Aespl/Eia/15/Ind/001
Total Page:16
File Type:pdf, Size:1020Kb
Project No: AESPL/EIA/15/IND/001 Environmental Impact Assessment Report Proposed Establishment of Synthetic Organic Chemicals Manufacturing Facility 16 at - Aarav Fragrances & Flavors Pvt. Ltd. Winter2015 Village: Jamghar- Lakhmapur, Baseline Monitoring: Tal. Wada, Dist. Palghar, Maharashtra April- 2019 Environmental Consultant: Aditya Environmental Services Pvt. Ltd., Mumbai QCI- NABET Accredited EIA Consultant www.aespl.co.in Declaration by Experts contributing to the EIA ‘Proposed Establishment of Synthetic Organic Chemicals Manufacturing Facility by Aarav Fragrances & Flavors Pvt ltd. I, hereby, certify that I was a part of the EIA Team in the following capacity that developed the above EIA. EIA Coordinator: Name: Mr. Rajiv V Aundhe Signature & Date: 19th April 2019 Period of involvement: since February 2015 Contact information: Mob. 09821513367 E-mail: [email protected] Functional Area Experts: S. Functional Name of the Involvement Signature & Date N. Areas Expert/s (Period & Task**) 1 AP* Rajiv Aundhe Since February 2015 2 WP* (FAA Swapnil Ubale) 3 SHW* Rajiv Aundhe Since February 2015 (Assisted By PK Sarode) 4 SE* Ms. Anju October 15- March Chawhan & Ms. 2016 Bela Pharate 5 EB* N. K. Shendye October 15- March 2016 6 HG* Shreevallabh October 15- March Kothe 2016 7 GEO* -- -- -- 8 SC* -- -- -- 9 AQ* Sudhir Verma October 15- March 2016 10 NV* Rajiv Aundhe Since Feb 2015 11 LU* Ms. Bela Pharate October 15- May 2016 12 RH* D. K. Joshi / October 15- May (Assisted By PK 2016 Sarode) NOTE: (*) Full forms of abbreviations given on Next Page (**) Tasks for each Functional Area Expert given on Next Page Environmental Baseline monitoring and analysis for this project was carried out by in-house, environmental analytical laboratory, registered by MoEFCC, approved under Environment Protection Act 1986, vide MoEFCC Notification S.O. no. 1190 (E), dated 1st May 2014. The duration of recognition is from 1st May 2014 to 30th April 2019 (under renewal) Declaration be the Head of the Accredited Consultant Organization I, Rajiv V. Aundhe, hereby, confirm that the above mentioned experts prepared the EIA ‘Proposed Establishment of Synthetic Organic Chemicals Manufacturing Facility by Aarav Fragrances & Flavors Pvt. Ltd.’’ I also confirm that Aditya Environmental Service Pvt. Ltd. shall be fully accountable for any mis-leading information mentioned in this statement. Name: Rajiv V. Aundhe Designation: Director Name of the EIA Consultant Organization: Aditya Environmental Service Pvt. Ltd. NABET Certificate No. & Issue Date: NABET/ EIA/ 1720/ RA 0117 dated 18th January 2019 valid upto 24.11.2020 S.N. Functional Complete Name of the Tasks Area Code Functional Areas 1 AP Air Pollution Assessing baseline ambient air quality, stack Prevention, Monitoring emission, possible impacts and control & Control measures 2 WP Water Pollution Assessing baseline surface/ ground water Prevention, Control & quality, possible impacts and control measures Prediction of Impacts 3 SHW Solid Waste and Assessing solid/ hazardous waste generation, Hazardous Waste treatment and disposal Management 4 SE Socio-Economics Assessing baseline Socioeconomic, demographic situation, impacts and CSR plan/ measures for upliftment 5 EB Ecology and Assessing baseline biodiversity situation in Biodiversity study area, impacts and Biodiversity management plans 6 HG Hydrology, ground Assessing baseline hydrogeological situation in Water & Water study area, impacts and management plans Conservation 7 GEO Geology Assessing baseline geological situation in study area, impacts and management plans 8 SC Soil Conservation Assessing baseline geological situation in study area, impacts and management plans 9 AQ Meteorology, Air Quality Assessing nature and scale of impacts on Modeling & Prediction ambient air quality through modeling and management plans 10 NV Noise/ Vibration Assessing baseline ambient noise quality, possible sources, impacts and control measures 11 LU Land Use Assessing baseline Land use Land cover possible impacts and control measures 12 RH Risk Assessment & Assessing safety measures taken up by company Hazard Management modeling to assess scale of impacts, disaster management and control measures ADITYA ENVIRONMENTAL SERVICES PVT. LTD. Recognized by MOEF as “Environmental Laboratory” vide S.O.No. 983 valid up to 30.04.2019 ISO 9001:2008, OHSAS 18001:2007 Certified Accredited by QCI-NABET as ‘A’ Category EIA Consultancy Organization TO WHOMSOEVER IT MAY CONCERN This is to confirm that the EIA/ EMP for the project “Proposed Establishment of Synthetic Organic Chemicals Manufacturing Facility” located at Village: Jamghar- Lakhmapur, Tal. Wada, Dist. Palghar, Maharashtra by Aarav Fragrances & Flavors Pvt. Ltd. has been prepared by me in the capacity of EIA coordinator. The Standard ToR’s prescribed by MoEFCC vide Notification dated 10th April 2015 and the additional ToR’s prescribed by EAC (Industry-2) committee during 38th EAC meeting dated 20th April 2015 have been fully complied with in preparing the EIA/ EMP. A point wise compliance to the ToR’s prescribed as above has been presented in Chapter 1, Section No. 1.5.5. We also confirm that the EIA prepared is based on factual data and all due diligence has been followed in preparing the same. For Aditya Environmental Services Pvt. Ltd. Rajiv Aundhe EIA coordinator Date: 19th April 2019 Place: Mumbai Reg. Office: 107, Hiren Light Indl. Estate, Mogul Lane, Mahim, Mumbai -400016 Tel: 022 42127500 E-mail: [email protected] Central Lab : P-1, MIDC Mohopada, P.O. Rasayani, Dist. Raigad Pin 410207 Tel : 02192 252008 E-mail : [email protected] Branches : Goa 08322652456 Ahmedabad : 079 40063271 Pune : 915802585 Delhi : 01164595949 Baroda : 02652331790 CIN: U74999MH2001PTC132091 Table of Contents INTRODUCTION ......................................................................................................................................................... 1 1.1 PURPOSE OF ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REPORT ............................................................................ 1 1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT ....................................................................................................... 1 1.2.1 Project Proponent & Background of Promoters ........................................................................................... 1 1.3 BRIEF DESCRIPTION OF NATURE, SIZE, LOCATION OF THE PROJECT & ITS IMPORTANCE ........................................... 1 1.3.1 Nature & Size of Project .......................................................................................................................................... 1 1.3.2 Project Location ......................................................................................................................................................... 2 1.3.3 Importance of the Project to the Country, Region ........................................................................................ 2 1.4 REGULATORY FRAMEWORK ..................................................................................................................................................... 2 1.5 OBJECTIVES & SCOPE OF EIA .................................................................................................................................................. 4 1.5.1 Scope ............................................................................................................................................................................... 4 1.5.2 Process of EIA study .................................................................................................................................................. 5 1.5.3 Methodology adopted for EIA study ................................................................................................................... 5 1.5.4 Structure of EIA Report ........................................................................................................................................... 8 1.5.5 Regulatory Scoping & Its Compliance ............................................................................................................... 9 PROJECT DESCRIPTION ........................................................................................................................................ 17 2.1 TYPE OF PROJECT ................................................................................................................................................................... 17 2.2 NEED OF THE PROJECT .......................................................................................................................................................... 17 2.3 LOCATION OF THE PROJECT .................................................................................................................................................. 17 2.4 SIZE/ MAGNITUDE OF OPERATION ..................................................................................................................................... 19 2.5 PROPOSED SCHEDULE FOR APPROVAL & IMPLEMENTATION ......................................................................................... 22 2.6 TECHNOLOGY & PROCESS DESCRIPTION, ENVIRONMENTAL & SAFETY ASPECTS ...................................................... 22 2.6.1 Manufacture of Fragrances / Perfumes & Flavors .................................................................................... 22 2.6.2 Process flow diagram of proposed set up ....................................................................................................