ENERGY WORKING FOR BRITAIN Horizon Internal DCRM Number: WN0902-HZ-PAC-REP-00001

1.1 Application Form Wylfa Newydd Project June 2018 Revision 1.0 2 Schedule and Number: 5(1) Regulation Planning Act 2008 Infrastructure (Applications: Prescribed Planning 2009 Forms Regulations Procedure) and PINS Reference Number: EN010007 Application Reference Number: 1.1 [This page is intentionally blank] For help contact The Planning Inspectorate [email protected] Telephone: 0303 444 5000 Application for Development Consent for Nationally Significant Infrastructure under the Planning Act 2008 * required information

Application Form ?~ Please read guidance documents relating to the submission of applications prior to completing this form including guidance issued by the Department of Communities and Local Government and the advice note relating to application submissions by the Planning Inspectorate (Advice Note 6) * Do you have a reference number? (• Yes C No

* Reference number EN010007

1. Applicant

* Organisation IHorizon Nuclear Power Wylfa Limited

Address

* Building number or name Sunrise House

1420 Charlton Court, Gloucester Business * Street Park

* City or town Gloucester

County or administrative Gloucestershire area

* Postcode GL34AE

* Country [United Kingdom

* Name of contact |Mr Kieran Somers

* Telephone number 101242508508

Fax number

* Email [email protected]

2. Agent

* Are you an agent acting on behalf of the applicant? C Yes (S No

3. Fee

* State the arrangement for the application fee payment: (• BAGS C CHAPS F Cheque

* Please provide payment WN DCO PROJECT reference details

Page 1 of 22 Continued from previous page... 4. Confirming why the Planning Inspectorate should receive the application * Brief statement to explain why this application is, or is to be treated as, a development for which development consent is required under the Planning Act 2008 The application is for the construction of an on-shore generating station. The generating station will have a total installed generation capacity of 3,100MW and is located entirely in Wales. Therefore the project is within section 15 (3)(A) of the Planning Act 2008 and requires a development consent order.

5. Non-technical description of the Development Proposal * Brief non-technical description of the development proposal The Wylfa Newydd DCO Project comprises those parts of the Wylfa Newydd Project which are to be consented by a DCO, namely:

The Nationally Significant Infrastructure Project (NSIP): (refer to Environmental Statement Volume A - Introduction \{o the project and approach to the EIA A2 - Project overview and introduction to the developments (Application Reference Number 6.1.2))

1. Power Station: the proposed new nuclear power station at Wylfa, including two UK Advanced Boiling Water |Reactors, the Cooling Water System, supporting facilities, buildings, plant and structures, radioactive waste and |spent fuel storage buildings and the Grid Connection; (refer to Environmental Statement Volume D - WNDA Development D1 - Proposed development (Application Reference Number 6.4.1))

|2. Other on-site development: including landscape works and planting, drainage, surface water management |systems, public access works including temporary and permanent closures and diversions of public rights of way, |new Power Station Access Road and internal site roads, car parking, construction works and activities including |construction compounds and temporary parking areas, laydown areas, working areas and temporary works and [structures, temporary construction viewing area, diversion of utilities, perimeter and construction fencing, and |electricity connections; (refer to Environmental Statement Volume D - WNDA Development D1 - Proposed |development (Application Reference Number 6.4.1))

|3. Marine Works comprising:

Permanent Marine Works: the Cooling Water System, the Marine Off-loading Facility, breakwater structures, |shore protection works, surface water drainage outfalls, waste water effluent outfall (and associated drainage of [surface water and waste water effluent to the sea), fish recovery and return system, fish deterrent system, |navigation aids and Dredging;

Temporary Marine Works: temporary cofferdams, a temporary access ramp, temporary navigation aids, [temporary outfalls and a temporary barge berth; (refer to Environmental Statement Volume D - WNDA [Development D1 - Proposed development (Application Reference Number 6.4.1))

|4. Off-site Power Station Facilities: comprising the Alternative Emergency Control Centre (AECC), Environmental [Survey Laboratory (ESL) and a Mobile Emergency Equipment Garage (MEEG); (refer to Environmental Statement [Volume E Off-Site Power Station Facilities: AECC, ESL and MEEG E1 - Proposed development (Application [Reference Number 6.5.1))

[Associated Development

|1. The Site Campus within the Wylfa Newydd Development Area; (refer to Environmental Statement Volume D - JWNDA Development D1 - Proposed development (Application Reference Number 6.4.1))

Page 2 of 22 Continued from previous page... 12. I emporary Park and Kide facility at Ualar Hir tor construction workers (Park and Ride); (refer to Environmental iStatement Volume F - Park and Ride F1 - Proposed development (Application Reference Number 6.6.1)) 3. Temporary Logistics Centre at Parc Cybi (Logistics Centre); (refer to Environmental Statement Volume hi - Logistics Centre W - Proposed development (Application Reference Number 6.8.1)) 4. The A5025 Off-line Highway Improvements; (refer to Environmental Statement Volume G - A5025 Off-line Highway Improvements G1 - Proposed Development (Application Reference Number 6.7.1)) 5. Wetland habitat creation and enhancement works as compensation for any potential impacts on the Tre'r Gof Site of Special Scientific Interest (SSSI) at the following sites: (refer to Environmental Statement Volume D - WNDA Development App D1-2 - Ecological Compensation Sites: Assessment of Environmental Effects (Application Reference Number: 6.4.18)) TyDu; Cors Gwawr; Cae Canol-dydd

(refer to schedule 1 of the draft Development Consent Order (Application Reference Number: 3.1))

6. Location or Route of the Development Proposal

* Description of location of application site(s), or route of development (reference to appropriate plans)

[Six sites form the overall Wylfa Newydd DCO Project. Each site is located on the Isle of in north Wales in |the administrative area of Isle of Anglesey County Council.

|The Wylfa Newydd Development Area is located at Wylfa, south of the existing Wylfa Power Station and east of |the village of . The A5025 road defines the south-east boundary. To the south and west the site abuts lagricultural land.

|The Off-Site Power Station Facilities site is located 450m north-east of village. The site is currently occupied by an existing business. It is bounded to the west by the A5025, residential and storage buildings to the north and farmland to the south and east.

There are five sections ofA5025 Off-line Highway Improvements, proposed along the A5025 at Valley, , Llanfaethlu, Cefn Coch and the Wylfa Newydd Development Area junction north ofTregele.

The Park and Ride facility is proposed in agricultural land near Dalar Hir, north of Llanfihangel, close to Junction 4 of the ASS.

The Logistics Centre is proposed to the north-west of the Parc Cybi employment area to the south of the ASS approximately 2km south of Holyhead.

Three ecological compensation sites are included in the application. These are located at: Ty Du, north of the A5025 between Cemaes and Bull Bay; Cae Canol-dydd, immediately east of B5110 and 1 .3km west of Talwrn; and Cars Gwawr, 250m east of Talwrn

The sites which comprise the Wylfa Newydd DCO Project are shown on Order Limits - All DCO Sites (Application Reference Number 2.1)

* Is the site a single site or a linear site?

(S Single site C Linear site

Grid reference

* Easting 1235796

* Northing 1393463

Page 3 of 22 Continued from previous page... * Document reference 2.1 - Order Limits - All DCO Sites

Add another reference

7. Associated development

* Associated development is included within this application: (• Yes C No

* Document reference 2.1 - Order Limits - All DCO Sites

Add another reference

8. a) Consultation report * Document reference |5.1 - Consultation Report

Add another reference

8. b) Copies of newspaper notices

* Document reference 1.6 - Newspaper Notices

Add another reference

9. Draft Order

* Document reference 3.1 - Draft Development Consent Order

Add another reference

10. Explanatory Memorandum

* Document reference 3.3 - Explanatory Memorandum

Add another reference

11. Land Plan

* Document reference |2.2 - Land Plans

Add another reference

12. Works Plan

* Document reference 2.3 - Work Plans

Add another reference

13. Compulsory acquisition of land or an interest in land or right over land

Page 4 of 22 Continued from previous page... * Issues are relevant for this application: C Yes C No

Statement of reasons 14.1 - Statement of Reasons document reference

Add another reference

Funding statement document reference 4.2 - Funding Statement

Add another reference

Book of Reference 4.3 - Book of Reference document reference

Add another reference

14. a) Environmental Impact Assessment (EIA)

* Environmental Statement (ES) required: (S Yes C No

* ES Document Reference 6.1 - 6.10 - Environmental Statement - Volumes A - J

* ES Document Reference 6.11 Environmental Statement Non- Technical Summary

Remove this reference

Add another reference

14. b) Screening Opinion/Direction and Scoping Opinion/Direction

* Screening opinion sought, or direction received: C Yes (S No

* Scoping opinion sought: ff Yes r No

Document reference 16.1.9 - Environmental Statement Volume A I- Introduction to the project and approach to the EIA Appendix A6-1 - Scoping Opinion Tracker

Page 5 of 22 Continued from previous page...

Document reference 6.1.6 - Environmental Statement Volume A - Introduction to the project and approach |to the EIA A6 - EIA Scoping Report and lAddendum

Remove this reference

Add another reference

14. c) Publicity required under Regulation 11 of the Infrastructure Planning (Environmental Im pact Assessment) Regulations 2009 In addition to publishing the notice, a copy of the notice was sent to:-

* the consultation bodies

* Yes * the persons notified to the applicant in accordance with regulation 9(1 )(c) of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2009: (• Yes F No, not applicable 15. European sites (to which Regulation 48 of the Conservation (Natural Habitats, & c.) Regulations 1994 applies) or a Ramsar site * Report required for this application: (S Yes C No

*Document reference 5.2 - Shadow Habitats Regulations Assessment

Add another reference

16. A plan, with accompanying information, identifying any statutory or non statutory sites or features of nature conservation, geological or landscape importance; habitats of protected species, important habitats or other diversity features; and water bodies in a river basin management Plan - together with an assessment of any effects likely to be caused by the development. * Issues are relevant for this application: (• Yes C No

* Document reference 6.4.9 - Environmental Statement Volume D - WNDA Development D9 - Terrestrial and freshwater ecology

*Document reference 6.4.10 - Environmental Statement Volume D - WNDA Development D10 - Landscape and visual

Remove this reference

Page 6 of 22 Continued from previous page.

* Document reference 6.4.7 - Environmental Statement Volume D - WNDA Development D7 - Soils and geology

Remove this reference

* Document reference 6.5.7 - Environmental Statement Off-Site Power Station Facilities: AECC, ESL and MEEG E7 - Soils and geology

Remove this reference

* Document reference 6.5.9 - Environmental Statement Volume E - Off-Site Power Station Facilities: AECC, ESL and MEEG E9 - Terrestrial and freshwater ecology

Remove this reference

* Document reference 6.5.10 - Environmental Statement Volume E - Off^Site Power Station Facilities: AECC, ESL and MEEG E10 - Landscape and visual

Remove this reference

* Document reference 6.6.7 - Environmental Statement Volume F - Park and Ride F7 - Soils and geology

Remove this reference

* Document reference 6.6.9 - Environmental Statement Volume F - Park and Ride F9 - Terrestrial and freshwater ecology

Remove this reference

* Document reference 6.6.10 - Environmental Statement Volume F - Park and Ride F10 - Landscape and visual

Remove this reference

*Document reference 6.7.7 - Environmental Statement Volume G - A5025 Off-line Highway Improvements G7 - Soils and geology

Remove this reference

Page 7 of 22 Continued from previous page.

* Document reference 6.7.9 - Environmental Statement Volume G - A5025 Off-line Highway Improvements G9 - Terrestrial and freshwater ecology

Remove this reference

* Document reference 6.7.10 - Environmental Statement Volume G - A5025 Off-line Highway Improvements G10 - Landscape and visual

Remove this reference

* Document reference 6.8.7 - Environmental Statement Volume H - Logistics Centre H7 - Soils and geology

Remove this reference

* Document reference 6.8.9 - Environmental Statement Volume H - Logistics Centre hl9 - Terrestrial and freshwater ecology

Remove this reference

* Document reference 6.8.10 - Environmental Statement Volume H - Logistics Centre hl10 - Landscape and visual

Remove this reference

Add another reference

17. A plan, with accompanying information, identifying any statutory or non statutory sites or features of the historic environment such as scheduled monuments, World Heritage sites, listed buildings and other historic structures, archaeological sites and registered battlefields, together with an assessment of any effects likely to be caused by the proposed development * Issues are relevant for this application: (• Yes C No

* Document reference 6.4.11 - Environmental Statement Volume D - WNDA Development D1 1 - Cultural heritage

* Document reference 6.5.11 - Environmental Statement Volume E - Off-Site Power Station Facilities: AECC, ESL and MEEG E1 1 - Cultural heritage

Remove this reference

Page 8 of 22 Continued from previous page...

* Document reference 6.6.11 - Environmental Statement Volume F - Park and Ride F11 - Cultural heritage

Remove this reference

* Document reference 6.7.11 - Environmental Statement Volume G - A5025 Off-line Highway Improvements G 11 -Cultural heritage

Remove this reference

* Document reference 6.8.11 - Environmental Statement Volume H - Logistics Centre H11 - Cultural heritage

Remove this reference

Add another reference

18. Flood Risk Assessment

* Flood risk assessment required:

(• Yes C No

* Document reference |5.5 - Overarching Flood Consequence |Assessment Signposting Document

* Document reference 6.4.29 - Environmental Statement Volume D - WNDA Development App D8-4 - Flood Consequence Assessment

Remove this reference

* Document reference 16.5.16 - Environmental Statement Volume |E - Off-Site Power Station Facilities: IAECC, ESL and MEEG App E8-1 - MEEG/ IAECC/ESL - Flood Consequence lAssessment

Remove this reference

*Document reference 6.6.16 - Environmental Statement Volume F - Park and Ride App F8-1 - Dalar Hir - Flood Consequence Assessment

Remove this reference

Page 9 of 22 Continued from previous page...

* Document reference 6.7.20 - Environmental Statement - Volume G - A5025 Off-line Highway Improvements App G8-1 - A5025 Off-line Highway Improvements - Flood Consequence Assessment

Remove this reference

* Document reference 6.8.16 - Environmental Statement Volume H - Logistics Centre App H8-1 - Logistics Centre - Flood Consequence Assessment

Remove this reference

Add another reference

19. Matters set out in section 79 (1) (statutory nuisances etc) of the Environmental Protection Act 1990 * Statement required for this application: (• Yes C No

* Document reference 5.3 - Statement of Statutory Nuisances

Add another reference

20. A plan with any accompanying information identifying any Crown land * Issues are relevant for this application: (• Yes C No

* Document reference 2.5 - Crown Estate Land Plans

Add another reference

21. A plan identifying new or altered means of access, stopping up of streets or any diversions, extinguishments or creation or rights of way or public rights of navigation * Issues are relevant for this application: (• Yes C No

* Document reference 2.4-Rights of Way Plans

Add another reference

22. Additional information for specific types of infrastructure * Additional information is required to be submitted in accordance with regulation 6 of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009: (• Yes C No

* Provide a brief description

Page 10 of 22 Continued from previous page..

A Grid Connection statement has been prepared in accordance with Reg 6(1)(a) of The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009. This statement provides information of who will be responsible for designing and building the connection to the electricity network

* Document reference 7.1 - Grid Connection Statement

Add another reference

Regulation 6 of the Infrastructure Planning (Applications: Prescribed Forms and Procedures) Regulations 2009 requires additional information to be submitted with the following types of development.

* Please check any of the following boxes that apply:

Construction or extension of an offshore generating station (Reg. 6 (1a))

^] Construction or extension of a non offshore generating station (Reg. 6 (1b))

Highway related development (Reg. 6 (2)(part 1))

Construction or alteration of a railway (Reg. 6 (2) (part 2))

Construction or alteration of harbour facilities (Reg. 6 (3))

Construction of a pipeline (Reg. 6 (4))

Construction or alteration of a hazardous waste facility (Reg. 6 (5))

n Construction of a dam or reservoir (Reg. 6 (6))

Construction or extension of a non offshore generating station (Reg. 6 (1b))

* Provide a statement of who will be responsible for designing and building the connection to the electricity grid

Refer to Grid Connection Statement (Application Reference Number: 7.1)

* Is it a gas fuelled generating station? C Yes (• No 23. Any other plans, drawings and sections necessary to describe the proposal for which development consent is sought, and any other documents, reports or information to support the application Provide a brief description of any other plans, drawings and sections that are being submitted with this application

|0rder Limits - All DCO sites - (Application Reference Number 2.1)

Detailed design drawings, including for example parameter plans, floor plans, roof plans, elevations, sections, idetails, drainage and landscaping for each site or project component. Including: IWylfa Newydd Development Area- Power Station Site Plans - (Application Reference Number 2.6.1) Wylfa Newydd Development Area- Site Campus Plans (Application Reference Number 2.6.2) Wylfa Newydd Development Area- Marine Works Plans (Application Reference Number 2.6.3) Wylfa Newydd Development Area- Site Preparation and Clearance Plans (Application Reference Number 2.6.4) A5025 Offline Highways Section 1 -Valley Plans (Application Reference Number 2.7) A5025 Offline Highways Section 3 - Llanfachraeth Plans (Application Reference Number 2.8)

Page 11 of 22 Continued from previous page... AbUZb Uffline Highways bection 5 - Llanfaethtu Plans (Application Reference Number 2.9) A5025 Offline Highways Section 7 - Cefn Coch Plans (Application Reference Number 2.10) Park and Ride - Dalar Hir Plans (Application Reference Number 2.11) Logistics Centre - Parc Cybi Plans (Application Reference Number 2.12) Off-site Power Station Facilities - Llanfaethlu Plans (Application Reference Number 2.13) Ecological Compensation Site - Cars Gwawr Plans ((Application Reference Number 2.14) Ecological Compensation Site - Cae Canol-Dydd Plans (Application Reference Number 2.15) Ecological Compensation Site -Ty Du Plans (Application Reference Number 2.16)

Document reference 2.1 - Location Plan - All DCO site

Document reference 2.6.1 -Wylfa Newydd Development Area- Power Station Site Plans

Remove this reference

Document reference 2.6.2 - Wylfa Newydd Development Area- Site Campus Plans

Remove this reference

Document reference 2.6.3 - Wylfa Newydd Development Area- Marine Works Plans

Remove this reference

Document reference 2.6.4 - Wylfa Newydd Development Area- Site Preparation and Clearance Plans

Remove this reference

Document reference 2.7 - A5025 Offline Highways Section 1 - Valley Plans

Remove this reference

Document reference 2.8 - A5025 Offline Highways Section 3 - Llanfachraeth Plans

Remove this reference

Document reference 2.9 - A5025 Offline Highways Section 5 - Llanfaethlu Plans

Remove this reference

Document reference 2.10 - A5025 Offline Highways Section 7 - Cefn Coch Plans

Remove this reference

Page 12 of 22 Continued from previous page.

Document reference 2.11 - Park and Ride - Dalar Hir Plans

Remove this reference

Document reference |2.12 - Logistics Centre - Parc Cybi Plans

Remove this reference

Document reference 2.13 - Off-site Power Station Facilities - Llanfaethlu Plans

Remove this reference

Document reference 2.14 - Ecological Compensation Site - Cars Gwawr Plans

Remove this reference

Document reference 2.15 - Ecological Compensation Site - Cae Canol-Dydd - Plans

Remove this reference

Document reference 2.16 - Ecological Compensation Site -Ty Du - Plans

Remove this reference

Add another reference

Provide a brief description of any other documents considered necessary to support the application

|Water Framework Directive Compliance Assessment (Application Reference Number 8.26) - Assesses the effects |of the Wylfa Newydd Project on the relevant water bodies and to determine whether the Wylfa Newydd Project is lcompliant with the objectives of the The Water Framework Directive (WFD) (2000/60/EC). iGuide to the Application (Welsh) (Application Reference Number 1.3) - Details, in Welsh, the structure of and approach taken to Horizon's application for a DCO for the Wylfa Newydd DCO Project. iGuide to the Application (English) (Application Reference Number 1.3) - Details, the structure of and approach itaken to Horizon's application for a DCO for the Wylfa Newydd DCO Project.

General Glossary (Application Reference Number 1.4) - A glossary of terms used in the documents forming the DCO application. s55 application checklist (Application Reference Number 1.5) - Checklist demonstrating that the application is of a satisfactory standard to be accepted for Examination.

Newspaper Notices (Application Reference Number 1.6) - Copies of the newspaper notices which advertised Horizon's approach to each stage of statutory pre-application consultation in accordance with s47 of the Planning Act 2008 and the requirements set out in Regulation 4 of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, and newspaper notices which described the Wylfa Newydd DCO Project and the intended application submission dates in accordance with s48 of the Planning Act 2008

Page 13 of 22 Continued from previous page...

Mark-up of the proposed Order against model provision (Application Reference Number 3.2) - Identifies how the proposed Order has deviated from the Model Provisions. The mark-up is supported by the Explanatory iMemorandum which provides more discussion on, and the justifications for, any deviations from the Model IProvisions iDraft Heads of Terms for Planning Obligations (Application Reference Number 3.4) - Establishes the planning lobligations that will be provided to help mitigate effects caused by the Wylfa Newydd DCO Project as per the Town land Country Planning Act 1990

Details of other Consents, Licenses and Agreements (Application Reference Number 5.4) - Details the various consents, licenses and agreements required, in addition to the DCO application, in order to construct and operate the Project.

Planning Statement (Application Reference Number 8.1) - communicates the rationale for the Wytfa Newydd Project and sets this in the context of national, regional and local planning policy, to enable the decision maker to form a judgement on the overall planning balance, including a consideration of the benefits of the project versus its limpacts.

[Design and Access Statement - Volume 1 - Project-wide (Application Reference Number 8.2.1) - Describes the |design concepts and principles and access arrangements for the project.

|Design and Access Statement - Volume 2 - Power Station Site (Application Reference Number 8.2.2) - Describes |the design concepts and principles and access arrangements for the Power Station Site.

[Design and Access Statement - Volume 3 - Associated developments and Off-Site Power Station Facilities [(Application Reference Number 8.2.3) - Describes the design concepts and principles and access arrangements |for the associated developments.

|Jobs and Skills Strategy (Application Reference Number 8.3) - Sets out the strategy for employing and training staff |and encouraging local employment

|Workforce Accommodation Strategy (Application Reference Number 8.4) - Sets out the strategy for |accommodating the temporary construction workforce.

|Workforce Management Strategy (Application Reference Number 8.5) - Establishes principles which will help |Horizon to manage its contractors and workforce and guide the development of the Wylfa Newydd Code of IConduct.

[Wylfa Newydd Code of Construction Practice (Application Reference Number 8.6) - Outlines, for all aspects of the |Wylfa Newydd DCO Project, the strategies, measures and standards of work to be adopted throughout the [construction period. This CoCP (and some sub-CoCP) also deal with operational controls for specific |developments.

|Main Power Station Site sub-CoCP (Application Reference Number 8.7) - Outlines the strategies, measures and [standards of work to be adopted throughout the construction period for the Power Station Site.

[Marine Works sub-CoCP (Application Reference Number 8.8) - Outlines the strategies, measures and standards of [work to be adopted throughout the construction period for the Marine Works.

|Off-Site Power Station Facilities sub-CoCP (Application Reference Number 8.9) - Outlines the strategies, [measures and standards of work to be adopted throughout the construction period for the Off-site Power Station IFacilities.

|Park and Ride sub-CoCP (Application Reference Number 8.10) - Outlines the strategies, measures and standards |of work to be adopted throughout the construction period for the Park and Ride site.

Page 14 of 22 Continued from previous page... jLogistics Centre sub-CoCP (Application Reference Number 8.11) - Outlines the strategies, measures and [standards of work to be adopted throughout the construction period for the Logistics Centre site.

|A5025 Off-line Highway Improvements sub-CoCP (Application Reference Number 8.12) - Outlines the strategies, (measures and standards of work to be adopted throughout the construction period for the Off-line Highway [Improvements. jWylfa Newydd Code of Operational Practice (Application Reference Number 8.13) - Outlines the framework of [measures and standards for the operation of the development. jMitigation Route Map (Application Reference Number 8.14) - Establishes the mitigation measures which are [suggested in the Environmental Statement and secured through the Strategies and Codes of Practice.

[Carbon and Energy Report (Application Reference Number 8.15) - Details the carbon and energy footprint for the |Wylfa Newydd DCO Project

[Landscape and Habitat Management Strategy (Application Reference Number 8.16) - This strategy outlines how |the identified effects of the Wylfa Newydd DCO Project on habitats will be addressed and managed.

[Sustainability Statement (Application Reference Number 8.17) - Highlights how sustainable development principles |have been considered and integrated into the Wylfa Newydd DCO Project.

IHealth Impact Assessment Non-Technical Summary (Welsh) (Application Reference Number 8.18) -A non- |technical summary version of the Health Impact Assessment in Welsh.

|Health Impact Assessment Non-Technical Summary (English) (Application Reference Number 8.18) - A non- Itechnical summary version of the Health Impact Assessment (described below).

Health Impact Assessment Report (Application Reference Number 8.19) - Identifies and assesses the health and well-being effects of the Wylfa Newydd DCO Project and suggests mitigation.

Welsh Language Impact Assessment Non-Technical Summary (Welsh) (Application Reference Number 8.2) - Provides a Welsh language, non-technical summary of the Welsh Language Impact Assessment

Welsh Language Impact Assessment Non-Technical Summary (English) (Application Reference Number 8.2) - Provides a non-technical summary of the Welsh Language Impact Assessment

Welsh Language Impact Assessment (Welsh) (Application Reference Number 8.21) - Assesses, in Welsh, the likely impacts of the Wylfa Newydd DCO Project on Welsh language and culture.

Welsh Language Impact Assessment (English) (Application Reference Number 8.21) - Assesses the likely impacts of the Wylfa Newydd DCO Project on Welsh language and culture.

Equality Impact Assessment (Application Reference Number 8.22) - Assesses the impact of new and revised policies, practices and services against the requirements of the public sector equality duty.

community Impact Report (Application Reference Number 8.23) - Identifies the effects from the Environmental Statement, and other assessment documents, on local communities and presents these spatially.

Site Selection Report - Volume 1 - Introduction and Context (Application Reference Number 8.24.1) Site Selection Report - Volume 2 - Wylfa Newydd Development Area (Application Reference Number 8.24.2) Site Selection Report - Volume 3 - Off-Site Power Station Facilities (Application Reference Number 8.24.3) Site Selection Report - Volume 4 - Temporary Workers' Accommodation (Application Reference Number 8.24.4) Site Selection Report - Volume 5 - Park and Ride (Application Reference Number 8.24.5) Site Selection Report - Volume 6 - Logistics Centre (Application Reference Number 8.24.6)

Page 15 of 22 Continued from previous page... bite belection Keport - Volume 7 - A5UZ5 Utt-Line Highway Improvements (Application KeTerence Number 8,24.7) - Outlines the approach to determining the location of the main temporary and permanent components within the Wylfa Newydd DCO Project.

Statement of Common Ground Position Statement (Application Reference Number 8.25) - Sets out how hlorizon is working with key stakeholders to agree Statements of Common Ground and explains the progress that has been made in relation to each.

Water Framework Directive Information to Support Article 4(7) Derogation (Application Reference Number 8.27) - Provides the information required to support a derogation under Article 4(7) of the Water Framework Directive.

Combined Heat and Power Feasibility Study (Application Reference Number 8.28) - Provide an initial assessment to establish whether a combined heat and power system could be viable.

Phasing Strategy (Application Reference Number 8.29) - Establishes the sequence in which the Wylfa Newydd DCO Project and key pieces of mitigation will be constructed.

Document reference 8.26 - Water Framework Directive Compliance Assessment

Document reference 1.3 - Guide to the Application (English and Welsh)

Remove this reference

Document reference 11.4-General Glossary

Remove this reference

Document reference 1.5 - s55 application checklist

Remove this reference

Document reference |1.6 - Newspaper Notices

Remove this reference

Document reference 3.2 - Mark-Up of the Proposed Order against model provision

Remove this reference

Document reference 3.4 - Draft Heads of Terms for Planning Obligations

Remove this reference

Document reference 5.4 - Details of other Consents, Licences and Agreements

Remove this reference

Page 16 of 22 Continued from previous page... Document reference 8.1 - Planning Statement

Remove this reference

Document reference 8.2 - Design and Access Statement

Remove this reference

Document reference 8.3 - Jobs and Skills Strategy

Remove this reference

Document reference 8.4 - Workforce Accommodation Strategy

Remove this reference

Document reference |8.5 - Workforce Management Strategy

Remove this reference

Document reference 8.6 - Wylfa Newydd Code of Construction Practice

Remove this reference

Document reference 8.7 - Main Power Station Site sub-Code of Construction Practice

Remove this reference

Document reference 8.8 - Marine Works sub-Code of Construction Practice

Remove this reference

Document reference 8.9 - Off-Site Power Station Facilities sub- Code of Construction Practice

Remove this reference

Document reference 8.10 - Park and Ride sub-Code of Construction Practice

Remove this reference

Document reference 8.11 - Logistics Centre sub-Code of Construction Practice

Remove this reference

Page 17 of 22 Continued from previous page... Document reference 8.12 - A5025 Off-line Highway Improvements sub-Code of Construction Practice

Remove this reference

Document reference 8.13 - Wylfa Newydd Code of Operational Practice

Remove this reference

Document reference 8.14 - Mitigation Route Map

Remove this reference

Document reference 8.15 - Carbon and Energy Report

Remove this reference

Document reference 8.16 - Landscape and Habitat Management Strategy

Remove this reference

Document reference 8.17 - Sustainability Statement

Remove this reference

Document reference 8.18 - hlealth Impact Assessment Non- Technical Summary (Welsh)

Remove this reference

Document reference 8.18 - Health Impact Assessment Non- Technical Summary (English)

Remove this reference

Document reference 8.19 - Health Impact Assessment Report

Remove this reference

Document reference 8.20 - Welsh Language Impact Assessment Non-Technical Summary I (Welsh)

Remove this reference

Page 18 of 22 Continued from previous page... Document reference 8.20 - Welsh Language Impact Assessment Non-Technical Summary (English)

Remove this reference

Document reference 8.21 -Welsh Language Impact Assessment (Welsh)

Remove this reference

Document reference 8.21 - Welsh Language Impact Assessment (English)

Remove this reference

Document reference 8.22 - Equality Impact Assessment

Remove this reference

Document reference 8.23 - Community Impact Report

Remove this reference

Document reference |8.24 - Site Selection Report

Remove this reference

Document reference 8.25 - Statement of Common Ground Position Statement

Remove this reference

Document reference 8.27 - Water Framework Directive Information to Support Article 4(7) Derogation

Remove this reference

Document reference 8.28 - Combined Heat and Power Feasibility Study

Remove this reference

Document reference 8.29 - Phasing Strategy

Remove this reference

Add another reference

Provide a brief description of any other information provided that is in support of the application, but which has not been explicitly required

Page 19 of 22 Continued from previous page... Additional information relating to hazardous waste facilities (Application Reference Number; 7.2) This document has been prepared to detail the purpose and estimated capacity of these facilities.

Additional information relating to harbour facilities (Application Reference Number: 7.3) This document has been prepared to outline the need and proposed scope of these facilities as part of the Wylfa Newydd DCO Project.

Document reference 7.2 - Additional information relating to hazardous waste facilities

Document reference 7.3 - Additional information relating to harbour facilities

Remove this reference

Add another reference

24. Other consents/licences required under other legislation * Other consents/licences are required: (? Yes F No

* Provide a list of consents/licences

Planning Applications (Town and Country Planning Act 1990) -

Two planning applications have been submitted for elements of the Wylfa Newydd Project not within the scope of the DCO application. A planning application for Site Preparation and Clearance works was submitting to Isle of Anglesey County Council on 10 November 2017 and was under consideration when the DCO application was submitted. A planning application for A5025 On-line Highways Improvements was submitted to Isle of Anglesey ;ounty Council on 17 November 2017 and was under consideration when the DCO application was submitted. iMarine Licences (Marine and Coastal Access Act 2009) -

|Two Marine Licences are required for marine construction and dredging and disposal works. Both licences will be isubmitted at the same time as the application for the DCO. These are being discussed and progressed with NRW.

|Environmental Permits (Environmental Permitting (England and Wales) Regulations 2016) -

|To be submitted at the same time as the submission of the DCO application: IRadioactive Substances activities, ICombustion installation activities, |Water discharge activities, |Flood risk activity permit, and [Waste permits

[European Protected Species Licence (Conservation of Habitats and Species Regulations 2010)-

[Licenses are required for Great Crested Newts and Bats. Draft licences are submitted with the DCO application |and will be finalised post DCO grant.

Page 20 of 22 Continued from previous page... |Conservation Licences (Wildlife and Countryside Act 1981)-

I Licences will be required for water voles and red squirrels (if identified through pre-construction sun/eys) prior to |construction. Draft licenses are submitted with the DCO application and will be finalised post DCO grant (or TCPA [grant in the case of Site Preparation and Clearance works)

[Nuclear Site Licence (Nuclear Installations Act 1965) grant expected in October 2018.

|Control of Major Accident Hazards (COMAH) (Control of Major Accident Hazards Regulations 2015 (as amended)) |to be submitted post DCO grant

[Article 37 (Euratom Treaty) submitted to the European Committee in October 2017 [Article 41 (Euratom Treaty) submitted to the European Committee in February 2017

|Electricity generation licence Obtained 9 May 2011. Copy of licence attached in Appendix 2.1 of Details of Other [Consents, Licences and Agreements (Application Reference Number 5.4)

|0ther consents to be submitted following DCO application submission:

[Planning (Hazardous Substances) Consent (Planning (Hazardous Substances) Act 1990 Planning (Hazardous [Substances) (Wales) Regulations 2015); [Request for Non-domestic Water Supply (Section 55 of the Water Industry Act 1991); |Water Abstraction Licence(s) for the abstraction of water during construction (Water Resources Act 1991); |Foul Water Sewer Requisition (Section 98 of the Water Industry Act 1991 and the Water Act 2003); |0rdinary Watercourse Consents (Land Drainage Act 1991); -ocal Authority Pollution Prevention and Control Part B (Environmental Permitting (England and Wales) |Regulations2010);

Other consents required prior to construction:

Permit for transport of Abnormal Indivisible Loads Permits (The Road Vehicles (Authorisation of Special Types) (General) Order 2003 or with authorisation from the Secretary of State under the Road Traffic Act 1998; Section 61 consent (Control of Pollution Act 1974); ;onstruction-related Health and Safety consents (hleatth and Safety at Work Act 1974 and subsidiary legislation); coastal Station Radio Technically Assigned (Wireless Telegraphy Act 2006); Bespoke Hazardous Waste Permits (Environmental Permitting (England and Wales) Regulations 2016);

Other consents required prior to operation:

Building Regulations (Buildings Regulations ) 2010; Permit to emit C02 (Greenhouse Gas Emissions Trading Scheme Regulations 2012); Operation-related hlealth and Safety consents (Health and Safety at Work Act 1974 and subsidiary legislation); Hazardous waste producer registration (Hazardous Waste (England and Wales) Regulations 2005);

For full details refer to Details of Other Consents, Licences and Agreements (Application Reference Number 5.4)

You must cite the document references as appropriate

* Document reference 5.4 - Details of Other Consents, Licences and Agreements

Add another reference

Page 21 of 22 Continued from previous page... 25. Declaration I declare to the best of my knowledge that the information given in this form and enclosed maps, plans and other documents are true. Please note there is a requirement for one hard copy of the form to be signed. Please ensure that when you submit you include at least one signed copy. Further copi^ do not require the hand written signature. Signature

(For and on behalf of the Applicant

* Name KIERAN SOMERS (In block letters) * Date 28 /|03|/ 2018 dd mm yyyy

* Organisation IHorizon Nuclear Power Wylfa Limited * Position within the Head of Planning organisation

Page 22 of 22