47030-002: Jiangxi Pingxiang Integrated Rural-Urban

Total Page:16

File Type:pdf, Size:1020Kb

47030-002: Jiangxi Pingxiang Integrated Rural-Urban Resettlement Plan November 2018 People’s Republic of China: Jiangxi Pingxiang Integrated Rural-Urban Infrastructure Development — Pingshui River Integrated Improvement Project Updated Resettlement Plan Prepared by Xiangdong Sub-PMO of Jiangxi Pingxiang Integrated Urban and Rural Infrastructure Improvement Project for the Asian Development Bank. This is an updated version of the draft originally posted in April 2015 available on https://www.adb.org/projects/documents/jiangxi-pingxiang-integrated-rural-urban-infrastructure- development-project-xiangdong-rp. CURRENCY EQUIVALENTS (as of 3 November 2018) Currency unit – yuan (CNY) CNY1.00 = $0.1441 $1.00 = CNY6.9380 NOTE In this report, "$" refers to US dollars. This updated resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Jiangxi Pingxiang Integrated Urban and Rural Infrastructure Improvement Project Pingshui River Integrated Improvement Project Updated Resettlement Plan Xiangdong Sub-PMO November 2018 Update Description The original RP for the project, dated April 2015 included two components: (i) Pingshui River restoration project including river dredging, building new river embankment, protecting the mountain slope and building new crossing-dyke protections; and (ii) Xiangdong District wastewater pipeline network project. This updated RP includes the land acquisition and resettlement impacts associated with the implementation of component 1 above, Pingshui River restoration project, and has been prepared based on the preliminary design/construction drawing design of Xiangdong Pingshui River Integrated Improvement Project finished in August 2017. Component 2 of the original RP, on Xiangdong District wastewater pipeline network is being implemented using domestic funds and is therefore not considered in this updated RP. In the event of Component 2 being proposed for inclusion under ADB project at a later date, a Due Diligence report on the implementation process of the land acquisition and resettlement components will be undertaken, and measures to bridge gaps if any, in relation to ADB Safeguard Policy Statement (2009) requirements, will be agreed, prior to ADB’s commitment for funding. Upon completion of the preliminary designs for the Pingshui River restoration project, between August 2017 to May 2018, the Xiangdong Sub-PMO organized Xiangdong District People’s Government, Xiangdong District Land Resource Survey and Design Institute, affected town (township) governments, village committee and conducted DMS on land acquisition, housing demolition and resettlement. The updated RP is prepared on this basis. The scope of improvements to be carried out under the Pingshui River restoration project have remained the same as outlined in the original RP, and the land acquisition and resettlement impacts have been minimized through optimization of the project designs. Because of the optimization of the design plan, the width of red line decreased resulting in reduction of need for acquisition of collective lands. In addition, the utilization of state lands for the project increased by 22mu, further contributing to the reduction of collective lands and minimization of land acquisition and resettlement impacts. The preparation of the updated RP is in accordance with the preliminary project design, construction drawing design, land survey report, and field survey. The new contents include LAR impacts, compensation and resettlement policies, revision of compensation standards to reflect the current replacement costs, summary of consultations carried out during the RP updating, revised resettlement budget, and resettlement implementation plan. This updated RP shall be read in conjunction with the original RP. I Contents 1 PREPARATION DESCRIPTION ............................................................................................. 1 2 EXECUTIVE SUMMARY ......................................................................................................... 2 3 PROJECT IMPACT ................................................................................................................. 5 3.1 LAND ACQUISITION .............................................................................................................. 8 3.1.1 Acquisition of Collective Land .................................................................................... 8 3.1.2 Permanent Occupation of State-owned Land .......................................................... 13 3.1.3 Temporary Land Occupation .................................................................................... 13 3.2 AFFECTED INFRASTRUCTURE AND LAND ATTACHMENTS ...................................................... 14 3.3 HOUSING DEMOLITION ....................................................................................................... 17 3.3.1 Rural Housing Demolition ......................................... Error! Bookmark not defined. 3.3.2 Urban Housing Demolition ........................................ Error! Bookmark not defined. 3.4 AFFECTED ENTERPRISES/SHOPS ....................................................................................... 19 3.5 AFFECTED VULNERABLE GROUPS ...................................................................................... 20 4 RESETTLEMENT POLICIES AND STANDARD OF COMPENSATION .............................. 21 4.1 COMPENSATION STANDARDS ............................................................................................. 21 4.1.1 The Compensation Standards for Collective Land .................................................. 21 4.1.2 Compensation Standards for Green Crops and Attachments on the Ground ......... 22 4.1.3 The Change of Relevant Taxes Standard ................................................................ 22 4.1.4 Compensation Standard for Temporary Land Occupation ...................................... 22 4.1.5 Compensation Standard for Housing Demolition on Collective Land ...................... 23 4.1.6 Non-residential Housing Demolition ........................................................................ 25 4.2 Resettlement Policies ................................................................................................. 26 4.2.1 LLF’s Endowment Insurance ................................................................................... 26 4.2.2 Vulnerable Groups ................................................................................................... 26 4.2.3 Supporting Measures for Women ............................................................................ 27 4.2.4 Compensation Qualifications and Cut-off Date of Compensation ........................... 27 5 PUBLIC PARTICIPATION ..................................................................................................... 34 6 RESETTLEMENT PLAN ....................................................................................................... 46 6.1 RESIDENTS’ RESETTLEMENT PLAN ..................................................................................... 46 6.2 AFFECTED ENTERPRISES/SHOPS ....................................................................................... 47 7 RESTORATION PROGRAM FOR AFFECTED FARMERS’ LIVING STANDARD .............. 47 8 RESETTLEMENT FUNDS BUDGET AND MANAGEMENT ................................................ 56 8.1 CONSTITUTION OF RESETTLEMENT FUNDS ......................................................................... 56 8.2 BUDGET OF RESETTLEMENT FUNDS ................................................................................... 56 9 RESETTLEMENT ORGANIZATION ................................................................................... 600 III 9.1 RESETTLEMENT IMPLEMENTATION AND MANAGEMENT ORGANIZATIONAL ............................. 600 9.2 ORGANIZATION RESPONSIBILITY ....................................................................................... 600 10 GRIEVANCE AND APPEAL ............................................................................................. 611 10.1 GRIEVANCE AND APPEAL PROCEDURE .......................................................................... 611 10.2 RECORDING AND FEEDBACK OF GRIEVANCES AND APPEALS .............................................. 61 10.3 CONTACT INFORMATION FOR GRIEVANCE REDRESS .......................................................... 62 11 RESETTLEMENT IMPLEMENTATION ............................................................................... 62 12 CONCLUSIONS .................................................................................................................. 66 IV Table List FIGURE 1-1 SCHEMATIC MAP OF PINGSHUI RIVER INTEGRATED IMPROVEMENT PROJECT ................................................................................................................................... 2 TABLE 3-1 IMPACT SCOPE OF XIANGDONG PROJECT ...................................................... 8 TABLE 3-2 COMPARISON OF LAND OCCUPATION QUANTITY OF CONTRACTS ............. 9 TABLE 3-3 IMPACT ON ACQUISITION OF COLLECTIVE
Recommended publications
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • 1 International Standards and China's Coercive Population Policies Chinese Officials Continue to Actively Promote and Implemen
    1 POPULATION PLANNING 1 International Standards and China’s Coercive Population Policies Chinese officials continue to actively promote and implement co- ercive population planning policies which, as they are written and implemented, violate international standards. The PRC Population and Family Planning Law and provincial implementing guidelines limit couples’ freedom to build their families as they see fit by stip- ulating if, when, and how often they may bear children.2 Local im- plementing regulations across China still require that couples be married and obtain a birth permit to lawfully bear a child.3 The population planning policies of all of China’s 31 provincial-level ju- risdictions limit couples to bearing one child.4 Exceptions for cou- ples who meet certain criteria vary by province,5 and include some exceptions for ethnic minorities.6 Officials continue to coerce com- pliance with population planning targets using methods including heavy fines,7 forced abortions,8 and forced sterilizations.9 Controls imposed on Chinese women and their families, and ad- ditional abuses engendered by China’s stringent population and family planning system, violate standards set forth in the 1995 Bei- jing Declaration and Platform for Action 10 and the 1994 Pro- gramme of Action of the Cairo International Conference on Popu- lation and Development.11 China was a state participant in the ne- gotiations and adoption of both.12 Acts of official violence com- mitted in the implementation of coercive population planning poli- cies 13 contravene
    [Show full text]
  • Part II:Assessment of Conformity
    File No.: 4Q200328R.JGM0066 P1 /9 PPE TEST REPORT For Jiangxi Guoyou Medical Technology Co., Ltd Disposable protective mask Model:MSKZ-1、MSKZ-2 Prepared For : Jiangxi Guoyou Medical Technology Co., Ltd Optoelectronic Technology Industrial Park, Xiangdong District, Pingxiang City, Jiangxi Province Prepared By : China Ceprei (Sichuan) Laboratory No.45 Wenming Dong Road Longquanyi District, Chengdu, 、 Sichuan Report Number: 4Q200328R.JGM0066 Date of Test: Mar.19, 2020 Date of Report: Mar.25, 2020 File No.: 4Q200328R.JGM0066 P2 /9 TEST REPORT DECLARATION Applicant : Jiangxi Guoyou Medical Technology Co., Ltd Adress : Optoelectronic Technology Industrial Park, Xiangdong District, Pingxiang City, Jiangxi Province Manufacturer : J iangxi Guoyou Medical Technology Co., Ltd : Address : Optoelectronic Technology Industrial Park, Xiangdong District, Pingxiang City, Jiangxi Province EUT Description : Disposable protective mask Model : MSKZ-1、MSKZ-2 Remark : N/A Test Procedure Used: EN 149:2001+A1:2009 The results of this test report are only valid for the mentioned equipment under test. The test report with all its sub-reports, e.g. tables, photographs and drawings, is copyrighted. Unauthorized utilization, especially without permission of the test laboratory, is not allowed and punishable. For copying parts of the test report, a written permission by the test laboratory is needed. The test results of this report relate only to the tested sample identified in this report. File No.: 4Q200328R.JGM0066 P3 /9 Property Method Principle / Requirements Result Classification EN 149:2001+ Particle filtering half masks are classified Pass. A1:2009 according to their filtering efficiency and FFP2. Clause 5 their maximum total inward leakage. There are three classes of devices: FFP1, FFP2 and FFP3.
    [Show full text]
  • Electrification Project of Zhe-Gan Railway Public Disclosure Authorized
    ! ~~~~~~~RP213Volume 2 Electrification Project of Zhe-Gan Railway Public Disclosure Authorized (Jiangxi Section) RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Foreign-Financing Center of Ministry of Railways, PR China Public Disclosure Authorized East China Investigation and Design Institute I ~~~~under State Power Corporation May 2004 ;FILEFCwOPY Approved by: Gong Heping Examined by: Bian Bingqian Checked by: Yu Zhijian, Zhu Qiang Compiled by: Mao Zhenjun, Yu Zhijian, Zhu Qiang Xia Yunqiu, Gu Chunrong, Han Xiaojin, Li Min'an List of contents OBJECTIVES OF RESETJ'LEMENT PLAN & DEFINITION OF RESETTLEMENT TERMINOLOGY . 1 Generals ................................................................. 3 1.1 Project Background ...................................................... 3 1.1.1 Existing conditions ...................................................... 3 1.1.2 Necessity of of railway electrification ...................................................... 3 1.1.3 Significance of the project ...................................................... 5 1.2 Project Design and Design Approval .................................................... 6 1.3 Description of Project ...................................................... 7 1.4 Project Impacts ...................................................... 9 1.5 Measures To Alleviate Project Inpacts ....................................... 10 1.5.1 In project planning and design stage ..................................................... 10 1.5.2 In project implementation
    [Show full text]
  • Download 5.12 MB
    Resettlement Plan August 2019 People’s Republic of China: Jiangxi Pingxiang Integrated Rural-Urban Infrastructure Development Project—Xiangdong District Zhangli River (Dacheng- Quanhulong) Improvement Subproject Prepared by the Xiangdong District Government (XDG) and Pingxiang Project Management Office (PMO) for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ADB-financed Xiangdong District Zhangli River (Dacheng- Quanhulong) Improvement Subproject Resettlement Plan Xiangdong District Government (XDG) Pingxiang Project Management Office (PMO) August 2019 Contents 1 OVERVIEW OF THE SUBPROJECT ........................................................................................................................ 1 1.1 BACKGROUND ............................................................................................................................................................................. 1 1.2 COMPONENTS ............................................................................................................................................................................
    [Show full text]
  • KS1208H P Roduct Demonstration
    TECHNICAL DATA KS1208H P roduct Demonstration Shenzhen Kings 3D Printing Technology Co., Ltd Floor 14-15, Building 3-A, Yunzhi Science Park, Gongming Street, Guangming District, Shenzhen | China 518107 Jiangxi Kings 3D AM Tech Co., Ltd Xiabu Town, Xiangdong District, Pingxiang City, Jiangxi Province | China 337022 Material Overview KS1208H is a high temp resistant SLA resin with low-viscosity in semitranslucent color. The part can be used with a temperature around 120℃. For instantaneous temperature it is resitant to above 200℃. It has good dimensional stability and fine surface details, which is perface solution for parts requiring resistance to heat and humidity, and it's also applicable for quick mold with certain material in small batch production. Advantages Ideal Applications - High temperature resistance - Prototypes need high-temp resistance - Excellent dimensional stability - Quick mold - High strength and accuracy Technical Datasheet Liquid Properties Optical Properties Appearance Semi-translucent Dp 0.115 mm [slope of cure-depth vs. In (E) curve] Viscosity 340 cps @ 28 ℃ Ec 13.5 mJ/c㎡ [critical exposure] Density 1.14g/cm³ @ 25 ℃ Building layer thickness 0.08-0.12mm 0.08-0.12mm Mechanical Properties UV Postcure TEST ITEMS TEST METHOD NUMERICAL VALUETEST METHODS NUMERICAL VALUE Tensile Strength ASTM D 638 65MPa GB/T1040.1-2006 71MPa Elongation at break ASTM D 638 3-5% GB/T1040.1-2006 3-5% Bending strength ASTM D 790 110MPa GB/ T9341-2008 115MPa Flexural modulus ASTM D 790 2720MPa GB/ T9341-2008 2850MPa Izod notched impact strength ASTM D 256 20J/m GB/T1843-2008 25J/m Shore hardness ASTM D 2240 87D GB/T2411-2008 87D Glass transition temperature DMA, tan θ peak 135℃ 58 - 70 58 - 70 Thermal expansion coefficient(25-50℃) ASTME831-05 50 µ m/m℃ GB/T1036-89 50 µ m/m℃ Thermal expansion coefficient(50-100℃) ASTME831-05 150 µ m/m℃ GB/T1036-89 160 µ m/m℃ Recommended temperature for processing and storage of the above resin should be 18℃-25℃.
    [Show full text]
  • Wangxian, Liling
    Wangxian, Liling Wangxian, Liling (Q14195406). From Wikidata. Jump to navigation Jump to search. No description defined. edit. Language. Label. Also known as. English. Wangxian, Liling. No description defined. Statements. instance of. town in China. 0 references. official name. Index»China»Hunan»Zhuzhou»Liling»Wangxian. Too many requests for today, please try again later. You can buy this database for extended and unlimited use. Wangxian Town is an urban town in Liling City, Zhuzhou City, Hunan Province, People's Republic of China. The town is divided into 12 villages and 3 communities, the following areas: Zhongxin Community, Xinmin Community, Cinikuang Community, Lishan Village, Maqiao Village, Shutang Village, Guankou Village, Wangxian Village, Situ Village, Xiangshui Village, Sanshi Village, Shiyan Village, Shuangjiang Village, Qingtan Village, and Zhuangbu Village WangXian's both versions; Lan Wangji's singing version and Wei Wuxian's flute version from Mo Dao Zu Shi. update: I added chords for Lan Wangji's version. WangXian's both versions; Lan Wangji's singing version and Wei Wuxian's flute version from Mo Dao Zu Shi. update: I added chords for Lan Wangji's version. é”é“祖师 Mo Dao Zu Shi Grandmaster of Demonic Cultivation. Advanced search. Hunan Liling Xianfeng Chinauare Co. Ltd. Liling Xianfeng Chinauare Co. Ltd. Wangxian Town Liling City, Hunan 412200 China. Call. Call. Liling (Chinese: 醴陵; pinyin: LÇlÃng) is a county-level city and the 12th most populous county-level division in Hunan Province, China; it is under the administration of Zhuzhou prefecture-level City. Located on the middle eastern margin of the province, the city is bordered to the north by Liuyang City, to the west by Lusong District and Zhuzhou County, to the south by You County, to the east by Xiangdong District of Yichun, Shangli County of Jiangxi.
    [Show full text]
  • Minimum Wage Standards in China August 11, 2020
    Minimum Wage Standards in China August 11, 2020 Contents Heilongjiang ................................................................................................................................................. 3 Jilin ............................................................................................................................................................... 3 Liaoning ........................................................................................................................................................ 4 Inner Mongolia Autonomous Region ........................................................................................................... 7 Beijing......................................................................................................................................................... 10 Hebei ........................................................................................................................................................... 11 Henan .......................................................................................................................................................... 13 Shandong .................................................................................................................................................... 14 Shanxi ......................................................................................................................................................... 16 Shaanxi ......................................................................................................................................................
    [Show full text]
  • 47030-002: Urban-Rural Road Project From
    Updated Resettlement Plan Updated Resettlement Plan January 2017 People’s Republic of China: Jiangxi Pingxiang Integrated Rural-Urban Infrastructure Development Prepared by the Project Management Office of the Jiangxi Pingxiang Integrated Urban and Rural Infrastructure Improvement Project for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 31 December 2016) Currency unit – Chinese Yuan (CNY) CNY1.00 = $0.15 $1.00 = CNY6.95 ABBREVIATIONS AAOV Average Annual Output Value ADB Asian Development Bank ADG Anyuan District Government AHs Affected Households APs Affected Persons DMS Detailed Measurement Survey FSR Feasibility Study Report HD House Demolition HH Household IA Implementation Agency JMG Jiangxi Municipal Government LA Land Acquisition LLFs Land-Loss Farmers LCG Luxi County Government M&E Monitoring and Evaluation MLS Minimum Living Security O&M Operation and Maintenance PMO Project Management Office PMG Pingxiang Municipal Government PMTB Pingxiang Municipal Transportation Bureau RP Resettlement Plan SCG Shangli County Government WWTP Wastewater Treatment Plant WEIGHTS AND MEASURES mu – 0.006 ha 2 square meter – m NOTE In this report, "$" refers to US dollars. This updated resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • The Stock Exchange of Hong Kong Limited Takes No Responsibility For
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. (Stock Code: 603) ANNOUNCEMENT The board (the “Board”) of directors (the “Directors”) of China Oil And Gas Group Limited (the “Company”, together with its subsidiaries, the “Group”) is pleased to announce that on 8 December 2015, in order to establish a long-term and stable business cooperation relationship, 萍鄉市燃氣有限公 司 (Pingxiang City Natural Gas Company Limited*) (“Pingxiang Natural Gas”), a subsidiary of the Company, entered into a framework agreement in relation to natural gas utilization cooperation in Xiangdong District (the “Cooperation Framework Agreement”) with 萍鄉市安達生活水電氣公司 (Pingxiang City Anda Life Gas & Water Company*) (“Pingxiang Anda Life Gas & Water”) and 萍 鄉市中燁燃氣有限公司 (Pingxiang City China Natural Gas Company Limited*) (“Pingxiang China Natural Gas”), pursuant to which Pingxiang Natural Gas will supply gas for industrial and commercial as well as residential usage in Xiangdong District, Pingxiang City, Jiangxi Province, the PRC. Having made all reasonable enquiries by the Directors, Pingxiang Anda Life Gas & Water and Pingxiang China Natural Gas are third parties independent of and not connected with the Company and its connected persons (as defined in the Rules Governing the Listing of Securities on the Stock Exchange of Hong Kong Limited). In order to fulfil the safety and environmental requirements of the local government, the industrial users and commercial as well as residential users who used coke oven gas in Xiangdong District have to change to use natural gas.
    [Show full text]
  • Water Resources Deployment Model for Pingshui River Basin - 985
    Huang et al.: Water resources deployment model for Pingshui River Basin - 985 - WATER RESOURCES DEPLOYMENT MODEL FOR PINGSHUI RIVER BASIN HUANG, B. B.1,2,* ‒ NIU, J. T.2 ‒ GUI, F. L.1 ‒ ZHANG, X. H.2 1JiangXi Engineering Research Center of Water Engineering Safety and Resources Efficient Utilization 2School of Water Resources and Ecological Engineering, Nanchang Institute of Technology No. 289 Tianxiang Avenue, Nanchang, Jiangxi Province, China *Corresponding author e-mail: [email protected]; phone: +86-13698095556 (Received 28th Oct 2016; accepted 28th Feb 2017) Abstract. The reasonable deployment of water resources can reduce resources consumption, increase the output of resources and thus ensure a sustainable economic development. The Pingshui River Basin in Jiangxi Province of China with developed economy but seriously lacking in water, was chosen as the study area and the dualistic distributed hydrological model of this region was established. Then, the water resources allocation objective, basic principles, river water operation rules and priority levels for all water consumers were fixed. Also, the objective function and constraint conditions were established, and forecast the water demand from various industries. Next, the optimal deployment of water resources in Pingshui River Basin was achieved through controlling variables including the water conservancy project operation rules, the channel discharge capacity, priority rules for water consumers and simulating the transport and transformation and interaction process under the natural and artificial dual coupling conditions. The deployment results show that there is seasonal and locality water shortage in Pingshui River Basin. Finally, based on the optimal water resources deployment results, utilization and exploitation status, specific countermeasures for water resources tapping and saving were proposed to increase the output of water resources and reduce its consumption.
    [Show full text]
  • People's Republic of China: Preparing the Jiangxi Sustainable Forest Ecosystem Development Project
    Technical Assistance Final Report Project Number: 42022 April 2010 People's Republic of China: Preparing the Jiangxi Sustainable Forest Ecosystem Development Project Prepared by: AFC Consultants International GmbH, Germany For the Forestry Department of Jiangxi Province This report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design.) Asian Development Bank Preparing the Jiangxi Sustainable Forest Ecosystem Development Project (TA 7179-PRC) FINAL REPORT Report submitted by AFC Consultants International GmbH March 2010 This report was prepared at the request and with the financial support of the Asian Devel- opment Bank. The views expressed are those of the Consultants and do not necessarily reflect those of the Government of PRC, the Forestry Department of Jiangxi Province or the Asian Development Bank. Contributors Mr. Volker Kohler, Team Leader Mr. Lu Ping, Deputy Team Leader Mr. Bi Huaxing, GIS Specialist Mr. Gardette Eric, Environmental Specialist Mr. Guo, Yongli, Agricultural Insurance Specialist Mr. Indu Chandra Ram, Agricultural Insurance Specialist Mr. Ru Taoqin , Silvicultural Specialist Mr. Sun Tuohan, Environmental Specialist Mr. Wang Dehai, Social Development Specialist Mr. Zheng Shaofeng, Financial Specialist Key Data Sheet Name of project: Preparing the Jiangxi Sustainable Forest Ecosystem Development
    [Show full text]