Wylfa Newydd Project
Total Page:16
File Type:pdf, Size:1020Kb
ENERGY WORKING FOR BRITAIN FOR WORKING ENERGY Wylfa Newydd Project 1.1 Application Form PINS Reference Number: EN010007 Application Reference Number: 1.1 June 2018 Revision 1.0 Regulation Number: 5(1) and Schedule 2 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Horizon Internal DCRM Number: WN0902-HZ-PAC-REP-00001 [This page is intentionally blank] For help contact The Planning Inspectorate [email protected] Telephone: 0303 444 5000 Application for Development Consent for Nationally Significant Infrastructure under the Planning Act 2008 * required information Application Form ?~ Please read guidance documents relating to the submission of applications prior to completing this form including guidance issued by the Department of Communities and Local Government and the advice note relating to application submissions by the Planning Inspectorate (Advice Note 6) * Do you have a reference number? (• Yes C No * Reference number EN010007 1. Applicant * Organisation IHorizon Nuclear Power Wylfa Limited Address * Building number or name Sunrise House 1420 Charlton Court, Gloucester Business * Street Park * City or town Gloucester County or administrative Gloucestershire area * Postcode GL34AE * Country [United Kingdom * Name of contact |Mr Kieran Somers * Telephone number 101242508508 Fax number * Email [email protected] 2. Agent * Are you an agent acting on behalf of the applicant? C Yes (S No 3. Fee * State the arrangement for the application fee payment: (• BAGS C CHAPS F Cheque * Please provide payment WN DCO PROJECT reference details Page 1 of 22 Continued from previous page... 4. Confirming why the Planning Inspectorate should receive the application * Brief statement to explain why this application is, or is to be treated as, a development for which development consent is required under the Planning Act 2008 The application is for the construction of an on-shore generating station. The generating station will have a total installed generation capacity of 3,100MW and is located entirely in Wales. Therefore the project is within section 15 (3)(A) of the Planning Act 2008 and requires a development consent order. 5. Non-technical description of the Development Proposal * Brief non-technical description of the development proposal The Wylfa Newydd DCO Project comprises those parts of the Wylfa Newydd Project which are to be consented by a DCO, namely: The Nationally Significant Infrastructure Project (NSIP): (refer to Environmental Statement Volume A - Introduction \{o the project and approach to the EIA A2 - Project overview and introduction to the developments (Application Reference Number 6.1.2)) 1. Power Station: the proposed new nuclear power station at Wylfa, including two UK Advanced Boiling Water |Reactors, the Cooling Water System, supporting facilities, buildings, plant and structures, radioactive waste and |spent fuel storage buildings and the Grid Connection; (refer to Environmental Statement Volume D - WNDA Development D1 - Proposed development (Application Reference Number 6.4.1)) |2. Other on-site development: including landscape works and planting, drainage, surface water management |systems, public access works including temporary and permanent closures and diversions of public rights of way, |new Power Station Access Road and internal site roads, car parking, construction works and activities including |construction compounds and temporary parking areas, laydown areas, working areas and temporary works and [structures, temporary construction viewing area, diversion of utilities, perimeter and construction fencing, and |electricity connections; (refer to Environmental Statement Volume D - WNDA Development D1 - Proposed |development (Application Reference Number 6.4.1)) |3. Marine Works comprising: Permanent Marine Works: the Cooling Water System, the Marine Off-loading Facility, breakwater structures, |shore protection works, surface water drainage outfalls, waste water effluent outfall (and associated drainage of [surface water and waste water effluent to the sea), fish recovery and return system, fish deterrent system, |navigation aids and Dredging; Temporary Marine Works: temporary cofferdams, a temporary access ramp, temporary navigation aids, [temporary outfalls and a temporary barge berth; (refer to Environmental Statement Volume D - WNDA [Development D1 - Proposed development (Application Reference Number 6.4.1)) |4. Off-site Power Station Facilities: comprising the Alternative Emergency Control Centre (AECC), Environmental [Survey Laboratory (ESL) and a Mobile Emergency Equipment Garage (MEEG); (refer to Environmental Statement [Volume E Off-Site Power Station Facilities: AECC, ESL and MEEG E1 - Proposed development (Application [Reference Number 6.5.1)) [Associated Development |1. The Site Campus within the Wylfa Newydd Development Area; (refer to Environmental Statement Volume D - JWNDA Development D1 - Proposed development (Application Reference Number 6.4.1)) Page 2 of 22 Continued from previous page... 12. I emporary Park and Kide facility at Ualar Hir tor construction workers (Park and Ride); (refer to Environmental iStatement Volume F - Park and Ride F1 - Proposed development (Application Reference Number 6.6.1)) 3. Temporary Logistics Centre at Parc Cybi (Logistics Centre); (refer to Environmental Statement Volume hi - Logistics Centre W - Proposed development (Application Reference Number 6.8.1)) 4. The A5025 Off-line Highway Improvements; (refer to Environmental Statement Volume G - A5025 Off-line Highway Improvements G1 - Proposed Development (Application Reference Number 6.7.1)) 5. Wetland habitat creation and enhancement works as compensation for any potential impacts on the Tre'r Gof Site of Special Scientific Interest (SSSI) at the following sites: (refer to Environmental Statement Volume D - WNDA Development App D1-2 - Ecological Compensation Sites: Assessment of Environmental Effects (Application Reference Number: 6.4.18)) TyDu; Cors Gwawr; Cae Canol-dydd (refer to schedule 1 of the draft Development Consent Order (Application Reference Number: 3.1)) 6. Location or Route of the Development Proposal * Description of location of application site(s), or route of development (reference to appropriate plans) [Six sites form the overall Wylfa Newydd DCO Project. Each site is located on the Isle of Anglesey in north Wales in |the administrative area of Isle of Anglesey County Council. |The Wylfa Newydd Development Area is located at Wylfa, south of the existing Wylfa Power Station and east of |the village of Cemaes. The A5025 road defines the south-east boundary. To the south and west the site abuts lagricultural land. |The Off-Site Power Station Facilities site is located 450m north-east of Llanfaethlu village. The site is currently occupied by an existing business. It is bounded to the west by the A5025, residential and storage buildings to the north and farmland to the south and east. There are five sections ofA5025 Off-line Highway Improvements, proposed along the A5025 at Valley, Llanfachraeth, Llanfaethlu, Cefn Coch and the Wylfa Newydd Development Area junction north ofTregele. The Park and Ride facility is proposed in agricultural land near Dalar Hir, north of Llanfihangel, close to Junction 4 of the ASS. The Logistics Centre is proposed to the north-west of the Parc Cybi employment area to the south of the ASS approximately 2km south of Holyhead. Three ecological compensation sites are included in the application. These are located at: Ty Du, north of the A5025 between Cemaes and Bull Bay; Cae Canol-dydd, immediately east of B5110 and 1 .3km west of Talwrn; and Cars Gwawr, 250m east of Talwrn The sites which comprise the Wylfa Newydd DCO Project are shown on Order Limits - All DCO Sites (Application Reference Number 2.1) * Is the site a single site or a linear site? (S Single site C Linear site Grid reference * Easting 1235796 * Northing 1393463 Page 3 of 22 Continued from previous page... * Document reference 2.1 - Order Limits - All DCO Sites Add another reference 7. Associated development * Associated development is included within this application: (• Yes C No * Document reference 2.1 - Order Limits - All DCO Sites Add another reference 8. a) Consultation report * Document reference |5.1 - Consultation Report Add another reference 8. b) Copies of newspaper notices * Document reference 1.6 - Newspaper Notices Add another reference 9. Draft Order * Document reference 3.1 - Draft Development Consent Order Add another reference 10. Explanatory Memorandum * Document reference 3.3 - Explanatory Memorandum Add another reference 11. Land Plan * Document reference |2.2 - Land Plans Add another reference 12. Works Plan * Document reference 2.3 - Work Plans Add another reference 13. Compulsory acquisition of land or an interest in land or right over land Page 4 of 22 Continued from previous page... * Issues are relevant for this application: C Yes C No Statement of reasons 14.1 - Statement of Reasons document reference Add another reference Funding statement document reference 4.2 - Funding Statement Add another reference Book of Reference 4.3 - Book of Reference document reference Add another reference 14. a) Environmental Impact Assessment (EIA) * Environmental Statement (ES) required: (S Yes C No * ES Document Reference 6.1 - 6.10 - Environmental Statement - Volumes A - J * ES Document Reference 6.11 Environmental Statement Non- Technical Summary Remove this reference Add another reference 14.