Pomc Long Document

Total Page:16

File Type:pdf, Size:1020Kb

Pomc Long Document Port Information Guide 4TH EDITION MARCH 2018 4th Edition Port Information Guide for the port of Melbourne General introduction This guide has been written for masters of seagoing vessels, ships’ agents, shipping lines, publishers of nautical information and any other party that needs nautical information pertaining to the operation of vessels in port waters of the Port of Melbourne. It should be read in conjunction with its companion publication, Harbour Master's Directions. Although the document is available to download it should be noted that any printed copy is considered uncontrolled and the hyperlinks accessible within the online version will no longer be active. Legal disclaimer The current version of this publication is available on the Victorian Ports Corporation (Melbourne) website. Users are responsible for ensuring they are referring to the latest edition of this document noting that any printed version is an uncontrolled document. The information and material contained in this publication has been compiled by Victorian Ports Corporation (Melbourne) (VPCM) for use by port users. VPCM shall not in any way be, or become, responsible in law or otherwise for any errors in, or omissions from, this publication of whatsoever nature and howsoever occurring. The information provided in no way whatsoever supersedes or detracts from that available in Australian or State Acts, ordinances, rules or regulations. Contact the port Victorian Ports Corporation (Melbourne) Street address: Level 5, 530 Collins Street Melbourne Victoria 3000 Postal address: GPO Box 261 MELBOURNE VIC 3001 Tel: +61 3 8347 8300 Contact for port information Navigation Services [email protected] Website of the port www.vicports.vic.gov.au Website link for this document Harbour Master’s Directions & Port Information Guide Printed copies of this document are considered uncontrolled. Please refer to the VPCM website for the latest version. Page ii 4th Edition Port Information Guide for the port of Melbourne Contents 1 Part 1: Introduction, contacts and regulations ................................................. 2 1.1 Foreword by the Harbour Master ............................................................................................ 2 1.1.1 Port performance ....................................................................................................... 2 1.2 Contact information................................................................................................................. 3 1.2.1 VPCM Port Operations key personnel ...................................................................... 3 1.2.2 VPCM Marine and Navigation Department ............................................................... 3 1.2.3 Port Operations Control Centre (POCC) ................................................................... 3 1.3 Rules and regulations ............................................................................................................. 4 1.3.1 Applicable laws .......................................................................................................... 4 1.3.2 Exemptions and permits ............................................................................................ 5 1.3.3 Standard terms and conditions for use of shipping channels, common user berths and terminal hire ........................................................................................................ 6 2 Part 2: Notification, documentation and reporting .......................................... 8 2.1 General ................................................................................................................................... 8 2.2 Arrival and departure checklists ............................................................................................. 9 2.2.1 Arrival checklist ......................................................................................................... 9 2.2.2 Departure checklist .................................................................................................. 11 2.3 Notifications .......................................................................................................................... 12 2.3.1 Australian Border Force and Immigration ............................................................... 12 2.3.2 Biosecurity ............................................................................................................... 12 2.3.2.1 Non-commercial vessels .......................................................................... 13 2.3.3 Ballast water ............................................................................................................ 13 2.3.3.1 Same Risk Area ....................................................................................... 14 2.3.3.2 Discharge of ballast relating to safety, accident or minimising pollution . 14 2.3.4 VPCM cruise vessel berth booking protocol ........................................................... 15 2.3.5 Security.................................................................................................................... 15 2.3.6 Dangerous goods .................................................................................................... 15 2.3.7 Waste ...................................................................................................................... 15 2.3.8 Fresh water ............................................................................................................. 15 2.3.9 Pollution reports ...................................................................................................... 16 2.3.10 Helicopter operations .............................................................................................. 16 2.3.11 Operation of drones ................................................................................................. 16 2.4 Reporting .............................................................................................................................. 17 2.4.1 VTS reporting points ................................................................................................ 17 2.4.2 General reporting requirements .............................................................................. 17 3 Part 3: Port description and navigation .......................................................... 21 3.1 Port location .......................................................................................................................... 21 3.1.1 Port description ....................................................................................................... 21 3.1.2 Port limits ................................................................................................................. 21 3.1.3 Load lines ................................................................................................................ 21 3.1.4 Maximum size vessels ............................................................................................ 21 3.1.5 Time zone ................................................................................................................ 21 3.1.6 Local holidays .......................................................................................................... 22 3.1.7 Working hours ......................................................................................................... 22 3.1.8 Traffic....................................................................................................................... 22 3.1.9 Cargo ....................................................................................................................... 23 3.2 Charts and nautical publications ........................................................................................... 23 3.2.1 Charts ...................................................................................................................... 23 3.2.2 Nautical publications ............................................................................................... 24 Printed copies of this document are considered uncontrolled. Please refer to the VPCM website for the latest version. Page iii 4th Edition Port Information Guide for the port of Melbourne 3.3 Shippings announcements for the port area ........................................................................ 24 3.3.1 Victorian Notices to Mariners .................................................................................. 24 3.3.2 Port Information Notice ............................................................................................ 24 3.3.3 Marine Radio Victoria .............................................................................................. 24 3.3.3.1 Weather information: Marine Radio Victoria VHF broadcast schedule ... 24 3.3.4 Weather warnings broadcast by Melbourne VTS ................................................... 25 3.4 Pilot boarding grounds .......................................................................................................... 25 3.5 Port infrastructure ................................................................................................................. 25 3.5.1 Bridges .................................................................................................................... 25 3.5.2 Berth information ..................................................................................................... 29 3.5.2.1
Recommended publications
  • Independent Review of the Victorian Ports System: Discussion Paper
    Independent review of the Victorian Ports System DISCUSSION PAPER JULY 2020 Department of Transport Authorised by the Victorian Government, Melbourne 1 Spring Street Melbourne Victoria 3000 Telephone (03) 9655 6666 Designed and published by the Department of Transport ISBN 978-0-7311-9179-6 Contact us if you need this information in an accessible format such as large print or audio, please telephone (03) 9655 6666 or email [email protected] © Copyright State of Victoria Department of Transport Except for any logos, emblems, trademarks, artwork and photography this document is made available under the terms of the Creative Commons Attribution 3.0 Australia licence Contents Minister's Foreword 4 6. Safe operation of the port system 40 Preface 5 6.1. Introduction 40 Abbreviations 6 6.2. Issues and options 42 1. Introduction 7 6.2.1. Harbour Masters 42 1.1. The purpose of the review 7 6.2.2. Pilotage 43 1.2. The review approach 7 6.2.3. Towage 46 1.3. Review process and timing 8 6.2.4. Safety and Environment 47 Management Plans 2. The Victorian Ports System 10 6.2.5. A port safety licensing system 49 2.1. The recent evolution of the system 10 7. Port strategic planning 53 2.2. The system today 12 7.1. Introduction 53 2.2.1. Commercial ports 14 7.2. Issues and options 54 2.2.2. Local ports 15 7.2.1. Port Development Strategies 54 3. A Vision for the Victorian Ports 19 System 7.2.2. A Victorian ports strategy 55 3.1.
    [Show full text]
  • Principal Freight Network – Submission to Consultation Via: [email protected]
    Friday 18 December 2020 Principal Freight Network – Submission to consultation Via: [email protected] To whom it may concern The Committee for Geelong provides strategic leadership and influence to leverage the economic and social prosperity of our city-region. An independent, non-partisan, membership-based, not for profit organisation, the CfG works collaboratively with an authoritative group of stakeholders and influencers to design Geelong’s best future. Please consider this document as the Committee for Geelong’s submission to the consultation regarding the Principal Freight Network development process. If you have any questions please contact me on [email protected] or M: 0413241033 Kind regards Jennifer Cromarty, CEO Committee for Geelong Submission - 1 Recommendations 1. There is a need to undertake integrated transport planning in Geelong that considers longer term needs with consideration of current and future transport modes, noting that such study will provide a sound foundation for a whole of G21 integrated transport strategy undertaken at a later date. 2. Note that two Integrated Transport Plan (ITP) studies should be undertaken. a) One ITP focussing on the Geelong Port precinct (including associated industrial areas), led by the Department of Transport / Victorian Regional Channels Authority (VRCA), and b) The other focussed on the CBD and urban/regional environs led by the Dept of Transport / City of Greater Geelong. 3. That both ITP’s will be overseen and supported by a steering committee led by State Government to ensure integration, alignment and consistency of the ITP inputs and outputs. As noted above, the outputs would be key inputs into a (next stage) G21 Integrated Transport Strategy to provide a cohesive transport and land use planning framework for the entire G21 region.
    [Show full text]
  • Duke's & Orr's Dry Dock Pump House, Melbourne, Victoria
    Engineers Australia Engineering Heritage Victoria Nomination Engineering Heritage Australia Heritage Recognition Program DUKE’S & ORR’S DRY DOCK PUMP HOUSE, MELBOURNE , VICTORIA May 2014 2 Front Cover Photograph Caption “The way it was in the 1940s through the eyes of a shipwright. Melbourne photographer Jack Cato captured the atmosphere of the dry dock in this study of the entrance to Duke’s & Orr’s in the 1940s. The mitre gates are closed and pumping out is well under way”. Image: Jack Cato. Reproduced at page ix of Arthur E Woodley and Bob Botterill’s book Duke’s & Orr’s Dry Dock. The caption is also taken from the book with thanks to the authors. 3 TABLE OF CONTENTS PAGE Table of Contents 3 1 Introduction 5 2 Heritage Nomination Letter 7 3 Heritage Assessment 8 3.1 Item Name 8 3.2 Other/Former Names 8 3.3 Location 8 3.4 Address: 8 3.5 Suburb/Nearest Town 8 3.6 State 8 3.7 Local Govt. Area 8 3.8 Owner 8 3.10 Former Use 8 3.11 Designer 8 3.12 Maker/Builder 8 3.13 Year Started 8 3.14 Year Completed 8 3.15 Physical Description 8 3.16 Physical Condition 9 3.17 Modifications and Dates 9 3.18 Historical Notes 12 3.19 Heritage Listings 17 4 Assessment of Significance 18 4.1 Historical significance 18 4.2 Historic Individuals or Association 18 4.3 Creative or Technical Achievement of the Pump House 20 4.4 Research Potential of the dry dock and Pump House 20 4.5 Social Significance of the dry dock 21 4.6 Rarity relating to the dry dock and Pump House 21 4.7 Representativeness of the Pump House pumping machinery 23 4.8 Integrity/Intactness of
    [Show full text]
  • Australian Historic Theme: Producers
    Stockyard Creek, engraving, J MacFarlane. La Trobe Picture Collection, State Library of Victoria. Gold discoveries in the early 1870s stimulated the development of Foster, initially known as Stockyard Creek. Before the railway reached Foster in 1892, water transport was the most reliable method of moving goods into and out of the region. 4. Moving goods and cargo Providing transport networks for settlers on the land Access to transport for their produce is essential to primary Australian Historic Theme: producers. But the rapid population development of Victoria in the nineteenth century, particularly during the 1850s meant 3.8. Moving Goods and that infrastructure such as good all-weather roads, bridges and railway lines were often inadequate. Even as major roads People were constructed, they were often fi nanced by tolls, adding fi nancial burden to farmers attempting to convey their produce In the second half of the nineteenth century a great deal of to market. It is little wonder that during the 1850s, for instance, money and government effort was spent developing port and when a rapidly growing population provided a market for grain, harbour infrastructure. To a large extent, this development was fruit and vegetables, most of these products were grown linked to efforts to stimulate the economic development of the near the major centres of population, such as near the major colony by assisting the growth of agriculture and settlement goldfi elds or close to Melbourne and Geelong. Farmers with on the land. Port and harbour development was also linked access to water transport had an edge over those without it.
    [Show full text]
  • Victoria Harbour Docklands Conservation Management
    VICTORIA HARBOUR DOCKLANDS CONSERVATION MANAGEMENT PLAN VICTORIA HARBOUR DOCKLANDS Conservation Management Plan Prepared for Places Victoria & City of Melbourne June 2012 TABLE OF CONTENTS LIST OF FIGURES v ACKNOWLEDGEMENTS xi PROJECT TEAM xii 1.0 INTRODUCTION 1 1.1 Background and brief 1 1.2 Melbourne Docklands 1 1.3 Master planning & development 2 1.4 Heritage status 2 1.5 Location 2 1.6 Methodology 2 1.7 Report content 4 1.7.1 Management and development 4 1.7.2 Background and contextual history 4 1.7.3 Physical survey and analysis 4 1.7.4 Heritage significance 4 1.7.5 Conservation policy and strategy 5 1.8 Sources 5 1.9 Historic images and documents 5 2.0 MANAGEMENT 7 2.1 Introduction 7 2.2 Management responsibilities 7 2.2.1 Management history 7 2.2.2 Current management arrangements 7 2.3 Heritage controls 10 2.3.1 Victorian Heritage Register 10 2.3.2 Victorian Heritage Inventory 10 2.3.3 Melbourne Planning Scheme 12 2.3.4 National Trust of Australia (Victoria) 12 2.4 Heritage approvals & statutory obligations 12 2.4.1 Where permits are required 12 2.4.2 Permit exemptions and minor works 12 2.4.3 Heritage Victoria permit process and requirements 13 2.4.4 Heritage impacts 14 2.4.5 Project planning and timing 14 2.4.6 Appeals 15 LOVELL CHEN i 3.0 HISTORY 17 3.1 Introduction 17 3.2 Pre-contact history 17 3.3 Early European occupation 17 3.4 Early Melbourne shipping and port activity 18 3.5 Railways development and expansion 20 3.6 Victoria Dock 21 3.6.1 Planning the dock 21 3.6.2 Constructing the dock 22 3.6.3 West Melbourne Dock opens
    [Show full text]
  • West Gate Tunnel Project Preliminary Matters and Further Information
    Inquiry and Advisory Committee West Gate Tunnel Project Preliminary Matters and Further Information Request Front page 18 July 2017 Preliminary Matters and Further Information Request General Declaration: This information is sought for clarification and is sought without prejudice to the final recommendations of the Inquiry and Advisory Committee (IAC). The Western Distributor Authority (WDA) and other parties should not assume that the issues raised in this request for information are the only issues of interest to the IAC or that the IAC has particular concerns about these issues. The IAC reserves the right to seek further information as necessary throughout the course of the Public Hearing process. The issues raised in this report do not represent any, or the only, opinions of the IAC. 18 July 2017 Nick Wimbush, Chair West Gate Tunnel Project | Preliminary Matters and Further Information Request | 18 July 2017 Contents Page 1 Introduction ..............................................................................................................1 1. Background .............................................................................................................. 1 2. Purpose of this document ....................................................................................... 1 3. The IAC and Technical Advisers ............................................................................... 1 2 Traffic and Transport .................................................................................................2 1. Port Access
    [Show full text]
  • Sustainability Report Based on Financial Year 2020 Contents
    Sustainability Report Based on Financial Year 2020 Contents About this Report Message from the CEO 3 This is Port of Melbourne’s second About Port of Melbourne 4 Sustainability Report and has been prepared in accordance with the Global Reporting Initiative (GRI) Contributing to the Economy 8 Standards: ‘Core option’. This Report outlines our performance for Financial Our FY20 Sustainability Highlights 10 Year (FY) 2020, across the environmental, social, economic, and governance systems that Port of Melbourne is responsible for. Sustainability at Port of Melbourne 12 Following the publication of our first Sustainability Report in 2019, we reviewed our approach to strengthen transparency and achieve industry Our Stakeholder Community 22 alignment. Changes made include: • reporting year: Financial Year 2020 (as opposed to calendar year); Our Workplace 30 • applying Global Reporting Initiative (GRI) Standards; and • conducting a Stakeholder Materiality Assessment Our Environmental Responsibilities 37 to help guide our approach to sustainability decision-making and inform our Sustainability Strategy, supporting Framework and Policy Our Investment in Infrastructure 46 which is currently being developed. Governance 48 Reporting Boundary Our reporting boundary includes Port of Melbourne’s corporate office, located in Appendix 50 Melbourne’s Docklands District, and other Port of Melbourne-controlled external sites, assets and activities. These include our Short Road Glossary 51 maintenance facility, Port Education Centre, common user facilities, hydrographic surveying vessel, pool cars, and staff operations. It does GRI Content Analysis 52 not include our regional offices based in New South Wales or Tasmania. Electricity and water data relate to our office and Port of Melbourne- controlled external sites.
    [Show full text]
  • Trade Relocation Expanding Melbourne’S Port Capacity
    FACT SHEET Trade relocation Expanding Melbourne’s Port Capacity A key element of the creation of additional container capacity within the Port of Melbourne is the construction of a new international container terminal at Webb Dock East. To facilitate this work, shipping operations at Webb Dock East berths 3, 4 & 5 ceased on 1 July 2014. Until completed, the wharves at 3, 4 and 5 Webb Dock East will be under the control of the Corporation’s appointed maritime works contractor, McConnell Dowell, which will upgrade and modify the wharves. The closure of the three berths at Webb Dock will create the need to reallocate trade to other locations including Webb Dock West and Appleton Dock. These docks will be managed by Australian Amalgamated Terminals (AAT). Berth priority arrangements are in place to efficiently accommodate car trade in particular and ensure that Victoria continues to deliver its manufactured cars to world markets. There is also a temporary automotive laydown area, which is a secure car park for the short term storage of new vehicles, north of Williamstown Rd. Berthing of vessels at Appleton Dock and Webb Dock West are being managed in accordance with the berthing priority arrangements ‐ AAT is responsible for the allocations of all berths, Webb Dock West berth 2, Appleton Dock berths 1 (D & E) and 2 (B & C). Bass Strait coastal trade operators, Toll and SeaRoad, will continue with ‘business as usual’ during this period. Terminal operators and the Port of Melbourne Corporation are working closely to create ‘predictive schedules’ that will wherever possible minimise impacts, or at the very least, forecast ahead enabling co‐ordination across the supply chain.
    [Show full text]
  • I I I I I I I I I I I I I I I I I I I .F
    I I MELBOURNE DOCKLANDS STRATEGIC OPTIONS I I CONSULTANTS' REPORT No. I 8.2.2.5b I Ground contamination overview study I / I I I I I I I I I I DOCK LANDS I 711.5 TASK FORCE 099451 DOC strategic I options cr I . f I IN[I~iiliil~ir M0045880 I I DOCKLANDSTASKFORCE I I I I MELBOURNE DOCKLANDS REDEVELOPMENT I I Final Report on I GROUND CONTAMINATION OVERVIEW STUDY I ...~'.".~ . ~ . .~~ , I I Infrastructure Library May 1990 I I I I CAMP SCOTT FURPHY PTY. LTD. in association with I GOLDER ASSOCIATES PTY. LTD. II I I I I I I I I I I I I I I I 711.5 DOI07583 099451 DOC Melbourne docklands I strategic strategic options: options cr consultants' report f I I I I I I I DOCKLANDSTASKFORCE MELBOURNE DOCKLANDS REDEVELOPMENT I GROUND CONTAMINATION OVERVIEW STUDY TABLE OF CONTENTS I, PAGE NO. I 1. INTRODUCTION 2. STUDY SCOPE 2 I 2.1 General 2 I 2.2 Study Limitations 4 3. SITE DATA 5 I 3.1 Geology 5 3.2 Site History 7 I 3.3 Industrialalnd Commercial Heritage 11 I 3.4 Present Land-use 14 4. PRELIMINARY CONTAMINATION ASSESSMENT 15 I 4.1 General 15 'I 4.2 Impact of Land Reclamation 17 4.3 Impact of Industry 19 I 4.4 Potential Ground and Groundwater Contamination 21 5. REMEDIATION STRATEGY DEVELOPMENT 24 I 5.1 General 24 I 5.2 Factors Influencing the Selection of a Site Remediation 24 5.3 Appropriate Remediation Technologies 25 I 5.4 Remediation Requirements 27 I 6.
    [Show full text]
  • On the Road on the Paths
    On the road Hospice DLEY PARK EN E Is it legal to ride E H M DA NOLA N AV RA two abreast? ER Xavier D T Prep Are the road rules the S 3101 BVD LM Coll. Yes, but you must not ride 9 Hole Par 3 ST C KEW R same when you’re on a WA A 3101 GOLF COURSE C K YARRA McEVOY ST KEVIN SYLVA ST C more than 1.5 metres apart. TANTON GV bike or driving a car? SEE ADJOINING CITY OFYARR YARRA & BOROONDARA TRAVELSMART MAPS BAN N LA ST ST HO S BVD ST GIPP W.H.S. MA V YARRA BEND PARK RAVEN ST YTON i ST ST I Dickinson PHY H T T T C R ST YARRA T GV Yes, bicycles are classified und S Res E E E S S GIPPS S ST ST T R Is it OK to occupy a ST ST ST T r Sch O T M L L O E RD ST S S HODGSO MUR 16 R REEVES L D D E E M S 350 p OU LL T PEEL ST GLASSH I as vehicles under the law L H E D D A e S AEL ST CT ST RY whole traffic lane when Steine C S ST 684 A D LAVER ST O O . STEVENSON Sophia ST T RAVE ST S ST O PH D Yarra ST W S ST EL IT ST CR R R ROBERT ST MOLLISON FIN ST Ste H 246 (H (H L ST A HEN LIT.
    [Show full text]
  • Australia's Largest Container Port
    Australia’s largest container port Port Development Strategy 2050 The Port of Melbourne has released its 30-year Port Development Strategy 2050 (2050 PDS) for consultation; A roadmap for the future development of the Port. The 2050 PDS outlines ten key projects that will improve capacity at the Port and respond to the needs of a growing Victoria. A key part of the 2050 PDS is a transformative rail project to improve landside transport connections for industry. The 2050 PDS provides a framework for the next thirty years, yet it is also flexible to respond to industry trends and innovation and our evolving city. We welcome your feedback on the 2050 PDS. Fast facts: The Port Development Strategy 2050 has been developed in consultation with industry, key stakeholders Port of Melbourne is one of Australia’s most important infrastructure and the community, with 190 stakeholders participating in the development of the 2050 PDS. assets, and contributes $6 billion to the Victorian economy. • Victoria’s economic and population growth means more demand We are committed to working closely with industry, governments and the community to develop the Port for every day goods to support our daily lives in an environmentally, socially and commercially sustainable manner. • Container trade is forecast to grow 3.5% per annum year on year To download your copy, go to PortofMelbourne.com/facilities-development/port-development-strategy/ • Changing vessel size means existing facilities will need modifications and upgrade to accommodate longer and The closing date for comments is December 6 2019. wider vessels • Investment in rail is essential to improve landside connections • Moving containers by rail will help get trucks off local roads, particularly in the inner-west of Melbourne • Infrastructure projects can have long lead times.
    [Show full text]
  • Advice on Securing Victoria's Ports Capacity
    ADVICE ON SECURING VICTORIA’S PORTS CAPACITY Contents EXECUTIVE SUMMARY 4 LIST OF FIGURES 6 LIST OF TABLES 7 Glossary and abbreviations 8 OUR TERMS OF REFERENCE 11 OUR ADVICE 12 RECOMMENDATIONS 13 A CONSULTATIVE APPROACH 24 Consultation snapshot 25 Overview of consultation activities 26 Key themes of feedback on the evidence base 28 How consultation on the evidence base influenced our work 29 CHOOSING A NEW PORT 30 The importance of an efficient international port 33 Port capacity factors 36 Victorian commercial ports today 37 DEVELOPING OUR ADVICE 38 EVIDENCE FOR FUTURE DEMAND, CHANNEL CAPACITY AND SHIP SIZES 41 Demand forecasts 42 Channel capacity, including Port Phillip Heads 46 Changing ship sizes 54 WHEN A SECOND PORT WILL BE REQUIRED 67 Port of Melbourne supply chains 67 Port of Melbourne road and rail links beyond the port gate 73 Opportunities to expand capacity at the Port of Melbourne 78 Maximum effective capacity of the Port of Melbourne 88 Environmental and social considerations 90 Calculating the least economic cost 95 Likely development pathways for the Port of Melbourne 98 The interaction between the Port of Melbourne and the Government 105 WHERE A SECOND CONTAINER PORT SHOULD BE LOCATED 110 Hastings port concept technical evidence 114 Bay West port concept technical evidence 128 Economic evidence for where 140 Potential environmental impacts 149 Approvals and offsets 155 Social issues – major differentiators 159 Multi-criteria assessment 161 The evolution path and trigger points to investing in Bay West 167 SOURCES 176 ABOUT US 179 3 Executive summary In May 2016 the Special Minister of State requested that Infrastructure Victoria provide advice on options to secure Victoria’s future ports capacity.
    [Show full text]