Land Acquisition and Resettlement Plan

March 2020

Loan 3285-UZB: Northwest Region Power Transmission Line Project:

Section 5: The power line section between “Khorezm” Substation and 3rd river-crossing of the transmission line with the Amudarya River (Khorezm region)

Prepared by the Joint-Stock Company National Electrical Networks of (NENU) for Asian Development Bank (ADB), Uzbekistan.

The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Resettlement Planning Document

Document: Land Acquisition and Resettlement Plan Document Stage: Final/Updated Project Number: 47296-001 Date: March 2020

Republic of Uzbekistan: Northwest Region Power Transmission Line Project

Section 5: The power line section between “Khorezm” Substation and 3rd river-crossing of the transmission line with the Amudarya River (Khorezm region)

Prepared by the Joint-Stock Company Uzbekistan National Electrical Networks of Uzbekistan (NENU) for the Asian Development Bank. This is an updated version of the draft originally posted in March 2015 available on http://www.adb.org/projects/47296- 001/documents.

i

ABBREVIATIONS

ADB – Asian Development Bank AH – Affected Household AP – Affected Person CoM – Cabinet of Ministers of Uzbekistan DDR – Resettlement Due Diligence Report DLARC – District Land Acquisition and Resettlement Department DMS – Detailed Measurement Survey DMS – Detailed Measurement Survey EA – Executing Agency EMP – Environmental Management Plan EPC – Engineering, procurement, and construction FGD – Focus Group Discussion GRM – Grievance Redress Mechanism Ha – Hectare HHs – Households IA – Implementing Agency IA – Implementing Agency IEE – Initial Environmental Examination KMPN – North West Main Power Network LAA – Land Allocation Act LAR – Land Acquisition and Resettlement LARP – Land Acquisition and Resettlement Plan NWRTLP – Northwest Region Power Transmission Line Project O&M – Operation and Maintenance PIC – Project Implementation Consultant PMU – Project Management Unit RoW – Right-Of-Way SAESP – Sredazenergosetproject JSC – Design Institute SCLRGCSC – State Committee on Land Resources, Geodesy, Cartography, and State Cadaster SPS – Safeguard Policy Statement 2009 ToR – Terms of Reference UNPN – JSC ”Uzbekistan National Power Networks” UZS – Uzbek Soum

CURRENCY EQUIVALENTS (As of December 1, 2019)

Currency Unit – Sum (UZS) $1.00 = UZS 9494

NOTE In this report, i. “$” refers to United State Dollars (USD) ii. UZS refers to Uzbekistan Soum

ii

Table of Contents GLOSSARY ...... vii 1. EXECUTIVE SUMMARY ...... xi I.1 Project description...... xi I.2 Scope of Land Acquisition and Resettlement ...... xii I.3 Socio-economic information and profile ...... xvi I.4 Information disclosure, consultation and participation ...... xviii I.5 Grievance redress mechanism ...... xviii I.6 Policy and legal framework ...... xviii I.7 Entitlements, assistance, and benefits ...... xix I.8 Income restoration and rehabilitation ...... xxii I.9 Resettlement budget and financing plan ...... xxii I.10 Institutional arrangements ...... xxiii I.11 LARP Implementation...... xxiii I.12 Monitoring and reporting ...... xxiii 2. PROJECT DESCRIPTION ...... 1 2.1 General ...... 1 2.2 Project components ...... 1 LARP and Project implementation conditions ...... 4 2.3 Approach and methodology...... 5 3. SCOPE OF LAND ACQUISITION AND RESETTLEMENT ...... 6 3.1. Approaches to the identification of project impacts ...... 6 3.1.1 Census and inventory of losses ...... 6 3.1.2 Categorization of impacts ...... 6 3.2 Impact to AHs ...... 7 3.3 Construction of transmission line ...... 8 3.4 Permanent land impacts ...... 9 3.5 Temporary land impacts...... 12 3.6 Loss of crops ...... 13 3.7 Loss of structures ...... 14 3.8 Loss of trees...... 17 3.9 The severely affected HHs ...... 18 3.10 The legal status of land ownership ...... 21 3.11 Unanticipated Impacts ...... 21 3.12 Impact of construction to access roads ...... 21 3.13 Socioeconomic and environmental impacts ...... 21 3.14 Summary of Impact ...... 22

iii

4. SOCIOECONOMIC INFORMATION AND PROFILE ...... 23 4.1. Methodology...... 23 A. Socioeconomic profile of affected households ...... 23 4.2. Demography and socioeconomic characteristics ...... 23 B. Social impacts on AHs and their communities ...... 26 4.3. The livelihood of AHs and low-income AHs ...... 26 3.1 Source of Livelihood and Income ...... 28 3.2 Vulnerable Households ...... 28 4.4. Ethnic composition and indigenous people...... 30 4.5. Gender issues ...... 30 5. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION ...... 31 5.1. General ...... 31 5.2. Disclosure ...... 31 6. GRIEVANCE REDRESS MECHANISM ...... 34 6.1. General ...... 34 6.2. Existing complaint handling mechanism in Uzbekistan ...... 34 6.3. GRM developed for NWRTLP ...... 35 6.4. Contact details ...... 36 6.5. GRM Records and documentation ...... 36 7. POLICY AND LEGAL FRAMEWORK ...... 38 7.1 General ...... 38 7.2 Laws, Regulation, and Provision relating to LAR in Uzbekistan ...... 38 7.2.1 Constitution ...... 40 7.2.2 Land code (30 April 1998) ...... 41 7.2.3 Resolution of Cabinet of Ministers № 97 (29 May 2006)...... 41 7.2.4 Civil Code (29 August 1996) ...... 41 7.2.5 Resolution of Cabinet of Ministers № 146 (25 May 2011) ...... 42 7.2.6 Resolution of Cabinet Ministers №317 (21 September 2016) ...... 43 7.2.7 Resolution of Cabinet Ministers №3857 (16 July 2018) ...... 43 7.2.8 Decree of the President of Uzbekistan №5495 (1 August 2018) ...... 43 7.2.9 Law of Uzbekistan on Protection of Private property and Guarantees of Ownership rights 336 (22 September 2012) ...... 43 7.2.10 Presidential Order F-5491(3 August 2019) ...... 44 7.2.11 Resolution of Cabinet of Ministers № 1047 (26 December 2018) ...... 44 7.2.12 Presidential Decree 5421 (20 April 2018) ...... 45 7.2.13 Resolution of Cabinet of Ministers № 44 (15 February 2013) ...... 45 7.2.14 Tax code ...... 46 7.2.15 Resolution of Cabinet of Ministers # 63(28.01.2019) ...... 46 7.2.16 Resolution of Cabinet of Ministers # 165 (30.03.2017) ...... 47

iv

7.2.17 Presidential Decree # 4086 ...... 48 7.2.18 Labor code and employment law ...... 49 7.3 ADB Safeguard Policy Statement, 2009 ...... 49 7.4 Policy differences and reconciliation ...... 51 8. ENTITLEMENTS, ASSISTANCE, AND BENEFITS ...... 58 8.1 Eligibility and the cut-off date ...... 58 8.2 Compensation and valuation of assets ...... 58 8.4.1. Compensation for Land ...... 58 8.4.2. Trees ...... 59 8.4.3. Crops ...... 59 8.4.4. Loss of building and structures ...... 60 8.4.5. Loss of Income/Livelihood ...... 60 8.4.6. Vulnerable Households ...... 60 8.4.7. Compensation estimation process ...... 60 9. INCOME RESTORATION AND REHABILITATION ...... 63 10. RESETTLEMENT BUDGET AND FINANCING PLAN ...... 64 10.1 Compensation for permanent land acquisition ...... 64 10.2 Compensation for temporary land acquisition ...... 65 10.3 Compensation for affected trees...... 66 10.4 Compensation for demolished residential houses and structures ...... 67 10.5 Relocation and additional assistance to vulnerable AHs ...... 67 10.6 Summary Budget...... 69 11. INSTITUTIONAL ARRANGEMENT ...... 71 11.1 General ...... 71 11.2 UNPN and project management unit ...... 71 11.2.1 Resettlement Experts (RE) ...... 71 11.3 Design Institute - “JSC Sredazenergosetproekt” (SAESP) ...... 72 11.4 Land Use Planning Institute UzDavYerLoyiha ...... 72 11.5 District branch of State Committee on Land Resources, Geodesy, Cartography and State Cadaster (SCLRGCSC) ...... 72 11.6 District (Hokimyat) (Governorates) ...... 73 11.7 Independent Valuation Companies ...... 73 11.8 Community-Based Organizations (CBOs) ...... 73 11.9 Training of PMU...... 74 12. LARP IMPLEMENTATION ...... 75 12.1 General ...... 75 12.2 LARP Implementation Stage ...... 75 12.3 Procedures for Payment of Compensation ...... 75 12.4 Implementation Schedule ...... 76

v

13. MONITORING AND REPORTING ...... 77 Annex 1: Location of tension towers in section 5 ...... 78 Annex 2: Photos from a census survey of affected agricultural farms ...... 79 Annex 3: Location of land units of Section 5 (part 1)...... 80 Location of land units of Section 5 (part 2) ...... 81 Location of land units of Section 5 (part 3) ...... 82 Location of land units of Section 5 (part 4) ...... 83 Annex 4: Details of AHs by land units in Section 5 ...... 84 Annex 5: Land plot allocation document provided by the Architectural Department of Khazorasp district ...... 88 Annex 6: Extract from land allocation acts approved by the regional Hokim of Horezm region ...... 89 Annex 7: Temporary Land Acquisition ...... 90 Annex 8: Photos from the affected residential structures in district ...... 96 Annex 9: Photos from the affected residential structure in Bogot district ...... 97 Annex 10: Photos from the affected lands trees in Hazorasp district ...... 98 Annex 11: List of consulted stakeholders ...... 99 Annex 12: Pictures from public disclosure meeting ...... 100 Annex 13: Grievance Redress Mechanism...... 101 Annex 14: The Logbook of GRM ...... 102 Annex 15: Extract from DMS/IOL that calculated agricultural income loss for AHs for temporary land acquisition ...... 103 Annex 16: Compensation for affected standing crops calculated by the Khorezm branch of the Uzdavyerloyiha Institute ...... 104 Annex 17: Valuation report for affected trees ...... 109 Annex 18: Valuation report for the affected residential structure of Masharipova Saodat ...... 110 Annex 19: Valuation report for the affected residential structure of Allaberganova Salomat ...... 111 Annex 20: Valuation report for the affected residential structure of Ibodullaeva Gulnoza ...... 112 Annex 21: Valuation report for the affected residential structure of Ruziboyeva Mohira 113 Annex 22: Valuation report for the affected residential structure of Matyakubova Qurbongul ...... 114 Annex 23: Valuation report for the affected residential structure of Ibragimov Dilshod 115 Annex 24: Valuation report for the affected residential structure of Olimova Iroda .... 116 Annex 25: Presentation prepared in the Uzbek language for the disclosure meetings 117 Annex 26: Summary of compensation per AHs ...... 120

vi

GLOSSARY

Affected Affected persons (APs)are the members of the affected households, Persons those who experience full or partial, permanent or temporary physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access to assets, income sources, or means of livelihoods) resulting from (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Although this definition of affected people is at variance with the usage in the SPS-2009, this is how it is understood and officially used in Uzbekistan, and it is not different from ‘displaced person’ defined in the SPS-2009.

Affected A household consists of one or more people who live in the same Household dwelling and share meals or living accommodations and may consist of a single-family. In the project, the household is the unit for compensation and all the members of a household are considered as affected persons.

Architectural A document containing a set of town-planning and architectural Planning requirements. To construct an object following documentation shall be Assignments submitted such as approved city-planning documentation, relevant decisions of state authorities, including requirements and conditions for the protection of historical and cultural monuments, the environment, legal rights and interests of third parties, persons for a specific land plot. Based on these documents, architectural planning assignment for construction is being developed (re-constructions) of the object.

Cadastral A set of materials, cadastral surveys, technical inventories and document certification, quality and valuation of the object necessary for the formation, accounting and subsequent state registration of rights to real property.

Compensation Payment for an asset to be acquired or affected by a project at replacement cost. Cut-off-date The date after which people will not be considered eligible for compensation, i.e., they are not included in the list of AHs as defined by the census. If the country expropriation law does not specify a cut-off date, usually, the cut-off date is the last date of the detailed measurement survey which is based on the final engineering design. The validity of the cut off date in ADB projects typically is three years.

Detailed With the aid of the approved detailed engineering design, this activity Measurement involves the finalization and/or validation of the results of the inventory of Survey (DMS) losses (IOL), the severity of impacts, and the list of AHs earlier done during RP preparation. The final cost of resettlement can be determined following the completion of the DMS.

Dehkan farm A small farm that runs a household plot. Please refer to the definition of the household plot below. Economic Loss of land, assets, access to assets, income sources, or means of Displacement livelihoods, as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or access to legally designated parks and protected areas.

vii

Eminent domain The right of the state using its sovereign power to acquire land for public purposes. National law establishes which public agencies have the prerogative to exercise eminent domain.

Entitlement The range of measures comprising the cost of compensation, relocation cost, income rehabilitation assistance, transfer assistance, income substitution, and relocation which are due to /business restoration, which is due to AH, depending on the type and degree nature of their losses, to restore their social and economic base. All entitlements are given to all affected households as per the entitlement matrix. Hokimiyat The local government authority that interfaces between local communities and the government at the regional and national level. It has ultimate administrative and legal power over local populations residing within its jurisdiction.

Household Household means all persons living and eating together as a single social unit and eating from the same kitchen whether or not related to each other. The census used this definition and the data generated by the census forms the basis for identifying the household unit. Household plot In this report, a plot of land allocated in the manner and amount established by law in addition to the residential household as inheritable lifetime possession to one of the family members for the production of agricultural products both for free sale and for the needs of the family. The construction of residential structures is not allowed.

Illegal Households that are not registered their business, agriculture, residential and orchard and those who have no recognizable rights or claims to the land that they are occupying and includes people using private or state land without permission, permit or grant i.e. those people without legal lease to land and/or structures occupied or used by them. ADB’s SPS explicitly states that such people are entitled to compensation for their non-land assets.

Income This is the re-establishment of sources of income and livelihood of the Restoration affected households Inventory of Is the process where all fixed assets (i.e., lands used for residence, Losses commerce, agriculture, including ponds; dwelling units; stalls and shops; secondary structures, such as fences, tombs, wells; trees with commercial value; etc.) and sources of income and livelihood inside the Project right-of- way (ROW) are identified, measured, their owners identified, their exact location pinpointed, and their replacement costs calculated. Additionally, the severity of impact to the affected assets and the severity of impact to the livelihood and productive capacity of AHs will be determined. Land The process whereby a person is compelled by a public agency to alienate acquisition all or part of the land s/he owns or possesses, to the ownership and possession of that agency, for the State purposes, in return for fair compensation.

Land allocation In this report, this term used when land is being allocated out of the unproductive/unsettled State Reserve Land or from the areas that are being used by the State Organization for the modernization/construction of a new substation, and transmission line towers as well as stringing the power cables.

Land Use rights According to Land Code (article 17) real persons (can have the land plot under the lifelong inheritable possession right and land parcel use

viii

transferred as a descent. This right is given to individual residential housing construction and collective gardening and vineyard (orchards), peasant farms. Juridical persons (enterprises, stores, and businesses) can possess land parcels according to the right to permanent possession, permanent use, temporary use, lease, and property. In the two above cases, when a person wants to sell the property (land and building), he will sell the building & structure, and subsequently, the land parcel sold as an attachment (right is sold).

Makhalla A local level community-based organization recognized officially by the State that serves as the interface between state and community. It is responsible for facilitating a range of social support facilities and ensuring the internal social and cultural cohesiveness of its members and; local communities to elect Makhalla leaders.

Massif It is a territory comprising a group of houses within the regional . In other words, it is an administrative division of the districts. In cities of Uzbekistan, this term is called as blocks. Meaningful A process that (i) begins early in the project preparation stage and is Consultation carried out on an ongoing basis throughout the project cycle; (ii) provides timely disclosure of relevant and adequate information that is understandable and readily accessible to affected people; (iii) is undertaken in an atmosphere free of intimidation or coercion; (iv) is gender inclusive and responsive, and tailored to the needs of disadvantaged and vulnerable groups; and (v) enables the incorporation of all relevant views of affected people and other stakeholders into decision making, such as project design, mitigation measures, the sharing of development benefits and opportunities, and implementation issues. Physical Relocation, loss of residential land, or loss of shelter as a result of (i) Displacement involuntary acquisition of property, or (ii) involuntary restrictions on land use or access to legally designated parks and protected areas

Private farm A legal entity engaged in agricultural activity with larger land plots. Farmland is managed by the head of the household and there are a number of criteria for a private farm, such as the availability of agricultural machinery, the agricultural education background of the head of the farm and others. The private farm is responsible to the Government for the execution of certain requirements on crop production and other agricultural projects.

Relocation This is the physical relocation of an AH from her/his pre-project place of residence and/or business. Rehabilitation This refers to additional support provided to AHs losing productive assets, incomes, employment or sources of living, to supplement payment of compensation for acquired assets, in order to achieve, at a minimum, full restoration of pre-project living standards and quality of life. Replacement The term used to determine the value enough to replace affected assets Cost and/or cover transaction costs necessary to replace the affected assets without depreciation for such assets as well as material advantage, taxes and/or travel expenses. Resettlement Means all social and economic impacts that are permanent or temporary and are (i) caused by the acquisition of land and other fixed assets, (ii) by change in the use of land, or (iii) restrictions imposed on land, as a result of a project.

ix

Resettlement This is a time-bound action plan with budget setting out compensation Plan and resettlement, entitlement, actions, responsibilities, monitoring, and evaluation. Safety zone the area below, and around, transmission lines in which activities and land use that are incompatible with the safe and efficient operation of the national electricity transmission network are avoided. The safety zone corridors do not restrict normal farming activities such as cropping, harvesting, grazing, plowing. Only incompatible activities, milking sheds, residential dwellings, and some major earthworks - primarily around the foundations of the transmission towers would be restricted.

Severely This refers to affected households who will (i) lose 10% or more of their Affected total productive land and/or assets, (ii) have to relocate; and/or (iii) lose Households 10% or more of their total income sources due to the Project.

Significant 200 people or more will experience major impacts, which are defined as; impact (i) being physically displaced from housing, or (ii) losing 10% or more of their productive assets (income-generating). Vulnerable These are distinct groups of people who might suffer disproportionately or Group face the risk of being further marginalized by the effects of resettlement and specifically, include: (i) female-headed households without support, (ii) disabled household heads, (iii) households falling under the generally accepted indicator for poverty, (iv) children and the elderly households who are landless and with no other means of support.

x

1. EXECUTIVE SUMMARY

I.1 Project description

1. Construction of transmission line (TL) within Section 5 of NWRTLP will be carried out in , Honka, Yangiarik, Bogot, and Hazorasp districts of the Khorezm region. The total length of the transmission line in section 5 is 83,467 meters. In total 36 tension and 228 suspension towers will be built in this section of NWRTLP.

2. The State Joint-Stock Company Uzbekistan National Power Networks (UNPN) acting as the successor of the Unitary Enterprise “Uzelektrotarmoq” that was under the Joint- Stock Company Uzbekenergo (UE) is the executing agency of the NWRTLP. UNPN has been institutionally reformed by Presidential Decree #4249 on 27 March 2019 and currently affiliated to the Ministry of Energy. The draft Land Acquisition and Resettlement Plan (LARP) was prepared by UNPN based on the preliminary design in March 2015. According to draft LARP the NWRTLP was classified as Category B for involuntary resettlement.

3. This updated LARP for section 5 covers the assessment of impacts associated with permanent land acquisition for construction of TL towers and temporary land acquisition for stringing the conductor cables of TL based on the final design. Aside from an assessment of impacts, this LARP provides an assessment of compensation to the affected persons and affected households, implementation arrangement, grievance mechanism, and monitoring and reporting in compliance with policies, laws, and regulations of Uzbekistan, and the policies of the ADB as described in the Safeguard Policy Statement (2009).

4. ADB approved the request from UNPN in 2018 to split Components 1 and 2 of the Project into several sections to accelerate the construction works. As a result, the project was split into eight sections as shown in Table 1.1 below. Table 1.1: The division of the NWRTLP Section LAR and Actions Involuntary needed resettlement Section 1: The power line section between Takhiatash TPP and 1st river-crossing of the YES Resettlement Plan transmission line with the Amudarya River submitted (Republic of Karakalpakstan)

Section 2 (Part 2A): The power line section NO Social Due between 1st river-crossing of the transmission Diligence Report line with the Amudarya River and Tension Tower submitted 25 (Republic of Karakalpakstan)

Section 2 (Part 2B): The power line section YES Resettlement Plan between Tension Tower 25 and 2nd river- submitted crossing of the transmission line with the Amudarya River (Republic of Karakalpakstan)

Section 3: The power line section between 2nd YES Resettlement Plan (Khorezm region) river-crossing of the is being prepared transmission line with the Amudarya River and “Khorezm” Substation (Khorezm region) Social Due Section 4: “Khorezm” Substation (Khorezm NO Diligence Report region) submitted

xi

Current Section 5: The power line section between YES Resettlement Plan “Khorezm” Substation and 3rd river-crossing of is being prepared the transmission line with the Amudarya River for this section (Khorezm region)

Section 6: The power line section between the YES Resettlement Plan 3rd river-crossing of the transmission line with submitted Amudarya River and Sarimay Switchyard (Khorezm region and Karakalpakstan) Social Due Section 7: Sarimay Switchyard (Khorezm region) NO Diligence Report submitted

5. This updated LARP is for the subproject “Section 5 - The power line section between “Khorezm” Substation and 3rd river-crossing of the transmission line with the Amudarya River (Khorezm region)”. Hereinafter referred to as in this document as Section 5.

Figure 1.1: Location of Section 5

6. As described in figure 1.1 above, the power line route of section 5 starts from the Tension Tower 1 right after the Khorezm substation (section 4) and ends with Tension Tower 37 near to 3rd river-crossing of the Amudarya River.

7. This updated LARP was prepared by Resettlement Expert from July to November 2019. It provides a final impact assessment of section 5 of NWRTLP and compensation/rehabilitation measures. DMS/IOL for section 5 was based on the final design prepared by the Design Institute – Sredazenergosetproject within 2016-2018. The reports of DMS/IOL were prepared by the regional branches of Uzdavyerloyiha (State land design institute) of Khorezm in June - July 2019.

I.2 Scope of Land Acquisition and Resettlement

8. The census in Section 5 of Khorezm region was conducted from 10 July to 02 August 2019 by the Resettlement consultant team of PIC (Annex 2) while IOL and DMS were prepared June - July 2019 by Land Use Planning Institute - Uzdayerloyiha branch of Khorezm region. Both census and DMS/IOL is based on the final design that was developed by Design Institute – SAESP.

xii

9. A total of 238 AHs, comprises 68 private farms, 158 household plots, and 5 business entities will be impacted for a permanent and temporary period while 7 residential households will have a permanent impact on their lands and structures. All AHs are located Urgench, Honka, Yangiarik, Bogot, and Hazorasp districts of Khorezm region. All the identified 238 AHs are divided into 136 land units (Annex 3). Details on the AHs and land users are given in Annex 4.

10. The RoW of 83,467 meters TL will require temporary approximately 115 ha of land from AHs, while the remaining about 9 ha is allocated out of the State lands. Out of the total land holding of AHs, 58% of agricultural land is required temporarily, while 42% comprises of the State-governed lands non-agricultural land use type. The summary of temporary impacts is given in Table 1.2 below.

Table 1.2: Summary of total temporary land Impacts The Temporary Impact (ha) length of Number AHs Type of Land the TL by AHs State-governed who will be Use type of Total (Private farms Lands (reserve, temporarily land use and residen.HH) forest, other lands) impacted Agricultural 58% 115.06 71.88 43.18 231 land Other lands (ditches, canals, 42% 8.94 - 8.94 - roads, and other lands) TOTAL 100% 124.00 71.88 52.12 231 Source: Land allocation document and Impact Assessment Survey, August 2019.

11. In total 231 AHs will be temporarily impacted due to the construction of towers and stringing of TL cables on their lands in section 5. Construction works will impact on standing crops, orchards and trees.

12. Due to the construction of TL and towers, there will be a loss of standing crops belonging to 190 AHs. These AHs include private farms, dehkan farms that hold household plots and business entities who have agricultural lands. The detail information per AHs on impact to crops is given in annex 16 while the summary of the impact on crops on a district level is given in Table 1.3 below.

Table 1.3: Summary of the affected crops of AHs Districts Number of Number of Type of crops AHs affected crops Urgench 19 3 Cotton, Rice, Corn Honka 35 4 Cotton, Rice, Corn, Alfalfa Yangiarik 48 4 Cotton, Rice, Corn, Vegetable Bogot 59 4 Cotton, Rice, Corn, Vegetable Khozarasp 29 4 Cotton, Rice, Corn, Vegetable TOTAL 190 4 Source: Land allocation document and Impact Assessment Survey, August 2019.

13. The dominant crops of the AHs are cotton and rice. Around 44% of the total impacted crop is cotton while another 44 % is rice. Share of other impacted crops, such as corn, alfalfa, and vegetables, is low. The least impacted crops are alfalfa (1%) and vegetables (4%)

14. For the erection of 264 towers in total 2.33 ha will be required permanently. Out of 2.33 ha of land, 71% of land comprises of AHs including, private farms, dehkan farms, business entities, and residential households while remaining 29% comprises of the State-owned lands

xiii including, reserve lands, forest, and other land types. In total 94 AHs will have a permanent land impact. Table 1.4 summarizes permanent land acquisition and land allocation for section 5. Table 1.4: Summary of Total permanent land Impacts Permanent Impact (ha) Total Number AHs Type of Total State Suspen AHs (Private who will be Land Tension reserve, sion Total farms and permanently Use Towers forest, other Towers residen. HHs) impacted lands Agricultural 36 228 2.03 1.35 0.68 land 87 Residential - - 0.30 0.30 - 7 land TOTAL 36 228 2.33 1.65 0.68 94 Source: Land allocation document and Impact Assessment Survey, August 2019.

15. About 59% of the temporary alignment corridor will pass through the agricultural farms while around 41% of the temporary alignment corridor is needed out of the state-governed lands and only 0.1% will pass through residential lands.

16. During the preliminary site visit in total 60 HHs (1 HH in Bogot district and 59 HHs in Khazorasp district) were preliminary assessed as affected residential households. The previous Hokimiyat of the Hazorasp was aware that land plot was allocated specially to the construction of 220 kV TL, but later in 2017 a new Hokimiyat of the Hazorasp district developed a Master Plan and allocated land to local people to build houses However, this number has been reduced to 7 HHs after carrying out a due diligence review of land documents of the excluded 53 households (HHs). According to the document review, the Khazorasp district Hokimiyat issued an order for 53 HHs, but legal title to the land plots have not been entitled yet. Therefore, these 53 HHs have not started any building activity on those lands. Therefore, in order to avoid resettlement, Hokimiyat issued a new land plots nearby location for those 53 HHs. An information letter was provided by the Khazorasp Hokimiyat regarding the issuance of a new land allocation documentation for those 53 HHs is given in Annex 5. Therefore, these 53 HHs have not been considered as AHs in this updated LARP. However, during the implementation of the this LARP, these HHs shall be monitored as well.

17. In total, 7 residential lands will be permanently impacted and land for land compensation of equal value and size within the neighborhood location will be provided. 1 AH, who is in Bogot district will keep the total landholding in addition to the replacement land. She will have restrictions to build residential structures within the safety zone, but building of other types of non-residential structures are allowed. All these lands are not income-generating/productive lands. All the 7 AHs in addition to land impacts will have a permanent impact on their structures.

Table 1.5: Details of affected Residential lands Name of Detail Address of Name of Total Affected Impact district affected land AH land, land, to land, sqm sqm % Bogot Hujalik village, 1. Masharipova Saodat 1200 650 54% Kalajikkala Makhalla Hazorasp 2. Allaberganova 400 400 100% Salomat Hazorasp 3. Ruziboyeva Mohira 400 400 100% Yangibozor village, Hazorasp 4. Matyakubova 400 400 100% Alokalikul Makhalla Qurbongul Hazorasp 5. Ibodullayeva Gulnoza 400 400 100%

xiv

Hazorasp 6. Ibragimov Dilshod 400 400 100% Hazorasp 7. Olimova Iroda 400 400 100% Total 3,600 3,050 Source: Land allocation document and Impact Assessment Survey, August 2019.

18. In total, there are 7 AHs whose structures will be demolished. Out of 7 AHs, 6 residential AHs are in Khazorasp district and census showed that they have managed to build only the foundations of the buildings. Therefore, there will be no physical displacement of the family members. They are still living in the Pitnak town which is located 13 km away from the affected lands. The built foundations made of concrete and stones. In Bogot district, Masharipova Gulnoza also living permanently at a different address (Bogot town, Pakhtakor street), therefore, no APs are living in the affected building in Bogot district the Table below shows the addresses of the AHs. In total, 985 sqm of structures will be demolished in Hazorasp district and 65.2 sqm of structures in the Bogot district. Compensation at the replacement cost will be provided for each AH.

Table 1.6: Details of affected structures Type of Total Affected Impact, Name of AHs affected structure structure % District № structure area, sqm area, sqm Residential Masharipova Saodat 158.1 65.2 41% Bogot 1 building Allaberganova foundation 168 168 100 2 Salomat 3 Röziboyeva Mohira foundation 148.5 148.5 100 Matyakubova foundation Hazorasp 4 Qurbongul 126.5 126.5 100 5 Ibodullayeva Gulnoza foundation 175 175 100 6 Ibragimov Dilshod foundation 143 143 100 7 Olimova Iroda foundation 224 224 100 TOTAL 1143.1 1050.2 92% Source: Land allocation document and Impact Assessment Survey, August 2019

19. In this section 5, there will be affected 8 types of trees including, fruit trees such as apple, apricot, cherry, plum, grape, peach, pear and wood tree such as poplar. Almost 99% of the affected trees consist of fruit trees. The most impacted trees are grape (37%) and apple (24%). In total 918 trees will be affected all the trees are under the possession of the 4 AHs who are private farms. There are no affected trees that are under the possession of residential households nor dehkan farms.

Table 1.7: Type of affected trees Type of Total Number of Share out of the total # affected trees affected trees affected trees, % 1 Apple 219 23.9 2 Apricot 23 2.5 3 Cherry 287 31.3 4 Plum 4 0.4 5 Grape 339 36.9 6 Peach 5 0.5 7 Pear 32 3.5 8 Poplar 9 1.0

xv

Total affected trees 918 100% Source: Land allocation document and Impact Assessment Survey, August 2019.

20. Severely affected households are AHs who will lose 10% or more of their total productive land and/or assets. Therefore, in the calculation of severity impact only productive lands of the AHs are considered while other land-use types are not included. As per the census, in total 7 residential households out of 94 AHs have been found as severely affected households in terms of permanent land acquisition (see Table 1.5 above). None of the AHs will have major impacts in terms of temporary land acquisition. Temporarily impacted lands will be returned to farmlands after the end of construction and compensation for temporary land acquisition will be provided to AHs. The maximum impact in terms of permanent land acquisition among private farms reaches 5.4% while among household plots (dehkan farms) this number reaches up to 6.5%. All the affected 7 residential AHs are considered as severely AHs since they will have an impact of 54% and 100%. Table 1.8: Summary of Impact

# Type of Impact Scope of Impact Permanently acquired land area (ha) - Total 2.33 - agricultural land from AHs (ha) 1.35 1 - residential land from AHs (ha) 0.30 - other lands from State-governed Lands 0.68 Temporary acquired land area (ha) – Total: 124 2 - agricultural land from AHs (ha) 71.88 - Ditches, canals, roads and other lands from AHs 8.94 - other lands from State-governed Lands 43.18 3 Number of affected crop types 5 4 Number of severely AHs 7 Total affected Trees: 918 5 - Total affected fruit trees 909

- Total affected wood trees 9 6 Number of AHs losing residential and other structures 7 7 Number of Business entity losing agricultural land 5 8 Total number of AHs (APs) 238 (1369) 9 Number of Tension (Suspension) towers 36 (228) 10 The total length of section 5, (meters) 83,467

I.3 Socio-economic information and profile

21. The census/SES data covered 238 AHs and 1,369 APs (7 affected residentials, 68 affected farmers, 5 business entities and 158 dehkan HHs) in Urgench, Honka, Yangiarik, Bogot and Khazorasp districts of Khorezm region. The field methodology included a census of all 238 AHs through interviews, consultations and structured questionnaires.

Table 1.9: Affected Households and Affected Persons Impact type Number of AHs Number of APs Affected residential structures 7 51 Affected business land 5 14 Affected farmlands 68 343 Affected Dehkan farm with household plot 158 961

xvi

Total 238 1369 Source: Impact Assessment Survey, August 2019

22. The APs include 709 (52%) males and 660 (48%) females. There are 44 female-headed households and 217 male-headed households. The average household size is 6 persons. Majority of the surveyed heads of AHs (98%) declared that they are married. Three widowers and 1 single head of AHs were identified among male heads, while 12 female heads of the AHs are widows. No single female heads were found. The APs have an average age of 30 years. Majority of APs (56%) are married. The 46-55 age group is the most represented group among the male-headed households (36%).

23. Livelihood, education, and occupations. Majority of heads of AHs (82% - 165 male AH heads and 30 female 30 AH heads) have secondary level education. Only 14% (29 male AHs heads, and 5 female AH heads) have achieved a higher level of education. Among members of the AHs, 60% have secondary education while 1% (3 males and 1 female 1 APs) are illiterate.

24. Heads of AHs are involved in agriculture, in agriculture, retired, have government jobs, private jobs, housekeeping, others, daily wage workers, unemployed, disabled, business and student activities as well as the main type of employment and source of income. There is the most percentage of about 45% of AHs heads (males 95 AHs heads and female 10 AHs) involved in agriculture while at least percentage 0,4% (male 1 AHs) gathered by a student. In terms of employment status among the APs, there is the most presented percentage 25% (males 178 APs, females 160 APs) underemployment while the least 1.3% of APs (males 9 APs, females 11 APs) was engaged in agriculture, receiving pension, or engaged in private jobs simultaneously and migrant worker among 1,369 APs.

25. Agriculture is the main source of income for the AHs (45%), by government jobs (19%), by pension (13%), by business (5%), by private jobs (8.3%), by daily wage (6.5%), and the next source of income mentioned by surveyed AHs is by other sources (4%). The average household monthly income from the agricultural activity exceeds the other type of income sources which equals 1,117,597 UZS. According to survey results, the total average annual income of AHs is 30,732,735 UZS while the total average annual expenditure of the AHs is 25,287,908UZS, which is less than the total average annual income by 17.7%.

26. As a result of the impact assessment survey, 8 AHs have been categorized as vulnerable AHs out of the total 238 AHs. According to the survey, three types of vulnerable AHs have been identified such as woman-headed household without any support in working-age people in the family (50%), household headed by physically/mentally challenged person (37.5%) and elderly headed household without any support in working-age people in the family (12.5%) in section 5. The detailed data about vulnerable households are given in Table 1.10.

Table 1.10: Vulnerable AHs Share in the total of Category Quantity of AHs vulnerable AHs, % Woman - headed household without any 4 50 support in working-age people in the family Household headed by physically/mentally 3 38 challenged person and low-income family An elderly headed household without any 1 12 support in working-age people in the family Total 8 100 Source: Impact Assessment Survey, August 2019

xvii

27. In terms of ethnic composition, all AHs declared themselves as Uzbek ethnically. No ethnic group maintaining cultural and social identities separate from mainstream Uzbekistan’s society fitting the ADB definition of Indigenous Peoples was identified.

I.4 Information disclosure, consultation and participation

28. Consultation meetings were carried out with affected households, relevant stakeholders, including cadastral office, land use engineer, design engineers, transmission line operators of the. Resettlement consultants undertook the field visit on 10 July – 02 August 2019.

29. Disclosure of LARP objectives was carried out also during the consultation meetings among AHs in July-August 2019 through meaningful consultation with AHs. In this meeting, Project objectives, ADB’s policy on Involuntary Resettlement, and Grievance Redress Mechanism, entitlements and possible compensation amounts will be described in the local language (Uzbek) to AHs and stakeholder in the form of presentation. The results of the census, the results of the valuation companies in regard to affected residential structures and trees as well as crops were disclosed among AHs in order to get their opinions and feedback. The comments and feedback from the disclosure meetings were incorporated for this updated LARP. The final LARP will be also disclosed on ADB’s (in the English Language) and on the UNPN website (http://uzbekistonmet.uz), as well as the telegram channel (t.me/uzmetaxborotxizmati) in the local language (Uzbek/Russian) upon approval.

I.5 Grievance redress mechanism

30. Complaints can be submitted to makhalla, village assembly of citizens, farmer councils or directly to EA and North-West Main Power Network (KMPN ) office. KMPN will be the entry point for receiving a complaint or known as a Grievance Focal Point (GFP). Upon receipt of a complaint, the GFP will establish contact with the Project Management Unit (PMU) and makhalla and other relevant bodies. The PMU will establish a complaint handling team headed by one of the KMPN management staff designated for handling grievances of the project. All complaints will be resolved in 15 days, and in case additional details are required, a maximum of 30 days will be used to resolve and close the complaint. The Project Grievance Redress Mechanism does not prevent any AH to approach the national/government legal system to resolve their complaints at any stage of the grievance redress process. The APs can address their complaints to the courts at any time and not only after using the GRM. AP can also vent their grievances in the ADB Accountability Mechanism. I.6 Policy and legal framework 31. The most recent Government resolutions on land acquisition have been used for preparing this LARP. Policy differences between the GOU and ADB have been reconciled where necessary. Based on the survey and consultation, the most important safeguard policy in the context of this project are compensation payable for land acquired if the land-for-land option is unavailable, transparent formulas for the estimation of replacement cost for land and other physical assets, prompt payment of compensation for APs affected by loss of employment, and provision for payment of allowances to the small number of poor and vulnerable APs.

32. The LARP has been prepared in line with national laws/regulations and ADB Safeguard Policy Statement (SPS) 2009. In case of any gaps between the national law and ADB SPS 2009, for this project purpose, the ADB SPS 2009 shall prevail.

33. The analysis of national legislation shows that Uzbekistan adopted presidential decrees and governmental resolution in recent years that fit the policies of SPS 2009. For example, the Presidents Decrees on the legalization of non-titled owners of residential houses, allocation of one-time financial allowance for families in need and who are not included in any social programs, and monitoring of any kind of involuntary resettlement by the approval of Cabinet of Ministers are examples.

xviii

I.7 Entitlements, assistance, and benefits 34. Compensation eligibility will be limited by a cut-off date established based on the last day of the DMS/IOL of affected households. The cut-off date for section 5 territory is August 02, 2019. Households who settle in the affected area and/or make any improvements on the land parcel to be acquired for the project after the cut-off date will not be eligible for compensation.

35. The Entitlements Matrix identifies the assets – permanent loss of agricultural land, temporary impact on agricultural land, field crops, socioeconomic impact on vulnerable groups, people without formal title or rights to property, and severely AHs – and what entitlements are able to be received using the legal framework and negotiations between the ADB and UNPN.

36. Compensation for residential land will be on a “land for land” basis, with land being provided to owners by the District Hokimiyat. Such land will be of equal value/productivity in a nearby location and with comparable associated services/ facilities, or compensation to provide such services. Transaction costs, registration fees, if any, will be borne by UNPN

37. Cash compensation for permanently affected agricultural land at replacement cost will be provided in case the AHs refuse land-for-land compensation. The compensation for the permanent loss of land use rights over the affected agricultural land will be compensated equivalent to 4 years' net average income of the past 3 years (of the affected annual crop). Transaction costs, registration fees, if any, will be borne by UNPN.

38. Cash compensation for temporary affected agricultural land at replacement costs will be provided. The compensation for the temporary loss of land use rights over the affected agricultural land will be compensated equivalent to construction years multiplied to the net average income of the past 3 years (of the affected annual crop). Transaction costs, registration fees, if any, will be borne by UNPN.

39. Loss of income from fruits trees and timber trees will be compensated in monetary value based on the market value. Fruit trees will be evaluated based on the average annual income for the past 3 years multiplied by the remaining productive life of the fruit-bearing trees. In the case of loss of timber trees, compensation will be based on the market value of their dry wood volume.

40. Loss income from crops planted on the affected land will be compensated in monetary value at replacement cost based on average net income computed based on the annual average income over the past 3 years to restore the lands for an affected portion of land.

41. Compensation for affected structures is based on the results of the market estimation of the cost of the specified object, including all the related payments, depreciation and transaction costs and relocation costs. Full compensation will be also provided for the affected substructures adjacent to the house. No deductions shall be made for salvageable materials. The results of the DMS/valuation reports will be used as a reference to pay compensation to AHs in this LARP. Table 1.11: Entitlements Matrix Specificatio Type Affected HHs Entitlement ns A. Impact on Land A.1. Permanent All AHs, 1. Monetary Compensation at replacement cost by Agricultural land losses Leaseholders providing compensation for loss of land use rights land caused by equivalent to 4 years of the net average income tower 1of the past 3 years (of the affected annual construction crops.); 2. Unaffected portions of an affected arable plot will

1 Based on the Tax authority information

xix

Specificatio Type Affected HHs Entitlement ns also be compensated if the same becomes unviable after impact. 3. Transaction cost, registration fee, related to new plot allotted will be borne by UNPN 4. Independent valuator will be engaged only in cases where AHs disagree by DMS valuation. Temporary 1. Monetary Compensation at replacement cost by land losses providing compensation for loss of land use rights caused by equivalent to temporary period years of the net tower average income 2of the past 3 years (of the construction affected annual crops.); and 2. Unaffected portions of an affected arable plot will transmission also be compensated if the same becomes line stringing unviable after impact. 3. Independent valuator will be engaged only in cases where AHs disagree with compensation rates A.2. Land Loss All AHs, 1. Land for land compensation through the provision Residential Leaseholders of a land plot comparable in value/location to the land with plot lost including services (or compensation to Lifelong provide such services) to plots lost with inheritable registration and transfer charges if any to be possession/ borne by the project; permanent OR possession 2. Unaffected portions of a plot will also be compensated if they become unviable after the impact occurs. 3. All mandatory fees for registering the land, completion of required house design, surveys, acquiring permission for construction under the AHs name and any other related costs will be paid by UNPN. B. Impact on Structures Residential Full or Ownership 1. Monetary compensation at full replacement rate / Business partial loss for affected structure/fixed assets free of structures of structures salvageable materials, depreciation and transaction costs. OR 2. In case of partial impacts on structures (structure wall, fences, etc.), monetary compensation at replacement rates to restore the remaining structure. 3. Unaffected portions of the structure will also be compensated at replacement value if they become unviable after impact. 4. Monetary Compensation at replacement cost to be determined by the Independent Valuator and cost of valuation shall be paid by UNPN.

2 Based on the Tax authority information

xx

Specificatio Type Affected HHs Entitlement ns C. Impact on Crops and Trees Agriculture Loss of All AHs 1 Monetary compensation at replacement cost for land, crops primary (and secondary crops if any) on affected orchard land-based on 1 year of production costs (inputs) plus an allowance equivalent to 1-year average net income based on the average income over the past 3 years. 2 Monetary compensation at replacement cost will be determined by Uzdavyerloyiha Institute. 3 Independent valuator will be engaged only in cases where AHs disagree with monetary compensation rates Loss of fruit All AHs 1. Monetary compensation for fruit trees will be trees (including the based on the average annual income for the past non-leased 3 years multiplied by the remaining productive life landowner) of the fruit-bearing trees. 2. Production costs (inputs) of trees till to cut date. 3. Monetary Compensation at replacement cost to be determined by the Independent Valuator and cost of valuation shall be paid by UNPN. 4. Felled trees will be kept by the AHs. Loss of All AHs 1. Monetary compensation for timber trees will be timber trees compensated based on the market value of dry wood volume. OR Production costs (inputs) of trees till to cut date. 2. Monetary compensation at full replacement rate for affected 3. Felled trees will be kept by the AHs. D. Impact on Income and Livelihood Employmen Loss of Agricultural 1. Monetary indemnity corresponding to their salary t from employment workers losing (in monetary value and in-kind3 benefit) for the affected from their contract remaining part of the agricultural year/or agricultural affected contractual period whichever is higher in land agricultural monetary value. land E. Vulnerable Households Vulnerable Low-income 1. Financial aid allowance is equivalent to 5 times of Affected households, minimal wage given a lump sum at once. Households female-headed According to the Presidential Decree # 4086 households with financial aid allowance for families in need fewer than 2 starting from August 1, 2019, is set 446,000 – adult income- 1,115,000 UZS per AHs. earners, HHs 2. Priority for employment in project-related jobs, with disabled training opportunities, self-employment, and wage family members) employment assistance. F. Impact on Community Structures and Assets Community Loss or Community- 1. Rehabilitation/replacement of affected Structures damage to owned Assets structures/utilities (i.e. footbridges, roads, and Assets public communication lines, water pipelines, power infrastructur transmission lines, etc.) to pre-Project level. e and utility G. Any unanticipated Impacts Any unanticipated impacts identified during the Project implementation will be compensated in full at replacement rate, subject to independent valuation methodology.

3 Products which workers used to receive as payment and/or additional benefit for on-farm work such as wheat, rice, hay etc.

xxi

I.8 Income restoration and rehabilitation

42. As part of the income restoration and rehabilitation measures, these AH will be provided compensation at replacement cost for their impacted structures, trees and land for land compensation of equal value and size will be provided.

43. There are 7 AHs whose structures will be demolished. Out of 7 AHs, 6 residential HHs are in Khazorasp district and census showed that they have managed to build only the foundations of the buildings Therefore, there will be no physical displacement of the family members. They are still living in the Pitnak town which is located 13 km away from the affected lands. Out of 7 AHs, 1 AH (Masharipova Saodat) whose land is in Bogot district, uses the affected building for the temporary period in summer times. As part of the income restoration measures, salvaged materials after the demolition of structures will be allowed to be kept by AHs.Relocation assistance in the amount of 500,000 UZS will be provided to Masharipova Saodat for the transportation of salvaged materials Saodat Masharipova’s current residential address is in Bogot town, which is around 15 km away from the affected structures. Therefore, no family members are living permanently in the affected building. Remaining part of the building (60% is being not affected) is suitable for living. Also, until the new residential structure is built, the affected structures will not be demolished since it is within the safety zone of TL not within the RoW for construction. Therefore, transition allowance is not foreseen for the AH.

44. Land-based income restoration. Masharipova Saodat in Bogot district will be provided as part of the income restoration measures, a new land of equal size in a neighboring territory which enables to enlarge her territory. Bogot district Hokimityat will provide a new land. All the transaction costs in relation to registration and obtaining new cadastral documents will be paid by the Khokimiyat or by the UNPN.

I.9 Resettlement budget and financing plan

45. The LARP budget, based on compensation calculations for losses to agricultural land, crops, agricultural land replacement, building and structures, and support allowances are estimated to be US$ 78,923. The direct compensation cost will comprise 98% while indirect cost 2% of the total compensation costs. Internal monitoring and evaluation, as well as LARP implementation, will be covered under an ongoing contract package between UNPN and PIC.

46. The detailed budget items are summarized in Table 1.13 below.

Table 1.13: Summary of Estimated Budget Cost Estimate, Cost Estimate, № Description UZS UZS (A) Direct Cost 1 Temporary impacts (Crops) 516,608,858 54,414 2 Trees 38,180,223 4,022 3 Building and Structures 173,880,000 18,315 Subtotal (A) 728,669,081 76,750 (B) Indirect cost 1 Reimbursement of Valuation fee 4,917,000 518 Support allowances for vulnerable 2 groups and severely affected 15,710,000 1655 households Subtotal (B) 20,627,000 2173 Grand Total 749,296,081 78,923

xxii

I.10 Institutional arrangements

47. The State Joint-Stock Company Uzbekistan National Power Networks (UNPN) acting as the successor of the State Joint-Stock Company Uzelektroset is the executing agency of the NWRTLP. Khorezm's main power network (KMPN) is one of five power networks of Uzelektroset responsible for power transmission and maintenance of transmission lines and substations in the North – West region of Uzbekistan. KMPN will be the entry point for receiving a complaint or known as a Focal Grievance Point (FGP). Moreover, KMPN will ensure local monitoring of LARP implementation and assisting PMU in all LARP related implementation activities.

48. The PMU within UNPN will be responsible for the day-to-day management of LARP implementation. The PMU team together with Fichtner GmbH & C.KG as Project Implementation Consultant (PIC) for planning, implementation, and monitoring of LARP. The PMU will work closely with relevant government agencies and community-based organizations. I.11 LARP Implementation

49. The implementation of this updated LARP for section 5 of NWRTLP will be scheduled after review and approval of the final LARP by ADB. All activities related to the land acquisition and resettlement will be planned to ensure that compensation is paid before taking possession of land and commencement of civil works. Public consultation, monitoring, and grievance redress will be undertaken intermittently throughout the project duration. Construction will be initiated when compensation is fully paid. The completion of LARP implementation will be documented through the LARP implementation compliance report (s) and approved by ADB.

I.12 Monitoring and reporting

50. The implementation of LARP will be internally monitored by UNPN. For that purpose, UNPN has hired Fichtner GmbH & C.KG as Project Implementation Consultant (PIC) for monitoring and reporting of LARP implementation. Resettlement Expert of PIC will work closely with PMU’s Safeguards Specialist and the engineering team. The Resettlement Expert will carry out internal monitoring process in close coordination with local Hokimiyat and community-based organizations. Internal monitoring will be carried out in parallel to project implementation and at different stages respectively.

51. The Resettlement Expert will prepare the LARP compliance report to record whether the LARP has been implemented and all AHs have been compensated prior to the commencement of civil work. The Resettlement Expert will compile a full report with including extended detailed information on actual land acquisition and impact, listing affected households and payment. Based on that full implementation report a Compliance Report will be submitted to EA and ADB. The Monitoring/Compliance report will be used by ADB and UNPN as a basis to issue a notice to proceed with civil work activities to the contractor. Internal monitoring will be carried out continually after completing LARP implementation and prepared semi-annual reports that will be submitted to the EA and ADB. The PMU will disclose relevant information from such reports to affected persons promptly upon submission to ADB

xxiii

2. PROJECT DESCRIPTION 2.1 General 52. The Government of the Republic of Uzbekistan (the Government) has applied for financing from the Asian Development Bank (ADB) in the form of a loan toward the cost of the North-West Region Power Transmission Project (NWRTLP). The Project will strengthen energy security through improved power system reliability and efficiency by constructing a new transmission line without passing through any country. The new line will transmit power from Takhiatash Thermal Power Plant (TPP) and increase the reliability of power supply for the Khorezm province and Karakalpakstan in the northwestern part of Uzbekistan where major investments will be developed, benefiting at least 3 million population.

53. The State Joint-Stock Company Uzbekistan National Power Networks (UNPN) acting as the successor of the Unitary Enterprise “Uzelektrotarmoq” that was under the Joint-Stock Company Uzbekenergo (UE) is the executing agency of the NWRTLP. UNPN has been institutionally reformed by Presidential Decree #4249 on 27 March 2019, and currently affiliated to the Ministry of Energy.

54. The draft Land Acquisition and Resettlement Plan (LARP) was prepared by UNPN based on the preliminary design in March 2015. According to draft LARP the NWRTLP was classified as Category B for involuntary resettlement and updated LARP for section 5 prepared in 2019 also classified as Category B for involuntary resettlement.

55. This updated LARP for section 5 covers the assessment of impacts associated with permanent land acquisition for construction of TL towers and temporary land acquisition for stringing the conductor cables of TL. Aside from an assessment of impacts, this LARP provides an assessment of compensation to the affected persons and affected households, implementation arrangement, grievance mechanism, and monitoring and reporting in compliance with policies, laws, and regulations of Uzbekistan, and the policies of the ADB as described in the Safeguard Policy Statement (2009).

56. Project-related construction activities will be done and financially covered by UNPN. Procurement of the equipment and goods will be performed under the ADB loan. The total cost of the project is 258,5mln. USD. Feasibility study approved by Decree of the President of Uzbekistan No. 2541 on 06 June 2016. 2.2 Project components 57. The Project will strengthen energy security through improved power system reliability and efficiency by constructing a new transmission line through Uzbekistan only.

58. The Project consists of the following main components: i. Construction of 363.8 km of 220 kV single-circuit overhead transmission line: between Takhiatash TPP and 220 kV Khorezm substation (197.7 km) and between Khorezm substation and Sarymay substation near V1 node (166.1 km); ii. Expansion/Rehabilitation/Construction of 2 Substations. Including (a) rehabilitation and expansion of 220/110 kV Khorezm Substation; and (b) construction of an open switchyard 220 kV of a new 500/220 kV Sarymay Switchyard near a V-1 node (Sarimay settlement); and iii. Support for Institutional Development, Capacity Building, and Project Management: including (a) consultancy service for project supervision and management, (b) upgrading transmission system planning and dispatch automation, (c) implementation of asset management system, (d) external auditing for project accounting, and (e) strengthening UNPN operational and maintenance capacity for transmission assets.

1

59. In this report component Construction of 363.8 km of 220 kV single-circuit overhead transmission line: between Takhiatash TPP and 220 kV Khorezm substation (197.7 km) and between Khorezm substation and Sarymay substation near V1 node (166.1 km) is included.

60. In 2018 UNPN (formerly as Uzelektroset) asked ADB to split the above-mentioned components (i) and (ii) into seven sections to accelerate the construction works. Later in this year, No-Objection Letter to Land Acquisition and Resettlement Plan Revision was given by ADB’s Energy division of Central and West Asia Department to UNPN. As a result, the project was split into eight sections such as shown in Table 2.1 below.

Table 2.1: The division of the NWRTLP Section LAR and Actions Involuntary needed resettlement Section 1 The power line section between Takhiatash TPP and 1st river-crossing of the YES Resettlement Plan transmission line with the Amudarya River submitted (Republic of Karakalpakstan)

Section 2 (Part 2A): The power line section NO Social Due between 1st river-crossing of the transmission Diligence Report line with the Amudarya River and Tension Tower submitted 25 (Republic of Karakalpakstan)

Section 2 (Part 2B): The power line section YES Resettlement Plan between Tension Tower 25 and 2nd river- submitted crossing of the transmission line with the Amudarya River (Republic of Karakalpakstan)

Section 3: The power line section between 2nd YES Resettlement Plan (Khorezm region) river-crossing of the is being prepared transmission line with the Amudarya River and “Khorezm” Substation (Khorezm region) Social Due Section 4: “Khorezm” Substation (Khorezm NO Diligence Report region) submitted Current Section 5: The power line section between YES Resettlement Plan “Khorezm” Substation and 3rd river-crossing of is being prepared the transmission line with the Amudarya River for this section (Khorezm region)

Section 6: The power line section between the YES Resettlement Plan 3rd river-crossing of the transmission line with submitted Amudarya River and Sarimay Switchyard (Khorezm region and Karakalpakstan) Social Due Section 7: Sarimay Switchyard (Khorezm region) NO Diligence Report submitted

61. This updated LARP is for the subproject “Section 5 - The power line section between “Khorezm” Substation and 3rd river-crossing of the transmission line with the Amudarya River (Khorezm region)”, hereinafter referred to as in this document as Section 5.

2

2.2.1 Location of NWRTLP 62. NWRTLP is located in the south-western provinces of Karakalpakstan and Khorezm region of the Republic of Uzbekistan, near the border of Turkmenistan (see figure 1). The new line will transmit power from Takhiatash Thermal Power Plant (TPP) to Khorezm Region.

63. The first part of the TL route passes across the territories of Hojeyli, Nukus, Karauzyak, Amudarya and Beruniy districts of the Republic of Karakalpakstan, and Urgench, and Yangibazar districts of the Khorezm region of the Republic of Uzbekistan. The second part of the projected TL route is laid across territories of Urgench, Hanka, Yangiarik, Bagat and Hazarasp districts of the Khorezm region and the Turtkul district of the Republic of Karakalpakstan.

Figure 2.1: Map of ADB financed NWRTLP location

2.2.2 Location of Section 5 64. Construction of transmission line (TL) within Section 5 of NWRTLP will be carried out in Urgench, Honka, Yangiarik, Bogot, and Hazorasp districts of the Khorezm region. The total length of the transmission line in section 5 is 83,467 meters. In total 36 tension and 228 suspension towers will be built in this section of NWRTLP.

65. As described in figure 2.2, the power line section 5 starts from the Tension Tower 1 right after the Khorezm substation (section 4) and ends with Tension Tower 37 near to the 3rd river- crossing of the Amudarya River. The geographical coordinates (WGS-84) of the towers was based on the information given by the Design Institute – SAESP (Annex 1).

3

Figure 2.2: Location of Section 5

66. This updated LARP was prepared by Resettlement Expert within July - November 2019 period. It provides a final impact assessment of section 5 of NWRTLP and the plan needed for compensation/rehabilitation measures. DMS/IOL for section 5 was based on the final design prepared by the Design Institute – Sredazenergosetproject within the 2016-2018 period. The reports of DMS/IOL were prepared by the regional branches of Uzdavyerloyiha (State land design institute) of Khorezm branch in June - July 2019.

67. In this updated LARP, there are in total 238 AHs inlcuding, 68 private farms, 158 dehkan farms with household plots, 5 Business entities, and 7 residential households. Additionally, State-governed lands have been impacted as well.

68. Cadastral information containing technical, economic and legal characteristics of the land plot, residential structures, and information about the owners were also studied from cadastral documents and land allocation acts. LARP and Project implementation conditions 69. This LARP fits relevant Uzbekistan legislation and the ADB’s Safeguard Policy Statement of 2009 (SPS 2009) on Involuntary Resettlement. Based on the Resolutions of the Cabinet of Ministers (№ 146, №317) agricultural land acquisition has to be carried out only after the value of compensation has agreed and paid by the legal entity whom land is allocated to land user (i.e. farmers) and, demolition of residential houses can be demolished only after payment of full compensation to AHs (Resolutions of the Cabinet of Ministers - 63, 97, 3857, Presidential Decrees – 5495, 5491). The recent GOU law and regulation on land acquisition require also that civil works can be commenced only after meaningful consultation with affected households and payment of full replacement cost for land acquisition. The detail description of the regulations is given in Chapter 7 of this LARP.

70. The ADB Safeguard Policy also requires that project implementation will be subject to LARP related conditions. The most important conditions are: (i) land acquisition, including demolition of any structure and housing, is allowed only after all compensations are fully paid, and (ii) commencement of civil works is conditional to the satisfactory implementation of the final LARP to be checked and verified by the Resettlement Expert and reported in the LARP compliance report.

4

71. This updated LARP is subject for approval by ADB and the implementation requires to follow these milestones:  All the field works related to reconstruction and construction of substations and TL construction and other support field works can only be commenced after the updated LARP is approved by ADB, and compensation based on the updated LARP is fully paid.  UNPN will submit to ADB a report on completing the implementation of LARP especially on payment of compensations to AHs.  A LARP Compliance Report needs to be prepared by Resettlement Expert and be issued from the UNPN to ADB to confirm that compensation money and other allowances have been fully paid to AHs. This report will be used by ADB as one of the conditions in the disbursement of loan money.

72. Project Implementation Consultant (PIC) Fichtner Co & KG GmbH was hired to carry out the updating, implementation, and monitoring of LARP. The Project Management Unit (PMU) will assist PIC with the implementation of LARP and record it in the report. For that purpose, PMU assigned the responsible Safeguards Specialist Mr. Azizbek Botirov. PIC and the Safeguards Specialist of PMU will check the implementation of LARP and produce the LARP compliance report prior to the commencement of civil works.

73. A leaflet in the Uzbek/Russian language containing a brief description, eligibility criteria, the entitlement matrix, and implementation schedule will be distributed to AHs and any other affected parties by the PIC and representatives of UNPN through disclosure meetings. The updated LARP will be disclosed on websites of UNPN and ADB. 2.3 Approach and methodology 74. This updated LARP is based on a detailed study of the impacts of land acquisition. In order to accurately assess the impacts of land acquisition, the following activities have been undertaken:  Detailed Measurement Survey (DMS) and Inventory of Losses (IOL) is aimed to measure the size and type of land, as well as identify households and study of business and farming practice and assets that will be affected by the land acquisition;  Assessing official documents from Cadastral office, Tax office, Farmers’ Protocols  AH/AP census aimed to gather the socioeconomic conditions of affected households and affected people;  Consultation with governmental agencies and affected parties;  Final estimation of compensation rates aimed to provide a full replacement cost based on the entitlement matrix given in this LARP.

75. The DMS and IOL were undertaken by the regional branches of Uzdavyerloyiha (State land design institute) in the Khorezm branch with professionally qualified land surveyors who measured the affected area of land acquisition in the form of land parcels. The DMS, as well as IOL results, were based on the final design prepared by the Design Institute – Sredazenergosetproject (SAESP) within 2016-2018 years. The results of DMS and IOL was verified and completed by the Resettlement Expert by visiting the project location and in consultation with stakeholders. Moreover, Resettlement Expert has implemented a census of affected households and due diligence work to identify and consider non-titled land users and their assets without differentiating the legal status of ownership for adequate compensation.

76. After identifying assets affected by land acquisition, the census survey on the socio- economic situation of the land users was undertaken to cover both informal and legal ownership of the asset. Aside from interviews, the questionnaire was designed by taking into account a culturally sensitive to record accurate response, was used as a census tool. 77. The questionnaire covers the following aspects: (i) household composition and socio- economic characteristics (age, ethnicity, education, gender, etc.); (ii) occupation and break- down of household expenditures; (iii) land owned/occupied and agricultural activities; (iv) debts and assets; and (v) preferences for compensation and livelihood restoration assistance.

5

3. SCOPE OF LAND ACQUISITION AND RESETTLEMENT

78. This chapter discusses the project impacts, the scope of land acquisition and summarizes the key effects in terms of assets acquired and affected households. The impacts on land acquisition and involuntary resettlement for the project is categorized into temporary and permanent impact in terms of land acquisition.

79. Temporary impacts: Temporary land acquisition with the ROW includes loss of land required temporarily during the construction of transmission line with 220kV voltage Takhiatash- Sarimay which will cause loss of trees and one-year crops due to the construction.

80. Permanent impacts: Permanent land acquisition includes impacts on agricultural land for the installation of tension and suspension towers which will cause of loss of residential and agricultural lands

3.1. Approaches to the identification of project impacts

3.1.1 Census and inventory of losses

81. The impact assessment survey for this final LARP for section 5 was carried out based on the final design which was confirmed by PIU and UNPN for the construction of a 220 kV transmission line. The following activities have been undertaken at this stage:

Identification of affected lands: The final schemas have been superimposed on Google maps, final design in order to identify the number of land parcels and their demarcation including the quantification within the defined location. The list of affected assets/parcels was developed based on Google map data and the data on ownership status, type of lands (agricultural), names of affected households were collected through consultations with the khokimiyats (local government) and local cadastral offices and documents from PIU provided.

Inventory of Losses: The data about the affected trees and crops were collected through SES/Census survey from AHs and land allocation documents from local cadaster.

Census and Socio-Economic Survey (SES): To identify the exact number of AHs and their members, including some elementary social characteristics such as gender and ethnicity, as well as the current socio-economic condition of affected people and household’s census and SES surveys were carried out covering all 238 AHs.

82. The census in Section 5 of Khorezm region was conducted from 10 July to 02 August 2019 by the Resettlement consultant team of PIC (Annex 2) while IOL and DMS were prepared June - July 2019 by Land Use Planning Institute - Uzdayerloyiha branch of Khorezm region. Both census and DMS/IOL is based on the final design that was developed by Design Institute – SAESP.

3.1.2 Categorization of impacts

83. According to the census and DMS, there are 238 AHs which comprises 68 private farms, 158 household plots, 5 Business entities who will be impacted for a permanent and temporary period and additionally 7 residential lands will be impacted for the permanent period only. Out of the 7 residential AHs, 1 AH will have an impact on her residential structure while the remaining 6 AHs will have an impact on their foundation only. These 6 AHs have not built yet the residential structures. In total 1369 APs will be impacted due to the construction of TL in section 5 of NWRTLP.

6

84. Seven (7) AHs out of the 238 AHs are severely affected. The remaining 231 AHs will have a very minor impact on their lands of less than 6 percent. A total of 57 APs will expereince significant impact on their residential structures

3.2 Impact to AHs

85. There are in total 238 AHs which comprise 68 private farms, 158 household plots, and 5 business entities will be impacted for a permanent and temporary period while 7 residential households will have a permanent impact on their lands and structures. All AHs are located Urgench, Honka, Yangiarik, Bogot, and Hazorasp districts of Khorezm region. The AHs have total of affected 136 land (Annex 3). Details of each AHs and landusers are given in Annex 4.

86. The list of AHs was based on the reference Letter from Land Use Planning Institute of Khorezm branch of Uzdavyerloyiha for section 5 and census by Resettlement Specialists of PIC.

87. The RoW of 83,467 meters TL will require 124 ha temporarily. This includes 71.88 ha from AHsand 52.2 ha of state lands. Around 58% of the temporarily affected land is used for agriculture, while 42% are non-agricultural land. The summary of temporary impacts is given in Table 3.1 below.

Table 3.1: Summary of total temporary land Impacts

The Temporary Impact (ha) Number length of AHs State-governed AHs who Type of Land the TL by (Private Lands (reserve, will be Use type of Total farms and forest, other temporarily land use residen.HH) lands) impacted Agricultural 58% 115.06 71.88 43.18 231 land Other lands (ditches, canals, roads, 42% 8.94 - 8.94 - and other lands) TOTAL 100% 124.00 71.88 52.12 231

88. For the erection of 264 towers in total 2.33 ha will be required permanently. Out of 2.33 ha of land, 71% of land comprises private farms and residential households while the remaining 29% comprises of the State-owned lands including, reserve lands, forest, and other land types. Table 3.2 summarizes total permanent land acquisition and land allocation for section 5. Estimated impacts by districts and land use types are given in the following subsections.

Table 3.2: Summary of total permanent land Impacts Permanent Impact (ha) Number Type of Total Total AHs (Private State AHs who Land Tension Suspension farms and reserve, will be Use Towers Towers Total residen. forest, permanently HHs) other lands impacted Agricultural 36 228 2.03 1.35 0.68 land 87 Residential - - 0.30 0.30 - 7 land TOTAL 36 228 2.33 1.65 0.68 94

7

89. About 59% of the temporary alignment corridor will pass through the agricultural farms while around 41% of the temporary alignment corridor is needed out of the state-governed lands and only 0.1% will pass through residential lands. Details of AHs and land users with an indication of corridor length is presented in Table 3.3.

Table 3.3: Length of TL by land-use type

Total Land users meters % Agricultural Farms 47914 57,4 Residential Households 162 0,2 The State Forest Lands 3598 4,3 State enterprises, reserve, 31793 38,1 lands, and other lands TOTAL 83467 100

3.3 Construction of transmission line

90. According to the SAESP and resolution of Cabinet of Ministers (CoM) “On the approval of the rules of protection of power transmission facility objects dated 26.12.2018 # 1050 a safety zone of 60 meters width (30 meters from the center of the tower to each side) will be established for 220 kV TL (Figure 3).

91. The safety zone of TLs is a land plot from the surface to the bottom, on which a special procedure is established for the ownership and use of a land plot. Safety zones of TLs established in accordance with the rules are encumbrances of land plots and are subject to state registration in the prescribed manner.

Figure 3.1: Safety zone for the 220 kV TL in Uzbekistan (30 meters from the center)

92. The land area for safety zones is not subject to withdrawal from landowners, landowners and land users, including tenants. After completion of the construction works safety zone does not restrict normal farming activity such as cropping, harvesting, grazing, plowing. Only incompatible activities, milking sheds, residential dwellings, and some major earthworks - primarily around the foundations of the transmission towers would be restricted. Therefore, all the residential houses within the safety zone are subject to demolition. Other non-residential structures are not subject to restrictions. Also agricultural and other types of businesses can continue their activities within the safety zone by Resolution of CoM#1050.

93. Land allocation for a permanent and temporary period for the construction of tension and suspension towers are regulated by land allocation norms of Uzbekistan - KMK 2.10.08-97 –

8

Land allocation norms for power transmission lines 0.4 – 750 kV. Based on this document, land for a temporary period of three years will be allocated with a width of 15 meters for UNPN to string the cables and construction towers. The contractor for civil works will clean the corridor before the start of construction works; therefore all the structures, houses, crops and trees are subject to demolition.

94. Based on the final design, the project will string 83,467 meters of TL and erect 264 towers. There are 36 tension and 228 suspension towers in this section. The suspension towers will be erected within the distance of 150-250 meters while tension towers will be erected on each angle of TL where required.

3.4 Permanent land impacts

95. Permanent land acquisition will be required for the construction of tension and suspension towers. Additionally, land will be allocated out of the State’s Reserve Land. According to the final design for the construction, a land from 75 to 203 sqm is needed for different types of tension towers while 33 to 63 sqm is needed for different types of suspension towers. The details of land allocation norms are given in Table 3.4.

Table 3.4: Permanent land allocation norms for construction of Towers Permanent land № Type of towers allocation norms, sqm Tension tower 1 У220-3 75 2 У220-3+5 105 3 У220-3+9 130 4 У220-3+14 167 5 У330-3+5 126 6 У330-3+9 155 7 ПП330-1/51 2034 Suspension tower 2 2ПБ220-1ТСз (21.5) 33 3 П220-3, П220-Т 57 4 П220-3+5 63 5 ПС220-3 51

96. Section 5 permanently affects 94 AHs located in Urgench, Honka, Yangiarik, Bogot, and Hazorasp districts of Khorezm region. Of the 2.33 ha of permanently affected land, 58% belongs to AHs comprising of agricultural land (Arable/Crop/orchard cultivation), 30% is State- governed land and the remaining 12% is residential land. The complete list of the land users showing their individual impacts in terms of permanent impact is given in Table 3.17.

Table 3.5: Permanent land acquisition and land allocation

# Name of Total affected land (ha) the district Total Including affected Agricultural land State-governed Residential land (Arable/ Lands (reserve,

Name of Name of forest, other the the region Crop/ orchard) lands) 1 Urgench 0.11 0.098 0.013 -

2 Honka 0.26 0.26 - - zm

3 Khore Yangiarik 0.20 0.16 0.045 -

4 This type of tension tower will be erected along the river banks when TL crosses Amudarya River.

9

4 Bogot 0.72 0.28 0.376 0.065 5 Hazorasp 1.04 0.55 0.247 0.24 Total: 2.33 1.35 0.68 0.30 Source: Land allocation document an d Impact Assessment Survey, August 2019

97. In total, 94 AHs will be permanently impacted on their agricultural and residential lands. In total 264 tension and suspension towers will be built on the lands of 94 AHs. Table 3.6 summarizes total number of towers and number of AHs by the district level.

Table 3.6: List of List of the affected region, districts and AHs (permanent impact) # Name of the Name of the Number of Number of Region district AHs towers 1 Urgench 6 15 2 Honka 18 36 3 Khorezm Yangiarik 12 27 4 Bogot 18 91 5 Hazorasp 40 95 1 5 94 264 Source: Land allocation document an d Impact Assessment Survey, August 2019.

98. In total, 7 residential households out of 94 AHs will have permanent impact on their lands. A land for land compensation of equal value and size within the neighborhood location will be provided for these 7 AHs. All these lands are not income-generating/productive lands. In total, 87 AHs out of the total 94 AHs, will have permanent impact on their agricultural lands. Compensation for permanent land acquisition to agrucltural land holders will be provided in the form of monetary compensation instead of land for land since the impact is not significant among farmlands with the maximum impact of 5%. This option has been approved during the census survey by private and dehkan farmers as well. Complete list of the permanent to agricultural lands impacts in terms of percentage is given in Table 3.17

99. During the preliminary site visit in total 60 households were assessed as the affected residential households which are located in Bogot (1 HH) and Hazorasp (59 HH) districts. The previous Hokimiyat of the Hazorasp was aware that land plot was allocated specially to the construction of 220 kV TL, but later in 2017 a new Hokimiyat of the Hazorasp district developed a Master Plan and allocated land to local people to build houses (Figure 3.2)

Figure 3.2: Location of Residential Lands with structures

10

100. After consultation with the architectural department and Hokimiyat of the Hazorasp district, we have found that for 53 HHs out of 60 but legal title to the land plots have not been entitled yet and the allocation process was not yet started. Therefore, for those 53 households, a new master plan has been developed at another location within the 270 meters distance. Also, for those 53 HHs land allocation documentation has been issued. An information letter has been also provided by local administration regarding the issuance of land allocation documentation for those 53 HHs (Annex 5). Therefore, these 53 HHs have not started any building activity on those lands. Based on these facts, 53 HHs have not been included during the census survey but an assistance in the issuance of land allocation documentation has been provided Khazorasp Hokimiyat. Figure 3.3 gives information regarding the location of impacted and the allocated new land plot.

Figure3.3: The location of the allocated land plot Greenline: Previous route of TL. Redline: redesigned tension tower 29

101. As stated above, out of a total of 60 HHs in total 7 HHs had a legal title to their lands. AHs already built a foundation of the building on the land plot. Therefore, these households were considered as AHs and included in the census survey. Out of the total 7 AHs, 1 AH is in the Bogot district between suspension tower 106 and 107, and the remaining 6 AHs are in Hazorasp district near to tension tower 29 (Table 3.7).

Table 3.7: Details of affected residential lands Name of Detail Address Name of Total Affected Impact, district of affected land AH land, sqm land, sqm % Bogot Hujalik village, Masharipova 1200 650 55% Kalajikkala Saodat Makhalla Hazorasp Allaberganova 400 400 100% Salomat Hazorasp Ruziboyeva 400 400 100% Yangibozor Mohira Hazorasp village, Alokalikul Matyakubova 400 400 100% Makhalla Qurbongul Hazorasp Ibodullayeva 400 400 100%

11

Gulnoza Hazorasp Ibragimov Dilshod 400 400 100% Hazorasp Olimova Iroda 400 400 100% Total 3600 3050 Source: Land allocation document and Impact Assessment Survey, August 2019.

3.5 Temporary land impacts

102. Temporary impacts envisaged during the construction are due to the requirement for temporary access of vehicles that will deliver the pre-fabricated steel, equipment, cables, and utilities, construction materials in the work areas as well as stringing the cables with special machinery. The actual area required for the construction of tension and suspension towers is based on specifications prepared in the final detailed design that is given in Table 3.8. The TL requires a temporary alignment corridor of 15 meters in width for stringing the conductor cables. Therefore, temporary land allocation within the RoW of 15 meters will be also applicable to tower erection.

Table 3.8: Temporary land allocation norms for construction of towers

Temporary land allocation № Type of towers norms, sqm Tension 2 У220-3+5 700 towers 3 У220-3+9 700 4 У220-3+14 700 5 У330-3+5 630 6 У330-3+9 700 7 ПП330-1/51 500 2 2ПБ220-1ТСз(21.5) 800 Suspension 3 П220-3, П220-Т 560 towers 4 П220-3+5 560 5 ПС220-3 560

103. In total, 231 AHs will be temporarily impacted due to the construction of towers and stringing of TL cables on their lands. Construction works will impact standing crops, orchards, and trees. Detail information on the impacts on crops and trees are given in further sections. The land will be temporarily acquired for the project for a period of 1 year. All AHs are in Khorezm region.

104. In total, 124.00 ha of land will be temporarily acquired for the project during the construction period. Out of the total (i.e., 71.88 ha), 58% of the land will be allocated out of the lands of AHs while 42% ha of land will be allocated out the State-governed Lands (e.g., ditches, canals, roads, reserve lands, forest lands). The details on the temporary land acquisition impact on each AH is given in Annex 7, while the summary of the temporary land impact is given in Table 3.9.

12

Table 3.9: Temporary land acquisition by districts # Total affected land (ha) Including Number Name of Total Agricultural Ditches, State- AHs who the district affected land canals, governed will be land (Arable/Cro roads and Lands temporarily p/orchards other impacted cultivation) lands 1 Urgench 6.73 5.21 1.3 0.22 23 2 Honka 15.67 12.09 2.7 0.88 39 3 Yangiarik 13.20 9.63 1.38 2.19 51 4 Bogot 46.24 17.11 2.17 26.96 67 5 Hazorasp 42.15 27.84 1.39 12.93 51 Total 124.0 71.88 8.94 43.18 231 Source: Land allocation document and Impact Assessment Survey, August 2019.

3.6 Loss of crops

105. Due to the construction of TL and towers, there will be a loss of standing crops belonging to 190 AHs. These AHs include private farms, dehkan farms, household plots and business entities that have agricultural lands. The detail information per AHs on impact to crops is given in Annex 16 while the summary of the impact on crops on a district level is given in Table 3.10 below.

Table 3.10: Summary of the affected crops of AHs Districts Number of Number of Type of crops AHs affected crops Urgench 19 3 Cotton, Rice, Corn Honka 35 4 Cotton, Rice, Corn, Alfalfa Yangiarik 48 4 Cotton, Rice, Corn, Vegetable Bogot 59 4 Cotton, Rice, Corn, Vegetable Khozarasp 29 4 Cotton, Rice, Corn, Vegetable TOTAL 190 4 Source: Land allocation document and Impact Assessment Survey, August 2019.

106. In Section 5, the dominant crops of the affected households are mainly cotton and rice while the share of impacted other types of crops such as corn, alfalfa, and vegetables is low. Around 44% of the total impacted crop is cotton and the next major impacted crop is rice which is also 44 %. The least impacted crops are alfalfa (1%) and vegetables (4%).

107. According to the UNPN, the construction works will be taken place only one year until the next cropping season and next year in 202, farms can continue to plant the crops again. The compensation for the income loss from the cropping is given in the resettlement budget chapter.

108. The details on impacted crops and yields for this year5 per AHs are given in Annex 16 while the summary of the affected crops is given in Table 3.11 below.

Table 3.11: Summary of the affected crops of AHs Private Dehkan Business Total affected Type of crop Farm Farm entity cropped land Affected land, ha 18.18 18.18 Cotton Share % 50% 44%

5 According to the census data and land acquisition act given by Uzdavyerloyiha Institute, 2019

13

Private Dehkan Business Total affected Type of crop Farm Farm entity cropped land Affected land, ha 14.20 3.79 0.12 18.11 Rice Share % 39% 84% 100% 44% Affected land, ha 1.90 0.55 2.45 Corn Share % 5% 12% 6% Affected land, ha 0.50 0.02 0.52 Alfalfa Share % 1% 0% 1% Affected land, ha 1.68 0.14 1.82 Vegetable Share % 5% 3% 4% Total affected 36.46 4.51 0.12 41.09 Total cropped land, ha Share % 100 100 100 Source: Land allocation document and Impact Assessment Survey, August 2019.

109. During the census and inventory of losses carried out in July-August 2019, there were crops planted on the affected agricultural land. Nowadays, in December month all the crops could have been already harvested and there can be no crops at all on some of the affected lands. Therefore, during the implementation of this LARP and payment of compensation AHs, there can be a case that no compensation will be needed for standing crops since there will be no crops on fields. So, the payment for affected crops listed in this Report will be subject to revising based on the availability of crops on fields

3.7 Loss of structures

110. In section 5 the resettlement team did not identify any non-residential structures that fall within the RoW. However, there are 7 residential lands with unfinished structures that have been included in this LARP. Out of the 7 in total 6 structures are located in Alokali Kul makhalla in Hazorasp district while 1 structure is located in Bogot district. These structures are not inhabited structures. Table 1.12 below shows the addresses of the AHs.

Table 3.12: Residential addresses of AHs Current Address of District № Name of aAHs residential affected Notes address structure

The affected structure is Bogot district, Bogot district, not used for permanent Masharipova Pakhtakor Hujalik village, Bogot 1 living. AH is living Saodat Street, Kaljikqala permanently at their house#10 makhalla current residential house.

Allaberganova 2 Salomat Ruziboyeva 3 Mohira Khazorasp Affected structures Khazorasp Matyakubova district, consist of foundations 4 district, Pitnak Qurbongul Yangibozor only. The building is not Khazorasp town, Ibodullayeva village, fully constructed yet. 5 A.Ibragimov Gulnoza Aloqalikul Therefore, no APs are mahalla Ibragimov makhalla living yet. 6 Dilshod Olimova 7 Iroda

14

111. According to the Final Design developed by SAESP and census, in section 5, a tension tower 29 was located within the residential land thus affecting in total 6 residential houses. In order to mitigate a large number of physical displacement, an effort has been made to minimize the impact. As a result, the location of tension tower 29 was amended to a new location. Table 3.13 describes the old and the new locations of the tension tower.

Table 3.13: Geographic coordinates (WGS-84) of the Tension tower 29 Old Location New location Tower Latitude Longitude Latitude Longitude Tension Tower 29

(Alokali Kul MFY, Hazorasp district) 41°14'7.52"N 61°11'58.64"E 41°14'05.926"N 61°12'00.85"E

112. According to the reference letter (N: 10/1232) given by Design Institute dated 26 September 2019 a location of Tension tower 29 has been amended. During the implementation and monitoring of this LARP, the Resettlement consultant shall ensure that the new location of the tension tower has been followed by the construction contractors during the construction period to avoid demolition of recently built residential structures.

Figure 3.2: Location of 6 affected structures in Hazorasp district

113. Affected 6 residential HHs in Hazorasp district will permanently lose their residential land and structures based on the final design, DMS/IOL as well as by census. The structures consist of foundations made of concrete and stones. In total 985 sqm of structures will be permanently impacted. Compensation at the replacement rate will be provided for each AH.

Table 3.14: Details of affected structures of 6 AHs in Hazorasp district Type of Total Affected Impact, Name of AHs affected structure structure % District № structure area, sqm area, sqm Allaberganova foundation 168 168 100 1 Salomat 2 Röziboyeva Mohira foundation 148.5 148.5 100 Hazorasp Matyakubova foundation 3 Qurbongul 126.5 126.5 100 4 Ibodullayeva Gulnoza foundation 175 175 100

15

5 Ibragimov Dilshod foundation 143 143 100 6 Olimova Iroda foundation 224 224 100 TOTAL 985 985 100% Source: Land allocation document and Impact Assessment Survey, August 2019.

114. All the residential structure (foundation) has been built in 2018-219 and the cut off date has been established as of August 2, 2019, and it is not yet finished. Therefore, no household members are found to be living in this residential house. In total 985 sqm of structures will be permanently impacted in Hazorasp district and compensation at replacement rate will be provided for each AHs. (See Figure 3.3).

115. Also, there is one more affected residential household (Masharipova Saodat) who lives in Bogot district and will permanently lose her 50% residential land and around 41% of her structures based on the final design, DMS/IOL as well as by census. The building was built in 2017-2018. The building is used only in summer times during the croppings seasons. Therefore, Masharipova Saodat’s primary residential house is in another location in Bogot district.

Figure 3.4: Location of 1 affected structure in Bogot district

116. The affected structure of Masharipova Saodat consists of nonresidential and residential rooms. In total she has 158 sqm of residential structures and around 41% out of the total structure will be demolished due to the structure is under the safety zone of the TL. Compensation at the replacement rate will be provided for the affected structure.

Table 3.15: Details of affected structures of 1 AHs in Bogot district

Total Quantity Total area Name of Description of affected Impact, of structures, AHs room structure, % rooms sqm sqm

Living room-1 1 18.36 18.36 100%

Masharipova Living room-2 1 18.36 18.36 100% Saodat Auxiliary room - 1 1 56.10 28.5 50% Additional room - 2 1 65.26 - 0% Subtotal 4 158.08 65.22 41%

16

117. In order to get photo information of affected residential structures in Hazorasp district see Annex 8 and for the affected structure in Bogot district, refer to Annex 9.

118. According to the census, the affected structures in Hazorasp district consist of the only foundation. AHs have other residential houses in different locations. Therefore, no physical displacement of family members will be observed. During the implementation and monitoring of this LARP, the resettlement consultant shall ensure that no other residential structures were affected except those which are presented in this report.

3.8 Loss of trees

119. There are 8 types of affected trees including, fruit trees such as apple, apricot, cherry, plum, grape, peach, pear and wood tree such as poplar. Almost 99% of the affected trees consist of fruit trees. In order to get photo information of affected trees in Hazorasp district, please refer to Annex 10. 120. The most impacted trees are grapes (37%) and apple (24%). All the 918 affected trees are under the possession of private farms. There are no affected trees that are under the possession of residential households or household plots. The plum and peach trees are less affected trees with an impact share of 1% in total.

Table 3.16: Type of affected trees Type of Total Number of Share out of the total # affected trees affected trees affected trees, % 1 Apple 219 23.9 2 Apricot 23 2.5 3 Cherry 287 31.3 4 Plum 4 0.4 5 Grape 339 36.9 6 Peach 5 0.5 7 Pear 32 3.5 8 Poplar 9 1.0

Total affected trees 918 100% Source: Land allocation document and Impact Assessment Survey, August 2019.

121. In total, 4 AHs which are categorized as private farms will have an impact on their trees based on the DMS/IOL, valuation reports. All the affected farms are located in the Hazorasp district. During the census, it was impossible to evaluate the compensation for affected trees by the average net profit since no tax declaration has been submitted by the farmers. The Independent Valuation Company (IVC) has been consulted to use entitlements set in this LARP for affected fruit and timber trees during the valuation of affected trees. As a result of estimation IVC provided valuation report for the affected trees which was used in this LARP. All the affected trees have been calculated and evaluated based on the market values by an independent valuation company. The summary of the valuation report is attached to this updated LARP. The number of affected trees of each farm have been given in Table 3.17.

Table 3.17: Types and numbers of affected trees per AHs

# The name of Land Types of Number of Users affected trees affected trees Hazorasp district

17

# The name of Land Types of Number of Users affected trees affected trees 1 Norjon Miskin farm Apple 23 Apricot 8 Cherry 120

Plum 4

Apple 36

2 Grape 126 Raxmatullaev

Otajon farm Peach 5 Poplar 6 Pear 5 Apricot 4 Karimboy Halima Cherry 4 3 farm Apple 124 Grape 114 Apricot 11 Cherry 163 Rahmatillo Dilbar Apple 36 4 farm Grape 99 Poplar 3 Pear 27 Total for Hazorasp district: 918 Subtotal: 918 Source: Land allocation document and Impact Assessment Survey, August 2019

3.9 The severely affected HHs

122. Severely affected households are AHs who will lose 10% or more of their total productive land and/or assets. Therefore, in the calculation of severity impact only productive lands of the AHs are considered while other land-use types are not included. As per the census, in total 7 AHs out of 94 AHs has been found as severely affected household in terms of permanent land acquisition. None of the AHs will have major impacts in terms of temporary land acquisition. Temporarily impacted lands will be returned to farmlands after the end of construction and compensation for temporary land acquisition will be provided to AHs.

123. Severely affected households are entitled one-time allowance per entitlement matrix. The identified severely AHs are residential households whose residential lands will be acquired who are located in Bogot district (1 AH) and Hazorasp district (6 AHs) who will have a 10% or more permanent impact on their residential land. Table 3.18 below details the severity of impacts. Table 3.18: Severity of impact in terms of permanent land acquisition

Total Permanent land № Land user landholdings, Impact, % acquisition, ha ha

Urgench district 1 Ibrohim Farida agricult. land 2.3 0.033 0.010% 2 Doniyor Mirishkor agricult. land 313.0 0.039 0.034% 3 Xusinboy karim bogi agricult. land 114.0 0.0065 0.049% 4 Jaloladin Madraxim agricult. land 13.3 0.0065 0.006% 5 Ortiqov Sopohon agricult. land 105.2 0.0065 5.4% 6 Samandarova Zamira agricult. land 0.12 0.0065 5.4%

18

Total Permanent land № Land user landholdings, Impact, % acquisition, ha ha Subtotal 545.7 0.098 Honka district 7 Gajrat Otabek agricult. land 109.2 0.0195 0.0% 8 Davron Otajon agricult. land 22.1 0.013 0.1% 9 Xumoyun Nizomiddin agricult. land 105.2 0.026 0.0% 10 Anvar Dilshod agricult. land 111.1 0.0585 0.1% 11 Jayxun Kalandar agricult. land 100.5 0.0325 0.0% 12 Voxidjon raxmatjon agricult. land 113.9 0.0065 0.0% 13 Ortik lola Dapmachi agricult. land 46.4 0.013 0.0% 14 Sulton Jirmiz agricult. land 98.8 0.013 0.0% Business entity 15 Bogdorchilik Sirlari MCHJ with agricult. 19.6 0.0065 land 0.0% Gulxayo Gulsaro agricult. land 16 93.65 0.0195 Zulxumor 0.0% 17 Rahimov Murod agricult. land 0.12 0.0065 5.4% 18 Yusupov Ahmadjon agricult. land 0.12 0.0065 5.4% 19 Hayitov Quvondiq agricult. land 0.12 0.0065 5.4% 20 Hudoyberganov Islom agricult. land 0.19 0.0065 3.4% 21 Rahimov Muhammad agricult. land 0.12 0.0065 5.4% 22 Jumanazarov Omon agricult. land 0.14 0.0065 4.6% 23 Bobojonov Ihtiyor agricult. land 0.12 0.0065 5.4% 24 Qalandarov Maqsud agricult. land 0.1 0.0065 6.5% Subtotal 821.48 0.26 Yangiarik district 25 Quchqorov Azamat agricult. land 100.6 0.013 0.01% 26 Xusinboy Qadamboy agricult. land 100.6 0.0065 0.01% 27 Gulobodli Mahkambek agricult. land 108.8 0.0195 0.02% 28 Gulsevar Bonu agricult. land 102.3 0.013 0.01% Business entity Kumush Tola with agricult. 5.0 0.0065 MCHJ 29 land 0.13% 30 Alibek Uktamboy agricult. land 100.8 0.013 0.01% 31 Gulobod Urin Zak agricult. land 104.2 0.0325 0.03% 32 Berdiboy Asilbek agricult. land 100.1 0.0065 0.01% 33 Diyorbek Bunyodbek agricult. land 101.1 0.0195 0.02% 34 Sardorbek agricult. land 110.7 0.0195 0.02% 35 Raximov Otajon agricult. land 0.15 0.0065 4.33% 36 Rozmetov Sharofaddin agricult. land 0.15 0.0065 4.33% Subtotal 934.5 0.162 Bogot district 37 Mirza agricult. land 108.6 0.026 0.02% 38 Sherali Matkarimov agricult. land 100.0 0.026 0.03% 39 Ulugbek agricult. land 107.3 0.039 0.04% 40 Ibrat ixtiyor aziz agricult. land 101.4 0.0065 0.01% Ruziboev Sobir agricult. land 151.4 0.039 41 Ruziboevich 0.03% 42 Boburjon Nozimjon agricult. land 164.7 0.039 0.02%

19

Total Permanent land № Land user landholdings, Impact, % acquisition, ha ha 43 Dilfuza Qozoq agricult. land 105.6 0.013 0.01% 44 Saidov Gayrat agricult. land 101.2 0.0065 0.01% 45 Asadbek Shohista agricult. land 46.5 0.013 0.03% 46 Ozod Razzoq agricult. land 5 0.0065 0.13% 47 Shukurjon Shovkatjon agricult. land 101.9 0.0195 0.02% Farangiz Farizoda agricult. land 146.0 0.013 48 Matkarim 0.01% 49 Masharipova Saodat Resident. Land 0.12 0.065 54.17% 50 Yaxshimurodov Umar agricult. land 0.12 0.0065 5.42% 51 Ro'zmetov Ibodulla agricult. land 0.5 0.0065 1.30% 52 Ollomov Ozod agricult. land 0.12 0.0065 5.42% 53 Röziboyev Oybek agricult. land 0.19 0.0065 3.42% Xudayberganova agricult. land 0.17 0.0065 54 Gulchehra 3.82% Subtotal 1240.82 0.344 Hazorasp district Jurabek Jamshidbek oltin agricult. land 1.2 0.0065 55 baligi 0.54% 56 Sobir Bobur Bunyod agricult. land 95.5 0.0195 0.02% 57 Ogabek Zohida agricult. land 116.3 0.0065 0.01% 58 Shovkat Kusa agricult. land 110.7 0.0195 0.02% 59 Kenja Yoqitjon agricult. land 7.5 0.0195 0.26% 60 Ulugbek agricult. land 103.9 0.0065 0.01% Bekmurot Sevara agricult. land 146.7 0.039 61 barchinoy 0.03% 62 Ummon oq qush nur agricult. land 51.3 0.013 0.03% 63 Tulqinbek agricult. land 102 0.0195 0.02% 64 Matkarim Xotam agricult. land 109.5 0.0455 0.04% 65 Tolibjon Golibjon agricult. land 43.7 0.0325 0.07% 66 Zulfiya Matyaqubova agricult. land 100 0.0195 0.02% 67 Orom buyi agricult. land 104.1 0.0195 0.02% 68 Quvonchbek Duschanov agricult. land 109.9 0.0065 0.01% 69 Quramboy Sapargul agricult. land 222.8 0.039 0.02% 70 Abdullox agricult. land 100.4 0.0065 0.01% 71 Oybek Asadbek Qazbek agricult. land 100.5 0.0065 0.01% 72 Allanazarov Oromboy agricult. land 20.7 0.026 0.13% 73 Mariya Muborak doston agricult. land 100.4 0.013 0.01% 74 Abdirimova Darmon agricult. land 36.3 0.013 0.04% 75 Nur Xitoy agricult. land 12.3 0.0195 0.16% 76 Norjon Miskin agricult. land 16.9 0.0065 0.04% 77 Karimboy Xalima agricult. land 11.4 0.0065 0.06% 78 Rahmatillo Otajon agricult. land 10.5 0.013 0.12% 79 Rahmatilla Dilbar agricult. land 9.2 0.013 0.14% 80 Asadbek Amudaryo agricult. land 29.2 0.0195 0.07% 81 Qirdagi Ilxom agricult. land 15.4 0.0065 0.04% 82 Aminboy Anvarbek agricult. land 13.6 0.013 0.10% 83 Asadbek Amudaryo agricult. land 29.2 0.0455 0.16%

20

Total Permanent land № Land user landholdings, Impact, % acquisition, ha ha 84 Erkayev Sadullo agricult. land 0.20 0.0065 3.25% 85 Rajabov Buvaxon agricult. land 0.13 0.0065 5.00% 86 Sultonov Yusuf agricult. land 0.12 0.0065 5.42% 87 Avezov Shonazar agricult. land 0.10 0.0065 6.50% 88 Xusainov Baxtiyor agricult. land 0.20 0.0065 3.25% 89 Allaberganova Salomat Resident. Land 0.04 0.04 100.00% 90 Ruziboyeva Mohira Resident. Land 0.04 0.04 100.00% 91 Matyakubova Qurbongul Resident. Land 0.04 0.04 100.00% 92 Ibodullayeva Gulnoza Resident. Land 0.04 0.04 100.00% 93 Ibragimov Dilshod Resident. Land 0.04 0.04 100.00% 94 Olimova Iroda Resident. Land 0.04 0.04 100.00% Subtotal 1932.09 0.7925 TOTAL 5474.59 1.6565 Source: Land allocation document and Impact Assessment Survey, August 2019.

124. The maximum impact in terms of permanent land acquisition among private farms reaches 5.4% while among household plots (dehkan farms) this number reaches up to 6.5%. All the affected 7 residential AHs are considered as severely AHs since they will have an impact of 54% and 100%. 3.10 The legal status of land ownership

125. All AHs have the legal occupation of all land that will be acquired for section 5 of NWRTLP. Residential land belonging to 6 AHs obtained their legal document for the newly allocated land in 2019 by the Hazorasp district Hokim’s decree.

3.11 Unanticipated Impacts

126. If unanticipated impacts are found during project implementation, the resettlement specialist responsible for the implementation will conduct a census to update this LARP.

3.12 Impact of construction to access roads

127. Construction of 220 kV TLs will not require an additional access road to the site. Access to land will be through an already functioning path. In order to string the cables TL and laying down towers, a temporary RoW will be used for access roads. Temporary RoW that will pass out of AHs has been included in this LARP and will be compensated per entitlement matrix.

3.13 Socioeconomic and environmental impacts

128. There will be insignificant social impacts and environmental impacts are observed such as noise, dust and air pollutant emissions from the construction equipment. Minor spills and leakages may occur from vehicles and machinery and transformers during the replacement works. The mitigation measures are described in detail in the Initial Environmental Examination.

129. Construction of TLs will generate possibilities of local employment as some laborers will be required during the project implementation. Uzbek companies will do all construction activities. The exact number of domestic workers will be decided by the Contractor who will be responsible for the project implementation. Forced and child labor is strictly prohibited in ADB financed projects. Overall, the implementation of the project has a positive impact on national and local socioeconomics.

21

3.14 Summary of Impact

130. Section 5 of the NWRTLP will have both temporary and permanent land acquisition impacts. There are in total 238 affected AHs which comprises 68 farmers, 158 Dehkan farms and 5 business entity whose agricultural lands will be impacted for a permanent and temporary period while 7 residential households who will be impacted for a permanent period. All AHs are located within 5 districts of Khorezm region. Summary details are given in Table 3.19. The summary of this chapter concludes that in terms of the number of affected households this LARP can be categorized as category “B” with less significant impacts in terms of ADB’s on Involuntary Resettlement.

Table 3.19: Summary of Impact Scope of # Type of Impact Impact Permanently acquired land area (ha) - Total 2.33 - agricultural land from AHs (ha) 1.35 1 - residential land from AHs (ha) 0.30 - other lands from State-governed Lands 0.68 Temporary acquired land area (ha) – Total: 124 2 - agricultural land from AHs (ha) 71.88 - Ditches, canals, roads and other lands from AHs 8.94 - other lands from State-governed Lands 43.18 3 Number of affected crop types 5 4 Number of severely AHs 7 Total affected Trees: 918 5 - Total affected fruit trees 909

- Total affected wood trees 9 6 Number of AHs losing residential and other structures 7 7 Number of Business entity losing agricultural land 5 8 Total number of AHs (APs) 238 (1369) 9 Number of Tension (Suspension) towers 36 (228) 10 The total length of section 5, (meters) 83,467

22

4. SOCIOECONOMIC INFORMATION AND PROFILE

131. This chapter describes the key socioeconomic features of the AHs, such as household size, age, gender (especially of the head of household), ethnicity, occupation, household income, and vulnerability education levels, modes of livelihood, sources of income, poverty/income levels, which can be used as indicators for preparing and monitoring the LARP. Socioeconomic features of AHs will increase the understanding of the potential and scale of land impacts affected households and identify options for rehabilitation.

4.1. Methodology

132. This updated LARP has been prepared based on a census of the AHs after a detailed measurement survey (DMS) of the affected properties has been completed. A DMS involves staking out of the affected land on the ground-based on the final engineering design of a project. DMS has been completed by Land Use Planning Institute - Uzdavyerloyiha of Khorezmbranch.

133. In this final LARP, the socio-economic profile is presented based on census/SES carried out on 10 July – 02 August 2019 for 238 affected households due to permanent and temporary agricultural land acquisition. The census/SES data presented in this chapter is actual with reference to the 238 AHs and 1369 APs (including 7 AHs losing residential plot and structure,68 affected farmers, 5 business entities and 158 dehkan households).

134. The field methodology included carrying out of census of all 238 AHs (AHs) through interviews, consultations and structured questionnaires. The socioeconomic profile of AHs living in Urgench, Honka, Yangiarik, Bogot and Hazorasp districts of the Khorezm region presented in this chapter is actual with reference to the 238 AHs and 1369 APs (affected farmers, residential and business households).

Table 4.1: Affected Households and Affected Persons Impact type Number of AHs Number of APs Affected residential structures 7 51 Affected business land 5 14 Affected farmlands 68 343 Affected Dehkan farm with household plot 158 961 Total 238 1369 Source: Impact Assessment Survey, August 2019

A. Socioeconomic profile of affected households

135. During the census, all of 238 AHs or 100% have expressed their strong interest in the new TL construction project. Affected households were also asked about their interest in getting compensation for possible impact from TL construction. Agricultural farms have preferred compensation in monetary form rather than land for land compensation since the impact on the land is insignificant. However, residential AHs were preferred land for land and monetary compensation for their affected structures.

4.2. Demography and socioeconomic characteristics

136. Gender of AHs: Census has covered 238 affected households with 1369 affected persons. It includes 709 (52%) males and 660 (48%) females (Table 4.2). The heads of households profile shows there are 44 female-headed households and 217 male-headed households. The average household size is 6 persons. The usual average household size in Uzbekistan is about 6 persons. The size of surveyed AHs approximately is comparatively bigger than the average rural Uzbekistan household size.

23

Table 4.2: Gender Profile of Affected Household heads Gender No % Male 709 52 Female 660 48 Total 1369 100% Source: Impact Assessment Survey, August 2019

137. Age of Heads of AHs: The APs have an average age of 30 years. The majority of APs (56%) are married. The details are presented in tables 4.4 and 4.5. The age distribution of the surveyed population shows that the 46-55 age groups were the most represented group among the male-headed households (36%).

Table 4.3: Age Distribution of Heads of AHs by Gender Male AH Heads Female AH Heads Total Age Cohort No. % No. % No. % 18-25 5 2 0 0 5 2 26-35 15 7 6 17 21 9 36-45 64 32 9 26 73 31 46-55 73 36 8 23 81 34 56-65 31 15 6 17 37 15 66 and more 15 7 6 17 21 9 Total 203 100 35 100,0 238 100% Source: Impact Assessment Survey, August 2019

138. Marital status of APs: The majority of the surveyed heads of AHs (98%) declared that they are married. 3 widowed and 1 single head of AHs have been identified among male heads while 12 female heads of the AHs were found as the widowers. No single female heads were found during the survey. The details are presented in Table 4.4

Table 4.4: Marital Status of Heads of AHs Male AH Heads Female AH Heads Total Marital Status No. % No. % No. % Married 198 98.00 24 66.60 222 93.13 Single (not married) 1 0.50 - - 1 0.43 Widower 3 1.50 12 33.40 15 6.44 Divorced ------Total 202 100 36 100 238 100% Source: Impact Assessment Survey, August 2019

139. However, among APs there not yet married APs which comprise about 41% of the total APs while the majority of APs (56%) have already got married. The share of the widower APs among 1369 APs is around 3% which less than heads of the AHs. The details are presented in Table 4.5

24

Table 4.5: Marital Status of AH members Male Female Total Marital Status No. % No. % No. % Married 387 55 378 57 765 56 Single (not 316 45 252 38 568 41 married) Widowed 5 0.6 28 4 33 2 Divorced - - 1 0.5 1 0.5 Others 1 0.2 1 0.5 2 0.5 Total 709 100 660 100 1369 100% Source: Impact Assessment Survey, August 2019

140. The population of APs: Representative number of APs as presented in Table 4.6 is aged between 16-25, male 19% and female 20%. The least presented are elderly (56-above) APs 10% and babies (0-5) APs 9%.

Table 4.6: Age Distribution of AHs members by Gender Male Female Total Age Cohort No. % No. % No. % 0-5 71 10 56 9 127 9 6-15 115 16 90 14 205 15 16-25 146 21 147 22 293 21 26-35 129 18 112 17 241 18 36-45 96 14 99 15 195 14 46-55 84 12 81 12 165 12 56-65 43 6 47 7 90 7 66 and more 25 3 28 4 53 4 Total 709 100 660 100 1369 100% Source: Impact Assessment Survey, August 2019

141. Household population. The AHs in section 5 has been estimated a population of 1369 APs. The average membership of each AH is around 6 persons per household. The maximum number of persons in the family is 15 APs. Traditions and customs of people in this region usually are to have big families consisting of a few generations.

142. Livelihood, education, and occupations. The distribution of AHs and APs per education status are presented in tables 4.7 and 4.8. According to the survey results, heads of AHs 82% (males 165 AHs heads, female 30 AHs head) have secondary level education, 14% (males 29 AHs heads, female 5 AHs heads) has higher-level education status among 238 AHs heads.

25

Table 4.7: Education of AH Heads by Gender Male AH Female AH Total AH Educational Level Heads Heads Heads No. % No. % No. % 1. Illiterate 7 3 1 3 8 3 2. Primary ------3. Secondary 165 82 30 83 195 82 4. Higher 29 14 5 14 34 14 5. College ------6. University 1 1 - - 1 1 7. Kindergarden ------Total 202 100 36 100 238 100% Source: Impact Assessment Survey, August 2019

143. Among the members of AHs, 60% have secondary education. Only 1% (3 males and 1female 1 APs) are illiterate. Table 4.8: Education of AH members by Gender Male Female Total Educational Level No. % No. % No. % 1. Illiterate 3 1 6 1 9 1 2. Primary 117 16 101 15 218 16 3. Secondary 407 57 414 63 821 60 4. Higher 68 10 47 7 115 8 5. College 17 2 14 2 31 2 6. University 18 3 10 2 28 2 7. Kindergarden 79 11 68 10 147 11 Total 709 100 660 100 1369 100% Source: Impact Assessment Survey, August 2019

B. Social impacts on AHs and their communities

4.3. The livelihood of AHs and low-income AHs

144. The distribution of AHs and APs per employment status is presented in tables 4.9 and 4.10. According to the survey results, heads of AHs are involved in agriculture, retired, government jobs, private jobs, housekeeping, other, daily wage, unemployed, disabled, business and student activities as well as the main type of employment and source of income. There is the most percentage of about 47% of AHs heads (males 96 AHs heads and female 10 AHs) involved in agriculture while at least percentage 0,4% (male 1 AHs) gathered by the student. Table 4.9: Employment status of AH heads by Gender Male AH’s Female AH’s Total Occupation Status Heads Heads No. % No. % No. % 1. Agriculture 96 47 10 29 106 44.5 2. Business 2 1 0 0 2 0.8 3. Government Jobs 25 12 1 3 26 10.9 4. Private Jobs 18 9 0 0 18 7.6 5. Daily Wage 11 5 0 0 11 4.6 6. Retired 35 17 15 43 50 21.0

26

7. Student 1 0.5 0 0 1 0.4 8. Self Employed 0 0 0 0 0 0.0 9. Housekeeping 0 0 8 23 8 3.4 10. Underemployment 0 0 0 0 0 0.0 11. Unemployed 7 3 0 0 7 2.9 12. Disabled 2 1 1 3 3 1.3 13. Others (Agriculture/pension, private jobs 6 3 0 0 6 2.5 simultaneously and migrant worker) Total 203 100 35 100 238 100% Source: Impact Assessment Survey, August 2019

145. Among the members of AHs, 16% are working in agriculture. A few others are working in government (7%), have private jobs (5%), or daily wage workers (3%). Around 16% are mainly doing housekeeping work, 9% are retired while 5% are still studying. Many also described themselves as underemployment (25%). See Table 4.10. Table 4.10: Employment status of AH members by Gender Male Female Total Occupation Status No. % No. % No. % 1. Agriculture 163 23 58 9 221 16 2. Business 14 2 8 1 22 2 3. Government Jobs 55 8 46 7 101 7 4. Private Jobs 55 8 6 1 61 5 5. Daily Wage 38 5 7 1 45 3 6. Retired 53 7 73 11 126 9 7. Student 39 6 27 4 66 5 8. Self-Employed ------9. Housekeeping - - 216 33 216 16 10.Under employment 178 25 160 24 338 25 11.Unemployed 92 13 47 7 139 10 12.Disabled 8 1 10 2 18 1 13. Others (Agriculture/pension, private jobs 14 2 2 0 16 1 simultaneously and migrant worker) Total 709 100 660 100 1369 100% Source: Impact Assessment Survey, August 2019

146. Around 8% (73 males, 34 females) of the AH members are under the category of skilled such as seamstress/dressmaker, carpenter, blacksmith or welder, etc.

Table 4.11: Skilling profile of APs Type of Skill/handicraft/mastership APs % Skilled 107 8 Unskilled 1262 92 Total 1369 100% Source: Impact Assessment Survey, August 2019

27

3.1 Source of Livelihood and Income

147. As shown in the Table 4.12 the agriculture serves as a main source of income for the affected households (45%), by government jobs (19%), by pension (13%), by business (5%), by private jobs (8,3%), by daily wage (6,5%), and the next source of income mentioned by surveyed AHs is by other sources (4%). The average household monthly income from the agricultural activity exceeds the other type of income sources which equals 1,117,597 UZS. As stated before the AHs are mainly dependent on agriculture. The main justification for that that almost 95% of the total 238 AHs are possessing either private farm with large landholdings or dehkan farms with small household plots. Despite the large number of AHs (private and dehkan farms) who are dependent on agriculture, they are not severely affected in terms of land acquisition.

Table 4.12: AHs Source of Income Source of income Average %age of Total Monthly Average Income per type Per Income Per Household Household (%) per type (UZS) Agriculture 45 1,117,597 Business, self-employed 5 119,313 Government Jobs 19 475,966 Private Jobs 8 195,279 Daily Wage 6 157,940 Pension 13 315,717 Social allowances by - - Government Other (Agriculture/pension simultaneously and 4 115,021 immigrant) Source: Impact Assessment Survey, August 2019

Table 4.13: Proportion of Agricultural and Non-Agricultural Annual Incomes per household

Average Income By Non- Average Income Total Average % of agricultural Agricultural Activities Per By Agricultural Income Per income to non- Household (UZS) Activities Per Household agricultural Household (UZS) (UZS) income 16,550,832 13,411,159 29,961,991 81% Source: Impact Assessment Survey, August 2019

148. The total average annual income of AHs is 30,732,735UZS while the total average annual expenditure of the AHs is 25,287,908UZS, which is less than the total average annual income by 17.72%

3.2 Vulnerable Households

149. Out of 238 AHs, 8 AHs have been categorized as vulnerable AHs. Three types of vulnerable AHs have been identified such as woman-headed household without any support from a working-age member in the family (50%), household headed by physically/mentally challenged person (37.5%) and elderly headed household without any support from working- age members of the household (12.5%). Data about vulnerable households are given in Table 4.14.

28

Table 4.14: Vulnerable AHs Category Quantity of AHs Share in the total, % The woman headed household without any 4 50 support in working-age people in the family Household headed by physically/mentally 3 37.5 challenged person and low-income family An elderly headed household without any 1 12.5 support in working-age people in the family Total 8 100 Source: Impact Assessment Survey, August 2019

150. In total 3 heads of the AHs declared that they were listed as physically/mentally challenged persons while 1 head of the family declared that they were elderly persons without any other family members. During the structured questionnaire, 4 AH declared themselves to be a woman-headed household without any assistance from working family members. During the census, other farms have also declared that they have family members who were elderly persons (60 years for males and 55 years for female members). Impact assessment survey has found only 1 AH (Allaberganova Salomat) as a low-income family whose total income per family member per month is less than 11,150 UZS (1.2 USD). This AH is listed also as a household headed by a physically/mentally challenged person. The main reason for such a low number quantity of low-income family households is that 97% of AHs consist of private farms, dehkan farms and business entities with agricultural lands and other sources of income. However, the census revealed that none of them are single retired persons.

151. The vulnerable group of people listed above has been included in this LARP on the basis of a structured questionnaire. During the census, no data was provided with regard to individuals physically / mentally challenged. Therefore, the confirmation through the Makhalla registry or the submission of the official certificate shall be carried out during the payment of the allowance for physically / mentally challenged persons.

Table 4.15: Details of Vulnerable AHs

# District Type Category Name of AHs

Masharipova 1 Bogot Dekhkan farm Gulsara Kurbanbaeva 2 Bogot Dekhkan farm Woman headed household Nukildjon without any support in working- Yusupova 3 Honka Dekhkan farm age people in the family Maksuda Yarashova 4 Yangiarik Dekhkan farm Oliyadjon 5 Honka Dekhkan farm Bobodjonov Ihtiyor Household headed by Erkaev Hazorasp Dekhkan farm 6 physically/mentally challenged Sadullo Residential person Allaberganova 7 Hazorasp household Salomat Elderly headed household 8 Bogot Dekhkan farm without any support in working- Abdullayev Nurillo age people in the family Total Source: Impact Assessment Survey, August 2019

29

152. The census/SES included all 238 AHs who are permanently/temporarily impacted due to the project in section 5 including, 1369 APs. The census/SES data presented in this section are actual for all AHs.

4.4. Ethnic composition and indigenous people

153. In terms of the ethnic composition according to census data in section 5, all AHs declared themselves as Uzbek nationality. There was not identified any ethnic groups maintaining cultural and social identities separate from mainstream Uzbekistan’s society fitting the ADB definition of Indigenous Peoples. Therefore, the ADB’s policy, as described in ADB’s SPS, 2009 in the Indigenous Peoples is not triggered. No special action is required for this updated LARP.

4.5. Gender issues

154. Under the Project, there is no differentiation between the household headed by males and households headed by a female as they will equally feel the impacts of land restrictions and land acquisitions. During the development of this updated LARP, UNPN complies with ADB’s Policy on Gender and Development (1998) as a key strategy for promoting equity. As a Project policy in this LARP, the affected properties of a household headed by a female was valued the same as that of the household headed by a male, i.e. compensation based on replacement cost and receive allowances, assistance indicated in entitlement matrix of this LARP.

30

5. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION

5.1. General

155. Consultation meetings were carried out with affected households, relevant stakeholders, including cadastral office, land use engineer, design engineers, transmission line operators of the project. A list of the stakeholders and discussed questions is attached in Annex 11. Resettlement consultants undertook public consultations during the census from 10 July to 02 August 2019.

156. The consultation focused on possible impacts on households, farmers, business community buildings and lands as well as temporary disruption of livelihood, if any, from the proposed construction works within section 5. Possible impacts and opinions of affected households have been studied. Preliminary Grievance Redress Mechanism was explained in the local language (Uzbek) along with a list (names, address and contact numbers) of crucial persons at PMU to be contacted in case of AHs may have grievance/complaint.

157. The main objectives of the public consultations were as follows:

 To discuss their opinions about possible resettlement and land acquisition on their lands  to make people aware of the project and let the beneficiaries know about the positive outcome of the project regarding reliable new employment opportunities, power supply.  to disseminate information to the people about the project regarding its activities and scope of work;  to involve people as stakeholders in project planning and further during implementation;  to seek local peoples' views on minimizing probable adverse impacts on land acquisition, involuntary resettlement and indirect impact to livelihood;  to make people aware of the plan of action;  to make people aware of the process of Grievance Redress Mechanism;  to assess the local people's willingness to get involved with the project, and enumerate the measures to be taken during the implementation of the project.  to make people aware of the general policy principles of national laws and ADB Safeguard Policy Statement, 2009 and full eligibility and entitlements.

5.2. Disclosure

158. Disclosure of LARP objectives was carried out also during the consultation meetings among AHs in July-August 2019 through meaningful consultation with AHs. In this meeting, Project objectives, ADB’s policy on Involuntary Resettlement, and Grievance Redress Mechanism, entitlements and possible compensation amounts will be described in the local language (Uzbek) to AHs and stakeholder in the form of presentation. The results of the census, the results of the valuation companies in regard to affected residential structures and trees as well as crops were disclosed among AHs in order to get their opinions and feedback.

159. Participants of the disclosure meeting will be comprised of AHs/representatives of AHs, representatives of Hokimiyats, Architectural department, district branch of SCLRGCSC,Makhalla chairmans/representatives, Uzvdayerloyiha Khorezm branch and valuation companies. Details of the discussions on the disclosure meeting, including key issues discussed, and questions raised are summarized below in Table 5.1

31

Table 5.1: Issues raised and discussed during the disclosure meeting Queries Responses Who will evaluate the affected trees and An independent valuation company will be hired to structures? evaluate the affected trees and structures. AHs will be given a free choice to select an Who will pay the valuation fee for the independent valuation company. However, UNPN evaluation of structures and trees? is also ready to subcontract the Valuation company for AHs. Compensations will be paid before any civil works start. PMU will develop a compensation payment When compensation will be paid? plan after receiving the final design and confirmation of the number of affected assets and the number of AHs. The compensation for residential structures will be paid at replacement cost, including market price, What kind of compensation is provided for the additional support for relocation and salvageable demolition of residential structures materials will be given back to AHs without deduction of the total compensation. Even though you are not living in your residential house or it is not yet built, you will be entitled to Is it still possible to get land for land the same entitlements as for ready residential compensation for the unfinished structure? houses. Land for a land option will be also given to these AHs In the case of the indirect effect of the I have a rice field filled with water and in order construction of rice fields, then the whole field to get to the construction site, I have to make filled with water is subject to compensation. In the the rice field empty from water. As a result, all case of rice fields were already emptied from my rice can be damaged What kind of water, and then only affected rice area is subject compensation will be provided? for compensation. You can deliver your grievances verbally by phone In case of a complaint, whom we have to to district Khokimiyat and PMU. Also, you can address our concerns? make your complaint in paper form as well to PMU, Makahalla as well. Trees will be marked by the commission based on How can we know the affected trees? the final design and inventory of trees act will be prepared. During the census, you have found that my During the preparation of the Social compliance crops will be affected. Am I entitled to get audit report, you have already harvested your compensation in case I will manage to crops, then you are not eligible for compensation harvest all the crops prior start of the for crops/ construction works? According to the preliminary design of ROW Uzdavyerloyiha has implemented land surveying How do I know whether my land will be and measurements. And according to the land impacted or not? And what will be the extent survey report if you are in the list then the Project of impact? will impact your land. However, the final list of AHs will be confirmed after landmarks will be put on the ground.

32

Queries Responses The compensations for agricultural land losses caused by tower construction and transmission line stringing will be provided in monetary value. How compensation will be provided, i.e. For residential, business and orchard land losses monetary or in-kind? compensations include land to land in addition to the affected structures and trees. Affected trees and structures will be paid in accordance with the market value at replacement cost. There is no available information about the date of construction process commencement. However, When construction of TL will start? you will be fully compensated before the construction process will start. UNPN will instruct its contracted construction company to schedule construction processes Can this construction process coincide with within the agricultural area considering the farming our crop farming period? schedule. For this purpose, they will consult with the respective department at province/district khokimiyats. If crop damage wouldn’t be possible to avoid, then If yes, how crop damage will be UNPN will evaluate and compensate impact compensated? according to the Entitlement matrix. All the transaction cost relating to cadastral What kind of additional support is provided in document registration, the connection of utilities case of land for land compensation? are given in addition to land for land compensation.

160. A list (names, address and contact numbers) of the persons at PMU to be approached was distributed. The leaflet containing project information, compensation amount, possible land impacts and necessary contacts for grievances throughout the project will be also distributed to AHs through printed leaflets based on the presentations made to AHs (Annex 25).

161. The comments and feedback from the disclosure meetings were incorporated for this updated LARP. The final LARP will be also disclosed on ADB’s (in the English Language) and in the UNPN website (http://uzbekistonmet.uz), as well as the telegram channel (t.me/uzmetaxborotxizmati) in the local language (Uzbek/Russian) upon approval.

33

6. GRIEVANCE REDRESS MECHANISM

6.1. General

163. Consultation meetings were carried out with relevant stakeholders, including cadastral office, land use engineer, design engineers, transmission line operators of the project. As a result of discussions and consultations, a simple Grievance Redress Mechanism (GRM) is developed for the AHs who may have complaints or questions during the construction works.

164. The PMU through UNPN branch and Contractors already established a simple and accessible grievance redress mechanism in a frame of previous sections of the NWRTLP which ensures some instruments and levels for grievance resolution and appeals process. PMU’s Safeguards Specialist and through a representative of PMU on the site is carrying out monitoring of the project implementation and GRM. So, the same system will be applied in this section 5 as well.

165. The primary goals of GRM are ensuring the receipt and timely redress of grievances and concerns submitted by the aggrieved project affected persons, and resolve complaints at the project level and prevent escalation to the national courts or ADB Accountability Mechanism.

166. People will have the right to file complaints and queries on any aspect of land acquisition, compensation, and resettlement. The PMU will ensure that grievances and complaints on any point of the project implementation during the construction works are addressed in a timely and satisfactory manner.

6.2. Existing complaint handling mechanism in Uzbekistan

167. The National law on the appeals of individuals and legal entities6 obliges state authorities to deal with requests and provides a clear framework to handle the case. This law has recently replaced previous law on the requests of citizens and gives the right for individuals and legal entities to file requests. The requests can be in the form of applications, proposals and complaints and submitted in three ways: oral, written and digital format.

168. Any citizen in Uzbekistan has several channels to air his/ her complaints.

 On village (or Makhalla) level: - Physical visit to Makhalla Citizens’ Assembly Office to meet with Chair; - Call to President’s Virtual reception (tel. number is 1000 or 0-800-210-00-00) or send message to President’s Virtual reception online (www.pm.gov.uz); - Call to hotlines established at each district or regional Khokimiyat; - Send written complaint (letter) to district/regional Khokim/ line Ministry/President; - Attend meetings with district/regional Heads of Sectors on integrated socio-economic development of regions (4 sectors established in each district); - Attend meetings with the leadership of line ministries and agencies that have to regularly meet with citizens in rural areas. If a citizen is not satisfied with the reply provided by Makhalla Chair, or he has received an incomplete response, the citizen can apply to the upper level, specifically to District Khokimiyat.

 District level: - Physical visit to Khokimiyat on citizens reception days to meet with district Khokim or deputy Khokims - Call to hotlines established in each Khokimiyat - Physical visit to Public reception offices under President’s Virtual reception and established in each district nationwide

6 Republic of Uzbekistan Law on the appeals of individuals and legal entities (№ЗРУ-378, 03.12.2014).

34

- Call to President’s Virtual reception (tel. number is 1000 or 0-800-210-00-00) or send message to President’s Virtual reception online (www.pm.gov.uz) - Send written complaint (letter) to district Khokim/ line Ministry/President - Attend meetings with district/regional Heads of Sectors on integrated socio-economic development of regions (4 sectors established in each district) - Attend meetings with the leadership of line ministries and agencies that have to regularly meet with citizens in rural areas If a citizen is not satisfied with the reply provided on a district level, or he has received an incomplete response, the citizen can apply to the upper level, specifically to Regional Khokimiyat.

 Regional level: - Physical visit to Khokimiyat on citizens reception days to meet with regional Khokim or deputy Khokims - Call to hotlines established in each Khokimiyat - Physical visit to Public reception offices under President’s Virtual reception and established in each regional center nationwide - Call to President’s Virtual reception (tel. number is 1000 or 0-800-210-00-00) or send message to President’s Virtual reception online (www.pm.gov.uz) - Send written complaint to a portal of the Ministry of Energy (http://cabinetpm2.gov.uz/) - Send written complaint (letter) to regional Khokim/ line Ministry/President - Attend meetings with regional Heads of Sectors on integrated socio-economic development of regions (4 sectors established in each district) - Attend meetings with the leadership of line ministries and agencies that have to regularly meet with citizens in rural areas

6.3. GRM developed for NWRTLP

169. The Grievance Redress Mechanism (GRM) developed for this subproject is available to AHs and people living or working in nearby section 5. The Project GRM disseminated via the LARP disclosure meetings in the leaflets that will be distributed to people through local Hokimiyat, the makhalla, village assembly of citizens or farmers' councils.

170. In case there will be any person impacted by or concerned about the project activities he/she has the right to participate in the GRM. They should have easy access to it and be encouraged to use it. The proposed GRM does not replace the known mechanisms of complaint and conflict resolution envisaged by the legal system of Uzbekistan but attempts to minimize the use of it to the extent possible.

171. The PMU established a simple and accessible GRM (see annex 13). The GRM provides some avenues and levels for grievance resolution and appeals process. The primary objective behind the project-specific grievance mechanism is to ensure a timely and user-friendly solution to the complaints received from the people living near to subprojects. However, Project GRM does not prevent any person to approach the governmental legal system to resolve their claims at any stage of the grievance redress process. The people can address their complaints to the courts at any time and not only after using the GRM.

172. Level 1 (Makhalla / Village Assembly). Under this project grievance redress mechanism, complaints can be submitted to the district level Hokimiyat, makhalla, village assembly of citizens, farmer councils, Contractor or directly to the local branch of the UNPN which is Khorezm Magestrial Power Network (KMPN). The makhalla/village assembly and Site Engineer of KMPN will try to resolve or clarify the issue within 2 weeks. Unresolved issues will be referred to the PMU in Tashkent.

35

173. Level 2 (Project Management Unit). The UNPN through its PMU on a regular basis (weekly) and as per immediate request will check with the KMPN whether any complaint is received by the Site engineer. The PMU, on receipt of a complaint from KMPN or any other local bodies, will immediately take the following actions:

(i) Will inform the complainant within five days; (ii) Inform ADB office both resident mission and HQ; (iii) If required, establish complaint handling a team with members Head of PMU, representatives from the EA, District Hokimiyat, Land Resources, and Cadastral Department, and Makhalla or Village Assembly of Citizens or/and Farmer’s Councils, or/and Women Association.

174. Complaint handling. The complaint handling team will be headed by one of the EA management staff designated for handling grievances of the project.

(i) The team will consult the complainant and gather complainant’s concerns; (ii) The team will also take advice from an independent valuation company (in case of grievances related to valuation); (iii) All complaints will be resolved in 15 days, and in case additional details are required, a maximum of 30 days will be used to address and close the complaint; (iv) If the complaint is not addressed by Project Grievance Mechanism Team, the PMU will inform ADB and District Hokimiyat regarding the issue.

175. District or provincial Hokimiyat will also have 15 calendar days to resolve the complaint.

176. Court. If the complaint is still unresolved, the complainant can submit his/her complaint to the appropriate court of law. The schematic explanation of GRM is given in Annex 13.

6.4. Contact details

177. The PMU will be responsible for recording the complaint; the step was taken to address the grievance, a minute of the meetings, and preparation of a report for each complaint. The complaint handling process will be reported to ADB through the quarterly project implementation report. Citizens may address their complaint and concerns to the following address:

42, Osiyo street, Tashkent, 100084, Uzbekistan Tel/Fax.: +998 71-236-6808 +998 99 8527991 (mobile) E-mail: [email protected] Mr. Azizbek Batirov - Safeguards Specialist at PMU Website: uzbekistonmet.uz

178. The aggrieved persons can also use the ADB Accountability Mechanism (AM) through the direct citizens’ application to the Head Quarter in Manila, particularly to Complaints Receiving Officer, Accountability Mechanism Asian Development Bank Headquarters 6 ADB Avenue, Mandaluyong City 1550, Philippines Email: [email protected], Fax +63-2-636-2086.

179. AM is the last resort, and ADB has its availability as a recourse in case other mechanisms for dealing with harmful project effects are not successful. SPS requires GRM, and the use of project-level GRM should be encouraged first.

6.5. GRM Records and documentation

180. Project Management Unit under UNPN already established GRM in other sections of NWRTLP. The regional branch of UNPN which is the KMPN is responsible for collecting complaints and grievances from AHs and people living near to construction sites. KMPN is also collecting complaints made by AHs through contractors working directly on the sites. People in village areas used to apply directly to makhalla and hokimiyat.

36

Hokimiyat currently receives complaints verbally and in writing form and both methods in accordance with National legislation are officially recognized and documented. Therefore, the Safeguard specialist at PMU regularly contacting with the Hokimiyat if AHs made complaints.

181. KMPN will be the entry point for receiving a complaint or known as a Focal Grievance Point (FGP). Moreover, KMPN will ensure monitoring of LARP implementation and assisting PMU in all LARP related implementation activities. KMPN is keeping a record of complaints received for its use as well as for review by ADB during regular missions. The grievance mechanism applies equally to all affected households and for the population living near to subjects. When reference is made to the Naymankul makhalla, it is to the makhalla that the affected persons are located. Makhalla chairman forwards the complaints to the PMU staff who records the complaint.

182. The complaint handling process will be reported to ADB through project progress reports. All grievances received from the population are being registered in a logbook (Annex 14 attached in this LARP) which is available at levels 1 and 2: at the site office of the Contractor, each makhalla committee of subproject area districts and PMU Tashkent office. Besides, there are also logbooks in the Hokimiyats where the grievances of the population are usually registered. Even so, the information received by Contractor grievances and applications from the aggregated persons and undertook measures should be submitted to the representatives of PMU on the project site for the accounting of all grievances. Thereafter the information on all received grievances will be collected at the PMU

183. The above-mentioned GRM that is being used for other sections will be applied to the section 5 as well.

37

7. POLICY AND LEGAL FRAMEWORK 7.1 General 184. The legal and policy framework of the project is based on national laws and legislation related to land acquisition and compensation policy in Uzbekistan and ADB Safeguard Policy Statement 2009 (SPS). Project-related LAR principles have been adopted by this Report based on the analysis of applicable laws and policies and ADB’s Policy requirements. The policies below are to be applied LAR related impacts during the implementation. 7.2 Laws, Regulation, and Provision relating to LAR in Uzbekistan 185. In Uzbekistan, a land expropriation takes place for the State and public needs under the Land Code (LC) and other legal documents. The expropriation in this context refers to the taking away of private land for a state and public purpose by the government with or without the owner’s consent subject to laws of eminent domain, which stipulates prompt and adequate compensation. Recent legal documents issued by the Presidential Decrees and the Cabinet of Ministers of Uzbekistan foresee to protect citizen’s and legal entities’ private ownership to land and for the building and structures. Collectively, these regulations provide a sound basis for acquiring land for the State and public purposes and for compensating land users a replacement cost at market values for the affected structures.

186. In Table 7.1 below the summary of legal documents used in the development of current land acquisition and resettlement plan is presented.

Table 7.1: Legal instruments applicable to Land acquisition and resettlement and categorization of vulnerable groups Legal Framework Functional Relationship to Resettlement

Land acquisition and resettlement The Land Code (LC) dated 30 April 1998 Describes a condition for permanent land expropriation and temporary land acquisition The resolution of Cabinet of Ministers (CoM) Regulates resettlement compensations for “On Approval of the procedure of damages affected buildings, structures, and plantings to citizens and legal persons in connection in the settlements. with the withdrawal of land plots for state and public needs” dated on 29 May 2006 #97 Civil Code (CC) dated on 29 August 1996 Regulates general rules of property seizure, determination of property cost and rights for compensation, terms of rights termination The resolution of CoM “On measures to Regulates resettlement compensations for improve the procedure for granting land the income loss, the value of agricultural loss plots for urban development activities and belonging to landowners, users, tenants in other non-agricultural purposes” dated on case of land acquisition. Also, it regulates the 25 May 2011 #146 provision of land to land compensation in case of agricultural and forest relates losses. The resolution of CoM “On amending and It defines the procedure of registration of adding to some decrees of the Republic of titled and non-titled land users and real Uzbekistan, aimed the further improvement property owners. It also establishes the of registration of cadastral document on a process and payment method for real property” dated on 21 September 2016 compensation in case of land acquisition. # 317

38

Legal Framework Functional Relationship to Resettlement Presidential resolution “On measures to Confirms that the resettlement costs are paid improve the effectiveness of training and based on assessment documents prepared realizing projects with participation of by IFI by their methodology. international financial institutions and foreign government financial organizations” dated on 16 July 2018 #3857 Presidential Decree “On measures on major Defines that land expropriation can be improvement of the investment climate in implemented only after meaningful the Republic of Uzbekistan" dated on 1 consultation with PAPs. August 2018 #5495 Presidential Decree “On measures to It defines the source of the Resettlement improve the system of protection of rights budget in investment projects. and legal interests of subjects of entrepreneurship” dated 27 July 2018 # 5490 Presidential Order F-5491(3 August 2019) “On additional measures to provide unconditionally the property rights of citizens and business entities” The Law of Uzbekistan on Protection of The purpose of this Law is to regulate Private property and Guarantees of relations in the field of protection of private Ownership rights dated 22 September 2012 property and guarantees of property rights. It # 336 regulated the entitlement of property owners to full market value compensation in case of acquisition for the State needs. Implementation of Land acquisition and resettlement Presidential Decree “On measures on major Defines that land expropriation can be improvement of the investment climate in implemented only after meaningful the Republic of Uzbekistan" dated on 1 consultation with PAPs. The resolution August 2018 #5495 prohibits a land confiscation without the consent of the Republican Centralized Fund. The resolution of CoM “On the procedure It defines the source of compensation for the formation and use of funds of payments based on the type of projects. centralized funds for the compensation to Establishes Republican Centralized Fund affected individuals and legal entities for the (RCF) as the main body which is responsible expropriation of land for the state or public for the compensation payments to AHs. The needs” dated 26 December 2018 # 1047 Supervisory Board of RCF decides on the allocation of funds for compensation. Presidential Decree on Additional measures Residents of Uzbekistan are allowed to for social support of citizens and legalize ownership rights to their implementation of a latest public campaign unregistered and non-titled residential on the recognition of ownership rights to structures until 1st May 2019. The Decree illegally built residential structures dated on defines the conditions for legalization. 20 April 2018 # PF 5421 The resolution of CoM “Additional measures Annex 2 of the Resolution clarifies the for the implementation of modern and definition of land expropriation for the State transparent mechanisms of the provision of and public needs. Also, it regulates the land plots with long-life inherited possession allocation of land plots after the Involuntary rights for individual housing” dated on 28 resettlement of physical and legal entities. January 2019 #63 The responsible authorities for the implementation of LAR are defined.

39

Legal Framework Functional Relationship to Resettlement Categorization of vulnerable groups The resolution of CoM “On approval of the Regulates the mechanism to the order of the appointment and payment of determination of vulnerable groups and their social allowances and material (financial) entitlements assistance to low-income families” dated on 15 February 2013 #44. Tax Code of Uzbekistan Regulates compensation for a vulnerable group of people regarding applying for discounts or exemption from property taxes, land tax, income tax, and other taxes The resolution of CoM “On approval of the This resolution regulates the categories of provision on the order of allotment and eligible families for one-time financial payment of the one-time financial assistance. The specificity of this resolution assistance to the families in need in the is that it clearly states that this type of Republic of Karakalpakstan and Khorezm assistance is given to families who need and Region” dated on 30.03.2017 # 165 find themselves in difficult life situations that are not fully supported by the State. This financial assistance can be given as an addition to the social allowance that they are receiving from the State. Presidential Decree “On the Forecast of the According to the Annex 25 of this Decree, main macroeconomic indicators and the exact amount of all types of social parameters of the State Budget of the allowances to low-income families within Republic of Uzbekistan for 2019 and budget Uzbekistan is given focus to 2010-2021 dated 26.12.2018 # PP- 4086 Labor Code and Law on employment Regulates labor relations of individuals employed with labor contracts by enterprises, institutions, organizations of all type ownership forms, including contracted by individuals. Establishment of restrictions and safety zones The resolution of CoM “On the approval of This resolution defines safety zones for the rules of protection of power transmission power transmission lines both horizontally facility objects dated 26.12.2018 # 1050 and vertically. This resolution applies for all infrastructures and facilities in relation with power up to 500 kV KMK 2.10.08-97 – Land allocation norms for This set of norm regulates the land allocation power transmission lines 0.4 – 750 kV for the temporary and permanent period during the construction of transmission lines 7.2.1 Constitution 187. The Constitution of the Republic of Uzbekistan (December 8, 1992) provides that:

 Everyone shall have the right to own property (Article 36). The economy of Uzbekistan, evolving towards market relations, is based on various forms of ownership. The state shall guarantee freedom of economic activity, entrepreneurship, and labor with due regard for the priority of consumers’ rights, equality and legal protection of all forms of ownership (Article 53);  An owner, at his discretion, shall possess, use and dispose of his property. The use of any property must not be harmful to the ecological environment nor shall it infringe on the rights and legally protected interests of citizens, juridical entities and the state (Article 54);

40

 The land, its minerals, waters, fauna and flora, other natural resources shall constitute the national wealth and shall be rationally used and protected by the state (Article 55) 7.2.2 Land code (30 April 1998) 188. The Land Code (LC) is the primary regulatory framework for land-related matters in Uzbekistan. The LC regulates allocation, transfer, and sale of land plots, defines ownership and rights on the land. It describes responsibilities of different state authorities (Cabinet of Ministers, province, district, city Hokimiyat) in land management; rights and obligations of the land possessor, user, tenant, and owner; land category types, land acquisition, and compensation, resolution of land disputes and land protection. The LC also defines the terms of rights termination on the land plot, seizure and land acquisition of land plot for state and public needs, and conditions of confiscation of a land plot in violation of land legislation.  According to the new version of the Code, currently, the granted lands for the construction of infrastructure, business, and residential houses shall be carried out within the three years. After that, the land will be taken back by local municipalities.  The land can be given for temporary use as a short term period (up to three years) or long term (from three to ten years).  The Code clearly defines (i.e., Article 23) that the land for construction of power transmission line shall be allocated out of the low quality agricultural or non-agricultural lands. The legal entity whom the land was allocated cannot use and take possession of the land until property deed has been issued. 7.2.3 Resolution of Cabinet of Ministers № 97 (29 May 2006) 189. This resolution regulates compensation for losses to individuals and legal entities due to the seizure of land plots for state and public needs. This regulation is mainly dealing with land plots, houses, building and structures of individuals and legal entities.

190. The resolution determines the procedure for the seizure of land or part thereof, as well as the method for calculating the amount of compensation to individuals and legal entities for the demolished residential, industrial and other buildings, structures and plantings in due to the seizure of land for state and public needs. The details of the Resolution are given in the draft LARP prepared for this project.

191. Replacement of the affected land shall be done in accordance with the land allocation norms for the construction of individual housing. According to the current norms, 0.04- 0.06 ha of land can be allocated without auctions directly to AHs.

192. According to thus resolution AHs shall be entitled proper house or rent allowance up to 2 years during the transition period. It also obliges the legal entities whom the land is being allocated to assist with the relocation.

7.2.4 Civil Code (29 August 1996) 193. The Civil Code (CC) defines the legal status of participants of public relations, the grounds, and procedure of implementation of property rights and other proprietary rights, rights of intellectual property, regulates the contractual and other obligations, as well as other property and related personal non-property relations. The CC defines general rules of property seizure, determination of property cost and rights for compensation, terms of rights termination.

194. The CC provides that: a person whose right has been violated may demand full compensation for damages unless the law or the contract provides compensation for losses in a smaller size (Article 14, Clause 1). The Civil Code (Article 14, Clause 2) also specifies that losses are understood as:  expenses that the person whose right is violated, made or must make to restore the violated right;  the loss of or damage to property;

41

 the revenues that this person would have received under normal conditions of civil turnover if his right had not been violated (lost incomes).

195. According to article 14, Clause 3 “If the person has violated the law, revenues received as a result of this, the person whose rights were violated, has the right to demand compensation along with other losses, lost profits in the amount not less than such profits.” 7.2.5 Resolution of Cabinet of Ministers № 146 (25 May 2011) 196. This Resolution is aimed to improve the procedure of granting land plots, protect the rights of legal entities and individuals on land, and improve the architecture of settlements and the efficient use of their land for construction by the Land Code and the Town Planning Code. This resolution has approved two Regulations: (i) Regulation on the procedure for granting land for urban development and other non-agricultural purposes, (ii) Regulation on the method of compensation for landowners, users, tenants, and proprietors (in case of residential land), as well as losses of agriculture and forestry.

197. The Regulation on the method of compensation for landowners, users, tenants, and proprietors, as well as losses of agriculture and forestry, includes the following:  Compensation for losses of landowners, users, tenants, and proprietors (hereinafter AHs);  Compensation for losses of agriculture and forestry;  cost of irrigation and developing the equal new land plot in return for seized irrigated agricultural land;  Cost of fundamental improvement of grassland and pasture;  Scheme for determination of losses of land possessors, users, tenants, and owners, as well as damages of agriculture and forestry;  Coefficients on the location of seized land plots.

198. In this LARP, the entitlements and compensation for AHs per resolution #146 have been included. According to this resolution, AHs are entitled to following compensations: - The cost of the land plot under the ownership of legal and physical entities - The cost of residential houses, structures, unfinished structures and structures that are not directly affected but unviable to use after land acquisition. - The cost of fruit trees, windbreak forests and other perennial plantations - The cost of not harvested agricultural crops - Agricultural income loss (in case of land for land development compensation provided to AHs, then agricultural income loss will not be provided)

199. Compensation for AHs is provided in case of: - Permanent acquisition of land - Redemption of land - Temporary acquisition of land

200. The losses of land possessors, users, tenants, and owners, as well as losses in agriculture and forestry, should be compensated before granting of documents certifying rights on the land plot. The regulation also orders that demolition of the house or building shall be done only after agreeing on compensation and providing replacement premises. The replacement procedure is done according to the Resolution of CoM № 63 which is detailed in section 7.2.15 in this report. The regulation orders that compensation has to be paid before starting any construction work. AHs whose land plots are seized and to whom land plots are granted, in case of disagreement with a defined amount of losses, can appeal to the court. In Uzbekistan, no monetary compensation for land to land for the affected residential lands is foreseen. Therefore, replacement land will be allocated in agreement with the physical and legal entity whose land is being acquired. This agreement is regulated through the Resolution of CoM № 63.

42

201. This resolution shall be implemented together with the Resolution of Cabinet of Ministers #317 dated 21 September 2016. 7.2.6 Resolution of Cabinet Ministers №317 (21 September 2016) 202. The resolution “On amending and adding to some decrees of the Republic of Uzbekistan, aimed the further improvement of registration of cadastral document on real property” defines responsible design institution which calculates the agricultural and forest- related losses belonging to legal land users, tenants. This institute is “Uzdavyerloyiha” and its branches in the regions. It defines that in case of the following type of construction works, then compensation for agricultural and forest-related losses will not be compensated:  construction of individual housing and maintenance of a residential house;  construction of pre-school, general secondary, secondary special, professional educational and medical institutions;  construction of water management facilities, land reclamation facilities and hydraulic structures;  formation of protected natural areas;

203. In resolution # 317, there is no indication that in case of the above-mentioned purposes AHs will also not be compensated. Based on this we consider that even though, the land is being expropriated for public needs; still, the compensation for AHs shall be paid. By this resolution, the Government defined the procedure of legalization cadastral document of the titled and not titled (illegal) land users. The main requirements for the legalization of non-titled land users are to provide i) explanation of circumstances of unlawful use of land, ii) certificate from local self-governed bodies on possession of the last 15 years, iii) payment of land tax for the previous five years. This resolution updates the compensation mechanism of agricultural and forest-related losses. Therefore, in the calculation of compensation, this resolution shall be used together with Resolution of Cabinet of Ministers #146dated on 25 May 2011. 7.2.7 Resolution of Cabinet Ministers №3857 (16 July 2018) 204. The resolution “On measures to improve the effectiveness of training and realizing projects with participation of international financial institutions and foreign government financial organizations” partly provides that payment of compensation for the land acquisition, demolition of houses, structures, plantings within the framework of projects with the participation of International Financial Institutions (IFIs). If it is agreed and stated in agreements, then the project implementation procedure will be followed by authorized bodies following the requirements of IFIs or Foreign Governmental Finance Organizations (FGFOs). This resolution gives to Executing Agencies to implement ADB’s LAR or other principles in case of discrepancies between national legislation and ADB policies. 7.2.8 Decree of the President of Uzbekistan №5495 (1 August 2018) 205. The decree “On measures on cardinal improvement of the investment climate in the Republic of Uzbekistan" regulates that the seizure of land for state and public needs is allowed only after an open discussion with interested parties whose land plots are confiscated. It also sets that demolition of residential, industrial premises, other structures, and structures belonging to individuals and legal entities and seizure of land is allowed after the full compensation of the market value of immovable property and losses caused to owners in connection with such seizure. 7.2.9 Law of Uzbekistan on Protection of Private property and Guarantees of Ownership rights 336 (22 September 2012) 206. The purpose of this Law is to regulate relations in the field of protection of private property and guarantees of property rights. It regulates the entitlement of property owners to full market value compensation in case of acquisition of the property and land for the State needs.

43

207. According to the Law, withdrawal of the property, including a privately owned land, in cases of nationalization and requisition, is carried out only after payment of full compensation to the owner at market value, as well as losses incurred to the owner in connection with such a withdrawal, unless otherwise provided by law. The owner has the right to appeal in court the decision on land expropriation, confiscation, and requisition of property in private ownership. According to Article 19, the Demolition of buildings and structures before the payment of full compensation is not allowed. 7.2.10 Presidential Order F-5491(3 August 2019) 208. The order “On additional measures to unconditionally provide guarantees of ownership rights of citizens and business entities” has been issued after a number of breaching the national legislation in connection with involuntary resettlement and land expropriation for the State needs by local authorities in Uzbekistan. The main requirements of the Order are the following:

 All the Involuntary resettlement activities in connection with the expropriation for the public and the State needs must be consulted with the centralized fund that was established under the Cabinet of Ministers to compensate for the LAR activities.  LAR Implementation can be carried out only after meaningful consultation with PAPs (residents and business entities) and valuation of compensation, and payment of the value of demolished buildings at replacement cost  Inappropriate/illegal issuance of the administrative documents by the respective authorities to residents and business entities will be firstly compensated by the special budget of the local respective authorities and sooner the compensation will be reimbursed by the guilty person who issued that document.  Starting from August 5, 2019, all the LAR activities in connection with the expropriation for the public and the State needs shall be carried out in 3 stages. 1st stage includes that all the LAR documents shall be submitted to the Cabinet of Ministers (CoM), 2nd stage includes the issuance of conclusion by the responsible persons at CoM, and in 3rd stage, the prepared conclusions shall be submitted to the Prime Minister for review and issuance of final decisions.

209. In general, this Order fully complies with the ADB’s SPS 2009 on Safeguard Requirements - Involuntary resettlement in regard to public consultation, compensation at replacement cost and provision of relocation costs. This Order clearly states that all the inappropriate documents that made property owners as illegal owners will be compensated as well. However, one discrepancy includes that property owner without any document (squatter) is not subject to compensation. 7.2.11 Resolution of Cabinet of Ministers № 1047 (26 December 2018) 210. This full name of the resolution is called “On the procedure for the formation and use of funds of centralized funds for the compensation to affected individuals and legal entities for the expropriation of land for the state and public needs.” This resolution appoints Republican Centralized Fund (RCF) under the Cabinet of Ministers for calculation and distribution of compensation during the involuntary resettlements to affected households and affected entities. Involuntary resettlement can be done only for the public and the state needs. RCF will be responsible for the Governmental level and internationally funded projects. This resolution sets the procedure of compensation payments to affected physical and legal entities. The Supervisory Board under RCF has the right to decide, and the decisions are compulsory to execute. The Board will also monitor the allocation of funds to AHs during the resettlement implementation period. Local managing bodies (i.e., Hokimiyats) should start the process by inquiring to RCF on the distribution of necessary funds for LAR. The Board will review this application, and the appropriate decisions will be accepted. Regional Hokimiyats issue the Decree on the allocation of compensation based on the RCF’s decision. The Decree serves as a legal instrument to provide compensation to affected physical and legal entities.

44

7.2.12 Presidential Decree 5421 (20 April 2018) 211. The decree announced a one-time nationwide campaign for recognition of the ownership rights to the residential premises that were built illegally or built without proper documentation. The campaign ended on May 1, 2019.

212. To be eligible for the campaign and legalize ownership right to an illegally built or without a building permit structure following conditions shall be fulfilled:

 The building should be built before the adoption of this Decree;

 Aland plot or part of the land plot is not located on land which cannot be realized for housing purposes. These lands include the safety zones, protected areas, military zones;

 Shall meet requirements of urban planning norms and rules, as well as its possession will not violate the rights and legally protected interests of other persons or pose a threat to the lives and health of citizens.

 specific cases in which the non-titled buildings cannot be recognized by the Cabinet of Ministers of the Republic of Uzbekistan; 213. Recognition of the non-titled rights to buildings is carried out by the decision of the Hokim of the district (city) on the recommendation of the Commission after paying a one-time fee in the amount of five times minimum wages;

214. After legalization, the owner is granted a lifelong inheritable possession right to the land plot (part of the plot) on which the building was erected. The size of the legalized land shall not exceed the limits established by law. The legalization will be carried out without imposing a fine to the owner that was foreseen by Article 121 of the Tax Code of the Republic of Uzbekistan (see 5.2.12 Tax code). 7.2.13 Resolution of Cabinet of Ministers № 44 (15 February 2013) 215. This resolution determines the procedure for the appointment and payment of Makhalla allowances for a) low-income families with children under the age of 14 years, b) allowances for low-income parents for childcare until the age of two years and c) allowance for low-income families. According to this resolution the following types of families are entitled to benefits:  families where the average monthly total income7 does not exceed 1.5 minimal wages per person during the last three months. Along with incomes household members gain officially, additional factors are also to be considered by makhalla committee members, including the availability of land, employment status of family members, and presence of persons in need of care;  the preferential rights for makhalla allowances have families who have lost both parents and children involved in family education;  families where one or both parents are disabled children;  widow(er), raising two or more children under the age of 14, living separately from other relatives;  family with disabled children;  mothers or fathers who are bringing up the children in a single-parent family. In this case the fact of a child-rearing mother (father) in an incomplete family established by makhalla;  families in which one or both parents are unemployed who have been registered at state employment bodies (regional and city departments of the Ministry of Employment and Labor Relations) as job-seekers;

42. 7 The total family income are considered as earnings in the form of wages, property income, income of an individual entrepreneur, the amount of money from family members working abroad or doing business, pensions, scholarships and allowances (described in this explanation), other than the allowance or financial assistance received by the family, income from running a personal dekhkan farm and other incomes established by the legislation of the Republic of Uzbekistan.

45

 single retired persons.

216. The amount of allowances is determined by the Ministry of Finance of the Republic of Uzbekistan according to calculations submitted by the People’s Bank. According to the interpretation of this Resolution by the Ministry of Finance8, the amount of financial assistance can be from 1.5 times up to three times of minimum wage9. The maximum duration of giving an allowance is up to six months.

217. The family, recognized by the citizens' assembly as the family in need, has the right to receive only one type of allowance or financial aid.

7.2.14 Tax code 218. The Tax Code (TC) is a regulatory framework for taxation related matters of individuals and legal entities. This law regulates compensation for a vulnerable group of people regarding applying for discounts or exemption from property taxes, income tax and other taxes stipulated in this TC.

219. By article 121, the use of entire land plot or expanding the territory without documents or illegally is subject for sanctions in the amount equivalent to:  Four times of land taxes for legal entities  Three times of land taxes for physical bodies According to the Presidential Decree 5421, this fine is not applied during the campaign period till 1st May 2019.

7.2.15 Resolution of Cabinet of Ministers # 63(28.01.2019) 220. The resolution of CoM “Additional measures for the implementation of modern and transparent mechanisms of a provision of land plots with long-life inherited possession rights for individual housing”. Annex 2 of this resolution defines the procedure for the provision of land for the State and public needs.

The state needs10 – provision of land plot for the needs of: - the needs of defense and state security, the creation of protected natural territories, the creation and functioning of free economic zones; - fulfillment of obligations arising from international treaties of the Republic of Uzbekistan; - discovery and development of mineral deposits; - construction (reconstruction) of roads and railways, airports, airfields, air navigation, and aero technical centers, railway facilities, bridges, subways, tunnels, energy systems and power lines, communication lines, space activities, trunk pipelines, engineering, and communications networks ; - execution of master plans for settlements in the construction of facilities at the expense of the State budget of the Republic of Uzbekistan, as well as in other cases provided for by the legislation of the Republic of Uzbekistan;

Public needs - the need for construction of: - automobile motorways and pedestrian walkways to buildings and structures, territories belonging to legal entities, regardless of legal forms, as well as individuals;

8 https://www.mf.uz/uz/news/2615.html 9 Since August 2019 the minimal wage was set at 223,000 UZS per month, thus the low-income line has been set at 334,500 UZS (35 USD) per month per person. Based on this methodology the official low-income line (as nominal indicator) is about 1.2 USD per day per capita. 10 Note: According to this resolution, land for the construction of TL for the section 1 is considered as allocation of land for the State needs.

46

- engineering communications to buildings and structures, territories belonging to legal entities, regardless of their legal form, as well as to individuals; - irrigation canals and other water arteries, reservoirs designed to supply water to the population, green spaces, and crops; - state educational and medical institutions, boarding schools, houses of mercy, as well as in the framework of public-private partnerships; - areas, as well as recreation parks, alleys, boulevards, recreation areas, lakes, reservoirs, ponds and other recreational facilities financed from the State budget of the Republic of Uzbekistan and funds of state organizations formed from sources not prohibited by law; - affordable residential buildings for typical projects in rural areas and cities as part of targeted programs.

221. It clearly defines what kind of organizations is eligible to get land in the frame of the State and public needs. According to the Resolution, there are 15 stages for a procedure for the provision of land for the State and public needs.

222. In case of allocated land is under the ownership of the legal or physical entity, the provision of a land plot for state and public needs for the interested organization is carried out only after the acquisition (procurement) of the land plot from the physical and legal entities in the established order. The decree on land acquisition is regulated through the Presidential Order #5495, which regulates that the seizure of land for state and public needs is allowed only after an open discussion with interested parties whose land plots are confiscated. It also sets that demolition of residential, industrial premises, other structures, and structures belonging to individuals and legal entities and seizure of land is allowed after the full compensation of the market value of immovable property and losses caused to owners in connection with such seizure.

223. The size of the land plot to be offered as a replacement for the acquired land due to the public and state needs is agreed with the owner of the affected land plot. In Uzbekistan, all the lands are to be allocated on the electronic platform by participating in the auctions. According to this resolution, affected households are exempted from the participation in auctions and land will be given by the Hokimiyats directly. A procedure for land allocation without auctions is done through an application to be submitted by the affected household to Hokimiyat. Hokimiyat then offers to AHs a suitable land. If AHs agree with the replaced land plot, then they shall declare their agreement by writing manually agreement letter 7.2.16 Resolution of Cabinet of Ministers # 165 (30.03.2017) 224. This resolution is issued to implement the decree of the President of the Republic of Uzbekistan “On the State Program for the Development of the Aral Sea Region for 2017–2021” and to target the social protection of low-income families in the Aral Region. According to this Decree family in need living in the Khorezm region and Karakalpakstan region are eligible to receive one-time financial assistance.

225. One time financial assistance to families in need is appointed by the Commission’s decision to the following categories of families (citizens) who find themselves in difficult life situations that are not fully supported by the State:  lonely citizens and retirees who need care (not able-bodied and not able-bodied family members), families with a disabled bread-winner and other low-income categories of the population and families;  Citizens who are disabled in Group I or have a serious illness (with complete or partial loss of a person’s ability and ability to carry out self-care, to be engaged in labor activities);  families who have lost their sole breadwinner as a result of his death (within three months);

47

 a parent (family member) in an incomplete family, caring for a disabled child or another family member – a disabled group I or group II or having a serious illness that requires surgical intervention or long-term (more than five months) outpatient treatment requiring financial expenditures;  families with two or more children, in which one of the parents is a disabled person of group I or II, and the second is forced to take care of the patient with the termination of employment or both parents are the disabled group I or II.

226. A difficult life situation means:  severe illnesses leading to disability (group I disabled person) or the treatment of which requires a long-term (more than five months) use of drugs or surgical intervention;  death of a spouse, parents (adoptive parents), breadwinner;  damage to life, health, property as a result of natural disasters, catastrophes, fires and other emergency situations (circumstances) of force majeure.

227. Families in need that received one-time financial assistance can re-apply for this assistance after one year. The amount of assistance is determined by Presidential Decree annually. Since January 1, 2019, the amount of one-time assistance is between 446 000 – 1 115 000 UZS which equals 2 times to 5 times of minimum wage.

228. Therefore, in this project setting the one time allowance in the amount of 101400 UZS for vulnerable families who are not benefiting from the State’s Social Program fits the National legislation of Uzbekistan. In translating this document into local language the term, an allowance shall be interpreted as moddiy yordam (in the Uzbek language) to avoid misunderstandings during the implementation stage. 7.2.17 Presidential Decree # 4086 229. As stated before, the amount of social allowance and financial assistance is determined by the Presidential Decree. Presidential Decree #4086 determines the amounts of allowances and social supports for vulnerable categories of citizens/families of Uzbekistan. Starting from January 1, 2019, the following benefits for families with children under the age of 14 years old, allowances for childcare until they reach the age of two years and material assistance to low- income families, and one-time financial assistance to families in need in the Republic of Karakalpakstan and the Khorezm region are established: Table 7.2: The established amounts of social allowances by Presidential Decree #4086 № Amount (UZS) Type of Social allowances I. Allowance for low-income families with children under 14 years old Of them: for family with one child, per month 122,000 for a family with two children, per month 203,000 for a family with three or more children, per month 284,000 II. childcare allowance until they reach the age of 2 406,000 years, per month III. one time financial allowance to low-income families 305,000 - 610,000 IV. one-time financial allowance to families in need in 406,000 – 1,014,000 the Republic of Karakalpakstan and Khorezm region V Disabled Children, per month 406,000

48

7.2.18 Labor code and employment law 230. These two documents are central legislation regulating labor relations of individuals employed with labor contracts by enterprises, institutions, organizations of all type ownership forms, including contracted by individuals. These legislations are considering interests of employees and employers provide the efficient function of the labor market, just and secure labor conditions, protection of labor rights and employees health, promote the growth of labor productivity, an increase of work quality, rising on this matter welfare and social livelihood level of the population.

231. Both ADB policy and the Uzbek law provide for the indemnification of APs who lose a job because of land/assets acquisition under a public interest project. The two, however, differ substantially on how the matter is conceptualized and resolved in practice. ADB policy compounds the case as an income rehabilitation issue and thus requires that the actual job income lost by the APs is fully reimbursed to them. This approach covers temporary and permanent job losses and is generally implemented through an allowance providing the APs their declared monthly salary (what should be substantiated by the supporting documents) for the number of months of business stoppage up to a maximum of 12 months which is the benchmark for permanent job loss. For informal permanent jobs without declared salaries, the approach is the same but based on the national minimum wage. To guarantee proper policy application the payment of the job loss allowances are to be directly disbursed to the APs by the project proponent.

232. The national legislation, instead, limits the matter to the payment as mandated by the Labor Code of fixed employment termination indemnities due by an employer to his employees and to the obligation of the project proponent to reimburse the employer of the cost of those indemnities mandate by the Civil Code. Such an approach excludes from job loss compensation informal employees without a declared salary, applies only to permanently affected jobs and does not automatically guarantee that the APs receive their job termination dues11. 7.3 ADB Safeguard Policy Statement, 2009 233. ADB adopted its Safeguard Policy Statement (SPS) in 2009 including safeguard requirements for environment, involuntary resettlement, and indigenous people. The objectives of the Involuntary Resettlement Safeguard policy is to avoid involuntary resettlement wherever possible; to minimize involuntary resettlement by exploring project and design alternatives; to enhance, or at least restore, the livelihoods of all displaced persons in real terms relative to pre- project levels; and to improve the standards of living of the displaced poor and other vulnerable groups.

234. The involuntary resettlement safeguards cover physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. It covers them whether such losses and involuntary restrictions are full or partial, permanent or temporary. The three essential elements of ADB’s SPS are: (i) compensation at replacement cost for lost assets, livelihood, and income prior to displacement; (ii) assistance for relocation, including provision of relocation sites with appropriate facilities and services; and (iii) assistance for rehabilitation to achieve at least the same level of well-being with the project as without it. The SPS gives special attention to poor and vulnerable households to ensure their improved well-being as a result of project interventions.

11 Based on the Labor Code of 1996, last amended on 2015 (Article 67) loss of employment is to be compensated with 2 months average salary plus a severance pay of a maximum of 1 month average salary depending on the length of the employment lost. Also according to the Civil Code (Article 14) all losses (including real damage, lost incomes) are to be compensated.

49

235. The rate of compensation for acquired housing, land and other assets will be calculated at full replacement costs. The calculation of full replacement cost will be based on the following elements: (i) fair market value; (ii) transaction costs; (iii) interest accrued, (iv) transitional and restoration costs; and (v) other applicable payments if any. Where market conditions are absent or in a formative stage, the borrower/client will consult with the displaced persons and host populations to obtain adequate information about recent land transactions, land value by types, land titles, land use, cropping patterns and crop production, availability of land in the project area and district, and other related information. The borrower/client will also collect baseline data on housing, house types, and construction materials. Qualified and experienced experts will undertake the valuation of acquired assets. In applying this method of valuation, depreciation of structures and assets should not be taken into account. The following are the basic policy principles of ADB’s SPS, 2009: (i) Screen the project early on to identify past, present, and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and census of displaced persons, including gender analysis, specifically related to resettlement impacts and risks. (ii) Carry out meaningful consultations with affected persons, host communities, and concerned non-government organizations. Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and Indigenous Peoples, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate the resolution of the affected persons’ concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by a social preparation phase. (iii) Improve, or at least restore, the livelihoods of all displaced persons through (a) land-based resettlement strategies when affected livelihoods are land-based where possible or cash compensation at replacement value for land when the loss of land does not undermine livelihoods, (b) prompt replacement of assets with access to assets of equal or higher value, (c) immediate compensation at full replacement cost for assets that cannot be restored, and (iv) additional revenues and services through benefit-sharing schemes where possible. (iv) Provide physically and economically displaced persons with needed assistance, including the following: (a) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, integration of resettled persons economically and socially into their host communities, and extension of project benefits to host communities; (b) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (c) civic infrastructure and community services, as required. (v) Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural areas provide them with legal and affordable access to land and resources, and in urban areas provide them with appropriate income sources and legal and affordable access to adequate housing. (vi) Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through a negotiated settlement to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status. (vii) Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non- land assets.

50

(viii) Prepare a resettlement plan elaborating on displaced persons’ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule. (ix) Disclose a final resettlement plan, including documentation of the consultation process promptly, before project appraisal, in an accessible place and a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders. (x) Conceive and execute involuntary resettlement as part of a development project or program. Include the full costs of resettlement in the presentation of the project’s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation. (xi) Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation. (xii) Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports. 7.4 Policy differences and reconciliation 236. A summary comparison between the Uzbekistan law and regulation and ADB policies, and reconciliation provisions to fill the gaps is presented in Table 7.3 below:

Table 7.3 Comparison of ADB resettlement safeguards with Uzbekistan law and regulation for land acquisition and resettlement

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK SOCIAL SAFEGUARDS REQUIREMENTS Involuntary The legal and policy The analysis of national Resettlement ADB Safeguard framework of the project is legislation shows that Policy Statement based on national laws and Uzbekistan is adopted a (2009) legislation related to land number of presidential acquisition and decrees and governmental compensation policy in resolution that fits policies Uzbekistan, that are of SPS 2009 described in Table 7.2 Categorization ADB carry out According to legislation, ADB’s SPS 2009 will be project screening there is no categorization in used. and categorization Resettlement documents. at the earliest stage of project preparation when sufficient information is available for this purpose. Type of project categorizations is A, B, C, FI. Compensation A. APs with the A. APs with the formal title is A. Same in formal title has to compensated for lost principle/application. No entitlements be compensated land/other assets. reconciliation needed. for lost land/other

assets.

51

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK B. APs with the B. APs with legalizable B. Same in legalizable title or no legal title can be principle/application. No have the right to be legalized per Presidential reconciliation needed. compensated for Decree #5421. Only lands of

lost land and residential houses that are assets after the located in safety zones, EAs help them in safety zones, protected legalizing their areas, military zones cannot assets. be legalized.

C. APs with non- C. APs with no legalizable titles considered C. Per Resolution of CoM legal title are non-titled as legalization is a #3857, in case of compensated for burden of the APs. Non- discrepancies between lost non-land legal APs have no right to be International Financial assets. compensated for land and Institution in terms of non-land assets. payment of compensation for the land acquisition then IFI policies prevail. So ADB policy will be used

Compensation A. Permanent loss A. Permanent loss of land. A. Same in of land. Replacement land for legal principle/application for Replacement land APs. legal APs. Reconciliation as a preferred needed both for principle

option or cash and application to allow compensation at the compensation of all full market rate. At non-land losses of least for legalizable and non-legal legal/legalizable APs, which shall be APs. covenanted.

B. Replacement of B. Replacement of leased B. Same in principle. leased land. Based land. Based on lease Application to be further on the replacement replacement and improved. No of lost income compensation in cash all reconciliation needed. To through cash losses including lost income. be reflected through compensation of instruction for ADB gross income x the projects. remaining lease

years or a

replacement land

lease.

C. Loss of C. Loss of C. No reconciliation of structures/ structures/buildings. Cash principles and application buildings. Cash compensation at market cost needed. However, it is compensation at for a lost item free of required the establishment replacement cost depreciation, transaction of a protocol allowing the for a lost item free costs, and other deductions. compensation of of depreciation, structures/ building at transaction costs, replacement cost, when and other the salvageable materials deductions. remain with the developer

or landowner provides full reimbursement to the

52

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK owner. It is hoped that this can be formalized without

legal reform but only a Decree for ADB projects or through the inclusion of additional safeguard covenants into the loan agreements which are equivalent of the international treaty or D. Loss of indirectly affected agreement. D. Loss of indirectly assets. Law requires that all D. No reconciliation of affected items. Not losses including lost incomes principles and application affected parts of an are to be compensated to all needed. asset no longer legal APs. usable after impact will have to be compensated as

well. E. Loss of business. Cash E. Business losses. E. Same in principle but compensation at market Reimbursement of ADB does not consider value for all actual losses + opportunity cost. damages/opportunity costs business re- Application reconciliation incurred. The burden of establishment needed to define a clear proving opportunity costs costs. For an methodology and rest on the AP based on application based distinguish short- and recognized documented on tax declared long-term losses. evidence but no clear income for a period methodology. of business stoppage. In the

absence of a tax declaration based on maximum non- taxable salary.

F. Loss of unproductive and F. Loss of trees: F. Same in principle, productive trees. different in application. i) Unproductive. Unproductive as well as Already adjusted for Irrespective of legal productive trees affected by previous ADB projects but land occupancy a public project are to be Application reconciliation status compensated according to shall be covenanted compensation at the independent valuator's ensuring systematic law market rate. report, but with no right to implementation, and also Application-based have felled trees. cash compensation is on tree type/ wood provided by default, volume or other ensuring and use of methods ensuring valuation standards fitting AP rehabilitation. SPS 2009.

ii) Productive. Compensation at replacement cost

based for application on

53

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK various methods: tree reproduction

cost, income lost (x tree type x market value of 1-year income x full production years lost).

G. No reconciliation for a G. Loss of crops. G. Loss of crops. Loss of policy is needed, but shall Compensation of crops to be compensated. be covenanted to ensure crop in cash at There are two forms of that crops are market price. compensation of loss of compensated at the crops: i) compensation of moment close as much as uncompleted agriculture possible to the date of production and ii) calculation lost income. compensation of lost income by multiplying four (years) average income for the last three years.

Involuntary Land Acquisition Resettlement Plan. There Partly different in principle Resettlement and Resettlement are no requirements to and application. No Planning, Plan (LARP). LARP prepare integrated and reconciliation needed as assessment, preparation stand-alone LARP. LAR law/regulation is silent on and valuation includes: planning entails similar but this matter and SPS of impacts a) impacts less extensive/simpler (2009) requirements have assessment/AP assessment/survey efforts been already applied in census; than ADB Policy, as detailed previous ADB projects. b) definition of below: Still, clear instructions entitlements, i. Measurement survey. Land regarding ADB projects income/livelihood and buildings impacts ensuring the measurement restoration measured. Other impacts of all impacts and the strategy, identified but not measured; counting of all AP are compliance & ii. APs Identification. needed for mainstream grievance redress Identifies only legal APs; purposes. mechanisms, iii. Socio-economic survey. i. Detailed Measurement institutional No comparable requirements Surveys to be arrangements; exist; mainstreamed for all c) consultations iv. Valuation survey; impacts; results; a) Land: valued at a market ii. Detailed count of d) monitoring rate based on a transactions individuals to be schemes; survey. The valuation mainstreamed; e) budget and includes transaction iii. The execution of the implementation costs/third party liabilities; survey is to be schedule. b) Buildings and structures. mainstreamed; LARP requires the Replacement cost but the iv. Valuation survey following surveys: salvageable materials a) The land is not valued i. Measurement remain with the developer or because of compensation survey. Measures landowner provide full land to land; there is only all affected items. reimbursement to the owner; measuring land area and ii. AP Census. c) Trees/crops. Based on valuation of land quality Identifies all APs the methodology detailed in (productivity/soil quality) to and establishes section Compensation F. compensate land to equal

54

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK legitimate and G. land; beneficiaries based b) Already reconciled for on legal status. previous ADB projects. iii. Socio-economic survey. Provides background information on AP’ socio-economic features. iv. Valuation survey a) Land: If land market exist based on a survey of recent transactions; without land market based on land productivity/ income;

b) Buildings and structures. The replacement cost of materials, labor and transport and special features of building/structure without discounting depreciation, salvageable materials, and transaction costs; c) Trees/crops. Based on the methodology detailed in section Compensation. Procedural A. Information A. Information disclosure. No A. Different in principle mechanisms disclosure. disclosure requirement and application. Already Resettlement- exists. reconciled for ADB

related documents projects. to be timely disclosed in the AP language. B. Public B. Public consultations. B. Same in principle but consultations. Matters of local importance different in application. Meaningful public to be publicly discussed with This is already reconciled consultations are to local authorities. But no for ADB projects. be held with the requirement to consult the APs. APs should APs directly. be informed about their entitlements and options, as well as resettlement

55

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK alternatives.

C. Grievance C. Grievance Procedures. C. No reconciliation is procedure. A Each state agency/ministry needed. Grievance Redress must follow to detail Mechanism (GRM) instructions (approved by the is to be established government) on registering for each project. and reviewing the concerns Information on and claims from citizens. GRM to be communicated to the APs.

D. Asset D. Asset acquisition D. Same in principle, but acquisition conditions. Property can only unsystematic in the conditions. be acquired after full application. Application to compensation is paid to APs. be improved.

Property can be acquired only after full compensation is paid to the APs. Assistance to A. These APs are A. There are no special laws A. According to Resolution vulnerable to be identified, and or regulations for livelihood #, 165 of Cabinet of and severely special assistance restoration due to land Ministers for families living is to be provided to acquisition and involuntary affected AP in Khorezm and restore/ improve resettlement impact. Karakalpakstan in need their pre-project However, there are a and who are not officially level of livelihoods. number of legislative registered as low-income documents related to social families can be given one- support and livelihood time financial allowance improvement measures amounting of 2 to 5 times considered by the of minimum wage. Based government of Uzbekistan to on these norms, in this consider social allowances project, we can allocate and needy families through one-time allowance Cabinet of Ministers amounting of 5 times of resolutions (#350 dated 12 minimum wage. December 2012, #44 dated 15 December 2013, and #165 dated 30.03.2017) and to consider disabled people through the Law on social protection of disabled people (#422-XII, 18 November 1991). According to the Presidential Decree #4086 dated 26.12 2018, the exact amount of all types of social allowances to low-income families within Uzbekistan is given

56

ASPECT ADB NATIONAL UZBEK HARMONIZED REGULATIONS FRAMEWORK Thus, support of vulnerable groups of the population is provided on the regular base by the Government on central and local levels and does not require additional payments in connection with the project implementation.

57

8. ENTITLEMENTS, ASSISTANCE, AND BENEFITS

237. This chapter details the eligibility and entitlements for compensation for assets affected by section 5 of NWRTLP. 8.1 Eligibility and the cut-off date

238. The cut-off date is normally set by host government procedures to establish displaced persons who are eligible to receive compensation and resettlement assistance by a project. The aim is not to inflict losses on people. Any person who purchases or occupies land in the demarcated project area after a cut-off date is not eligible for compensation or resettlement assistance. Fixed assets such as built structures, crops, fruit trees, and woodlots established after this date, will not be compensated. The good practice is to use the completion date of the census of displaced/affected persons as the cut-off date. They will, however, be given sufficient advance notice requesting them to vacate land parcels and dismantle affected structures prior to project implementation. Their dismantled structures will not be confiscated and will not be subject to fine or compensation.

239. In Uzbekistan, according to the procedures, there is no regulation on cut-off dates. Therefore, when a DMC lacks established procedures, therefore, in this updated LARP cut-off date for eligibility is determined as the last day of the census of AHs and IOL

240. Compensation eligibility will be limited by a cut-off date established based on the last day of the DMS/IOL of affected households. The cut-off date for section 5 of the Khorezm region territory is set as August 2, 2019, the last day of the census and DMS/IOL. Households who settle in the affected area and/or make any improvements on the land parcel to be acquired for the project after the cut-off date will not be eligible for compensation.

8.2 Compensation and valuation of assets

241. This section details the entitlements for compensation for assets affected by the project. According to ADB’s SPS (2009), AHs are eligible to receive compensations at replacement cost. The intention is that AP will be able to replace an expropriated asset of the same or better quality in the current market conditions. The full replacement cost consists of the five elements as:  Fair market value  transaction costs  Transitional and restoration cost  Per resolution # 146, the AHs are eligible to receive loss of agricultural income in the form of monetary compensation alternatives to land for land compensation.

8.4.1. Compensation for Land

242. The legally based agricultural land compensation method that exists in Uzbekistan is based on land to land compensation. According to resolution # 146 of CoM, in case of permanent and temporary land acquisition from AHs, agricultural loss of AHs due to permanent and temporary land acquisition will be compensated as monetary form. For this TL, the compensation for agricultural loss is based on monetary compensation only12. This approach has been selected, because not only the unit impacts are too small to justify both logistically and economically for replacement plots, but also preferable by the AHs.

12 In Uzbekistan is existing standardized valuation of agricultural land differentiating by type of land (i.e. irrigated, rainfed, pasture). This valuation will be determined by district land resources and cadaster department based on Resolution of Cabinet of Ministers 146 (25.05.2011).

58

243. Compensation for the land is aimed at providing a farmer whose land is acquired and used for project purposes with compensation for land labor and crop loss. Compensation for agriculture land will be on a “land for land” basis, with land being provided to owners by the District Hokimiyat following assessment by the Land Acquisition and Resettlement Commission. Such land will be of equal value/productivity in a nearby location and with comparable associated services/ facilities, or compensation to provide such services.

244. Alternatively, cash compensation for agricultural land at replacement cost will also be provided in case the AHs refuses land-for-land compensation or land for land compensation is not a convenient way for AHs. The compensation for the permanent loss of land use rights over the affected agricultural land will be compensated equivalent to 4 years net average income of the past 3 years (of the affected annual crop). Per resolution # 146 replacement cost includes followings:  The cost of the land plot under the ownership of legal and physical entities  The cost of residential houses, structures, unfinished structures and structures that are not directly affected but unviable to use after land acquisition.  The cost of fruit trees, windbreak forests and other perennial plantations  The cost of not harvested agricultural crops  The cost of agricultural income loss due to encumbrances, such as the establishment of safety zones for TL 1. Agricultural income loss in case of land for land compensation provided to AHs then agricultural income loss will not be provided)

245. In cases wherein all or parts of the lease holding become unviable, unaffected portions of a plot will also be compensated.

246. In cases wherein all or parts of the lease holding become unviable, unaffected portions of a plot will also be compensated. This matter will be determined by district land resources and the cadaster department and in case of disputes, this matter will be resolved with the support of local Hokimiyat and district agriculture and water resources department.

247. Transaction costs, registration fees, if any, will be borne by UNPN.

8.4.2. Trees

248. Loss of income from fruits trees and timber trees will be compensated in monetary value based on the market value of wood. Fruit trees will be evaluated based on the average annual income for the past 3 years multiplied by the remaining productive life of the fruit-bearing trees. In the case of loss of timber trees, compensation will be based on the market value of their dry wood volume. The compensation for trees will be free of the deduction for the value of the wood left to the AH. Monetary compensation was calculated by the Independent Valuator and valuation fee was paid by UNPN. The Independent Valuator has been consulted to use entitlements set in this LARP for affected fruit and timber trees during the valuation of affected trees.

8.4.3. Crops

249. Loss income from crops planted on the affected land will be compensated in monetary value at replacement cost based on average net income computed based on the average income over the past 3 years multiplied to construction period years to restore the lands for an affected portion of land. The results of the reports of the Design Institute Uzdavyerloyiha is used as a reference to pay compensation for crop loss to AHs in this LARP.

59

8.4.4. Loss of building and structures

250. Compensation for affected structures is based on the results of the market estimation of the cost of the specified object, including all the related payments, depreciation and transaction costs and relocation costs. Full compensation will be also provided for the affected substructures adjacent to the house. No deductions shall be made for salvageable materials.

251. The calculation of compensation of affected assets is calculated by the independent valuation company hired for this section. The results of the Independent valuation company for the valuation of structures is used as a reference to pay compensation to AHs in this LARP.

8.4.5. Loss of Income/Livelihood

252. Loss of income/livelihood will be compensated for the period of business interruption13. This will be calculated based on the estimated average monthly income in the past 3 years multiplied by the number of months of business interruption. Workers from the affected businesses will be paid for lost wages for the duration of business interruption up to 12 months. In case of agricultural workers losing their employment as a result of land acquisition, monetary compensation will correspond to their salary (in monetary value and in-kind) for the remaining part of the agricultural year or contractual period whichever is higher.

8.4.6. Vulnerable Households

253. Vulnerable households, including women, headed households without support, low- income household, a household headed by elderly with no support and household headed physically challenged people will be provided with a one-time additional allowance equivalent to 5 times of minimum wage14. Additionally, members of vulnerable households will also be prioritized15 in project-related employment. Since August 2019 the minimum wage was set at 223,000 UZS per month, thus the financial aid allowance is determined by the Presidential Decree #4086 for the 2019 year as 406,000-1,014,000 UZS per AHs. The mahallas and village assembly of citizens have a record of all households in the communities and will be tapped in identifying and certifying vulnerable households.

8.4.7. Compensation estimation process

254. All compensation estimates of the property and assets will be at the replacement value. The LARP sets eligibility and entitlement provisions establishing compensation rates in accordance with guidelines from the GOU and ADB SPS 2009.

255. All compensation and assistance to be provided for this section 5 of NWRTLP are summarized in the entitlement matrix below (See Table 8.1).

13 Business interruption includes the time for receiving a new land plot, and designing/building of a new business structure. 14 Defined by the Presidential Decree #4086 adopted on 26.12.2018 (see 7.2.14 for details) 15 Applicants should meet eligibility requirements in terms of qualification and skills

60

Table 8.1: Entitlements Matrix

Specifica Type Affected HHs Entitlement tions B. Impact on Land A.1. Permane All AHs, 1. Monetary Compensation at replacement cost by Agricult nt land Leaseholders providing compensation for loss of land use rights ural losses with equivalent to 4 years of the net average income 16of the land caused by Lifelong past 3 years (of the affected annual crops.); tower inheritable 2. Unaffected portions of an affected arable plot will also be constructi possession/ compensated if the same becomes unviable after on permanent impact. possession 3. Transaction cost, registration fee, related to new plot (hereinafter as allotted will be borne by UNPN. All AHs) 4. Independent valuator will be engaged only in cases where AHs disagree with compensation rates determined by Khorezm branch of Uzdavyerloyiha Land Use Planning Institute. Temporar All AHs 1. Monetary Compensation at replacement cost by y land providing compensation for loss of land use rights losses equivalent to temporary period years of the net average caused by income17 of the past 3 years (of the affected annual tower crops.); constructi 2. Unaffected portions of an affected arable plot will also be on and compensated if the same becomes unviable after transmissi impact. on line 3. Independent valuator will be engaged only in cases stringing where AHs disagree with compensation rates determined by Khorezm branch of Uzdavyerloyiha Land Use Planning Institute. A.2. Land All AHs 1. Land for land compensation through the provision of a Residen Loss land plot comparable in value/location to the plot lost tial land including services (or compensation to provide such services) to plots lost with registration and transfer charges if any to be borne by the project; OR 2. Unaffected portions of a plot will also be compensated if they become unviable after the impact occurs. 3. All mandatory fees for registering the land, completion of required house design, surveys, acquiring permission for construction under the AHs name and any other related costs will be paid by UNPN. B. Impact on Structures Residen Full or All AHs 1. Monetary compensation at full replacement rate for tial / partial affected structure/fixed assets free of salvageable Busines loss of materials, depreciation and transaction costs. OR s structures 2. In case of partial impacts on structures (structure wall, structur fences, etc.), monetary compensation at replacement es rates to restore the remaining structure. 3. Unaffected portions of the structure will also be compensated at replacement value if they become unviable after impact. 4. Monetary Compensation at replacement cost to be determined by the Independent Valuator and cost of valuation shall be paid by UE.

16 Based on the Tax authority information 17 Based on the Tax authority information

61

Specifica Type Affected HHs Entitlement tions C. Impact on Crops and Trees Agricult Loss of All AHs 1 Monetary compensation at replacement cost for primary ure crops (and secondary crops if any) on affected land-based on land, 1 year of production costs (inputs) plus an allowance orchard equivalent to 1-year average net income based on the average income over the past 3 years. 2 Monetary compensation at replacement cost will be determined by Uzdavyerloyiha Institute. 3 Independent valuator will be engaged only in cases where AHs disagree with monetary compensation rates determined by Uzdavyerloyiha Loss of All AHs 1. Monetary compensation for fruit trees will be based on fruit trees (including the the average annual income for the past 3 years non-leased multiplied by the remaining productive life of the fruit- landowner) bearing trees. 2. Production costs (inputs) of trees till to cut date. 3. Monetary Compensation at replacement cost to be determined by the Independent Valuator and cost of valuation shall be paid by UE. 4. Felled trees will be kept by the AHs. Loss of All AHs 1. Monetary compensation for timber trees will be timber compensated based on the market value of dry wood trees volume. OR Production costs (inputs) of trees till to cut date. 2. Monetary compensation at full replacement rate for affected 3. Felled trees will be kept by the AHs. D. Impact on Income and Livelihood Employ Loss of Agricultural 1. Monetary indemnity corresponding to their salary (in ment employm workers losing monetary value and in-kind18 benefit) for the remaining from ent from their contract part of the agricultural year/or contractual period affected affected whichever is higher in monetary value. agricult agricultur ural al land land E. Vulnerable Households Vulnera Low-income households, 1. Financial aid allowance is equivalent to 5 times of ble female-headed households minimal wage given a lump sum at once. According to Affected with fewer than 2 adult the Presidential Decree # 4086 financial aid allowance Househ income-earners, HHs with for families in need is set 406,000 – 1,014,000 UZS per olds disabled family members) AHs. 2. Priority for employment in project-related jobs, training opportunities, self-employment, and wage employment assistance. F. Impact on Community Structures and Assets Commu Loss or Community- 1. Rehabilitation/replacement of affected structures/utilities nity damage owned Assets (i.e. footbridges, roads, communication lines, water Structur to public pipelines, power transmission lines, etc.) to pre-Project es and infrastruct level. Assets ure and utility G. Any unanticipated Impacts Any unanticipated impacts identified during the Project implementation will be compensated in full at replacement rate, subject to independent valuation methodology.

18 Products which workers used to receive as payment and/or additional benefit for on-farm work such as wheat, rice, hay etc.

62

9. INCOME RESTORATION AND REHABILITATION

256. As part of the income restoration and rehabilitation measures, these AH will be provided compensation at replacement cost for their impacted structures, trees and land for land compensation of equal value and size will be provided.

257. There are 7 AHs whose structures will be demolished. Out of 7 AHs, 6 residential HHs are in Khazorasp district and census showed that they have constructed the foundation of building only. No APs have been resettled yet and APs are living in their current residential address which located in in the Pitnak town which is located 13 km away from their affected lands. Out of 7AHs In Bogot district 1 AH (Masharipova Gulnoza) using the affected building for the temporary period. Demolished foundation cannot be transported. In consideration of the fact that no APs will be relocated, and no salvaged materials will be transported, relocation assistance is not foreseen for AHs in Khazorasp district.

258. Saodat Masharipova’s current residential address is in Bogot town, which is around 15 km away from the affected structures. No APs are living permanently in the affected building. Masharipova Sadoat’s remaining part of the building (60% is being not affected) is suitable for living. Also, until the new residential structure is built, the affected structures will not be demolished since it is within the safety zone of TL not within the RoW for construction. No transition allowance is foreseen for the AH, but relocation allowance in the amount of 500,000 UZS will be provided for the AH (Masharipova Saodat) for the demolished structures will be provided. As part of the income restoration measures, salvaged materials after the demolition of structures will be allowed to be kept by AHs.

259. Land-based income restoration. Masharipova Saodat in Bogot district will be provided as part of the income restoration measures, a new land of equal size in a neighboring territory which enables to enlarge her territory. Bogot district Hokimityat will provide a new land. All the transaction costs in relation to registration and obtaining new cadastral documents will be paid by the Khokimiyat or by the UNPN.

260. Cash Assistance for Income Restoration. Income restoration assistance is also sometimes provided in cash. In this section 5, cash assistance in the form of 5 times of minimum wage will be provided for AHs who will lose their more than 10% of their productive assets.

261. In-kind assistance: According to the Resolution of CoM of Uzbekistan #97, after the demolition of the affected structures, the salvageable building materials shall be evaluated in order to deduct from the total amount of compensation to be paid to AHs. The Land Acquisition and Resettlement Commission will decide whether to deduct and give to AHs or to get all the building materials. In this Project as part of the livelihood restoration measures, all the salvageable materials and cut trees will be kept by AHs for free of charge. During the census, AH declared that most of the salvaged materials can be used to build new houses. Therefore, salvageable materials will be allowed to be taken away by the AHs after the demolition at no deductions.

63

10. RESETTLEMENT BUDGET AND FINANCING PLAN

262. This chapter provides an itemized budget for all resettlement activities, including all compensation and assistance and cost for implementation of LARP.

263. In order to ensure that sufficient funds are available for LAR tasks, the UNPN as the EA will allocate 100% of the cost of compensation at replacement cost and expected allowances estimated in each LARP plus contingencies before LARP implementation. PMU will be responsible for the timely allocation of the funds to implement the LARPs. The PMU will provide compensation for lost assets and other allowances in accordance with the entitlements agreed in the LARP and reflected in the Entitlement matrix.

264. The details of the compensation cost for each category of impact are provided in the following subsections. Enumerated compensation costs are estimated on the approximate manner, therefore numbers have to be updated and confirmed through valuation by licensed firms and request of tax/income statements before disbursement of compensation and assessment of actual impact.

10.1 Compensation for permanent land acquisition

265. In accordance with the Resolution of CoM # 146, land for land compensation will be provided for affected households in case of permanent land acquisition from physical and legal entities.

266. Compensation for the land is aimed at providing a farmer whose land is acquired and used for project purposes with compensation for restoring the affected lands to the previous condition. Compensation for agriculture land will be on a “land for land” basis, with land being provided to owners by the District Hokimiyat following assessment by the Land acquisition and resettlement commission. Such land will be of equal value/productivity in a nearby location and with comparable associated services/ facilities, or compensation to provide such services.

267. Alternatively, cash compensation for agricultural land at replacement cost will also be provided in case the AHs refuse land-for-land compensation. The compensation for the permanent loss of land use rights over the affected agricultural land will be compensated equivalent to 4 years net average profit of the past 3 years from affected land. In this LARP monetary compensation was preferred by AHs.

268. The compensation for the permanent land acquisition to be paid to affected agricultural farms is determined by the following formula:

C= APL *AL Where: C – Compensation for permanent land acquisition APL – Agricultural income loss per ha calculated based on the net income for the last 3 years multiplied to 4 years, UZS AL – Total affected lands, ha

269. According to the conformation letter provided by Confirmation letter (Annex 27) from the Khorezm regional land resources and the State cadaster Department, compensation for permanent land acquisition has been already paid in 2015-2016 by the UNPN in accordance with the Decree of the Khorezm Region (Annex 28) which was also described in draft LARP. Due diligence of the documents regarding the payment of compensation for permanent land acquisition have been carried out by the Resettlement consultant . Therefore, in order to avoid double payment, compensation for permanent land acquisition is not foreseen in this LARP.

64

10.2 Compensation for temporary land acquisition

270. Compensation for temporary land acquisition will be based on the net loss income from crops planted on the affected land equivalent to construction years multiplied to the net average income of the past 3 years. The total construction period is established per final design as three years. Therefore, the construction period should not exceed this period. Unaffected portions of an affected arable plot will also be compensated if the same becomes unviable after impact. Inflation rate shall be taken into account in the calculation of future agricultural income loss

271. In 2015 UE has transferred compensation for temporary land acquisition for a period of 3 years. Since 3 years period was ended in 2018 a new temporary land allocation act has been done and UNPN shall pay affected farmers for temporary land acquisition once again.

272. According to the UNPN, the construction of Towers and stringing of TLs will be finished by the end of this year. Therefore, starting from the next cropping season affected farmers will be eligible to plant a new crop on affected lands. PIC shall monitor LARP Implementation and approve that construction works will be finished until next cropping season which is spring 2020. In case of delays, then AHs shall be entitled to the next year’s crop loss.

273. The local Land Use Planning Institutes (Uzdavyerloyiha) has performed land acquisition and land allocation procedures. Loss income from crops planted on the affected land will be compensated in monetary value at replacement cost based on average net income computed based on the annual average income for this year to restore the lands for an affected portion of land.

274. In total 190 AHs will have an impact on their crops. The types of crops that will be affected include cotton, rice, corn, alfalfa, and vegetables. In terms of impact on the total lands under crops cotton and rice are equally affected (44 %), but in terms of compensation, the AHs will receive more compensation for the affected rice crop than cotton. The summary of the compensation for affected crops is given in Table 10.1 below while detail information on compensation per AHs is given in (Annex 16).

Table 10.1: Summary of the compensation payments for affected crops

Name of Cotton, Rice, Corn, Vegetable, Alfalfa, Total, the UZS UZS UZS UZS UZS UZS district 57,370,000 1 Urgench 43,470,000 9,900,000 4,000,000 - - 95,845,400 2 Honka 60,038,400 30,037,000 5,270,000 - 500,000 63,876,000 3 Yangiarik 23,886,000 39,490,000 400,000 100,000 - 151,915,120 4 Bogot 45,141,120 100,774,000 4,000,000 2,000,000 - 147,042,260 5 Hazorasp 50,262,260 80,780,000 1,000,000 13,000,000 2,000,000 222,797,780 260,981,000 14,670,000 15,100,000 2,500,000 516,048,780 Source: Land allocation acts

275. During the census and inventory of losses carried out in July-August 2019, there were crops planted on the affected agricultural land. Nowadays, in December month most of the crops could have been already harvested and there can be no crops at all on the affected lands.

65

Therefore, during the implementation of this LARP and payment of compensation AHs, there can be a situation where no compensation will be needed for crops since there will be no crops on fields. So, the payment for affected crops listed in this LARP will be subject for revision during the implementation stage.

10.3 Compensation for affected trees

276. Compensation for affected trees has been calculated by the Independent Valuation Company “Estimation Standart” hired by the UNPN for section 3 and section 5. The Independent Valuation Company (IVC) has been consulted to use entitlements set in this LARP for affected fruit and timber trees during the valuation of affected trees. As a result of estimation IVC provided valuation report for the affected trees which was used in this LARP (Annex 17).

277. The selection of the Valuation company has been consulted with the AHs and they agreed on that. Therefore, the costs of the valuation have been paid by the UNPN. No reimbursements are foreseen for the affected farmers for the valuation fee.

278. In total 918 trees were evaluated by the independent valuation company. The results of the valuation report have been given in Table 10.2 below.

Table 10.2: Compensation for affected trees Compensation to Types of Number of № Name of Land Users be paid to AHs, affected trees аffected trees UZS Hazorasp district 1 Norjon Miskin farm Apple 23 1,333,952 Total affected trees: 23 1,333,952 Apricot 8 435,576 Cherry 120 526,775 Plum 4 40,835 Rahmatullaev Otajon Apple 36 3,920,136 2 farm Grape 126 6,002,785 Peach 5 51,044 Poplar 6 8,636,661 Pear 5 102,083 Total affected trees: 310 19,715,951 Apricot 4 8,167 Cherry 4 40,835 3 Karimboy Halima farm Apple 124 4,265,925 Grape 114 349,142 Total affected trees: 246 4,664,069 Apricot 11 262,026 Cherry 163 3,127,301 Apple 36 2,177,881 4 Raxmatullo Dilbar farm Grape 99 2,021,346 Poplar 3 3,591,462 Pear 27 1,286,311 Total affected trees: 339 12,466,329 Total: 918 38,180,301 Source: Reports of the Independent Valuation Company “Estimation Standart” 2019

66

10.4 Compensation for demolished residential houses and structures

279. Monetary compensation at full replacement rate for affected structure/fixed assets free of salvageable materials, depreciation and transaction costs. All the costs in relation to the registration of new land, cadastral document fees shall be recovered by UNPN or Local Khokimiyat.

280. Monetary Compensation at replacement cost was evaluated by the Independent Valuation company “by “Estimation Standart LLC” for AHs located in Hazorasp district and “Mezon Baholash LLC” for AH located in Bogot district through June - August 2019 (Please refer to Annexes 18 to Annex 24). It was agreed with AHs that they would hire an independent valuation company on their choice, and then UNPN would pay the valuation fee. Therefore, in addition to the replacement cost compensation for the affected structures, AHs will be reimbursed for the valuation fee.

281. Salvageable materials after the demolition will be kept by the AHs as livelihood restoration measures.

282. The valuation company used a recovery cost which is the estimated value in current prices at the date of valuation of an exact copy of the valued structures. Table 10.3 below details the results of the valuation reports prepared by the valuation companies.

Table 10.3: Compensation for affected structures and cost of valuation Compensation Reimbursement The total № Name of AHs for Residential of the valuation compensation, structure, UZS fee, UZS UZS

Masharipova 1 76,050,000 405,000 76,455,000 Saodat

Allaberganova 2 20,080,000 112,000 20,192,000 Salomat 3 Ruziboyeva Mohira 12,600,000 800,000 13,400,000 Matyakubova 4 15,160,000 800,000 15,960,000 Qurbongul Ibodullayeva 5 14,700,000 1,000,000 15,700,000 Gulnoza 6 Ibragimov Dilshod 14,470,000 800,000 15,270,000 7 Olimova Iroda 20,820,000 1,000,000 21,820,000 TOTAL: 173,880,000 4,917,000 178,797,000 Source: Reports of “Estimation Standart” and Mezon Baholash LLC 2019

10.5 Relocation and additional assistance to vulnerable AHs

283. In Section 5, there is no physical relocation of the members of the family as there are no persons living in the affected structures. In the Hazorasp district, all the affected structures consist of a concrete foundation that cannot be moved which means no relocation possible. In the district of Bogot, the AH (Masharipova Saodat) uses the residential structure for temporary housing during the growing seasons. AH will continue to use the remaining part of the building (60% is being not affected). Also, the building will not be demolished until the new residential structure will be constructed. Also, affected lands will not be expropriated from the AH but limited to construct residential structures. A residential structure can be built within the existing territory of the AH. However, the affected structures can be still used for non-residential purposes without demolishing them. As part of the income restoration measures, salvaged materials after the demolition of structures will be allowed to be kept by AHs, therefore

67 relocation assistance in the amount of 500,000 UZS will be provided for the AH (MasharipovaSaodat) Based on these facts, a relocation assistance was included in addition to other forms of assistance are included in this updated LARP.

284. As stated before affected residential structures have not been finished yet, therefore no person has been settled yet. AHs have other residential houses in different locations. Therefore, no displacement of HH members will be observed. So, no assistance for the transition period will be provided. Land for land compensation will be provided for each AHs.

285. Census has found 8 AHs who are categorized as vulnerable heads of the AHs, including, woman-headed household without any support in working-age people in the family (50%), household headed by physically/mentally challenged person (37.5%) and elderly headed household without any support in working-age people in the family (12.5%). These AHs are entitled one-time allowance in the amount of 1,014,000 UZS per household.

286. Additionally, members of vulnerable households will also be prioritized19 in project- related employment. In compliance with Resolution#866 of the CoM of Uzbekistan of 14 October, 2019 individuals with disabilities and low-income families are receiving an additional payment of 50,000 UZS per month in addition to their allowances for the purchase of bread products by the Ministry of Finance of Uzbekistan.

287. In addition to vulnerability allowance, AHs losing residential structures will be provided 1,014, 000 UZS per household for severity impact.

288. In total 15,710,000 UZS will be paid for support allowances for vulnerable AHs and severely affected households. Table 10.4 elaborates on the type of allowance, unit rate, number of AHs, and total support allowances.

Table 10.4: Support allowances for vulnerable AHs and severely affected households Support allowance for: Woman Elderly headed Household headed Severely household headed by household affected # District Name of AHs without any physically/ without any household support in mentally support in + Total working-age challenged working-age relocation people in the person people in the assistance family family Masharipova 1 Bogot 1,014,000 Gulsara 1,014,000 Kurbanbaeva 2 Bogot 1,014,000 Nukildjon 1,014,000 Masharipova 3 Bogot 1,514,000 Saodat 1,514,000 Abdullayev 4 Bogot 1,014,000 Nurillo 1,014,000 Yusupova 5 Honka 1,014,000 Maksuda 1,014,000 Yarashova 6 Yangiarik 1,014,000 Oliyadjon 1,014,000 Bobodjonov 7 Honka 1,014,000 Ihtiyor 1,014,000 8 Hazorasp Erkaev Sadullo 1,014,000 1,014,000

19 Applicants should meet eligibility requirements in terms of qualification and skills

68

Support allowance for: Woman Elderly headed Household headed Severely household headed by household affected # District Name of AHs without any physically/ without any household support in mentally support in + Total working-age challenged working-age relocation people in the person people in the assistance family family Allaberganova 9 Hazorasp 1,014,000 1,014,000 Salomat 2,028,000 Ruziboyeva 10 1,014,000 Hazorasp Mohira 1,014,000 Matyakubova 11 1,014,000 Hazorasp Qurbongul 1,014,000 Ibodullayeva 12 1,014,000 Hazorasp Gulnoza 1,014,000 Ibragimov 13 1,014,000 Hazorasp Dilshod 1,014,000 14 Hazorasp Olimova Iroda 1,014,000 1,014,000 Total 4,056,000 3,042,000 1,014,000 7,598,000 15,710,000

289. During the census, affected residential households declared that they are not living in these residential houses since the building structure has not been fully built yet. Therefore, during the census, no family members except the head of HH presented. Also, investigation of the rooms of the houses showed that AHs have not yet brought any goods. Currently affected residential AH is living at other residential houses. During the social compliance audit report, this information needs to be verified once again. Additionally, the Contractor for civil works will be ready to assist residential AH with the transportation of the family members, goods and chattels to temporary and permanent relocation sites. This will be also attracted to the Contractor’s contract as well.

290. In cases where an AH requires support which would typically involve the provision of labor for the dismantling of house/building and transportation of materials, UNPN will provide the necessary support through the Contractor responsible for Construction.

10.6 Summary Budget

291. The LARP budget, based on compensation calculations for losses to agricultural land, crops, agricultural land replacement, building and structures, and support allowances are estimated to be 728,109,081 UZS equivalent to US$ 78,057. The summary of the total compensation payments is given in Annex 26. The direct compensation cost will comprise 98% while indirect cost 2% of the total compensation costs. Internal monitoring and evaluation, as well as LARP implementation, will be covered under an ongoing contract package between UNPN and PIC.

292. The detailed budget items are summarized in Table 10.5 below.

69

Table 10.5: Summary of Estimated Budget

Cost Estimate, Cost Estimate, № Description UZS UZS (A) Direct Cost 1 Temporary impacts (Crops) 516,608,858 54,414 2 Trees 38,180,223 4,022 3 Building and Structures 173,880,000 18,315 Subtotal (A) 728,669,081 76,750 (B) Indirect cost 1 Reimbursement of Valuation fee 4,917,000 518 Support allowances for vulnerable 2 groups and severely affected 15,710,000 1655 households Subtotal (B) 20,627,000 2173 Grand Total 749,296,081 78,923

70

11. INSTITUTIONAL ARRANGEMENT

11.1 General 293. This section describes institutional arrangements for preparing, implementing, and monitoring involuntary land acquisition and resettlement activities of the project including a description of organizational procedures for delivering entitlements, implementation process, including how resettlement preparation, approval, and implementation will be linked to contract awards and the start of the project’s civil works.

11.2 UNPN and project management unit

294. The State Joint-Stock Company National Electric Networks of Uzbekistan (UNPN) will have overall responsibility for all aspects of the program. The Project Management Unit (PMU) within UNPN will be responsible for the day to day management of the Project including cross-agency coordination, and via the Resettlement Expert (RE) for LARP implementation and monitoring the compensation and disbursement.

295. The RE under PMU will be directly involved in all LAR related planning, implementation, inter-agency coordination, monitoring, and reporting. The RE will receive support from the relevant project consultants and benefit from inputs from the Design Institute (DI), district/city executive authority and land resources and cadaster department as appropriate.

296. Khorezm main power network (KMPN) that has been established on 23 July 2019 is one of 14 regional power networks of UNPN responsible for power transmission and maintenance of transmission lines and substations in the Khorezm region of Uzbekistan. JSC UNPN is a central organization of the Ministry of Energy responsible for sustainable and regular service of power consumers as well as maintenance of the grid in constant high technical operation. Through KMPNs power is transmitted from a power plant to Khorezm power grids.

297. KMPN will be the entry point for receiving a complaint or known as a Focal Grievance Point (FGP). Moreover, KMPN will ensure local monitoring of LARP implementation assisting PMU in all LARP related implementation activities.

298. UNPN as the Executing Agency (EA) has established a PMU with required staff, including a safeguards specialist within the PMU. UNPN will also be responsible for the selection of a Construction Supervision Consultant (CSC). UNPN and its PMU will be responsible for finalizing final LARP after detailed design with support from resettlement consultants hired by Fichtner GmbH & C.KG. UNPN will be capable for approval of adequate budgetary support for LARP implementation and will facilitate coordination with the concerned government line agencies on LAR activities as well as with independent valuation firms. UNPN and its PMU will be responsible for finalizing/updating LARP, getting the government’s endorsement, approval of the LARPs from ADB and will ensure compliance regarding complete payment of compensation to APs before the start of civil construction.

11.2.1 Resettlement Experts (RE)

299. UNPN has hired Fichtner GmbH & C.KG as Project Implementation Consultant (PIC) for the overall development of final LARPs. A Resettlement Expert (RE) of PIC will work closely with PMU’s Safeguards Specialist and the engineering team. RE will assist all necessary information to finalize LARPs for all sections based on the detailed design. The work for the RE will broadly be segregated in two parts such as developing final Due diligence reports and updating LARP based on detailed design, implementation of the LARP including preparation of monitoring reports.

71

The RE will assist Safeguards Specialist of PMU in the overall supervision of the project and ensure that LAR activities are implemented in a smooth and timely manner by the provisions of the LARP. During the implementation of LARP, the consultants will ensure that affected persons/households will receive compensation at replacement cost prior to construction works, including ongoing rehabilitation measures.

11.3 Design Institute - “JSC Sredazenergosetproekt” (SAESP)

300. SAESP is one of the most significant Design and Survey Company in Uzbekistan as well as in Central Asia for designing high voltage transmission line projects. It has past experiences with previous transmission line designs of UNPN. In this project, SAESP has been responsible for finalizing the detailed design. The role of the SAESP in this NWRTLP project includes design and control during the construction activity.

301. SAESP will collaborate and work closely with the PMU/Safeguard Team and has the following tasks: (i) look for measures and alternatives to avoid and minimize the land acquisition and resettlement impacts during detail design; (ii) assemble all documents required for compensation if any impacts determined during detail design; (iii) carry out topographic surveys of the expropriated land and replacement lands, if any; (iv) elaborate layouts indicating the location of worksites, permanent infrastructures and perimeter of required surfaces differentiating the land use patterns in the areas being occupied to serve as a base for the selection of compensation land; (v) Conduct landmarking of the land allocated for the construction and identify the possible impacted AHs including their lands, structures, and dwellings.

11.4 Land Use Planning Institute UzDavYerLoyiha

302. This Design Institute is mainly responsible for land use designs in Uzbekistan. By the Resolution of Cabinet of Ministers #317, Uzdavyerloyiha is the authorized institution that develops documentation for land acquisition and land allocation and calculates agricultural losses due to permanent and temporary land acquisition. It is also responsible for identifying and verifying property boundaries and ownership for allocated land during the preparation of the Land Acquisition and Allocation Act (otvod zemli) or in common term Detailed Measurement Surveys. DMS should show in the documents the final list of AHs and their affected lands should be in detail presented through the maps.

303. It also prepares the Government Decree on Eminent Domain (Dalolatnoma in the Uzbek language) for affected lands. The Decree contains the agreement letters from affected households, the conclusions of the utility companies concerning the affected land’s status, reference letters regarding the legal status of the affected lands. EMD should reflect also the impacted assets and lands, and the amount of compensations to be paid to AHs.

304. In the development of this updated LARP for this section 5 a consultant based on the DMS prepared by Khorezm branches of UzDavYerloyiha. These Institutes provided the list of affected households, inventory of losses and extent of land impacts.

11.5 District branch of State Committee on Land Resources, Geodesy, Cartography and State Cadaster (SCLRGCSC)

305. SCLRGCSC is a permanent committee with its Provincial and District level branches. However, it plays an enhanced role throughout implementation. It is responsible for:

72

 identifying land losses incurred by land users plus agricultural output losses;  determining the degree and area of land restitution, including removal and temporary storage of productive soil layer;  determining the need for protective sanitary and water protection zones around constructions;  preparing proposals on the allocation of land plots of equal value under land for land;  investigating alternatives to acquiring currently used land through developing unused land;  approving the Implementation Act and the attached plan;  amending government edicts on land use and land ownership as well as other cadaster documents.

11.6 District (Hokimyat) (Governorates)

306. District (Hokimyat) will be intimately involved in the LARP review and implementation which forms the Commission on Land Acquisition and District Evaluation Commissions. These will form district land acquisition and resettlement committee (DLARC) which will undertake the following:  issue Eminent Domain Decree (EDD) for affected lands  delegate the EDD to Regional Hokimiyat for final approval  notification of APS on EDD and provide Maps of affected lands and properties  outline locations of constructions and structures affected by the project;  select land for the construction sites;  allocated new land plots for affected AHs  legalize the lands of non-titles land users  approves the decree for the right to use the land plot  forwards the complaints of citizens and affected households to PMU.

11.7 Independent Valuation Companies

307. In this section 5 of the NWRTLP in total 2 Independent Valuation companies have been involved. Both companies are located and registered in Khorezm region.

308. The first company named “Expert Price” LLC has been hired by the AH themselves and the company estimated the market price of the affected residential houses belonging to 1 AH. The valuation company has been hired by the AH and costs have been paid themselves as well. UNPN will reimburse the costs of the valuation fee in a frame of this LARP budget.

309. In order to identify the market value of the Trees belonging to AHs, the Independent Valuation company “Estimation standard” has been selected by the UNPN. This selection has been consulted with the AHs and they were agreed. Therefore, the costs of the valuation have been paid by the UNPN. No reimbursements are foreseen for the affected farmers for valuation costs.

11.8 Community-Based Organizations (CBOs)

310. Board of Farmers in Uzbekistan (BFU) and Makhalla leaders will be involved in land acquisition activities to ensure the rights and interests of affected households. Implementation of LARP will require close coordination with the local Makhalla representatives and the Board of Farmers. This coordination will help UNPN in the following: (i) Dissemination of LARP related information; (ii) Checking timely disbursement of compensation to AHs; (iii) Obtaining early warnings on the grievances of AHs; (iv) Verifying as to whether the vulnerable AHs were identified according to the requirement laid down in this LARP; and

73

(v) Collecting information regarding any unexpected impacts, if any, being incurred by the AHs. (vi) forwards the complaints of citizens and affected households to PMU

311. The CBOs will ensure that vulnerable households be adequately supported by the national livelihood support program.

11.9 Training of PMU

312. UNPN understands that in order to follow ADB’s Safeguards policies, there is a need for training of PMU staff. Mainly responsible for land use designs in Uzbekistan. By the Resolution of Cabinet of Ministers #317, Uzdavyerloyiha is the authorized institution that develops documentation for land acquisition and land allocation and calculates agricultural losses due to permanent and temporary land acquisition. It is also responsible for identifying and verifying property boundaries and ownership for allocated land during the preparation of the Land Acquisition and Allocation Act (otvod zemli) or in common term Detailed Measurement Surveys. DMS should show in the documents the final list of AHs and their affected lands should be in detail presented through the maps.

74

12. LARP IMPLEMENTATION

12.1 General 313. The implementation of this updated LARP for section 5 of NWRTLP will be scheduled after review and approval of the final LARP by ADB. All activities related to the land acquisition and resettlement will be planned to ensure that compensation is paid before taking possession of land and commencement of civil works. Public consultation, monitoring, and grievance redress will be undertaken intermittently throughout the project duration. Construction will be initiated when compensation is fully paid. The completion of LARP implementation will be documented through the LARP implementation compliance report (s) and approved by ADB.

12.2 LARP Implementation Stage 314. Upon the approval of final LARP, all the arrangements for fixing the compensation and the disbursement needs to be done which includes issuance of identity cards (IDs), payment of all eligible compensation and assistance; initiation of land development process; site preparation for delivering the site to contractors for construction and finally commencement of the civil works. Payment of compensation and allowances under the LARP will commence after some preparatory tasks have been completed, but before the civil works commence. These tasks are:  Disclosure of LARP on the websites and Telegram channel of the UNPN  Disbursement of compensation and assistance  Grievance resolution (if any)  LARP Compliance Report submission  Notice to proceed for civil works construction  Restoration of public land by the contractor  Monitoring 315. During implementation, the AHs will need to be informed about their rights and options, at which point they will have their say and discuss matters that need clarification. Cash compensation amount and land for land compensation will be presented to each eligible AHs for consideration and endorsement before cash payment. A grievance redress committee will be established throughout the project duration.

12.3 Procedures for Payment of Compensation 316. Compensation payments will be made before any project use of land, loss of assets or physical resettlement takes place unless those payments are staggered to enable affected people to begin preparation of new sites. The income/livelihood restoration activities may continue alongside project construction activities. The overall responsibility for payments of compensation for this Project is under UNPN. The district Hokimiyats is responsible for the provision of land for land compensation.

317. DMS including the decision of Hokims and agreement letter from each affected household regarding land acquisition are already submitted for this section 5. Each AH will receive their compensation payable into a bank account opened by the affected household. Such sums will be transferred to the bank account of each AH(s), according to the banking documentation provided by them. The AHs will be individually informed by the bank upon the transfer of compensation into the account. The transfer of payment will be made after public disclosure among AHs.

75

318. In the event of an appeal in the Court, when no agreement is reached or the compensation payable is not agreed upon between the UNPN and the landowner, such compensation shall be determined by the Court. In these conditions, the person gets the money from the bank, but depending on the judicial decision he is entitled to receive an additional benefit.

12.4 Implementation Schedule 319. The schedule for the LARP implementation of the section 5 is provided in Table 12.1. The schedule can be adjusted during the implementation. Table 12.1: Implementation Schedule

LAR ACTIVITIES TIMING Responsibility A. Detailed Design Submission of Final LARP for ADB December 2019 Project Implementation Approval Consultant and UNPN Disclosure of LARP on the website December 2019 Project Implementation of UNPN and ADB Consultant and UNPN B. LARP Implementation Issuance of IDs to APs December 2019 UNPN and Hokimyat Continuous Project Implementation Consultant and UNPN (throughout the construction Consultation and GRM period) Payment of compensation to APs January 2020 UNPN Payment of all eligible assistance January 2020 UNPN January 2020 Project Implementation LARP Compliance Report Consultant and UE Notice to proceed for civil works January 2020 ADB construction

C. Internal Monitoring by UNPN Continuous Project Implementation Consultant and UNPN Quarterly reports being submitted to (throughout the construction ADB period) LARP Compliance Report to be Upon completion of LARP Project Implementation submitted upon completion of LARP implementation or, while the Consultant and UNPN implementation LARPs implementation is in progress

76

13. MONITORING AND REPORTING

320. While effective institutional arrangements can facilitate implementation, effective monitoring ensures that the course and pace of implementation continue as originally planned. Monitoring is important for ensuring that the LARP is effectively implemented, unforeseen impacts related to land acquisition activities can be identified and appropriate measures to address the same can be taken in a timely manner.

321. The implementation of LARP will be internally monitored by UNPN. UNPN has hired Fichtner GmbH & C.KG as Project Implementation Consultant (PIC) for monitoring and reporting of LARP implementation. Resettlement Expert of PIC will work closely with PMU’s Safeguards Specialist and the engineering team.

322. The monitoring process will be in close coordination with local Hokimiyat and CBOs. Internal monitoring will be carried out in parallel to project implementation and at different stages respectively. Through the monitoring process, UNPN will ensure that:

(i) in case if any unanticipated social risks and impacts arise during construction, implementation or operation of the Project that was not considered in the LARP, promptly inform ADB of the occurrence of such risks or impacts, with a detailed description of the event and proposed corrective action plan; and (ii) report any actual or potential breach of compliance with the measures and requirements set forth in the LARP promptly after becoming aware of the breach.

323. The indicators for internal monitoring will be subject related to immediate activities for LARP implementation and its outputs and results. This information will be collected directly from the field and from the District land resources and cadaster department. It will be used to assess the progress and results of LARP implementation, and to adjust the work program, if necessary. The quarterly reports will be incorporated into the standard supervision reports to ADB. Internal monitoring will continue until all construction works are completed and continuously reported by submitting semi-annual reports. These reports should be submitted to the UE and ADB. The PMU will disclose relevant information from such reports to affected persons promptly upon submission to ADB. The specific monitoring milestones will be:

(i) Information disclosure to AH; (ii) Status of land acquisition and payments of compensation for land; (iii) Compensation for affected structures and other assets; (iv) Payments for loss of assets;

324. The Resettlement Expert will prepare the LARP compliance report to record whether the LARP has been implemented and all AHs have been compensated prior to the commencement of civil work. The Resettlement Expert will compile a full report with including extended detailed information on actual land acquisition and impact, listing affected households and compensation payments. Based on that full implementation report a Compliance Report will be submitted by UNPN to ADB.

325. The Monitoring/Compliance report will be used by ADB and EA as a basis to issue a notice to proceed with civil work activities to the contractor for site preparation. The report will be published on the website of the UNPN and ADB

77

Annex 1: Location of tension towers in section 5

78

Annex 2: Photos from a census survey of affected agricultural farms

Source: Social Impact assessment survey, 2019

79

Annex 3: Location of land units of Section 5 (part 1)

80

Location of land units of Section 5 (part 2)

81

Location of land units of Section 5 (part 3)

82

Location of land units of Section 5 (part 4)

83

Annex 4: Details of AHs by land units in Section 5

Distances, № Land User Typ of AHs meters Urgench 1 Reserve Lands The State lands 146 2, 1 Ibragim Farida Private farm 787 HH Plots (9 units of HH 3 Dehkan farms 140 Plots) 4, 5, 7, 9, 14 Doniyor Mirishkor Private farm 1317 HH Plots (3units of HH 6 Dehkan farms 52 Plots) HH Plots (7units of HH 8 Dehkan farms 95 Plots) 11 Xusunboy Karim bog'i Private farm 475 12, 13 Jaloliddin Madrahim bogi Private farm 611 Canal, road and other The State lands 867 lands Subtotal 4490 Honka 15, 17 G'ayrat Otabek Private farm 1056 16 Davron Otajon Private farm 291 18, 22 Reserve Lands The State lands 589 19, 2 Xumoyun Nizomiddin Private farm 864 21 Honqa Pilla LLC Business entity 191 23, 29 Anvar Dilshod Private farm 1963 HH Plots (12units of HH 24 Dehkan farms 298 Plots) 25, 27, 28 Jayxun Qalandar Private farm 920 HH Plots (6units of HH 26 Dehkan farms 83 Plots) HH Plots (2units of HH 30 Dehkan farms 69 Plots) 31 Vohidjon Rahmatjon Private farm 111 32 Ortiq Lola Dapmachi Private farm 444 33 Agropilla LLC Business entity 84 34, 38 Sulton Jirmiz Private farm 456 HH Plots (2units of HH 35 Dehkan farms 30 Plots) 36 Bog'dorchilik sirlari LLC Business entity 436 HH Plots (5units of HH 37 Dehkan farms 64 Plots) 39 Gulhayo Gul Zulxumor Private farm 697 Canal, road and other The State lands 1804 lands Subtotal 10450

84

Distances, № Land User Typ of AHs meters Yangiarik 40, 42 Qo'chqorov Azamat Private farm 686 HH Plots (21units of HH 41 Dehkan farms 333 Plots) 43 Xusinboy Qadamboy Private farm 199 44 Gulobodli Maxkambek Private farm 405 HH Plots (20units of HH 45 Dehkan farms 479 Plots) 46, 47 Gulsevar Bonu Private farm 686 47 Yangiariq Kumush Tola Private farm 115 48, 5 Alibek Öktamboy Private farm 871 51 Gulobod Örin Zak Private farm 815 52 Berdiboy Asilbek Private farm 237 53 Diyorbek Bunyodbek Private farm 799 54, 56 Reserve Lands The State lands 1461 55 Sardorbek Private farm 793 Canal, road and other The State lands 921 lands Subtotal 8800 Bogot 57 Mirzo Private farm 904 58 Sherali Matkarimov Private farm 1258 59, 61 Ulug'bek Private farm 1178 60 Ibrat Ixtiyor Aziz Private farm 375 62,73,75,78, Reserve Lands The State lands 17977 82, 84 Ruziboy Sobir 63, 65 Private farm 1924 Ruziboyevich HH Plots (23units of HH 64 Dehkan farms 462 Plots) HH Plots (28units of HH 66, 67 Dehkan farms 572 Plots) 68 Boburjon Nozimjon Private farm 1760 69 Masharipova Saodat Residential 38 70 Dilfuza Kazak Private farm 553 71 Sahro Mo'jizasi Private farm 64 72 Saidov G'ayrat Private farm 184 74 Asadbek Shoxista Private farm 435 75 Shirin Umidli Yulduz Private farm 54 77 Shermat Roziya Private farm 128 79 Ozod Razzoq Private farm 186 80 Shukurjon Shavkat Private farm 773 81 Matnazar Baliqchi Private farm 180 Farangiz Parizoda 83 Private farm 418 Matkarim

85

Distances, № Land User Typ of AHs meters Canal, road and other The State lands 1447 lands Subtotal 30870 Hazorasp Jurabek Jamshid Oltin 85 Private farm 232 Baliq 86, 101, 104, 106, 108, 118, Reserve Lands The State lands 5020 121, 122, 125, 128, 135 HH Plots (4units of HH 87 Dehkan farms 48 Plots) Khorezm State Forestry 88, 90 Forestry 3598 Lands 89 Sobir Bobur Bunyod Private farm 666 91 Shavkat Ko'sa Private farm 659 92 Kenja Yoqutjon Private farm 831 93 Ulug'bek Private farm 277 HH Plots (4units of HH 94 Dehkan farms 64,6 Plots) Bekmurod Sevara 95 Private farm 1225 Barchinoy 96 Ummon Oqqush Nur Private farm 455 97 Tölqinbek Private farm 492 98, 100 Matkarim Xotam Private farm 1260 99 Muhomon Bio Servis LLC Business entity 83 102 Tolibjon G'olibjon Private farm 860 103 Zulfiya Matyakubovna Private farm 1028 HH Plots (4units of HH 105 Dehkan farms 45,6 Plots) 107 Orom Bo'yi Private farm 571 109 Quvonchbek Duschanov Private farm 204 110, 112 Quronboy Sapargul Private farm 1666 HH Plots (4units of HH 111 Dehkan farms 44 Plots) 113 Qut Baraka Bog'i Private farm 223 114 Oybek Asadbek Kazbek Private farm 277 115 Allanazarov Oromboy Private farm 804 116 Abdulloh Private farm 444 117 Mariya Muborak Doston Private farm 767 Residential Lands (6 units 118 Residential 124 of Residential Plots) HH Plots (4units of HH 119 Dehkan farms 51,6 Plots) 120 Abdirimova Darmon Private farm 310 86

Distances, № Land User Typ of AHs meters 123 Og'abek Zohida Private farm 180 124 Nur Xitoy Private farm 595 126 Norjon Miskin Private farm 360 127 Karimboy Xalima Private farm 332 129 Rahmatilla Otajon Private farm 477 130 Rahmatilla Dilbar Private farm 459 131 Asadbek Amudaryo Private farm 450 132 Qirdagi Ilhom Private farm 304 133 Aminboy Anvarbek Private farm 150 134 Asadbek Amudaryo Private farm 1660 136 Amudarya river The State lands 632 Canal, road and other The State lands 928 lands Subtotal 28857 TOTAL 83467

87

Annex 5: Land plot allocation document provided by the Architectural Department of Khazorasp district

88

Annex 6: Extract from land allocation acts approved by the regional Hokim of Horezm region

89

Annex 7: Temporary Land Acquisition

Name of Type of Temporary № № Land user district HHs impacted land, ha

1 Urgench 1 Ibrohim Farida Farm 1,1805 2 Urgench 2 Doniyor Mirishkor Farm 1,9755 3 Urgench 3 Xusinboy karim bogi Farm 0,7125 4 Urgench 4 Jaloladin Madraxim Farm 0,9165 5 Urgench 5 Ortiqov Sopohon HH plot 0,073 6 Urgench 6 Ahmedov Qodir HH plot 0,024 7 Urgench 7 Otajonov Quvondiq HH plot 0,019 8 Urgench 8 Matkarimov Hamro HH plot 0,015 9 Urgench 9 Bobojonov Farhod HH plot 0,019 10 Urgench 10 Bobojonov Hayitboy HH plot 0,012 11 Urgench 11 Artiqov Rajabboy HH plot 0,011 12 Urgench 12 Samandarova Zamira HH plot 0,009 13 Urgench 13 Qodirova Zevar HH plot 0,0285 14 Urgench 14 Nurillaeva Oybibi HH plot 0,024 15 Urgench 15 Ruzmetov Yuldosh HH plot 0,0355 16 Urgench 16 Abdullaev Urinboy HH plot 0,018 17 Urgench 17 Artikova Quzigul HH plot 0,021 18 Urgench 18 Shernazarov Mamat HH plot 0,029 19 Urgench 19 Olloberganov Mansurbek HH plot 0,021 20 Urgench 20 Olloberganov Anvar HH plot 0,018 21 Urgench 21 Olloberganov Ibrohim HH plot 0,019 22 Urgench 22 Sobirov Mansur HH plot 0,019 23 Urgench 23 Sobirov Erkin HH plot 0,015 Subtotal Urgench 5,215 24 Honka 1 Gajrat Otabek Farm 1,584 25 Honka 2 Davron Otajon Farm 0,4365 26 Honka 3 Xumoyun Nizomiddin Farm 1,296 27 Honka 4 Anvar Dilshod Farm 2,9445 Business Honka 5 Xonqa Pilla MCHJ 0,2865 28 entity 29 Honka 6 Jayxun Kalandar Farm 1,38 30 Honka 7 Voxidjon raxmatjon Farm 0,1665 31 Honka 8 Ortik lola Dapmachi Farm 0,666 Business Honka 9 Xonqa Agro Pilla MCHJ 0,126 32 entity 33 Honka 10 Sulton Jirmiz Farm 0,684 Business Honka 11 Bogdorchilik Sirlari MCHJ 0,654 34 entity 35 Honka 12 Gulxayo Gulsaro Zulxumor Farm 1,0455 36 Honka 13 Sapaeva Shukurjon HH plot 0,0201 37 Honka 14 Rahimov Murod HH plot 0,0635 38 Honka 15 Ruziboev Sirojiddin HH plot 0,0175 39 Honka 16 Yusupov Ahmadjon HH plot 0,0635

90

Name of Type of Temporary № № Land user district HHs impacted land, ha

40 Honka 17 Hayitov Quvondiq HH plot 0,0208 41 Honka 18 Yusupov Hasan HH plot 0,0373 42 Honka 19 Jumaniyozova Tojigul HH plot 0,018 43 Honka 20 Rajabova Dilbar HH plot 0,0195 44 Honka 21 Qurbonov Hayitboy HH plot 0,0158 45 Honka 22 Hudoyberganov Islom HH plot 0,0754 46 Honka 23 Xujaniyozov Komil HH plot 0,0245 47 Honka 24 Rahimov Muhammad HH plot 0,0714 48 Honka 25 Mirzaev Ismoil HH plot 0,0185 49 Honka 26 Rajabboev Ahmadjon HH plot 0,023 50 Honka 27 Turaev Safarmad HH plot 0,0225 51 Honka 28 Masharipov Umirbek HH plot 0,023 52 Honka 29 Matkarimov Davron HH plot 0,019 53 Honka 30 Yusupova Maqsuda HH plot 0,018 54 Honka 31 Jumanazarov Omon HH plot 0,0815 55 Honka 32 Qalandarova Ozoda HH plot 0,0225 56 Honka 33 Bobojonov Hudyjbergan HH plot 0,024 57 Honka 34 Urunov Gayrat HH plot 0,021 58 Honka 35 Qalandarov Xushnud HH plot 0,021 59 Honka 36 Abdullayev Ilhom HH plot 0,021 60 Honka 37 Bobojonov Ihtiyor HH plot 0,0145 61 Honka 38 Niyozmetova Roziya HH plot 0,024 62 Honka 39 Qalandarov Maqsud HH plot 0,0145 Subtotal Honka 12,085 63 Yangiariq 1 Quchqorov Azamat Farm 1,029 64 Yangiariq 2 Xusinboy Qadamboy Farm 0,2985 65 Yangiariq 3 Gulobodli Mahkambek Farm 0,6075 66 Yangiariq 4 Gulsevar Bonu Farm 1,029 Yangiariq Kumush Tola Business Yangiariq 5 0,1725 67 MCHJ entity 68 Yangiariq 6 Alibek Uktamboy Farm 1,306 69 Yangiariq 7 Gulobod Urin Zak Farm 1,2225 70 Yangiariq 8 Berdiboy Asilbek Farm 0,3555 71 Yangiariq 9 Diyorbek Bunyodbek Farm 1,1985 72 Yangiariq 10 Sardorbek Farm 1,1895 73 Yangiariq 11 Qurbonov Ganijon HH plot 0,02 74 Yangiariq 12 Raximov Xamro HH plot 0,021 75 Yangiariq 13 Anyazov Xasanboy HH plot 0,022 76 Yangiariq 14 Qurbonov Shonazar HH plot 0,022 77 Yangiariq 15 Raximov Otajon HH plot 0,0855 78 Yangiariq 16 Raximov Qadamboy HH plot 0,02 79 Yangiariq 17 Abdirimov Avezmat HH plot 0,022 80 Yangiariq 18 Matyoqubov Ravshan HH plot 0,031 81 Yangiariq 19 Sultonov Rahim HH plot 0,02 91

Name of Type of Temporary № № Land user district HHs impacted land, ha

82 Yangiariq 20 Rozmetov Sharofaddin HH plot 0,0165 83 Yangiariq 21 Matyoqubova Bekposhsha HH plot 0,023 84 Yangiariq 22 Bekmetov Kenja HH plot 0,019 85 Yangiariq 23 Xudayberganova Bibijon HH plot 0,021 86 Yangiariq 24 Eshmetov G'ayrat HH plot 0,019 87 Yangiariq 25 Botirov Nuriddin HH plot 0,018 88 Yangiariq 26 Egamov Rashid HH plot 0,029 89 Yangiariq 27 Yormetov Xushnud HH plot 0,025 90 Yangiariq 28 Ro'zmetov Xasanboy HH plot 0,021 91 Yangiariq 29 Elomonov Bahtiyor HH plot 0,01 92 Yangiariq 30 Davletov Bahodir HH plot 0,015 93 Yangiariq 31 Saidahmedov Ruziboy HH plot 0,17 94 Yangiariq 32 Ruziboev Karimboy HH plot 0,027 95 Yangiariq 33 Sobirov Sobir HH plot 0,016 96 Yangiariq 34 Qalandarov Shavkat HH plot 0,019 97 Yangiariq 35 Bekjonova Sanamjon HH plot 0,025 98 Yangiariq 36 Avazmetov Ravshan HH plot 0,018 99 Yangiariq 37 Boltaev Jumaboy HH plot 0,014 100 Yangiariq 38 Abdullaeva Saodat HH plot 0,017 101 Yangiariq 39 Qurbonov Rahim HH plot 0,015 102 Yangiariq 40 Nurmetov Rustam HH plot 0,2 103 Yangiariq 41 Yarashova Oliyajon HH plot 0,017 104 Yangiariq 42 Normetov Farhod HH plot 0,018 105 Yangiariq 43 Egamov Davron HH plot 0,024 106 Yangiariq 44 Sobirov Ismoil HH plot 0,019 107 Yangiariq 45 Egamov Ergash HH plot 0,024 108 Yangiariq 46 Otajonov Otahon HH plot 0,019 109 Yangiariq 47 Saidmetov Ruslan HH plot 0,024 110 Yangiariq 48 Matrasulov Rustam HH plot 0,023 111 Yangiariq 49 Jumaniyozov Erkinboy HH plot 0,018 112 Yangiariq 50 Ibodullaev Qurbonboy HH plot 0,019 113 Yangiariq 51 Ibodullaev Vais HH plot 0,012 Subtotal Yangiariq 9,627 114 Bogot 1 Mirza Farm 1,356 115 Bogot 2 Sherali Matkarimov Farm 1,887 116 Bogot 3 Ulugbek Farm 1,767 117 Bogot 4 Ibrat ixtiyor aziz Farm 0,5625

Bogot 5 Ruziboev Sobir Ruziboevich Farm 2,886 118 119 Bogot 6 Boburjon Nozimjon Farm 2,64 120 Bogot 7 Dilfuza Qozoq Farm 0,8295 121 Bogot 8 Sahro Mujizasi Farm 0,096 122 Bogot 9 Saidov Gayrat Farm 0,276 123 Bogot 10 Asadbek Shohista Farm 0,6525 92

Name of Type of Temporary № № Land user district HHs impacted land, ha

124 Bogot 11 Shermat roziya Farm 0,192 125 Bogot 12 Shirin Umidli Yulduz Farm 0,081 126 Bogot 13 Ozod Razzoq Farm 0,279 127 Bogot 14 Shukurjon Shovkatjon Farm 1,1595 128 Bogot 15 Matnazar Baliqchi Farm 0,27 Bogot 16 Farangiz Farizoda Matkarim Farm 0,627 129 130 Bogot 17 Ro'ziboyev Ravshanbek HH plot 0,013 131 Bogot 18 Tojiyev Doston HH plot 0,031 132 Bogot 19 Yacshimurodov Ilhomboy HH plot 0,0285 133 Bogot 20 Tojiyev G'ayrat HH plot 0,0255 134 Bogot 21 Tojiyev Farxod HH plot 0,0258 135 Bogot 22 Yaxshimurodov Umar HH plot 0,072 136 Bogot 23 Qurbonova Zulxumor HH plot 0,027 137 Bogot 24 Egamov Ulug'bek HH plot 0,021 138 Bogot 25 Egamov Ismoil HH plot 0,024 139 Bogot 26 Normatov Rustam HH plot 0,027 140 Bogot 27 Röziboyev Abdulla HH plot 0,022 141 Bogot 28 Normatov Farxod HH plot 0,027 142 Bogot 29 Masharipova Gulsara HH plot 0,028 143 Bogot 30 Tojiyev Alisher HH plot 0,0254 144 Bogot 31 Röziboyev Ramat HH plot 0,027 145 Bogot 32 Tojiyev Xaitboy HH plot 0,007 146 Bogot 33 Matjonov G'ayrat HH plot 0,027 147 Bogot 34 Ro'zmetov Ibodulla HH plot 0,072 148 Bogot 35 Allayev Shonazar HH plot 0,027 149 Bogot 36 Mametov Otanazar HH plot 0,027 150 Bogot 37 Röziboyev Qadam HH plot 0,027 151 Bogot 38 Qurbonov Shuhrat HH plot 0,056 152 Bogot 39 Nurberdiyev Madamin HH plot 0,027 153 Bogot 40 Boboyev Umirbek HH plot 0,027 154 Bogot 41 Maratov Kadamboy HH plot 0,027 155 Bogot 42 Ollomov Ozod HH plot 0,050 156 Bogot 43 Abdullayev Nurullo HH plot 0,027 157 Bogot 44 Ollomov Ruslan HH plot 0,027 158 Bogot 45 Ollonazarova Anajon HH plot 0,027 159 Bogot 46 Rözmetov Toxir HH plot 0,027 160 Bogot 47 Sobirov Xasanboy HH plot 0,027 161 Bogot 48 Röziboyev Oybek HH plot 0,021 162 Bogot 49 Matyoqubov Yöldosh HH plot 0,045 163 Bogot 50 Matyoqubov Radisu HH plot 0,021 164 Bogot 51 Sobirova Gulsara HH plot 0,027 165 Bogot 52 Maratov Yöldosh HH plot 0,027 166 Bogot 53 Maratov Muhitdiin HH plot 0,056 93

Name of Type of Temporary № № Land user district HHs impacted land, ha

167 Bogot 54 Röziboyev Otanazar HH plot 0,027 168 Bogot 55 Röziboyev Rustam HH plot 0,03 169 Bogot 56 Boboyev Shuhrat HH plot 0,03 170 Bogot 57 Rözmetov Otabek HH plot 0,019 171 Bogot 58 Abdullayev Otabek HH plot 0,027 172 Bogot 59 Rejabov Xushnud HH plot 0,027 173 Bogot 60 Röziboyev Ergash HH plot 0,027 174 Bogot 61 Qöshaqov Sanjar HH plot 0,0285 175 Bogot 62 Qöshaqov Sarvar HH plot 0,027 176 Bogot 63 Qöshaqov Sardor HH plot 0,027 177 Bogot 64 Jumanazarov Ilhom HH plot 0,027 178 Bogot 65 Otajanov Xamdambek HH plot 0,027 179 Bogot 66 Ismoilov Ilhom HH plot 0,027 Bogot 67 Xudayberganova Gulchehra HH plot 0,072 180 Subtotal Bogot 17,113 Jurabek Jamshidbek oltin Khozarasp 1 Farm 0,348 181 baligi 182 Khozarasp 2 Sobir Bobur Bunyod Farm 0,999 183 Khozarasp 3 Ogabek Zohida Farm 0,27 184 Khozarasp 4 Shovkat Kusa Farm 0,9885 185 Khozarasp 5 Kenja Yoqitjon Farm 1,2465 186 Khozarasp 6 Ulugbek Farm 0,4155 187 Khozarasp 7 Bekmurot Sevara barchinoy Farm 1,8375 188 Khozarasp 8 Ummon oq qush nur Farm 0,6825 189 Khozarasp 9 Tulqinbek Farm 0,738 Business Khozarasp 10 Muhomon Bioservis MCHJ 0,1245 190 entity 191 Khozarasp 11 Matkarim Xotam Farm 1,89 192 Khozarasp 12 Tolibjon Golibjon Farm 1,29 193 Khozarasp 13 Zulfiya Matyaqubova Farm 1,542 194 Khozarasp 14 Orom buyi Farm 0,8565 195 Khozarasp 15 Quvonchbek Duschanov Farm 0,306 196 Khozarasp 16 Quramboy Sapargul Farm 2,499 197 Khozarasp 17 Qutbaraka Bogi Farm 0,3345 198 Khozarasp 18 Abdullox Farm 0,666 199 Khozarasp 19 Oybek Asadbek Qazbek Farm 0,4155 200 Khozarasp 20 Allanazarov Oromboy Farm 1,206 201 Khozarasp 21 Mariya Muborak doston Farm 1,1505 202 Khozarasp 22 Abdirimova Darmon Farm 0,465 203 Khozarasp 23 Nur Xitoy Farm 0,8925 204 Khozarasp 24 Norjon Miskin Farm 0,54 205 Khozarasp 25 Karimboy Xalima Farm 0,498 206 Khozarasp 26 Rahmatillo Otajon Farm 0,7155 207 Khozarasp 27 Rahmatilla Dilbar Farm 0,6885 94

Name of Type of Temporary № № Land user district HHs impacted land, ha

208 Khozarasp 28 Asadbek Amudaryo Farm 0,675 209 Khozarasp 29 Qirdagi Ilxom Farm 0,456 210 Khozarasp 30 Aminboy Anvarbek Farm 0,225 211 Khozarasp 31 Asadbek Amudaryo Farm 2,49 212 Khozarasp 32 Bobojonov Rustam HH plot 0,018 213 Khozarasp 33 Erkayev Sadullo HH plot 0,0175 214 Khozarasp 34 Rajabov Muzaffar HH plot 0,019 215 Khozarasp 35 Rajabov Buvaxon HH plot 0,0175 216 Khozarasp 36 Rajabov Davlat HH plot 0,015 217 Khozarasp 37 Vaisov Mirza HH plot 0,017 218 Khozarasp 38 Abdirimov Odilbek HH plot 0,019 219 Khozarasp 39 Rajabov Rashid HH plot 0,046 220 Khozarasp 40 Vaisova Salima HH plot 0,018 221 Khozarasp 41 Matnazarov G'ulom HH plot 0,0189 222 Khozarasp 42 Sultonov Yusuf HH plot 0,0125 223 Khozarasp 43 Egamberdiyeva Gulhayo HH plot 0,019 224 Khozarasp 44 Karimberdiyev Rözimboy HH plot 0,024 225 Khozarasp 45 Xojiyev Oybek HH plot 0,023 226 Khozarasp 46 Sultonov Komil HH plot 0,018 227 Khozarasp 47 Avezov Shonazar HH plot 0,0125 228 Khozarasp 48 Buyazov Allabergan HH plot 0,023 229 Khozarasp 49 Xusainov Baxtiyor HH plot 0,0115 230 Khozarasp 50 Egamberdiyev Raxmon HH plot 0,019 231 Khozarasp 51 Soliyev Sobir HH plot 0,012 Subtotal Khozarasp 27,832 TOTAL 71,88

95

Annex 8: Photos from the affected residential structures in Hazorasp district

96

Annex 9: Photos from the affected residential structure in Bogot district

97

Annex 10: Photos from the affected lands trees in Hazorasp district

98

Annex 11: List of consulted stakeholders

Stakeholder’s Name and Position Discussed questions organization

Khorezm Main Power Qurbonov Pulat Construction works during the Network Deputy director on implementation of the LARP and during Construction the construction of TL Unanticipated impacts during the implementation stage Sredazenergosetproekt – Alla Drobova Final Design and right of ways, safety SAESP Chief Design zones of TLs discussed. Settlements are Engineer out of the safety zone are has been confirmed Sredazenergosetproekt – Asanov Remzi The location of towers as of final design SAESP Head of Survey and possible impacts within section 5 has division been discussed. Change of location of Tension tower 29 to avoid demolition of residential structures. District architectural Chief architects Development of a master plan for the AHs departments whose residential structures will be demolished. Land for land compensation and allocation of equal value/size land plots Hazorasp district Hokim Jabbarov Rawshan Allocation of a new residential land plot to affected households, Grievance Redress mechanisms Yangiariq district Hokim Masharipov Uktam Approval of the land allocation documents. Development of a new Bogot district Hokim Holboyev Oybek master plan for the affected residential households. Allocation of a new residential land plot to affected Honka district Hokim Jumanazarov households, the establishment of Omanboy Grievance Redress mechanisms Urganch district Hokim Sharipov Frunze within section 5 for the AHs. Allocation of land plots for the affected residential land plots. Land Use Planning Artur Tadjiev Land allocation procedure, the boundaries Institute-Uzdavyerloyiha Engineer and territories of section 5 within the Khorezm branch, district and possible land-use impacts. The development of land allocation acts based on the final design. Construction cannot be started before JSC Elektrtarmoqqurilish - Alisher Hamrayev compensations are fully paid to AHs. Any Contractor for civil works Chief Engineer unanticipated impacts shall be restored. ESMP shall be followed during the construction work period. Affected households All households Detailed measurements. Affected lands and structures, trees. Compensation payments. Demolition of structures cut off dates

99

Annex 12: Pictures from public disclosure meeting

100

Annex 13: Grievance Redress Mechanism

AHs

Makhalla committee Site Engineer of LEVEL-1 KMPN Grievance Site office of Addressed Contractor  District khokimiyat

Project Not addressed within Management Unit 15 days in Tashkent

Grievance Addressed LEVEL-2

Not addressed Complaint handling team within PMU within 15 days

Economic Court People can approach the court of law at time during the Grievance redress process independent of GRM and the grievance mechanism should not impede access to the country’s judicial or administrative remedies

101

Annex 14: The Logbook of GRM

Cover page: THE LOGBOOK OF COMPLAINTS, SUGGESTIONS, AND GRATITUDE

Continuation: The short content of the status of 1) Answer orally / date response and reimbursement

2) Replied in writing/date (1-satisfactory, 3) Forwarded to another 2-partially satisfactory, authority (to be indicated) / date 3-unsatisfactory.)

4) Other action (to be indicated) Contact details Contact Note Signature/ by Accepted N Date of The content Grievances /Complaint /Suggestions /Gratitude Applicant /Aggrieved Person Name) (Full / date 1 2 3

For the implementation of Loan 3285-UZB: Northwest Region Transmission Line Project (NWRTLP)

Subproject Name (Section 5) ______

Name Makhalla committee/ Contractor working office/Hokimiyat and PMU Tashkent office/: District, Province:

Notice: The grievance book should sequentially be numbered and pages have been bound securely

102

Annex 15: Extract from DMS/IOL that calculated agricultural income loss for AHs for temporary land acquisition

103

Annex 16: Compensation for temporary land acquisition

Type of Affected Yield Per Affected Total loss of Total compen- Name of AH AHs crop 1 ha, kg land. ha crops, kg sation, UZS

Urganch Ibrohim Farida Agricul.f Cotton 3000 1.14 3420 13,716,000 Agricul.f Cotton 3000 1.32 3960 15,804,000 Doniyor Mirishkor Agricul.f Rice 5000 0.35 1750 3,510,000 Xusinboy karim bogi Agricul.f Cotton 3000 0.71 2130 8,550,000 Agricul.f Cotton 3000 0.45 1350 5,400,000 Jaloliddin Madraxim Agricul.f Rice 5000 0.46 2300 4,665,000 Ortiqov Sopohon Dehkan f. Rice 5000 0.079 395 790,000 Ahmedov Qodir Dehkan f. Corn 20000 0.024 480 500,000 Matkarimov Hamro Dehkan f. Rice 5000 0.015 75 150,000 Bobojonov Farhod Dehkan f. Corn 20000 0.019 380 500,000 Artiqov Rajabboy Dehkan f. Rice 5000 0.011 55 110,000 Samandarova Zamira Dehkan f. Rice 5000 0.015 75 155,000 Qodirova Zevar Dehkan f. Corn 20000 0.028 560 500,000 Abdullaev Urinboy Dehkan f. Rice 5000 0.018 90 180,000 Artikova Quzigul Dehkan f. Corn 20000 0.021 420 500,000 Shernazarov Mamat Dehkan f. Corn 20000 0.029 580 500,000 Olloberganov Mansur Dehkan f. Corn 20000 0.021 420 500,000 Olloberganov Anvar Dehkan f. Corn 20000 0.018 360 500,000 Olloberganov Ibrohim Dehkan f. Corn 20000 0.019 380 500,000 Sobirov Mansur Dehkan f. Rice 5000 0.019 95 190,000 Sobirov Erkin Dehkan f. Rice 5000 0.015 75 150,000 Sub total 217000 4.781 19350 57,370,000 Honka Gajrat Otabek Agricul.f Cotton 2700 1.65 4455 17,868,600 Davron Otajon Agricul.f Corn 20000 0.44 8800 270,000 Xumoyun Nizomiddin Agricul.f Cotton 3200 1.3 4160 16,588,800 Agricul.f Rice 5000 0.9 4500 9,000,000 Anvar Dilshod Agricul.f Cotton 3200 0.99 3168 12,691,200 Agricul.f Cotton 3300 0.56 1848 7,425,000 Jayxun Kalandar Agricul.f Rice 5000 0.44 2200 4,425,000 Voxidjon raxmatjon Agricul.f Cotton 3300 0.17 549 2,197,800 Ortik lola Dapmachi Agricul.f Rice 5000 0.66 3300 6,660,000 Agricul.f Cotton 3300 0.25 825 3,267,000 Sulton Jirmiz Agricul.f Rice 5000 0.44 2200 4,365,000 Gulxayo Gulsaro Agricul.f Rice 5000 1.014 5070 1,014,000 Zulxumor Sapaeva Shukurjon Dehkan f. Rice 5000 0.02 100 201,000 Rahimov Murod Dehkan f. Corn 20000 0.07 1400 500,000 Ruziboev Sirojiddin Dehkan f. Corn 20000 0.07 1400 675,000 Hayitov Quvondiq Dehkan f. Rice 5000 0.03 150 273,000 Yusupov Hasan Dehkan f. Rice 5000 0.037 185 373,000 Jumaniyozova Tojigul Dehkan f. Rice 5000 0.018 90 180,000 104

Type of Affected Yield Per Affected Total loss of Total compen- Name of AH AHs crop 1 ha, kg land. ha crops, kg sation, UZS Rajabova Dilbar Dehkan f. Rice 5000 0.019 95 195,000 Qurbonov Hayitboy Dehkan f. Rice 5000 0.016 80 158,000 Hudoyberganov Islom Dehkan f. Rice 5000 0.081 405 819,000 Xujaniyozov Komil Dehkan f. Rice 5000 0.024 120 245,000 Rahimov Muhammad Dehkan f. Rice 5000 0.071 355 714,000 Mirzaev Ismoil Dehkan f. Rice 5000 0.018 90 185,000 Rajabboev Ahmadjon Dehkan f. Rice 5000 0.023 115 230,000 Turaev Safarmad Dehkan f. Rice 5000 0.022 110 225,000 Masharipov Umirbek Dehkan f. Rice 5000 0.023 115 230,000 Matkarimov Davron Dehkan f. Rice 5000 0.019 95 190,000 Yusupova Maqsuda Dehkan f. Rice 5000 0.018 90 180,000 Jumanazarov Omon Dehkan f. Corn 20000 0.081 1620 500,000 Qalandarova Ozoda Dehkan f. Corn 20000 0.022 440 500,000 Bobojonov Hudyjbergan Dehkan f. Corn 20000 0.024 480 500,000 Urunov Gayrat Dehkan f. Corn 20000 0.021 420 500,000 Qalandarov Xushnud Dehkan f. Corn 20000 0.021 420 500,000 Abdullayev Ilhom Dehkan f. Alfalfa 10000 0.021 210 500,000 Bobojonov Ihtiyor Dehkan f. Corn 20000 0.021 420 500,000 Niyozmetova Roziya Dehkan f. Corn 20000 0.024 480 500,000 Qalandarov Maqsud Dehkan f. Corn 20000 0.021 420 500,000 Sub total 349000 9.65 50980,5 95,845,400 Yangiarik Agricul.f Cotton 3000 0.28 840 3,348,000 Quchqorov Azamat Agricul.f Rice 5000 0.75 3750 7,500,000 Xusinboy Qadamboy Agricul.f Rice 5000 0.3 1500 2,985,000 Gulobodli Mahkambek Agricul.f Rice 5000 0.61 3050 6,075,000 Gulsevar Bonu Agricul.f Cotton 3000 0.73 2190 8,802,000 Alibek Uktamboy Agricul.f Cotton 3000 0.56 1680 6,678,000 Agricul.f Cotton 3000 0.22 660 2,610,000 Agricul.f Rice 5000 0.41 2050 4,155,000 Gulobod Urin Zak Agricul.f Corn 20000 0.31 6200 400,000 Agricul.f Vegetable 25000 0.17 4250 100,000 Agricul.f Cotton 3000 0.2 600 2,448,000 Diyorbek Bunyodbek Agricul.f Rice 5000 0.65 3250 6,465,000 Qurbonov Ganijon Dehkan f. Rice 5000 0.02 100 200,000 Raximov Xamro Dehkan f. Rice 5000 0.021 105 210,000 Anyazov Xasanboy Dehkan f. Rice 5000 0.022 110 220,000 Qurbonov Shonazar Dehkan f. Rice 5000 0.022 110 220,000 Raximov Otajon Dehkan f. Rice 5000 0.092 460 920,000 Raximov Qadamboy Dehkan f. Rice 5000 0.02 100 200,000 Abdirimov Avezmat Dehkan f. Rice 5000 0.022 110 220,000 Matyoqubov Ravshan Dehkan f. Rice 5000 0.031 155 310,000 Sultonov Rahim Dehkan f. Rice 5000 0.02 100 200,000 Rozmetov Sharofaddin Dehkan f. Rice 5000 0.023 115 230,000 Matyoqubova Dehkan f. Rice 5000 0.23 1150 230,000 Bekposhsha Bekmetov Kenja Dehkan f. Rice 5000 0.019 95 190,000 105

Type of Affected Yield Per Affected Total loss of Total compen- Name of AH AHs crop 1 ha, kg land. ha crops, kg sation, UZS Xudayberganova Bibijon Dehkan f. Rice 5000 0.021 105 210,000 Eshmetov G'ayrat Dehkan f. Rice 5000 0.019 95 190,000 Botirov Nuriddin Dehkan f. Rice 5000 0.018 90 180,000 Egamov Rashid Dehkan f. Rice 5000 0.029 145 290,000 Yormetov Xushnud Dehkan f. Rice 5000 0.025 125 250,000 Ro'zmetov Xasanboy Dehkan f. Rice 5000 0.021 105 210,000 Elomonov Bahtiyor Dehkan f. Rice 5000 0.01 50 100,000 Davletov Bahodir Dehkan f. Rice 5000 0.015 75 150,000 Saidahmedov Ruziboy Dehkan f. Rice 5000 0.17 850 1,700,000 Ruziboev Karimboy Dehkan f. Rice 5000 0.027 135 270,000 Sobirov Sobir Dehkan f. Rice 5000 0.016 80 160,000 Qalandarov Shavkat Dehkan f. Rice 5000 0.019 95 190,000 Bekjonova Sanamjon Dehkan f. Rice 5000 0.025 125 250,000 Avazmetov Ravshan Dehkan f. Rice 5000 0.018 90 180,000 Boltaev Jumaboy Dehkan f. Rice 5000 0.014 70 140,000 Abdullaeva Saodat Dehkan f. Rice 5000 0.017 85 170,000 Qurbonov Rahim Dehkan f. Rice 5000 0.015 75 150,000 Nurmetov Rustam Dehkan f. Rice 5000 0.2 1000 2,000,000 Yarashova Oliyajon Dehkan f. Rice 5000 0.017 85 170,000 Normetov Farhod Dehkan f. Rice 5000 0.018 90 180,000 Egamov Davron Dehkan f. Rice 5000 0.024 120 240,000 Sobirov Ismoil Dehkan f. Rice 5000 0.019 95 190,000 Egamov Ergash Dehkan f. Rice 5000 0.024 120 240,000 Otajonov Otahon Dehkan f. Rice 5000 0.019 95 190,000 Saidmetov Ruslan Dehkan f. Rice 5000 0.024 120 240,000 Matrasulov Rustam Dehkan f. Rice 5000 0.023 115 230,000 Jumaniyozov Erkinboy Dehkan f. Rice 5000 0.018 90 180,000 Ibodullaev Qurbonboy Dehkan f. Rice 5000 0.019 95 190,000 Ibodullaev Vais Dehkan f. Rice 5000 0.012 60 120,000 Sub total 290000 6.6 37210 63,876,000 Bogot Agricul.f Cotton 3190 0.34 1084,6 4,363,920 Agricul.f Rice 5000 0.43 2150 8,640,000 Mirza Agricul.f Corn 20000 0.25 5000 1,000,000 Agricul.f Vegetable 20000 0.26 5200 2,000,000 Sherali Matkarimov Agricul.f Cotton 3060 1.86 5691,6 22,729,680 Agricul.f Cotton 3170 0.47 1489,9 5,934,240 Ulugbek Agricul.f Rice 5000 0.4 2000 7,950,000 Ruziboev Sobir Agricul.f Rice 5000 1.73 8650 34,650,000 Ruziboevich Agricul.f Cotton 2880 1.05 3024 12,113,280 Boburjon Nozimjon Agricul.f Rice 5000 0.28 1400 5,670,000 Agricul.f Corn 20000 0.48 9600 2,000,000 Dilfuza Qozoq Agricul.f Rice 5000 0.26 1300 5,130,000 Saidov Gayrat Agricul.f Corn 20000 0.276 5520 1,000,000 Shukurjon Shovkatjon Agricul.f Rice 5000 0.35 1750 7,050,000 Ro'ziboyev Ravshanbek Dehkan f. Rice 5000 0.013 65 260,000 106

Type of Affected Yield Per Affected Total loss of Total compen- Name of AH AHs crop 1 ha, kg land. ha crops, kg sation, UZS Tojiyev Doston Dehkan f. Rice 5000 0.031 155 620,000 Yacshimurodov Dehkan f. Rice 5000 0.0285 142,5 570,000 Ilhomboy Tojiyev G'ayrat Dehkan f. Rice 5000 0.0255 127,5 510,000 Tojiyev Farxod Dehkan f. Rice 5000 0.0258 129 516,000 Yaxshimurodov Umar Dehkan f. Rice 5000 0.0785 392,5 1,570,000 Qurbonova Zulxumor Dehkan f. Rice 5000 0.027 135 540,000 Egamov Ulug'bek Dehkan f. Rice 5000 0.021 105 420,000 Egamov Ismoil Dehkan f. Rice 5000 0.024 120 480,000 Normatov Rustam Dehkan f. Rice 5000 0.027 135 540,000 Röziboyev Abdulla Dehkan f. Rice 5000 0.022 110 440,000 Normatov Farxod Dehkan f. Rice 5000 0.027 135 540,000 Masharipova Gulsara Dehkan f. Rice 5000 0.028 140 560,000 Tojiyev Alisher Dehkan f. Rice 5000 0.025 125 508,000 Röziboyev Ramat Dehkan f. Rice 5000 0.027 135 540,000 Tojiyev Xaitboy Dehkan f. Rice 5000 0.007 35 140,000 Matjonov G'ayrat Dehkan f. Rice 5000 0.027 135 540,000 Ro'zmetov Ibodulla Dehkan f. Rice 5000 0.078 390 1,570,000 Allayev Shonazar Dehkan f. Rice 5000 0.027 135 540,000 Mametov Otanazar Dehkan f. Rice 5000 0.027 135 540,000 Röziboyev Qadam Dehkan f. Rice 5000 0.027 135 540,000 Qurbonov Shuhrat Dehkan f. Rice 5000 0.056 280 1,120,000 Nurberdiyev Madamin Dehkan f. Rice 5000 0.027 135 540,000 Boboyev Umirbek Dehkan f. Rice 5000 0.027 135 540,000 Maratov Kadamboy Dehkan f. Rice 5000 0.027 135 540,000 Ollomov Ozod Dehkan f. Rice 5000 0.056 280 1,120,000 Abdullayev Nurullo Dehkan f. Rice 5000 0.027 135 540,000 Ollomov Ruslan Dehkan f. Rice 5000 0.027 135 540,000 Ollonazarova Anajon Dehkan f. Rice 5000 0.027 135 540,000 Rözmetov Toxir Dehkan f. Rice 5000 0.027 135 540,000 Sobirov Xasanboy Dehkan f. Rice 5000 0.027 135 540,000 Röziboyev Oybek Dehkan f. Rice 5000 0.027 135 540,000 Matyoqubov Yöldosh Dehkan f. Rice 5000 0.045 225 900,000 Matyoqubov Radisu Dehkan f. Rice 5000 0.021 105 420,000 Sobirova Gulsara Dehkan f. Rice 5000 0.027 135 540,000 Maratov Yöldosh Dehkan f. Rice 5000 0.027 135 540,000 Maratov Muhitdiin Dehkan f. Rice 5000 0.056 280 1,120,000 Röziboyev Otanazar Dehkan f. Rice 5000 0.027 135 540,000 Röziboyev Rustam Dehkan f. Rice 5000 0.03 150 600,000 Boboyev Shuhrat Dehkan f. Rice 5000 0.03 150 600,000 Rözmetov Otabek Dehkan f. Rice 5000 0.019 95 380,000 Abdullayev Otabek Dehkan f. Rice 5000 0.027 135 540,000 Rejabov Xushnud Dehkan f. Rice 5000 0.027 135 540,000 Röziboyev Ergash Dehkan f. Rice 5000 0.027 135 540,000 Qöshaqov Sanjar Dehkan f. Rice 5000 0.028 140 570,000 Qöshaqov Sarvar Dehkan f. Rice 5000 0.027 135 540,000 Qöshaqov Sardor Dehkan f. Rice 5000 0.027 135 540,000 107

Type of Affected Yield Per Affected Total loss of Total compen- Name of AH AHs crop 1 ha, kg land. ha crops, kg sation, UZS Jumanazarov Ilhom Dehkan f. Rice 5000 0.027 135 540,000 Otajanov Xamdambek Dehkan f. Rice 5000 0.027 135 540,000 Ismoilov Ilhom Dehkan f. Rice 5000 0.027 135 540,000 Xudayberganova Dehkan f. Rice 5000 0.078 390 1,570,000 Gulchehra Sub total 377300 10.02 61771,6 151,915,120 Khazorasp Shovkat Kusa Agricul.f Cotton 3000 0.22 660 2,700,000 Ulugbek Agricul.f Cotton 3000 0.3 900 3,654,000 Bekmurot Sevara Agricul.f Rice 5000 1.64 8200 32,730,000 barchinoy Ummon oq qush nur Agricul.f Rice 5000 0.62 3100 12,390,000 Muhomon Bioservis Agricul.f Rice 5000 0.12 600 2,490,000 MCHJ Matkarim Xotam Agricul.f Rice 5000 0.23 1150 4,680,000 Tolibjon Golibjon Agricul.f Alfalfa 20000 0.5 10000 2,000,000 Zulfiya Matyaqubova Agricul.f Cotton 3000 0.77 2310 9,288,000 Agricul.f Cotton 3560 0.24 854,4 3,460,320 Orom buyi Agricul.f Rice 5000 0.24 1200 4,800,000 Agricul.f Cotton 3560 1.28 4556,8 18,170,240 Quramboy Sapargul Agricul.f Rice 5000 0.74 3700 14,850,000 Agricul.f Cotton 3560 0.26 925,6 3,738,000 Abdullox Agricul.f Corn 20000 0.15 3000 1,000,000 Agricul.f Vegetable 20000 0.17 3400 1,000,000 Oybek Asadbek Qazbek Agricul.f Cotton 3560 0.42 1495,2 3,905,700 Agricul.f Cotton 3000 0.45 1350 5,346,000 Mariya Muborak doston Agricul.f Vegetable 20000 0.39 7800 3,000,000 Agricul.f Rice 5000 0.29 1450 5,760,000 Nur Xitoy Agricul.f Vegetable 20000 0.29 5800 1,000,000 Qirdagi Ilxom Agricul.f Vegetable 20000 0.4 8000 1,000,000 Vaisov Mirza Dehkan f. Rice 5000 0.017 85 340,000 Rajabov Rashid Dehkan f. Rice 5000 0.05 250 920,000 Vaisova Salima Dehkan f. Vegetable 20000 0.018 360 1,000,000 Matnazarov G'ulom Dehkan f. Vegetable 20000 0.019 380 1,000,000 Sultonov Yusuf Dehkan f. Vegetable 20000 0.019 380 1,000,000 Egamberdiyeva Gulhayo Dehkan f. Vegetable 20000 0.019 380 1,000,000 Karimberdiyev Dehkan f. Vegetable 20000 0.024 480 1,000,000 Rözimboy Xojiyev Oybek Dehkan f. Vegetable 20000 0.023 460 1,000,000 Sultonov Komil Dehkan f. Vegetable 20000 0.018 360 1,000,000 Avezov Shonazar Dehkan f. Rice 5000 0.019 95 380,000 Buyazov Allabergan Dehkan f. Rice 5000 0.023 115 460,000 Xusainov Baxtiyor Dehkan f. Rice 5000 0.018 90 360,000 Egamberdiyev Raxmon Dehkan f. Rice 5000 0.019 95 380,000 Soliyev Sobir Dehkan f. Rice 5000 0.012 60 240,000 Subtotal 356240 10.018 74042 147,042,260 TOTAL 1589540 41.0908 243354,1 516,048,780

108

Annex 17: Valuation report for affected trees 20

20 This report has been prepared for section 3 and section 5. Affected trees in Section 5 includes Khazorasp district only. The total amount compensation for affected trees is 38,180,301 UZS out of the 60,500,000 UZS 109

Annex 18: Valuation report for the affected residential structure of Masharipova Saodat

110

Annex 19: Valuation report for the affected residential structure of Allaberganova Salomat

111

Annex 20: Valuation report for the affected residential structure of Ibodullaeva Gulnoza

112

Annex 21: Valuation report for the affected residential structure of Ruziboyeva Mohira

113

Annex 22: Valuation report for the affected residential structure of Matyakubova Qurbongul

114

Annex 23: Valuation report for the affected residential structure of Ibragimov Dilshod

115

Annex 24: Valuation report for the affected residential structure of Olimova Iroda

116

Annex 25: Presentation prepared in the Uzbek language for the disclosure meetings

117

118

119

Annex 26: Summary of compensation per AHs

Support Loss profit Cost of allowances Total from affected affected Type of (vulnerable, Compensation № AHs land (crop + structures impact severely AHs, to be paid per tree loss), and valuation relocation), AHs, UZS UZS fee, UZS UZS Urgench 1 Ibrohim Farida Crop loss 13,716,000 13,716,000 2 Doniyor Mirishkor Crop loss 19,314,000 19,314,000 3 Xusinboy Karim Bog'i Crop loss 8,550,000 8,550,000 4 Jaloladdin Madrahim Crop loss 10,065,000 10,065,000 5 Ortiqov Sopoxon Crop loss 790,000 790,000 6 Axmedov Qodir Crop loss 500,000 500,000 7 Matkarimov Xamro Crop loss 150,000 150,000 8 Bobojonov Farxod Crop loss 500,000 500,000 9 Artiqov Rajabboy Crop loss 110,000 110,000 10 Samandarova Zamira Crop loss 155,000 155,000 11 Qodirova Zevar Crop loss 500,000 500,000 12 Abdullayev urinboy Crop loss 180,000 180,000 13 Artiqova Quzigul Crop loss 500,000 500,000 14 Shernazarov Mamat Crop loss 500,000 500,000 Olloberganov 500,000 15 Mansurbek Crop loss 500,000 16 Olloberganov Anvar Crop loss 500,000 500,000 17 Olloberganov Ibrohim Crop loss 500,000 500,000 18 Sobirov Mansur Crop loss 190,000 190,000 19 Sobirov Erkin Crop loss 150,000 150,000 Subtotal 57,370,000 57,370,000 Honqa 20 G'ayrat Otabek Crop loss 17,868,600 17,868,600 21 Davron Otajon Crop loss 270,000 270,000 22 Xumoyun Nizomaddin Crop loss 16,588,800 16,588,800 23 Anvar Dilshod Crop loss 21,691,200 21,691,200 24 Jayhun Qalandar Crop loss 11,850,000 11,850,000 25 Vohidjon Rahmatjon Crop loss 2,197,800 2,197,800 26 Ortiq Lola Dapmachi Crop loss 6,660,000 6,660,000 27 Sulton Jirmiz Crop loss 7,632,000 7,632,000 Gulhayo Gulsaro 1,014,000 28 Zulhumor Crop loss 1,014,000 29 Sapayeva Shukurjon Crop loss 201,000 201,000 30 Raximov Murod Crop loss 500,000 500,000 31 Ruziboyev Sirojiddin Crop loss 675,000 675,000 32 Xayitov Quvondiq Crop loss 273,000 273,000 33 Yusupov Hasan Crop loss 373,000 373,000 34 Jumaniyozova Tojigul Crop loss 180,000 180,000 35 Rajabova Dilbar Crop loss 195,000 195,000 36 Qurbonov Xayitboy Crop loss 158,000 158,000 37 Xudoyberganov Islom Crop loss 819,000 819,000 38 Xujaniyozov Komil Crop loss 245,000 245,000 120

39 Raximov Muhammad Crop loss 714,000 714,000 40 Mirzayev Ismoil Crop loss 185,000 185,000 41 Rajabboyev Ismoil Crop loss 230,000 230,000 42 Turayev Safarmad Crop loss 225,000 225,000 43 Masharipov Umirbek Crop loss 230,000 230,000 44 Matkarimov Davron Crop loss 190,000 190,000 45 Yusupova Maqsuda Crop loss 180,000 1,014,000 1,194,000 46 Jumanazarov Omon Crop loss 500,000 500,000 47 Qalandarova Ozoda Crop loss 500,000 500,000 Bobojonov 48 Xudoybergan Crop loss 500,000 500,000 49 urunuv G'ayrat Crop loss 500,000 500,000 50 Qalandarov Xushnud Crop loss 500,000 500,000 51 Abdullayev Ilhom Crop loss 500,000 500,000 52 Bobojonov Ihtiyor Crop loss 500,000 1,014,000 1,514,000 53 Niyozmetova Roziya Crop loss 500,000 500,000 54 Qalandarov Maqsud Crop loss 500,000 500,000 Subtotal 95,845,400 2,028,000 97,873,400 Yangiariq 55 Quchqorov Azamat Crop loss 10,848,000 10,848,000 56 Xusinboy Qadamboy Crop loss 2,985,000 2,985,000 57 Gulobodli Maxkamboy Crop loss 6,075,000 6,075,000 58 Gulsevar Bonu Crop loss 8,802,000 8,802,000 59 Alibek uktamboy Crop loss 6,678,000 6,678,000 60 Gulobod urin Zak Crop loss 7,265,000 7,265,000 61 Diyorbek Asilbek Crop loss 8,913,000 8,913,000 62 Qurbonov Ganijon Crop loss 200,000 200,000 63 Raximov Xamro Crop loss 210,000 210,000 64 Anyazov Xasanboy Crop loss 220,000 220,000 65 Qurbonov Shonazar Crop loss 220,000 220,000 66 Raximov Otajon Crop loss 920,000 920,000 67 Raximov Qadamboy Crop loss 200,000 200,000 68 Abdirimov Avezmat Crop loss 220,000 220,000 69 Matyoqubov Ravshan Crop loss 310,000 310,000 70 Sultonov Rahim Crop loss 200,000 200,000 71 Rozmetov Sharofaddin Crop loss 230,000 230,000 Matyoqubova 72 Bekposhsha Crop loss 230,000 230,000 73 Bekmetov Kenja Crop loss 190,000 190,000 Xudayberganova 74 Bibijon Crop loss 210,000 210,000 75 Eshmetov G'ayrat Crop loss 190,000 190,000 76 Botirov Nuriddin Crop loss 180,000 180,000 77 Egamov Rashid Crop loss 290,000 290,000 78 Yormetov Xushnud Crop loss 250,000 250,000 79 Ro'zmetov Xasanboy Crop loss 210,000 210,000 80 Elomonov Bahtiyor Crop loss 100,000 100,000 81 Davletov Bahodir Crop loss 150,000 150,000 82 Saidahmedov Ruziboy Crop loss 1,700,000 1,700,000 121

83 Ruziboev Karimboy Crop loss 270,000 270,000 84 Sobirov Sobir Crop loss 160,000 160,000 85 Qalandarov Shavkat Crop loss 190,000 190,000 86 Bekjonova Sanamjon Crop loss 250,000 250,000 87 Avazmetov Ravshan Crop loss 180,000 180,000 88 Boltaev Jumaboy Crop loss 140,000 140,000 89 Abdullaeva Saodat Crop loss 170,000 170,000 90 Qurbonov Rahim Crop loss 150,000 150,000 91 Nurmetov Rustam Crop loss 2,000,000 2,000,000 92 Yarashova Oliyajon Crop loss 170,000 1,014,000 1,184,000 93 Normetov Farhod Crop loss 180,000 180,000 94 Egamov Davron Crop loss 240,000 240,000 95 Sobirov Ismoil Crop loss 190,000 190,000 96 Egamov Ergash Crop loss 240,000 240,000 97 Otajonov Otahon Crop loss 190,000 190,000 98 Saidmetov Ruslan Crop loss 240,000 240,000 99 Matrasulov Rustam Crop loss 230,000 230,000 100 Jumaniyozov Erkinboy Crop loss 180,000 180,000 101 Ibodullaev Qurbonboy Crop loss 190,000 190,000 102 Ibodullaev Vais Crop loss 120,000 120,000 Subtotal 63,876,000 1,014,000 64,890,000 Bog'ot 103 Mirza Crop loss 16,003,920 16,003,920 104 Sherali Matkarimov Crop loss 22,729,680 22,729,680 105 Ulug'bek Crop loss 13,884,240 13,884,240 Ruziboyev Sobir 34,650,000 34,650,000 106 Ruziboyevich Crop loss 107 Boburjon Nozimjon Crop loss 19,783,280 19,783,280 108 Dilfuza Qozoq Crop loss 5,130,000 5,130,000 109 Saidov G'ayrat Crop loss 1,000,000 1,000,000 110 Shukurjon Shovkatjon Crop loss 7,050,000 7,050,000 Ro'ziboyev 260,000 260,000 111 Ravshanbek Crop loss 112 Tojiyev Doston Crop loss 620,000 620,000 Yacshimurodov 570,000 570,000 113 Ilhomboy Crop loss 114 Tojiyev G'ayrat Crop loss 510,000 510,000 115 Tojiyev Farxod Crop loss 516,000 516,000 116 Yaxshimurodov Umar Crop loss 1,570,000 1,570,000 117 Qurbonova Zulxumor Crop loss 540,000 540,000 118 Egamov Ulug'bek Crop loss 420,000 420,000 119 Egamov Ismoil Crop loss 480,000 480,000 120 Normatov Rustam Crop loss 540,000 540,000 121 Ruziboyev Abdulla Crop loss 440,000 440,000 122 Normatov Farxod Crop loss 540,000 540,000 123 Masharipova Gulsara Crop loss 560,000 1,014,000 1,574,000 Kurbanbayeva 560,000 1,574,000 124 Nukildjon Crop loss 1,014,000 125 Tojiyev Alisher Crop loss 508,000 508,000

122

126 Ruziboyev Ramat Crop loss 540,000 540,000 127 Tojiyev Xaitboy Crop loss 140,000 140,000 128 Matjonov G'ayrat Crop loss 540,000 540,000 129 Ro'zmetov Ibodulla Crop loss 1,570,000 1,570,000 130 Allayev Shonazar Crop loss 540,000 540,000 131 Mametov Otanazar Crop loss 540,000 540,000 132 Ruziboyev Qadam Crop loss 540,000 540,000 133 Qurbonov Shuhrat Crop loss 1,120,000 1,120,000 134 Nurberdiyev Madamin Crop loss 540,000 540,000 135 Boboyev Umirbek Crop loss 540,000 540,000 136 Maratov Kadamboy Crop loss 540,000 540,000 137 Ollomov Ozod Crop loss 1,120,000 1,120,000 138 Abdullayev Nurullo Crop loss 540,000 1,014,000 1,554,000 139 Ollomov Ruslan Crop loss 540,000 540,000 140 Ollonazarova Anajon Crop loss 540,000 540,000 141 Ruzmetov Toxir Crop loss 540,000 540,000 142 Sobirov Xasanboy Crop loss 540,000 540,000 143 Ruziboyev Oybek Crop loss 540,000 540,000 144 Matyoqubov Yuldosh Crop loss 900,000 900,000 145 Matyoqubov Radisu Crop loss 420,000 420,000 146 Sobirova Gulsara Crop loss 540,000 540,000 147 Maratov Yuldosh Crop loss 540,000 540,000 148 Maratov Muhitdiin Crop loss 1,120,000 1,120,000 149 Ruziboyev Otanazar Crop loss 540,000 540,000 150 Ruziboyev Rustam Crop loss 600,000 600,000 151 Boboyev Shuhrat Crop loss 600,000 600,000 152 Ruzmetov Otabek Crop loss 380,000 380,000 153 Abdullayev Otabek Crop loss 540,000 540,000 154 Rejabov Xushnud Crop loss 540,000 540,000 155 Ruziboyev Ergash Crop loss 540,000 540,000 156 Qushaqov Sanjar Crop loss 570,000 570,000 157 Qushaqov Sarvar Crop loss 540,000 540,000 158 Qushaqov Sardor Crop loss 540,000 540,000 159 Jumanazarov Ilhom Crop loss 540,000 540,000 160 Otajanov Xamdambek Crop loss 540,000 540,000 161 Ismoilov Ilhom Crop loss 540,000 540,000 Xudayberganova 1,570,000 1,570,000 162 Gulchehra Crop loss Masharipova Saodat Residen. 76,455,000 1,514,000 77,969,000 163 Building Subtotal 152,475,120 76,455,000 4,556,000 233,486,120

Khazorasp 164 Shavkat Kusa Crop loss 2,700,000 2,700,000 165 Ulug'bek Crop loss 3,654,000 3,654,000 Bekmurod Sevara 166 Barchinoy Crop loss 32,730,000 32,730,000 167 Ummon Oqqush Nur Crop loss 12,390,000 12,390,000 Muhomon Bio Servis 168 LLC Crop loss 2,490,000 2,490,000 123

169 Matkarim Xotam Crop loss 4,680,000 4,680,000 170 Tolibjon G'olibjon Crop loss 2,000,000 2,000,000 171 Zulfiya Matyakubova Crop loss 9,288,000 9,288,000 172 Orombuyi Crop loss 8,260,320 8,260,320 173 Quramboy Sapargul Crop loss 33,020,240 33,020,240 174 Abdulloh Crop loss 5,738,000 5,738,000 Oybek Asadbek 175 Qazbek Crop loss 3,905,700 3,905,700 Mariya Muborak 176 Doston Crop loss 8,346,000 8,346,000 177 Nur Xitoy Crop loss 6,760,000 6,760,000 178 Norjon Miskin Tree loss 1,333,952 1,333,952 179 Karimboy Xalima Tree loss 4,664,069 4,664,069 180 Rahmatillo Otajon Tree loss 19,715,951 19,715,951 181 Rahmatilla Dilbar Tree loss 12,466,329 12,466,329 182 Qirdagi Ilhom Crop loss 1,000,000 1,000,000 183 Allaberganova Salomat 20,192,000 2,028,000 22,220,000 184 Ruziboyeva Mohira 13,400,000 1,014,000 14,414,000 Matyakubova

186 Qurbongul Founda- 15,960,000 1,014,000 16,974,000 tion of the Ibodullayeva Gulnoza 187 unfinshed 15,700,000 1,014,000 16,714,000 188 Ibragimov Dilshod residential 15,270,000 1,014,000 16,284,000 building Olimova Iroda 189 21,820,000 1,014,000 22,834,000 190 Erkayev Sadullo Crop loss 1,014,000 1,014,000 191 Vaisov Mirza Crop loss 340,000 340,000 192 Rajabov Rashid Crop loss 920,000 920,000 193 Vaisova Salima Crop loss 1,000,000 1,000,000 194 Matnazarov G'ulom Crop loss 1,000,000 1,000,000 195 Sultonov Yusuf Crop loss 1,000,000 1,000,000 Egamberdiyeva

196 Gulhayo Crop loss 1,000,000 1,000,000 Karimberdiyev

197 Ruzimboy Crop loss 1,000,000 1,000,000 198 Xojiyev Oybek Crop loss 1,000,000 1,000,000 199 Sultonov Komil Crop loss 1,000,000 1,000,000 200 Avezov Shonazar Crop loss 380,000 380,000 201 Buyazov Allabergan Crop loss 460,000 460,000 202 Xusainov Baxtiyor Crop loss 360,000 360,000 Egamberdiyev

203 Raxmon Crop loss 380,000 380,000 204 Soliyev Sobir Crop loss 240,000 240,000 Subtotal 185,222,561 102,342,000 8,112,000 295,676,561

TOTAL 554,789,081 178,797,000 15,710,000 749,296,081

124

Annex 27: Confirmation letter from the Khorezm regional land resources and the State cadaster Department regarding receival of the compensation payments from UNPN.

125

Annex 28: Decree of Khorezm Regional Khokim on allocation of land for permanent period to UNPN and payment of comensation.

126