ORIS Measure 2
Total Page:16
File Type:pdf, Size:1020Kb
ORIS Measure 2 Location of Funding County Name of Project Description of Project Project Approved Carlow Removal and replacement of existing boardwalks with gravel (2.7km), provision of additional seating, provision of additional/enhanced signage, Oak Park Forest information/safety signs /road markings Park Looped on link to Carlow town and other Oak Park Forest, Carlow Walks locations Carlow, Co. Carlow €200,000.00 Cavan Cavan Way To re-route a 2.5km section near the Upgrades & Shannon Pot, of the Cavan Way (26km) Rerouting, national way-marked trail. Section of Blacklion, Dowra Cavan Swanlinbar Beara Breifne Way Co Cavan €139,596.00 The project is the first phase of delivering a looped greenway through Dromore existing off road laneways within the Greenway, rural countryside adjoining Cootehill Cootehill, Co Cavan Cootehill town Cavan €200,000.00 Clare A universally accessible walkway/cycleway connecting the River Fergus outskirts of Ennis to the outskirts of the Clare Walk/Cycleway adjoining village of Clarecastle Ennis, Co Clare €200,000.00 The project entails the development of a series of canoe trails (4) and trail head at Trail Head and O’Briensbridge. The access and egress at Canoe Trail O’Briensbridge will be via a floating O'Briensbridge, Clare Project pontoon jetty. Co. Clare €200,000.00 Cork Extension of Gallanes Walkway to link existing walkway to Clonakilty Gallanes Technology Park and development of a Templebryan Walkway, hiking trail which is also part of the South, Clonakilty, Cork Clonakilty walkway Co. Cork €146,205.00 Trails and Development of Trails at Mallow Castle Mallow & Blueway Grounds and Blueway Facilities along the Killavullen, Co. Cork development River Blackwater at Killavullen Cork €200,000.00 Galway Continued regeneration of The Walks, specifically 3 sections from the river bend to the bank will be Loughrea, Co. Galway The Walks Project repaired/restored. Galway €200,000.00 Kerry Upgrading works to the final section of the 178km National Walking Trail – The Más an Tiompáin, Dingle Way at Más an Tiompáin near The Dingle Way, Kerry The Dingle Way Cloghane. Co. Kerry €200,000.00 This project involves the creation of a circa 5km loop walk in Ballyseedy Wood SAC by linking existing trails with a new Ballyseedy 800m long trail on the northern side of Ballyseedy, Tralee, Kerry Amenity Trail the River Lee Co. Kerry €200,000.00 Kilkenny Moat Field To complete the second and final phase Nature & of the Moat Field Nature & Heritage Heritage Trail Trail, which encompasses two fields, an within Westcourt area of 7.61ha., on the banks of the Demesne – Loop King’s River in Callan, which is located in Moat, Ballylarkin, Kilkenny 2 the southwest of County Kilkenny Co. Kilkenny €193,500.00 Woodstock Estate Trail The upgrade and restoration of 2.7km of Woodstock Development the original Victorian Estate paths, Gardens & Phase 2 opening up access from Woodstock Arboretum, Inistioge, Co. House Gardens and Arboretum, to the Inistioge, Kilkenny Kilkenny Brownsford Stream Waterfall. Co. Kilkenny €200,000.00 Leitrim Development of an attractive and safe trail for walkers and cyclists from Leitrim Leitrim Village to Sheemore Walk Village to parking accessing the historical Sheemore, Co. Leitrim and Cycle Track and scenic Sheemore Hill. Leitrim €149,400.00 Enhancement of Fowley’s Falls trail providing 3km+ sectional walks catering to users of varied abilities. The project remedies landslide block, provides car Fowley’s Falls, Fowley’s Falls parking and link path to the Organic Rossinver, Co. Leitrim Enhancement Centre. Leitrim €180,180.00 Limerick The upgrade of an existing amenity at Clare Glens including trail widening, Clare Glens wheelchair accessible trail, pedestrian Clare Glens, Amenity bridge replacement, carpark Murroe, Co. Limerick Improvements refurbishment and signage provision. Limerick €198,000.00 Longford Development of c. 2.9km trail linking the village of Newtownforbes with the Newtownforbes nearby countryside, through grassland, Newtownforbes, Longford Bog Walk bog and forest. Co. Longford €200,000.00 Phase 1 of the construction of a Ballymahon to walkway/cycleway linking Ballymahon Newcastle Woods Town with Newcastle Woods, along the Ballymahon, Co. Longford Phase 1 River Inny. Longford €200,000.00 Louth Boyne Valley This project will include a trail extension, Camino - Signage provision of signage and message boards Drogheda, Co. Louth Project to aid walkers. Louth €51,753.87 Mayo Trail improvements to the existing network of Burrishoole loop walks. Each of the four areas have a series of Burrishoole, Burrishoole Loop approved walks ranging in distance from Newport, Co. Mayo Walks 3 to 16km. Mayo €200,000.00 Trail extension to Belleek Woods, Ballina and additional section to Monasteries of Belleek Woods Mayo Monasteries Trail the Moy Greenway & Western Way Ballina, Co. Mayo €200,000.00 Meath Segregated footpath linkages with Rathmullan associated lighting from the Boyne Footpath Greenway to communities on the Rathmullen, Co. Meath Cycleway Rathmullan Road Meath €145,118.38 Monaghan Creation of a walking loop/trail from Lough na Glack to Lough na Glack through Nuremore Hotel - Lock na Glack, Ardee Road installation of 350m concrete footpath, Carrickmacross, Monaghan Walking Trail kerbing, signage and pedestrian crossing Co. Monaghan €63,957.67 Works to the Ballybay trail networks - Construction of a footpath connecting the existing footpath at Meadow View Estate to the entrance to the Ballybay Wetlands Centre off the R183. Derrynaloobinagh, Ballybay Path Reconstruction of section of pathway Ballybay, Co. Monaghan Networks around Lough Major. Monaghan €200,000.00 Roscommon Portrun Water Development of slipway to safely access and Land Lough Ree, development of an Outdoor accessible walk/cycleway from Recreation Portrunny Harbour to Crith Point and Amenity enhancement of harbour side recreation Portun, Co. Roscommon Improvements opportunities. Roscommon €200,000.00 Development of Doon Shore Amenity on Lough Key to allow for safe access to outdoor water recreation and the various islands on Lough Key and Doon Shore onwards to Lough Key Forest and Outdoor Activity Park to include improvement of Amenity, Lough access for boating, angling, swimming, Lough Key, Boyle, Roscommon Key and walking. Co. Roscommon €149,850.00 Sligo The project entails the improvement/expansion of trailhead parking facilities at the popular Benbulben Benbulben Forest, to include new Gortarowey, Co. disability and age-friendly spaces, bus Sligo Benbulben Access turning area, interpretive and directional Sligo Upgrade Project signage and landscaping. €198,000.00 Upgrading/extending the Lady Anne Walk to create a 2km continuous off- road route from Sligo town to Hazelwood, extension to create 4km Hazelwood Lady looped trail, furnishings, signage, Hazelwood Anne Walk sculptural element and promotional Demesne, Lough Sligo Upgrade Project activities. Gill, Co. Sligo €198,000.00 The project entails constructing new trail to allow re-routing of an on-road section of the existing Lough Talt Trail looped Lough Talt Trail trail to provide for a safer off-road Lough Talt, Co. Sligo Extension Project amenity Sligo €198,000.00 South Dublin Review and upgrade the existing branding and way finding signage for the Dublin Mountains Way through Kiltipper Park. Development of promotion, branding and signage strategy for the Dodder Greenway and Kiltipper Park and Kiltipper Park provision of way finding and information Kiltipper Park, South Dublin Phase 2 boards for same in Kiltipper Park. Tallagh, Dublin 24 €148,500.00 Tipperary The project involves infrastructural enhancement works to the existing Suir Blueway walking trail along the River Suir Cahir Blueway to provide a safer, more Infrastructure accessible walkway adjacent to the Cahir, Co. Tipperary Enhancement mature native Irish forest. Tipperary €200,000.00 Completion of the section of the Beara-Breifne Ormond Way walking trail from Lorrha Lorrha to Way (Lorrha to to Portumna as part of the overall Beara- Portumna, Co. Tipperary Portumna) Breifne national walking route Galway €81,900.00 Waterford Mahon Falls, Comeragh Mountain - Extension and enhancement of existing trailhead, walking trailhead and car parking facilities, trail and access walking trail maintenance and Mahon Falls, road improvement of road access/passing Comeragh improvement bays at Mahon Falls, Comeragh Mountain, Co. Waterford project Mountains, Co. Waterford. Waterford. €200,000.00 Biotechnical/ecological engineering Owenashad River revetment solution for high energy Owenashad River, bank revetment, Owenashad River where significant Ballyrafter, Lismore Co. erosion has occurred to River walkway at Lismore, Co. Waterford Waterford: Ballyrafter from recent storm events. Waterford. €47,270.00 Westmeath This project will renew a large section of Midland Amenity the outdoor infrastructure of a popular Park Outdoor public Amenity Park, with repair, Dún na Sí Amenity Recreation replacement, and development of the & Heritage Park, Infrastructure outdoor path system, equipment and Moate, Co. Westmeath Project toilet facilities. Westmeath €126,000.00 The aim of this project is to provide an extension to the existing Extension of pedestrian/cycle trail to link from Northern Cycling Cullion/Levington to Scragh Bog and to Route to Scragh regularise and expand the existing Mullingar, Co. Westmeath Bog carpark at the entrance to Scragh bog. Westmeath €169,732.00 Wexford Phase 2 will provide a walking/cycle trail from Duncannon to Dunbrody