metallurgical coal. The region is most commonly identified as “Jharia Coal Field (JCF)” which is the one single depository of coal spread over an area of about 480 sq.kms. This has influenced the location of many coal‐oriented industries, such as fertilizers, washeries, coke plants, ceramic industry, pottery works, steel industries, lead and zinc smelting and numerous other engineering industries. In a relative perspective, the region could be linked to industrial zone of Asansol‐ Durgapur in the West Bengal and Jamshedpur – Chaibasa in the Jharkhand‐ the comparative elements being the Bokaro Steel Plant in the west, Sindri Fertilizer complex, Sulphuric Acid Plant and ACC Cement Factor in the south and a number of coal‐based chemical industries scattered around the coal‐belt. In this venture of coal mining, a number of new mining towns have sprung up in a chain, spreading from Dhanbad south‐wards upto Sindri and westwards upto Katras. -
For the Year Ended 31 March 2014
Report of the Comptroller and Auditor General of India on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 Government of Jharkhand Report No. 2 of the year 2015 TABLE OF CONTENTS Reference to Paragraph Page Preface v Overview vii CHAPTER – 1 INTRODUCTION Budget profile 1.1.1 1 Application of resources of the State Government 1.1.2 1 Persistent savings 1.1.3 2 Funds transferred directly to the State implementing agencies 1.1.4 2 Grants-in-aid from Government of India 1.1.5 3 Planning and conduct of audit 1.1.6 3 Lack of responsiveness of Government to Inspection Reports 1.1.7 3 Follow-up on Audit Reports 1.1.8 4 Government response to significant audit observations (draft 1.1.9 5 paragraphs/reviews) Status of placement of Separate Audit Reports of Autonomous Bodies 1.1.10 6 in the State Assembly CHAPTER – 2 PERFORMANCE AUDIT DRINKING WATER & SANITATION DEPARTMENT Total Sanitation Campaign/Nirmal Bharat Abhiyan 2.1 7 LABOUR, EMPLOYMENT & TRAINING DEPARTMENT AND SCIENCE AND TECHNOLOGY DEPARTMENT Establishment and Upgradation of Government Women ITIs and 2.2 25 Government Women Polytechnics in Jharkhand HUMAN RESOURCES DEPARTMENT (HIGHER EUUCATION) Functioning of State Universities in Jharkhand 2.3 38 FOREST AND ENVIRONMENT DEPARTMENT Compliance with Environmental Laws in Dhanbad district including 2.4 66 Dhanbad Agglomeration SOCIAL WELFARE, WOMEN & CHILD DEVELOPMENT DEPARTMENT AND PLANNING & DEVELOPMENT DEPARTMENT Implementation of Schemes for Welfare and Protection of Girls in 2.5 77 Jharkhand HOME DEPARTMENT Information Technology Audit on preparedness of Crime and 2.6 94 Criminal Tracking Network System HUMAN RESOURCE DEVELOPMENT DEPARTMENT AND HEALTH, MEDICAL EDUCATION & FAMILY WELFARE DEPARTMENT Tribal Sub Plan (Education and Health Sectors) 2.7 105 ENERGY DEPARTMENT Implementation of Solar Energy programmes in Jharkhand 2.8 116 Audit Report on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 CHAPTER – 3 COMPLIANCE AUDIT Non-Compliance with the Rules, Orders, etc. -
B.I.T. SINDRI, DHANBAD (Department of Higher, Technical Education & Skill Development) Government of Jharkhand P.O
B.I.T. SINDRI, DHANBAD (Department of Higher, Technical Education & Skill Development) Government of Jharkhand P.O. Sindri Institute, Dhanbad – 828123 (Jharkhand) RECRUITER’S GUIDE 2019-20 Estd. 1949 VISION To provide the valuable human resources for the industry and society through the excellence in technical education and scientific research for the sustainable development. MISSION To offer the state of the art Undergraduate, Postgraduate and Doctoral Programs. To generate the new knowledge by quality research. To undertake the collaborative projects with industries and society. To develop human intellectual capacity with its full potential. To solve the problems of society through innovation in technology. CONTENTS About Us Director’s Address Training & Placement Officer’s Address Departments at B.I.T. Sindri Graduating Batch Profile (2016-2020) Laboratories Pursuit of Excellence Our Collaborations Student Activities Incubation Centre & Research Activities Why B.I.T. Sindri? Summer Internships Placement Process Placement Record Our Major Recruiters How to reach B.I.T. Sindri Contact Us About Us BIT, Sindri was started as College of Mechanical and Electrical Engineering in 1949 at Patna. After one year it was shifted to Sindri on 17th November 1950 and thus BIT Sindri was born with a Principal, three Professors and sixty Students in a simple ceremony with a cup of tea on the dining table. The institute grew and flourished rapidly during the early days under the dynamic leadership of Prof. D.L. Deshpande, the then Director [1950-61], who is regarded as the architect of the institute. BIT Sindri was previously known as Bihar Institute of Technology, Sindri and was affiliated to Ranchi University. -
September 12, 2009 (A)LIST of SIDINGS OVER EAST CENTRAL
September 12, 2009 (A)LIST OF SIDINGS OVER EAST CENTRAL RAILWAY AND NAME OF SERVING STATION Alpha Name of the Siding Serving Station Remarks Code DHANBAD DIVISION KHARGALI SIDING KGWS Bermo POL (IOC, HPC AND BPC) SIDING DHANBAD PIDH Dhanbad Jn. GARERIA COLLIERY SIDING GRRK Kusunda Jn. KHALARI SDG, NO.2 KSNT Khalari PRIVATE SIDING KESARGARH COLLIERY SIDING KGCK Katrasgarh BLOCK II JAMUNI WASHERY SIDING JMNK Katrasgarh LODNA COKE PLANT SIDING LCPS Katrasgarh T B COLLIERY SIDING CCSP Pathardih Jn. (For Coal) BIRDS SONDA COLLIERY SIDING BSDC Patratu RAJHURA COLLIERY SIDING RCSB Rajhaura HPCL SIDING RANCHI ROAD PHLR Ranchi Road SIRKA SIDING SCPT Ranchi Road ASSOCIATED CEMENT CO. SDG, SINDRI TOWN SNFC Sindri Town PRIVATE SIDING SINDRI ASSISTED SDG SNFP Sindri Town PRIVATE SIDING SENDRA BANSJORA COLLIERY SIDING SBKT JHARIA KUSUNDA COLLIERY SDG KSDK JHARIA SIJUA STABLING COLLIERY SDG SSCK JHARIA 1 September 12, 2009 (A)LIST OF SIDINGS OVER EAST CENTRAL RAILWAY AND NAME OF SERVING STATION Alpha Name of the Siding Serving Station Remarks Code DANAPUR DIVISION FCI SIDING BUXAR FFSB Buxar FCI SIDING DIGHAGHAT FCDG Digha Ghat FCI PVT SIDING PHULWARI SHARIF FCPD Danapur BHARAT WAGON AND ENGG WORKS MOKAMA BWEM Mokama Jn. FCI SIDING MOKAMA FCMI Mokama Jn. MUGHAL SARAI DIVISION BPC LTD SIDING MUGALSARAI BPCM Mughal Sarai Jn. KCL SIDING SONENAGAR KCLS Son Nagar jn. SONPUR DIVISION BHARAT WAGON AND ENGG CO LTD SIDING BWCM Muzaffarpur Jn. BUFFER STORAGE GODOWN SIDING BGSN Narayanpur Anant BPCL SIDING NARAINPUR ANANT BPNA Narayanpur Anant BARAUNI THERMAL POWER STATION SIDING BTSS Simaria IOC SIDING SIMARIA IFSG Simaria SAMASTIPUR DIVISION REGA SUGAR CORPN SIDING REGA SCR Riga 2 September 12, 2009 (A)LIST OF SIDINGS OVER EAST CENTRAL RAILWAY AND NAME OF SERVING STATION Alpha Name of the Siding Serving Station Remarks Code SAMASTIPUR DIVISION FCI SIDING SAHARSA SFCS Saharsa Jn. -
Chapter Subject Page No No
STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government. ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN (As per EIA Notification, 2006) For MADHUBAND NLW COAL WASHERY Normative Capacity: 5.0 MTPA Raw Coal Peak Capacity : 6.5 MPTA Raw Coal Land Requirement 23 Ha (Block II Area) Bharat Coking Coal Limited (February, 2011) Prepared at Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Regional Institute - II, Koyla Bhawan complex, Koyla Nagar, Dhanbad - 826005 (Jharkhand), India C O N T E N T S SL. CHAPTER SUBJECT PAGE NO NO. NO. 1 EXECUTIVE SUMMARY I- XIII 2 1 INTRODUCTION 1-7 3 2 PROJECT DESCRIPTION 8-30 4 3 DESCRIPTION OF THE ENVIRONMENT 31-74 ANTICIPATED ENVIRONMENTAL 5 4 75-128 IMPACTS & MITIGATION MEASURES ANALYSIS OF ALTERNATIVES 6 5 129 (TECHNOLOGY & SITE) ENVIRONMENTAL MONITORING 7 6 130-131 PROGRAMME 8 7 ADDITIONAL STUDIES 132-135 PROJECT BENEFITS IMPROVEMENTS 9 8 136-137 IN PHYSICAL INFRASTRUCTURE ENVIRONMENTAL COST BENEFIT 10 9 138-139 ANALYSIS 11 10 EMP 140-142 12 11 SUMMARY & CONCLUSION 143-146 DISCLOSURE OF CONSULTANTS 13 12 147 ENGAGED QUESTIONNAIRE FOR ENVIRONMENTAL APPRAISAL 14 148-172 FOR COAL WASHERY PROJECTS 15 ANNEXURE-I ORGANISATIONAL STRUCTURE C-1 to C-4 16 ANNEXURE-II PUBLIC HEARING PROCEEDINGS AII-1 to AII-23 17 ANNEXURE-III COPY OF APPROVED TOR AIII-1 to AIII-3 Proposed Madhuband NLW Washery EIA_EMP TEXT(FINAL) i JOB No.