ITB 2021-011 GENERATOR PREVENTATIVE MAINTENANCE, SERVICE, AND REPAIR

BID COMPARISON

1-A - Buildings & Grounds Division

Item #1-A-1 Item #1-A-2 Item #1-A-3 Item #1-A-4 Item #1-A-5 Bidder Courthouse Courthouse Annex Calvert House Safe Harbor Shelter Harriett E. Brown Community Center

First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total

Power Services Inc. $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 Kelly Generator & Equip. $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 PowerSecure Service $300.00 $715.00 $1,015.00 $300.00 $485.00 $785.00 $300.00 $635.00 $935.00 $300.00 $405.00 $705.00 $300.00 $345.00 $645.00 Fidelity Engineering LLC $300.00 $820.00 $1,120.00 $300.00 $790.00 $1,090.00 $300.00 $1,060.00 $1,360.00 $400.00 $1,600.00 $2,000.00 $300.00 $580.00 $880.00

1 -A - Buildings & Grounds Division (continued)

Item #1-A-6 Item #1-A-7 Item #1-A-8 Item #1-A-9 Item #1-A-10 Bidder Health Services Center Alcholo Svcs/Substance Abuse Southern Community Center Public Safety Building Linda L. Kelley Animal Shelter

First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total

Power Services Inc. $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $500.00 $696.00 Kelly Generator & Equip. $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 $185.50 $550.00 $735.50 $185.50 $400.00 $585.50 PowerSecure Service $300.00 $345.00 $645.00 $300.00 $690.00 $990.00 $300.00 $305.00 $605.00 $300.00 $990.00 $1,290.00 $300.00 $725.00 $1,025.00 Fidelity Engineering LLC $300.00 $1,060.00 $1,360.00 $400.00 $1,225.00 $1,625.00 $200.00 $500.00 $700.00 $500.00 $1,400.00 $1,900.00 $400.00 $1,668.00 $2,068.00

B1031- A - Buildings & Grounds Division (continued)

Item #1-A-11 Bidder Joint Information Center -A

First Visit Second Visit Total

Power Services Inc. $196.00 $400.00 $596.00 $6,656.00 Kelly Generator & Equip. $185.50 $400.00 $585.50 $6,590.50 PowerSecure Service $300.00 $485.00 $785.00 $9,425.00 Fidelity Engineering LLC $300.00 $800.00 $1,100.00 $15,203.00 Bid Comparison

ITB 2022-011 Page 2

1-B Load Bank Testing - Buildings & Grounds Division Only

Bidder Item #1-B-1 Item #1-B-2 Item #1-B-3 Calvert House Courthouse Courthouse Annex Quantity Total Quantity Total Quantity Total Per Test Per Test Per Test Unit Price Unit Price Unit Price Power Services Inc. $400.00 2 $800.00 $400.00 2 $800.00 $400.00 2 $800.00 Kelly Generator & Equip. $400.00 2 $800.00 $500.00 2 $1,000.00 $400.00 2 $800.00 PowerSecure Service $775.00 2 $1,550.00 $850.00 2 $1,700.00 $750.00 2 $1,500.00 Fidelity Engineering LLC $725.00 2 $1,450.00 $1,300.00 2 $2,600.00 $700.00 2 $1,400.00

1-B Load Bank Testing - Buildings & Grounds Division Only (continued)

Item #1-B-4 Bidder Public Safety Total 1-B Quantity Total Per Test Load Bank Testing Unit Price Power Services Inc. $400.00 2 $800.00 $3,200.00 Kelly Generator & Equip. $500.00 2 $1,000.00 $3,600.00 PowerSecure Service $1,050.00 2 $2,100.00 $6,850.00 Fidelity Engineering LLC $1,500.00 2 $3,000.00 $8,450.00 Bid Comparison ITB 2022-011 Page 3

Item #2 Item #3 Item #4 Item #5 Detention Center Fleet Maintenance HIGHWAY MAINTENANCE Marine Museum Biddder Second Second First Visit Second Visit Total First Visit Total First Visit Total First Visit Second Visit Total Visit Visit

Power Services Inc. $196.00 $800.00 $996.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 $196.00 $400.00 $596.00 Kelly Generator & Equip. $185.50 $900.00 $1,085.50 $185.50 $400.00 $585.50 $185.50 $400.00 $585.50 $185.50 $350.00 $535.50 PowerSecure Service $300.00 $1,075.00 $1,375.00 $300.00 $485.00 $785.00 $300.00 $365.00 $665.00 $300.00 $465.00 $765.00 Fidelity Engineering LLC $500.00 $1,800.00 $2,300.00 $300.00 $800.00 $1,100.00 $300.00 $600.00 $900.00 $300.00 $700.00 $1,000.00

Item #6 Item #7 Item #8 Solid Waste Natural Resources Division Sheriff's Office Bidder Second Second First Visit Second Visit Total First Visit Total First Visit Total Visit Visit

Power Services Inc. $196.00 $300.00 $496.00 $196.00 $350.00 $546.00 $196.00 $350.00 $546.00 Kelly Generator & Equip. $185.50 $300.00 $485.50 $185.50 $400.00 $585.50 $185.50 $375.00 $560.50 PowerSecure Service $245.00 $300.00 $545.00 $245.00 $300.00 $545.00 $245.00 $300.00 $545.00 Fidelity Engineering LLC $250.00 $440.00 $690.00 $250.00 $440.00 $690.00 $300.00 $500.00 $800.00 Bid Comparison ITB 2022-011 Page 4

9 - Water & Sewerage Division

Item #9-1 Item #9-2 Item #9-3 Item #9-4 Prince Frederick WPS #1 Cavalier Country Chesapeake Heights WPS (Tower) Prince Frederick \WWPS #4 Bidder

First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total

Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $400.00 $1,100.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 PowerSecure Service $1,065.00 $585.00 $1,650.00 $860.00 $380.00 $1,240.00 $860.00 $380.00 $1,240.00 $860.00 $380.00 $1,240.00 Fidelity Engineering LLC $1,000.00 $900.00 $1,900.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00

9 - Water & Sewerage Division (continued)

Item #9-5 Item #9-6 Item #9-7 Item #9-8

Prince Frederick Village SPS Aquatic Center Pump Station Silverwood SPS Dares Beach WWPS Bidder

First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total

Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 PowerSecure Service $780.00 $300.00 $1,080.00 $860.00 $380.00 $1,240.00 $860.00 $380.00 $1,240.00 $825.00 $340.00 $1,165.00 Fidelity Engineering LLC $900.00 $700.00 $1,600.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00

9 - Water & Sewerage Division (continued)

Item #9-9 Item #9-10 Item #9-11 Item #9-12

Chapline Place SPS Prince Frederick WWTP #1 Tobacco Ridge Road WWTP College of Southern MD SPS Bidder

First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total

Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $500.00 $1,100.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $800.00 $1,500.00 $700.00 $300.00 $1,000.00 PowerSecure Service $840.00 $350.00 $1,190.00 $1,065.00 $585.00 $1,650.00 $1,445.00 $865.00 $2,310.00 $830.00 $320.00 $1,150.00 Fidelity Engineering LLC $950.00 $800.00 $1,750.00 $1,000.00 $900.00 $1,900.00 $1,900.00 $1,500.00 $3,400.00 $950.00 $800.00 $1,750.00 Bid Comparison ITB 2022-011

Page 5

9 - Water & Sewerage Division (continued)

Item #9-13 Item #9-14 Item #9-15 Item #9-16

Bidder Yardley Hills SPS #1 Yardley SPS #2 Market Square SPS Oak Tree Landing SPS

First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $400.00 $1,100.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 PowerSecure Service $840.00 $340.00 $1,180.00 $780.00 $300.00 $1,080.00 $800.00 $300.00 $1,100.00 $830.00 $320.00 $1,150.00 Fidelity Engineering LLC $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00

9 - Water & Sewerage Division (continued)

Item #9-17 Item #9-18 Item #9-19 Item #9-20 Bidder Headworks SPS Solomons SPS #2 Solomons SPS #4 Solomons SPS #5 First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $400.00 $1,100.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 PowerSecure Service $1,065.00 $585.00 $1,650.00 $830.00 $320.00 $1,150.00 $800.00 $300.00 $1,100.00 $800.00 $300.00 $1,100.00 Fidelity Engineering LLC $1,000.00 $900.00 $1,900.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00

9 - Water & Sewerage Division (continued)

Item #9-21 Item #9-22 Item #9-23 Item #9-24 Bidder Dowell Road SPS Oyster Bay SPS Windward Harbor SPS Solomons WWTP Genset #2 First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $400.00 $1,100.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 $700.00 $600.00 $1,300.00 PowerSecure Service $850.00 $350.00 $1,200.00 $800.00 $300.00 $1,100.00 $800.00 $300.00 $1,100.00 $1,450.00 $850.00 $2,300.00 Fidelity Engineering LLC $950.00 $900.00 $1,850.00 $950.00 $700.00 $1,650.00 $950.00 $800.00 $1,750.00 $1,900.00 $1,400.00 $3,300.00 Bid Comparison

ITB 2022-011

Page 6

9 - Water & Sewerage Division (continued)

Item #9-25 Item #9-26 Item #9-27 Item #9-28 Bidder Solomons Landing SPS Patuxent Business Park SPS Lusby Hills SPS Lusby Common SPS First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $400.00 $1,100.00 $700.00 $400.00 $1,100.00 $700.00 $300.00 $1,000.00 $700.00 $350.00 $1,050.00 PowerSecure Service $830.00 $320.00 $1,150.00 $860.00 $380.00 $1,240.00 $800.00 $300.00 $1,100.00 $850.00 $330.00 $1,180.00 Fidelity Engineering LLC $950.00 $1,200.00 $2,150.00 $950.00 $800.00 $1,750.00 $950.00 $700.00 $1,650.00 $950.00 $800.00 $1,750.00

9 - Water & Sewerage Division (continued)

Item #9-29 Item #9-30 Item #9-31 Item #9-32 Bidder Solomons WPS (Standpipe) Solomons WWTP #1 Genset 1 Lusby Center SPS Cove Point Aquatic Center SPS First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $400.00 $1,100.00 $700.00 $400.00 $1,100.00 $700.00 $300.00 $1,000.00 $700.00 $300.00 $1,000.00 PowerSecure Service $1,135.00 $640.00 $1,775.00 $1,135.00 $640.00 $1,775.00 $830.00 $320.00 $1,150.00 $830.00 $320.00 $1,150.00 Fidelity Engineering LLC $1,100.00 $900.00 $2,000.00 $1,100.00 $900.00 $2,000.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00

9 - Water & Sewerage Division (continued)

Item #9-33 Item #9-34 Item #9-35 Item #9-36 Bidder Chesapeake Light House SPS Marley Ru WWTP Industrial Park SPS East Prince Frederick Tower First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 $600.00 $300.00 $900.00 Kelly Generator & Equip. $700.00 $300.00 $1,000.00 $700.00 $400.00 $1,100.00 $700.00 $400.00 $1,100.00 $700.00 $400.00 $1,100.00 PowerSecure Service $800.00 $300.00 $1,100.00 $1,090.00 $610.00 $1,700.00 $880.00 $420.00 $1,300.00 $900.00 $450.00 $1,350.00 Fidelity Engineering LLC $950.00 $700.00 $1,650.00 $1,100.00 $900.00 $2,000.00 $950.00 $800.00 $1,750.00 $950.00 $800.00 $1,750.00 Bid Comparison ITB 2022-011 Page 7

9 - Water & Sewerage Division (continued)

Item #9-37 Bidder Off Site Area A First Visit Second Visit Total Power Services Inc. $600.00 $300.00 $900.00 $33,500.00 Kelly Generator & Equip. $700.00 $300.00 $1,000.00 $38,950.00 PowerSecure Service $800.00 $300.00 $1,100.00 $48,675.00 Fidelity Engineering LLC $950.00 $700.00 $1,650.00 $69,100.00 Bid Comparison ITB 2022-011 Page 8

10 - Fire Departments

Item #10-1 Item #10-2 Item #10-3 Bidder Company 1 Company 2 Company 3

Second Second First Visit Second Visit Third Visit Fourth Visit Total First Visit Third Visit Fourth Visit Total First Visit Third Visit Fourth Visit Total Visit Visit

Power Services Inc. $200.00 $400.00 $200.00 $400.00 $1,200.00 $200.00 $400.00 $200.00 $400.00 $1,200.00 $200.00 $400.00 $200.00 $400.00 $1,200.00 Kelly Generator & Equip. $185.50 $400.00 $185.50 $400.00 $1,171.00 $185.50 $400.00 $185.50 $400.00 $1,171.00 $185.50 $400.00 $185.50 $400.00 $1,171.00 PowerSecure Service $275.00 $600.00 $275.00 $600.00 $1,750.00 $275.00 $600.00 $275.00 $600.00 $1,750.00 $275.00 $380.00 $275.00 $380.00 $1,310.00 Fidelity Engineering LLC $200.00 $600.00 $200.00 $600.00 $1,600.00 $200.00 $550.00 $200.00 $550.00 $1,500.00 $200.00 $550.00 $200.00 $550.00 $1,500.00

10 - Fire Departments (continued)

Item #10-4 Item #10-5 Item #10-6

Bidder Company 3A Company 4 Company 5

Second Second First Visit Second Visit Third Visit Fourth Visit Total First Visit Third Visit Fourth Visit Total First Visit Third Visit Fourth Visit Total Visit Visit Power Services Inc. $200.00 $300.00 $200.00 $300.00 $1,000.00 $200.00 $300.00 $200.00 $300.00 $1,000.00 $200.00 $300.00 $200.00 $300.00 $1,000.00 Kelly Generator & Equip. $185.50 $300.00 $185.50 $300.00 $971.00 $185.50 $400.00 $185.50 $400.00 $1,171.00 $185.50 $300.00 $185.50 $300.00 $971.00 PowerSecure Service $275.00 $310.00 $275.00 $310.00 $1,170.00 $275.00 $600.00 $275.00 $600.00 $1,750.00 $275.00 $380.00 $275.00 $380.00 $1,310.00 Fidelity Engineering LLC $200.00 $500.00 $200.00 $500.00 $1,400.00 $200.00 $600.00 $200.00 $600.00 $1,600.00 $200.00 $550.00 $200.00 $550.00 $1,500.00

10 - Fire Departments (continued)

Item #10-7 Item #10-8 Item #10-9 Bidder Company 6 Company 7 Compay 10 Second Second First Visit Second Visit Third Visit Fourth Visit Total First Visit Third Visit Fourth Visit Total First Visit Third Visit Fourth Visit Total Visit Visit Power Services Inc. $200.00 $300.00 $200.00 $300.00 $1,000.00 $200.00 $400.00 $200.00 $400.00 $1,200.00 $200.00 $400.00 $200.00 $400.00 $1,200.00 Kelly Generator & Equip. $185.50 $300.00 $185.50 $300.00 $971.00 $185.50 $400.00 $185.50 $400.00 $1,171.00 $185.50 $400.00 $185.50 $400.00 $1,171.00 PowerSecure Service $275.00 $380.00 $275.00 $380.00 $1,310.00 $275.00 $600.00 $275.00 $600.00 $1,750.00 $275.00 $725.00 $275.00 $725.00 $2,000.00 Fidelity Engineering LLC $200.00 $550.00 $200.00 $550.00 $1,500.00 $200.00 $550.00 $200.00 $550.00 $1,500.00 $200.00 $550.00 $200.00 $550.00 $1,500.00 Bid Comparison ITB 2022-011 Page 9

10 - Fire Departments (continued)

Bidder

Power Services Inc. $10,000.00 Kelly Generator & Equip. $9,939.00 PowerSecure Service $14,100.00 Fidelity Engineering LLC $13,600.00 Bid Comparison ITB 2022-011 Page 10

BID SUMMARY

Bidder

Total 1-A Total 1-B Total 9 Total 10 Total Bid

Power Services Inc. $6,656.00 $3,200.00 $996.00 $596.00 $596.00 $596.00 $496.00 $546.00 $546.00 $33,500.00 $10,000.00 $57,728.00

Kelly Generator & Equipment Inc. $6,590.50 $3,600.00 $1,085.50 $585.50 $585.50 $535.50 $485.50 $585.50 $560.50 $38,950.00 $9,939.00 $63,503.00

PowerSecure Service $9,425.00 $6,850.00 $1,375.00 $785.00 $665.00 $765.00 $545.00 $545.00 $545.00 $48,675.00 $14,100.00 $84,275.00

Fidelity Engineering LLC dba Fidelity Power Systems $15,203.00 $8,450.00 $2,300.00 $1,100.00 $900.00 $1,000.00 $690.00 $690.00 $800.00 $69,100.00 $13,600.00 $113,833.00

Trade Personnel Certified Technician Response Time Bidder Hourly Rate During Working Hours After Working Hours Normal Response Time Maximum Response Time Power Services Inc. $115.00 $172.50 2 Hours 3 Hours Kelly Generator & Equipment Inc. Inc. $145.00 $217.50 Within 1 Hour 2 Hours PowerSecure Service $170.00 $255.00 2 Hours 2 Hours Fidelity Engineering LLC dba Fidelity Power Systems $144.00 $216.00 4 Hours 4 Hours