Invest in Pécs Basic Data from Pécs for Investors

Total Page:16

File Type:pdf, Size:1020Kb

Invest in Pécs Basic Data from Pécs for Investors Invest in Pécs Basic data from Pécs for investors Population, the role of the city of Pécs in the region • Population: 1. Pécs: 157 000 2. Agglomeration: 200 000 3. Baranya county: 390 000 4. South Transdanubian Region: 953 000 • The role of the city of Pécs in the South Transdanubian Region: Pécs is the administrative, educational, commercial and financial center in the region. Basic data from Pécs for investors Resources: natural, industrial (in Pécs and Baranya county) • Natural resources: 1. Agricultural opportunities: wine culture, mixed farming (one of the most developed agricultural area in Hungary: Bóly Zrt.) 2. Mining opportunities: coal, uranium 3. Thermal water opportunities 4. Forest management opportunities • Industrial resources in Pécs and Baranya county 1. Traditons: Zsolnay porcelain, leather indsutry, tobacco factory, beer factory, machinery 2. The industry of the future: biotechnology, manufacturing active pharmaceutical ingredients, electronic manufacturing, repair services Basic data from Pécs for investors Labour force Labour statistics in Pécs at June 2012 Free and available labour Grouped by qualification (person) Grouped by gender and age Entrant Primary Secondary Higher Man Wo Younger Between Over 51 school or education education man than 25 26-50 less 804 2330 5241 801 4175 419 1311 5262 1800 8 total: 8273 Basic data from Pécs for investors Resources: education 1. Primary education: 47 kindergarden, 25 institutions deal with primary education 2. Secondary education: • 8 vocational and techical shools in Pécs. Students can qualify 78 different qualifacations: machine fitter (locksmith), welder, electrician, IT operative, infromation system manager • 10 secondary schools in Pécs. Wide range on bilengual education: German, English, French, Spanish bilengual classes 3. University of Pécs: • The university presented by Csaba Ruzsa Basic data from Pécs for investors Regional Resources Pannon EGTC Airport Regional Croatian EU Centre accession Regional Resource Gateway to the Infrastructure Balkans M6 motorway, Railway corridor V./C motorway Location of Pécs Location of Pécs- Distances • Distance to Liszt Ferenc International Airport- 250 km • Distance to the nearest Danube port- 40 km • Distance to the capitals: Budapest (H): 220 km Zagreb (CRO): 235 km Ljubljana (SLO) 310 km Vienna (A) 450 km Bratislava (SK) 310 km Location of Pécs Transport infrastructure • M6/M60 Highway • Air transport- Pécs Pogány • Train transport: Main railway no 40. connects Pécs and Budapest Nine pairs of Intercity trains a day connecting Pécs with Budapest The railway line, which connects Sarajevo to the European railway lines goes through Pécs Danube port in Mohács Stategic Plan for the near Future What is Pécs now? • The fifth largest city in Hungary • Center of the South Transdanubian Region • One of the most important Hungarian cultural center • One of the largest university center in Hungary (more than 600 German students) • Educational center • Financial and commercial center • Administrative center Stategic Plan for the near Future: What can Pécs be? South Transdanubian Region Baranya PÉCS IT Productive Logistics and and R+D and Electronics Processing Center SSC Center Centre Industry Center Stategic Plan for the near Future: What can Pécs be? IT and Electronics Center Resources: • Human resources • Educational system: vocational and technical shools, University of Pécs • Skilled workers: vocational and technical shools, university, ELCOTEQ Partners: • JABIL Circuit, Flextronics, Huawei Advanteges: • Global competitors in one place • untapped human resource • Information Management Innovation Cluster • Empty industrial halls Stategic Plan for the near Future: What can Pécs be? Productive and Processing industry center Resources: • Human resources • Educational system: vocational and technical shools, University of Pécs • Skilled workers: vocational and technical shools, university, tradition • Croatian EU accession, new markets • Partners: • HAUNI, BADER, HONSA, BAT, LAFARGE, Zsolnay porcelain Advanteges: • New markets • Human resource • Machine Industry Cluster Stategic Plan for the near Future: What can Pécs be? R+D Center Resources: • Human resources • Educational system: University of Pécs • Partners: • Univerity of Pécs, Pannonpharma Advanteges: • Biotechnology Innovation Base Cluster • University of Pécs is a good background for all areas of R+D Stategic Plan for the near Future: What can Pécs be? Logistics and SSC Center Resources: • Human resources • Skilled workers: vocational and technical shools, university, • Croatian EU accession, new markets • Nearby countries: Croatia, Slovenia, Bosnia, Serbia • Partners: • BUW, UNISYS Advanteges: • Young and mobile labour force Pécs Urban Development Company EU allocation- example for the cooperation 1. JABIL Circuit wanted to make an after market service in Pécs in 2011. • The winner application has been made by the Pécs Urban Development Company • The company has responsible for the project management and the administration 2. NOW: • JABIL Circuit has a new industrial hall, and 400 employees Pécs Urban Development Company „The company” 1. The municipal resolution no. 46/2010. of the Assembly of the Municipality of the City of Pécs declares that the Pécs Urban Development Company is responsible for inciting and preparation of investments 2. The Pécs Urban Development Company professionals help to answer investor’s questions, and guide them in the Municipality and in the system of the city’s companies. Pécs Urban Development Company „The company” Contact: • Dr. Péter Merza Pécsi Városfejlesztési Nonprofit Zrt. Chief Executive Officer Pécs, Mária u. 9. [email protected] 7621 • Dóra Egry Pécs Urban Development Comapany Director of Development 7621 Pécs, Mária u. 9. [email protected] Hungary www.pvzrt.hu [email protected] The „supply” iPARK Pécs • The municipality of the city of Pécs and an Austrian investor jointly implement the most recent economic-, commercial and service area in the Southern part of Pécs. • Its size is 200 hectares. • Great part of the area has won the industrial park title in 2010, which makes application for different funds possible for the settling companies. The „supply” iPARK Pécs • 1.5 km away from Pogány Airport • In the vicinity of M6 motorway • Auchan-Immochan group purchased a territory right next to it. The „supply” Pécs Industrial Park- Pécs Holding • The following companies operates in the Park: electronic, car industry, logistic and biotechnological enterprises such as: JABIL Circuit, HONSA, Biotechnology Innovation Base Cluster • The park welcomes investors who need area between 0.6-0.8 hectares The „supply” PANNOVA Industrial Park • Park area: 53, 82 hectares • The full spectrum of infrastructure can be immediately available in all parts of the Industrial park: gas, electricity, drinking water, water for fire extinguishers', communal sewage system, rainwater pipe, telephone line, industrial railway, exterior lighting and road system. • One of the special services of the Park is so called ‘office hotel’ service The „supply” South West Zone- Füzes Action Field • Almost 50 hectares development area • Excellent transport ability with possible railway connection • Event organising possibilities The „supply” South West Zone- Füzes Action Field Füzes ridge: EXPO Center: • Total area size: 238.482 m2 • The construction has 10.000 m2 • Zone classification: covered, 20.000 m2 open-air economic, trade and ground-surface. service zone • Multifunctional event hall 3 68 1 5282 368 6 3684 3 724 /1 3 683 623 5279/ 3 3682/ 3 ú t Gksz-711865 3687 ú t 528 1 /2 24011/ 1 624 617 372 3 3701 K i-711955 622 3702 3699 3 696 54 3700 3 688 369 8 3697 3694 24011/ 2 3693 3691 5289 3692 3722 út 3689/ 1 621 3725/ 1 2399 8/1 372 4 /2 370 3 t elephely 3689 /3 619 3721/ 1 100 F üze s dűl ő 3689 /2 ú t 3 689 /4 01- 77- 02 618 út 3704 3732 24010 v as út 3721 /2 út út 3705 52 87 /2 1162/ 1 3706 3 707 3 711 3728 37 08 23998/ 2 370 9 m k 371 0 371 2 3720/ 1 K i-711955 3713 3714 371 8 3715 ipar t elep 3716 3730 616 3720/ 2 3731 3726 der í t ő 3725/ 2 671 der í t ő Gksz-711865 Vt ar t . út ár ok 3719/ 1 3719/ 2 52 88 Ev 3 729 út Gksz-711865 Gksz-711865 11 58 /9 m k 615 á r ok der í t ő Vt ar t . 1 158 /1 614 3 727 K i-711956 613 szennyví zt iszt í t ó t elep m k Sz 1 23998/ 3 1160 Sz 1 Vtar t . der í t ő Sz 1 Ev 5 290 /3 115 8 /10 5 27 9 /2 Gksz-711865 ú t m k der í t ő 1158 /11 Gksz-711865 a Sz 1 út Sz 1 der í t ő b 1158 /8 1162 /3 Gksz-711865 Gksz-711865a 5279 /1 v asút K i-711956 der í t ő mk Sz 1 1156 Gksz-711865 1158 /12 Ev á r ok 528 1 /1 239 9 7 út Ev 55 b 523 5291 /2 Sz 1 116 2 /4 1157 5298 m k 52 8 7 /1 524 k özút 1155 Sz 1 23996/ 2 2399 6 /1 522 Ev Gksz-711865 Ev Gksz-711865 Gksz-711865 út 23994/ 10 Sz 1 1 164 /1 167/ 5 116 1 1162/ 5 út 1 68 / 18 Sz 3 2399 4/11 612 521 Sz 3 Ev 168/ 2 Sz 3 1 68/ 4 529 0 /2 168 / 3 Gksz-711854 11 61 /3 Sz 3 Ev 5 29 0 /1 Sz 3 23994/ 14 16 8/ 20 K ke-700050 16 8/19 Gksz-711865 23994/ 17 Sz 3 519 Sz 3 Sz 3 1 68/ 6 168/ 1 6 23994/ 5 Sz 3 5291/ 1 Ev 116 1 /2 168/ 7 Sz 3 Gksz-711865 kút 23994/ 13 Sz 3 Fonór ét Gy 5 611 m k G y 1 68 / 8 út áro k 1161 /1 16 8/ 11 1 68 / 9 Ev Gksz-711865 Sz 3 17 3/ 3 mk 173 /36 Ev Sz 3 16 8/ 10 Sz 3 518 Sz 3 Sz 3 168/ 12 Ev Gksz-711865 Gy5 517 1 75/ 2 Sz 3 633 áro k 23994/ 1 17 3/ 4 Ev 23994/ 16 168/ 13 173/ 37 641641 16 8/ 14 ár o k Sz 3 Ev G y 2399 3/2 út 559 G y G y 5 561 514 ár ok 638 239 93/1 K kö-700051 1 2212 9/5 2399 1 639 516 út 23992 2122 9/6 515 515 23989/ 2 ár o k
Recommended publications
  • Economic and Social Council
    UNITED NATIONS E Economic and Social Distr. Council GENERAL TRANS/WP.5/2005/16/Add.8 24 October 2005 ENGLISH ONLY ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Working Party on Transport Trends and Economics (Eighteenth session, 15-16 September 2005, agenda item 3(b)) MONITORING OF DEVELOPMENTS RELEVANT FOR THE PAN-EUROPEAN TRANSPORT CORRIDORS AND AREAS Infrastructure bottlenecks and missing links Transmitted by the Government of Hungary According to the report on “Infrastructure Bottlenecks and Missing Links in the European Transport Network” bottlenecks can be caused by: (1) insufficient infrastructure capacity; (2) low quality of transport infrastructure. In the same manner, the phenomenon of a “missing link” may be considered as a situation in which the quality of service has extremely low values due to the fact that no direct link exists between two points. As described in the above-mentioned document, as a simplified method, for individual road categories, one may take the following capacities in terms of number of vehicles as the average daily traffic: − 4-lane motorway: 40,000 – 60,000 PCU/24 hrs − roads of 2 lanes: 8,000 – 12,000 PCU/24 hrs As in the case of roads, there are a great number of factors determining the bottlenecks on a railway line. It is practically impossible to concentrate all elements in a single bottleneck measure. In order to reach practical measures it appeared appropriate to take the following capacity limits: TRANS/WP.5/2005/16/Add.8 page 2 − Single track main lines: 1 x 60 – 80 trains/day − Double track main lines: 2 x 100 – 200 trains/day According to that definition, the bottlenecks regarding the Hungarian TEN road network are described below.
    [Show full text]
  • Public-Private Partnerships Financed by the European Investment Bank from 1990 to 2020
    EUROPEAN PPP EXPERTISE CENTRE Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Terms of Use of this Publication The European PPP Expertise Centre (EPEC) is part of the Advisory Services of the European Investment Bank (EIB). It is an initiative that also involves the European Commission, Member States of the EU, Candidate States and certain other States. For more information about EPEC and its membership, please visit www.eib.org/epec. The findings, analyses, interpretations and conclusions contained in this publication do not necessarily reflect the views or policies of the EIB or any other EPEC member. No EPEC member, including the EIB, accepts any responsibility for the accuracy of the information contained in this publication or any liability for any consequences arising from its use. Reliance on the information provided in this publication is therefore at the sole risk of the user. EPEC authorises the users of this publication to access, download, display, reproduce and print its content subject to the following conditions: (i) when using the content of this document, users should attribute the source of the material and (ii) under no circumstances should there be commercial exploitation of this document or its content. Purpose and Methodology This report is part of EPEC’s work on monitoring developments in the public-private partnership (PPP) market. It is intended to provide an overview of the role played by the EIB in financing PPP projects inside and outside of Europe since 1990.
    [Show full text]
  • Agricultural Land Property Value
    Dear Reader, We would like to present you a brief summary of the results of our most recent research focusing on the real estate market soon to be published within the framework of the OTP Value Map. Maintaining previously introduced basic principles, methods and values of our real estate market analyses, this time we examine the agricultural land market. In recent years on the Hungarian real estate market agricultural land has been the second most popular type of real estate with the highest number of sales following residential properties. Based on our previous experience and according to the analyses published so far on the market, arable land has reacted to the crisis more favourably than other elements of the sector. In the course of our survey we were looking for answers to the following questions: Is agricultural land really more crisis-resistant? How has the turnover of land evolved during the crisis? What is the price of agricultural land in different areas? Does the development of the infrastructure result in price changes regarding agricultural land, and if yes, to what extent? Arable land forms a special category within the real estate market, because: ‐ it is available in limited (or actually, due to restrictions, in slightly decreasing) quantity; ‐ the speculative market is basically distinguished from the market of agricultural land meant for long- term agricultural production; ‐ its market is highly influenced by the government’s political decisions (land purchase moratorium, ban on purchases by companies, pre-emption right
    [Show full text]
  • Hungary General Report 2015
    HUNGARY GENERAL REPORT 2015 ASECAP STUDY AND INFORMATION DAYS MADRID, 23 - 25 MAY 2016 Network length Length of the motorway network in Hungary as of 31 December 2015: 1.180 km. The length of the motorway, expressway and trunk road sections operated by the Hungarian Public Road Nonprofit Pte Ltd Co. (MK NZrt.) as of 31 December 2015 are: 1071 km. The Hungarian Public Road Company is responsible for the operation and maintenance of M1, M3, M30, M31, M35, M43, M7, M8 Motorways; M5 Motorway between km sections 13 - 17.4, M6 Motorway between km sections 14 - 22,3 and several expressways (M0, M2,…). 2 AKA Zrt. (AKA Alföld Concession Motorway Co. Ltd.) is a Concession Company responsible for the operation and maintenance of M5 Motorway between km section 17+400 and 173+895, total length of 156,5 km. Overall length of the bridges on the M5 motorway are 3,7 km. No more sections are foreseen at the moment to be included in this Concession. M6 Duna Autópálya Koncessziós Zrt. (M6 Danube Concession Motorway Co. Ltd.) is a Concession Company responsible for the operation and maintenance of M6 between km sections 22+150 and 76+200 and M8 between km sections 5+750 and 10+300 which sections were opened to traffic on 11 June 2006. The bridges on the above motorways are 2,81 km long (including all types of bridges). No more sections are foreseen at the moment to be included in this Concession. M6 Tolna Autópálya Koncessziós Zrt. (M6 Tolna Motorway Concession Ltd.) is a Concession Company responsible for the design, construction, finance, operation and maintenance of M6 motorway between km sections 76+200 and 141+300.
    [Show full text]
  • PROFECY – Processes, Features and Cycles of Inner Peripheries in Europe
    PROFECY – Processes, Features and Cycles of Inner Peripheries in Europe (Inner Peripheries: National territories facing challenges of access to basic services of general interest) Applied Research Final Report Annex 12 Case Study Report Tamási járás (Hungary) Version 07/12/2017 This report is one of the deliverables of the PROFECY project. This Applied Research Project is conducted within the framework of the ESPON 2020 Cooperation Programme, partly financed by the European Regional Development Fund. The ESPON EGTC is the Single Beneficiary of the ESPON 2020 Cooperation Programme. The Single Operation within the programme is implemented by the ESPON EGTC and co-financed by the European Regional Development Fund, the EU Member States and the Partner States, Iceland, Liechtenstein, Norway and Switzerland. This delivery does not necessarily reflect the opinion of the members of the ESPON 2020 Monitoring Committee. Authors Katalin Kovács, Gergely Tagai, MTA KRTK (Hungary) Krisztina Magócs, Lechner Knowledge Center (Hungary) Advisory Group Project Support Team: Barbara Acreman and Zaira Piazza (Italy), Eedi Sepp (Estonia), Zsolt Szokolai, European Commission. ESPON EGTC: Marjan van Herwijnen (Project Expert), Laurent Frideres (HoU E&O), Ilona Raugze (Director), Piera Petruzzi (Outreach), Johannes Kiersch (Financial Expert). Acknowledgements Annamária Uzzoli, MTA KRTK (Hungary), Anna Hamar, MTA KRTK (Hungary) Information on ESPON and its projects can be found on www.espon.eu. The web site provides the possibility to download and examine the most recent documents produced by finalised and ongoing ESPON projects. This delivery exists only in an electronic version. © ESPON, 2017 Printing, reproduction or quotation is authorised provided the source is acknowledged and a copy is forwarded to the ESPON EGTC in Luxembourg.
    [Show full text]
  • El?Adas Cime
    PRIVATE SECTOR PARTICIPATION IN INFRASTRUCTURE DEVELOPMENT IN HUNGARY 1990- Miklós Murányi Sarolta Beregi Toth October, 2009. Seoul PPP PILOTE PROJECTS INTERMINISTERIAL COMMITTEE TO EVALUATE AND DECIDE: • Tourism (conference center) • Justice (prison) • Health care (Hospital) • Local Government (Sport stadium) PPP PILOTE PROJECTS • Education (student dormitory) • Infrastructure (fast train link from city of Budapest to Ferihegy International Airport) • Residental developments (appartements for long term rent) • Motorways FAR THE LARGEST SEGMENT • Expressway development program of the government in PPP MAIN TRANSPORTATION ARTERIES IN THE NEIGHBOURHOOD OF HUNGARY Tornyosnémeti MainMain transporttransport corridorscorridors inin Záhony V. UA Lónya HUNGARYHUNGARY Barabás Beregsurány Parassapuszta Miskolc IV. VII. Rajka SK Salgótarján Emőd Tiszabecs Hegyeshalom Nyíregyháza Medve A Komárom Eger Gyöngyös Csengersima Polgár Győr Füzesabony Debrecen Sopron Tatabánya BUDAPEST Szombathely Székesfehérvár Szolnok Veszprém Rábafüzes RO Biharkeresztes Zalaegerszeg Balatonaliga Kecskemét Zamárdi Békéscsaba Kiskunfélegyháza additional Tornyisz.miklós TINA Szekszárd SLO Letenye Szekszárd Szeged Kaposvár Sükösd elements V. Nagylak Baja Mohács Röszke Pécs HR proposed YU IV. Illocska TINA X/A. V/C. VII. elements MOTORWAY NETWORK OF HUNGARY IN 1993 UA Tisza Miskolc SK Salgótarján Nyíregyháza A M3 Duna Gyöngyös Győr Füzesabony Sopron M1 Tatabánya BUDAPEST Debrecen Szombathely Székesfehérvár Szolnok Veszprém M0 Baliga M5 RO Dunaújváros Zalaegerszeg M7 Kecskemét
    [Show full text]
  • Ppps Financed by the European Investment Bank from 1990 to 2017 February 2018 Terms of Use of This Report
    PPPs financed by the European Investment Bank from 1990 to 2017 February 2018 Terms of Use of this Report The European PPP Expertise Centre (EPEC) is part of the Advisory Services of the European Investment Bank (EIB). It is an initiative that also involves the European Commission, Member States of the EU, Candidate States and certain other states. For more information about EPEC and its membership, please visit www.eib.org/epec. This publication has been prepared to contribute to and stimulate discussions on public- private partnerships (PPPs) as well as to foster the diffusion of best practice in this area. The findings, analyses, interpretations and conclusions contained in this publication do not necessarily reflect the views or policies of the EIB or any other EPEC member. No EPEC member, including the EIB, accepts any responsibility for the accuracy of the information contained in this publication or any liability for any consequences arising from its use. Reliance on the information provided in this publication is therefore at the sole risk of the user. EPEC authorises the users of this publication to access, download, display, reproduce and print its content subject to the following conditions: (i) when using the content of this document, users should attribute the source of the material and (ii) under no circumstances should there be commercial exploitation of this document or its content. Purpose and Methodology This report is part of EPEC’s work on monitoring developments in the PPP market. It is intended to provide an overview of the role played by the EIB in financing PPP projects inside and outside Europe since 1990.
    [Show full text]
  • Centre-Periphery Analysis About the Hungarian Public Road System
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Toth, Geza Conference Paper Centre-Periphery Analysis About the Hungarian Public Road System 46th Congress of the European Regional Science Association: "Enlargement, Southern Europe and the Mediterranean", August 30th - September 3rd, 2006, Volos, Greece Provided in Cooperation with: European Regional Science Association (ERSA) Suggested Citation: Toth, Geza (2006) : Centre-Periphery Analysis About the Hungarian Public Road System, 46th Congress of the European Regional Science Association: "Enlargement, Southern Europe and the Mediterranean", August 30th - September 3rd, 2006, Volos, Greece, European Regional Science Association (ERSA), Louvain-la-Neuve This Version is available at: http://hdl.handle.net/10419/118158 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence.
    [Show full text]
  • M6 Motorway Section Between Érdi Tetô – Dunaújváros
    Executive Summary Of Detailed Environmental Impact Study (DEIS) M6 MOTORWAY SECTION BETWEEN ÉRDI TETÔ – DUNAÚJVÁROS 1 INTRODUCTION 1.1 Background Hungary’s existing Road No. 6 has developed into a very busy transit road. The existing road is unable to cope with the heavy traffic flow and especially with international transit traffic. It was obvious already in the early 1990’s that the heavy traffic flow of Trunk Road No. 6 led to unacceptable environmental conditions (noise, air pollution, waste and other problems) in the accessed communities. Road No. 6 includes urban sections (Ercsi, Adony), suburban sections (Érd, Százhalombatta, Sinatelep, Kulcs, Rácalmás, Dunaújváros), and several sections built on the flood dike of River Danube. Due to its alignment and construction standards this road is unable to meet the requirements of traffic safety. Road No. 6 has a record of exceptionally high number of serious and fatal traffic accidents. A bypass section of Road No. 6 was opened in 1990 in an effort to relieve the urban area of Érd City and the environment. By this bypass section Érd bound and through traffic streams have been effectively separated. However, this has not been followed by other relief or bypass sections. These conditions ask for a brand new road section to support economic growth in the region while bypassing all settlements. The proposed Motorway M6 will bypass the communities as it will run mostly in cultivated agricultural areas. 1.2 Objectives of the Project With completion of the M6 motorway a fast and a good quality link will be provided at the level of state roads.
    [Show full text]
  • Environmental Summary / Performance Evaluation
    The preparation of supplementary documentation necessary for the grant of support of the European Regional Development Fund regarding the construction of development of highway no. 62 sections between M8 (new Danube-bridge) and Székesfehérvár Application for Grant Annex No. IV/A: Environmental summary / Performance evaluation Budapest, September 2013 Transinvest - Budapest Kft. Kereskedelmi Iroda 1106 Budapest Telefon: 252 1577 Cégjegyzékszám: 01-09-063800 Fehér út 10. Fax: 252 3577 Mérnök Iroda Fővárosi Bíróság Cégbírósága Postacím: [email protected] Építő Iroda 1581 Budapest, Pf. 96. www.transinvest.hu Adószám: 10322837-2-42 Made by: Vibrocomp Kft. Dr. Pálné Bite E-mail: [email protected] Mobile phone: 06-30-940-1285 Environmental engineer MMK ID: 01-0193 SZKV-zr Expert in noise- and vibration protection SZKV-le Expert in air purity protection and environmental protection SZKV-vf Expert in water- and geological medium protection SZKV-hu Expert in waste management and environmental protection OKTVF ID: Sz-035/2009 SZTjV Landscape protection SZTV Biota protection Mr. Szabolcs Silló Geographer specialized in Tract development and Community development MMK ID: 13-13573 SZKV-1.4. Expert in noise- and vibration protection SZKV-1.2. Expert in air purity protection SZKV-1.3. Expert in water- and geological medium protection SZKV-1.1. Expert in waste management OKTVF ID: Sz-036/2009 SZTjV Landscape protection Mr. Szabolcs Nerpel Engineer specialised in Geographic information systems Ms. Tímea Bencsik Engineer of Landscape Architecture Ms. Éva Ruckerbauer Engineer of Landscape Architecture Mr. Attila Gergely Biologist OKTVF ID: Sz-013/2008 SZTjV Landscape protection SZTV Biota protection TABLE OF CONTENTS EXECUTIVE SUMMARY ...........................................................................................
    [Show full text]
  • Transnational Strategy for the Sustainable Territorial Development of the Danube Area with Special Regard to Tourism DATOURWAY
    Transnational Strategy for the Sustainable Territorial Development of the Danube Area with special regard to Tourism DATOURWAY Abstract TOURISM SURVEY Hungary February 2010, Budapest Introduction Tourism has gradually grown into the most important sector in terms of job-creation, as well as a leading economic sector with a growth rate exceeding that of the global economy. Tourism can provide a future for economic development for a country, a region, a town or a village. The World Tourism Organisation (WTO) forecasts that the contribution of tourism revenues to the GDP will rise from 10% today to 13% in 2020 (with tourist arrivals rising threefold). At the same time, it must be born in mind that the number and length of stay of tourists in Hungary saw a continuous decline in the past 20 years, and the recent economic recession domestic tourism has also come to a halt. Tourism accounts for 8.76% of domestic GDP1 and provides 328 thousand jobs, plays an extremely significant role in improving the balance of foreign trade, facilitates the exhaustion of local potential and restoring regional imbalances, while having a positive impact on the quality of life. Despite its favourable potentials, the Hungarian tourism sector faces many a problem, such as the amount of per capita spending, a medium-scale figure by European standards, the strong seasonality factor, as well as the high level of geographical concentration. These can be explained by several factors, such as the insufficient quality and quantity of tourism supply, the inappropriate conditions of tourist welcome services, outdated training skills and the underdeveloped operational structure of the tourism sector (a well-coordinated organisational system with appropriate financing, responsible for the development of tourism destination areas and management, with clearly designated competencies and professional skills).
    [Show full text]
  • Social and Economic Transition in Dunaújváros and Its Region
    Szirmai_kiseroszinnel_Urban 1-4.qxd 2016.06.13. 15:37 Page 165 Social and Economic Transition in Dunaújváros and its Region NóRA BARANYAI Introduction WITH A POPULATION BELOW 50,000, DUNAúJVáROS IS A MEDIUM- SIZED TOWN SITUATED 67 KILOMETRES SOUTH OF BUDAPEST, IN THE SOUTH - EAST PART OF FEJéR COUNTY (NUTS3). IT IS THE CENTRE OF THE DUNAúJVáROS DISTRICT (LAU1) (Map 8). ONE OF THE TOWN’S MOST IMPORTANT POTENTIALS IS ITS FAVOURABLE TRANSPORT GEOGRAPHY BOTH IN THE PAST AND THE PRESENT. LOCATED IN THE CENTRAL PART OF THE COUNT - RY, NEAR THE DANUBE, IT BOASTS OF EXCELLENT TRANSPORTATION FACILITIES (WITH THE CLOSE PROXIMITY OF THE M6 MOTORWAY, THE PENTELE BRIDGE, A RIVER PORT, RAILWAYS AND HIGHWAYS). THE TOWN RESIDES AT ONE OF THE SUBSECTIONS OF THE PAN-EUROPEAN TRANSPORT CORRIDOR V CON - NECTING KIEV WITH VENICE. THE PLANNED CONSTRUCTION OF THE M8 MOTORWAY WOULD BRING THE POSSIBILITY OF NEW ECONOMIC RELATION - SHIPS. DUNAúJVáROS IS SITUATED ON THE MEZőFöLD PLAINS AREA, ITS LOESS-COVERED TABLE STRUCTURED SOIL HAS GOOD FERTILITY. THE RIVER DANUBE PLAYS A PROMINENT ROLE IN THE REGION’S LIFE WITH ITS OPPOR - TUNITIES FOR RECREATION AND SPORTS (IVS, 2008); ALTHOUGH THE TOWN DOES NOT YET FULLY MAKE USE OF THE OPPORTUNITIES FOR TOURISM PRO - VIDED BY THE NATURAL AND BUILT ENVIRONMENT (TK and ITS Foundation Study, 2013). THE OLD TOWN PART OF DUNAúJVáROS, FORMERLY CALLED PENTELE, HAS EXISTED SINCE THE BRONZE AGE. IN THE TIME OF THE ROMAN EMPIRE IT WAS CALLED INTERCISA AND WAS A PART OF THE EASTERN FORTIFICATION SYS - THE STUDY HAS BEEN REALISED WITHIN THE CONFINES OF THE RESEARCH ENTITLED “SOCIAL POLARISATION IN THE HUNGARIAN AND EASTERN-CENTRAL EUROPEAN ‘NEW TOWN’ REGIONS: IMPACTS OF TRANSITION AND GLOBALISATION” (K 106169), FUNDED BY THE NATIONAL RESEARCH, DEVELOPMENT AND INNOVATION OFFICE.
    [Show full text]